TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of June 2017 at 5th TNSOCC Meeting
Transmission Lines / Elements DetailsSl. No P_Id From Substation To Substation Purpose conditions From Date To Date To Time Remarks SE Approval
1 Madurai 55601 110 KV 0 Thu, 01-Jun-2017 9:00 Sun, 04-Jun-2017 17:00 4 Pending
2 Madurai 55610 230 KV 230KV Sipcot -Kavanoor feeder entire No SS affected. POSSIBLE Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
3 Madurai 55682 110 KV SURULIYAR 110 KV Bus entire only For Annual Overhauling Work POSSBLE Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 0 Approved
4 Erode 55745 110 KV KUNDAH PH2 110kv GC SF6breaker and its accessiories for monthly maintenance work 0 Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 0 Approved
5 Erode 55860 110 KV GOBI 230 KV possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
6 Erode 55949 230 KV ALIYAR 230 KV Monthly Mtce and line patrol works 230KV ALR-UDT feeder will caters the load possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 16:00 1 Approved
7 Erode 55984 230 KV 230kV PGCIL # and Auto Transformer I & II will be in service possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 18:00 1 Approved
8 Erode 55985 230 KV For Monthly maintenance work possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 5:00 1 Approved
9 Madurai 56038 110 KV 0 POSSIBLE Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
10 Erode 56063 230 KV LC programmed at other end also. possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 18:00 1 Approved
11 Madurai 56065 110 KV Monthly Mainteanace work POSSIBLE Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 14:00 1 Approved
12 Madurai 56117 110 KV For monthly maintenance works. POSSIBLE Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
13 Erode 56216 230 KV ARASUR 230 KV possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 16:00 1 Approved
14 Erode 56302 230 KV possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
15 Madurai 56332 230 KV Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 12:00 1
16 Erode 56342 0 Thu, 01-Jun-2017 8:00 Sat, 03-Jun-2017 17:00 3 invalid lc Wrong entry
17 Erode 56366 possible Thu, 01-Jun-2017 8:00 Sat, 03-Jun-2017 17:00 3 Approved
18 Chennai 56406 230 KV 230 KV SVC-Oragadam Feeder entire For Quarterly mtce work Possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
19 Chennai 56425 230 KV MONTHLY MAINTENANCE ALL OTHER FEEDERS ARE IN SERVICE Possible Thu, 01-Jun-2017 7:00 Thu, 01-Jun-2017 10:00 1 0 Approved
20 Erode 56436 230 KV AUTO-I ,HV-I,LV-I Breaker and Its CTs For monthly maintenance works possible Thu, 01-Jun-2017 10:00 Thu, 01-Jun-2017 17:00 1 Approved
21 Madurai 56451 110 KV POSSIBLE Thu, 01-Jun-2017 8:00 Thu, 01-Jun-2017 17:00 1 Approved
22 Erode 56462 230 KV possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
23 Madurai 56508 110 KV POSSIBLE Thu, 01-Jun-2017 10:00 Thu, 01-Jun-2017 16:00 1 0 Approved
24 Madurai 56638 230 KV 230 KV KAVANOOR-SIPCOT # NO SUPPLY IN THE FEEDER POSSIBLE Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
25 Erode 56745 110 KV Monthly maintenance works 1. Scheduled shut down at 110/11KV Peelamedu SS. possible Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 16:00 1 Approved
26 Erode 56868 BHAVANISAGAR - RBCPH - UNIT II possible Thu, 01-Jun-2017 9:00 Sun, 04-Jun-2017 23:00 4 Approved
27 Madurai 55785 230 KV For monthly maintenance works. During the LC period, no other SS will be affected please. 0 Thu, 01-Jun-2017 9:00 Thu, 01-Jun-2017 17:00 1 Approved
28 Madurai 55678 230 KV 230/33KV Power Trfr IV HV IV & LV IV BR monthly maintenance works POSSIBLE Fri, 02-Jun-2017 10:00 Fri, 02-Jun-2017 16:00 1 Approved
