1 | Page FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN

Transcript of FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio...

Page 1: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

1 | P a g e

FINAL 2011/16

INTEGRATED DEVELOPMENT PLAN

Page 2: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

2 | P a g e

GENERAL INFORMATION

I. Executive Committee Members

(i) Cllr R.S Mamekoa (Mayor)

(ii) Cllr M.M Manamenla (portfolio chairperson Technical services)

(iii) Cllr M.B Pholoane (portfolio chairperson Corporate services)

(iv) Cllr A. P Mohlala ( portfolio chairperson Finance)

(v) Cllr M. C Moshwana (portfolio chairperson Strategic services)

(vi) Cllr N. J Mahlake ( portfolio chairperson Community services)

(vii) Cllr S. O Serothwane ( portfolio chairperson Economic and Land

Development)

(viii) Cllr S. M Nkosi ( Deputy chairperson Technical services)

(ix) Cllr T. A Maroga (Deputy chairperson Finance)

(x) Cllr M.R Khoza (Deputy chairperson Community services)

II. Addresses

The Greater Tubatse Municipality 01 Kastania street

Box 206 Burgersfort

Burgersfort

1150

Tel: (013 231 1000

Fax :( 013 231 7467

Website: http://www.tubatse.gov.za

III. Contacts

M.F. Mokoko R.R. Molapo

Acting Municipal Manager Director Strategic Planning

[email protected] Email: [email protected]

Page 3: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

3 | P a g e

FOREWORD BY THE MAYOR

Majority of the people of Tubatse are celebrating delivery of services, whilst there are yet many

others who are still waiting.

This is as a result of the legacy of apartheid and colonial oppression which cannot be outdone

within a short period, however the ANC led government is determined to achieve the mission of

building a better South Africa, Limpopo, Sekhukhune and Tubatse for all.

Of significance were programmes and projects that responded to the following key tenets as crafted then: Institutional Development and Organizational transformation, Basic service delivery, Local Economic development, financial viability and Good Governance. Transient to the actualization of the mentioned tenets, spatial rationale demanded due attention that was intermittently observed for institutional reporting.

The IDP process took queue from key national calls to drive service delivery and economic development.

. To mention but a few these are: State of the nation’s address, turnaround strategies, outputs for

outcome nine(9) most relevant to Local Government and significant to these, community inputs from

public participation and results of the 2010 community satisfaction survey.

Key to these are the inputs amassed from the several engagements held. Few conclusions were drawn

with due acknowledgements that Greater Tubatse faces challenges related to poor Revenue collection

systems, significant Electrification backlog, Poor roads infrastructure and maintenance plans and

Limited capacity to manage waste.

The Greater Tubatse Municipal vision is, “a developed platinum city for the benefit of all.”

We believe that through this vision, this municipality will be able to build a united, no-sexist,

democratic and prosperous Tubatse.

Our 2011/16 IDP document will be utilized as a tool to realize the above stated vision and the

following key areas have been prioritized:

- Institutional development and transformation

- Basic services delivery

- Local economic development

- Financial viability and management

- Good Governance and public participation and

- Spatial rationale

We are confident of the future and believe that our relationship and partnership with the

community, Magoshi and business and all stakeholders in Tubatse should be responsive, cautious

and honest, focusing on good governance, poverty eradication and sustainable development.

Page 4: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

4 | P a g e

Working together we can develop Tubatse as South Africa’s first democratic platinum city for the

benefit of all.

I thank you.

MAYOR

CLLR R.S MAMEKOA

Page 5: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

5 | P a g e

Executive summary by the Acting Municipal Manager

The Municipal systems act has introduced the notion of integrated development planning in-order to

promote local democracy, integration of programmes and socio development for the local communities.

The Greater Tubatse Municipality has indeed for the past ten years lived to its commitments of

improving the quality of life of the people of Tubatse. A lot has been done and a lot more needs o be

done during the next five years. The 2011/16 IDP document for the Greater Tubatse Municipality is a

five year programme for the municipality and is focusing on the six local government strategic agenda

items and the national priorities for development.

Roads and other municipal infrastructure calls for adept focus and appropriate management systems

inclusive of detailed and well resourced maintenance plans. Limitations to these unfortunately

undermine elements like revenue collection, community confidence and others. The topography of

Greater Tubatse create stress to sustenance of access roads to key destinations given that mild rains

easily wash away such amenities.

The Integrated Development Plan for 2006/11 has come and gone with its successes and limitations. To

mention but a few successes, the municipality has been recognised to perform well on Expanded Public

Works programme in the past year. Amidst electricity capacity challenges and limited budget provision

over the years, 70% of households enjoy the basic amenity of their households being electrified. The

compilation of the IDP as a municipality has been acknowledged to be of good standard over the past

two years and this is incumbent upon the current and coming administration to maintain and sustain

the standard.

In summary the municipality consolidated the focus areas for the coming five years in the following

manner for which appropriate strategies are drawn and these will be subject to annual reviews - Capacity building programmes for both Councillors, Officials and Ward Committees

- Systems development and improvements

- Construction and maintenance of roads

- Constructions and maintenance of small access bridges

- Electrification and new connections to households

- Development and maintenance of sports facilities

- Refuse removal

- Capacitating and maintaining the municipal public works programme and

- Implementation of Mayor’s special programme and intensify the public participation

programme etc.

The overall budget for the 2011/12 financial year is R 250 546 970 and an amount of R 54 700 00

will be utilised as capital expenditure and R 195 846 971 for operational purposes.

I thank you.

M.F MOKOKO

Acting Municipal Manager

Page 6: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

6 | P a g e

Table of Contents SECTION 1: EXECUTIVE SUMMARY ................................................................................................. 11

1.1 Greater Tubatse Municipality ..................................................................................................... 11

1.2 Legal framework ......................................................................................................................... 12

1.2.1 Bill of Rights (The Constitution of the Republic of South Africa) ........................................ 12

1.2.2 Objects of Local Government (Section 152) ....................................................................... 12

1.2.3 Municipal Systems Act, Act 32 of 2000 ............................................................................... 12

1.3 Powers and functions of GTM .................................................................................................... 13

1.4 MEC’’S assessment reports ........................................................................................................ 14

1.5 Local Government Key Performance Areas ................................................................................ 16

1.6 National Outcomes ..................................................................................................................... 16

SECTION 2: PREPARATORY PHASE .................................................................................................. 17

2.1. 11/16 IDP processes/methodology ..................................................................................... 17

2.2. IDP Process Plan ...................................................................................................................... 18

2.2 GTM Revised IDP Process plan (2011/2012 – 2015/2016.) .................................................. 19

2.3 IDP and Budget Structures and responsibilities...................................................................... 20

SECTION 3: SITUATIONAL ANALYSIS ............................................................................................... 22

3.1 Population and Demographics ................................................................................................... 22

3.2 Special Focus Groups .................................................................................................................. 24

3.3 Spatial Analysis ........................................................................................................................... 25

3.3.1 Spatial patterns ................................................................................................................... 25

3.3.2 Roads ................................................................................................................................... 26

3.3.3 Topography ......................................................................................................................... 26

3.3.4 Land Tenure System/ Apartheid Legacy .............................................................................. 26

3.3.5 Mining Belt .......................................................................................................................... 27

3.3.6 Delimitation of Municipal wards ......................................................................................... 28

3.3.7 Conservation Areas ............................................................................................................. 30

3.3.8 Rural Settlements ................................................................................................................ 30

3.3.9 Land claims .......................................................................................................................... 31

3.3.10 Landownership ................................................................................................................ 31

3.3.11 Climate and Environmental Analysis ............................................................................... 32

3.4 Infrastructure and Basic Services Analysis ................................................................................. 40

3.4.1 Water................................................................................................................................... 40

3.4.2 Sanitation ............................................................................................................................ 43

3.4.3 Electricity ............................................................................................................................. 44

Page 7: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

7 | P a g e

3.4.4 Housing ................................................................................................................................ 48

3.4.5 Waste and Refuse Removal................................................................................................. 54

3.4.6 Roads and Storm water ....................................................................................................... 55

3.4.7 Transport ............................................................................................................................. 61

3.4.8 Cemeteries .......................................................................................................................... 63

3.5 Local Economic Development .................................................................................................... 64

3.5.1 Economic Profile of GTM..................................................................................................... 64

3.5.2 Comparative and Competitive advantages of the local economy ...................................... 69

3.6 Socio Economic Analysis ............................................................................................................. 70

3.6.1 Education............................................................................................................................. 70

3.6.2 Health and Social Development .......................................................................................... 71

3.6.3 Health facilities .................................................................................................................... 72

3.6.4 Safety and Security .............................................................................................................. 74

3.6.5 Disaster Management ......................................................................................................... 75

3.6.6 Sports, Arts and Culture ...................................................................................................... 75

3.6.7 Post Offices.......................................................................................................................... 76

3.7 Good Governance and Public Participation ............................................................................... 76

3.7.1 Communication ................................................................................................................... 76

3.7.2 Public participation ............................................................................................................. 76

3.7.3 Ward Committees ............................................................................................................... 77

3.7.4 Community Development Workers .................................................................................... 77

3.7.5 Traditional Leadership ......................................................................................................... 77

3.7.6 Intergovernmental Relations .............................................................................................. 77

3.7.7 Special focus Groups ........................................................................................................... 77

3.7.8 Audits .................................................................................................................................. 77

3.7.9 Risk management .............................................................................................................. 101

3.7.10 Fraud and Anti corruption ............................................................................................. 102

3.8 Financial Viability and Management ........................................................................................ 103

3.8.1 Municipal Sources of Revenue .......................................................................................... 103

3.8.2 Credit and Debt Control .................................................................................................... 105

3.8.3 Investments ....................................................................................................................... 105

3.8.4 Budget and Treasury ......................................................................................................... 105

3.8.5 Revenue Management ...................................................................................................... 106

3.8.6 Supply Cain Management ................................................................................................. 106

3.8.7 Asset Management ........................................................................................................... 106

Page 8: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

8 | P a g e

3.9 Municipal Transformation and Organisational Development .................................................. 107

3.9.1 Council ............................................................................................................................... 107

3.9.2 Staff Component ............................................................................................................... 108

3.9.2.1 Skills profile and needs for both Councillors and Officials ............................................ 108

3.9.3 Legal services ..................................................................................................................... 109

3.9.4 Labour relations ................................................................................................................ 110

3.9.5 Information Technology .................................................................................................... 110

3.9.6 Occupational Health and Safety ........................................................................................ 110

3.9.7 Policies and plans for GTM ................................................................................................ 111

3.9.8 Organisational Performance Management System (OPMS) and Performance Management

System (PMS) .................................................................................................................................. 112

3.9.9 Ranked needs of Greater Tubatse Municipality ................................................................ 113

3.9.10 Organogram ................................................................................................................... 115

3.9.11 SWOT ANALYSIS .................................................................................................................... 143

3.9.11.1 Economic and Land Development ................................................................................. 143

3.9.11.2 Departments: Executive Support................................................................................... 145

3.9.11.3 Financial Services ........................................................................................................... 147

3.9.11.4 Community Services Department .................................................................................. 151

3.9.11.5 Strategic Planning .......................................................................................................... 155

3.9.11.6 Technical services .......................................................................................................... 157

3.9.11.7 Corporate services ......................................................................................................... 162

SECTION 4: STRATEGY CHAPTER ................................................................................................... 166

4.1 Vision for Greater Tubatse Municipality .................................................................................. 167

4.2 Mission statements for Greater Tubatse Municipality ............................................................ 167

4.3 Values for the Greater Tubatse Municipality ........................................................................... 167

4.4 Summary of the Strategy Chapter ............................................................................................ 169

4.5 KPA 1: Institutional Development and Transformation ........................................................... 170

4.6 KPA 2: Basic Services ................................................................................................................ 171

4.7 KPA: 3 Local Economic Development ....................................................................................... 172

4.8 KPA: Financial Viability ............................................................................................................. 173

4.9 KPA: 5 Good Governance and Public Participation .................................................................. 174

4.10 KPA: 6 Spatial Rationale ........................................................................................................ 175

SECTION 5: MEDIUM TERM REVENUE AND EXPENDITURE FRAMEWORK ..................................... 176

5.1 Revenue .................................................................................................................................... 176

5.2 Expenditure .............................................................................................................................. 178

Page 9: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

9 | P a g e

SECTION 6: PROJECTS ................................................................................................................... 182

6.1 Greater Tubatse Municipal Projects & Programmes ................................................................ 182

6.2 Sekhukhune District Municipality ............................................................................................. 214

6.2.1 Water and Sanitation Projects .......................................................................................... 214

6.3 Sector Departmental Projects .................................................................................................. 217

6.3.1 Submissions from Dept.Agriculture .................................................................................. 217

6.3.2 Projects from Department of Health ................................................................................ 219

6.3.3 Projects from Roads and Transport .................................................................................. 220

6.3.4 Projects from DWAE .......................................................................................................... 223

6.3.5 Submissions from LEDET ................................................................................................... 227

6.3.6 Projects from Department of Education ........................................................................... 228

6.3.7 Submissions of Housing Projects by DLGH ........................................................................ 231

6.3.8. Submissions from Department of Environmental Affairs ................................................ 234

6.3.9 Community Works Programme Projects ............................................................................... 235

6.4 ESCOM priority list.................................................................................................................... 239

6.4.1 Villages that will benefit from Alternative Source of Energy/ None Grid/ Solar Systems 243

6.5 SUBMISSIONS FROM LOCAL MINES ......................................................................................... 245

6.5.1 Submissions from Marula mine ........................................................................................ 245

6.5.2 Submissions from Twickenham mine ................................................................................ 247

6.5.3 Submissions from Dwarsriver Mine .................................................................................. 248

6.5.4 Submissions from XSRATA ................................................................................................ 249

6.5.5 Submissions from Modikwa mine ..................................................................................... 254

6.5.6 Submissions from Der Brochen mine ................................................................................ 255

6.5.7 Submissions from Phoka Thaba Platinum mine ................................................................ 256

6.5.8 Submissions from Two Rivers mine .................................................................................. 257

SECTION 7: INTEGRATION ............................................................................................................. 258

7.1 Spatial Development Framework ............................................................................................. 258

7.2 Land Use Management Scheme ............................................................................................... 259

7.3 Integrated Waste Management Plan ....................................................................................... 259

7.4 Employment Equity Plan .......................................................................................................... 260

7.5 Workplace Skills Plan ................................................................................................................ 260

7.6 HIV/AIDS Plan ........................................................................................................................... 260

7.7 LED Strategy.............................................................................................................................. 261

7.8 Revenue Enhancement Plan ..................................................................................................... 261

7.9 Disaster Management Plan ...................................................................................................... 261

Page 10: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

10 | P a g e

7.10 Capital Investment Framework ............................................................................................ 262

7.11 Integrated Transport Plan ..................................................................................................... 262

7.12 Risk Management Plan ......................................................................................................... 262

7.13. Water Services and Maintenance Strategy (Sekhukhune District) ........................................ 263

Page 11: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

SECTION 1: EXECUTIVE SUMMARY

1.1 Greater Tubatse Municipality

The Greater Tubatse municipality was established after the Local Government elections of 2000

comprise thirty one (31) wards represented by one Ward

local Authority of which main offices are located in Burgersfort.

The municipality is a category B municipality as determined in terms of the Municipal structures Act,

Act 117 of 1998. It is a municipality with collective system as contemplated in the Act.

GTM is located north of the N4 highway, Middel

Groblersdal and South of Polokwane. The area of Jurisdiction is approximately 4

as the middelveld as it is located between the Highveld and lowveld regions. It forms part of

Sekhukhune District Municipality within the borders of the Limpopo Province.

Map 1: shows location of GTM

ECTION 1: EXECUTIVE SUMMARY

Greater Tubatse Municipality

Tubatse municipality was established after the Local Government elections of 2000

represented by one Ward Councillor per ward and is administered by a

local Authority of which main offices are located in Burgersfort.

municipality is a category B municipality as determined in terms of the Municipal structures Act,

Act 117 of 1998. It is a municipality with collective system as contemplated in the Act.

GTM is located north of the N4 highway, Middelburg, Belfast and Nelspruit, east of the N1 highway,

Polokwane. The area of Jurisdiction is approximately 4 550 km and is known

as the middelveld as it is located between the Highveld and lowveld regions. It forms part of

within the borders of the Limpopo Province.

11 | P a g e

Tubatse municipality was established after the Local Government elections of 2000. It

per ward and is administered by a

municipality is a category B municipality as determined in terms of the Municipal structures Act,

east of the N1 highway,

550 km and is known

as the middelveld as it is located between the Highveld and lowveld regions. It forms part of the

Page 12: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

12 | P a g e

1.2 Legal framework

1.2.1 Bill of Rights (The Constitution of the Republic of South Africa)

• The Bill of rights is a cornerstone of democracy in South Africa. It enshrines the rights

of all people in the country and affirms the democratic values of human dignity;

equality and freedom.

• The state must respect, protect, promote and fulfil the rights in the bill of rights.

• The rights in the Bill of rights are subjected to the limitations contained or referred for

in section 36, or elsewhere in the bill.

1.2.2 Objects of Local Government (Section 152)

The objects of local Government are, to provide democratic and accountable government

for local communities, to ensure the provision of services to communities in a sustainable

manner, to promote social and economic development, to promote a safe and healthy

environment, and to encourage the involvement of communities and community

organisation in the matters of local government.

A municipality must strive, within its financial and administrative capacity, to achieve the

objects set out in the act.

1.2.3 Municipal Systems Act, Act 32 of 2000

• Section 23 of the act stipulates that a Municipality must undertake developmentally

oriented planning so as to ensure that it strives to achieve the objects of local

government set out in section 152 of the Constitution; gives effect to its developmental

duties as required by section 153 of the Constitution and together with other organs of

state contributed to the progressive realisation of the fundamental rights contained in

section 24, 25, 26, 27 and 29 of the Constitution.

Page 13: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

13 | P a g e

1.3 Powers and functions of GTM

The following powers and functions are assigned to the GTM In terms of the Municipal

Structures Act of 1998 and the Demarcations Board:

Table1: below reflects GTM power and functions for GTM:

FUNCTION AUTHORISED PROVIDED BY

Water and sanitation No GSDM

Electricity Reticulation No ESKOM

Municipal Roads Yes GTM

Other roads (District and Provincial) No GSDM and Limpopo Department Transport

Housing No Limpopo DPLGH

Building regulations Yes GTM

Local tourism Yes GTM

Fire fighting No GSDM

Street lighting Yes GTM

Traffic and Parking Yes GTM

Trading regulations Yes GTM

Local sports facilities yes GTM

Municipal planning yes GTM

Municipal public transport Yes GTM

Storm water No GSDM

Municipal airport Yes GTM

Billboards and advertising Yes GTM

Control of liquor and food outlet and street

trading

Yes GTM

Local amenities yes GTM

Waste and Cleansing yes GTM

Page 14: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

14 | P a g e

1.4 MEC’’S assessment reports

Section 32 (1) (a) of the Municipal systems act, act 32 of 2000 mandates the municipal manager

of a municipality to submit a copy of the integrated development plan as adopted by council of

the municipality, and any subsequent amendment to the plan, to the MEC for local government

in the Province within 10 days of the adoption or amendment of the plan.

The Greater Tubatse municipality adopted its 2010/111 IDP review on the 30th

May 2009 and

was submitted to the MEC on the 05th June 2009.

Table2: below are comments from the MEC for the 2010/111 IDP review document:

FUNCTIONS FINDINGS RECCOMMENDATIONS

KPA 1. Spatial

Rationale

Analysis : spatial analysis

information indicated and hierarchy

of settlements

None

Strategies: spatial objectives are

clearly articulated

To be maintained

Projects : spatial projects indicated None

Integration : SDF and LUMS are

available

Maintain status quo

KPA 2:Infrastructure

and basic service

delivery

WATER AND

SANITATION

Analysis: Water and sanitation

challenges and backlogs are

indicated

Maintain status quo

Strategies : water and sanitation

strategies outlined

Maintain status quo

Projects : water and sanitation

projects indicated

Maintain status quo

Integration : no indication of WSDP Indication must be made that

water and sanitation issues are

addressed by Sekhukhune

District WSDP

ENERGY and

ELECTRICITY

Analysis : indication of electricity

backlogs is made

Maintain status quo

Strategies: strategies are indicated Maintain status quo

Projects : electricity and energy

projects indicated

Maintain status quo

Integration : no energy master plan

indicated

GTM must develop energy

master plan

ROADS, STORM

WATER AND PUBLIC

TRANSPORT

Analysis : indication of backlogs on

roads, storm water drainage and

public transport challenges is made

Maintain status quo

Strategies : clear indication of

strategic objectives for water, storm

water drainage and public transport

Maintain status quo

Projects : roads and storm water

drainage projects indicated

Indicate public transport

projects in the next IDP

Integration : no roads master plan Develop roads master plan

Page 15: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

15 | P a g e

FUNCTIONS FINDINGS RECCOMMENDATIONS

WASTE MANAGEMENT Analysis : waste management

backlogs indicated

Maintain status quo

Strategies : strategies indicated Maintain status quo

Projects : waste management

projects indicated

Maintain status quo

Integration : indication of

availability of IWMP

Maintain status quo

LOCAL ECONOMIC

DEVELOPMENT

Analysis : no indication of local skills

base

Indicate the skills base,

challenges and opportunities

and the number of jobs

created through LED

Strategies : LED strategic objectives

indicated

Maintain status quo

Projects : LED projects indicated Maintain status quo

Integration : LED strategy available Maintain status quo

GOOD GOVERNANCE

AND PUBLIC

PARTICIPATION

Analysis : relationship with

traditional leaders indicated

Maintain status quo

Strategies : Good Governance and

public participation strategies

outlined

Maintain status quo

Projects : Good Governance projects

indicated

Maintain status quo

Integration : no indication of public

participation plan

Develop public participation

strategy

FINANCIAL VIABILITY Analysis : indication is made on

financial standing, source of revenue

and financial policies

Maintain status quo

Strategies : financial strategic

objectives indicated

Maintain status quo

Projects : finance projects indicated Maintain status quo

Integration : 5/3 financial plans

available

Maintain status quo

MUNICIPAL

TRANSFORMATION

AND

ORGANISATIONAL

DEVELOPMENT

Analysis : skills needs indicated Maintain status quo

Strategies : municipal

transformation and organisational

development strategies indicated

Maintain status quo

Projects : organisational

development projects indicated

Maintain status quo

Integration : no institutional plans

available

Develop institutional plan

Page 16: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

16 | P a g e

1.5 Local Government Key Performance Areas

This document was prepared in relation to the Local Government Strategic agenda which are:

• Spatial rationale

• Basic service delivery

• Local economic development

• Good Governance and Public participation

• Financial viability

• Institutional development and Transformation

1.6 National Outcomes

There are 12 National Outcomes as approved by the National Government. This document

focuses mainly on the National Outcome Number 09 which is more related to Local Government

operations.

• Quality basic education

• A long and healthy life for all South Africans

• All people in South Africa are and feel safe

• Decent employment through inclusive economic growth

• An efficient, competitive and responsive economic infrastructure network

• Skilled and capable workforce to support inclusive growth path

• Vibrant, equitable, sustainable rural communities contributing towards food

security for all

• Sustainable human settlement and improved quality of household life

• Responsive, accountable, effective and efficient local government system

• Protect and enhance our environmental assets and natural resources

• Create a better South Africa, a better Africa and a better world

• An efficient, effective and development orientated public service and an

empowered, fair and inclusive citizenship.

Page 17: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

17 | P a g e

SECTION 2: PREPARATORY PHASE In order to ensure certain minimum quality standards of the IDP process and Proper co-

ordination between and within the spheres of government, the Preparation of the planning

process must be regulated in terms of the Municipal Systems Act, 2000. Following is summary

of IDP processes which GTM undertook during the development of the 2011/16 IDP document.

2.1. 11/16 IDP processes/methodology

2.1.1. Analysis phase

During this phase, the municipality conducted a desk top analysis where by researches or

information was collated through internet and other relevant sources. A report was then

developed and the Municipality constituted a team to scrutinise the report. The information

was then compiled into a document and was submitted to council for approval and was then

used to consult with various stake holders for inputs and or comments.

2.1.2. Strategy phase

The Greater Tubatse Municipal strategic planning session was fully internally facilitated. The

Executive Committee and Management of the Municipality formed a team that attended the

session and was held in the municipal building in Burgersort town.

Summary of the situational analysis was developed whereby key problems were identified and

presented to the session and a matrix was employed to analyse the information

This is the phase whereby the Municipality develops Vision statement, mission statements,

objectives, strategies etc. During this phase the Municipality also considers the relevance and

applications of National policy guidelines in the local context e.g the Local government strategic

agenda, making sure that the government outcomes are built in the municipal strategies,

considering the provincial policies like Limpopo economic growth and development plan etc.

2.1.3. Project phase

Projects and programmes were formulated and elementary costing exercise was conducted

during this phase.

Projects from Sector departments, mining houses and other stakeholders were presented

during this phase for alignment.

2.1.4. Integration phase

During this phase, projects are agreed upon and integrated programmes for the projects were

identified.

Page 18: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

18 | P a g e

2.2. IDP Process Plan

Section 28(1) of the Local Government Municipal Systems act, Act 32 2000 stipulates that each

Municipal Council, within a prescribed period after the start of its elected term, must adopt a

process set out in writing to guide the planning, drafting, adoption and review of its integrated

development Plan.

In responding to the above statutory obligation, the Greater Tubatse Municipality adopted the

process plan for the drafting and adoption of the 2011/12-2015/16 IDP document on the 31st

August 2010 as resolution number A115/2010

Table3: below is the process plan for the drafting and adoption of the 2011/12-2015/16 IDP:

PLANNING ACTIVITY RESPONSIBLE TIME SCHEDULE

PHASE 1 : ANALYSIS

Table time schedule outlining deadlines Strategic dept. August 2010

Establish committees and forums Strategic dept. August 2010

Compilation of existing information Strategic dept September 2010

Community and stakeholder analysis Strategic dept September 2010

Reconciling existing information and community stakeholder

analysis

Strategic dept September 2010

Municipal wide analysis All September 2010

Spatial analysis ELD and

strategic dept

October 2010

Socio economic gender differentiation Strategic dept. October 2010

In-depth analysis of priority issues Strategic dept October 2010

Consolidation of priority issues analysis Strategic dept. October 2010

PHASE 2 : STRATEGIES

PLANNING ACTIVITY RESPONSIBLE TIME SCHEDULE

Vision All October 2010

Working objectives All October 2010

Strategic guidelines All October 2010

Creation of conditions for public debate on analysis Strategic dept.

and Executive

support

November 2010

PHASE 3 :PROJECTS

PLANNING ACTIVITY RESPONSIBLE TIME SCHEDULE

Formulation of IDP steering committee Strategic dept November 2010

Establishing preliminary budgets Strategic dept

and Finance

November 2010

Design project and programme proposals All November 2010

Involvement of project proposals All November 2010

Setting indicators for objectives All November 2010

Cost/budget estimates sources of financing All November 2010

PHASE 4 :INTEGRATION

TIME SCHEDULE RESPONSIBLE TIME SCHEDULE

Screening of draft project proposals All December 2010

Integrating projects and programmes Strategic dept December 2010

Page 19: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

19 | P a g e

PLANNING ACTIVITY RESPONSIBLE TIME SCHEDULE

Integrating sector programmes Strategic dept December 2010

5 year capital investment programme All December 2010

Integration of sector plans in the IDP All January 2011

Performance management indicators All February 2011

PHASE 5 : APPROVAL

TIME SCHEDULE RESPONSIBLE

PERSON

TIME SCHEDULE

Adoption of draft IDP by council Council March 2011

Providing opportunity for comments from the District,

Provincial, and National Government

Council April 2011

Providing opportunity for comments from the IDP

representative forum

All April 2011

Providing opportunity for comments from the public All April 2011

Incorporate comments from IDP Representative forum, Public,

District, Provincial and National Government.

Strategic dept April 2011

Final adoption of IDP by Council Council May 2011

Submission of the final IDP to District, Province and National

Government

Strategic ept June 2011

2.2 GTM Revised IDP Process plan (2011/2012 – 2015/2016.)

Circular No: 54, issued by COGTA, mandated all municipalities to revisit their IDP/Budget

process plans due to the Local Government elections scheduled for May 2011.

The Greater Tubatse Municipality therefore revised its process plan to comply with the above

stated circular and below is the revised process plan for GTM:

DATE ACTIVITY RESPONSIBILITY

26th January SDBIP Adjustment (ELD, Finance,

Technical and Strategic.

Strategic

28th January Finalize Adjustment AMM

29th January Draft outstanding PA’S Executive Support

31 Jan – 01 Feb Strategic Planning session (2nd phase) Strategic Dept.

02nd – 10th February Consolidate Strategic planning report

in doc.

Strategic Dept.

03rd

February Audit Committee meeting AMM

15th

February Possible Special ExCo Executive Support

17th

February Economic Growth Interrogative

Session

ELD

25TH February Council Meeting ( approval of Draft Executive support

Page 20: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

20 | P a g e

DATE ACTIVITY RESPONSIBILITY

IDP/Budget

01st Mar – 31st March Public Participation Executive support/ Strategic

Planning

21st

April Special ExCo (IDP/Budget) Executive Support

28th

April Special Council (IDP/Budget) Executive Support

09 May Submission of final documents to MEC Strategic Dept.

2.3 IDP and Budget Structures and responsibilities

The 2011/16 IDP process plan requires the Municipality to establish forums and committees with

different responsibilities. The Committees will be responsible for the day to day monitoring of the

development of the IDP with special emphasis on technical matters whereas on the other hand

the IDP structures will be used as a vehicle during the consultation processes.

Table4: below reflects IDP structures and respective responsibilities:

STRUCTURE RESPONSIBILITIES

Municipal council - Consider and adopt a process plan

- Consider, adopt and approve the IDP and budget

Executive committee chaired by the

Mayor

- Decide on the process plan

- Be responsible for the overall management, co-

ordination and monitoring of the process and

drafting of the IDP, or to delegate this function to

Municipal Manager

- Approve nominated persons to be in charge of

the different roles, activities and responsibilities

of the process and drafting.

Ward councillors - link the planning process to their constituencies

or wards

- Be responsible for organising public consultation

and participation

- Ensure that the annual business plans and

municipal budgets are linked to and based on the

IDP.

IDP Manager - Prepare the process plan

- Undertake the overall management and co-

ordination of the planning process

- Ensure that all relevant actors are appropriately

involved

- Nominate persons in charge of different roles

- Be responsible for the day-to-day management

of the drafting process

- Ensure that the planning process is participatory,

strategic and implementation orientated and is

aligned with and satisfies sector planning

requirements

Page 21: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

21 | P a g e

- Respond to comments on the draft IDP from the

public, horizontal alignment with other spheres of

government to the satisfaction of the Council

- Ensure proper documentation of the results of the

planning of the IDP document, and

- Adjust the IDP in accordance with the MEC for

Local Government’s proposals

Even if the Municipal Manager delegates some of the

functions to the IDP Manager, he or she is still

accountable for the entire process.

STRUCTURE RESPONSIBILITIES

Heads of Departments and Officials/

Steering committee

- Provide relevant technical, sector and financial

information to be analysed for determining

priority issues

- Contribute technical expertise in the

consideration and finalisation of strategies and

identification of projects

- Provide departmental operational capital,

- Budgetary information

- Responsible for preparing amendments to the

draft IDP for submissions to municipal council for

approval a

IDP representative forum - Represent the interests of their constituencies in

the IDP process

- Provide an organisational mechanism for

discussion, negotiation and decision making

between stake-holders and the municipality

- Ensure communication between all stake-holders

representatives, and

- Monitor the performance of the planning and

implementation process

IDP Representative forum code of conduct

- Meeting schedules must be adhered to

- Agenda facilitation and documentation of

meetings

- Align their activities with the responsibilities of

the forum as outlined in the IDP

- Regular reporting to constituencies

- Require majority for any issue to be resolved

Page 22: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

22 | P a g e

SECTION 3: SITUATIONAL ANALYSIS

3.1 Population and Demographics

The population statistics for Greater Tubatse Local Municipality vary greatly depending on the

source of information used. According to the Community survey conducted by Statistics South

Africa, 2007, the total population of this municipality is approximately 343 468 with 66 611

households which makes Greater Tubatse Local Municipality a municipality with highest

population in the District. It also appears from 1996 to 2007 community survey results that

there has been a positive population growth in most of the local municipalities

Table 5: Population figures. Source: (Stats SA CS 2007)

Municipality Population

1996

% Population

2007

%

Makhuduthamaga 267 951 30 262 726 24.4

Greater Tubatse 228 531 26 343 468 31.4

Elias Motsoaledi 217 198 24 247 488 22.6

Greater Marble Hall 95 911 11 124 510 11.4

Fetakgomo 83 947 9 112 232 10.2

Sekhukhune District 893 538 100 1 090 424 100

Table 6: below indicates population by gender and age: Source: (STATSA CS 2007)

AGE MALE FEMALE Grand Total 0 – 4 22878 21999 44877 5 – 9 20271 22517 42788 10 – 14 22440 23354 45794 15 – 19 19349 19811 39160 20 – 24 15907 19112 35019 25 – 29 13245 14505 27750 30 – 34 10667 11582 22249 35 – 39 7324 8828 16152 40 – 44 6076 9519 15595 45 – 49 4952 7109 12061 50 – 54 4180 6448 10628 55 – 59 3241 3993 7234 60 – 64 2552 4075 6627 65 – 69 2256 3015 5271 70 – 74 1484 3086 4570

Page 23: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

23 | P a g e

AGE MALE FEMALE Grand Total 75 – 79 1124 2618 3742 80 – 84 362 1322 1684 85+ 355 1911 2266 Grand Total 158663 184804 343467

The projected population growth within the growth points over the period 2005 to 2015 shows

that it will be more than double. This will have far more serious implications for the demand for

services in the Municipal area; this is due to the mining activities taking place around the area.

Table 7: below indicates projected population growth in some areas of the Municipality:

AREA 2005 2010 2015

Burgersfort 13 389 24 525 28 431

Steelpoort 4 015 9 845 11 414

Ohrigstad 1 313 2 115 2 621

Total 18 717 36 485 42 466

The age group below 18 years comprise approximately 51% of the population, meaning the population is

largely young. The female ratio is almost equal at the age of between 0 and 17 years. This substantially

changes when comparing male-female distribution in the economical active age cohorts, i.e. 19-65 years

where there are more women.

Table 8: below indicate age cohorts: Source: (STATS CS 2007)

AGE GROUP MALE FEMALE TOTAL PERCENTAGE

0-17 67 895 68 990 136 885 51%

8-64 49 252 70 351 119 603 44%

65+ 4 182 9 446 13 627 5%

Total 121 329 148 787 270 116 100%

Table 9: below indicates language frequently spoken in Households Source: (GTM households Survey

2007)

English Afrikaa

ns

IsiXhos

a

IsiZulu Sepedi Sesotho SiSwat

i

Xitsong

a

Tshivend

a

Others

207 340 224 532 46 592 572 1864 822 38 406

Page 24: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

24 | P a g e

3.2 Special Focus Groups

According to the survey conducted by the Greater Tubatse municipality in 2007, there are

various focus groups which the municipality has identified and needs to put more effort on.

