    Assignment 02M Jobayair Ibna Rafiq I.D: 063 189 030FIN 470.1 Prepared for: M. AhsanurRahim (ARM) 05 th Oct.2010

    Rankingaccordingto risk

    Steps & Descriptions Best outcome Moderateoutcome

    Worst outcome

    1 Sales*500 gram packet at 150taka each packet*1kg packet at 270 takaeach packet

    Prompt sales andcollection, no bad debt, strongaccountreceivablemanagement,capture mostmarket share,lower lead time

    Some bad debt, but still covered by reserve for bad debt,increasing salevery slowly fromtime to time,accepted somecredit terms bycustomers

    Huge bad debtand no reservefor bad debt,weak accountreceivablemanagement

    2 Packing Stage

    PPMMetal detectionStackersFeeding chuteHorizontal flow fromwrapCream sandwichingWrapper PrintingCarton sealing

    Good looking

    durable colorful packing,successfulresearch on

    packing attractedto all agecustomer, able torecycle of

    packing

    Packing only for

    coping situationnot having goodquality and notwell durable andsusceptible todifficult situation

    Bad quality

    packing that cantear duringsupplying of goods, physicaldamage of

    product due to bad quality packing.

    3 Pre Mixing Stage

    Ingredients AdditionSugar solutionMilk solutionPreparation of Flour FatAmmoniaAdditivesFlour sifters sugar grinders

    Get all the

    materials incheap price, easyto get materials,available supplychain, hygienicmaterials, nocarrying cost,minimal orderingcost

    Frequent

    fluctuation of price of materials but still possiblein achieving

    profit, tricky toset price due tofluctuation

    Continual

    upwardmovement of price of everymaterial, higher cost of inventory,difficult to reachcost of

    production

    4 Mixing Stage

    Mixer timeWater CreamingDough consistencyBiscuit grinders

    Balance in

    mixing of allmaterials thatgive perfectflavor and taste,experiencemixing worker

    Little imbalance

    in mixing whichis not susceptibleand still possibleto marketing

    Spoilage in time

    mixing byexcessive use of any materialrather than

    balancing of allmaterials

    5 Forming StageLaminator

    Best lookingdesigning,

    Cuttingunkemptly not

    Worst designing,improper size,

  • 8/8/2019 Fin 470

    2/2

    Assignment 02M Jobayair Ibna Rafiq I.D: 063 189 030FIN 470.1 Prepared for: M. AhsanurRahim (ARM) 05 th Oct.2010

    Gauge rollsSheet reductionCutter

    MouldersShape & size of dough piece

    cutting andmaking shapeand size

    according tolocal demand,cost effectivedesign

    having perfectshape for somematerials but still

    marketable

    shape, cutting ineach item, unableto marketing,

    6 Baking StageBaking ovenBaking timeTemperatureBurnersSteam extractionOven output

    No spoilage andacute perfectionwhen baking,lower bakingtime,

    Moderate perfection andsome spoilageswhich areacceptable

    Worst situationand hugespoilage,inefficientemployees in

    baking

    7 Cooling StageCooling timeCooling conveyor

    Properly cooling by moderncooling machine,reducing coolingtime and best

    piece of biscuit

    Needcontemporarycooling machineto reduce coolingtime, gettingefficient workersin cooling

    Wrapping beforecooling finished,so rotten all the

    product, notfollowed coolingstage