29 Madurai 55721 110 KV For Monthly Maintenance Work POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 0 Approved
Name of the LDC
Voltage Level (KV)
Recommendations
From Time
No. of days
TUTICORIN -AUTO 230 KV
110KV TTN-Sipcot-III feeder (Section between 230KV Auto SS-110KV Town SS)
To replace existing leopard conductor with Panther conductor between location No:1 to 69
No SS affected .During the LC period 110KV Town SS will be radially fed from 230KV Melavittan SS
LONG LC: NOTE TO BE PUT UP
TUTICORIN -AUTO 230 KV
to replace flash mark disc insulators at Y-phase of location No: 96
SUB TO LOAD CONDITION
During the LC period 110 KV Periyar feeder and 110 Kv Kayathar feeder radial from other end up to Suruliyar PH. 110 Kv Vannathiparai SS will be availed Monthly maintenance work
on this period, hence no SS will be affected.SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN
IN CONDITION110 KV ANTHIYUR FEEDER BREAKER AND CT'S WITH LINE SWITCH
FOR MONTHLY MAINTENANCE WORK
110 KV KUGALUR SS MAY AVAIL TOTAL SHUTDOWN,SUPPLY TO 110 KV T N PALAYAM SS MAY FED FROM 230 KV ANTHIYUR SS
subject to kugalur ss
availing tsd230KV ALR-KPH feeder CB, CT and line entire
subject to both ends availing
the lc
KARUVALUR 230 KV
230 Kv -Karuvalur -Karamadai # Breaker,CT's LAS and its lines switch
For Monthly maintenance work, for lines PMI by PLDM/Lines and for SF6 Circuit Breaker Y Phase Limb replacement work due to SF6 gas leak and1. Free Arm Stringing - Stringing of 3 nos ZEBRA Conductor Loc 65 - 66 (Existing Location). 2. Free Arm Stringing - Stringing of 3 nos ZEBRA Conductor Loc 66 - 67 (Existing Location). by EE/TLC/MTP
other feeders will cater to the
loads
KARUVALUR 230 KV
230 TBC/BC (Bus coupler) BREAKER and CTs
230kV PGCIL #, Auto Transformer I & II will be in service in BUS-1
bus 1 will be in service
KODIKURICHY 230 KV
on 110KV Kodikurichi-Veerasigamani-II # section between Puliyangudi SS- 110KV Narayanapuram SS
For replacement of defective insulator at location No:51
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:CONDITIO
N NOT MENTIONED
KARAMADAI 230 KV
230KV Karamadai- Karuvalur feeder Breaker,CT,CVT and feeder entire
1.Monthly maintenance works of Breaker, CTs and CVT,s2.230KV Karamadai- karuvalur feeder location b/w65-66&66-67free arm stringing of 3 nos zebra conductor at loc. 65&66( existing location)& 66-67 by EE/TLC/MTP
other feeders will cater to the
loads
SRPUDUR 230 KV
110 KV SRP-NGL # Breaker, CT & line switch
During the LC period,110/11 KV TGPR, MPM and KKY SS will avail total shut down as approved by SE/KKEDC/NGL. Nagercoil
SS will avail supply from 110 KV SRP - Kodayar I #. Maharajapuram SS will avail supply from 110 KV SRP-KKY #.
Hence no SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTUTICORIN -SIPCOT 230 KV
On 230 KV Sipcot-Kavanoor feeder breaker with CTs and line isolators only.
1) This particular LC previously applied vide ID No. 55785 may be cancelled. 2) During the LC period, AEE/Lines/TTN also applied LC on same date & time and no other SS will be
affected please.
SUB TO LOAD CONDITION
230/110 KV AUTO TRANSFORMER-I,HV-I, LV-I BREAKERS,CTS ,LAS AND ITS ASSOCIATED EQUIPMENTS.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD,1) REMAINING 3 NOS. AUTO TRANSFORMERS WILL BE IN SERVICE.2) 110 K V
SARAVANAMPATTY SS WILL BE UNDER TOTAL SHUTDOWN.
subject to the other auto trs loading limit
OTHAKKAL MANDABAM 230 KV
230KV OKM-Palladam Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
For monthly maintenance works and PMI works by Lines/TDLR wing & Lines/PLDM wing.