Statistics for the Focus groups such as youth, women and disabled were developed and the

following has been recorded:

Table 10: (Source STATSA survey 2007)

Male Female

Age

gro

up

s

Sig

ht (b

lind

/se

ve

re v

isu

al lim

ita

tion)

Hea

rin

g (

de

af

Com

mu

nic

atio

n (

sp

ee

ch im

pa

irm

en

t)

Ph

ysic

al (n

ee

ds w

he

elc

hair

Inte

llectu

al (s

eri

ous d

ifficu

ltie

s in

lea

rnin

g)

Em

otio

na

l (b

eh

avio

ura

l

Mu

ltip

le d

isab

ilitie

s

Sig

ht (b

lind

/se

ve

re v

isu

al lim

ita

tion)

Hea

rin

g (

de

af

Com

mu

nic

atio

n (

sp

ee

ch im

pa

irm

en

t)

Ph

ysic

al (n

ee

ds w

he

elc

hair

Inte

llectu

al (s

eri

ous d

ifficu

ltie

s in

lea

rnin

g)

Em

otio

na

l (b

eh

avio

ura

l

Mu

ltip

le d

isab

ilitie

s

To

tal

0 - 4 - - - 31 76 142 - 5 29 - - - - - 283

5 - 9 39 69 66 211 69 - - - - - 123 - 70 - 647

10 - 14 92 72 35 - 70 161 - 165 - 13 198 54 - - 860

15 - 19 - 42 61 23 - 42 42 60 - - - 54 - - 324

20 - 24 - - 67 46 72 64 - 62 123 34 176 111 138 - 893

25 - 29 - - 58 124 89 18 - - - 70 185 68 - - 612

30 - 34 115 178 58 144 44 54 - - 85 - 126 60 125 42 1031

35 - 39 127 - - 169 - 219 - 59 - - 165 - 68 - 807

40 - 44 112 - 62 119 - 101 - 161 59 - 42 - - - 656

45 - 49 - - - 147 - - 42 123 61 - 201 84 34 - 692

50 - 54 62 - - 85 54 - - 175 - - 95 - 73 - 544

55 - 59 67 42 - 62 - 204 - - - 59 282 - - - 716

60 - 64 198 - 121 133 - - - - - - 42 - - - 494

65 - 69 143 59 - 78 - - - - - - 42 - 73 - 395

70 - 74 40 - - 13 - 31 - 144 - - - - - - 228

75 - 79 - - - - - - 42 - - - 35 - - - 77

80 - 84 - - - - - - - 97 22 - - - - - 119

85 + - - - - - - - - 104 - 77 - - - 181

Total 995 462 528 1385 474 1036 126 1051 483 176 1789 431 581 42 9559

Page 25: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

25 | P a g e

3.3 Spatial Analysis

3.3.1 Spatial patterns The spatial patterns of the Greater Tubatse Municipality are shaped by 4 features, which

collectively create a distinct spatial character of the municipality, namely:

- Roads

- Mining belt

- Topography

- Apartheid tenure arrangements

Map 2: indicates structuring or development settlements

Page 26: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

26 | P a g e

3.3.2 Roads

These are the most decisive structuring element of the municipality with three major corridors

forming the central nerve system of the municipality along which major spatial activities are

taking place, namely:

(a) Dilokong and Burgersfort (R37) Corridor

(b) Stoffberg (R555) Corridor; and

(c) Ngwaabe Corridor to Jane Furse

(d) The Hoedspuit (R36) Corridor

The major roads either allow formation of nodes or settlements at certain appropriate points

along the road which become an anchor of spatial development agglomeration, e.g.

Burgersfort, Ohrigstad and Steelpoort or smaller settlements such as Kgautswana, Alverton,

Penge, etc. or a continuous band of spatial development along a longer road section, e.g.

settlements between Mecklenburg and Driekop and Burgersfort or along the Ngwaabe

Corridor.

3.3.3 Topography

The GTM area is highly mountainous hence development occurs mostly in valleys. Settlements

sizes are small and scattered due to extensive broken terrain. In fact the ridges and the

mountains form linear dividers between the settlements. “In certain areas the topography is

very steep creating mountainous terrain which is impossible for inhabitation. The ridges

further divide the municipal areas creating pockets of homogenous compositions, which

determine growth and development potential” (GSDM: Central Tubatse-Driekop, Praktiseer

and Burgersfort: Trends Report and Detail Development Plans; )

The terrain dictates that larger settlement development occurs mainly in flat, low lying areas

in-between the mountain ranges. Generally the roads run at the bottom of the basin/ valleys.

It is therefore not surprising that the major roads, i.e. R555, R37 and R36 and Jane Furse/

Ngwaabe road) for most part run parallel to rivers. The position of cross-link roads is dictated

by topography that is flatter to allow the road to pass through at reasonable flat grades.

Where these roads passes through wide basin, particularly in rural hinterlands, an array of

settlements has grown around these major roads. In other words there is clustering of series

of settlements for almost the entire length of the road, e.g. Mecklenburg-Driekop (R37),

Mapareng -Tswenyane (R36) and Mampuru to Eerste Geluk (parallel toR555). There is hardly

undeveloped land between these settlements.

Even the scattered rural villages have located within more developable basin almost parallel to

mountain range. The central spine road (normally the bus and a taxi route) usually runs along

the flatter alignment in the basin. Generally the settlements are linear in form as they are

bound by the undevelopable ridges on either side of the access through-road, usually located

on low-lying grounds adjacent to a stream.

3.3.4 Land Tenure System/ Apartheid Legacy

The apartheid policies expected African people to settle permanently only in demarcated

areas of the former Lebowa territory (i.e. scattered rural villages) while white people settled in

the former Transvaal provincial area with few very compact settlements/ towns (Burgersfort,

Steelpoort & Ohrigstad). Land allocation procedures led by the tribal authorities myriad of

small settlements, further exacerbated by lack of formal settlement planning in former

Lebowa government.

There is a clear and distinctive divide and pattern between the southern and northern areas of

the municipality (with the R555 road as a buffer/ boundary). The southern part comprises

mainly privately owned farms with intensive commercial agriculture and a few compact

towns/ settlements (Burgersfort, Steelpoort & Ohrigstad).

Page 27: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

27 | P a g e

To the contrary, the northern part comprises mainly farms owned by the National

Government of the Republic of South Africa, the Limpopo Provincial Government and

communities, with very few/ scarce incidences of private land ownership (recently by mines).

These areas are often characterized by scattered settlements as already explained. There is

also an evident distinction between these two areas in terms of socio-economic development

(an apartheid legacy of separate development).

The continuation of historic pattern of ownership of land and current use makes it very

difficult to reverse or restructure the settlement and spatial patterns.

3.3.5 Mining Belt

The eastern limb of the Bushveld Igneous Complex (mining belt) is emerging as important

structuring element of the municipality’s spatial development, which will be increasingly

dominant in future. The mining activities will affect mainly the western quadrant of the

municipality. It is expected that retail and service businesses will respond to the opening of

mines and the development of housing by also locating close to these areas. In time, this may

eventually alter the current fragmented spatial pattern by creating few large urban

settlements, if the expected scale of mining activities materialise.

Map 3: indicates mining belt development

Page 28: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

28 | P a g e

Challenges facing land use in GTM

Currently the GTM has no unified land use management system across its municipal area.

Historically parts of the GTM area fell into self- governing territory of Lebowa and province of

Transvaal. The apartheid laws resulted in different land use and ownership regulations being

applicable in the two areas.

The Black Laws Amendment Act 56 of 1944 specifically excluded the application of the provincial

townships ordinances in self governing territories. “Instead, separate regulations regarding

township establishment and development in the urban areas were published in terms of the

Proclamation R293 of 1962 entitled Regulations for the Administration and Control of Township

in Black Areas promulgated in terms of the Black Administration Act 38 of 1927 and

Development Trust and Land Act 18 of 1936” (p102, van Wyk, Planning Law,1999). Evidently

Praktiseer, Mecklenburg A and B, and Ga-Mapodile were established in terms of this

proclamation. Although Proclamation R293 has no elaborate land use management system but

it does make provision to alter the building and use of various facilities within the township at

the discretion of township superintendent, or Commissioner.

The rest of the traditional settlements and the land within former Lebowa territory were

regulated in terms of Proclamation R188 of 1969 called Black Areas Land Regulations. This

proclamation “… contains measures to designate areas for arable and residential allotment, to

control, maintain and develop such land and to issue occupational permits (Permission to

Occupy Certificates) for residential, business, church, school and arable allotments” (p16,

Greater Tubatse Spatial Development Framework,2005). The proclamation however contains no

land use planning provisions.

Consequently development in these areas of the Greater Tubatse Municipality relies on other

laws such as Development Facilitation Act, Proclamation R293 of 1962, Less Formal Township

Establishment Act, etc. that allows specific use zones to be created through township

application.

Development within the former Transvaal province part of GTM was regulated though the

Town-Planning and Township Ordinance 1986 (Ordinance No 15 of 1986). In terms of this

Ordinance a Town-Planning scheme (Greater Tubatse Land Use Scheme 2006) for Burgersfort,

Steelpoort and Ohrigstad was promulgated, which provide detailed measures to manage land

uses within each scheme area. The application of this scheme generally excludes rural areas.

In order to overhaul the fractured or non-existent land use management in various parts of the

municipality it is required that the municipality must prepare a Land Use Management System

that will cohere regulation and facilitation of land development across the municipal area under

a single system of management. This will afford the opportunity to develop appropriate land

development management procedures in the rural areas (former Lebowa territory) within the

same legal framework as the more developed urban nodes like Burgersfort and Steelpoort.

A draft document in this regard has been developed and is undergoing legal review before

promulgation.

3.3.6 Delimitation of Municipal wards

During the past 10 (ten) years, Greater Tubatse Municipality was consisting of 29 wards and is

currently having 31 (thirty one). This was published in June 2010 in terms of the Local

Government Municipal Structures Act, 1998 (Act No: 117 of 1998) and the Municipal

Demarcation Board notice 186 of 2010.

Page 29: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

29 | P a g e

The Municipality consists of approximately 166 villages, 5 formally proclaimed townships with

180 voting stations.

Map 4: indicates wards for GTM

Page 30: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

30 | P a g e

3.3.7 Conservation Areas

The largest proportion of land in GTM area (probably in excess of 80%) is natural environment.

The mines, agriculture and urban development have barely encroached on these wilderness

areas. The wilderness generally comprises of bushveld and sparse grassland in limited parts of

GTM. It is important to preserve the wilderness for posterity and harvest plant and animal

species in a manner that preserve the habitat.

The objectives of protecting habitats for animal and plant species occurring naturally in the

wilderness area should be conscious of subsistence requirements of local population and

income generating tourism. The GTM area consists of vast plains of bushveld, the rugged

topography, natural features such as rivers, an abundance of wildlife, bird species and flora. The

expansive vacant land in the south and east is mainly owned by private individuals and in the

north and west by tribal authorities. An opportunity exists to revive and re-introduce indigenous

species that were previously endemic to the area.

Use of natural and biological resources will create or augment destinations for nature based

tourism. Environmental investigations will be necessary before specific habitats are set-aside for

such purposes.

Unfortunately no environmental investigation has been conducted to determine whether any of

the Red Data species area is found in these areas.

These high-lying areas should be conserved to retain the natural vegetation and characteristics

with the aim of accommodating possible future tourism. The extensive natural environment

provide opportunity for tourism activities including caravan parks, hiking trails, mountain biking,

sky diving, game parks, overnight accommodation, country estate, etc. There are couple of

cases where the environment has been kept in its natural states through a number of private

game and nature reserves.

Two areas in the municipal area have been identified as highly sensitive in terms of

environment. The first lies on the northern boundary of the region along the Olifants River

stretching from the villages of Maretlwaneng and Makoloto up to Morathong along the R527 to

Hoedspruit. The area is endowed with forestry, deep gorges and waterfalls and has been

identified as the very sensitive environment area due to these features. The second is the area

bordered by the R36 to Hoedspruit on the west, by R532 to Bouke’s Luck on the south and the

study area boundary on the north east has been identified as one of the most sensitive area.

3.3.8 Rural Settlements

There are two categories of rural settlement envisaged in GTM viz the traditional homesteads in

villages and the country estate (see definition below) in aesthetical pleasant locals particularly

around Ohrigstad. The rural settlements are those settlements that are occurring outside the

provincial, district and municipal growth points and population concentration points (first order

settlement) as articulated in the Limpopo Spatial Rationale, 2002. Essentially the distinguishing

characteristic of the rural and urban settlements is that in the former it is expected that the

households are to some degree for subsistence, economic or leisure reasons dependent on land

livestock and wildlife.

The population concentration points i.e. Penge, Batau/Praktiseer, Ga-Masha and Ga-Masete are

functional part of urban areas and design of the built form reflect this though some households

may still till land and keep livestock. Whether or not the ploughing of land and animal

husbandry is allowed, for purposes of settlement planning such settlements should be treated

as extension of urban settlements as the overwhelming majority of households earn their living

through employment in urban centres. All large scale and denser housing projects such that

they require urban engineering services should be located in growths points and to a very

Page 31: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

31 | P a g e

limited extent in population concentration points. Consequently these settlements should

receive priority in terms of bulk infrastructure.

3.3.9 Land claims

Approximately 50% of the land in Greater Tubatse Local Municipality is under claims. The claims

are almost exclusively in rural areas that were part of the former Lebowa territory. Only one

claim is found in near an urban area, and that is, in Steelpoort with none in Burgersfort and

Ohrigstad. In the first quarter of 2007 the records of the Limpopo Land Claims Commissioner

indicated that, out of 52 land claims that were lodged in GTM, 13 have been gazetted and 39

are in the process of being gazetted. The offices of the Land Claims Commissioner in Greater

Tubatse in Limpopo were investigating the claims, as required in terms of the Restitution Act.

Nearly 48 % of land claims have been submitted by the communities, 24 % by tribal authority,

and 18 % by individual persons (private claimants). Successful land restitution is sometimes

undermined by the profile of beneficiaries who, mainly as a result of our colonial and racist past,

have limited financial resources, skills, etc required for productive utilisation of the land

resources once handed over to them.

3.3.10 Landownership

The landownership investigation was conducted through Aktex (Deeds Web) in large farm areas

and the Provisional Valuation Roll was used in formally laid out settlements to establish trends

discussed below

Table 11: indicated Land Situated Within Former-Lebowa Boundary

No. Of Farms Extent Ownership %

35 69320.2347 Government of Lebowa SA

Development Trust Tribal

Land

56

25 43251.6938 RSA 37.4

7 11793.6509 Private 9.3

67 124365 100

Table 12: Properties within former “whites” Republic of South Africa

No. Of Farms Extent Ownership %

15 16208.0890 Government of Lebowa SA

Development Trust Tribal

Land

12

13 17404.8141 RSA 13

21 103343.2545 Private 75

49 136955.1576 100

The landownership within the former Lebowa area is predominantly in the hands of the State,

Government of Lebowa, SA Development Trust and a small proportion is privately owned. Some

townships of GTM are owned by national government as a result of pre-1994 constitutional

Page 32: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

32 | P a g e

negotiations that saw national government as the successor in-title of all homeland

government’s assets. However, some of these properties have been transferred to the local

authority that is an appropriate level of government where they should be managed, viz

Praktiseer Extension 1 and 2, Ga-Mapodile and Mecklenburg.

Penge on the other hand is not proclaimed as a township. It is owned by the provincial

government of Limpopo and there are processes underway to formalise it since 2001/2002 to

date.

In the township of Tubatse Extension 1 the erven have been transferred to residents. However

many residential erven; some vacant and others built up; business erven, social facilities e.g. for

churches, police stations, schools, crèches, community halls etc, are owned by the Limpopo

Province government. Ordinarily the management of most social facility erven is a municipal

function in terms of the constitution. This anomaly should therefore be corrected.

The balance of land within the former Lebowa territory that comprise of villages settled by

various tribes or clans and vast unoccupied woodlands is owned by Republic of South Africa,

Government of Lebowa, South African Development Trust and few traditional authorities.

Residents on the rural/ peri-urban settlements are allocated the land parcel that they are

settled upon by traditional authorities. They neither have formal title deed nor any other real

right document to the land they occupy. Theoretically these cause uncertainties as to the rights

of the occupiers of the land who invariably improve it at their cost but cannot dispose their

properties to whomever by transferring title deeds at Deeds Office.

Challenges facing spatial development

• The municipality does not own strategic or potential land in the area

• Majority of the land is under land claim

• Traditional Leaders are responsible for land allocation especially in the rural villages

• The area is mountainous and is full of dongas

• Scattered settlements poses threat to land development

3.3.10.1 Settlement Patterns

A stark contrast exists in the spatial structure of the GTM. These areas are associated with the

division of the apartheid planning policies of the past, i.e. the ‘former Lebowa homelands‘. The

northern part is very rural composition and subsistence-based, whilst the southern part is far

more developed and has a more diversified economy, see map below.

The map above shows the general land use patterns of the municipal area. The existing spatial

patterns of the GTM area is dispersed with limited hierarchy of functional order. The majority of

settlements in the area have low density per km². The majority of villages are located far apart

which, of course, makes the provision and maintenance of services very costly.

These villages are furthermore too small to attain the economic thresholds required to provide

social facilities in a cost-effective manner. Poor co-ordination amongst the relevant government

departments, both on local and provincial levels, further aggravates the situation as there is no

hierarchy or functional order in which priority areas are identified

3.3.11 Climate and Environmental Analysis

3.3.11.1 Climate The weather conditions for Steelpoort, Ohrigstad and Burgersfort region as a whole is a sub-

tropical by nature and conducive to agricultural production. The summer tend to be extremely

Page 33: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

33 | P a g e

hot and humid with temperatures often exceeding 35 degrees Celsius between the months of

October and march, while the winters tend to be warm during the day and cool to cold at night

and in the early mornings.

3.3.11.2 Geology The GTM is situated on the eastern side of the Bushveld Igneous Complex and the Transvaal

geological system and is therefore underlain by both sedimentary and volcanic rock formations.

Owing to the geological composition, the area is characterized by steep rising mountains, which

are linked by undulating river valleys.

Minerals are found in abundance in the Bushveld Igneous Complex, which has seen the

establishment of several mines in the area. The most fertile soils in the region are to be found

in the lower lying areas of Burgersfort and Steelpoort, which are deep, well-drained and

characteristic of deep sandy/loamy soils of exceptional quality. These soils are suitable for most

agricultural purposes.

3.3.11.3 Settlements Hierarchy

The Limpopo Spatial Rationale, 2002 and the Limpopo Growth Development Strategy identify

hierarchy of settlements for the Limpopo Province, which provide a framework to analyse

spatial development trends in Greater Tubatse Local Municipality. The settlement hierarchy is as

follows:

• First order settlements (Growth points)

• Second order settlements (Population concentration points)

• Third order settlements (Local Service Points)

• Fourth order settlements (Village service area

3.3.11.4 Growth Points There are three categories of growth points. They are described in terms of their relative

importance in the proposed hierarchy

Population growth / concentration points are clusters of individual settlements with large

numbers of people and high population densities. GTM has three population growth points and

this is where most number of people is concentrated. The projected population growth within

the growth points as identified in the Limpopo Employment Growth and Development Plan over

the period 2005 to 2015 which shows that it will be more than double. This will have far more

serious implications for the demand for services in the municipal area.

Page 34: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

34 | P a g e

Map 5: indicates GTM growth points

Page 35: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

35 | P a g e

Table 13: Settlement Classification and Population 2005 to 2020: Source (Greater Tubatse

Municipality

3.3.11.5 Provincial Growth Points (PGPs):

Burgersfort is identified as a provincial growth point and is located where the sections of R555

and R37 are coterminous, virtually at the centres of the Greater Tubatse. It is one of the major

trading towns in Limpopo. It consists of higher order land uses such as retail shops, warehouses,

government offices (e.g. Municipal offices), transport interchange facilities, e.g. taxi and bus

rank, railway station; social facilities, etc. serving the hinterland of about 50 km. This town is

located roughly in the geographic centre of the municipal area and this makes it accessible to

the majority of people. “Burgersfort is also a municipal capital of Greater Tubatse Local

Municipality, which increases its status in the region.

A number of housing developments are planned on the northeast side of Burgersfort. This has

also triggered numerous retail and service businesses. The town is also starting to experience

problem characteristic of growing urban area, viz, the growth of informal settlements, traffic

congestion on certain road section, rising land prices, declining capacity of bulk engineering

infrastructure, etc. It also seems that the recent housing development is not match by the

required social facilities, such as schools and halls. The town is among the fast growing small

towns in and around Limpopo.

3.3.11.6 District Growth Points (DGPs): Steelpoort is identified as the second order of settlement hierarchy within the GTM. Steelpoort

in comparison to Burgersfort, comprised more of manufacturing industries and mining related

suppliers whilst the latter is more dominated by the retail and service centre. This growth point

mostly serves the mining community. There are about six operating mines around the town.

Steelpoort town is characterised by a mixed used development; including heavy engineering

enterprises; suppliers to the mines; transport facilities; building material suppliers; distributors/

wholesale, medium density housing and small retail component. About sixty per cent of

industrial township, i.e. Steelpoort Ext 7 is occupied. Some of the service businesses related to

mining have even emerged in fringe areas in the former Lebowa i.e. Tukakgomo and Eerste

Geluk, Mapodile just south of Steelpoort.

3.3.11.7 Municipal Growth Points (MGP): These municipal growth points serve mainly the surrounding farming areas and most have

higher order goods. However, in traditional rural villages the economic sector is relatively small.

There are few local businesses but supported by a large number of population (GSDM LED,

POPULATION PROJECTIONS INCREMENTAL POPULATION GROWTH RATE

PLANNING

POPULATION

(2002) SETTLEMENT CLASSIFICATION 2005 2010 2020 2005-2010 2010-2020 2005-2010 2010-2020

577 Growth Point: Burgersfort Total 600 8589 28431 7989 19842 70.3 12.7

14700 Growth Point: Driekop Total 15291 16155 18985 864 2830 1.1 1.6

11065 Growth Point: Ga-Kgwete Total 11510 12161 14291 651 2130 1.1 1.6

207 Growth Point: Ohrighstad Total 215 227 267 12 40 1.1 1.6

998 Growth Point: Penge Total 1038 1097 1289 59 192 1.1 1.6

2019 Growth Point: Steelpoort Total 2100 2219 2607 119 388 1.1 1.6

54569 Pop Concentration: Batau / Praktiseer Total 56762 59968 70475 3206 10507 1.1 1.6

804 Pop Concentration: Ga-Masete Total 836 883 1038 47 155 1.1 1.6

15475 Pop Concentration: Ga-Masha Total 16098 17007 19986 909 2979 1.1 1.6

34773 Third Order Settlements Total 36171 38213 44910 2042 6697 1.1 1.6

6952 Commercial Farm Land Total 7231 7640 8979 409 1339 1.1 1.6

115439 Tribal Areas Scattered Total 120080 126867 149085 6787 22218 1.1 1.6

257578 Grand Total 267932 291026 360343 23094 69317 1.7 2.2

Page 36: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

36 | P a g e

2003). In GTM the municipal growth points are Ohrigstad, Driekop and Mecklenburg. These

settlements except Ohrigstad are expected to grow faster due to mining related development

occurring around them. More services need therefore to be rendered in these settlements.

Ohrigstad is a small rustic town located along major roads of R36. The town is stagnant with

little building activity taking place. There are number of vacant stands and business premises in

Ohrigstad.

These properties are also poorly maintained. Mecklenburg is located in the former Lebowa

homeland territory along the R37 Dilokong Corridor. The settlement of Mecklenburg is

anchored by the police station, Mines and the hospital, and surrounded by the series of hills

forming an amphitheatre around an extensive flat land. The settlement is formed along the

movement spine road (R37) and a number of roads taking off this main route at almost regular

intersection. Generally, the housing densities in these areas are not more than 10 units per ha.

3.3.11.8 Population Concentration Points (PCPs): These are clusters of individual settlements with large number of people and high population

densities. Usually these settlements have a small or no economic base but with meaningful

social facilities and a substantial number of people. “In most instances the PCPs form part of the

settlement cluster that also has one or more growth points within a cluster. The PCPs are mainly

located adjacent to the tarred road or intersections of main district roads which provide

accessibility to job opportunities elsewhere” (GTM SDF, 2005 p: 25). In GTM, there are currently

four population concentration points: Riba Cross, Bothashoek, Mashamothane and Praktiseer.

Praktiseer is a fast growing settlement that is merging with Bothashoek. Some of the informal

settlements around the east and south of Praktiseer e.g. Gamatodi are in the process of being

formalized.

3.3.11.9 Local Service Points (LSP): LSPs are those settlement with a population of 5 000 people or more and do not form part of

any clusters. Most of these settlements are dispersed and it is only in few instances where two

or more settlements are grouped to each other (GSDM ISDF, 2005). “The potential for self-

sustained development is limited by the lack of development in these settlements” (GTM SDF,

2005 p: 29).

However, some LSPs have a potential to develop based on population growth or servicing

function potential. Some of these settlements have well-developed social facilities and are big in

size compared to the third and fourth order settlements. The LSP settlements in GTM are; viz,

Kgautswana, Maakgongwane, Masakeng, Mophalema, Mampuru and Extension, Malokela A and

B and Leboeng. Most of these settlements are small in sizes, and are located a distance from

each other and this makes it difficult to provide public facilities unless these are sited adjacent

to a movement route (taxi or buses).

3.3.11.9.1 Village Service Point: This category of settlements in the settlement hierarchy has been identified to allow for

circumstances in mainly traditional rural areas where three or more settlements are located in

such a way that they are interdependent or linked to one another by means of a specific social-

infrastructure. These settlements are mutually dependent on these services. The settlements

are small and have small number of people. For instance, there is only one high school in

Maretlwaneng, Maadiswane and Ga-mamogolo (North West of Penge).

3.3.11.10 Corridor development Limpopo Employment growth and development plan (LEGDP), was developed due to the need

to put in place a development framework that should guide growth and development in

Limpopo. With its strong emphasis on improving the quality of life and sustainable

Page 37: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

37 | P a g e

development, the LEGDP aims to create a conductive environment for the people of the

province and is identifying the following areas for corridor development:

• Dilokong corridor

• Burgersfort Stoffberg corridor

• Mining belt development

3.3.11.10.1 Strategic Located land

There are a number of strategically located portions of land in various growth points of the

municipality, namely:

3.3.11.10.2 Strategic land in Burgersfort

o Steelpoortsdrift 296 KT

o Appiesdoorndraai 298 KT (portions owned by National Government)

o Dresden 304 KT

o Viljoenshoop 301 KT

o Praktiseer 275 KT

All the above portions are owned by the national government (Department of Rural

Development and Land Reform). Processes are already underway by the municipality to

have the land transferred from the National government to the municipality in order to

develop integrated human settlements. In other instances (Praktiseer) the municipality

has already taken further steps to plan for settlement expansion in order to

accommodate the increasing pressure to occupy the land in search of proximity to

conventional services and work opportunities.

3.3.11.10.3 Strategic land in Steelpoort (privately owned)

o Olifantspoortjie 219 KT (some undeveloped portions thereof)

o Goudmyn 337 KT (some undeveloped portions thereof)

Funding is required to purchase the undeveloped portions from the current owners for

integrated human settlements and expansion of the town.

3.3.11.10.4 Topography The northern part of the GTM is mountainous, thereby presenting engineering challenges as far

as the development and provision of infrastructure is concerned. The southern part of the GTM

is high-lying and has a more moderate topography. The management of the koppies, valleys and

the mountain ranges in the area is critical to ensure environmental sustainability. The GTM area

is highly mountainous hence development occurs mostly in valleys. Settlements sizes are small

and scattered due to extensive broken terrain. In fact the ridges and the mountains form linear

dividers between the settlements. “In certain areas the topography is very steep creating

impossible mountainous terrain which is barely inhabited. The ridges further divide the

municipal areas creating pockets of homogenous composition, which determine growth and

development potential” (GSDM: Central Tubatse-Driekop, Praktiseer and Burgersfort: Trends

Report and Detail Development Plans).

The terrain dictates that larger settlement development occurs mainly in flat, low lying areas in-

between the mountain ranges. Generally the roads run at the bottom of the basin/ valleys. It is

therefore not surprising that the major roads, i.e. R555, R37 and R36 and Jane Furse to

Lydenburg road for most part run parallel to rivers. The position of cross-link roads is dictated by

topography that is flatter to allow the road to pass through at reasonable flat grades. Where

these roads pass through wide basin, particularly in former Lebowa homeland motley of

settlements have grown around these major roads. In other words there is clustering of series of

Page 38: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

38 | P a g e

settlements for almost the entire length of the road, e.g. Mecklenburg-Driekop (R37), Mapareng

-Tswenyane (R36) and Mampuru to Eerste Geluk (parallel toR555).

In former ‘white areas’ the spatial development is contrasting as it tends to be more nodular

therefore not continuous. For example, there is approximately 20 km of vacant of intervening

land between Steelpoort and Burgersfort and about 50 km between Burgersfort and Ohrigstad

along R555. This land need to be managed properly for the expansion or growth of Burgersfort,

Steelpoort and Ohrigstad towns.

Even the scattered rural villages have located within more developable basin almost parallel to

mountain range. The central spine road (normally the bus and a taxi route) usually runs along

the flatter alignment in the basin.

3.3.11.11 Rivers There are three main rivers in the GTM, namely the Spekboom, Steelpoort and the Olifants,

which is the largest. The existence and topography of these water sources present an

opportunity to create water storage facilities. The construction of De hoop dam in the

Steelpoort River which will be finalised in 2011 will have major benefits for agriculture, as well

as for general development in the region. There is a need to carefully assess the water needs of

the area, taking into consideration the development of the mining industry, which in itself need

large quantities of water. Given the present water needs in the municipal area, an increase in

storage facilities or the expansion of the existing storage facilities needs to be investigated.

Due to the lack of waterborne sewerage infrastructure in many of the villages, one of the major

challenges is the pollution occurring in these rivers. These rivers are a major source of drinking

water for the communities who do not have access to piped water. These rivers are also used

for irrigation purposes for agricultural activities within the municipal area.

3.3.11.12 Air quality and pollution

Air pollutants are defined as substances which, when present at high enough concentrations,

produce significant negative impacts on people and/or the environment. The main or key

pollutants that are likely to be detected in the district include SO2, NOX, CO, PM and VOCs. The

origin and health impacts associated with these pollutants will be discussed in a later chapter.

The Tubatse Local Municipality is found in the Northern eastern part of the District. The main

towns in the area are Burgersfort and Steelpoort. The main activity in this area is the mining of

chrome and platinum. There are also three chrome smelters in the area. This then means that

the area is likely to have air pollutants like sulphur dioxide, nitrous oxides, chromium (VI) and

particulate matter. There is also significant traffic in the area due to the transportation of

minerals which introduces a substantial pollution from the vehicles. Other pollutants like

pesticides can also emanate from the farms around Orighstad towards Burgersfort, of which the

extent has not yet been determined.

One key element, which is of paramount importance for the Greater Tubatse is to put real time

air pollution monitoring measures in place as soon as is practically feasible, so as to determine

the extent of the problem and/or the concentrations of air pollutants in the area of jurisdiction,

since air pollution has economic and social implications. This will also allow for accurate

dispersion modelling. Currently, the district has three passive air quality monitoring stations

which are being monitored by an independent company. The pollutants being monitored

include SO2, NOX and Fallout dust. The results that are being obtained indicate the following:

Page 39: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

39 | P a g e

Table 14: Air Quality Monitoring Station Positions in Tubatse (source GSDM air quality management strategy)

Name of the farm Station number Coordinates Lion Ferrochrome 01 S24º49’10.1”

E30º07’36.2” Transmix 02 S24º39’46.3”

E30º17’27.9” Modikwa 03 S24º37’49.3”

E30º09’04.3”

Table 15: Average Monthly SO2 concentrations in Tubatse (source GSDM air quality management strategy)

Sample ID Monthly SO2 RSA/ Spec (ppb)

May/Jun Average

Jun/Jul Average

Jul/Aug Average

Aug/Sep Average

Sep/Oct Average

Lion Ferr 50 1.4 3.0 2.2 1.8 0.2

Transmix 50 1.0 1.7 0.6 0.3 0.1

Modikwa 50 1.5 2.0 0.9 0.2 0.2

Table 16: Average Monthly NOX concentrations in Tubatse (source GSDM air quality management strategy)

Sample ID Monthly NOX RSA/Spec (ppb)

May/Jun Average

Jun/Jul Average

Jul/Aug Average

Aug/Sep Average

Sep/Oct Average

Lion Ferr 80 10.4 11.3 16.0 7.8 5.2

Transmix 80 18.9 19.4 17.0 8.6 7.1

Modikwa 80 13.4 13.9 6.5 4.1 5.9

Table 17: Average Monthly Dust Fallout results (30 Day Average mg/m2/day) in Tubatse (source GSDM air quality management strategy)

Sample ID Monthly Dust RSA/Spec mg/m2/day

May/Jun Average

Jun/Jul Average

Jul/Aug Average

Aug/Sep Average

Sep/Oct Average

Lion Ferr 1200 377.00 - - -

Transmix 1200 119.00 169.00 499.31 504.25 537.18

Modikwa 1200 107.00 279.03 285.98 295.07

Page 40: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

40 | P a g e

3.3.11.12.1 Surface pollution The Municipality has outsourced the refuse removal services in Burgersfort Town and the

contract which was supposed to elapse on 31 October 2009 has been extended up to 2013.The

Service Provider appointed is The Waste Group Ingwe and Bauba Marumo Waste Management.

The said Joint Venture shared responsibilities for Burgersfort town whereby Bauba Marumo

Waste Management is responsible for refuse collection & street cleaning and picking up a litter

while The Waste Group Ingwe is responsible for the management of landfill site.

All the waste is collected and dumped at Burgersfort municipal landfill site. Empty cans, bottles,

plastics and paper are the most dumped litter in the areas of Burgersfort, Ohrigstad, Praktiseer,

Steelpoort and Ga-mapodile. There are no formal litter picking done in the rural areas of

Greater Tubatse Municipality. Old mining areas such as Penge, Taung, and Krommelenboog etc

are regarded as the most hazardous areas due to the asbestos remains exposed either by rain

and life stock.

Emphasis must also be made on the mines and agricultural activities that are currently taking

place in the area in making sure that they are restricted from using hazardous chemicals that

might result as a threat to the environment. There is a need for the Municipality to develop

Environmental management policy and strategy in making sure that the environment is

managed properly. Total amount of waste collected for 2008/09 in Greater Tubatse amounts to

32 341 m³.

Challenges facing environment in GTM

• Lack of by-laws.

• Excess littering by hawkers in the areas of Burgersfort, Steelpoort and Ohrigstad

• Community with little education on environmental issues

• The Municipality has insufficient capacity on environmental management issues

• Mining activities causing serious threat to environment

• High Traffic volume

3.4 Infrastructure and Basic Services Analysis

3.4.1 Water

GTM is currently not either water services provider or authority. The Sekhukhune district

municipality is the Water services Authority. Due to the rapid growth of the municipality, GTM

has made an application to the Minister and MEC for local government to be designated as both

the water and sanitation Authority and is still a-waiting for a response. Due to its status as both

water authority and provider, Sekhukhune District Municipality is also responsible for the

development of the Water Sector plans.

There are four main sources of water within GTM:

• Abstraction from surface sources within the area of jurisdiction (dams, springs, large

rainwater collectors such as natural rock surfaces or streams).

• There are 3 main rivers in GTM from which water is collected, i.e. Spekboom, Steelpoort,

Tubatse and Olifants rivers.

• Abstraction from groundwater sources within the area of jurisdiction (boreholes or dug

wells);

• Purchase from external sources (e.g. bottled water)

There are five water schemes within the Greater Tubatse Local Municipality. These are:

• Lebalelo water scheme (northern portion)

Page 41: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

41 | P a g e

• Penge local sources (north eastern portion)

• Lower Steelpoort Tubatse water supply scheme (central portion)

• Blyde Local source (eastern portion)

• De Hoop 1,8, and 13 water scheme (western portion)

Table 18: indicates 4 (four) water purification plants in Tubatse local municipality:

NAME CAPCITY REQUIREMENT

Burgersfort water treatment works 5ml/day Increase capacity

Steelpoort water treatment plant 2ml/day Increase capacity

Praktiseer water treatment plant 5ml/day Increase capacity

Penge water treatment plant Refurbishment

Historically, piped potable water at GTM was available only in the towns of Burgersfort,

Steelpoort and Ohrigstad, few ‘black” formal townships e.g. Praktiseer and Eerste Geluk, mines

and public institutions, e.g. hospital, police stations, etc. Most public institutions had their own

supply system, mainly from boreholes. Recently the water supply network has been extended

for domestic uses to many villages within the former Lebowa homeland territory. In the rural or

peri-urban areas, water is provided mainly through standpipes on the streets. It is therefore not

surprising that “17 % of the people obtain their water from natural resources which includes

rivers, streams and rainfall, 51.8 % of people obtain water from public taps, 6.8% from a

borehole and only 12.3% from an on-site tap”. Based on the census survey, 2007, it is expected

that the proportion of urban households will increase gradually in future as people move from

scattered (remote) villages to denser population concentration points where more services are

available.

The voluntary movement of young people away from remote rural settlements will reduce

water demand at these places in future and will increase water demand at the concentration

points where the people are moving to. It is important to prioritise planning of larger and

denser settlements where people are migrating towards for service delivery to ensure greater

impact.

The protracted drought in Sekhukhune region has forced the public authorities to speed up the

extension of water network or delivery of water through tanks in the rural / peri-urban areas.