During the LC period, the other 230 KV feeders are in service to cater the SS loads.
other feeders will cater to the
loads
ANUPPANKULAM 230 KV
230KV Southern Bus entire (from 1 - 89 B switch to south side end) & 230KV APKM - Sterlite feeder entire.
For Removal of dropper jumper of 230KV Anuppankulam - Sterlite feeder ( Augmentation of 100MVA to 160MVA Auto Transformer work)
During the LC period, a) Auto Transformer-II & III, HV-II & III, LV-II & III will be under hand tripped condition and 230KV
Anuppankulam - Sterlite feeder hand tripped condition and Auto Transformer-I will be fed from 230KV Anuppankulam-
Madurai and 230KV Anuppankulam - Kayathar feeder sources. 230 KV Anuppankulam - Sterlite feeder will be no supply. 110KV Aruppukottai SS loads will be transferred to 110KV
Kavanoor - Kamuthi feeder and 110KV APKM - PSQ # Radial fed from other end. 110 KV Aviyoor SS load will be transfer to
110 KV Thulukkapatti - PSQ feeder. Hence No SS affected.
NOT POSSIBLE
DUE TO 110KV PSQ-
KINNIMANGALAM#1&2 LC. LC
MAY BE PROGRAMMED
AFTER THE ABOVE LC
Approved After completing the PSQ-Kinnimangalamfeeder LC
GENERATING
STATIONS
LOWER METTUR 4
Unit Overhauling works (30 days - from 01.06.2017 8.00 hrs to 30.06.2017 17.00 hrs)
Unit Overhauling works (30 days- from 01.06.2017 8.00 hrs to 30.06.2017 17.00 hrs )
L.C period 30 days- from 01.06.2017 8.00 hrs to 30.06.2017 17.00 hrs.During L.C period the Unit will be in shutdown
condition.Due to Nil demand of PWD for irrigation and drinking water the AOH has been scheduled from 01.06.2017 to 30.06.2017( 30 days)Ref: Note approved by director /
generation dt 27.12.2016. communicated vide SE/EGC/UKT Endt.No : 019606/gen.1/AOH - 2017 dt 29.12.2016.
GENERATING
STATIONS
LOWER METTUR 4
Sathanur Dam power house Unit Over hauling works ( 30 days from 01.06.2017 8.00 hrs to 30.06.2017 17.00 hrs)
Sathanur Dam power house Unit Over hauling works ( 30 days from 01.06.2017 8.00 hrs to 30.06.2017 17.00 hrs)
Sathanur Dam power house Unit L.C ( 30 days from 01.06.2017 8.00 hrs to 30.06.2017 17.00 hrs)During L.C period
the SDPH Unit will be in shutdown condition.Due to 'Nil' demand of pwd for irrigation and drinking water , the AOH has
been scheduled from 01.06.2017 to 30.06.2017.Ref: Note approved by director / generation dt 27.12.2016.
communicated vide SE/EGC/UKT Endt.no : 019606/gen.1/AOH - 2017 dt 29.12.2016.
schedule approved by
director operation and
director generation
Sunguvarchatram 400 KV
During the Period of LC, the 230 SVC-Oragadam # entire will be in OFF condition. 400 KV SPR SS will feed Load to 230 KV
Oragadam SS Via 230 KV SPR - Oragadam #.Hence there will be no interruption to 230 KV Oragadam SS.
Subject to load condition (230
kV Spkoil-Orgadam # to be tie opened)
ORAGADAM 230 KV
230KV SUNGUVAR CHATRAM FEEDER BREAKER &CTS
PONNAPURAM 230 KV
1. WITH MEDIUM WIND POWER GENERATION, IT IS EXPECTED THAT THE LOAD WILL BE WITH IN THE OTHER TWO AUTO
TRS.2. HENCE NO SS WILL BE AFFECTED
subject to the other auto trs loading limit
KAYATHAR 110 KV
110KV KAYATHAR-SURULIYAR FEEDER SEC B/W KAYATHAR&SANKARANKOVIL
DEFECTIVE DISC REPLCEMENT & JUMBER TIGHTNESS WORK
DURING THE LC PERIOD,SANKARANKOVIL SS WILL BE RADIALLY FED FROM SURULIYAR POWERHOUSE HENCE NO SS
AFFECTEDSUB TO LOAD CONDITION
PALLADAM 230 KV
230KV Palladam-Othakalmandapam # Breaker,CT'S and line entire
To carryout monthly maintenance work by AEE/M/Palladam and to carryout Premonsoon inspection work by AE/Lines/Palladam
1)Other three 230 KV ( PGCIL,Sadayapalayam and Kurukathi) Feeders will be in service 2)Other end availing LC3)No other SS
wil be affected
other feeders will cater to the
loadsKADALANGUDI 230 KV
110KV Kadalangudy- Nidur- Vaitheeswarankoil feeder entire
1)Line inspection and rectificaion work 2)Monthly maintenance work
No interruption to any SS. The 110KV Nidur SS proposed to shutdown. All other feeders will be in tied condition.
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
SUB TO LOAD CONDITION
COIMBATORE 230 KV
1. 110kv CBE - Peelamedu feeder breaker and CTs.2. Auto Transformer - II, 3. HV Breaker-II and CTs & LAs,4. LV Breaker-II and CTs and LAs.
subject to peelamedu ss availing tsd
GENERATING
STATIONS
LOWER METTUR 1
For Independent Spell Annual Overhauling Works in Unit II at RBCPH / Bhavanisagar from 01.06.2017 to 30.06.2017 for 30 days
1. The AOH schedule has been approved vide Lr. No: CE / H / SE / H(E) / EE / HP / AEE-9 / F. AOH-2017 / D. 1896 / 16, dt.
31.12.2016.2. During LC period, the demand will be only 5 c/s in RBCPH, hence generation loss will not arise.3. At present, Unit I / RBCPH is under AOH LC from 02.05.2017. This LC will
be returned on 31.05.2017.
schedule approved by
director operation and
director generationTUTICORIN -
SIPCOT 230 KVOn 230 KV Sipcot-Kavanoor feeder breaker with CTs and line isolators only.
PREPONED TO 1.6.17
UDAYATHUR 230 KV
Including Monthly Mtce work on 33KV #s(SIMRAN I,II,III,IV) will be carried out.Depending upon wind generation
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTUTICORIN -AUTO 230 KV
On 110KV TTN-Sipcot-III feeder breaker with CT bus and line side switches
No SS will be affected, and the feeder is radial from other end. During this Lc period 110 KV Town ss will be fed from 230 KV
Sipcot ss.
30 Erode 55744 110 KV Monthly Maintenance Work. possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 14:00 1 Approved
31 Madurai 55772 230 KV For monthly maintenance works. POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
32 Madurai 55814 230 KV 0 Fri, 02-Jun-2017 10:00 Sun, 04-Jun-2017 17:00 3
33 Madurai 55826 110 KV POSSIBLE Fri, 02-Jun-2017 10:00 Fri, 02-Jun-2017 17:00 1 0 Approved
34 Erode 55506 230 KV MTPS MTPS.I TO ANTHIYUR 230KV FEEDER. Monthly maintenance work. programed LC postponed Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1
35 Madurai 55523 110 KV POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
36 Erode 55619 230 KV Monthly Maintenance works. postponed Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 15:00 1
37 Madurai 55634 110 KV TRICHY 230 KV POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 16:00 1 0 Approved
38 Erode 55966 110 KV For monthly maintenance works. 0 Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 0
39 Erode 55982 110 KV For attending conductor strand cut Idle line portion.No interruption of supply to SS. possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 idle section Approved
40 Erode 55986 230 KV possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
41 Madurai 56008 110 KV For Monthly Maintenance Work. 0 POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
42 Erode 56025 230 KV MTPS MTPS.I TO ANTHIYUR FEEDER Programmed LC postponed Fri, 02-Jun-2017 9:00 Sat, 03-Jun-2017 6:00 2
43 Madurai 56047 110 KV Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1
44 Madurai 56068 110 KV Tree clearance work POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
45 Madurai 56078 110 KV Monthly Mtce& tree cutting works Feeder will be radial from other end.uptoValayapatty SS POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 16:00 1 Approved
46 Madurai 56103 230 KV POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