This demand has been exacerbated by the increasing densification of few settlements where

population is gravitating towards. The recent proliferation of mining activities, edging closer to

twenty in the municipal area will be more than double the amount of water required in the

future. In this regard the estimated total mining water demand was between 27.2 and 38.5

millilitres per day in 2005 and is projected to be between 76.1 and 100.1 by 2020.

The recent investigation by the Department of Water Affairs confirmed that most feasible

option to improve water supply in this drought stricken region was to construct De Hoop dam

and bulk raw water distribution system with connections of Olifants via Lebalelo Water Scheme.

The construction of the dam has commenced and will only be functional in 2010. Following are

figures indicating water access by households in the area:

Page 42: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

42 | P a g e

Table 19: indicates Source: comparative information on basic services 2009: COGTA

Service Total

households

Households

access

Households

access

percentage

Households

below basic

level/

backlogs

Households

below basic

level/backlogs

percentage

Water 66 611 53 026 79.3% 13 759 20.7%

The Greater Tubatse Municipality has entered into a Public Private Partnership project with the

National Treasury for the conducting of study which commenced in June 2009 on water supply

and reticulation in the area, however there are currently five known categories of consumer

profile; viz. households, mines, industrial, commercial and the others, which refers to users such

as irrigation, institutional, etc. There is no available database on the number of commercial

users in Greater Tubatse Local Municipality. However, it can be noted that there is a spatial

concentration of commercial activities at urban nodes i.e. Burgersfort, Steelpoort and

Ohrigstad.

Total consumption (for commercial activities) can be estimated as a small fraction of domestic

consumption and is unlikely to change much in the foreseeable future. Other consumers include

agriculture and government institutional users” (GSDM WSP, 2005, p: 38). The commercial users

are highly competitive users with well established water rights.

Mines and Smelters are by far the greatest consumers of water in Greater Tubatse municipality,

followed by irrigation and domestic use. The (mines) water needs are likely to increase even

further in the medium term. Irrigation needs are also likely to increase considerably with the re-

establishment of former government irrigation schemes (RESIS Project by Department of

Agriculture) that is currently underway. The spatial plan should take cognisance of the need to

extend water infrastructure particularly to meet water requirements of mines and households.

Table below indicates different water sources in GTM.

3.4.1.1 Free basic water The municipality is providing free basic water services to its communities especially in the areas

falling within the then Lebowa borders. Most of the households in Greater Tubatse can be

defined as poor or indigent – where the total income is below R1, 500 per month. Present,

approximately 60% of the households in Greater Tubatse fall into this category, however the

municipality updates its Indigent Register on annual basis. These are the households to which

Free Basic Water must be supplied, and to whom the Equitable Share subsidy applies. The

Municipality has last updated its Indigent Policy and Register for provision of Free Basic Services

during 2008/09 financial year.

Table 20: below indicates free basic water service backlogs. Source: basic services

publication: 2009: COGTA

Service Total households

Total indigent households registered

Total indigent household served

Total indigent household served in a percentage

Total households served

Total household served as a percentage

Free basic water

66 611 39 000 41 610 105.5% 41 610 105.5%

Page 43: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

43 | P a g e

Water critical challenges

• Aging infrastructure

• Drought

• Lack of financial resources

• Topography of the area

• Informal and scattered settlements

• GTM Municipality not water authority

3.4.2 Sanitation The Water Services Provider status which has been delegated to GTM in towns of Burgersfort,

Steelpoort and Ohrigstad also includes the provisioning of sanitation services to the identified

areas. Only 8.5 % of households have access to waterborne sewerage systems and they are

concentrated in and around Burgersfort, Steelpoort and Ohrigstad. The three towns within

Tubatse Municipality are served with potable and waterborne sewer system. In rural areas, it is

estimated that 25% of all villages are served to RDP level of service. Generally, sanitation

facilities in some villages are in poor state (GSDM Cross Border Feasibility Study, 2003). Most

industrial consumers are in the existing urban centres (e.g. Burgersfort) and discharge their

effluent into the municipal sewers for treatment at the Waste Water Treatment Works.

Table 20: indicates the list of the current status of Wastewater Treatment Works is indicated below:

LOCATION TYPE PRESENT CAPACITY

REQUIREMENT

Burgersfort Conventional 1.5Ml/day Increase capacity

Praktiseer Ponds 0.4Ml/day Increase capacity

Penge Conventional Under construction

Ga-mapodile Ponds Needs proper fencing and increase capacity

Ohrigstad Septic tanks Construction of new sewerage system

Steelpoort Conventional 0.5ml/day Increase capacity

The Steelpoort sewerage plant is refurbished to cater for the development taking place in the

area and to eliminate overcapacity to the facility. There is a clear overloading of the plant due to

chemical toilet and septic tank discharged at treatment works. However there is a planned

sewerage works downstream for Steelpoort and Winterveldt.

Almost 5.5 % of the households use VIP (Ventilated Improved Toilets) toilets with no bucket

system in use. In terms of the National Sanitation Policy, there is a variety of forms or equivalent

of VIP as long as it meets certain criteria, in terms of cost, structures, health benefits and

environmental impact. Bucket latrines are the most obvious that do not meet RDP requirements

and are not in existence in GTM.

Table21: below indicates sanitation services by households: Source: basic services publication: 2009: COGTA

Service Total households

Households access to sanitation

Households access to sanitation in a percentage

Households below basic level/backlogs

Percentage backlogs

Sanitation 66 611 10 193 19.3% 53 736 80.7%

Page 44: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

44 | P a g e

The envisaged increase urbanisation within the GTM will invariably require substantial

investment in bulk sanitation infrastructure.

Table 22: below indicates household by type of toilet facility in GTM.

TOILET TYPE CS 2007 2008-09

Flush toilets (connected to sewerage system) 4796 5221

Flush toilets with septic tanks 865 1112

Dry toilet facility 2931 2931

Chemical toilets 4330 4567

Pit latrine with ventilation (VIP) 46961 47411

None 6728 6278

Sanitation challenges

• Water treatment plants over capacity

• Aging infrastructure

• Informal settlements

• GTM not water and sanitation authority

• Limited resources

3.4.3 Electricity

GTM is not the electricity Authority nor Provider and this is the sole competency of ESKOM. The

municipality is only responsible for the coordination of the service by making sure that

communities are consulted and by compiling a priority list. The only provider of electricity in the

region is ESKOM; which has installed basic infrastructure to provide electricity to the

communities. For most part, the rural population has no electricity. Lack of access to electricity

to some villages poses a problem to the GTM as it impacts negatively on local economic

development and community projects.

It is important that ESKOM and DME speed up the process of electrification by making sure that

all communities have access to electricity by 2014 as set in the millennium targets. According to

the report presented by ESCOM, in August 2009, indication was made that a total number of

144 villages within the jurisdiction of the Greater Tubatse municipality is already electrified and

56 villages are still without electricity. ESCOM has connected 37 650 households and a total of

28 961 households are without electricity. DME, ESKOM and Greater Tubatse municipality have

developed electricity priority list, which will be used as a guiding tool for the electrification of

villages within the area of Tubatse.

For the 2009/10 financial year ESKOM has electrified Dresden village benefitting 600

households. The municipality with the assistance of the Department of Cooperative Governance

and Traditional Affairs has electrified Tswenyane village (245 connections), Lepelle village (210

connections), Bokome village (218 connections), Ditentseng village (262 connections) and

Kalkfontein (358 connections). An overall amount of R11 760m has been utilised to electrify the

above stated villages.

ESKOM has developed a District Wide Energy Master Plan which will also assist in fast racking

electrification of villages within the Greater Tubatse Municipal area of jurisdiction.

Page 45: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

45 | P a g e

Table 23: below indicates total number of households with electricity and backlogs: Source:

basic services publications 2009: COGTA

Service Total households

Households with access

Household access in percentage

Households below service/backlogs

Backlog percentage

Electricity 66 611 37 650 63.3% 28 961 29.7%

Table 24: below indicates villages electrified by GTM during 2006/07 to 2010/11 FY

PROJECT NAME HOUSEHOLD

S BENEFITED

BUDGET STATUS

06/0

7

07/0

8

08/0

9

09/10 10/11

Installation of communal

lights in Ohrigstad

230 3.0m complete

Installation of Apollo lights 32 692 1.5m complete

Electrification of Magakala

and Manoke villages

2 147 5.0m complete

Electrification of Kalkfontein,

Ditenseng, Bokome, Lepelle

and Tswenyane villages

1 293 11.7m Complete

Electrification of Ga-Maepa

village

200 2.0m

Electrification of Kgotlopong

village

423 4.2m

Electrification of Maahlashi

village

297 2.9m

Table 25: below indicates backlog electrification per Village: Source: Stats SA CS2007

Village total backlogs

Shakung (Moroke Cluster) 630

Motloulela (Malokela Cluster) 410

Modubeng (Malokela Cluster) 700

Ga-phala (Malokela cluster) 225

Malokela (Malokela cluster) 850

Kgopaneng (Malokela cluster) 280

Page 46: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

46 | P a g e

Maakubu (Malokela cluster) 620

Moshira (Malokela cluster) 300

Makgalane 540

Page 47: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

47 | P a g e

Village total backlogs

Banareng 660

Makopung 563

Mokutung 2 60

Malaeneng 439

Mapareng 480

Sekopung 360

Makofane/Pidima 240

Ga-Malepe/Ga-Moraba/Ga-Motshana 110,50,300

Ga-Mokgotho/Maretlwaneng/Mankele 370,290

Segorong/Mamogolo/lefahla 256,70,45

Kgotlopong/Taung/Matokomane/Makotaseng 2700

Madikane 312

Senyatho 530

Radimpsa 420

Sekhwakhwaila 390

Dithamaga 38

Leboeng/New stands 439

Phadishanong 545

Driekop- France 1500

Mandela park 680

Kampeng 610

Magologolo 188

Maputle 393

Dibakwane 290

Page 48: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

48 | P a g e

Village total backlogs

Barelong/Barcelona 261

Kutollo 350

Koppie

Buffelshoek

Table 26: below indicates other source of energy used per household:

SOURCE OF ENERGY CENSUS 2008/09 Gas 104 67

Paraffin 2931 5679

Solar 156 77

Wood 22890 22890

Animal dug 666 666

3.4.3.1 Free Basic Electricity The main challenges facing GTM revolves around the electricity capacity in the area as outlined

by Eskom. Improved awareness in terms of the collection of tokens by beneficiaries also needs

to be improved. Currently only 22.1% of the total households in GTM are receiving Free Basic

Electricity.

Table 27: below indicates total number of households receiving free basic electricity and

backlogs. Source: public service publication 2009: COGTA

Service Total

households

Total

indigent

households

Total

households

access

Household

served

percentage

Backlogs Backlogs

percentage

Free basic

electricity

66 611 39 000 6 471 22.1% 32 529 70.8%

Challenges

• GTM not electricity authority

• Highest electricity backlogs in the district

• No electricity capacity available in the area

• No accurate indigent register for the provisioning of free basic electricity

• Limited resources

3.4.4 Housing

Bulk of the 66 611 units within GTM are found in rural and peri-urban settlements. For

historically reasons these rural or peri-urban settlements occurred within the former Lebowa

homeland part of the municipality. Generally these rural settlements are very small with most

of them comprising of less than 1000 housing units. There are close to 180 settlements spread

across the GTM area. Although the settlements are scattered they are only found in the

northern and north-western parts of the municipal area with private housing developments

taking place in the southern part of the GTM.

Page 49: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

49 | P a g e

The biggest complex of settlements occur around the Praktiseer/ Bothashoek /GaMatodi and

Riba-cross where about 40 000 people reside, which is more than 15% of the total population.

Another expansive cluster of settlements is the band along R37 (Dilokong Corridor) that includes

Mecklenburg and Driekop. There are other eight clusters of settlements that are comprised of

relatively fewer housing units. These include a linear grouping of settlements (Parallel to R555)

from Mampuru in the south to Eerste-Geluk in the north.

The Mampuru - Eerste Geluk settlements mainly accommodate people working in the mines,

retail and industries around Steelpoort. The other clusters of settlements are around Alverton-

Maahlashi, Kgotlopong-Kgautswana, Matokomane-Taung, Mabotsha, Ga-Moraba, Maakubu-

Motloulela, Mapareng-Tswenyane, Ga-Maepa, Ga-malekane and Penge and its environs.

The majority of these settlements are unplanned. There are however few planned and formal

housing development within the GTM that were planned prior to 1994 i.e. Mecklenburg A and

B, Penge, Driekop, Mapodile/Eerste Geluk and Praktiseer. These settlements except

Mecklenburg A and B and Driekop in the main enjoy full engineering services like waterborne

sewerage, water connected to plumbing fixtures inside the house, some or most roads are

surfaced with asphalt, regular waste disposal and electricity. These settlements together

provide about 6000 residential erven.

The unplanned villages generally have poor services characterized by gravel roads, self-made pit

toilets and lack of electricity and solid waste disposal. However in most settlements water is

provided through standpipes at least along the main roads. As stated above, historically the

former “white towns” of Burgersfort, Steelpoort and Ohrigstad had limited housing stock.

Before the recent housing development associated with the expansion of platinum group

minerals mining activities there were only 405 formal houses in these towns (299 on township

erven and 106 on farm portion) as late as 2001/2002. High level of engineering services was

generally provided in these areas including housing on the farm portions. In the farm portions

there was reliance to on-site services, e.g. septic tanks, water boreholes, etc.

Until very recently the formal housing stock in the entire municipal area was about formally

demarcated housing erven estimated to be about 6000, which is just 10% more of the total

housing stock. A significant number of housing in these areas is still rudimentary in terms of

quality of material and construction technology. Most of these houses are in Driekop,

Mecklenburg and parts of Praktiseer, This underscores the importance of formalizing housing in

peri-urban settlements in appropriate locations so that the residents can have more secure

tenure so that high level of engineering and several services can be extended and housing could

be improved.

Page 50: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

50 | P a g e

Table 28: indicates the Greater Tubatse Housing Backlog source: Source: Greater Tubatse Municipal IDP Housing

Chapter

Ward No. Number and Type of Housing Units Wards

Based

Waitin

g Lists Settlement Name Informal Backyard Hostel Traditional Farm

Subtota

l Social Gap Bonded Subtotal Total

Ward 1 65 1 184 250 0 250 155

Ward 2

(Steelpoort)

144 4 215 363 500 500 863 201

Ward 3 66 0 128 194 0 194 117

Ward 4 48 1 143 192 0 192 172

Ward 5 67 3 53 123 0 123 298

Ward 6 49 3 346 398 0 398 198

Wad 7 201 11 88 300 0 300 152

Ward 8 179 4 116 299 0 299 271

Ward 9 20 0 109 129 0 129 168

Ward 10 75 0 52 127 0 127 232

Ward 11 277 2 84 363 0 363 269

Ward 12 41 1 117 159 0 159 183

Ward 13

(Praktiseer)

255 3 28 286 2500 2500 2786 115

Page 51: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

51 | P a g e

Ward No. Number and Type of Housing Units Wards

Based

Waitin

g Lists Settlement Name Informal Backyard Hostel Traditional Farm

Subtota

l Social Gap Bonded Subtotal Total

Ward 14 203 4 90 297 0 297 152

Ward 15 33 0 119 152 0 152 259

Ward 16 23 2 311 356 0 336 237

Ward 17 18 0 61 79 0 79 413

Ward 18

(Burgersfort)

51 4 400 455 3500 3500 3955 290

Ward 19 8 3 108 119 0 119 191

Ward 20 49 1 154 204 0 204 266

Ward 21 48 0 31 79 0 79 175

Ward 22 21 2 257 280 0 280 163

Ward 23 59 2 151 212 0 212 187

Ward 24 25 0 353 378 0 378 156

Ward 25 312 3 80 395 2000 2000 2395 339

Page 52: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

52 | P a g e

Ward No Number and Type of Housing Units

Wards

Based

Waitin

g

Lists Settlement Name Informal Backyard Hostel Traditional Farm

Subtota

l Social Gap Bonded

Subtota

l Total

Ward 26 53 0 238 291 0 291 160

Ward 27 150 4 180 334 0 334 150

Ward 28 5 3 375 384 0 384 177

Wad 29 23 9 203 235 0 235 152

2568 70 0 4775 0 7413 5000 0 3500 8500 15913 5989

Page 53: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

53 | P a g e

Table 29: below indicates household by type of main dwelling in GTM (source stats SA.CS 2007)

HOUSING TYPE CENSUS 2001 CENSUS 2007

House or brick on a separate stand or yard

36222 48497

Traditional dwelling/huts/structures made of traditional material

9568 7593

Flat in block of flats 364 66 Town/cluster/semi detached house(simple, duplex, triplex)

208 66

House/flat room in backyard 520 1132

Informal dwelling/shark in backyard 1404 1998 Not in back yard e.g. in an informal/squatter camp settlement

3276 5528

Room/flat not back yard but on a shared property

312 733

Caravan or tent 156 66 Private ship/boat 00 00 Workers’ hostel(bed/room) 00 733

Other 00 198

Table 30: Housing needs for the period 2008-2012

TYPE 2007 2008 2009 2010 2011 2012

TRADITIONAL 5440 5518 5590 5659 5726 5790

INFORMAL 3677 3729 3778 3825 3870 3913

BACKYARD 1574 1597 1617 1637 1657 1675

TOTAL 10691 10844 10985 11121 11253 11378

% growth per annual 1.4 1.3 1.2 1.2 1.1 1.3

In terms of the report prepared by EastCon for Steelpoort Valley Producers Forum about 8500

additional housing is required to accommodate new mining workers and their families in the short

term. These housing units will be distributed as follows: Burgersfort (3500) Praktiseer (2500

residential erven), Driekop (2000 residential erven) and Steelpoort (500 residential erven). In 2003,

specific sites were identified to locate the required housing units.

The proposed housing development at Driekop (part of Dilokong Corridor) is located on the eastern

side of Modikwa Mine but on the western side of R37 on the farm Hendricksplaats 281 KT. At

Burgersfort, housing is proposed in five different locations on portions of farms Leeuwvallei 297 KT,

Appiesdoorndraai 297 KT, Witgatboom 316 KT and Mooifontein 313 KT. These farms are vacant

properties from eastern, to northern and western parts of the existing town.

At Praktiseer the proposed development is located to the east and south of the existing township of

Praktiseer 275 KT and Appiesdoorndraai respectively. At Steelpoort a medium income housing i.e.

Steelpoort Extension 1 and 4 was recently completed on the portion of Goudmyn 337kT on the

western side of R555. Between 2002 – 2008 residential township of Burgersfort Extensions 10, 15,

Page 54: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

54 | P a g e

16, 26, 30 and 34 in Burgersfort town yielding just more than 2500 erven were approved. This is a

testimony to rapid demand for housing.

Housing challenges

• Staffing shortages with only one person (building inspector) working on housing in the

municipality.

• Lacking of experience/expertise regarding technical aspects around housing in the municipal

area.

• Poor communication and information dissemination between Limpopo Provincial Government

and the local authority regarding housing matters.

• Lacking of consumer education for housing beneficiaries.

• The bulk water, sanitation and electricity network in and around the various Development

Nodes will have to be extensively upgraded to cater for projected future growth.

• No land within the municipal area belongs to the municipality, while some of the land portions

belonging to the other spheres of government are subject to land claims.

3.4.5 Waste and Refuse Removal

Waste management services are rendered in a few areas of GTM by the municipality or independent

contractors in private properties. Dumping and burning of waste is the more common way of

disposing waste.

Most villages in Tubatse do not have access to this service. The rate of improvement in refuse

removal has also been very slow. Starting off a low base of only 4 729 in 2007/08 of the households

having their refuse removed by municipality weekly, the situation only improved to 4 707 of the

households receiving the service by 2009.

Table 31: indicates Basic services publications 2009 COGTA

Service Total

households

Household

access to

service

Percentage

households

access to

service

Backlogs

to service

Percentage

backlogs to

service

Refuse

removal

66 611 4 707 7.1% 61 904 92.9%

Table below shows other means of refuse removal by type per household:

REFUSE BY TYPE CENSUS 2001 CENSUS

2007

2009

At least once a week 3484 4729 8557

Less often 312 733 733

Communal refuse dump 260 932 932

Own refuse dumps 33852 50454 50454

No refuse disposal 14092 8926 8926

Other 00 67 67

Page 55: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

55 | P a g e

Table 32: indicates the areas or villages receiving refuse removal services in GTM: source GTM

Accounts 2009

AREA NO: OF HOUSEHOLD RECEIVING

SERVICE

Ohrigstad 190

Praktiseer 2332

Steelpoort 230

Burgersfort 1264

Ga-mapodile 691

Solid waste disposal and industrial waste disposal infrastructure is needed as there has been an

emergence of many industries thus the high demand. There is a little of these waste disposal

facilities in place within GTM, some are not regulated to ensure environmental soundness, health

and hygiene.

The municipality renders waste collection and cleaning service. Waste is collected and deposited in

landfill sites. Bins and containers are provided in public areas for collection of waste. Waste

collection is done on Monday to Friday. In Burgersfort business and household waste is collected

daily except on Sundays. However, waste is not collected in time and it was reported that the

personnel is not enough for the rendering of efficient service. In year 2005 it was estimated that

50 000 tons of waste was generated throughout GTM but only 5% was collected.

The projected population in 2025 is 415 000 which will generate 75 000 tons of waste. This would

require significantly improved operations on parts of the local authority to extend its service to all

households and substantially improve landfill capacity. The Municipality has initiated a Public Private

Partnership on Waste Management Project which will assist in alleviating the waste removal

backlogs as experienced in the area. The National Treasury has supported the initiative and has

funded the project with an amount of R5 million during the 2008/09 financial year. Section 78

processes are already done and the municipality is looking forward to commence with the second

phase which is the procurement stage.

CHALLENGES

• Permit of the existing landfill site has expired; Department of Environmental Affairs and Tourism

was approached for the extension of the license.

• Companies and communities utilizing municipal landfill site not paying the service and this

affects revenue negatively.

• BY-laws not yet gazetted to regulate illegal dumping.

3.4.6 Roads and Storm water

The road network of Greater Tubatse is approximately 1 318 km in extent. 39 % of this is a surfaced

road and the 61% is comprised of un-surfaced roads. This means the majority of the nodes depend

on un-surfaced roads for access to socio-economic opportunities (GTM Local Economic Development

-Phase 2, 2007). These un-surfaced roads are particularly found in scattered villages. Most of these

roads are poorly maintained and thus transport routes are limited by deteriorating roads.

In its quest to upgrade the standard of roads in the area, the municipality has created a public works

unit which was officially launched on the 10 September 2008. These roads are mainly used by buses

Page 56: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

56 | P a g e

and taxis to transport passengers in the area. Both surfaced and un-surfaced roads deteriorate

during rainy seasons and lack of storm water drainage and bridges worsen the problem.

Table 33: below indicates road ownership in terms of kilometres:

NAME PAVED GRAVEL EARTH TRACKS

SANRAL 173km

RAL 127km 103km

DISTRICT roads 15km 381km

GTM roads 76km 194km 249km

Page 57: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

57 | P a g e

Table 34: below indicates roads and storm-water projects implemented during the 2006/07 to 2010/11 financial years:

PROJECT NAME HOUSEHOLDS

BENEFITED

BUDGET STATUS

06/07 07/08 08/09 09/10 10/11

Upgrading of Mapodile road 727 2.5m complete

Upgrading of Ohrigstad roads 230 3.5m complete

Upgrading of Praktiseer roads 4 800 4.8m complete

Upgrading of Burgersfort roads 2 000 6.2m Complete

Upgrading of Ngwaabe roads 3 980 3.8m complete

Upgrading of Praktiseer roads 4 800 4.1m complete

Upgrading of Burgersfort roads 32 682 8.8m complete

Upgrading of Ngwaabe roads 3 980 4.5m complete

Upgrading of Burgersfort public

transport interchange facility

32 692 14m complete

Upgrading of Praktiseer roads 4 800 3.7m complete

Upgrading of Praktiseer roads 4 800

5.5m

Complete

Page 58: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

58 | P a g e

PROJECT NAME HOUSEHOLDS

BENEFITED

BUDGET STATUS

06/07 07/08 08/09 09/10 10/11

Upgrading of Burgersfort roads 32 692 complete

Ga-malekane bridge 9 161 5.4m

7.7m

Riba cross to Ga-Riba road 3 817 3.5m complete

Regravelling of Ga-moraba road(ward

26)

300 2.6m complete

Regravelling of Kgautswane road 1 163 2.8m complete

Upgrading of Praktiseer roads 4 800 5.4m complete

Upgrading of Ohrigstad roads 230 4.9m complete

Construction of Tukakgomo bridge 553 1.5m complete

Construction of manyaka bridge 677 1.5m complete

Construction of Mareseleng bridge 2 268 4.5m complete

Upgrading of Burgersfort roads 32 692 4.8m On-going

Page 59: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

59 | P a g e

PROJECT NAME HOUSEHOLDS BENEFITED BUDGET STATUS

06/07 07/08 08/09 09/10 10/11

Development of bridges for Mandela,

Molongwane and Taung villages

3 366 1.2m complete

Upgrading of Praktiseer roads 4 800 3.2m On-going

Upgrading of Ngwaabe roads 4 852 2.5m On-going

Construction of Tidintitsane bridge 396 1.7m complete

Upgrading of Bothashoek roads 2 495 4.4m Complete

Construction of Lekgwareng bridge 310 1.9m complete

Construction of Makofane bridge 816 1.9m complete

Upgrading of Ga-phala to Modubeng

bridge

1 325 4.4m Complete

Construction of Leboeng access road 2 611 4.3 On-going

Page 60: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

60 | P a g e

Table35: below indicates backlogs on Municipal roads: Source GTM roads and storm water

infrastructure asset management plan 2008

WARD NO: ESTIMATED km ASSUMED TOTAL

HOUSEHOLDS

ESTIMATED

HOUSEHOLDS

AFFECTED

1 20 2 356 471

2 80 100 80

3 50 1 664 832

4 10 1 664 166

5 30 1 664 499

6 20 1 664 333

7 50 1 664 832

8 20 1664 333

9 10 1 664 166

10 20 1664 333

11 80 1 664 1 331

12 60 1 664 998

13 10 1 384 138

14 20 2 412 482

15 30 2 594 778

16 50 1 664 832

17 50 1 664 832

18 20 50 10

19 50 1 664 832

20 40 1 664 666

21 30 1 664 499

22 10 2 100 210

23 30 1 664 499

Page 61: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

61 | P a g e

WARD NO: ESTIMATED km ASSUMED TOTAL

HOUSEHOLDS

ESTIMATED

HOUSEHOLDS

AFFECTED

24 30 1 664 499

25 10 2 1OO 210

26 60 1 664 998

27 30 1 664 499

28 10 1 664 166

29 70 2 733 1 913

There is however a fair road networks system that links most areas in Tubatse with major provincial

road such as R555, R36 and R37. R37 (which has recently become a national road) connects GTM to

other municipal areas and it forms part of the Dilokong Corridor. The poor conditions of roads make

public transport critical to the movement of goods and service. But this is undermined by the fact

that the settlements are dispersed and have low population densities leaving public transport less

frequent.

The busiest roads are Road R37 and R555. These serve also as the main collector routes from the

major urban nodes such as Burgersfort, Driekop, Mecklenburg, Steelpoort and Bothashoek and the

respective villages. These urban nodes are main areas where passengers are concentrated hence are

perceived as the major generators of traffic. The mining activities along Road R37 and the villages

located along this road generate high volumes of public transport on this route. It was therefore

recommended in the Local Economic Development report that the widening and rehabilitation of

R37 should be prioritized.

The conditions of the roads result in traffic congestion, accidents, high repair and maintenance

cost...etc which combine to reduce productivity. Lack of maintenance and upgrade of roads increase

the economic inefficiencies of the road transport services. There is a need to encourage haulage of

goods, to and from the mines to rail system, particularly those in bulk.

3.4.7 Transport The Greater Tubatse municipality has developed an integrated transport plan which indicates that

the municipality has two modes of transport found in the area, viz, railway and road transport. The

road transport is the common public transport to provide service to the community in remote areas,

i.e. buses (Greater North Transport) and mini-taxis. It also serves as the mode to transport raw

materials to and from the mines including agricultural products.

The route utilisation survey recorded 405 taxi vehicles and 18 Great North Transport buses and a

number of other private bus transport companies like, Sekhukhune express, Mahlangu bus services

and Thembalethu bus services are providing service in this municipal area.

Unregulated and influx of Mini taxis operating as metered taxis within the Burgersfort and

Steelpoort areas are posing a threat to road users as majority of them are not road-worthy. The

survey also showed a high volume of weekend operations to transport shoppers from rural

hinterlands to Burgersfort. The taxi route survey showed that there were 71 taxi and bus routes in

Greater Tubatse Municipality but in this survey the outward bound and inward bound route were

individually identified.

Page 62: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

62 | P a g e

These routes virtually penetrate all the villages around the urban centres of Burgersfort, Steelpoort

and Ohrigstad. The spatial structure of GTM particularly the radial nature of public transport into

and from Burgersfort town sees this town function as a focal point but there is no real inter-modal

system to speak of. The buses and the taxis do not feed each other but generally compete along the

same routes. The buses however tend to pick the denser routes, Burgersfort function as transport

interchange where passengers can change routes within the GTM area or beyond.

In terms of destination Burgersfort functions as fulcrum of the local taxi movement with the rest

going to either Ohrigstad or Steelpoort. There are long distance taxis operating from three urban

nodes going to areas beyond municipal boundaries such as Polokwane, Witbank, Jane Furse,

Middleburg, Tembisa and Johannesburg. Railway transport of general freight is only rendered in

Ohrigstad, Burgersfort and Steelpoort. There is no passenger train service, particular referring to

daily commuter service, operating in the area. The Greater Tubatse municipality in partnership with

the department of Transport is busy with the construction of multimodal transport facility in

Burgersfort town and a taxi rank around Driekop area. Few transport facilities are available in the

area and their state is as follows:

The availability of stable public transport and different modes of transport (taxis and buses) is a

strength that is acknowledged in GTM area. However lack of infrastructure has become a challenge.

There is lack of public transport facilities and as such the overwhelming majority of the taxi facilities

are informal. The National department of transport, Provincial department of transport together

with the municipality are busy with the development of plans for the integrated modal transport

facility in the Burgersfort town which will also add value to the transport service after its completion.

There are only seven identified formal public transport facilities:

• One in Praktiseer

• Four in Burgersfort

• One in Steelpoort

• One in Ohrigstad

The state of taxi ranks is as follows:

- 28.6 % of taxi facilities are on street facilities

- 85.7% of taxi facilities are informal facilities;

- 8.6 % of taxi facilities have lighting;

- 17.6 % of taxi facilities are paved;

- 2.9 % of taxi facilities have public phones;

- 14.3% of taxi facilities have offices

- 11.4 % of taxi facilities have shelters; and

- 14.3 % of taxi facilities have ablution facilities

Challenges facing Transport

• Insufficient taxi rank infrastructure

• Most of the Mini or metered taxis not road worthy

• Traffic congestion

• No transport facilities in some parts of the municipality especially in rural areas.

• Mushrooming of pick up points within town by mini taxis

• Mini taxi operating beyond their boundaries

• Delay by the department of road and transport to issue permits for taxis.

Page 63: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

63 | P a g e

3.4.8 Cemeteries

There are 4 (four) well developed or formal cemeteries in the Greater Tubatse municipality’s area of

jurisdiction. The four cemeteries were developed by the municipality during the last three financial

years. Praktiseer cemetery site is the largest in the area followed by Penge, Ga-Mapodile and

Ohrigstad cemeteries.

Community members in rural areas are using community grave yards which are not well fenced,

have no ablution facilities and no water to drink during funeral processes. Several requests were

received from the communities during the IDP consultative meetings for the development of better

cemeteries. The municipality has identified 1 (one) cemetery from each ward for fencing and

construction of ablution facilities using the EPWP Allocation received during 2010/11 financial year.

This process will be facilitated until majority of graveyards in rural areas are well developed

Table 36: below indicates cemeteries projects implemented during 06/07 financial year to 10/11

FY

PROJECT NAME HOUSEHOLD

S BENEFITED

BUDGET STATUS

06/0

7

07/0

8

08/0

9

09/1

0

10/11

Upgrading of Mapodile

cemetery

727 complete

Upgrading of Ohrigstad

cemetery

300 complete

Upgrading of Praktiseer

cemetery

4 800 complete

Upgrading of Penge

cemetery

300 Complete

Challenges

• There are still villages where people use their backyards or kraals as graveyards

• Lack of land for the development of Burgersfort Cemetery

• The cemeteries which were developed at Praktiseer, Ohrigstad and Mapodile are falling apart

because of poor workmanship during construction.

Page 64: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

64 | P a g e

3.5 Local Economic Development

3.5.1 Economic Profile of GTM

The Greater Tubatse Municipality has adopted an LED strategy in 2007 which makes emphasis that

the area has a high level of poverty and unemployment of which indication of the following

programmes and thrusts are made to improve the status of the economy:

Table 37: indicates programmes and thrusts

PROGRAMME THRUSTS

1. Sector development

1.1 Mining cluster development

1.2 Horticulture development

1.3 Meat cluster development

1.4 Tourism cluster development

1.5 Nodal development

1.6 Informal sector development

2. Economic infrastructure support 2.1 Road and transport

2.2 Water

2.3 Electricity

2.4 Telecommunication

2.5 Infrastructure investment plan

2.6 Enterprise development

3. Social development 3.1 Education and skills development

3.2 Housing

3.3 Health

4. Institutional/Governance reform 4.1 Regulatory framework

4.2 Waste & Environmental

management

4.3 financial management

4.4 LED directorate capacity building

The northern area of the GTM is economically the most marginal region of the Limpopo province,

and had no economic base. The area is solely dependent on government handouts and migrant

labour income for survival. With the development of mines in GTM, the area is currently benefitting

economically from the mines in many ways, however the economic melt-down experienced during

2008 and 2009 has left most of the mining industries with no option but to seize operations and

some mines had to retrench their employees.

This has left the municipality and its communities in drastic economic difficulties due to the fact that

some of the residents are un-able to pay for the services rendered by either the municipality or the

private sector. The Limpopo Employment Growth and Development Plan for 2009 suggests

programmes that will improve the economic status of the Province like: integrated poverty

reduction programme, Building Material manufacturing Programme, SMME’s and Co-operatives and

the integration of the National Youth Agency Programmes into the provincial programmes.

The following sections will give a broad overview of the four sectors contributing to the economy in

the GTM:

• Agriculture

• Mining

• Manufacturing

• Trade

Page 65: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

65 | P a g e

• Tourism

Table 38: below indicates Highest Education level or Skills level: Source GTM Household Survey

2007.

No

Schooling

Grade

0-

Grade

2

Grade

3 –

Grade

7

Grade

8-

Grade

12

Grade

12

plus

other

Diploma Bachelor

Degree

Honours Masters Ph.d

40 956 33

824

64

892

99

580

6 296 3 386 968 174 64 36

Table 39: below indicates employment by gender : Source: Stats SA survey 2007

MALE FEMALE Grand Total

Employed 26842 18479 45321

Unemployed 20868 30683 51551

Not economically active

36785 53911 90696

Unspecified 2954 2356 5310

Institutions 441 244 685 Grand Total 87890 105673 193563

Table 40: below indicates jobs created through LED initiatives

BENEFICIARIES YEARS VARIENCES

2009 2010

Youth 212 578 366

Women 324 702 378

Disabled 01 10 9

Total 537 1290 753

Page 66: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

66 | P a g e

Table 41: indicates income level by gender and race: Source Stats SA survey 2007

Income level MALE

FEMALE

Grand Total

Black Coloured Indian or

Asian

White Black Coloured Indian or

Asian

White

No income 52831 38 - 59 77264 76 35 164 130467 R1 - R400 2067 - - - 4460 - - 14 6541

R401 - R800 3004 38 - - 4980 - - 4 8026 R801 - R1 600 7812 76 - - 8333 - - 27 16248 R1 601 - R3 200

7019 - 24 4 2920 58 12 4 10041

R3 201 - R6 400

6629 - - 4 1826 - - 90 8549

R6 401 - R12 800

2775 - - 81 677 - - 123 3656

R12 801 - R25 600

524 38 12 152 196 - - 42 964

R25 601 - R51 200

62 - 12 109 64 - - 33 280

R51 201 - R102 400

30 - - - - - - - 30

R102 401 - R204 800

74 - - - - - - - 74

R204 801 or more

- - - - - - - - 0

Response not given

3909 - 12 56 3957 - - 67 8001

Institutions 420 - - 21 232 - - 12 685

Grand Total 87156 190 60 486 104909 134 47 580 193562

3.5.1.1 Tourism Tourism in GTM is underdeveloped as most tourist attraction places are found beyond the

boundaries of GTM, particularly the world’s famous Blyde River Canyon and a couple of game farms

e.g. Kruger National Park, Malamala Game Reserve, etc east of the municipal area. However the

municipal area has a potential to develop tourism industry by way of adopting two different

strategies with regard to tourisms cluster development as indicated in the GTM LED strategy. The

first is to promote a small number of high-impact projects as identified in the GSDM Tourism

Development strategy and the second is to promote small, local community tourism projects that

can be financially sustainable. The area is very rich in tourist attractions particularly cultural

diversity, historic places and the natural beauty of the land associated with dramatic topography.