47 Madurai 56106 110 KV 110 KV KKDI – ALKL # : S/B KKDI – TPTR POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
48 Erode 56157 110 KV possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
49 Madurai 56210 110 KV EE / O / Kinnimangalam has also programmed POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 14:00 1 0 Approved
50 Erode 56219 230 KV ARASUR 230 KV possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 16:00 1 Approved
51 Erode 56494 110 KV Monthly Maintenance Work THE WILL BE RADIAL FROM OTHER END possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
52 Madurai 56505 230 KV Auto Transformer I POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 0 Approved
53 Madurai 56513 110 KV POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 0 Approved
54 Madurai 56516 110 KV 110KV Palaiyur- Aduthurai feeder entire POSSIBLE Fri, 02-Jun-2017 10:00 Fri, 02-Jun-2017 16:00 1 Approved
55 Madurai 56526 110 KV POSSIBLE Fri, 02-Jun-2017 10:00 Fri, 02-Jun-2017 16:00 1 Approved
56 Madurai 56557 110 KV POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 16:00 1 0 Approved
57 Madurai 56579 110 KV 110KV KNMLM-PSQ 1 Feeder EE/O/PSQ has also programmed POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 0 Approved
58 Chennai 56606 110 KV Possible Fri, 02-Jun-2017 8:00 Sun, 04-Jun-2017 17:00 3 0
59 Madurai 56734 110 KV PAPANASAM PAPANASAM 110KV BUS ENTIRE POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 18:00 1 Approved
60 Erode 56748 110 KV Monthly maintenance work. possible Fri, 02-Jun-2017 14:00 Fri, 02-Jun-2017 16:00 1 Approved
61 Madurai 56882 230 KV then I 230 KV No interruption to any SS 0 Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1
62 Erode 56949 110 KV 110KV Deviakurichi – Thalaivasal Feeder possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
THINGALUR 230 KV
110KV Ingur Feeder Breaker, CTs and Line Isolator.
110KV Kunnathur SS availing Total shutdown.Feeder will be back charged.
subject to the feeder being kept radial
from ingur ss end
TUTICORIN -SIPCOT 230 KV
On 230 KV Sterlite -Annuppankulam feeder breaker with CTs only.
During the LC period, the other end has also proposed LC on the same date. M/S. Sterlite-CPP generation (if available) will
be exported to 230KV TTPS end and no other SS will be affected please.
SUB. TO LOAD & GEN. AT TTPS
AND WIND GEN. & FEEDER
LOADING AT TTPS
EACHANGADU 230 KV
50 MVA Auto Transformer-1, HV-1 and LV1-1 Breakers, CTs and LAS
LONG LC FOR 20 DAYSFor Dismantling of existing 50 MVA auto Transformer I and Erection of 80 MVA Auto Transformer towards Enhancement of existing 50 MVA Auto Transformer I approved vide (Per) CH.TANTRANSCO Proceedings No 173 dt 23.11.2015 and alloted vide Memo No: CE/TR/SE/TRII/ET/A3/F. Allotment /D.No. 005 /’16, dt. 08.01.2016.
During the above shutdown period, i)the Eachangadu 230 KV S.S Loads will be fed from Auto Transformer-II (50MVA) only. it
only sufficiant for the EHT consumers M/s ICL( 20 MVA) and 110 KV Eachangadu SS( 10 MVA). ii) the loads 110 KV
Viruthachalam SS and 110 KV Pennadam SS will be transferred to 110 KV Neyveli- deviakurichi feeder. iii) the 110 KV Supply of the 110 KV Neyveli -Deviakurichi feeder will extended upto
the line switch No 1329 D of 110 Pennadam feeder at Eachangadu end for availing backfeeding 110 KV Supply
during emergencies. concurrence obtained from EE/O/Cuddalore.
LC MAY BE PROGRAMMED AFTER 15th OF
JUNE 2017(ie,ON SET OF MONSOON)
Subject to EE/SLDC/ Madurai concurrence
EACHANGADU 230 KV
110 KV VIRUTHACHALAM FEEDER BREAKER,CT's For MONTHLY MAINTENANCE WORK
DURING THE ABOVE SHUTDOWN PERIOD Supply to M/S SASL CO- GENARATION WILL BE Fed BY CLOSING THE BUSCOUPLER SWITCH NO 44 AT 110 KV PENNADAM SS AND THERE WILL BE NO INTERRUPTION TO EHT CONSUMER. Vridhachalam 110KV
SS is aiso avialing shutdown on the same day. high feeder import and hence to be
scheduled after onset of wind generation is
complete
Subject to EE/SLDC/Erode Concurrrence
KAYATHAR 230 KV
On 110 KV Kayathar - Eppodumvendran Feeder, breaker with CT and entire Line
a) For Monthly maintenance work b) Tower to Tower Inspection work
During the LC period, other end also avails LC Hence no SS affected.
SUB TO WIND GEN AND LOAD
CONDITION
ANTHIYUR 230 KV
230KV MTPS feeder Breaker CT and Line switch
During the LC period 230KV Gobi feeder will be in service. 230KV MTPS 1 feeders other end also programmed to avail
LC .No SS will be affected.
high feeder import and hence to be
scheduled after onset of wind generation is
complete
Subject to EE/SLDC/Erode Concurrrence
110KV TRICHY - ALUNDUR I Feeder breaker, CTs and line isolators and line entire
1. For monthly maintenance works . 2. Premonsoon inspection.
During the LC period, a) The other end also availing LC on the same feeder. b) The Intermediate 110 KV Ammapettai SS
availing total shutdown for monthly maintenance works. c) All other 110 kv feeders will be in tied condition. d) There will be
no interruption of supply to any of the SS.
Pudhanchanthai 230kv
110KV Pudhansandai feeder CB, CTs and Line Switch. 110KV West Bus, its PTs and Switches-5 Nos.
During LC period110KV Pudhansandai SS availing Total Shut down. 110KV Namakkal SS will be back fed through 110KV PSI-
Valayapatty feeder. 110KV Rasipuram SS will be back fed through 110KV Salem- Mallur feeder. 110KV Elanagar SS now
back fed through 110KV PSI-Rasipuram feeder to be transferred to Unjanai 230KV SS. No supply interruption
Subject to EE/SLDC/ Erode concurrence
UNJANAI 230 KV110KV Puathansanthai-Valayapatty #line portion between Valayapatty and Thottiyam SS
KARUVALUR 230 KV
230 Kv Karuvalur - PGCIL feeder Breaker with Line switch,LAS and CT's
For Monthly maintenance work &PMI by PLDM/Lines (OCC Approved)
230kV KVLR-Karamadai #,Auto Transformer I & II will be in service
occ approved and srldc to be
addressedKODIKURICHY 230 KV
110 KV Veerasigamani II # Breaker with CT & Line Isolators
SUB TO WIND GEN
To replace the existing Static distance relay ( Main.2 ) by new CG make Numerical distance protection relay.( by P & C WING )
high feeder import and hence to be
scheduled after onset of wind generation is
complete
Subject to EE/SLDC/Erode Concurrrence
KODIKURICHY 230 KV
110KV Kodikurichi -Tenkasi - Papanasam feeder section between 110 KV Kodikurichi SS -Tenkasi SS
For replacement of defective insulator at loc no: 16
i)110KV Tenkasi ,Shenkottai, Keelapavoor & 110 KV Kadayam SS will be fed from 110 KV Kayathar - Papanasam - feeder by closing of AB switch at Rastha SS end ii).Hence no SS will be
affected.
NOT POSSIBLE
DUE TO 110 BUS LC AT PPM
Subject to EE/SLDC/ Madurai concurrence
SRPUDUR 230 KV
110 KV Kodayar- Kayathar & Kodayar - melakallur # section between KDR to MKLR and KDR to Viravanallur
During the LC period 110 KV Viravanallur fed from Kayathar, MKLR fed from other end. Hence no SS will be affected.
SUB TO WIND GEN
ALAGARKOIL 230 KV
110KV ALKL-Sembatty 2# Br,CT,&LI(Section between Alagarkoil&Valayapatty)
SUB TO LOAD CONDITION
KARAIKUDI 230 KV
230 KV Auto TR-I and its allied equipments
Monthly Maintenance works of Auto TR 1 and LV 1 Breaker.
1) Other Two Auto Trs will be in service.2) All feeders will be in service.