The eastern part of the municipal area (around length of R36) is a better place to lead the

exploitation of tourism potential, as it is the part of the well-marketed Panaroma Route.

The Panaroma route “leads through the rugged mountain range of the northern Drakensburg,

passes through the north-eastern part of Great Escarpment, the inland Plateau declines abruptly and

steeply and opens up a fantastic views of plains of the low-veld on thousands metres below”

(www.africa-explore.co.za/ct-panaroma_route html. The four tourist attractions in the northern

reaches of the route, namely, The Strydom Tunnel, Abel Erasmus Pan, Museum of Man and Echo

Caves are within the GTM area.

Page 67: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

67 | P a g e

Ohrigstad as a stop-over centre for tourist travelling to various destinations along Panaroma Route

will have to provide more restaurants, rest rooms, entertainment facilities, and overnight

accommodation facilities such as hotels, guest houses.

The good views that include the dramatic vantage points, river systems, natural landscape, and the

green valleys of the eastern part of Greater Tubatse will serve as attractions for tourist and transient

residents with a wide range of places of interests such as game farms, farmstays, etc.

There are number of tourism potential areas within the former Lebowa territory that has not been

explored viz Mahubehube Caves in Bothashoek, Mankele and Ga-Mokgotho water-falls and dramatic

topographical relief around Penge, discontinued mining settlement of Penge and Taung , old coach

wagon in Leboeng, King Sekhukhune statue at Tjate and miraculous trees (with healing powers) at

Phiring. These tourist attractions related to the generally ignored cultural history and areas of

African people. Lack of convenient access, support infrastructure including marketing and on-site

infrastructure and facilities are impacting negatively on tourism exploitation within the area.

Tjate heritage site as identified above as one of the potential tourism projects in Tubatse has been

budgeted for by Sekhukhune District municipality. The Limpopo Employment growth and

Development plan has identified Tjate as one of the fag-ship projects to be implemented during the

financial year under review. Work is been done and the project is currently at phase 5 of the

proposed scope of work.

The existence of the world re-known Panorama route nearby provides an opportunity to divert some

of the tourist already in the area to these forgotten attractions. Opening up another tourism route

linking these attractions is the key first step to promote rural natural and cultural attraction spots.

Ohrigstad is ideally located to be used as the base or stop over from which to explore the Blyde River

Canyon, Bourkei’s Luck Potholes, God’s Window, Three Rondavels and game reserves. Unfortunately

there are very few overnight accommodations in this town and environs.

There are a number of identified accommodation establishments, i.e., country game lodges, in

Ohrigstad and Burgersfort namely, Iketla Lodge, Hannah Game Lodge, khumula lodge, water-gat

lodge, Lapeng lodge, Gethlane lodge, kusile quest house, snowy owl guest lodge, khaya ndlovu guest

lodge, Hosanna guest lodge, Didingwe river lodge, Rooi ivoor lodge, Burgersfort town lodge, Ruud’s

country lodge, Lalalanga chalets, Mantsibi guest lodge, Helmon’ palace, van zyl’s chalets, Bonamanzi

lodge, Senare Lodge and George Steelpoort Lodge.

3.5.1.2 Agriculture and forestry Farming is an important economic resource as a wide range of products are cultivated owing to good

soil conditions, the sub-tropical climate and reasonable access to water. The following type of

products is produced: fruit, vegetables, grain, cotton, citrus, maize, tobacco and meat. The main

resources that encourage agricultural production are the Olifants, Steelpoort and Spekboom Rivers,

which provide water to the region. These sources of natural water are essential for present and long

term irrigation of crops.

Potential land for agricultural purpose is found on the river banks of three above mentioned rivers,

however some of the land is not used optimally e.g. the land at Penge on the river bank of Olifants

river and others.

No other region in the GTM reveals a higher potential for desertion, resultant from overgrazing over

a prolonged period by a highly impoverished rural population that struggles to plan and control their

area. Their lack of skills prevents them from managing their resource for long-term production. This

type of farming makes the region vulnerable to periodic droughts that affect both the regional

resources and the potential to generate work opportunities for the unemployed.

Page 68: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

68 | P a g e

3.5.1.3 Mining The intrusion of the Volcanic Bushveld Igneous Complex into the sedimentary rock of the Transvaal

system resulted in great metamorphism, which caused the introduction of many minerals including

chrome, vanadium, platinum, asbestos and magnetite in the area.

• Chrome is mined extensively at Dwars-river, Dooringbosch, Tweefontein and Lannex mine

and the product is exported by rail and sea to overseas destinations.

• The following chrome mines are still under prospection; Lwala mine and Mooihoek mine.

• Vanadium is mined and smelted at only one mine and this product caters for most of the

demand in the country.

• Platinum is found in the well-known Merensky Ridge and this resource accounts for more

than 50% of all platinum resources on earth and is mined at Helena (XSTRATA), Thorncliff

(XSTRATA), Mototolo (XSTRATA), Marula mine, Twickenham mine, Modikwa mine, Two-

rivers mine and De Brochen mine.

• The following platinum mines are still under prospection, Phokathaba mine, Spitzkop mine,

Grootboom mine, Nkwe platinum mine and Tjate mine.

• Two Andalusite mines exist in the areas of Segororng and Modubeng, which are Rhino

minerals and Annesley havecroft mines.

• Granite is mined at Elephant’s river mine near Tjate village.

• Clay is mined at one mine and most of the product is used for manufacturing of cat litter.

• Asbestos was mined at Penge and Taung, but because asbestos products have been banned

worldwide, the mines were closed down and are currently the areas are being rehabilitated.

• Slate is mined at Saringa mine near Kgautswane village and is used to manufacture roof and

floor tiles.

• Silica is mined for the production of sand and stone aggregate, and serves as a flux in the

chrome smelting process.

• Magnetite is an iron-ore mined at Goede Hoop and transported to Witbank for the

production of steel in the Highveld Steel Plant.

• Magnisite was mined extensively in the Burgersfort area, but as it does not meet the

required standard anymore, mining operations were ceased.

• There are currently three chrome smelters operating in the area, Lion Ferrochrome

(XSTRATA), ASA Metals at Ga-Maroga village and Tubatse Ferrochrome in Steelpoort.

Although there are several mines in the area, the existing resources remain unexploited. Investment

in this sector is important as it brings with it investment in infrastructure, results in creation of job

opportunities and generates many other economic spin-offs. The lack of economic growth in the

region warrants special attention and support to optimise the available opportunities. However,

cognisance should be taken of the outflow of money from the mines in Greater Tubatse to other

regions.

Page 69: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

69 | P a g e

General Challenges facing economic development

• Brain drain

• High level of illiteracy

• Lack of infrastructure for agriculture and tourism development

• Migration and immigration

• High level of HIV/AIDS

3.5.2 Comparative and Competitive advantages of the local economy Greater Tubatse Municipality has significant mining and manufacturing (ferrochrome smelters)

sectors, but unemployment is still significantly above the provincial average. Information from

different sources suggests that the new mining developments that have already been around could

reduce unemployment from 73% (expanded unemployment rate definition) in 2001 to 44% in 2010.

Further reduction in the unemployment rate will depend on effective intervention by public sector

institutions to facilitate economic sector diversification through competitive cluster value-chain

development. This implies upstream development in the manufacturing and trade sector to provide

essential items in the mining supply chain by local Entrepreneurs. It also implies side-stream

development in the form of construction and Urban renewal. This approach is consistent with the

Limpopo Employment Growth and Development Plan.

Constraints to cluster development include:

- Lack of infrastructure, with reference to water reticulation, poor road conditions,

electricity and sanitation

- Land ownership limitations in former homeland areas and inappropriate land use

management

- Shortage of skills , particularly in the local labour force and among unemployed people

- Institutional capacity limitations in Local Government, with specific reference to

economic development management capacity

Clusters affect competition in three broad ways that both reflect and amplify the parts of the

platinum belt, namely:

- Increasing the current productivity of constituent firms or industries

- Increasing the capacity of cluster participants for innovation and productivity growth

- Stimulating new business formation that supports innovation and expands cluster

Most cluster advantages rest on the external economies or spill-over across firms, industries and

institutions of various sorts. Thus a cluster is system of interconnected firms and industries whose

role is bigger than the sum of its parts. These three broad influences of clusters on competition

depend on personal relationship, face-to-face communication and networks of individuals and

institutions that interact. Within GTM local economic development our cluster building blocks are

the following:

• Mining cluster development

• Tourism cluster development

• Horticulture cluster development

• Nodal development

• Informal sector development

• Economic infrastructure development

Following projects are been implemented by the municipality and are driven by the LED strategy,

some are still on planning stages

• Mining input supply park

• Fresh produce market

Page 70: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

70 | P a g e

• Institutionalization of informal trading

• Formalisation of both Mashifane park and Burgersfort EXT 10

• Praktiseer commercial development EXT 11 (support NDPG)

• Tourism strategy development

• Multimodal transport facility

3.6 Socio Economic Analysis

3.6.1 Education

The quality of education for the African population has long been poor and insufficient in terms of

standard requirements. The Limpopo province’s education achievements lag behind those of other

provinces. For example, the literacy rate of the Limpopo province was 73.6% in 1991, while average

literacy in South Africa was 82.2%. Population Development Program (PDP) indicators suggest that,

in 1991 nearly one in every ten children of a school going age did not attend school.

According to the Education Atlas of the Education Foundation, which gives detailed data for 1991,

the overall pupil/classroom ratio for African pupils was 56:1 in the southern region of GTM. In

addition to the inadequate education facilities, costs are generally also high, as families spend on

average R710 .00 per child per year on tuition, uniforms and books, which is extremely high given

the overall subsistence existence that it lead in this region.

There are 247 schools (primary and secondary) situated in GTM. Steelpoort, Ohrigstad and

Burgersfort have one primary school each with Burgersfort having additional private primary

schools. The Department of education Limpopo has developed two state of the art schools namely

Nthame Primary School at Riba – Cross and Batubatse Primary School at Praktiseer. Generally in

rural or semi-rural areas such as this, the predominance of primary schools is not unusual as many

pupils leave school at the earliest possible time to find employment to assist and support the family.

The privileged scholars, who can afford to further their education, either attend the secondary

schools in the area or secondary schools located in larger towns outside the area.

Table 42: below indicates education level by gender: Source Stats SA survey 2007

Male Female Grand Total Some Primary Education 44213 50700 94913 Completed Primary Education 9615 10337 19952 Some Secondary Education 49353 57027 106380 Completed Secondary Education

8766 8226 16992

Certificate with/without Std 10/Gr 12

3277 2968 6245

Diploma with/without Std 10/Gr 12

2203 2281 4484

Degree & Higher 1314 717 2031 No schooling 14399 27899 42298 Unspecified 2151 2385 4536 Institutions 503 270 773

Grand Total 135794 162810 298604

The expansion of the mining activities in the GTM area presents an opportunity to address

unemployment in the area. However, the low skills levels pose a threat in this regard. Education

should be geared towards meeting the skills needs of the growing economy as a result of the mining

activities. The FET (Further Education and Training) facility at Dr CN Phatudi College is assisting

majority of the Young people in acquiring different skills in the area. There are no tertiary education

facilities like Technikons and Universities in the areas of GTM. Plans are underway to develop a

Technical school by the Mining houses in consultation with the Municipality and the Limpopo

Provincial Department of education.

Page 71: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

71 | P a g e

Challenges

• Shortage of classrooms in some schools within the municipality

• Shortage of high schools

• Children still crossing the busy R37 road and got involved in accidents

3.6.2 Health and Social Development

Welfare facilities in the GTM fall under the jurisdiction of the Department of Health and Social

Development of the Limpopo Province. Although there are still challenges in terms of distribution of

welfare services, the population within the GTM has fair access to social welfare services. SASSA

indicates that a big portion of the State resources are spent in the form of child grant in the Area of

Greater Tubatse Municipality especially in areas that are predominantly rural. Many of the

beneficiaries are either fostered, old aged, need support one way or the other hence they receive

different forms of grant, issues contributing to high dependency rate on grants range from amongst

others, orphans resulting from HIV/AIDS related death, child-headed households

Table 43: below shows statistics on grant beneficiaries in GTM (SASA Annual Performance 2009/10)

Month CSG CSG

EXT

W/V DG OPG AGE CDG FCG Q7FCG Q7DG Q7CSG SDR GIA

DEC 09 1320 - - 313 95 - 17 213 - 01 08 - 02

NOV09 545 - - 160 96 - 46 105 - - - - 01

OCT09 833 01 - 332 122 - 13 129 - - - - 03

SEP09 837 12 - 109 82 - 08 137 - - - - 05

AUG09 415 08 - 136 71 - 02 11 - - - - 01

JUL09 347 - - 140 64 - 06 30 - - - - -

JUN 10 2972 - - 248 357 - 18 153 - - - - 07

MAY10 1361 - - 135 155 - 06 59 - - - 250 02

APR10 270 - - 13 10 - 03 07 - - - - -

MAR10 615 86 - 157 189 12 07 608 01 - 07 100 01

FEB10 248 132 - 51 68 14 15 41 - - 06 - 02

JAN10 246 81 - 36 23 19 02 72 - - 02 2200 -

TOTAL 10045 320 - 1830 1332 45 149 1565 01 01 26 2550 24

Food insecurity occurs when people are under-nourished, a state that usually arises when their food

intake falls below their minimum calorie (energy) requirements. Under-nourishment can be the

result of several factors, including the physical unavailability of food e.g. during drought or an

inability to purchase food because of financial constraints. Food insecurity is therefore an extreme

revealing indicator of poverty levels in the municipality.

Food insecurity is very complex, however it involves a multiple factors like land availability, access to

natural resources and socio-economic circumstances of communities. The national Department of

Agriculture undertook a comprehensive livelihoods survey in the area of Sekhukhune in both 2004

and 2006. The survey highlights that some of the areas facing the worst levels of food insecurity in

Greater Tubatse at the following villages:

Page 72: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

72 | P a g e

Table 44: below shows levels of food insecurity in GTM

Village Score

Ga-Mamapuru 42.86

Ga-Masha 42.85

Santeng 42.85

Pidima 42.85

Kgautswane 42.78

Tshehlwaneng 42.70

Factors that give rise to food insecurity within the Greater Tubatse are food price increase, petrol

hikes, growing costs of producing food, an increase in the number o individuals within households,

violence, theft and illnesses etc. There is also evidence that ongoing water scarcity and limited

economic opportunities within the area limit the ability of its residents to adapt and cope to external

stresses and shocks. - .

3.6.3 Health facilities

There are 11 medical facilities in the GTM, which mainly constitute regional clinics that provide

localised inputs to the community. The Dilokong Hospital is the biggest hospital followed by

Mecklenburg, HC Boschof and Penge health centre. There are Clinics scattered in the area, i.e.

Burgersfort, Bothashoek, Praktiseer, Ga-makofane, Motshana, Ga-mashabela, Ga-motodi, Ga-rantho

Ga-riba, Leboeng, Malokela, Mampuru, Montwaneng, Mophalema, Phiring, Taung, Motlolo and Ga-

selala. There are three clinics located respectively in Steelpoort, Ohrigstad and Burgersfort, which

were previously the responsibility of the National Health Department and hence, these clinics offer

improved service to those scattered across the region. Specialist treatment is exclusively available at

the major hospitals outside of the municipal area, where sustainable health care is at an optimum.

General Challenges facing health services:

• Lack of access to health services.

• Shortage of doctors in Government Hospital.

• Shortage of medication in clinics.

• Lack of mobile clinics and the irregular services provided by Mobile clinics that are there

must be attended to.

• The long distances and/ or poor road conditions make hospitals and Clinics inaccessible

• Clinics should operate on a 24 hour basis.

• The stipend for Home-based carers must be adjusted upwards.

• Ill-treatment of community members by officials at clinics

• Response of ambulance services need to be addressed

• Poor services in clinics e.g. nurses sleeping while on duty

3.6.3.1 HIV and AIDS

HIV and AIDS is increasingly becoming a major public health problem and accounting for the highest

number of deaths in the country. Statistics already indicates that one out of five people are HIV

positive. Apart from addressing preventative and curative approaches it is important to address

social conditions aggravating the vulnerability of communities to HIV and AIDS, such as poverty

Page 73: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

73 | P a g e

especially among rural women. Linkages between community care and support services and health

facilities should be developed to ensure holistic approach to the handling of the epidemic.

Dependency ratio will increase dramatically in the short term and decline in the medium to long

term (10 to 15 years) source: Town and Regional Planning Commission Report. The Impact of HIV

and AIDS on Planning Issues is enormous as the change of demographics is rapid and unpredictable.

The Town and Regional Planning Commission Report indicate that the number of orphans will

increase resulting in children headed households. This is already a problem especially in housing

with an increase in children headed households.

The economy will be affected negatively as the household income will increasingly be spent on

medical costs initially, and finally resulting in loss of income. In order to fight against this pandemic

HIV and AIDS, GTM has developed local HIV and AIDS strategy to address the pandemic

appropriately.

Table 45: HIV and AIDS Stats: Source: Limpopo – Facility Indicator Data 2008-09

Sort Data Elements Name Grand Total

128 HIV pre-test counselled (excluding antenatal) 25 011

129 HIV client tested( excluding antenatal) 16 136

130 HIV test positive – new ( excluding antenatal) 3 186

133 Antenatal client tested for HIV 7 314

134 Antenatal client tested for HIV-new 1 236

135 Nevirapine dose to woman at antenatal or labour

881

136 Live birth to woman with HIV 630

137 Nevirapine close to baby born to woman with HIV

621

138 HIV test of baby born to HIV woman at 9 months

249

139 HIV test positive of baby born to HIV pos woman at 9 months

25

140 Blood drawn for CD4 5 035

141 Referral to ART service point for ART assessment-new

345

142 Registered ART patient 4 906

143 Registered ART patient on any adult regimen 4 550

144 Sexual assault case-new 75

145 Sexual assault case-new given ARV prophylaxis

68

146 Occupational HIV exposure-new case 6

147 Occupational HIV exposure case given ARV prophylaxis-new

6

Page 74: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

74 | P a g e

Sort Data Elements Name Grand Total

148 HIV positive new patient screened for TB 1 216 149 HIV positive new patient with confirmed TB 83

150 HIV positive new patient started on INH

prevention therapy 36

151 HIV positive new patient started on Co-trimoxazole prophylaxis

1 129

155 Scheduled dose issued(within 3 days) ART any regimen

4541

156 Scheduled dose defaulted(>3 days) ART any regimen

18

157 Impatient days-ART patient 2

General Challenges facing HIV/AIDS

• Insufficient drop in centres

• Most orphaned children are not in foster care due to long children procedures

• Inaccessible ARV sites and HIV and AIDS support groups

• Insufficient co-ordination of HIV and AIDS data from private agencies e.g. private medical

facilities, mining institution and nongovernmental organisation.

3.6.4 Safety and Security

There are currently five police stations within the GTM, namely Burgersfort, Leboeng, Mecklenburg,

Ohrigstad and Tubatse police stations. There are three satellite police stations in the area, namely

Penge, Driekop and Ga-Mapodile. Various types and degrees of crimes are reported in various police

stations on daily basis i.e. rape, murder, armed robbery, and house breaking. Penge satellite police

station has recorded the lowest levels of crime, whereas the Tubatse station has recorded the

highest in the region followed by Mecklenburg and then Leboeng.

Community Policing Forums (CPFs) have been established in several areas with varying degrees of

success. Magistrate courts are also available in the following areas of Burgersfort, Leboeng,

Mecklenburg and Tubatse police stations. There is a need for the development and implementation

of a crime prevention strategy in the area.

The department of Safety and Security and Liaison deployed 13 personnel as safety ambassadors in

various wards within the municipal area. The Deployed personnel work jointly with SAPS and

Municipal officials in driving a programme of anti crime and creating awareness through public co-

ordination. The area itself is composed of rural and urban settlements with more influx of foreign

nationals in particular, the mining industries. Crime rate is relatively high with the following statics

recorded:

Page 75: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

75 | P a g e

Table 46: Table below indicates crime rates in GTM: source SAPS crime situation 2010

CRIME NAME PERCENTAGE

House robbery 16%

ATM blasting 75%

Business robbery 15%

Rape 18%

Armed robbery 10%

Car hijackings 25%

Assaults 64%

Theft of copper 66%

General theft (including shop lifting) 80%

Domestic related crimes 74%

The following areas are regarded as flash points within the vicinity of the Greater Tubatse

municipality:

• Burgersfort town, Steelpoort town, Manoke village, Dresden village, Riba cross Village,

Bothashoek village, Mashamothane village, Praktiseer, Moroke village, Diphale village, Driekop

village.

3.6.5 Disaster Management

Disaster management service is shared service between GTM and Sekhukhune District Municipality

in terms of the Municipal demarcation board and Municipal systems Act, Act 32 of 2000. The

Municipality established disaster management sub unit in 2007 whose role is to co-ordinate disaster

management related issues.

General Challenges facing Disaster Management

• Unit is unable to assist victims with necessary relief material e.g. tents, blankets and food

parcels due to lack of funding

3.6.6 Sports, Arts and Culture

Well-developed sport and recreation facilities generally exist at the urban schools and mines.

Hence, these facilities are placed in the urban areas and are therefore not accessible to the extended

rural population. A formal sports facility (Ntoampe sports facility) has been constructed in the

Moroke area through the assistance of the Provincial department of sports arts and culture and

Transnet.

The rural villages often have some informal sport facilities such as an open soccer field used for

community sports. However, these are just open pitches in the communities that do not have the

necessary infrastructure to develop sustainable sports and recreation precincts.

Page 76: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

76 | P a g e

For the 2010 soccer tournament, the Greater Tubatse municipality has been accorded an

opportunity to host the tournament on a big screen. The screen will be mounted at Ntoampe sports

facility in Moroke village. The municipality is therefore charged with a responsibility of developing

strategy on how the said event will be hosted.

There are currently three community centres within the GTM and are Leboeng, Kgautswane and

Kgopaneng Thusong centres. The Ga-mapodile community centre in Ward 7; built by XSTRATA is still

under construction and is earmarked to be completed by 2010. GTM has progressively constructed

two community halls during the 2008/09 financial for Driekop and Mokgotho village in ward 16.

During the 2009/10 financial year, the municipality has budgeted for the construction of another

two community halls in both Leboeng and Tjate village. Various mining houses have also build

community halls as part of their social labour plans in areas like, Ga-selala, Mandagshoek and

Legabeng village near Ga-Maroga.

In areas without community hall facilities, School halls and church buildings are often used by

communities during elections, community meetings, etc.

3.6.7 Post Offices There are at least five post offices in Greater Tubatse Municipality which are at Burgersfort,

Ohrigstad, Steelpoort, Driekop and Penge. Lobby boxes are found in areas like Leboeng, Praktiseer,

Ga-Mapodile, Ngwaabe, and Moroke, and other rural areas. The South African Post offices has

developed lobby-boxes which assist in making the services accessible to communities. There is a

need for the South African Post Office Services to expand the services to other rural and

marginalised areas

3.7 Good Governance and Public Participation

3.7.1 Communication

The Greater Tubatse municipality has developed its communication strategy in 2008 and is reviewed

on annual basis. There is a dedicated communication unit available in GTM which serves as a key

driver of the strategy. The unit is attached to the Executive support department and has three

officials.

There are several means of communications used e.g. print media and electronic media. The

municipality also uses its web-site for communication purposes. Several structures such as Ward

Councillors, Ward committees, Community Development workers and Magoshi are also used as

vehicles for communication in the area.

The Municipality communicates its planning processes and the implementation of both the IDP and

Budget using the media for both internal and external communication.

Plans are underway to make arrangements with Tubatse community radio station for a slot every

Thursday whereby Municipal information can be communicated.

3.7.2 Public participation

Greater Tubatse Municipality has established its public participation unit in 2006. The unit comprise

four officials focusing on special programmes and public participation. Community development

workers and ward committees are linked to this unit for reporting purposes and alignment. Public

participation strategy is in place to guide activities that have to be undertaken by the unit. The Unit

has also established clusters for the purpose of public participation processes for the IDP and the

Budget. Public gatherings are the sole responsibilities of the Public participation unit.

Page 77: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

77 | P a g e

3.7.3 Ward Committees

The municipality comprises of 29 wards with 10(ten) ward committee members each. The ward

councillor serves as the chairperson of the ward committee. Training for ward committees is

conducted each year to assist with the day to day running of the ward. Annual Schedule of meetings

is submitted to the office of the Speaker each year. This will assist the Speaker to track down

minutes of the said meetings and monitor functionality of the ward committees in different wards.

The Greater Tubatse municipality budgeted for the provision of sty-pens to the ward committees

which is paid on monthly basis.

3.7.4 Community Development Workers

There are 27(Twenty Seven) community development workers appointed by office of the Premier in

the Greater Tubatse municipality. An intensive training or capacity building was conducted by the

OTP through the University of Venda. All CDWs in the GTM have graduated as qualified community

development workers.

3.7.5 Traditional Leadership The Greater Tubatse municipality had 29 wards and is currently having 31 (thirty one) wards and a

larger portion of the municipality is predominantly rural. With its rural nature, the area is

administered by Traditional Leaders and are responsible for the day to day running of the traditional

authorities including land allocation in the rural areas .Majority of the land claims in the Greater

Tubatse municipality are lodged by Traditional Leaders.

There are 23 (twenty three) recognised Traditional Leaders and 11(eleven) are serving in the Greater

Tubatse municipality as members of the Council. The relationship between Traditional Leaders and

the Municipality is generally good and therefore needs to be maintained.

3.7.6 Intergovernmental Relations

Intergovernmental relations is a cross cutting function in all departments, however the Greater

Tubatse municipality has created a unit in the strategic planning department to deal specifically with

IGR matters. The unit is staffed with 2 (two) members. The Municipality has approved Customer

Care Framework during 2009/10 financial year which lays a foundation for the IGR matters in the

municipality. The unit is also responsible for the day to day handling of the Presidential queries as

raised on the hotline by way of referring them to relevant departments for investigation and

attention. The unit is also responsible for reporting to the President progress in terms of solving all

queries as raised on the hotline.

3.7.7 Special focus Groups

Greater Tubatse Municipality has appointed officials to deal with special focus groups such as

Disabled, Youth, Women and Children. The Municipality has also created a forum that deals

specifically with matters relating to disability and the forum is functional.

3.7.8 Audits

Internal Audit for the municipality has been developed and is functional. Audit committee for the

municipality is also formulated and is reporting directly to Council as required by law. The Risk

Management Strategy of the Greater Tubatse municipality is identifying risk areas which need to be

monitored on daily basis. The audit plan which is developed by the Internal Audit unit is linked or

integrated into the risk strategy and serves as a vehicle to monitor progress and processes followed

during the risk reduction phase. Annual financial statements are prepared annually and are

submitted to the Auditor General for auditing.

The municipality is annually developing action plans to deal with issues or comments in the

management letter raised by the Auditor General. For the past two years, the Greater Tubatse

municipality did not get a clean audit report and as a result the management has developed or

created a position of a risk management officer who will be responsible for the day to day

implementation, monitor, and report, evaluate and review of the risk management strategy.

Page 78: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

78 | P a g e

3.7.8.1 Internal Audits

Below are internal audit findings for the 2009/10 financial year.

Table 47: Performance Information Review

No. Detailed Findings

1. Lack of procedures manual for guiding the process of collecting, processing and monitoring

performance information.

2. Insufficient portfolio of evidence to substantiate quarterly reports.

3. Reports not made public through municipal website.

4. Key performance indicators in the SDBIP are not linked to a specific budget.

5 Lack of Management Information System (MIS) to manage and facilitate effective

performance information reporting.

6 Inaccurate reporting against the key performance indicators in the quarterly performance

report.

7 Quarterly reports not submitted.

Table 48: Performance Audit on Technical Services

No Detailed Findings

1. Project Business plan is not comprehensively achieved and not coordinated with community

services.

2. There is no proof that service providers were assessed to determine if they had adequate

capacity and competence to carry out the work tendered for.

3. There is no documentary evidence that the quality of work performed by the contractors was

adequately monitored by the municipality.

4. Municipal Infrastructure Grant Management Information System (MIG) (MIS) was never used

by the project management unit (PMU).

5. A fully fleshed project management unit was not established and adequately capacitated.

Page 79: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

79 | P a g e

Table 49: Disasters Management

No Detailed Findings

1. Inadequate Recording and registering of disasters.

2. Disaster information not validated.

3. Non implementation of approved disaster management structure.

4. Lack of communication structure.

5. Late response to the reported disaster incidents.

6. Lack of disaster recovery and business continuity policy and procedures.

7. In adequate movement and issuing of disaster relief materials.

8. Movement and issuing of disaster relief materials not reported to relevant stakeholders.

Table 50: Supply Chain Management

No Detailed Findings

1 Lack of contract management and administration.

2 Lack of supplier clearance checks prior to awarding of contracts

3 Lack of contracts register by Legal Department.

4 Invoice not signed by the relevant head of department.

5 No blacklisting of suppliers for inferior services or goods.

6 Payment packs not stamped “PAID” after processing of payment.

7 Required number of quotations not obtained.

8 Supplier’s database not adequately maintained.

Page 80: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

80 | P a g e

Table 51: Economic and Land Development

No. Detailed Findings

1. LED forum meetings not held.

2. Preliminary actions for the implementation of the LED Strategy not undertaken.

3. No evidence of monitoring and evaluation of Implementation of LED strategy.

4. Projects not implemented.

5. Vacant positions within the Economic and Land Development Section.

6. Inadequate policy and procedure manual that guides processing and administration of Land

use and Town planning applications

7. No screening committee to provide strategic guidance and to ensure that land use and town

planning applications are efficiently and effectively administered.

8 No proper register in place to effectively administer application processing.

9 No evidence that applications were evaluated by the technical and finance department.

10 Site inspection not done by town planner.

Table 52: Performance Management for Second Quarter

No. MATTERS RAISED

1 Lack of performance agreements for Section 57 Managers

2 Lack of Performance Management System (Electronic)

3 The reported actual performance results are not complete and substantiated by relevant

source documentation

4 Non compliance with Section 45 of the Municipal System Act

5 Targets were not specific, measurable and time bound

Page 81: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

81 | P a g e

Table 53: Asset Management

No Detailed Findings

1 Movement and transfer of assets policy not communicated.

2 Municipal assets not properly bar-coded

3 Unauthorised movement of asset to another location.

4 Inaccurate asset register.

5 Municipal assets not properly safeguarded

6 Asset disposal committee not in place.

7 In adequate adverting for auctioning of municipal assets

8 Municipal asset not regularly verified.

Table 54: Corporate Governance

No Detailed Findings

1. Lack of central Partnership Governance Framework

2. The municipality does not keep any transcript records as evidence for decisions taken at

High Courts

3. No measure in place to safeguard employees against conflicts of interest

4. No effective Audit Committee in the municipality

5. No effective Risk Management and Whistle-blowing policy

6. Information loaded on the website is not updated on a regular basis

7. Code of conduct not communicated to employees

Table 55: Human Resources Management

No Detailed Findings

1 Some of the Policies and procedures are not approved.

2 Declaration of interest not always done by the interview panel members.

3 No reference checks performed

4 Overtime not pre-authorised

5 Overtime worked not in terms of regulation

Page 82: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

82 | P a g e

No Detailed Findings

6 Inadequate monitoring of leave management

7 Retention Strategy not in place

8 Succession plan not in place

9 Recruitment forms not in employee’s personnel files

10 Exit interviews were not always conducted

Table 56: Performance Management System

No Detailed Findings

1. Lack of performance agreements for Section 57 Managers.

2. Lack of Performance Management System (Electronic).

3. The reported actual performance results are not complete and substantiated by relevant

source documentation.

4. Non compliance with Section 45 of the Municipal System Act.

5. Targets were not specific, measurable & time bound.

Table 57: Document management system

No. Detailed Findings

1. No policies and procedures in place for Document Management Systems

2. Records are not classified in accordance with the Minimum Information Security Standards

3. Confidential records of the municipality are not kept in a centralized secured place

4. No structured system/framework for document management systems

5. Access to the Registry is not restricted

6. No forms of request are completed when records are requested from the registry

7. There is no separate register for recording confidential and sensitive records

8. Disposals of financial records not done in accordance with the National Archive and

Records Services of South Africa

Page 83: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

83 | P a g e

Table 58: Information Technology general control review

No Detailed Finding

1 There were no change management policies and procedures or practices relating to

normal and emergency changes

2

There were no human resource policies and procedures relating to recruitment, retention

and termination of ICT personnel

3 The disaster recovery policies and procedures for IT Infrastructure are not yet formally

approved

4 No Facilities Management policies and procedures or practices were in place

5

There were no operations management policies and procedures or practices in place.

6 There was inadequate Logical Access management

Table 59: Occupational Health and safety

No Detailed Findings

1. Non implementation of Occupational Health and Safety policy

2. Health and Safety inspection not conducted regularly.

3. Lack of disaster recovery and business continuity policy and procedures.

4. Non compliance with the relevant regulations.

5. Non implementation of Record keeping in terms of the Occupational Health & Safety Act.

6. Non functional of the Health and Safety structure

Table 60: Financial Management Review

No. Detailed Findings

1. Low Revenue Collection.

2. Debtors’ statements not delivered to all debtors.

3. Challenges affecting revenue base not addressed.

4. Unallocated Receipts.

5. Indigent Register not yet up to date.

6. Creditors Reconciliations not reconciled to statements.

7. Requisitions not signed by Head of Department.

Page 84: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

84 | P a g e

Table 61: Inter-Governmental Relations Review

Detailed Findings

1 Minutes of District Intergovernmental Forums as per the IGR Act are not maintained.

2 There is no complaint handling register that is kept and maintained by the municipality.

3 Turnaround time for complaint handling process not established.

4 There is no Public Private Partnership Framework within the municipality.

5 Non compliance to Batho Pele Principles in relation to Consultation and Courtesy.

Table 61: Performance Management System 3rd Quarter 2009/2010

Detailed Findings

1. Lack of controls and procedures for employee goal setting and Performance

2. No proof that Section 57 Managers have been assessed based on the Quarterly Report and

the Performance Agreement

Table 62:Inter-Governmental Relations Review

No Detailed Findings

1 Minutes of District Intergovernmental Forums as per the IGR Act are not maintained.

2 There is no complaint handling register that is kept and maintained by the municipality.

3 Turnaround time for complaint handling process not established.

4 There is no Public Private Partnership Framework within the municipality.

5 Non compliance to Batho Pele Principles in relation to Consultation and Courtesy.

Page 85: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

85 | P a g e

3.7.8.2 Auditor General‘s Report Table 63: Below are the Audit Findings and Action plan for 2009/10 financial year:

No Summary Classification Action plan to address

audit queries

1 Accumulated surplus –difference

between the annual financial

statements and the trial balance

Financial Year-end reconciliation for

balance sheet/statement of

financial statements

preparation. This reconciliation

should form part of the audit

pack to be submitted to the

Auditors.

2 Non compliance with section 15 of

the MFMA

Compliance (Non

AFS)

Develop compliance checklist

for monthly reviews

3 Approved cash management policy

not in place

Compliance (Non

AFS)

Perform monthly reconciliation

s along with the monthly

management pack for review

by designated officials.

4 Bank reconciliations not reviewed by

the accounting officer

Compliance (Non

AFS)

Perform monthly

reconciliations along with the

management pack review by

designated officials

5 Contravention of section 9 of the

MFMA

Control Perform monthly reconciliation

along with the monthly

management pack for review

by designated officials

6 Cash and cash equivalents prior year

error

Financial Perform monthly

reconciliations along with the

monthly management pack for

review by designated officials.

7 Petty cash reconciliation not

performed

Control Perform monthly

reconciliations along with the

monthly management pack for

review by designated officials

Page 86: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

86 | P a g e

No Summary Classification Action plan to address

audit queries

8 Cash and bank journal entries lack of

supporting documents

Financial Perform monthly

reconciliations along with the

monthly management pack for

review by designated officials

9 Prior year audit findings raised :

contravention of section 131 (1) of

the MFMA

Compliance (Non

AFS)

Compile action plan to address

all management letter queries

and portable matters in the AU

10 Accounting policies disclosed not

applicable

Financial Compile checklist for

compilation of Annual Financial

Statements, including reviews

of Accounting policies therein

applied.

11 Annual financial statements

disclosure

Financial Compile a checklist for

compilation of Annual Financial

Statements, including review of

Accounting policies therein

applied.

12 Employee cost: 21 % vacancy rate Compliance (Non

AFS)

Management to come –up with

the decision on

implementation thereof

13 Employee costs – overtime Compliance (Non

AFS)

Compile monthly report for

monitoring of leave records

and statistics for appropriate

management action.

14 Employee cost- Annual leave Compliance (Non

AFS)

Compile monthly report for

monitoring o leave records and

statistics for appropriate

management action.

15 Contravention of section 5 of the

unemployment insurance

contribution Act No.4 of 2002

Compliance (Non

AFS)

Develop a checklist of all

relevant regularatory and

legislative framework and

ensure that it is covered by

Internal Audit in the

Compliance Review audits to

ensure adherence.

16 Overtime policy not in place Compliance (Non

AFS)

Develop Overtime Policy for

approval and adoption by

Council

Page 87: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

87 | P a g e

No Summary Classification Action plan to address

audit queries

17 Employee cost –leave accrual non

compliance of section 7 (3) of the

South African Local Government

Association (SALGA)

Compliance (Non

AFS)

Develop a checklist of all

relevant regulatory and

legislative frameworks and

ensure that it is covered by

Internal Audit in the

Compliance Reviews audit to

ensure adherence.

18 Employee costs- Annual leave Control Implementation and

compliance to relevant and

applicable policies to manage

human resources effectively.

19 Employee costs – Sick leave Control Implementation and

compliance to relevant and

applicable policies to manage

human resource effectively.

20 Employee costs - other leave Control Implementation and

compliance to relevant and

applicable policies to manage

human resource effectively.

21 Employee costs – leave encashment Control Implementation and

compliance to relevant and

applicable policies to manage

human resource effectively.

22 Employee costs –terminations Control Implementation and

compliance to relevant and

applicable policies to manage

human resource effectively.

23 Employees costs appointments Control Implementation and

compliance to relevant and

applicable policies to manage

human resource effectively.

24 Employee costs – Leave a crucial Financial Calculation of annual provision

in accordance with the

legislative framework

Page 88: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

88 | P a g e

No Summary Classification Action plan to address

audit queries

25 Task team report Compliance (Non

AFS)

Any task team report

commissioned and since been

completely by the respective

task team appointed should be

made available to the auditors

in the event that it is

requested.

26 contravention of section 125 (2) of

the MFMA

Compliance (Non

AFS)

Aggressive application of the

MFMA prior year visions.

Implementation of Internal

Audit Recommendations with

respect to issue of non

27 Inventory valuation Development of accounting

policy in preparation of annual

financial statements

28 Investments prior year error Financial Address all prior year audit

findings prior to

commencements of next

scheduled audit. Engage with

auditor general to ensure

issues are

29 Expenditure –operating leases Financial Adhere to financial

requirement in accordance with

the applicable reporting

standards.

30 Audit committee: contravention of

section 166 of the MFMA

Financial Ensure compliance to audit

committee charter

31 Audit committee meetings Compliance (Non

AFS)

Ensure compliance to audit

committee charter

32 Excessive legal costs incurred Operating

expenditure

Review of legal costs incurred

and devise measures o

minimise the spend. This cost is

however driven by external

factors.

Page 89: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

89 | P a g e

No Summary Classification Action plan to address

audit queries

33 Contravention of supply chain

management policy 12 (1) (b) (c)

Compliance (Non

AFS)

Implement controls to ensure

compliance to financial and

operational policies

34 Operating expenditure – lack of

supporting documentation

Control Correct preparation of vat

returns support by relevant

calculations and reconciliations

35 Operating expenditure – payments

made on pro-forma invoices

Control Request suppliers in the

hospitality industry to always

submit a final invoice

subsequent to service provision

36 Expenditure recorded in the

incorrect financial year

Financial Implementation of cut –off

testing procedures to ensure

that expenditure is reported in

the correct financial reporting

period.

37 VAT input claimed in the incorrect

financial year

Financial Review of vat reconciliations to

ensure correct treatment

thereof in the financial records

of the municipality

38 Expenditure –payments exceeding 30

days

Financial Implement controls to ensure

compliance to financial and

operational policies

39 Expenditure – quotations Compliance (Non

AFS)

Implement controls to ensure

compliance to financial and

operational policies

40 Expenditure –payment vouchers not

signed by the delegated official

Control Implement controls to ensure

compliance to financial and

operational policies

41 Water and sanitation expenditure

overstated

Financial Compliance with the provisions

contained in the relevant and

applicable legislation, service

level agreements in place to

ensure compliance and

accurate revenue recognition

Page 90: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

90 | P a g e

No Summary Classification Action plan to address

audit queries

42 Systems description not in place Financial Compile a listing of all critical

financial processes and develop

system descriptions to assist

users in understanding and

executing

43 Management comments not

satisfactory

Control Timely preparations for the

annual financial year audit

through preparation of audit

packs to assist with substantive

responses. Implement a robust

process for addressing audit

queries and review of the

responses thereof.

44 Subsequent events –procedures not

established to identify subsequent

events

Control Implementation of applicable

procedures to identify

subsequent events and

incorporate this as part of

Annual Financial Statements

compilation checklist.

45 Purchase and payables – system

description

Compliance (Non

AFS)

Compile a listing of all critical

financial processes and develop

system descriptions to assist

users in understanding and

executing

46 Purchases and payable – system

description

Financial Review of financial statements

items disclosure to ensure

appropriate classification

47 Unallocated receipts Financial Implementation of the

statements items disclosure to

ensure appropriate

classification

48 VAT input incorrectly classified as

liability

Financial Review of vat reconciliations to

ensure correct treatment

thereof in the financial records

of the municipality

Page 91: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

91 | P a g e

No Summary Classification Action plan to address

audit queries

48 VAT input incorrectly classified as

liability

Financial Review of vat reconciliations to

ensure correct treatment

thereof in the financial records

of the municipality

49 Difference between the creditors age

analysis and the annual financial

statements

Financial Development of a creditor’s

ledger, sub ledger and

preparation of monthly

reconciliations of individual

suppler statements to invoices.

Review of year end cumulative

reconciliation as part of annual

financial statements

compilation preparations.

50 Sundry creditors – debit balance Financial Review of annual financial

statements items for correct

account classification and

disclosure thereof.

51 Unrecorded liabilities Financial Develop subsequent event

procedures to be carried after

year end to determine

unrecorded liabilities

52 Accrued expenses not recognised at

year end

Financial Incorporated accrual

computations as part of year

end preparation for annual

financial statements.

53 Trade creditors – no creditors listing Control Development of a creditor

ledger, sub ledger and

preparation of monthly

reconciliation of individual

supplier statements to invoices.

Review of year end cumulative

reconciliation as part of annual

financial statements

compilation preparations.

Page 92: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

92 | P a g e

No Summary Classification Action plan to address

audit queries

54 Other payables – no accruals listing Control Development of a creditor’s

ledger, sub ledger and

preparation of monthly

reconciliations of individual

supplier statements to invoices.

Review of year end cumulative

reconciliation as part of Annual

Financial Statements

compilation preparations.

55 VAT input claimed in the incorrect

financial year

Financial Review of vat reconciliation to

ensure correct treatment

thereof in the financial records

of the municipality

56 VAT input not claimed Financial Review of vat reconciliations to

ensure correct treatment

thereof in the financial records

of the municipality

57 Individual reconciliation

performance

Control Development of a creditor’s

ledger, sub ledger and

preparation of monthly

reconciliations of individual

supplier statements to invoices.

Review of year end cumulative

reconciliation as part of the

Annual Financial Statements

compilation preparations.

58 Reconciliation of the creditors

control account not performed

Control Development of creditor’s

ledger, sub ledger and

preparations of monthly

reconciliations of individual

supplier statements to invoices.

Review of year end cumulative

reconciliation as part of Annual

Financial Statements

compilation preparations.

Page 93: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

93 | P a g e

No Summary Classification Action plan to address

audit queries

59 Trade creditors – year end

statements not provided for audit

purposes

Control Development of creditor’s

ledger, sub ledger and

preparations of monthly

reconciliation of individual

supplier statements to invoices.

Review of year end cumulative

reconciliation as part of Annual

Financial Statements

compilation preparations.

60 VAT input – capital nature difference

between trial balance and general

ledger

Financial Review of vat reconciliations to

ensure correct treatment

thereof in the financial records

of the municipality

61 Assignment of the responsibility of

drafting the IDP to the Municipal

Manager

Compliance (Non

AFS)

Responsibility to compile the

IDP should be delegated by the

Municipal Manager to the

relevant municipal official. Key

performance indicators should

be identified and linked to the

IDP for use in monitoring and

review of performance and

effective implementation

thereof.

62 Inadequate information reported in

the Annual Performance report

Performance

information

Responsibility to compile the

IDP should be delegated by the

Municipal Manager to relevant

municipal officials. Key

performance indicators should

be identified and linked to the

IDP for use in monitoring and

review of performance and

effective implementation

thereof.

63 Inadequate time given to community

to comment on the final draft IDP

Performance

information

Public participation time should

be increased to allow for inputs

from the community

64 Documents that must be made

public not published on the website

Performance

information

Critical municipal documents

should be identified for listing

in the municipal website.

Page 94: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

94 | P a g e

No Summary Classification Action plan to address

audit queries

65 Inconsistencies in reporting

performance information

Performance

information

Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective implementation

thereof.

66 Measures to improve performance

not disclosed for certain KPI’s

Performance

information

Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective implementation

thereof.

67 Key performance indicators not

budgeted

Performance

information

Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective

68 Incorrect actual performance

recorded in the annual performance

report

Performance

information

Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective

69 Key performance indicators not

budgeted

Performance

information

Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective

70 Inadequate controls over

performance information

Performance

information

Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective

71 Project score cards not development

during the setting of targets

Performance

information

Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective implementation

thereof.

Page 95: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

95 | P a g e

No Summary Classification Action plan to address

audit queries

72 Key performance indicator not

reported in the annual performance

report

Financial Key performance indicators

should be identified and linked

to the IDP for use in monitoring

and review of performance and

effective implementation

thereof.

73 Difference between the fixed assets

register and the annual financial

statements

Financial Correctly update assets

transactions on the asset

register (additions, disposal,

transfer, revaluations and write

–up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

74 Property plant and equipment

difference between the general

ledger and the annual financial

statements

Financial Correctly upstate assets

transaction on the asset

register (additions, disposal,

transfers, revaluations, and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

Page 96: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

96 | P a g e

No Summary Classification Action plan to address

audit queries

75 Property plant and equipment

difference between the general

ledger and the annual financial

statements

Financial Correctly upstate assets

transaction on the asset

register (additions, disposal,

transfers, revaluations, and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

76 Fixed assets register –non

compilation of section (63) of the

MFMA

Compliance (Non

AFS)

Correctly upstate assets

transaction on the asset

register (additions, disposal,

transfers, revaluations, and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

77 Depreciation –system verification

weaknesses

Financial Correctly upstate assets

transaction on the asset

register (additions, disposal,

transfers, revaluations, and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

Page 97: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

97 | P a g e

No Summary Classification Action plan to address

audit queries

78 Property plant and equipment

system verification weakness

Financial Correctly upstate assets

transaction on the asset

register (additions, disposal,

transfers, revaluations, and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

79 Fixed assets physical verification

competencies

Financial Annual performance of asset

count and verification, updating

asset register with the relevant

findings from the verification

exercise

80 Fixed assets physical verification

existence

Financial Annual performance of asset

count and verification, updating

asset register with the relevant

findings from the verification

exercise

81 Assets with no cost in the fixed asset

register

Financial Correctly update assets

transactions on the asset

register (additions, disposal,

transfers, revaluations, and

write-up or write down,

depreciatin0 in accordance with

accounting policy for assets and

national treasury minimum

requirement for a complaint

asset register. Ensure assets

annual financial disclosure note

ties to the updated asset

register of the municipality.

Page 98: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

98 | P a g e

No Summary Classification Action plan to address

audit queries

82 Difference in depreciation as per

asset register and financial

statements

Control Correctly update assets

transactions on the register

(additions, disposal, transfers,

revaluation, and write-up or

write down, depreciation) in

accordance with accounting

policy for assets and national

treasury minimum requirement

for a compliant asset register.

Ensure assets annual financial

disclosure note ties to the

updated asset register of the

municipality.

83 Water infrastructure of community

assets accumulated depreciation

Financial Review assets for impairment

and apply appropriate

provisions provided within the

financial reporting standard on

impairment of assets.

84 Understatement of community

assets accumulated depreciation

Control Correctly update assets

transactions on the asset

register (additions, disposal,

transfers, revaluations and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

asset annual financial

disclosure note ties to the

updated asset register of the

municipality.

Page 99: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

99 | P a g e

No Summary Classification Action plan to address

audit queries

85 Weakness identified revaluation of

fixed assets

Financial Correctly update assets

transactions on the asset

register (additions, transfers,

disposals, revaluations and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

86 Assets from completed projects not

capitalised

Financial Correctly update assets

transactions on the asset

register (additions, transfers,

disposals, revaluations and

write-up or write down,

depreciation) in accordance

with accounting policy for

assets and national treasury

minimum requirement for a

complaint asset register. Ensure

assets annual financial

disclosure note ties to the

updated asset register of the

municipality

87 Debtors average collection period Compliance (Non

AFS)

Debtor data cleansing and

implementation of the debt

management and credit control

policies. Monitoring and review

of Debt collector’s efforts in

recovery of long outstanding

debt and collection through

development of performance

indicators.

88 Difference between the debtors age

analysis and the annual financial

statements

Financials Preparations of monthly

management packs and

supporting reconciliations

Page 100: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

100 | P a g e

No Summary Classification Action plan to address

audit queries

89 77% total debtors outstanding as per

age analysis at year end 30 June

2009 are more 90 days

Control Debtor data cleansing and

implementation of the debt

management and credit control

policies. Monitoring and review

of Debt collectors efforts in

recovery of long outstanding

debt and collection through

development

90 Debtors outstanding for more than

12 years

Control Debtor data cleansing and

implementation of the debt

management and credit control

policies. Monitoring and review

of Debt collectors efforts in

recovery of long outstanding

debt and collection through

development

91 New indigents debtors application

forms were not verified by an official

or municipal agent appointed by

council

Control Implementation of the indigent

policy

92 Trade receivables not disclosed

correctly in the annual financial

statements

Compliance ( Non

AFS)

Compilation of annual financial

disclosure checklist to assist

with the preparation of annual

financial year audit

93 VAT liability incorrectly recognised as

an asset

Financial Review of vat reconciliations to

ensure correct treatment

thereof in the preparation of

Annual Financial Year Audit

94 Bad debts policy used by the

municipality not disclosure

Control Compilation of annual financial

disclosure checklist to assist

with the preparation of annual

financial year audit

95 Traffic fine revenue understated Financial Development of measures and

acceptable procedures to be

applied in accounting for traffic

revenue in consultation with

the Auditor general

Page 101: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

101 | P a g e

No Summary Classification Action plan to address

audit queries

96 Overstatement of water and

sanitation revenue

Financial Compliance with the provisions

contained in the relevant and

applicable legislation, service

level agreements in place to

ensure compliance and

accurate revenue recognition

97 Revenue interest income difference

between bank certificate and the

general ledger

Financial Monthly review of bank

reconciliations and corroborate

to supporting documentation

for competencies.

98 Infrastructure projects CIDB projects Value for money Effective monitoring and

reporting on infrastructure

projects through review of

progress against service level

agreements and effective

project.

3.7.9 Risk management

The Greater Tubatse Municipality has adopted a Risk Management Strategy in June 2010 and is

reviewed annually to suite the current situation or circumstances. Objective of the risk management

strategy is to identify asses and prioritise the risks that need to be managed in order to achieve the

vision, mission and strategic objectives of the municipality. The following risk areas are identified in

the risk management strategy:

REF RISK

INHERENT

RATING

1 Inadequate information and communications technology 25

2 Inadequate financial management 25

3 Fraud and corruption 25

4 Inadequate compliance with Legislation and policies 25

5 Inadequate business continuity management 25

6

Inadequate implementation of supply chain management process and

systems 20

7 Inadequate infrastructure 16

8 Inadequate funding to fulfill mandate 16

9 Inadequate financial accounting 16

Page 102: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

102 | P a g e

REF RISK

INHERENT

RATING

10 Inadequate inter-governmental relations 16

11 Ineffective implementation of spatial development framework 16

12 Inadequate monitoring and evaluation 16

13 Inadequate service delivery infrastructure 16

14 Poor payment culture 16

15 Poor tenure system 16

16 Inadequate technical capacity 16

17 Inadequate funding 16

18 Inadequate human resource management 16

19 Inadequate monitoring of projects 16

20 Inadequate stakeholder engagement 12

21 Inadequate implementation of governance systems 12

22 Impaired reputation of the municipality 12

23 Inadequate communication systems (Internal and external) 12

24 Inadequate community participation 12

25 Inadequate disaster management 9

26 Local reliance on commodities 6

27 Lack of revenue generation in rural area 4

28 High service delivery expectations 4

29 Poor perceptions 4

3.7.10 Fraud and Anti corruption

Greater Tubatse Municipality has adopted the Fraud and Anti corruption Strategy in May 2008,

however no implementation of the strategy was witnessed due to lack of resources. Risk

Management Officer was appointed in 2010 and it was agreed that the Risk Officer will be currently

responsible for the implementation of the Strategy until such time that Risk Manager and Additional

Risk Officer are appointed. The Municipality is also planning to develop a fraud and Corruption Policy

during the 2011/12 financial year.

Fraud and Corruption in its wider meaning, and as referred to in the document, includes any conduct

or behaviour where a person accepts, agrees or offers any gratification for him/her or for another

person where the purpose is to act dishonestly or illegally, such behaviour also includes the misuse

of material or information, abuse of a position of authority or a breach of trust or violation of duty.

Page 103: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

103 | P a g e

The following forms of corruption are identified in the GTM fraud and Corruption strategy:

• Bribery

• Embezzlement

• Fraud

• Extortion

• Abuse of power

• Conflict of interest

• Abuse of privileged information

• Favouritism and

• Nepotism

3.8 Financial Viability and Management

3.8.1 Municipal Sources of Revenue

A Municipality has to generate its own revenue by way of levying its Clients on the services rendered

and receive income from National Government for a Municipality to be able to perform its powers

and functions as in terms of section 152 of the Constitution of the Republic of South Africa. It is in

this context that the National Government has to allocate some resources in a form of Grants for

Municipalities to be able to render services.

3.8.1.1 Grants received by GTM

Section 214(1) of the Constitution of the Republic of South Africa, 1996 requires an Act of Parliament

to provide for the equitable division of revenue raised nationally among the National, Provincial and

Local Spheres of Government and any other allocation to Provinces, Local Government or

Municipalities from the National Government’s share of revenue, and conditions on which those

allocations may be made.

Table 64: below indicates revenue received from Grants and subsidies for the 2010/11 F/Y

SOURCE AMOUNT

Equitable share Councillor contribution 3 168 000

Equitable shares 91 358 000

Finance management grant 1 000 000

Municipal support grant 750 000

MIG funds 28 884 576

PMU funds 1 375 456

City development strategy grant 1 250 000

Page 104: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

104 | P a g e

SOURCE AMOUNT

IRMA grant 4 300 000

Electrification grant 9 000 000

LGSETA 250 000

Institutional grant 1 200 000

EPWP grant 870 000

3.8.1.2 GTM Own sources of revenue

GTM is collecting revenue by way of levies, tax and services mainly from the proclaimed areas such

as Burgersfort, Steelpoort, Ohrigstad, Ga-Mapodile and Praktiseer. The municipality has also

developed traffic stations which generate income by way of traffic fines and testing of motor

vehicles within the area.

Table 64: following indicates own revenue by source for the 2010/11 F/Y:

SOURCE AMOUNT

Assessment rates 37 000 000

Refuse management fees 4 500 000

Sewerage fees 4 080 000

Water 9 616 084

Building plans and inspection fees 530 000

Cemeteries fees 70 000

Clearance certificate 30 000

Drivers licences 800 000

Interests on outstanding debtors 2 817 055

Learners licences 805 000

Libraries fees 1 000

Outdoor advertisement 30 000

Rent on property 350 000

Traffic fines 3 300 00

Interests on investments 650 000

Offsetting of depreciation 2 400 000

Bulk water contribution 1 000 000

Page 105: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

105 | P a g e

Table 65: below indicates GTM cash flow for 2009/10 financial year:

MONTH INCOME

OWN GRANT

TOTAL

INCOME

EXPENDITURE

OPERATION

EXPENDITURE

CAPITAL

July 4 495 041 33 141 148 37 636 189 11 258 178 1 096 770

August 3 908 967 750 000 4 658 967 13 969 459 3 082 551

September 4 317 926 - 4 317 926 11 737 750 3 005 922

October 4 783 778 228 375 5 012 151 11 976 790 445 257

November 4 340 109 4 500 000 8 840 109 11 038 730 2 451 485

December 4 181 441 24 783 287 28 964 728 12 619 570 4 066 249

January 4 386 088 - 4 386 088 4 428 633 11 071 033

February 2 874 981 3 667 471 6 542 452 9 366 781 20 443 267

March 4 481 822 18 587 465 23 069 287 9 905 762

April 9 502 046 - 9 502 046 9 269 204

May 4 204 120 - 4 204 120 9 594 200

June 4 012 820 228 375 4 241 195 17 963 600

3.8.2 Credit and Debt Control

Creditors and Debt collection manual was adopted in terms with chapter 9 of the municipal Systems

act, act 32 of 2000. Purpose of this policy is to ensure that credit control forms part of the

municipality’s financial system and to disclose the intension of the Council to standardise procedures

for each individual case.

3.8.3 Investments

The Greater Tubatse municipality has adopted an investment of funds policy and principle in 2008.

The policy is aimed at gaining the highest possible return without undue risk during those periods

when funds are not needed. Its main objectives are that effective cash management must be met at

all times, efficient cash collection procedure, effective payment of creditors, management of

investment in inventories and investment of surplus cash.

There were no investments made or budgeted for by the Greater Tubatse municipality during the

2009/10financial year.

3.8.4 Budget and Treasury

The municipality has developed a unit which manages the budgetary and treasury issues. The unit is

in the finance section and its main objectives are to develop a budget process plan which is linked to

the IDP process plan. The unit has to oversee the implementation of the plan and to manage

activities culminating during the development of the budget. It must develop a credible and realistic

budget which is linked or integrated to the IDP.

Page 106: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

106 | P a g e

3.8.5 Revenue Management

Greater Tubatse municipality has a unit that deals with revenue management. The unit was

developed in 2000 and its main objectives are to effectively manage the day to day income of the

municipality. Procedure manual is being developed in November 2008 for the control over cash

funds, depositing and receiving of funds by municipal employees.

Valuation roll for the municipality is in place and is reviewed regularly. The following are also used

for the management of funds in GTM; rates policy, credit control policy, indigent policy, indigent

register and audit standards.

3.8.6 Supply Cain Management

The municipality has developed and adopted a supply management policy in 2005, which is

reviewed regularly to suite current circumstances. It is managed by supply chain management unit

that forms part of the finance department. The unit comprises of a Manager and four other officials

who runs the activities of the unit

3.8.7 Asset Management

Asset management policy was approved By GTM in 2008. Objectives of the policy is to govern the

management of assets owned by GTM (both operational and financial) to ensure that they are

managed, controlled, safeguarded and used in an efficient and effective manner.

Asset management register for the municipality was compiled during 2008/09 financial year and is

updated regularly. The municipality created asset management unit which comprises of one senior

manager who will always keep track of all municipal assets and is reporting to the Chief Financial

Officer.

Page 107: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

107 | P a g e

3.9 Municipal Transformation and Organisational Development

3.9.1 Council

GTM has a Council made up of 57 Councillors comprising 29 ward Councillors and 28 PR Councillors.

It has a collective executive system headed by the Mayor, while the Council is chaired by the Speaker

elected in terms of Section 48 and Section 36 of the Municipal Structures Act (117 of 1998)

respectively.ANC is the majority party in the council, it comprises of 52(fifty two) councillors

followed by PAC with only 2(two) and UIF, NVP and DA with one representative each. GTM

committees were established following the provisions of Section 80 of the Municipal Systems Act of

2000. There are 11 Traditional Leaders seconded by the Limpopo House of Traditional Leaders

serving in the GTM council.

Table 66: below shows representation of different Political parties and Traditional Leaders in the

Council

Stakeholder Number

Africa National Congress 52

Pan African Congress 2

Democratic Alliance 1

UIF 1

NVP 1

Traditional Leaders 11

The relationship between the Council and Traditional Leaders in GTM is sound as there are no

serious incidents reported between the two parties. The Municipality also comprises of 28 CDWs

appointed by Office of the Premier to assist in fast racking development in the area. 29 ward

committee structures were launched and work-shopped by the municipality through office of the

speaker in 2008. Each ward comprises of 10 members of the ward committee with the ward

councillor being the chairperson of the structure. An amount of R1.2 million was budgeted during

the 2009/10 financial year for the sustainability of the structures.

Table 67: Section 79 committees of the Municipal Systems Act

NAME OF COMMITTEE DATE ESTABLISHED

Rules Committee 2009

Oversight Committee

Audit committee 2009

Municipal public Accounts committee 2010

Town planning committee 2010

Geographic names committee 2008

Petition and Ethics committee 2010

Page 108: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

108 | P a g e

Table 68: Section 80 Committees established in GTM

COMMITTEE DATE ESTABLISHED

Finance committee March 2006

Corporate Services committee March 2006

Economic, Land and Development committee March 2006

Community services committee March 2006

Technical Services committee March 2006

Strategic Planning committee March 2006

3.9.2 Staff Component

The Community Services Department is by far the largest, followed by Corporate Services and

Technical services respectively. While the larger allocation of staff to technical services is welcome,

the size of Corporate Services compared to Community Services seems anomalous. There is a high

vacancy rate within the departments of which such posts needs to be filled. The GTM Council has

raised a moratorium that there should be no new appointments made during the 2008/09 financial

year and that the Municipality must conduct staff assessment during the financial year under review.

Table 69: below indicates Organizational Structure analysis 2010/11 FY Source: GTM Organogram

2010

DEPARTMENT TOTAL No

POSTS

No: FILLED

POSTS

VACANT POSITIONS

BUDGETED UNBUDGETED TOTAL

Municipal

manager’s

office

8 6 2 0 2

Finance 60 34 3 23 26

Community

services

88 58 0 30 30

Corporate

services

54 38 0 16 16

Technical

services

93 57 2 34 36

Strategic

planning

17 8 0 9 9

Economic and

Land

40 18 1 21 22

Executive

support

34 24 1 9 10

TOTAL 394 243 9 142 151

3.9.2.1 Skills profile and needs for both Councillors and Officials

Municipalities are required in terms of the Skills Development Act no 97 of 1998 to facilitate training

for capacity building in order to address skills gaps created as a result of the past. GTM pays the skills

development levy on a monthly basis as required by the Skills Development Levies Act no 9 of 1999.

A skills audit is conducted on an annual basis to inform the Workplace skills plan which guides all the

training to be conducted throughout the year, the Workplace skills plan and Annual Training Report

s are then submitted annually to the LGSETA; budget is allocated for both councillors and officials.

Page 109: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

109 | P a g e

GTM has a training committee which comprises of labour, Management and council; its role is to

ensure that all training activities are done in consultation with all relevant stakeholders.

Table 70: below indicates the skills needs for Councillors and Officials: Source GTM WSP 2010

Finance Admin Technical and

Project

Management

Legal and Corporate Management and

Leadership

44 26 55 75 65

The implementation of planned programmes is minimal due to cash flow problems.

Table 71: below indicates skills interventions as in the 2009/10 WSP and Annual training report

Finance Admin Social/Community/Econo

mic

Development & planning

Legal and Corporate Management and

Leadership

No: of

Interventi

ons

No of people No: of

Intervent

ions

No: of

people

No:

of

Interventions

No: of

people

No: of

Interventions

No: of

people

No: of

Interventions

No: of

people

6 39 3 14 6 96 4 19 3 7

TOTAL NO OF INTERVENTIONS : 22

TOTAL NO OF PEOPLE TRAINED : 175

3.9.3 Legal services

During the financial year under review; the Municipality experienced high number of law-suits as a

result of administrative decision that were either right or wrong. It should be noted that

administrative actions of the Municipality can be only challenge if they are erratic and or in other

instances, Citizens and business challenges actions taken by the Municipality if such actions are

made to be sound or prudent.

Table 72: Following are cases against the municipality for the F/Y 2009/10

Name Amount Claimed Expenditure to date Status

Ipeleng Group 8 000 000 2 100 000 Supreme court

Mopicon construction 2 000 000 00 Awaiting trial

Mmalekgowa Trading 650 000 50 000 Awaiting trial

Limpopo Road Binders 700 000 Funded by DPLGH Awaiting trial

Amelia Mashego 1 000 000 Funded by DPLGH Awaiting trial

Kgoete Justice 150 000 Awaiting trial

Challenges facing legal

• Cases drag through different financial years and take long to be finalised

• Litigation too expensive

• Lack of resources

• Insufficient understanding of legal procedures by the Municipal personnel

Page 110: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

110 | P a g e

3.9.4 Labour relations

Greater Tubatse Municipality subscribes to all legislation regulating employment relations within the

workplace. Labour relations sub-unit has been established with the sole mandate of ensuring a

balance with regard to employment practices within the workplace.

GTM has a functional Local Labour Forum constituted in line with the SALGBC main collective

agreement. The committee sits on a monthly to discus s issues relating to employment relations.

Several activities were witnessed wherein employees were exercising their rights by raising their

grievances through the relevant channels as presented by SALGABC.

During the year under review the municipality had six grievances ending in arbitration of which only

two were awarded in favour of the Municipality.

3.9.5 Information Technology

The IS audit was carried out in accordance with the International Standards on Auditing of the

International Auditing and Assurance Standards Board (IAASB) and the Standards for Information

Systems Auditing of the Information Systems Audit and Control Association (ISACA). The

effectiveness of the general controls surrounding the IT environment at the municipality was

measured against the internationally accepted Control Objectives for Information and Related

Technology (COBIT) framework and industry best practices.

Table 73: below indicates IT risks as identified by the audit

CLASSIFICATION DESCRIPTION

High Weaknesses that could seriously compromise the system of internal control and data integrity and should therefore be addressed as soon as possible.

Medium Matters that are important to the system of internal control and the reduction of overall risk, but do not require immediate attention.

Low Suggested improvements that would enhance internal control efficiency, but are not vital to the system of internal control.

Challenges associated with IT in GTM

• IT security policy not in place and responsibility for internal control and security had not

been assigned to a specific employee.

• No change control policy and procedures were in place.

• No formal backup and restoration procedures were in place and the informal backup process

was found to be inadequate.

• The service level agreements (SLAs) for the Payday, E-Venus and Cash-drawer systems were

not monitored.

3.9.6 Occupational Health and Safety

GTM has established occupational Health safety sub-units one during the 2006/07 financial year

within the Human Resource Unit. The functions of the unit are guarded to advance the objects of

Occupational Health and Safety Act, 85 of 1993.

The sub-unit performs the following functions in an effort to ensure health and safety within the

workplace.

Page 111: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

111 | P a g e

• Enforcement or implementation of Occupational Health and Safety Act.

• Responsible for all administrative duties related to OHS including policy formulation and

reviewing.

• Conducting health and safety workshop, meetings and seminars.

• Providing full range of Employee assistance programme, that is assisting employee with solving

problem which might affect him from executing his/her duties

The sub-unit is currently manned by the Health and Safety Officer who is also responsible for

Employee Wellness. A Health and Safety Committee is functional which has also been established as

per legislative requirement and also there are six health and safety reps in place. The committee

meets on quarterly basis .Committee members have thus far received training on First Aid Level one.

The challenges within the unit are:

• Decentralized protective clothing and equipment budget. Departments are procuring on

their own protective clothing and equipment of which in some instances does not comply

with legislative provisions and the result is high injury incidences.

• Cash flow challenges

• Understaffing within the unit.

3.9.7 Policies and plans for GTM

POLICY/PLAN STATUS DATE APPROVED

Integrated SDF Approved June 2007

LUMS Approved June 2007

Integrated waste management plan Approved

Employment equity plan Approved 2007

Workplace skills plan Approved September 2007

HIV/AIDS plan Approved October 2008

LED strategy Approved June 2007

Housing sector plans Draft

Revenue enhancement plan Approved May 2009

Disaster management plan Approved 2008

Capital investment plan Approved April 2008

Environment management plan None (district)

Energy master plan None (ESKOM)

Water services development plan None (district)

Integrated transport plan Approved 2004

Risk management strategy and plan Approved 2008

5 year investment plan Approved April 2008

Consolidated infrastructure plan Draft

Roads and storm water management plan Approved 2008

Water sector plan Draft

Investment of funds policy Approved May 2008

Credit control policy and debt control manual Approved February 2006

Water services operations and maintenance

strategy(GSDM)

Approved June 2007

Water services by-laws(GSDM) Approved June 2007

Asset management policy Approved April 2007

Supply chain management policy Approved June 2006

Fleet management policy Approved June 2007

Performance management policy Approved 2007

Communication strategy Approved 2008

Customer Care Framework Approved 2010

Page 112: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

112 | P a g e

POLICY/PLAN STATUS DATE APPROVED

Public participation policy Draft 2010

Mayor and Speaker discretionary policy Draft 2010

Mangement of public gathering policy Draft 2010

Delegation of powers and functions policy Review 2010

Rules of order policy Review 2010

IT policy Approved 2009

Street by-law Gazetted

Management and control of Hostel by-law Gazetted

Informal street trading by-law Gazetted

Waste management by-law Gazetted

Traffic by-law Gazetted

Noise abatement Gazetted

Hiring of community by-law Gazetted

Electricity by-law Gazetted

Crematories and crematoria by-law Gazetted

Emergency services by-law Gazetted

Licensing and control of establishment that sell food

to the public by-law

Gazetted

Municipal Turnaround Strategy Approved 2010

Granting aid Draft 2010

3.9.8 Organisational Performance Management System (OPMS) and Performance

Management System (PMS)

The Greater Tubatse municipality has adopted its performance management policy during the year

2007. A performance management unit was established during 2007 which is currently focusing on

the organisational performance management system. Immediately after the adoption of the IDP and

budget, the municipality develops service delivery and budget implementation plans (SDBIP) which

will serve as business plans for individual departments within the municipality. The adopted SDBIP is

integrated into the performance contracts of the section 57 employees for implementation.

Performance management review workshops are conducted on quarterly basis. After every

performance management review session, a report is tabled to the EXCO lekgotla which comprises

of management and members of the Executive committee. Purpose of this sitting will be to monitor

progress in terms of the implementation of the IDP and budget and to propose reviews where

necessary.

The EXCO lekgotla report also has to serve before Executive committee and to council for directions

and adoption. Half yearly report (section 72report) is developed from the quarterly reports

generated during the EXCO lekgotla sessions. Municipal annual service delivery reports are

generated from this process on annual basis which amongst others will inform the formulation of

the annual report.

After the adoption of the annual report by the municipal council, the oversight committee

scrutinises the report and makes final recommendations to the council for the adoption of the final

oversight report which will then be open for public consumption.

3.9.8.1 Individual PMS

Greater Tubatse Municipality’s performance management system is not fully operational. Only

section 57 managers have signed performance contracts with the municipality and plans are

underway to cascading the performance management to the level-one Managers, and other staff

members for performance monitoring and evaluation.