SUB TO LOAD CONDITON
KARAIKUDI 230 KV
Flashed over Disc replacement work L.No: 67,68,70
1) 110 KV S.Pudur,110 KV A.Thekkur,110 KV Thuvarankurichy SS will be in TSD2) 110KV A.Koil will be Radial from other end
SUB TO LOAD CONDITION
UDUMALPET 230 KV
110KV Ranganathapuram # Breaker & Line sec bet Udt&Melkaraipatty
FOR MONTHLY MAINTENANCE WORKS
SEC BETWEEN RANGANATHAPURAM AND MELKARAI PATTY WILL BE Fed FROM 230KVSS RANGANATHAPURAM
subject to the feeder being kept radial
from renganathapur
am ss endPASUMALAI 230 KV
1) 110 KV Pasumalai - Kinnimangalam (Theni) # - I BKR & CT,LI only. 2) Line Entire
1)Maintenance Works of BKR & CT,LI 2) Tree Cutting works
230/110 KV AUTO TRANSFORMER-II,HV-II, LV-II BREAKERS,CTS ,LAS AND ITS ASSOCIATED EQUIPMENTS.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD,1) REMAINING 3 NOS. AUTO TRANSFORMERS WILL BE IN SERVICE.2) 110 K V SOMANUR SS
AND 110 K V KALAPATTY SS WILL BE UNDER TOTAL SHUTDOWN.
subject to the other auto trs loading limit
Udumalpet 110 KV
110 KV UDT –Okm – II #r breaker, CT’s and Section between UDT and Kongalnagaram.
subject to the feeder being kept radial
from okm ss end
VALUTHUR 230 KV
For Attending Auto Transformer I HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
During the LC period Auto Transformer II & III will be in service. Hence there is 'no' interruption in power evacuation
ALUNDUR 230 KV
110KV Alundur - Trichy -I Feeder breaker,CT's, and Line Isolators.
a)Preventive Monthly maintenance work.b)Premonsoon inspection and Tree cutting work.c)Relay testing work.
a)Intermediate 110KV Ammapettai SS also avail total shutdown.b)All other 110 KV feeders will be in service.c)There will be no interruption of supply to any other feeder's and ss.
KADALANGUDI 230 KV
Line inspection and rectification work
No interruption to any SS. All other feeders will be in tied condition. The 110KV Aduthurai SS proposed to shutdown.
SUBJECT TO LOAD CONDNS. & KTLM GEN.
KADALANGUDI 230 KV
110KV Mayiladuthurai- Thiruvarur feeder portion between Mayiladuthurai and Peralam SS.
Line inspection and rectification work
No interruption to any SS. All other feeders will be in tied condition. The 110KV Perambur and Peralam SS proposed to
shutdown.
SUBJECT TO LOAD CONDNS. & KTLM GEN.
ALAGARKOIL 230 KV
110KV ALKL-Sempatty2 # breaker,CT&Lines section between Alkl- L.Valayapatty SS.
For monthly maintenance work & tree clearance work.
DUING THE L.C period the feeder will be radial from other end up to L.Valayapatty SS.
kinnimangalam 230 KV
Monthly Maintenance works for Breaker and CT
KADAPPERI 230 KV
110KV Siruseri- Mambakkam and Siruseri - Shozinganallur feeder
400KV Kalivanthapattu to Ottiyambakkam feeder and line stringing work by TLC WING/ GCC-II which is crossing existing line.
110KV Shozinganallur SS loads fed from 230KV KITS PARK ss , and 110KV Siruseri -Mambakkam feeder idly charged
condition.
Approved Subject to Grid condition
For replacement of existing 110KV String bus (Phase I only)by new one
1. All machines will be in shutdown condition.2.During the LC period 110KV PPM-OTPATTI feeder,110KV PPM-KYTR
feeder,110KV PPM-SERVALAR feeder-1 and 110KV PPM-SERVALAR feeder-2 will be radial from other ends.3.Present
PWD demand is 100 c/s will meet out in later hours.Concurrence obtained from EE/PWD/TIN.