Page 113: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

113 | P a g e

3.9.9 Ranked needs of Greater Tubatse Municipality

The following 10 needs are ranked in-accordance with the order of their priority:

1. Water

2. Electricity

3. Roads and storm water drainage

4. Waste removal

5. Housing

6. Cemeteries

7. Land acquisition

8. Hawkers stalls

9. Sports and recreational facilities

10. Street and traffic lights

Page 114: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

114 | P a g e

3.9.9.1 Administrative Structure

Page 115: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

115 | P a g e

3.9.10 Organogram

GREATER TUBATSE MUNICIPALITY

ORGANIZATIONAL STRUCTURE

General Council

Office of the Mayor

Executive Committee

Section 80

Committees

Office of the Municipal Manager

Municipal Institutional

Management & Administration

Office of the Speaker

Section 79 Committees

Office Of the Chief Whip

Page 116: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

116 | P a g e

Municipal Manager

DIRECTORATES:

Finance

Corporate Services

Executive Support

Community Services

Economic and Land Development

Strategic Planning

Technical Services

Manager in the

Municipal Manager’s office

Internal Auditor

Internal Audit Clerk

Risk management Officer

Personal Assistant

Secretary Admin Clerk

MUNICIPAL MANAGER’S OFFICE

Page 117: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

117 | P a g e

FINANCE DEPARTMENT

CFO

Deputy CFO

Manager

ExpenditureManager Revenue

Manager

Budget & Reporting

Manager

Supply Cain Management

Manager

Information and Technology

Page 118: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

118 | P a g e

FINANCE DEPARTMENT Continued

Expenditure:

Manager

Expenditure

Deputy Manager

Expenditure

Assistant Manager

Expenditure

Chief Accountant

Expenditure

Accountant Expenditure

(Creditors)

Admin Clerk

X 2

Accountant Expenditure

(Payroll)

Admin Clerk

X 2

Page 119: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

119 | P a g e

FINANCE DEPARTMENT Continued

Revenue:

Manager

Revenue

Deputy Manager

Revenue

Chief Accountant Revenue x2

Accountant Billing

Senior Clerk

Admin Clerk x 3

Cashier x 6

Accountant

Credit control

Senior Clerk

Admin Clerk

Accountant Assessment Rates

Senior Clerk

Admin Clerkx2Cashier X 4

Page 120: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

120 | P a g e

FINANCE DEPARTMENT ContinuedBudget and Reporting:

Manager

Budget and Reporting

Assistant Manager

Budget and Reporting

Admin Assistant

Page 121: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

121 | P a g e

FINANCE DEPARTMENT Continued

Supply Chain Management:Manager

Supply Chain management

Deputy Manager

Assets

Assets Officer Fleet Management Officer

Messenger x 5

Procurement Officer x 3

Admin Assistant x 2

Admin Clerk

Page 122: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

122 | P a g e

FINANCE DEPARTMENT Continued

Information and Technology:

Manager

Information and Technology

Assistant Manager

Information and Technology

IT Officer

Telephone Systems

IT Clerk

IT Officer

Software

IT Clerk

IT Officer

Network

Page 123: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

123 | P a g e

COMMUNITY SERVICES DEPARTMENT

Director Community Services

ManagerTraffic Registration and

Licensing

Assistant ManagerDisaster

Manager Social ServicesAssistant Manager

Environment, Parks & Recreation

Secretary

Page 124: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

124 | P a g e

Community Services continued

Social Services:

Manager Social Services

Sports and Arts MPCC Coordinator HIV & Aids Coordinator Chief Librarian

Librarian x 2

Assistant Librarianx 3

Social Facilitator

Page 125: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

125 | P a g e

Community Services continued

Environment, Parks & Recreation:

Assistant Manager

Environment, Parks & Recreation

Supervisor:

Environment, Parks and Recreation

Cemetery Foreman

General Worker

X 5

Parks & Recreation Foreman

General Assistant

X 14

Driver

Page 126: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

126 | P a g e

Community Services Continued

Traffic & Licensing:

Manager Traffic & Licensing

Chief

Licensing Officer

Superintendant Licensing

Examiner of Driving Licenses

X 5

Superintendant Vehicles Steelpoort

Examiner of Vehicles

X 4

Pitman

X 2

Assistant

Superintendent VTS

Superintendent

Registering Authority

Assistant

Superintendent

Snr Licensing officer

Clerk

E Natis Clerk

X 8

Chief

Traffic Officer Logistics & Admin

Superintendant Traffic

Assistant Superintendant

X 2

Traffic Officer

X 10

Traffic Warden

X 3

Senior Ass Clerk

Clerk

X 2

Assistant

Superintendant Traffic

General Assistant

Chief

Traffic Officer Operational

Messenger of Court

Page 127: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

127 | P a g e

Community Services Continued

Disaster Management:

Assistant Manager

Disaster

Disaster Co-ordinator

Assistant Coordinator

X 2

Admin Assistant

Page 128: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

128 | P a g e

CORPORATE SERVICES DEPARTMENT

Director

Corporate Services

Manager

Corporate Administration

Manager

Human Resources

Manager

Legal Services

Secretary

Page 129: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

129 | P a g e

CORPORATE SERVICES DEPARTMENT Continued

Corporate Administration:

Manager

Corporate Administration

Area Head

Mapodile

Admin Assistant

Area Head Ohrigstad

Admin Assistant

Area Head Praktiseer

Admin Officer

Admin Clerk

Records Officer

Records Clerk

Driver/Messenger

Admin Assistant

Admin Clerk

Receptionist x 2

Page 130: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

130 | P a g e

CORPORATE SERVICES DEPARTMENT Continued

Legal Services:

ManagerLegal Services

Legal officer

Page 131: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

131 | P a g e

CORPORATE SERVICES DEPARTMENT Continued

Human Resources: Manager

Human Resources

Senior HR Officer

Employee Benefits and Personnel Administration

Assistant HR Officer

Employee benefits and Personnel Administration

Senior HR Officer

OHS and

Labour Relations

OHS Officer

Supervisor - Cleaners

Cleaners x 16

Labor Relations

Officer

Senior HR Officer

Training/Recruitment and Organizational Development

Assistant HR Officer

Recruitment and Training

HR Officer :Training and development HR Officer: Work-study

HR CLERK

Page 132: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

132 | P a g e

TECHNICAL SERVICES DEPARTMENT

Director

Technical Services

Manager

PMU Municipal Engineer

Manager

Waste Management

Manager

Roads and Storm Water

Secretary

Page 133: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

133 | P a g e

TECHNICAL SERVICES DEPARTMENT

Project Management Unit

Manager

PMU

Technician x3

Admin Officer

Page 134: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

134 | P a g e

TECHNICAL SERVICES DEPARTMENT

Municipal Engineer

Municipal Engineer

Technician

Supervisor-Sewerage

Foreman

General Assistants X 4 Pump Operatorx 3

Supervisor-Water

Foreman

Pump Operator General Assistantx4

Electrician

Admin Clerk

Page 135: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

135 | P a g e

Manager

Road & Storm water

Technician

Supervisor

Machine Operator/Grader

X6

Truck Driver

X 2

TLB Driver

X2Driver

Foreman

General Assistant

X14

Admin Officer

TECHNICAL SERVICES DEPARTMENT

Roads & Stormwater/ Public Works Unit

Page 136: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

136 | P a g e

TECHNICAL SERVICES DEPARTMENT

RefuseManager

Waste

Supervisor

Waste

Truck DriverStreet Cleaner

X 13

General Assistant

X 8

Admin Officer

Page 137: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

137 | P a g e

STRATEGIC PLANNING DEPARTMENT

Director

Manager

IDP

IDP Officer x 2

1 Vacant

Assistant IDP Officer

Manager

PMS

PMS Officer x 2

Assistant PMS Officer

Manager

IGR

Assistant Manager

IGR

IGR Officer

Coordinator Assistant IGR OFFICER

Secretary Admin Officer

Admin Assistant X2

Page 138: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

138 | P a g e

ECONOMIC AND LAND DEVELOPMENT DEPARTMENT

Director

ManagerDevelopment Planning Services

Manager

Housing & Property Management & Building Control

ManagerLocal Economic Development

Secretary

Page 139: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

139 | P a g e

ECONOMIC AND LAND DEVELOPMENT CONTINUED

Development Planning Services

ManagerDevelopment Planning Services

Assistant ManagerTown Planning

Town Planner

Spatial Planning

X 2

Town Planner

Land Use

X 4

GIS Specialist

GIS Technician Database Administrator

Admin Assistant

Page 140: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

140 | P a g e

ECONOMIC AND LAND DEVELOPMENT CONTINUED

Housing and Building Control

ManagerHousing Property

Management and Building Control

Assistant Manager: Housing and Property

Management

Housing Officer Property Management Officer.

Building Control Officer

Plan ExaminerBuilding Inspector

X 4

Admin Assistant

Admin Assistant

Page 141: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

141 | P a g e

ECONOMIC AND LAND DEVELOPMENT CONTINUEDLocal Economic Development

ManagerLocal Economic Development

Assistant ManagerResearch and Development

Assistant Manager

Sector Coordination

Sector Coordination officer x2

Assistant ManagerTrading and Licensing

Licensing Officers X 4

Admin Assistant

Page 142: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

142 | P a g e

EXECUTIVE SUPPORT DEPARTMENT

Director

Municipal Secretary

Assistant Municipal Secretary

Committee Secretary

X 3

Admin Officer

Admin Assistant x 2

Typist

Report Coordinator

ManagerOffice of the

Mayor

BodyguardMayor

Driver Mayor

Protocol Officer

Admin Support :Chief Whip

Office

Secretary Mayor's Office

Manager Special Programmes

Special Programmes

Officer x 3

Driver

ManagerCommunity Participation

Public Participation

Officer

Social FacilitatorX 3

Secretary Office of the Speaker

Admin Officer

ManagerCommunication

Spokesperson

Communication Officer

Admin Assistant

SecretaryDirector’s Office

Page 143: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

143 | P a g e

3.9.11 SWOT ANALYSIS

KPA: Spatial rationale and Local Economic development

3.9.11.1 Economic and Land Development

Town planning and Local economic development

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Land policies in place, LUMS,SDF,

Building regulations

Booming of mines in the area. Illegal land invasions.

Four qualified town planners in

place, one is a registered

professional.

Top land developers are investing

in the area.

Non cooperation of traditional

leaders on land management

issues.

GIS established (system in place

with one specialist).

Inadequate applications and

equipments

Potential to create PPP

Topographical shapes of the

area hampers more land

development.(for human

settlements and other related

developments)

Inadequate personnel Formalization of some rural areas Most of the land is privately

owned.

Page 144: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

144 | P a g e

Local Economic Development

STRENGTHS WEAKNESS OPPORTUNITIES THREATS

LED strategy in place Business linkages with mines

LED unit established LED Unit understaffed Potential for tourism Government agricultural

projects not properly

supported by communities.

LED Forum not functional Potential for agricultural growth Land invasion on potential

agricultural projects.

Integration of LED forum / IDP

forum

Poor relationship between

mines, municipality and

communities.

High unemployment rate

Mines not beneficiating

Poor skills based on major

economic sectors.

FET College available for

development of required skills

FET College not well equipped

Business support unit established

(LIBSA & LEDET)

Ineffective engagement with

provincial sector departments

Potential growth of BEE in the

mining industry

Page 145: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

145 | P a g e

KPA: Good Governance and Public Participation.

3.9.11.2 Departments: Executive Support.

Communication Unit, Secretariat, Public participation, Special programme

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Communication unit in place

with two personnel.

Insufficient personnel

Local radio station established.

Local news papers available.

Communication strategy in place.

Not well resourced

Local news papers available.

Inadequate civic education.

Website in place Inadequate skills and personnel

GCIS available

Local news papers available.

No clear job

descriptions/delegation

Established communication

forums e.g. ward committees.

Decentralized advertising.

Web site not fully functional

Secretariat unit

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Unit in place.

No clear job descriptions. Support by the district

municipality

Policies and systems available Inadequate skills. Separation of powers bill

available.

Audio recording system available No backup systems (records)

No proper filing systems

Late submissions of agenda

items by departments.

Inadequate communication

Page 146: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

146 | P a g e

Public participation unit

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Unit in place The unit is understaffed.

Inadequate capacity.

Public participation policy in

place.

Public participation strategy in

place

Established and functional ward

committees

Late submissions of reports by

ward committees.

CDW’s in place Lack of cooperation by CDW’s. No clear line of reporting for

CDW’s.

Special Programmes

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Unit in place Understaffed, operate without a

manager

Programmes are in place and

functional.(Youth, elderly, local

AIDS council, moral regeneration

movement, disability forum and

geographic names)

Children and Gender forums

dysfunctional.

Local HIV and AIDS policy in place No policies ( youth, children,

people with disability, gender

and elderly)

National ministry on children,

women and disabled and

National youth development

agency are in place.

NYDA not accessible, the

agency is not yet cascaded to

municipal level

Local youth council launched.

Page 147: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

147 | P a g e

KPA: Financial viability

3.9.11.3 Financial Services

Information technology, supply chain management, Asset management, Revenue and Expenditure

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Fraud prevention strategy.

Supply chain policy.

Asset management policy.

IT systems in place. No IT Master plan in compliant

to Legislative requirement

Policies in place but pending

approval

Physical access control system in

place but not yet commissioned

No off site data storage solution

in place

ICT infrastructure and resources

in place

Frequent network connectivity

downtime

Website and Email in place Inadequate of website content

management

Page 148: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

148 | P a g e

Expenditure

STRENGTH WEAKNESS OPPORTUNITIES THREATS

The unit is in place with seven

employees.

No clear supervision and

communication with service

providers.

Municipal finance management

act is in place to regulate financial

matter.

Venus financial systems in place. Total disregard of legislation

during procurement processes.

Pay day system in place. The municipality is not price

conscious.

Procedure manuals in place. Inadequate specialized

equipments.

Monthly and quarterly Reports

generated and submitted in time.

Uncontrolled study leaves.

Inadequate participation during

budgetary processes.

Inadequate management of

budget.

Page 149: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

149 | P a g e

Revenue

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Revenue enhancement strategy is

in place.

Cash flow problems. Low payments rate by

Government departments and

rate payers.

Indigent policy. Data base is not accurate.

Indigent register. Debt collector

Credit control policy in place. Inadequate control over service

provision

Lengthy legal processes for

recovery of debts.

Monthly and quarterly Reports

generated and submitted in time.

Inadequate management of

service providers.

Qualified audit opinion

Page 150: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

150 | P a g e

Assets Management Unit

STRENGTH WEAKNESS OPPORTUNITIES THREATS

The unit in place with one

employee.

Inadequate staff. The security company not

responsible for the loss of

municipal property.

Asset management policy in

place.

Unauthorized movement of

assets.

Asset audit system in place.

Asset registers GRAB compliant. The asset management policy

not fully communicated and

implemented.

Violation of asset management

policy.

Inadequate security for

municipal assets.

Page 151: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

151 | P a g e

KPA’s: Basic services delivery

3.9.11.4 Community Services Department

Environment parks and cemetery, Social services, Traffic and licensing and Disaster management

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Unit in place with one supervisor

and ten general assistants.

The unit is acutely under

staffed.

Unproductive work force.

Good stakeholder relations

No local environmental

management plan.

District environmental

management plan in place.

Availability of working tools. Poor workmanship of some

facilities during construction

Vandalism

Good relationship with

stakeholders.

Lack of cemetery management

system for newly built

cemeteries.

Availability of recreational parks Shortage of recreational parks Lack of response by potential

sponsors

Availability of municipal

cemeteries

Lack of cemetery and

crematorium in Burgersfort

Accessibility of MIG to develop

cemetery and crematorium

Land Availability

Page 152: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

152 | P a g e

Social Services

STRENGTH

WEAKNESS OPPORTUNITIES THREATS

Unit in place with one manager

and 04 assistant librarians and 02

officers.

skills match and shortage

HIV/AIDS local response strategy

in place

lack of HIV/AIDS Coordinator to

drive the implementation

Viable stakeholder relations E.g.

Public, Private & NPO’s, CBO’s.

Social influx

High HIV/AIDS infection rate.

Available community facilities Poor workmanship of some

facilities during construction

Incomplete and non handing

over to end user depts.

Availability of health and social

facilities.

Vandalism

Accessibility of MIG to develop

sports and recreational facilities.

Lack of sporting, arts

recreational facilities.

Availability of potential sponsors. Land Availability

Functional Libraries Shortage of libraries Availability of potential sponsors

Good stakeholder relations.

Land availability

Page 153: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

153 | P a g e

Traffic & Licensing

STRENGTH WEAKNESSES OPPORTUNITIES THREATS

Suitably qualified personnel Shortage of staff

Lack of dedication by traffic

officers.

Non functionality of robots that

impacts on the schedules of law

enforcement officers.

High rate of Accidents during

none functioning of the

robots.

Available working tools Inadequate working tools

Accessible registration and

licensing centers.

Good stakeholder relations 80/20 apportionment for

licensing fees.

Page 154: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

154 | P a g e

Disaster Management

STRENGTH WEAKNESS OPPORTUNITIES THREAT

Functional Unit with 01

coordinator and assistant.

District intervention in terms of

disasters of greater magnitude.

Flood line settlements

Rapid response by the unit

Functional disaster forum Good stakeholder relations

Page 155: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

155 | P a g e

KPA’s: Local economic development, Good governance and public participation and Institutional development

3.9.11.5 Strategic Planning

IDP, PMS and IGR

STRENGTH WEAKNESSES OPPORTUNITIES THREATS

IDP Unit in place with three

officials.

IDP forum not fully functional DLGH support and District support Rely on STATSSA for data.

Credible IDP in place.

IDP forum available. Inconsistent representation by

members.

IDP Sub-steering committee

established for proof reading of

the document.

IDP Sub-steering committee

not having adequate skills.

Shortage of sector plans

None compliance to IDP

process plan

Public participation not fully

attended to

Page 156: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

156 | P a g e

Performance Management System

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Effective PMS in place Insufficient staff and resources

in the unit

District and provincial support

thorough the District and provincial

for a

PMS policy, Manuel and

framework are in place

PMS not fully implemented, it

is implemented only at

institutional and senior

management level

Availability of PMS legislations

Turnaround strategic is fully

implemented

IGR

STRENGHTS WEAKNESSES OPPORTUNITIES THREATS

IGR Unit is in place with 2

officials

Unit is understaffed SALGA IGR FORUM, DISTRICT

BATHO PELE FORUM

Inconsistency of the forum

Customer Care framework

adopted by Council

Incapacity to deal with the

volume of Presidential queries

within the required time

SADC MOU

Draft IGR Strategy Non availability of the

Ambassadorship framework

Non implementation of the

IGR framework

Draft language policy PANSALB Litigation by Minority groups

Page 157: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

157 | P a g e

KPA: Basic service delivery

3.9.11.6 Technical services

Waste Management, Water and Sanitation, Project Management, Roads and Transport and Electricity

STRENGHTS WEAKNESSES OPPORTUNITIES THREATS

Waste management unit in place

with 21 general assistants and

one supervisor.

Unit is understaffed Support from Department of Water

Affairs and Environment

Lack environmental

awareness campaigns

Integrated waste management

plan in place.

Waste management plan not

reviewed

Waste management by-law in

place.

Inadequate equipment for

waste management

Registered with Institute for

Waste Management of Southern

Africa

Unit operates on a loss

Inadequate enforcement of

waste management by-law

Waste management partially

outsourced

License for Burgersfort landfill

site has expired

High waste management

services backlog

Inadequate beneficiation on

waste management projects

Page 158: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

158 | P a g e

Water and Sanitation (GTM not water services authority nor provider)

STRENGHTS WEAKNESSES OPPORTUNITIES THREATS

District WSDP in place GTM not water services

authority nor provider

Institutional Social Development

(ISD) in place

District WSDP not reviewed to

suit the current status

Support from local mines High water services backlog

District Municipality

outsourced O&M to Lepelle

water services (Turn around

time)

Vandalism of water

infrastructure

Aging infrastructure

Poor maintenance of the

existing infrastructure in rural

and townships

Page 159: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

159 | P a g e

Project Management Unit

STRENGHTS WEAKNESSES OPPORTUNITIES THREATS

PMU established with three

technicians and one admin

officer

No PMU manager Access support from Bigen Africa,

DPLGH,COGTA, & Public Works

Inadequate funding for

implementation of the

projects

Reports submitted to

stakeholders in time

Capital projects implemented in

time

Job creation through EPWP

programmes

Project steering committees in

place

Project steering committees

are incapacitated

Poor workmanship

Page 160: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

160 | P a g e

Roads and Storm water

STRENGHTS WEAKNESSES OPPORTUNITIES THREATS

Integrated Roads Master Plan in

place

Inadequate equipments for

road maintenance

Support from SANRAL & RAL Poor maintenance on

Provincial and National roads

Roads and storm water unit in

place

Poor maintenance of

equipments

Municipal Public Works

programmes in place

High backlog of access roads

and access bridges

Integrated Transport plan in

place

Lack environmental awareness

campaigns

GTM not water services authority

nor provider

District WSDP not reviewed to

suit the current status

Page 161: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

161 | P a g e

Electricity

STRENGHTS WEAKNESSES OPPORTUNITIES THREATS

Dedicated official appointed for

electricity programme

No electricity plan Support from ESCOM & DE GTM not electricity authority

Support from local mines High electricity backlog

Inadequate electricity capacity

Page 162: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

162 | P a g e

KPA: Institutional development and Transformation

3.9.11.7 Corporate services

Human Resource Unit, Legal services and Administration

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Availability of HR Policies

Training

Poor work ethic Access to Support by the District,

Provincial and SALGA

Non compliance with the

Employment Equity Act

Poor personnel records

keeping

Availability of Office Space Inadequate HR systems

Communication Infrastructure

Work Skills Plan – dedicated Skills

Development Facilitator

Lack of capacity in personnel

OD / work study

Functional Training Committee Decentralized training budget

None compliance to Skills

Audit Process by end-users

90% of vacant positions are filled Lack of Job descriptions

Lack of Individual performance

Management Systems

Resignation of employees

from critical positions

Competition with private

sectors over personnel

Page 163: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

163 | P a g e

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Functional Labour Relation sub-

unit

Functional Local Labour Forum

Employee Benefits

administration functional

Occupational Health and Safety

Committee functional

Shortage of personnel in the

OHS subunit

Lack of Occupational Health

and Safety plan ( Evacuation

plan, Emergency response

plan, EAP plan and Employee

HIV and Aids plan)

Lack of personnel in

employees wellness program.

Page 164: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

164 | P a g e

Legal Unit

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Timeous response to litigation

matters

Access to support by DLGH Land invasion

Contracted Attorney

Vetting of contract and Service

Level Agreements within 14 days

Not all stake holders are

consulted during vetting of

SLA

Some SLA are still with end-

users departments

Appointment of Service

providers without

completion/signing of SLA

By-laws in place By-laws not being

implemented

Lack of personnel

Page 165: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

165 | P a g e

Administration Unit

STRENGTH WEAKNESS OPPORTUNITIES THREATS

Competent personnel

Improved communication

between the satellite and the

main office.

Availability of office space No maintenance plan for

satellite offices.

File plan not yet adopted by

council

Inadequate personnel

Lack of security management

plan

Poor security Services

Poor management of

contracts

Inadequate front line skills

Corporate Image deteriorated

None functional electronic

record management system

Risk assessment of building (

Certificate of safety from

engineers)

Building can collapse

Page 166: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

166 | P a g e

SECTION 4: STRATEGY CHAPTER

Chapter 5 of the Municipal Systems Act 32 of 2000 stipulates the core components of integrated

development plans must reflect the following:

• (c) the council ‘s development priorities and objectives for its elected term, including its local

economic development aims and its internal transformation needs;

• (d) the council‘s development strategies which must be aligned with any national or provincial

sectoral plans and planning requirements binding on the municipality in terms of legislation.

Methodology and Processes followed during the development of the strategy chapter

• Sector departments were engaged from 29th November 2010 to 10th December 2010 to conduct

SWOT Analysis and develop departmental strategies.

- Status quo analysis key findings presentation.

- SWOT analysis for various KPA’s and functions

- Departmental strategy formulation

• Municipal Strategic Planning Workshop was held on the 15th December 2010 and 09th -11th

February 2011 and the following was discussed:

- High level status quo analysis presentations

- Austerity measures presented by HOD

- Formulation of Vision, mission and values

- Development of strategic objectives and strategies

- Projects and programmes identification and costing

Page 167: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

167 | P a g e

4.1 Vision for Greater Tubatse Municipality

A vision is a compelling picture of the future. It involves the heart and minds of the Employees and

Councillors of the Municipality to motivate them towards co-operation to create the idealised destination.

The Vision statement of the Greater Tubatse Municipality is:

“A developed platinum city for the benefit of all”

4.2 Mission statements for Greater Tubatse Municipality

A mission describes the purpose of a municipality. It describes the focus for the municipal area. The

mission addresses the objects of local government as stipulated in Section 152 of the Constitution that is

based on:

• democratic and accountable governance;

• sustainable services;

• social and economic development;

• safe and healthy environment; and

• Encourages community involvement.

The mission statements for Greater Tubatse Municipality are:

• Local accountable democracy through active community participation

• Economic advancement to fight poverty and unemployment

• Accessible, needs-satisfying services rendering in a sustainable and

affordable manner

• Municipal transformation and institutional development and

• Environmental management to ensure a balance between safe human

settlements and the economic base of the municipality

4.3 Values for the Greater Tubatse Municipality

Values underline the behavioural characteristics of the GTM. It guides the people within the municipality

towards the achievement of the mission and ultimately the vision of the municipality by not necessarily

outlining solutions how this will be done but rather the manner in which it is accomplished.

The following are Values of the Greater Tubatse Municipality:

Page 168: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

168 | P a g e

• Mutual Respect

• Commitment

• Transparency

• Accountability

• Discipline

Page 169: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

169 | P a g e

4.4 Summary of the Strategy Chapter

Page 170: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

170 | P a g e

4.5 KPA 1: Institutional Development and Transformation

PROBLEM STATEMENT OBJECTIVES STRATEGY OUTCOMES STRATEGIC PROJECTS

Skills shortage To develop a credible skills

planning institutional mechanism

Skills Development A skilled and capable workforce

to support inclusive growth

Developing Workplace skills plan

Inadequate utilization of

workforce

To ensure effective utilization of

the available workforce

Conduct a research

development and

innovation in human

capital

A skilled and capable workforce

to support inclusive growth

Skills audit and placement

Organizational Re-engineering

Development of job descriptions

Poor work ethics To build a disciplined

organizational culture

Facilitate change

management

A development orientated

public service and inclusive

citizenship

Enforcement of employee code

of conduct

Limited power and

functions

To acquire additional powers and

functions that will impact

positively on basic services

Transfer of water

services authority and

provision to the local

municipality

Acquire electricity

license

Acquire housing

accreditation

An efficient, competitive and

responsive economic

infrastructure network

Engagement with District and

local govt.

Apply for supply of electricity in

the Urban and township areas

Applying for housing

accreditation

Page 171: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

171 | P a g e

4.6 KPA 2: Basic Services

PROBLEM STATEMENT OBJECTIVES STRATEGIES OUTCOMES STRATEGIC PROJECTS

Inadequate development and

maintenance of municipal

infrastructure

High roads backlogs

To improve development

and maintenance of

municipal infrastructure

To improve accessibility

and mobility of transport

Improve infrastructural

development and

maintenence

Review and implement

integrated transport plan and

road master plan

An efficient, effective and

responsive economic

infrastructure network

An efficient, effective and

responsive economic

infrastructure network

Stakeholder engagement

Review and Implement the

environmental management plan

Review and implement integrated

transport plan and road master

plan and infrastructure

management plan

Inadequate access to waste

management services

To improve access to waste

management services

Review waste management

implementation plan

A responsive, accountable

effective and efficient local

government system

Extension of services. Review of

current waste management

contract. PPP project.

High electricity backlogs

(28000 HH)

To facilitate increased

allocation of grid electricity

Increase capacity for

engagement

An efficient, effective and

responsive economic

infrastructure network

Stakeholder engagement

High water and sanitation

backlogs

To facilitate increased

allocation of water and

sanitation projects in GTM

Increase capacity for

engagements

An efficient, effective and

responsive economic

infrastructure network

Stakeholder engagement

High housing backlogs To facilitate increased

allocation of housing

projects in GTM

Increase capacity for

engagement

An efficient, effective and

responsive economic

infrastructure network

Stakeholder engagement

Page 172: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

172 | P a g e

4.7 KPA: 3 Local Economic Development

PROBLEM STATEMENT OBJECTIVE STRATEGY OUTCOME STRATEGIC PROJECT

Limited benefit from mining

opportunities

To Improve stakeholder

relationship

facilitate access to

opportunities

Decent employment

through inclusive

economic growth

Coordinated benefit model for

communities (SLP)

Limited benefit from

stakeholder initiated

projects and planning

To improve municipal

support, planning and

financing

To improve support to

small business and

cooperatives

Facilitate

integrated planning

culture

Decent employment

through inclusive

economic growth

Structure institutionalization

Credible IDP

Limited skills appropriate for

mining employment

To facilitate resourcing

of the available learning

facilities

Resource and

influence

transformation of

the learning

outcome

A skilled and capable

workforce to support

inclusive growth

Harness provisions of LEGDP and local

LED Strategy

High unemployment rate To reduce

unemployment rate

Facilitate creation

of 1000 jobs /A

through CWP and

others

A responsive and

accountable , effective

and efficient local

government

Implement CWP and other related

programmes

Page 173: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

173 | P a g e

4.8 KPA: Financial Viability

PROBLEM STATEMENT OBJECTIVES STRATEGIES OUTCOME STRATEGIC PROJECT

Poor budget

management(planning,

implementation and review)

To improve budget

planning management

processes across

departments

Facilitate

comprehensive budget

processes across

departments

Responsive and budget

implementation

Establish budget steering

committee

Poor revenue collection To improve revenue

collection

Develop and

implement revenue

enhancement strategy

Improve quality of

services

Improve revenue

collection

Reduction of debtors

Improved cash flow

Implement revenue strategy

Responsive services maintenance

programme in billing areas

Inadequate asset

management

To ensure accountable

and effective asset

management

Facilitate effective use

of asset management

Proper management of

asset by respective asset

users

Establish asset steering committee

Monthly reporting on assets use

Inadequate implementation of

SCM policy

Ensure legislative

compliance of SCM

policy

Enforcement of SCM

policy

Legislative compliance

with the policy

Monitoring monthly reporting on

compliance

Page 174: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

174 | P a g e

4.9 KPA: 5 Good Governance and Public Participation

Problem Statement Objectives Strategies Outcome STRATEGIC PROJECT

Inadequate communication To ensure council is

portrayed in ways that

restores trust in local

government

Improve stakeholder

relation

Development orientated

public service and

inclusive citizenship

• Updated website;

• Review and implementation

of communication strategy

• Civic education

programmes

• Media house relations

• Implement public

participation strategy

• Improve IGR

Limited functionality of the

oversight tools

• PMS

• Risk

• Audit Committee

• Ward Committee

To improve performance

monitoring and

evaluation

Improve oversight

environment

Responsive accountable,

effective and efficient

local government system

• Review of the PMS

framework;

• Strengthening of the RISK

and Audit unit’s

functionality;

• Ward committee

capacitating

Limited guidelines/policies of

special programmes

• Limited functionality

of forums

• Conflicting roles of

CDWs and council

structures

Enable institutional

environment for

functionality of forums

Strengthening the IGR

environment

Responsive accountable,

effective and efficient

local government system

• Policy development

/guidelines

• Maximised linkages

• Capacity building of forums

Inadequate enforcement of

by-laws

To promote enforcement

of municipal by-laws

Facilitate enforcement

of the gazette

municipal by-laws

All people in South Africa

protected and feel safe

Stakeholder engagement

Contract management

Finalization of the appointment

of peace officers

Page 175: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

175 | P a g e

4.10 KPA: 6 Spatial Rationale

Problem Statement Objectives Strategy Outcomes STRATEGIC PROJECT

Land invasion on potential

agricultural projects and earmarked

development by communities.

To facilitate

formal

acquisition an

requisite use of

land

Land acquisition

and

improvement OF

stakeholder

relation

Sustainable human

settlement and

improved quality of

household life

Implementation of SDF

Enforcement of LUMS

Formalization of settlements.

Lack of Municipal owned land. To facilitate

formal

acquisition an

requisite use of

land

Land acquisition Sustainable human

settlement and

improved quality of

household life

Land acquisition.

Inadequate stakeholder relations To strengthen

relationship

Diverse

engagement

modalities.

Responsive,

accountable,

effective and

efficient local

government systems.

Formation of Forums.

Delayed finalization of Land claims To facilitate

finalization of

land claims

Strengthening

engagement

capacity.

Sustainable human

settlement and

improved quality of

household life

Page 176: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

176 | P a g e

SECTION 5: MEDIUM TERM REVENUE AND EXPENDITURE FRAMEWORK

5.1 Revenue

ITEM Budget Year Budget Year +1 Budget Year +2

2011/12 20012/3 2013/14

PROPERTY RATES (40,700,000) (44,770,000) (49,247,000)

SALE OF WATER - UNITS (11,534,692) (12,688,162) (13,956,978)

SALE OF WATER -PREPAID (693,000) (762,300) (838,530)

SEWERAGE CHARGES (2,948,000) (3,242,800) (3,567,080)

REFUSE REMOVAL CHARGES (6,050,000) (6,655,000) (7,320,500)

EQUITABLE SHARE COUNCILLOR CONTRIBUTION (3,730,000) (393,800) (4,167,000)

EQUITABLE SHARE (110,407,000) (122,281,000) (130,313,000)

EQUITABLE SHARE FREE BASIC ELECTRICITY - - -

FINANCE MANAGEMENT GRANT (1,250,000) (3,000,000) (3,300,000)

GRANT MUNICIPAL SUPPORT (CAPACITY BUILD) (790,000) (800,000) (900,000)

INSTITUTIONAL GRANT (913,500) (1,004,850) (1,105,335)

LGSETA - TRAINING - - -

GRANTS - INTERGRATED NAT ELECTRIFICATION - - -

GRANTS - MIG FUNDS (2,065,550) (2,407,550) (2,529,000)

NEIGBOUR DEVELOP PARTNER (CAPITAL GRANT) - - -

EXP PUBLIC WORKS PROG INCENTIVE GRANT - - -

CITY / DEVELOPMENT STRATEGY - - -

INVESTMENTS (165,000) (181,500) (199,650)

LATE PAYMENT (1,049,400) (1,154,340) (1,269,774)

INTEREST ON OUTSTANDING DEBTORS (3,098,761) (3,408,637) (3,749,501)

RENT - HOUSING (420,000) (462,000) (508,200)

ADVERTISING SIGNS (33,000) (36,300) (39,930)

BUILDING PLANS & INSPECTIONS (250,000) (275,000) (302,500)

BURIAL FEES (60,000) (66,000) (72,600)

CLEARANCE CERTIFICATES (18,145) (19,960) (21,955)

CONNECTION FEES - WATER (15,746) (17,321) (19,053)

FINES - LIBRARY AND LOST BOOKS (1,100) (1,210) (1,331)

LICENSING - COMMISSION ON VEHICLE REGIST (2,000,000) (2,200,000) (2,420,000)

LICENSING - DRIVERS LICENSES (1,100,000) (1,210,000) (1,331,000)

LICENSING - LEARNER LICENSES (1,100,000) (1,210,000) (1,331,000)

Page 177: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

177 | P a g e

ITEM Budget Year Budget Year +1 Budget Year +2

LICENSING - CHANGE OF LIC/ APPL FEES (832,000) (915,200) (1,006,720)

LICENSING - PERMITS (10,000) (11,000) (12,100)

LICENSING - HAWKERS (30,000) (33,000) (36,300)

MEMBERSHIP FEES (5,000) (5,500) (6,050)

SUNDRY INCOME - - -

WATER BULK CONTRIBUTION (440,000) (484,000) (532,400)

VALUATION CERTIFICATE (583) (641) (705)

IRMA AND ACCESS PAVING to COMMUNITY HALL (leboeng) 2,300,000

SUB-TOTAL DIRECT OPERATING INCOME -192,915,477 -211,022,570 -231,563,242

INCOME FOREGONE 1,600,000 1,760,000 1,936,000

TOTAL OPERATING INCOME -191,315,477 -209,262,570 -229,627,242

Page 178: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

178 | P a g e

5.2 Expenditure

BUDGET

ITEM Year Year +1 Year +2

2011/12 20012/3 2013/14

EMPLOYEE SAL AND ALLOWANCE 78,352,647 84,620,858 91,390,527

COUNCILLORS REMUNERATION 17,339,676 18,726,850 20,224,998

ADVERTISEMENTS 385,000 423,500 465,850

ALLOWANCES TRADITIONAL LEADERS 88,000 96,800 106,480

AUDIT COMMITTEE 150,000 150,000 150,000

AUDIT FEES - INTERNAL 280,000 308,000 338,800

AUDIT FEES - EXTERNAL 1,750,000 2,000,000 2,250,000

BANK CHARGES 275,000 302,500 332,750

BOOK REPLACEMENTS 17,600 19,360 21,296

BURIALS - NEEDY PERSONS 38,500 42,350 46,585

BURSARY FUND 330,000 363,000 399,300

COLLECTION COST 500,000 700,000 90,000

COMMUNICATION SYSTEM - - -

COORDINATED BENEFIT MODEL FOR COMMUNITIRES (SLP) 30,000 40,000 50,000

CITY DEVELOPMENT STRATEGY 1,375,000 1,512,500 1,663,750

DEPARTMENTAL BUSINESS PLANS - - -

DISATER PLAN REVIEW 30,000 - -

MAYOR'S DISCRETIONERY FUND 110,000 121,000 133,100

ENTERTAINMENT PUBLIC 264,000 290,400 319,440

SPEAKER'S DISCRETIONERY FUND 46,200 50,820 55,902

EVENTS &SPECIAL PROJECTS 209,000 229,900 252,890

E & S CHILDREN PROGRAMMES 22,000 24,200 26,620

E & S YOUTH PROGRAMMES 275,000 302,500 332,750

E & S DISABILITY 374,000 411,400 452,540

E & S GENDER 55,000 60,500 66,550

E & S ELDERY 33,000 36,300 39,930

E & S GEOGRAPHIC NAMES CHANGE 22,000 24,200 26,620

E & S HIV/AIDS 110,000 121,000 133,100

E & S MORAL REGENERATION MOVEMENT 50,000 55,000 60,500

E & S ISSUE BASED IMIBIZOS 50,000 50,000 50,000

Page 179: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

179 | P a g e

BUDGET

ITEM Year Year +1 Year +2

2011/12 20012/3 2013/14

E & S EXCO OUTREACH 150,000 200,000 250,000

E & S SOLMA 700,000 800,000 900,000

E & S IDP/PM/BUDGET FORUM 50,000 60,000 70,000

E & S MAYORS Special Program 1,500,000 1,000,000 1,000,000

E & S TRAINING OF WARD COMMITEES 120,000 130,000 140,000

E & S TRAINING OF COUNCILLORS - 400,000 500,000

E & S TRAINING OF FORUMS 50,000 50,000 50,000

E & S SUPPORT SECURED LINKAGES 500,000 1,000,000 1,000,000

E & S INSTITUTIONALISATION OF INFORMAL SECTOR 1,000,000 - -

E & S RELOCATION OF BEACONS IN URBAN TOWNSHIP 1,000,000 3,200,000 3,400,000

E & S ENGAGEMENT WITH MAGOSHI 50,000 60,000 70,000

E & S AUDIT URBAN PROPERTIES FOR COMPLIANCE 50,000 60,000 70,000

E & S DEVELOP OF BUILDONG PLANS FOR BGF. S/POORT & O/STAD 500,000 300,000 100,000

E & S PLANING / SURVEY OF MASHIFANE PARK 800,000 600,000 -

FREE BASIC ELECTRICITY EXPENSES 3,500,000 3,850,000 4,235,000

FREE BASIC WATER EXPENSES - - -

FUEL 715,000 786,500 865,150

GIS 610,000 671,000 738,100

GRANTS IN AID 330,000 363,000 399,300

IDP PROCESS 235,000 258,500 284,350

INTER GOVERNMENTAL RELATION 220,000 242,000 266,200

INDIGENTS (COUNCIL CONTRIBUTION) 55,000 60,500 66,550

IMPLEMENTATION MFSA GRANT 1,250,000 1,375,000 1,512,500

INSPECTORATE FEES 66,000 72,600 79,860

RECORDS MANAGEMENT 110,000 121,000 133,100

INSURANCE - GENERAL 440,000 484,000 532,400

EMPLOYEES WELLNESS PROGRAMME 280,500 308,550 339,405

LED STAKEHOLDER FORUM 44,000 48,400 53,240

LED PROJECTS 1,000,000 1,100,000 1,210,000

IT SYSTEM 550,000 605,000 665,500

LEGAL FEES 2,000,000 2,200,000 2,420,000

Page 180: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

180 | P a g e

BUDGET

ITEM Year Year +1 Year +2

2011/12 20012/3 2013/14

NOTICE BOARDS - - -

DEBT COLLECTION 650,000 715,000 786,500

OCCUPATIONAL HEALTH & SAFETY 200,000 300,000 400,000

PERIODICALS 50,000 - 30,000

POLICIES & BY-LAWS 100,000 40,000 30,000

PLANNING FEES - - -

PMS MANAGEMENT 220,000 242,000 266,200

PMU ADMINISTRATION - - -

PMU SKILLS DEVELOPMENT GRANT - - -

POSTAGE & TELEGRAMS 1,100 1,210 1,331

PRINTING & STATIONERY 798,600 878,460 966,306

PROTECTIVE EQUIPMENT 368,500 405,350 445,885

RENT OF EQUIPMENT & OFFICES 1,870,000 2,057,000 2,262,700

RENT OF CEVIC CENTRE 11,600,000 11,600,000 11,600,000

RENT OF FURNITURE 2,164,800 2,381,280 2,619,408

RENT OF IT NETWORK 2,706,000 2,976,600 3,274,260

LEASE OF GRADERS 970,000 1,067,000 1,173,700

STOCK & MATERIAL - - -

STATUTORY LEVIES - STAFF 220,000 242,000 266,200

SUNDRY EXPENSES 33,000 36,300 39,930

SYSTEMS - FINANCIAL 200,000 430,000 460,000

SYSTEMS - TELEPHONE 250,000 150,000 160,000

SYSTEMS - SECURITY - CCTV 5,800,000 800,000 1,000,000

SYSTEMS - WEBSITE 140,000 150,000 160,000

SYSTEMS - WIRELESS & I.C.A.S.A 200,000 300,000 400,000

SYSTEMS - PREPAID WATER 150,000 400,000 450,000

SYSTEMS - INTERNAL AUDIT 150,000 165,000 181,500

TELEPHONE EXPENSES 567,600 624,360 686,796

TOWNSHIP ESTABLISHMENT 550,000 605,000 665,500

TRAINING - STAFF 800,000 850,000 900,000

TRAINING - COUNCILLORS 300,000 330,000 363,000

Page 181: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

181 | P a g e

BUDGET

ITEM Year Year +1 Year +2

2011/12 20012/3 2013/14

VALUATION COSTS 260,000 286,000 314,600

VALUATION COURT EXPENSES 58,300 64,130 70,543

WARD COMMITTEES 3,720,000 4,092,000 4,501,200

CASH COLLECTION COST (DEPOSIT FEES) - - -

PROFESSIONAL SERVICES 165,000 181,500 199,650

PROFESSIONAL SERVICES (CONTRACTED) 6,699,000 7,368,900 8,105,790

SECURITY SERVICES 8,778,500 9,656,350 10,621,985

SECURITY BANKING SERVICES 229,790 252,769 278,046

REDEMPTION EXTERNAL 2,724,700 2,997,170 3,296,887

R & M OF CEMETRY 33,000 36,300 39,930

R & M OF MACHINERY & EQUIPMENT 1,258,755 1,384,631 1,523,094

R & M OF OFFICE FURNITURE & EQUIPMENT 33,000 36,300 39,930

R & M OF PIPELINES - - -

R & M OF STREETS AND PLANT 3,436,450 3,780,094 4,158,104

R & M OF LIGHTS & ROBOTS 990,000 1,089,000 1,197,900

R & M OF VEHICLE & MACHINERY 187,000 205,700 226,270

DEPARTMENTAL: ELECTRICITY 1,760,000 1,936,000 2,129,600

DEPRECIATION ON ASSETS 2,970,000 3,267,000 3,593,700

CONTRIBUTIONS TO BAD DEBTS RESERVE 3,322,000 3,654,200 4,019,620

SUB-TOTAL EXPENDITURE (GROSS) 191,540,524 203,303,730 218,904,149

Page 182: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

182 | P a g e

SECTION 6: PROJECTS

6.1 Greater Tubatse Municipal Projects & Programmes

Project No: Strategic

Project

Unpacked

project No:

Unpacked

Projects

Source of

Funding

Indicators BUDGET

R Values

KPA 1 11/12 12/13 13/14 14/15 15/16

1.1 Developing

Workplace

skills plan

1.1.1 Work place skills

plan

GTM % progress

development of WSP

0 0 0 0 0

1.2 Skills audit and

placement

1.2.1 Skills Audit GTM % progress skills

audit

0 0 0 0 0

1.2.2 Placement GTM % progress

placement

0 0 0 0 0

1.2.3

1.2.3.1

Training

Staff

GTM % progress training

800k

850k

900k

950k

1m

1.3 Organizational

Re-

engineering

1.3.1 Work Study GTM % progress work

study

0 0 0 0 0

1.3.2 Job Descriptions GTM % progress

development of job

descriptions

0 0 0 0 0

1.3.3 Job Evaluation GTM % progress job

evaluations

0 0 0 0 0

Page 183: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

183 | P a g e

Project No: Strategic

Project

Unpacked

project No:

Unpacked

Projects

Source of

Funding

Indicators BUDGET

R Values

KPA1 11/12 12/13 13/14 14/15 15/16

1.4 Enforcement

of employee

code of

conduct

1.4.1 Sign off for code

of conduct

GTM % progress singing

off code of conduct

0 0 0 0 0

1.4.2

Procurement of

legislative

banners and

national symbols

GTM % progress

procurement of

national symbols

50k 0 30k 0 30k

1.4.2 Occupational

health and safety

programme

GTM % progress

implementation of

health and safety

programme

200k 300k 400k 500k 600k

1.5 Engagement

with District

and local govt.

1.5.1 Task Team GTM % progress

development of task

team

0 0 0 0 0

1.5.2 Progress reports GTM # of reports

generated

0 0 0 0 0

Page 184: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

184 | P a g e

Project No: Strategic

Project

Unpacked

project No:

Unpacked

Projects

Source of

Funding

Indicators BUDGET

R Values

KPA1 11/12 12/13 13/14 14/15 15/16

1.6 Apply for

supply of

electricity in

the Urban and

township

areas

1.6.1 Task Team GTM % progress

development of task

team

0 0 0 0 0

1.6.2 Progress reports GTM # of reports

generated

0 0 0 0 0

1.7 Applying for

housing

accreditation

1.7.1 Task Team GTM % progress

establishment of

task team

0 0 0 0 0

1.7.2 Progress reports GTM # of reports

generated

0 0 0 0 0

1.8

Contract

management

1.8.1 Vetting of

contracts

GTM # of contracts vetted 0 0 0 0 0

1.8.2

Service level

agreement

GTM # of service level

agreement signed

0 0 0 0 0

1.8.3 Development of

by-laws

GTM # of by-laws

developed

50k 40k 30k 20k 10k

Page 185: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

185 | P a g e

Project No: Strategic

Project

Unpacked

project No:

Unpacked

Projects

Source of

Funding

Indicators BUDGET

R Values

KPA1 11/12 12/13 13/14 14/15 15/16

1.8.5 Revisit existing

maintenance

contract.

GTM # of maintenance

contracts revisited

0 0 0 0 0

1.8.6 Review current

waste

management

contract.

GTM % progress review of

waste management

contract

0 0 0 0 0

1.8.7 Review disaster

response plan

GTM % progress review of

disaster response

plan

30k 0 0 0 0

1.8.8 Develop pauper

policy

GTM % progress

development of

pauper policy

50k 0 0 0 0

Page 186: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

186 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA 2 11/12 12/13 13/14 14/15 15/16

2.1 Extension of

services.

2.1.1

Roads & storm

water

2.1.1.1 Alverton access

bridge

MIG % progress

development of

bridge

3.1m

0

0

0

0

2.1.2.2 Dresden access

bridge

MIG % progress

development of

bridge

3.1m 0 0 0 0

2.1.2.3 Maropong access

bridge

MIG % progress

development of

bridge

3.45m 0 0 0 0

2.1.2.4 Mokobola access

bridge

MIG % progress

development of

bridge

3.45m 0 0 0 0

2.1.2.5 Molawetsi access

bridge

MIG % progress

development of

bridge

3.45m 0 0 0 0

2.1.2.6 Motlolo access

bridge

MIG % progress

development of

bridge

3.42m 0 0 0 0

2.1.2.7 Mapodile sports

complex

MIG % progress

development of

complex

2.0m 3.0m 2.2m 0 0

Page 187: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

187 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA2 11/12 12/13 13/14 14/15 15/16

2.1.2.8 Burgersfort

internal street

MIG % progress

development of

streets

2.5m 4.0m 5.4m 7.0m 8.5m

2.1.2.9 Ngwaabe access

roads

MIG % progress

development of road

1.5m 3.0m 0 0 0

2.1.2.10 Praktiseer

internal streets

MIG % progress

development of

street

2.5m 4.0m 5.4m 6.0m 7.0m

2.1.2.11 Ohrigstad internal

streets

MIG % progress

development of

streets

2.5m 3.0m 0 0 0

2.1.2.12 Kampeng access

bridge

MIG % progress

development of

bridge

0 2.9m 0 0 0

2.1.2.13 Phiring access

bridge

MIG % progress

development of

bridge

0 3.0m 0 0 0

Page 188: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

188 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA2 11/12 12/13 13/14 14/15 15/16

2.1.2 Electricity

2.1.2.1 Maahlashi DoE % progress

electrification of

village

517K 0 0 0 0

2.1.2.2 Mafarafara DoE % progress

electrification of

village

2.86m 0 0 0 0

2.1.2.3 Malepe DoE % progress

electrification of

village

1.43m 0 0 0 0

2.1.2.4 Moraba DoE % progress

electrification of

village

910k 0 0 0 0

2.1.2.5 Motshana DoE % progress

electrification of

village

3.9m 0 0 0 0

2.1.2.6 Mokgotho DoE % progress

electrification of

village

4.55m 0 0 0 0

Page 189: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

189 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA2 11/12 12/13 13/14 14/15 15/16

2.1.2.7 Maretlwaneng DoE % progress

electrification of

village

2.86m 0 0 0 0

2.1.2.8 Mankele DoE % progress

electrification of

village

1.69m 0 0 0 0

2.1.2.9 Mamogolo DoE % progress

electrification of

village

1.08m 100k 0 0 0

2.1.2.10 Lefahla DoE % progress

electrification of

village

0 900k 0 0 0

2.1.2.11 Kutollo DoE % progress

electrification of

village

0 4.8m 0 0 0

2.1.3 Establishment of

libraries

2.1.3.1 Refurbishment of

Burgersfort

library

MIG % progress

refurbishment of

Burgersfort library

0 0 1.5m 0 0

Page 190: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

190 | P a g e

Project No:

Strategic

project

Unpacked

project No:

Unpacked projects Source of

Funding

Indicators BUDGET

R Values

KPA2 11/12 12/13 13/14 14/15 15/16

2.1.3.2 Establishment of

rural libraries

MIG % progress

establishment of rural

libraries

0 0 0 0 0

2.1.4 Establishment of

cemeteries

2.1.4.1 Establishment of

Burgersfort

cemetery

MIG % progress

establishment of

Burgersfort cemetery

0 0 0 2m 0

2.1.4.2 Establishment of

Praktiseer 2nd

cemetery

GTM % progress

establishment of

Praktiseer cemetery

0 200k 300k 0 0

2.1.4.3 Fencing of Rural

cemeteries

MIG % progress fencing of

Rural cemeteries

3.5m 4m 4.5m 5m 5.4m

2.1.5.1 Purchase of

disaster vehicles

GTM % progress purchase of

disaster vehicle

250k 250k 250k 0 0

2.1.5.2 Provision of

disaster relief

material

GTM % progress provision of

disaster relief material

100k 100k 100k 100k 100k

Page 191: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

191 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked projects Source of

Funding

Indicators BUDGET

R Values

KPA2 11/12 12/13 13/14 14/15 15/16

2.1.6.1 Establishment of 7

parks

GTM % progress

establishment of parks

0 0 0 0 0

2.1.8 Waste

management

GTM % progress

management of waste

4.9m 5.4m 5.9m 6.4m 6.9m

2.1.7 Establishment of

sport and culture

complexes and

events

2.1.7.1 Establishment of

Ngwabe sport

complex

MIG % progress

establishment of sports

complex

0 500k 500k 1m 1m

2.1.7.2 Establishment of

Ohrigstad sport

complex

MIG % progress

establishment of sports

complex

0 500k 500k 1m 1m

2.1.7.3 Establishment of

Driekop sport

complex

MIG % progress

establishment of sports

complex

0 500k 500k 1m 1m

2.1.7.4 Establishment of

Praktiseer sport

complex

MIG % progress

establishment of sports

complex

0 500k 500k 1m 1m

Page 192: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

192 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA2 11/12 12/13 13/14 14/15 15/16

2.1.7.5 Establishment of

Leboeng Sport

complex

MIG % progress

establishment of

sports complex

0 500k 500k 1m 1m

2.1.8 Development of

arts and culture

centre

MIG % progress

development of

arts & culture

centre

0 1m 2m 2m 0

2.1.9.1 Establishment of

Burgersfort

testing station

MIG % progress

establishment of

Burgersfort testing

station

0 200k 1m 0 0

2.1.9.2 Extension of

Praktiseer testing

station

MIG % progress

extension of

Praktiseer station

0 0 1m 0 0

2.1.9.3 Upgrading of

Steelpoort road

worthy centre

MIG % progress

upgrading of

Steelpoort road

worthy centre

0 0 0 2m 0

2.1.9.4 Establishment of

vehicle pound

MIG % progress

establishment of

Vehicle pound

0 0 0 1.5m 0

Page 193: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

193 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA2 11/12 12/13 13/14 14/15 15/16

2.2 PPP Project.

2.2.1

Refuse removal National

Treasury

% progress

implementation of

refuse removal

project

2.2.2 Food for waste National

Treasury

% progress

implementation of

refuse food for

waste project

2.2.3 Recycling National

Treasury

% progress

implementation of

recycling project

2.2.4 Land fill site National

Treasury

% progress

implementation of

land fill site

Page 194: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

194 | P a g e

Project No:

Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA3 11/12 12/13 13/14 14/15 15/16

3.1 Coordinated

benefit

model for

communities

(SLP)

3.1.1 Draft

Document

GTM % progress

development of

document

0 0 0 0 0

3.1.2 Engagement

sessions

GTM # of engagement

sessions held

30k 40k 50k 60k 70k

3.1.3 MOU sign of

support

GTM % progress signing

of M.O.U

0 0 0 0 0

3.2 Institutionaliz

ation of

Structures

and IDP

3.2.1 IGR Structures GTM % progress

establishment of

IGR structures

0 0 0 0 0

3.2.2 Beneficiary

structures

GTM # of meetings held

with beneficiary

structures

20k 20k 20k 20k 20k

3.2.3 Credible IDP

3.2.3.1 Status quo

analysis

GTM % progress

development of

status quo analysis

30K 30K 30K 30K 30K

Page 195: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

195 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA3 11/12 12/13 13/14 14/15 15/16

3.2.3.2 Strategy chapter GTM % progress

development of

strategy chapter

15K 15K 15K 15K 15K

3.2.3.3 Project phase GTM % progress

development of

Projects chapter

0 0 0 0 0

3.2.3.4 Integration

phase

GTM % progress

development of

integration chapter

0 0 0 0 0

3.2.3.5 Approval phase GTM % progress approval

of IDP

30K 30K 30K 30K 30K

3.2.3.6 Printing of IDP

document

GTM # of IDP documents

printed

140k 150k 160k 170k 180k

Page 196: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

196 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA3 11/12 12/13 13/14 14/15 15/16

3.3 Harness

provisions of

LEGDP and

local LED

Strategy

3.3.1 Engagement of

appropriate

stakeholders

(Mines & FET)

GTM % of stakeholder

engagement

meetings resolutions

implemented

0 0 0 0 0

3.3.2 Fresh Produce

market

GTM % progress

facilitation of fresh

produce market

0 0 0 0 0

3.3.3 Development of

DJate heritage

site

GTM % progress

facilitation of

development of

Djate heritage site

0 0 0 0 0

3.3.4 Poverty

alleviation

projects

GTM # of poverty

alleviation projects

funded

700k 800k 900k 1m 1.1m

3.3.5 Mining supply

park

GTM % progress

facilitation of mining

supply park

0 0 0 0 0

3.3.6 Institutionalisatio

n of informal

business sector

GTM % progress

institutionalisation of

informal businesses

1m 0 0 0 0

Page 197: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

197 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators

BUDGET

R Values

KPA3 11/12 12/13 13/14 14/15 15/16

3.4 Implement

CWP and

other related

programmes

3.4.1 Jobs created by;

3.4.1.1 In-house projects GTM # of in-house jobs

created

0 0 0 0 0

3.4.1.2 Mines GTM # of jobs created by

mines

0 0 0 0 0

3.4.1.3 Business GTM # of jobs created

retail

0 0 0 0 0

3.4.1.4 Social institutions GTM # of jobs created by

social institutions

0 0 0 0 0

3.4.1.5 Farming GTM # of jobs created by

farms

0 0 0 0 0

3.4.1.6 Tourism GTM # of jobs created by

tourism

0 0 0 0 0

3.4.1.7 CWP GTM # of jobs created by

CWP

0 0 0 0 0

3.4.1.8 Government

offices

GTM # of jobs created by

Government

0 0 0 0 0

3.4.1.9 Others GTM # of jobs created by

others

0 0 0 0 0

3.4.2 Establishment of

employment data

system

GTM % progress

establishment of

employment data

system

0 0 0 0 0

Page 198: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

198 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA 4 11/12 12/13 13/14 14/15 15/16

4.1 Promote

functionality

of Budget

steering

committee

4.1.1 Promote

functionality of

Budget steering

committee

GTM % progress

promotion of

functionality of

budget steering

committee

0 0 0 0 0

4.2 Implement

revenue

Enhancement

strategy.

4.2.1 *Campaigns GTM # of revenue

campaigns held

0 0 0 0 0

4.2.2 *Debtor data

cleansing

GTM % progress cleansing

of Debtor data

0

0

0

0

0

4.2.3 *Debt

Arrangements

GTM % progress

arrangements of

debts

0

0

0

0

0

4.2.4 Reduction of

municipal service

debts

GTM % progress in

reducing debts.

0 0 0 0 0

Page 199: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

199 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA 4 11/12 12/13 13/14 14/15 15/16

4.2.6 Suppliers

payments

management

GTM % compliance to 30

days payment time

0 0 0 0 0

4.2.7 Creditors

reconciliation

GTM % reconciliation of

all payment

transactions

0 0 0 0 0

4.2.8 Conditional

grants

management

GTM % compliance to

grant expenditure

conditions

0 0 0 0 0

4.2.9 Cash

management and

investments

GTM R-value of cash

available to monthly

expenditure

commitments

0 0 0 0 0

4.2.9 Statutory

payments

GTM % compliance to

statutory obligations

0 0 0 0 0

4.2.10 Pay roll

management

GTM % accuracy in payroll

management

0 0 0 0 0

Page 200: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

200 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA4 11/12 12/13 13/14 14/15 15/16

4.3 Responsive

services

maintenance

program in

billing areas.

4.3.1 Monetary

provision for

basic

maintenance

Collection of

municipal

services billed

GTM % progress monetary

provision for basic

maintenances

conducted

% collection of billed

revenue

0 0 0 0 0

4.4 Establish

asset steering

committee.

4.4.1

Reports

generated from

the system

GTM % implementation of

resolutions from

asset steering

committee

200k 210k 220k 230k 240k

4.4.2 Replacement and

repairs of assets

GTM % progress

replacement and

repair of assets

5m 5m 5m 5m 5m

Page 201: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

201 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

KPA4 11/12 12/13 13/14 14/15 15/16

4.5.5 Wireless System

& I.C.A.S.A

GTM % progress

maintenance of

wireless system

400k 400k 400k 400k 400k

4.5.6 Prepaid Water

System

GTM % progress

maintenance f

prepaid system

350k 400k 450k 500k 550k

4.5.7 Internal audit

systems

GTM % progress

maintenance f

internal audit system

200k 0 0 0 0

4.6 Implementatio

n of the audit

action plan

4.6.1 Internal Audit GTM # of internal audits

undertaken

0 0 0 0 0

4.6.2 External Audit GTM # of external audits

undertaken

# of reports

produced

1.75m 2m 2.25

m

2.5m 2.75m

4.6.3 Audit Committee GTM # of audit committee

meetings held

# of audit reports

produced

150k 150k 150k 150k 150k

4.7 Review and

Implementatio

n of IT plan

4.7.1 Desktop support GTM Turnaround time for

desktop support

0 0 0 0 0

Page 202: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

202 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

KPA4 11/12 12/13 13/14 14/15 15/16

4.8.2 Support for small

businesses

GTM % budget allocated

to small businesses

0 0 0 0 0

4.8.3 Small businesses

subcontracted

GTM % of tenders

subcontracted to

small businesses

0 0 0 0 0

4.2.4 Procurement to

local bussinesses

% procurement to

local businesses

0 0 0 0 0

Page 203: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

203 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA 5 11/12 12/13 13/14 14/15 15/16

5.1 • Updated

website;

5.1.1 Information

collating

GTM % progress collating

information

0 0 0 0 0

5.1.2 legislative

compliance

GTM % progress

legislative

compliance

0 0 0 0 0

• Review and

implementa

tion of

communicat

ion strategy

5.1.3 Status quo

analysis

GTM % progress

compilation of status

quo analysis

0 0 0 0 0

5.1.4 Final approval GTM % progress approval

of communication

strategy

0 0 0 0 0

5.1.5 Implementation

plan for Focus

areas

GTM % progress

implementation of

communication

strategy

0 0 0 0 0

• Civic

education

programmes

5.1.6 Talk shows GTM # talk shows held 0 0 0 0 0

5.1.7 Issue based

imbizos

GTM # of Imbizos held 50k 50k 50k 50k 50k

5.1.8 Newsletters GTM # of news letters

produced

250k 260k 270k 280k 290k

5.1.9 Media release GTM # media statements

released

50k 50k 50k 50k 50k

5.1.10 Marketing and

branding

GTM % progress

marketing and

branding of the

municipality

600k 700k 800k 900k 1m

Page 204: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

204 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA5 11/12 12/13 13/14 14/15 15/16

Implement

public

participation

strategy

5.1.11 EXCO Outreach GTM % EXCO outreaches

issues addressed

150k 200k 250k 300k 350k

5.1.12 SOLMA GTM # SOLMA conducted 700k 800k 900k 1m 1.2m

5.1.13 IDP/PMS/Budget

Forums

GTM # IDP/PMS/Budget

forums held

50k 60k 70k 80k 90k

5.1.14 Establishment of

project steering

committees

GTM # of project steering

committees

established

0 0 0 0 0

5.1.15 Mayors special

programmes

GTM % progress

implementation of

Mayor’s special

programmes

2.7m 2.8m 2.9m 3m 3.1m

Implementation

of PMS

5.2.1 Development of

SDBIP

GTM % progress

development of

SDBIP

0 0 0 0 0

5.2.2 Development

and signing of

performance

agreements

GTM % progress

development and

signing of P.A

0 0 0 0 0

5.2.3 Management

review

GTM # management

reviews conducted

100k 0 0 0 0

Page 205: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

205 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA5 11/12 12/13 13/14 14/15 15/16

5.2.4 EXCO lekgotla GTM # EXCO lekgotla

meetings held

100k 0 0 0 0

5.2.5 Individual

assessments

GTM % progress

conducting of

individual

assessments

0 0 0 0 0

5.2.6 Half yearly report GTM % progress

development of Half

yearly report

0 0 0 0 0

5.2.7 Annual report GTM % progress

development of

Annual report

0 0 0 0 0

5.2.8 Printing of

Annual reports

GTM # reports printed 0 0 0 0 0

Page 206: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

206 | P a g e

Project No: Strategic project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

5.2 • Review of

the PMS

framework;

5.2.1 Incentive model

GTM % progress

development of

incentive model

0 0 0 0 0

5.2.2 Cascading

programmes

GTM % progress

cascading of PMS

to other levels

0 0 0 0 0

5.3 • Strengthenin

g of the RISK

and Audit

unit’s

functionality;

5.3.1 Capacity addition GTM % progress

capacitating Risk

and Audit unit

430k 450k 460k 470k 480k

5.3.2 Compliance GTM % progress

compliance to

legislation

0 0 0 0 0

• Council’s

structures

capacitating

5.2.5 Establishment

and induction of

Councillors

GTM % progress

induction of

Councillors

350k 0 0 0 0

5.2.6 Training of ward

committees

GTM % progress training

of ward

committees

120k 130k 140k 150k 160k

Page 207: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

207 | P a g e

Project No: Strategic project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA5

11/12 12/13 13/14 14/15 15/16

5.2.7 Inauguration of

new Council

GTM % progress

inauguration of

council

50k 0 0 0 0

5.2.9 Training of

councillors

GTM 300K 400K 500K 600K 700K

5.2.10 Training of

forums

GTM % progress training

of forums

50K 50K 50K 50K 50K

• Policy

development

/guidelines

5.2.11 Draft Policy GTM # of policies

developed

0 0 0 0 0

5.2.12 Approval GTM # policies approved 0 0 0 0 0

Page 208: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

208 | P a g e

Project

No:

Strategic project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA5

11/12 12/13 13/14 14/15 15/16

Intergovernmental

relations

5.3.1 Presidential

hotline

GTM # presidential

queries responded

in time

0 0 0 0 0

5.3.2 Implementation

of IGR strategy

GTM % implementation

of IGR strategy

100k 120k 130k 140k 150k

5.3.4 Implementation

of customer care

framework

GTM % implementation

of customer care

framework

50k 60k 70k 80k 90k

5.3.4 Implementation

of language

policy

GTM % implementation

of language policy

0 0 0 0 0

Page 209: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

209 | P a g e

Project No: Strategic project Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

11/12 12/13 13/14 14/15 15/16

• Maximised

linkages/adv

ocacy

5.4.1 T.O.R for linkage

arrangements

GTM % progress T.O.R

linkage

development

0 0 0 0 0

5.4.2 Support secured

linkages

GTM % progress

securing linkages

for T.O.R

• Incentives for

ward

committees

5.4.3. Ward committee

incentives

GTM % progress

payment of ward

committee

incentives

3,720m 4,2m 4,8m 5,3m 5,9m

Page 210: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

210 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

KPA5 11/12 12/13 13/14 14/15 15/16

Systems

management

5.4.4 Wireless System

& I.C.A.S.A

GTM % progress

maintenance of

wireless system

400k 400k 400k 400k 400k

5.4.5 Prepaid Water

System

GTM % progress

maintenance f

prepaid system

350k 400k 450k 500k 550k

5.4.6 Financial Systems GTM % progress

maintenance of

financial systems

400k 430k 460k 490k 520k

5.4.7 Telephone

Systems

GTM % progress

maintenance of

telephone systems

250k 150k 160k 170k 180k

5.4.8 CCTV GTM % progress

maintenance of

CCTV

500k 800k 1.2m 1.4m 1.6m

5.4.8 Website System GTM % progress

maintenance of

website system

140k 150k 160k 170k 180k

5.4.9 Internal audit

systems

GTM % progress

maintenance f

internal audit system

200k 0 0 0 0

Page 211: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

211 | P a g e

Project No: Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

KPA5 11/12 12/13 13/14 14/15 15/16

5.4.10 External Audit GTM # of external audits

undertaken

# of reports

produced

1.75m 2m 2.25

m

2.5m 2.75m

5.4.11 Audit Committee GTM # of audit committee

meetings held

# of audit reports

produced

150k 150k 150k 150k 150k

5.4.12 Financial Systems GTM % progress

maintenance of

financial systems

400k 430k 460k 490k 520k

Page 212: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

212 | P a g e

Project No: Strategic project Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

KPA 6 11/12 12/13 13/14 14/15 15/16

6.1 Implementation

of SDF

6.1.1 Demarcation

of sites

GTM # of sites

demarcated

1.5M 1.5M 1M 1M 1M

6.1.2 Engagement

with

developers

GTM % progress

engagement with

developers

0 0 0 0 0

6.1.3 Relocation of

beacons in

urban

townships

GTM % progress

relocation of

beacons in Urban

and Townships

2,8m 3,2m 3,4m 3,6m 3,8

6.1.4 Engagement

with Magoshi

GTM % progress

engagement with

Magoshi

50k 60k 70k 80k 90k

6.1.5 GIS database GTM % progress

establishment of GIS

1,5m 1,5m 600k 500k 300k

Page 213: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

213 | P a g e

Project No: Strategic project Unpacked

project

No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

KPA 6 11/12 12/13 13/14 14/15 15/16

Enforcement of

LUMS

6.1.5 Audit urban

properties for

compliance

GTM % progress Auditing

of Urban properties

for compliance

50k 60k 70k 80k 90k

6.1.6 Development of

building plans

for BGF,

Steelpoort &

Ohrigstad

GTM % progress

development of

building plans for

BGF, Steelpoort and

Ohrigstad

1m 300k 100k 100k 100k

Formalization of

settlements.

6.1.7 Planning/

survey of

Mashifane park

GTM % progress

formalisation of

Mashifane park

800k 600k 0 0 0

6.2 Land acquisition. Facilitating

transfer of

strategic govt

land to the

Municipality;

Steelpoortdrift,

Aapiesboomen,

Aapiesdoringdra

ai

GTM % progress

facilitation of

transfere of strategic

govt land to the

Municipality

0 0 0 0 0

Page 214: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

214 | P a g e

6.2 Sekhukhune District Municipality

6.2.1 Water and Sanitation Projects

PROGRAMME OBJECTIVES CATEGORY PROJECTS

STATUS BUDGET

Rand value

TOTAL 11/12 12/13 13/14

To supply sanitation to basic

level of service

Sanitation Batau & Ga Manoke Sanitation

Design R 33 439 475 R 33 439 475 0.00 0.00

MIG and District Infrastructure Development Programme

To supply sanitation to basic level of service

Sanitation Burgersfort WWTW 7Ml (new Plant)

Design R 130 000 000 7 000 000 R 62 000 000

R 61 000 000

MIG and District Infrastructure Development Programme

To supply sanitation to basic level of service

Sanitation Dithabaneng VIP Sanitation

Design R 1 100 000 1 100 000 0.00 0.00

Page 215: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

215 | P a g e

MIG and District Infrastructure Development Programme

To supply sanitation to basic level of service

Sanitation Mahlashi, Makosaneng and Motokomane

Design R3 274 592 R3 274 592 0.00 0.00

MIG and District Infrastructure Development Programme

To supply water Water Mooihoek Tubatse Bulk Water Supply Scheme Phase 3

Ongoing R 56 000 000 R56 000 000 0.00 0.00

MIG and District Infrastructure Development Programme

To supply water Water Mooihoek Command Resevoir

New R16,582,748.00 R16,582,748.00 0.00 0.00

Page 216: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

216 | P a g e

MIG and District Infrastructure Development Programme

To supply water Water Mafolopark – Motwaneng BWS

New R 4 428 705 R 1 800 000 R 2 628 705

0.00

MIG and District Infrastructure Development Programme

To supply water Water Praktiseer Water Supply

Design R 27 500 000 R 9 500 000 R 18 000 000

0.00

MIG and District Infrastructure Development Programme

To supply water Water Reservoir SB (0.8ML/day) (Montwaneng)

Design R 3 324 754 R 3 324 754 0.00 0.00

MIG and District Infrastructure Development Programme

To supply water Water Taung reticulation Design R 9 000 000 R 9 000 000 0.00 0.00

Page 217: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

217 | P a g e

6.3 Sector Departmental Projects

6.3.1 Submissions from Dept.Agriculture

NO

Project

Name

Local

Municipalit

y

Projects

Description

/ Type of

structure

Implement

ing agent

Overall

Budget

Planning and Design

Implementation Period and Budget

FY Budget 2011/12 2012/13 2013/

14

2014/15 2015/16

1 2 Tubatse

Piggeries

Tubatse Constructio

n of 2 x 25

sow units

LDA 50 500 00 - 50 500 00

2 Moketeng

Poultry

Tubatse Broiler

production,

fencing 1

ha,

equipping

borehole,

constructio

n of 2 x

1000

capacity

houses,

electrificati

on.

LDA 1000000 1000000 0 0 0 0

3 Cattle

handling

facilities

Tubatse Constructio

n of a basic

cattle

handling

facility

LDA 60 000 2010/11 0 60 000 0 0 0 0

4 Cattle

handling

facilities

Tubatse Constructio

n of basic

cattle

handling

facility

LDA 60 000 2010/11 0 60 000 0 0 0

0

Page 218: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

218 | P a g e

NO

Project

Name

Local

Municipalit

y

Projects

Description

/ Type of

structure

Implement

ing agent

Overall

Budget

Planning and Design

Implementation Period and Budget

FY Budget 2011/12 2012/13 2013/14 2014/15 2015/16

5 Cattle

handling

facilities

Tubatse Constructio

n of a basic

cattle

handling

facility

LDA 60 000 2010/11 0 60 000 0 0 0 0

6 Leolo Tubatse Soil

conservatio

n

LDA 433460 - 0 433460 0 0 0

7 Praktiseer

Pump

Station

Tubatse Rehabilitati

on of

irrigation

scheme

LDA 1000 000 2009/10 0 500 000 500 000 0 0 0

8 Sterksprui

t

Tubatse Rehabilitati

on of

irrigation

scheme

LDA R12 100 000 2011/12 R 1 100 000 0 10 450 000 R550 000 0 0

9 Boschkloo

f

Tubatse Rehabilitati

on of

irrigation

scheme

LDA R22 000 000 2012/13 R2 000 000 0 0 R19 m R1m 0

10 Steelpoort

drift

Tubatse Rehabilitati

on of

irrigation

scheme

LDA R7 920 000 2014/15 R720 000 0 0 0 0 R7 200

000

Page 219: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

219 | P a g e

6.3.2 Projects from Department of Health

NO

Project

Name

Local

Municipality

Projects

Description

/ Type of

structure

Implement

ing agent

Overall

Budget

Planning and

Design

Implementation Period and Budget

FY Budget 2011/12 2012/13 2013/14 2014/15 2015/16

1 Dilokong

Hospital

Revitalisatio

n

Tubatse Hospital

District

DPW 2 000 Multiple 0 2 000 0 0 0 0

2 HC Boshoff

CHC

Tubatse Community

Health

Centre

DPW 65 139 2004/05 7 000 R1 000 0 0 0 0

3 Sekhukhun

e Malaria

Unit

(Naboomko

pies)

Tubatse Malaria

Camp

SAKHIWO

HS

6 329 2010/11 633 2 000 0 0 0 0

4 Leboeng

EMS

Tubatse Ambulance

base

SAKHIWO

HS

5 326 2010/11 533 1 626 0 0 0 0

5 Mecklenbur

g hospital

Tubatse Accommoda

tion

SAKHIWO

HS

6 532 2009/10 563 285 0 0 0 0

Page 220: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

220 | P a g e

6.3.3 Projects from Roads and Transport

NO

Project

Name

Local

Municipality

Projects

Description /

Type of

structure

Implementing

agent

Overall

Budget

Planning and Design

Implementation Period and Budget

FY Budget 2011/12 2012/

13

2013/

14

2014/

15

2015

/16

1 Intermodal

public

transport

facility

Tubatse Intermodal

public

transport

facility

(Burgersfort

CBD)

LDRT R353m 2010/11

&

2011/12

R43m R50m R40m R110m R110m

PUBLIC AND FREIGHT TRANSPORT

2 Extension

of traffic

station to

multipurpo

se traffic

centre

Tubatse Extension of

traffic

station to

multipurpose

traffic centre

(Dilokong)

LDRT R16m 2010/11 R693 100

80

R3 157 459 20 0 0 0 0

3 Mashamot

hane (R37)

to

Bothashoek

to

Praktiseer

Tubatse Road

preventative

maintenance

and rehab

LDRT R10m 2010/11 R1m R9m 0 0 0 0

4 Aapiesdoor

ingdraai

(P169/3) to

Praktiseer

to

Maphoko

to Penge

Tubatse Road

preventative

maintenance

and rehab

LDRT R7m 2010/11 R700 000 R6 3m 0 0 0

Page 221: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

221 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of

structure

Implementing

agent

Overall

Budget

Planning and Design

Implementation Period and Budget

FY Budget 2011/12 2012/13 2013/14 2014/15 2015/16

5 R37 , P33/2

to P169/2

Tubatse Road

preventative

maintenance

and rehab

LDRT R15m 2010/11 R1 5m R13 5m 0 0 0 0

6 Ohrigstad

(P8/2&P8/

3) to

Erasmas

pass

Tubatse Road

preventative

maintenance

and rehab

LDRT R15m 2010/11 R43m R1 5m R13 5m 0 0 0

7 Ga-

Malekane

to

Tshehlwan

eng to Jane

Furse to

Nebo to

Monsterlus

Tubatse /

Makhudutha

maga

Road

preventative

maintenance

and rehab

LDRT R10m 2010/11 R1m R9m 0 0 0 0

8 D2346 to

P169/1 and

P169/2

Tubatse Road

preventative

maintenance

and rehab

LDRT R7m 2010/11 R700 000 R6 3m

0

0

0

0

9 Extension

of

Dilokong

Traffic

station to

Multipurpo

se centre

Tubatse Extension of

Dilokong

Traffic

station to

Multipurpos

e centre

LDRT R16m R3.1m 0

0

0 0

Page 222: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

222 | P a g e

NO

Project

Name

Local

Municipalit

y

Projects

Description /

Type of

structure

Implementing

agent

Overall

Budget

Planning and Design

Implementation Period and Budget

FY Budget 2011/12 2012/13 2013/14 2014/15 2015/

16

10 Praktiseer

Motor

vehicle

testing

centre

Tubatse Motor

vehicle

testing Pit

LDRT R2.5m 0 0 R2.4m 0 0

11 Alverton

(D2537) to

Rietfontein

to

Kgautswane(

P116/1)

Tubatse Upgrade

(gravel to

tar)

RAL R135m R108m R27m 0 0 0

12 Mankele

road and

Bridge

Tubatse Upgrade

from gravel

to tar

RAL R43.6m R43.6m 0 0 0 0

13 Maredi to

Senyatho

bridge

Tubatse Upgrade

from gravel

to tar

RAL R40m R40m 0 0 0 0

Page 223: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

223 | P a g e

6.3.4 Projects from DWAE

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and Budget

2010/11 2011/12 2012/13 2013/14 2014/15 2015/

16

1 Lebalelo

community

bulk water

supply

Tubatse Southern zone:

MIG/LP0068/W/0

5/09

DWAE 83 540 48 540 35 000 0 0 0 0

2 Praktiseer

WWTW

Tubatse Praktiseer

WWTW

(oxidation Ponds)

DWAE 4 000 4 000 0 0 0 0 0

3 Lebalelo

community

bulk water

supply

Tubatse Central & North

RBWS

DWAE 387 000 20 000 110 000 50 000 47 000 46 000 114

000

4 Lebalelo

feasibility

study:

LPR009

Tubatse Lebalelo

feasibility study:

LPR009

DWAE 0 200 0 200 0 0 0 0 0

5 Lebalelo

south

internal

reticulation

Tubatse Lebalelo south

internal

reticulation

DWAE 38 400 10 000 9 000 9 400 10 000 0 0

6 Ga-Kobe

Water

supply:

MIG/LP0350

/W/05/07)

Tubatse Ga-Kobe Water

supply:

MIG/LP0350/W/0

5/07)

DWAE 0 0 0 0 0 0

Page 224: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

224 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and Budget

2010/11 2011/12 2012/13 2013/14 2014/15 2015/16

7 Lebalelo

central

reticulation

Tubatse Lebalelo central

reticulation

DWAE 24 600 8 000 16 600 0 0 00 0

8 Moroke

water supply

Tubatse Moroke water

supply phase 2

DWAE 1 700 1 700 0 0 0 0 0

9 Makotaseng

water supply

Tubatse Makotaseng

water supply

DWAE 0 0 0 0 0

10 Selala

househols

sanitation

Tubatse Selala household

sanitation

DWAE 0 0 0 0 0

11 Batau water

supply

Tubatse Batau water

supply

DWAE 6 000 2 000 4 000 0 0 0 0

12 Mabocha

water supply

Tubatse Mabocha water

supply

DWAE 3 171 3 171 0 0 0 0 0

13 Mokobola

water supply

Tubatse Mokobola water

supply

DWAE 0 0 0 0 0

14 Motlailane

water supply

Tubatse Motlailane water

supply

DWAE 0 415 0 414 0 0 0 0 0

15 Mooihoek

Tubatse RSW

Tubatse DWAF Regional

Bulk

Infrastructure

Grant : (LPR007)

DWAE 341 000 50 000 70 000 70 000 23 000 23 000 105 000

16 Ohrigstad

feasibility

study:

(LPR0007)

Tubatse Ohrigstad

feasibility study:

(LPR0007)

DWAE 0 400 0 400 0 0 0 0 0

Page 225: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

225 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and Budget

2010/11 2011/12 2012/13 2013/14 2014/15 2015/16

17 Blyde Local

Sources

(proposed

feasibility

study)

Tubatse Blyde Local

Sources

(proposed

feasibility study)

DWAE 68 000 0 0 0 0 0 68 000

18 Blyde Local

Sources

Tubatse Blyde Local

Sources

DWAE 15 600 0 300 0 300 0 0 0 15 000

19 Burgersfort

Waste Water

Treatment

Works

Tubatse Extend and

upgrade Waste

Water Treatment

Works

DWAE 33 000 15 000 18 000 0 0 0 0

20 Tubatse

WSS:

(DWAFLP

075/W)

Tubatse Tubatse WSS:

(DWAFLP 075/W)

DWAE 0 0 0 0 0 0

21 Steelpoort

WTW

Tubatse Steelpoort WTW DWAE 8 000 8 000 0 0 0 0 0

22 Steelpoort

WWTW

Tubatse Steelpoort

WWTW, 2MI/day

DWAE 5 500 2 500 3 000 0 0 0 0

23 Nkosi water

supply

Tubatse Nkosi water

supply

DWAE 8 600 8 600 0 0 0 0 0

24 Leolo water

supply

Tubatse Leolo water

supply

DWAE 1 000 1 000 0 0 0 0 0

25 Nebo

Plateau RSW

Subproject

14

Tubatse Ga-Masha to

Eerstegeluk

DWAE 68 000 0 0 0 0 68 000

26 Penge WSS

and

Reticulation

Tubatse Penge WSS and

Reticulation

DWAE 9 660 4 000 5 660 0 0 0 0

Page 226: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

226 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and Budget

2010/11 2011/12 2012/13 2013/14 2014/15 2015/16

27 Morgenzon

water supply

Tubatse Morgenzon water

supply

DWAE 0 537 0 537 0 0 0 0 0

28 Motshana

water supply

Tubatse Motshana water

supply

DWAE 1 700 1 700 0 0 0 0 0

29 Magolego

water supply

Tubatse Magolego water

supply

DWAE 1 000 1 000 0 0 0 0 0

30 Mohlake

water supply

Tubatse Mohlake water

supply

DWAE 1 200 1 200 0 0 0 0 0

31 Tubatse

Reticulation

Tubatse Water

reticulation in

Alverton,

Batau,Dithabanen

g,Ga-Manoke,Ga-

Motodi,Mahlashi,

Makotaseng,Mat

okomane,Makota

seng,Phasha/Ma

Mpuru

DWAE 38 000 18 000 20 000 0 0 0 0

32 Penge water

feasibility

study

Tubatse Penge water

feasibility study

DWAE 1 000 0 300 0 700 0 0 0 0

Page 227: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

227 | P a g e

6.3.5 Submissions from LEDET

NO

Project Name

Implementing

agent

Overall

Budget

Implementation Period and Budget

2010/11 2011/12 2012/13 2013/14 2014/15 2015/16

Development of a CASINO LEDET R240m R240m

Development of mining supply park LEDET

Maandagshoek 3 and 4 dumps LEDET R70m

Tshepong chrome mine LEDET R6.5m

Khumong chrome mine LEDET R3.26m

Vanadium and Magnetite explorations LEDET R10.5m

Page 228: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

228 | P a g e

6.3.6 Projects from Department of Education

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and Budget

2011/12 2012/13 2013/14 2014/15 2015/16

1. Burgersfort

(Driekop)

Tubatse New secondary

school

LDOE 0 17,865 13,572 0 0

2. Itireleng Tubatse New primary

school

LDOE 0 22,725 00 0

3. Morewane

Primary

Tubatse New Primary

school

LDOE 0 4,764 22,725 26,765 0

4. Maelebe

primary

school

Tubatse Sanitation DWAF 0 0 0 0 0

5. Mokabudi

primary

Tubatse Sanitation DWAF 0 0 - -

6. Kgoboko

primary

Tubatse Sanitation DWAF 0 0 - - -

7. Mampuru

primary -2

Tubatse Sanitation DWAF 0 - - - -

8. Taung high Tubatse Sanitation DWAF 0 - - - -

9. Teleki high Tubatse Sanitation DWAF 0 - - - -

10. Mante

primary

Tubatse Sanitation DWAF 0 - - - -

11. Magantshe

primary

Tubatse Sanitation DWAF 0 - - - -

12. Penge Tubatse Sanitation DWAF 0 - - - -

13. Nkotwane

secondary

Tubatse Sanitation DWAF 0 - - - -

14. Matsiri

primary

Tubatse Sanitation DWAF 0 - - - -

Page 229: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

229 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and Budget

2011/12 2012/13 2013/14 2014/15 2015/16

15. Mmutlane Tubatse Sanitation DWAF 0 - 0 - -

16. Shorwane Tubatse Sanitation DWAF 0 - 0 - -

17. Moisele

Primary

Tubatse Sanitation DWAF 0 - 0 - -

18. Masha Tubatse Sanitation DWAF 0 - 0 - -

19. Tibamoshito

Primary

Tubatse Sanitation DWAF 0 - 0 - -

20. Dikgageng Tubatse Sanitation DWAF 0 - 0 - -

21. Mohlarutse

secondary

Tubatse Sanitation DWAF 0 - 0 - -

22. Mashakwane

neng

secondary

Tubatse Sanitation DWAF 0 - 0 - -

23. Marota

primary

Tubatse Sanitation DWAF 0 - 0 - -

24. Masenyeletj

e Primary

Tubatse Sanitation DWAF 0 - 0 - -

25. Itirele

primary

Tubatse Sanitation DWAF 0 - 0 - -

26. Kanama Tubatse Water DWAF 0 - - - -

27. Tantanyane Tubatse Water DWAF 0 - - - -

28. Mamogolo Tubatse Water DWAF 0 - - - -

29. Mapiti Tubatse Water DWAF 0 - - - -

Page 230: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

230 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and Budget

2011/12 2012/13 2013/14 2014/15 2015/

16

30. Mabu Tubatse Water DWAF 0 - - - -

31. Nkgomeleng Tubatse Water DWAF 0 - - - -

32. Mohlope Tubatse Water DWAF 0 - - - -

33. Paepae Tubatse Water DWAF 0 - - - -

34. Shai Tubatse Water DWAF 0 - - - -

35. Phogole Tubatse Water DWAF 0 - - - -

36. Ntibaneneg Tubatse Water DWAF 0 - - - -

37. Mape Tubatse Water DWAF 0 - - - -

38. Tantanyane Tubatse Rehabilitation

/additions at old

schools

LDPW 0 - - - -

39. Gowe Tubatse Rehabilitation /

additions at old

schools

LDPW 0 - - - -

Page 231: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

231 | P a g e

6.3.7 Submissions of Housing Projects by DLGH

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and number of allocations

2011/12 2012/13 2013/14 2014/15 2015/

16

1. Rural

housing

development

Riba cross

/polaseng

DLGH 100

2. Ga-phasha DLGH 95

3. Mampuru DLGH 94

4. Ga-manyaka DLGH 87

5. Ga-kgoete DLGH 100

6. Paeng DLGH 26

7. Kgautswane DLGH 26

8. Ga-rantho DLGH 87

9. Ga-riba DLGH 50

10. Motlolo DLGH 50

11. lebalelo DLGH 26

12. Moloyi DLGH 26

13. Matsheretsane DLGH 26

Page 232: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

232 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and number of allocations

2011/12 2012/13 2013/14 2014/15 2015/

16

1. Rural

housing

development

Phadishanong 26

2. Legoleng 26

3. Makgwareng 26

4. Mashamothane 284

5. Ga-Rantho 90

6. Ga-Maepa 152

7. Tsakane 63

8. Dithamaga/Maga

nagobuswa/Tuka

kgomo/Kalkfontei

n

200

9. Makgopa 113

10. Swale

Page 233: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

233 | P a g e

NO

Project

Name

Local

Municipality

Projects

Description /

Type of structure

Implementing

agent

Overall

Budget

Implementation Period and number of allocations

2011/12 2012/13 2013/14 2014/15 2015/

16

1. Rural

housing

development

Seelane

2. Matlammotse

3. Malaeneng

4. Moshate

5. Marapong

6. Tidintsane

7. Sefufule

8. Maakgake

9. Morapaneng

10. Ditwebeleng 4

11. Difataneng 152

12. Mashemong

13. Maditameng

14. Kampeng

15. Gowe

Page 234: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

234 | P a g e

6.3.8. Submissions from Department of Environmental Affairs

NO

Project

Name

Projects

Description /

Type of

structure

Implementing

agent

Overall Budget

Implementation Period and budget

2011/12 2012/13 2013/14 2014/15 2015/16

1. Control of

bush

encroachment

at Ga-Riba

(Lapholaena

corrifolia)

DAE 10m 10m 0 0 0 0

2 Tufa

conservation

at Phiring

DAE 7.5m 7.5m 0 0 0 0

3 Tukakgomo

soil

conservation

project

DAE 8m 8m 0 0 0 0

Page 235: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

235 | P a g e

6.3.9 Community Works Programme Projects

Project No: Strategic

project

Unpacked projects BUDGET BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Building and fencing of

community centre -

Dithamaga

R 20 000 R 20 000 0 0 0 0

Establishment of

community garden -

Dithamaga

R 30 000 R30 000 0 0 0 0

Establishment of goat

project - Dithamaga

R 75 000 R 75 000 0 0 0 0

Fencing of graveyard -

GaKgwete

R 30 000 R 30 000 0 0 0 0

Building of pit toilets at

graveyard –

GaMampuru A

R 15 000 R 15 000 0 0 0 0

Installation of water

pipes in the village –

GaMampuru A

R 35 000 R 35 000 0 0 0 0

Establishment of goat

project – GaMampuru A

R 75 000 R 75 000 0 0 0 0

Page 236: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

236 | P a g e

Project

No:

Strategic

project

Unpacked projects BUDGET BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Installation of poles at

mentioned fields –

GaMampuru B

R 10 000 R 10 000 0 0 0 0

Building of pit toilets at

graveyard – GaMampuru B

R 15 000 R 15 000 0 0 0 0

Provision of parking lot at

school – GaMampuru B

R 20 000 R 20 000 0 0 0 0

Development of parks –

GaMampuru B

R 35 000 R 35 000 0 0 0 0

Fencing community garden –

GaMampuru B

R 30 000 R 30 000 0 0 0 0

Building of crèche –

GaMampuru B

R 50 000 R 50 000 0 0 0 0

Rehabilitation of fence at

graveyard - GaMashishi

R 20 000 R 20 000 0 0 0 0

Building of pit toilet at

graveyard - GaMashishi

R 15 000 R 15 000 0 0 0 0

Page 237: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

237 | P a g e

Project

No:

Strategic

project

Unpacked projects BUDGET BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Establishment of new soccer

field - GaMashishi

R 15 000 R 15 000 0 0 0 0

Establishment of community

goat project - GaMashishi

R 75 000 R 75 000 0 0 0 0

Establishment of community

garden - GaPhasha

R 30 000 R 30 000 0 0 0 0

Toilets at cemetery - GaSelala R 15 000 R 15 000 0 0 0 0

Establishment of community

garden - GaSelala

R 30 000 R 30 000 0 0 0 0

Small access bridge – GaSelala R 50 000 R 50 000 0 0 0 0

Establishment of recreation

park – Stocking

R 35 000 R 35 000 0 0 0 0

Equip existing boreholes with

submissible pumps – Stocking

R 10 000 R 10 000 0 0 0 0

Page 238: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

238 | P a g e

Project

No:

Strategic

project

Unpacked projects BUDGET BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Fencing and cleaning of grave

sites – Stocking

R 30 000 R 30 000

Shading of community pay

point - Stocking

R 5 000 R 5 000

Water reticulation (piping) -

Tukakgomo

R 35 000 R 35 000

Establishment of community

garden - Tukakgomo

R 30 000 R 30 000

Establishment of recreation

facilities -

Tukakgomo

R 25 000 R 25 000

Page 239: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

239 | P a g e

6.4 ESCOM priority list

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values & total connections

11/12 12/13 13/14 14/15 15/16

Electrificatio

n of villages

Shakung ESCOM 7.98m 0 0 0 0

Moshira ESCOM 6.747m 0 0 0 0

Modubeng ESCOM 3.363m 0

0

0

0

Malokela ESCOM 850

Motloulela ESCOM 410

Ga-phala ESCOM 225

Kgopaneng ESCOM 280

Maakubu ESCOM 535

Moshira ESCOM 300

Page 240: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

240 | P a g e

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators Number of

connections

11/12 12/13 13/14 14/15 15/16

Makofane/Sekop

ung/Pidima

ESCOM 600

Mokutung ESCOM 185

Makgalane ESCOM 540

Banareng ESCOM 660

Makopung ESCOM 563

Malaeneng ESCOM 493

Mapareng ESCOM 480

Taung/matokoma

ne/makotaseng

ESCOM 2000

Podile ESCOM 550

Page 241: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

241 | P a g e

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators Number of

connections

11/12 12/13 13/14 14/15 15/16

Selala/manyaka/

Maepa/mphethi

ESCOM 2470

Phiring ESCOM 1235

Madikane ESCOM 312

Senyatho ESCOM 530

Radimpsa ESCOM 420

Sekhwakhwaila ESCOM 390

Dithamaga ESCOM 38

Leboeng new

satnds

ESCOM 545

phadishanong ESCOM 545

Ditensing ESCOM 525

Page 242: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

242 | P a g e

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators Number of

connections

11/12 12/13 13/14 14/15 15/16

Bokome ESCOM 525

Driekop france ESCOM 1500

Mandela park ESCOM 680

Kampeng ESCOM 610

Magololo ESCOM 393

Maputle ESCOM 290

Dibakwane ESCOM 261

Barcelona ESCOM

Burgersfort

ext.10

ESCOM

Page 243: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

243 | P a g e

6.4.1 Villages that will benefit from Alternative Source of Energy/ None Grid/ Solar Systems

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Alternative

Electrificatio

n of villages

Taung ESCOM * 0 0 0 0

Matokomane ESCOM * 0 0 0 0

Koppie ESCOM * 0 0 0 0

Mokutung ESCOM * 0 0 0 0

Makotaseng ESCOM * 0 0 0 0

Makgalane ESCOM * 0 0 0 0

Makopung ESCOM * 0 0 0 0

Banareng ESCOM * 0 0 0 0

Mapareng ESCOM * 0 0 0 0

Malaeneng ESCOM * 0 0 0 0

Page 244: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

244 | P a g e

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

Source of

Funding

Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Makofane ESCOM * 0 0 0 0

Sekopung ESCOM * 0 0 0 0

Pidima ESCOM * 0 0 0 0

Leboeng New

stands

ESCOM * 0 0 0 0

Page 245: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

245 | P a g e

6.5 SUBMISSIONS FROM LOCAL MINES

6.5.1 Submissions from Marula mine

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Electrical

engineering

infrastructure

for villages in

ward 8 and 10.

14m 4m 4m 4m 2m 0

Water supply

and reticulation

network in ward

8 and 10.

16m 500k 4m 6m 3m 2.5m

School

infrastructure

development.

7.5m 3.5m 1m 1m 1m 1m

Hydroponics

project

310k 310k

Page 246: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

246 | P a g e

Hydroponics

project 2

2.8m 700k 1.5m 310k 200k 100k

Brick making

project

225k 125k 100k

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Chrome project 22.5m

Community

road

9.1m 4m 4m 1.1m

Business

Support Unit

5.1m 800k 960k 970k 1.1m 1.3m

Housing

Development

105m 5m 20m 45m 25m 10m

Page 247: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

247 | P a g e

6.5.2 Submissions from Twickenham mine

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Electrification R3,700 000 R3,7m 0 0 0 0

OVC Completion R300,000 R300k 0 0 0 0

Farmer Support R2,500,000 R2,5m 0 0 0 0

Road R3,000,000 R3m 0 0 0 0

Community Access

Bridge

R2,000, 000 R2m 0 0 0 0

Water Provision R6,400,000 R6,4m 0 0 0 0

School Infrastructure

Upgrading

R2,200,000 R2,2m 0 0 0 0

Feasibility study-

Community

Centre/Multipurpose

R2,900,000 R2,9 0 0 0

Page 248: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

248 | P a g e

centre

6.5.3 Submissions from Dwarsriver Mine

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Early Childhood

Development

Project

R 2.5m R

2.5m

0 0 0 0

Olive tree

project

R 2.5m R 2.5m 0 0 0 0

Electrification

project (Solar

System)

R 500k R 500k 0 0 0 0

Building Local

Trade Stores

R 500k R 500k 0 0 0 0

Water project R 500k R 500k 0 0 00 0

Building of 10

VIP toilets

R 200k R 200k 0 0 0 0

Page 249: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

249 | P a g e

Preparation of

Slab for

container

Fencing in of

clinic area

Toilets for the

clinic

R 200k R 200k 0 0 0 0

LIBSA

incubation

program

R 200 000 R 200

000

0 0 0 0

6.5.4 Submissions from XSRATA

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Crop production

and

hydroponics

gardening

13.5m 5.7m 7.8m 0 0 0

Bophelong

home based

care

690k 540k 150k 0 0 0

Craft and

needlework

centre

700k 600k 100k 0 0 0

Page 250: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

250 | P a g e

Welding centre 650k 200k 150k 0 100k 200k

Jewellery

making centre

500k 300k 100k 100k 0 0

Nkholeng

poultry farm

1m 900k 100k 0 0 0

MPCC 6.2m 6.2m 0 0 0 0

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Access Road –

Mpuru (1.5km

R2m

Creche at

Mpuru

R1.5m

Agricultural

Projects-MDHK

and

Matimatjatji

Water provision

at Mpuru

Page 251: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

251 | P a g e

Water provision

at Maroga

R2m

Electricity

Supply at

Maroga (France

Village)

Page 252: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

252 | P a g e

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Arts and

Craftwork

Business –

Beads

Manufacturing

R1m

Pension

Paypoint Facility

at Seuwe

Orchard

establishment

e.g. Citrus Fruit

Maandagshoek

R300k

Water

provision at

Hwashi

Access Road

Seuwe

R 2m

Page 253: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

253 | P a g e

Project

No:

Strategic

project

Unpacked

project No:

Unpacked

projects

BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Building bridges

Mpuru and

Mamphahlane

Arts and

Craftwork

Business –

Pottery

Manufacturing

Multi-purpose

Centre

(library) Sehlaku

R8.8m

Tribal Office at

Diphale

Biodiesel

project

Page 254: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

254 | P a g e

6.5.5 Submissions from Modikwa mine

Project

No:

Strategic

project

Unpacked

project No:

Unpacked projects BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Mamphahlane

access road(3km)

R1.5k R2.0m

Upgrading of

Driekop-

Mamphahlane

access road(11km)

R1.0m

Mamphahlane Tribal

office

R1.5m

Sehlaku Tribal office R2.0m

Maroga water

project

R1.5m

Mpuru creche R5.0m

Mpuru access road R1.0m

Agricultural projects

at MDHK and

matimatjatji

R2.0m

Mandaagshoek

water

R2.0m R2.0m

Page 255: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

255 | P a g e

6.5.6 Submissions from Der Brochen mine

Project

No:

Strategic

project

Unpacked

project No:

Unpacked projects BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Kalkfontein

olive farming

R3.0m R3.0m 0 0 0

Kalkfontein

processing plant

0 R2.5m R3.0m 0 0

Construction of

clinic

0 0 R4.0m 0 0

Page 256: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

256 | P a g e

6.5.7 Submissions from Phoka Thaba Platinum mine

roject

No:

Strategic

project

Unpacked

project No:

Unpacked projects BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Maandaagshoek

water project

R1.0m 0 0 0 0

Tar surfacing of

road

D4170(2km)

0 R7.8m 0 0 0

Upgrade of

crossing soccer

field

R1.8m 0 0 0 0

Establishment

of local

company to

transport

chrome

R240k 0 0 0 0

Page 257: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

257 | P a g e

6.5.8 Submissions from Two Rivers mine

roject

No:

Strategic

project

Unpacked

project No:

Unpacked projects BUDGET Indicators BUDGET

R Values

11/12 12/13 13/14 14/15 15/16

Ikageng Project R300k 0 0 0 0

Community storage

support at

Buffelshoek

R216K 0 0 0 0

Community storage

facility at kalkfontein

R216k 0 0 0 0

Day care

infrastructure at

Steelpoort park

R216k 0 0 0 0

Page 258: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

258 | P a g e

SECTION 7: INTEGRATION

7.1 Spatial Development Framework

The Greater Tubatse Municipality has adopted its Spatial Development Framework in June

2007. The GTM Spatial Development Framework is aligned with the Provincial Development

Strategy (PGDS) with its strong emphasis on improving the quality of life and sustainable

development; the PGDS is informed by the National Spatial Development Plan and all

provincial documents that have a bearing on growth and development in Limpopo.

The aim of a Spatial Development Framework is to provide general direction of preferred land

use which therefore guide decision-making and over a multi-year period aimed at the creation

of integrated and habitable built and natural environment. In other words the SDF aims at

informing the decision of different organs of state as well as creating a framework to guide

and facilitate spatial investment of both private and public sector entities

The SDF aims in addressing the following deliverables:

• Existing policies, plans, resolutions and by-laws in the municipality pertaining to

spatial issues

• The municipal-wide spatial issues ( in relation to the needs and the projects identified)

• The settlement spatial patterns and dysfunctionalities.

• Identification and analysis of the existing nodal points

• Major structuring elements, urbanisation trends and spatial implications

• Strategic roads and transportation networks

• Municipal investment and spending patterns

• Location and trends of basic services and infrastructure

• Location of low income houses

• Environment conservation and sensitive areas and the impact which development

may have on the environment

• Areas of agricultural potential ad land currently affected by land claims

• Major sporting nodes or areas with relevant infrastructure

Page 259: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

259 | P a g e

• Spatial relationship between urban and rural areas

• Relationship between the spatial issues and the vision of the municipality

7.2 Land Use Management Scheme

GTM Land – Use Management Scheme has been developed in terms of the provision of

section 18 of the Town Planning and Township ordinance, 1986. Its main objectives are to

protect and control Land environment, handling and drainage of storm water, excavations etc.

A consent granted by the municipality by virtue of the provisions of the scheme does not

entitle any person the right to use any land, or to erect or use buildings thereon in any

manner or for any purpose which is prohibited by the provisions of any conditions registered

against the title deed under which land is held, or imposed by legislation in respect of such

land.

7.3 Integrated Waste Management Plan

GTM has developed its Waste Management Plan in June 2007. Its main objectives are to

enable the municipality to progressively develop an Integrated Waste Management System.

GTM Waste Management Plan is aligned with the White Paper on Integrated pollution and

Waste Management (2000) and the National Waste Management Strategy (NWMS 1999).

Purpose of the plan is to enable the municipality to progressively develop an integrated waste

management system capable of delivering waste management services to all households and

businesses.

National policy requires municipalities to implement an IWMS where the focus is to prevent

and minimisation of waste, recycling of waste and treatment that is able yo reduce the

potential of harmful impacts of waste.

The plan projects that it will take the municipality about 20 years from 2005 to achieve the

goal of 100% service.

Page 260: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

260 | P a g e

7.4 Employment Equity Plan

GTM has adopted its employment equity plan in June 2007. Its main objectives are to meet

the objects of the Employment equity Act No. 53 of 1998. The plan is aligned with the

municipal budget, GTM organisational structure and the IDP.

7.5 Workplace Skills Plan

A Workplace Skills Plan for the Greater Tubatse Municipality was adopted in September 2007

and its main objectives are to capacitate employees with necessary skills in order to maximise

service delivery in municipal workplace. This was developed in terms with SAQA requirements

and is reviewed annually for its alignment with the IDP.

7.6 HIV/AIDS Plan

The Constitution of the Republic of South Africa (1996) in section 152(1) and section 153

states that the role of local government is to give priority to basic needs of the community ;

and provide a safe and healthy environment, where communities and community

organizations are involved in the matters of local government.

The GTM has developed its HIV/AIDS Plan in 2009 and is aligned with the framework for an

integrated local government response to HIV/Aids developed by the provincial and local

government (2007) and the HIV and AIDS and STI strategy plan for South Africa 2007-2011.

Following are HIV and AIDS and STI strategic plan for South Africa 2007-2011 developed by

the South African National Aids Council:

• Partnership

• Leadership

• Capacity building

• Communication

• Equal access

• Protecting rights of the children

• Targeting vulnerable groups

Page 261: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

261 | P a g e

7.7 LED Strategy

GTM has developed its LED Strategy in June 2007 and is aligned with the Limpopo Growth and

Development Strategy, Provincial Spatial Framework, National Spatial Development

Perspectives and ASGISA.

7.8 Revenue Enhancement Plan

Revenue Enhancement Plan for the Greater Tubatse Municipality was adopted in April 2008.

Its main objectives are to put in place systems and programmes that will assist the

municipality in maximising its revenue collection. The plan is aligned with the PGDS, NSDP,

GTM LED strategy and other provincial and national documents that inform growth and

development.

7.9 Disaster Management Plan

Main objects of the Disaster Management Plan are to identify and implement disaster risk

reduction measures to reduce the vulnerability of communities and infrastructure at risk. The

plan was adopted in 2008. The plan is aligned with the GSDM disaster management plan.

The plan is in line with national policy (National Disaster Management Framework).

The Disaster management plan for the Greater Tubatse municipality comprises various plans

like:

• District disaster management framework

• Disaster Hazard, vulnerability and risk plan

• Disaster risk reduction plan

• Disaster response and recovery plan

• Guidelines to establish the disaster management advisory forum and volunteer

contingent.

Page 262: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

262 | P a g e

7.10 Capital Investment Framework

The CIF for the Greater Tubatse Municipality is developed in accordance with the local

government: Municipal Finance Management Act (MFMA) Act No:56 of 2003 and the

investment and PPP regulations for the MFMA published in Government Gazette 27431 of

2005.

7.11 Integrated Transport Plan

Greater Tubatse Municipality has adopted its plan in 2004. The plan and development

framework in integrated with land development objectives(LDOs) integrated development

plans (IDPs) prepared in terms of provincial development planning legislation, such as guide

plans, structure plans, development plans, policy plans or other plans affecting the

development of land, prepared by other relevant sphere of government.

7.12 Risk Management Plan

A Risk Management Plan for the Greater Tubatse Municipality was adopted in June 2008 in

conjunction with section 62 and 79 of the MFMA. Its objectives are to provide a level of

assurance that current significant risks are effectively and improving decision making and

planning, promote less risk averse culture in which the taking of calculated risk in pursuit of

opportunities to benefit the organisation is encouraged and to provide sound basis for

integrated risk management and basis for integrated risk management and internal control as

components of good corporate governance.

GTM has identified the following strategic risks pertaining to each residual risk:

• Office space

• Lack of finance

• Poor intergovernmental relations

• Lack of land ownership

• Fraud and corruption

• Harm to reputation

Page 263: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

263 | P a g e

• Loss of investments by investors

• Unclear roles and responsibilities

• Ineffective internal communication

• Brain drain

• Dependence on contractors

• High staff turn over

• Natural disaster

7.13. Water Services and Maintenance Strategy (Sekhukhune District)

The plan seek to achieve the following key objectives: Analyse the current level of service to the

communities, determine the desired level of service by the community, determine future demand

and forecasts, lifecycle of assets including background data, routine maintenance plan and

information flow requirements.

Page 264: FINAL 2011/16 INTEGRATED DEVELOPMENT PLAN Final IDP 2011-15.pdf(v) Cllr M. C Moshwana (portfolio chairperson Strategic services) (vi) Cllr N. J Mahlake ( portfolio chairperson Community

264 | P a g e