SUB TO PPM PWD DEMAND
AND WIND GEN
COIMBATORE 230 KV
1. 110KV CBE - Arasur feeder breaker and CTs
1. Scheduled shut110/11KV Kallimadai SS on 02.06.2017.2. 110KV CBE - Arasur feeder loads (KPR Mill EHT service, Sulur traction EHT service and 110KV Irugur SS) will be transferred
to 230KV Arasur SS.
subject to the feeder being kept radial
from arasur ss end
230kv Theni- Sempatty # Br, CT,and line Insulator
For line mtc work & attending premonsoon remarks
LC MAY BE PROGRAMMED DURING LONG
LC PERIOD FROM 13.6.17
TO 24.6.17
Subject to Long LC approval
DEVIAKURICHI 230 KV
110KV Deviakurichi – Thalaivasal line jumper tightness work
1)Deviakurichy 230KV SS Thalaivasal feeder monthely maintenances work Breaker,CT ‘s and Thalaivasal 110KV SS availing total shutdown. 2)There will be no interruption any
other SS.
subject to thalaivasal ss availing tsd
63 Madurai 55828 230 KV MONTHLY MAINTENANCE WORK. POSSIBLE Fri, 02-Jun-2017 10:00 Fri, 02-Jun-2017 17:00 1 Approved
64 Madurai 55852 400 KV For Monthly Maintenance Work POSSIBLE Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
65 Erode 55854 110 KV For Monthly Maintenance work 110KV Thalaivasal SS availing total shutdown. possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
66 Erode 56252 110 KV ARASUR 230 KV possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 12:00 1 Approved
67 Erode 56317 230 KV possible Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
68 Madurai 56443 230 KV 230 KV Southern Bus & Isolators only. MONTHLY MAINTENANCE WORK. POSSIBLE Fri, 02-Jun-2017 10:00 Fri, 02-Jun-2017 17:00 1 Approved
69 Madurai 56345 230 KV 230 KV APKM - Sterlite feeder entire 0 Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
70 Madurai 56348 230 KV 0 Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
71 Madurai 56888 230 KV then I 230 KV Fri, 02-Jun-2017 9:00 Fri, 02-Jun-2017 17:00 1 Approved
72 Madurai 51839 230 KV MONTHLY MAINTENANCE WORK. 0 Sat, 03-Jun-2017 10:00 Sat, 03-Jun-2017 17:00 1 PREPONED
73 Madurai 55684 110 KV SURULIYAR For Monthly Maintenance work POSSBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 15:00 1 0 Approved
74 Erode 55694 PYKARA UNIT 1 NIL possible Sat, 03-Jun-2017 8:00 Sat, 03-Jun-2017 17:00 1 Approved
75 Erode 55714 110 KV Erode 110 KV MONTHLY MAINTENANCE WORK possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
76 Erode 55715 110 KV Erode 110 KV 110 KV SWTP BREKER ,CT AND LINE SIDE MONTHLY MAINTENANCE WORK possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
77 Erode 55735 110 KV possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 15:00 1 Approved
78 ERode 55746 230 KV Monthly Maintenance Work. possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
79 Erode 55747 110 KV Monthly Maintenance Work. possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 Approved
80 Erode 55748 230 KV KUNDAH PH2 0 Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
81 Madurai 55524 230 KV For Monthly Maintenance work POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
82 Erode 55547 230 KV Auto transformer III & LV III Breaker possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 Approved
83 Erode 55572 400 KV Salem 400 KV 400/230KV Auto:I HV & LV side Monthly maintenance Work possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1
84 Madurai 55884 110 KV For monthly maintenance work POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
85 Chennai 55932 230 KV ARNI 230 KV Possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
86 Erode 55983 110 KV Flashed over replacement work Idle line portion. No interruption of supply to SS. possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
87 Madurai 56011 110 KV For Monthly Maintenance Work. 0 POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
88 Erode 56049 110 KV possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
89 Madurai 56055 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
90 Madurai 56071 110 KV Tree clearance work POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
91 Erode 56079 110 KV possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 Approved
92 Madurai 56113 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
93 ERode 56159 110 KV 110KV Eastern Bus entire possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
94 Erode 56168 230 KV Both end LC appyied possible Sat, 03-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 4
EACHANGADU 230 KV
50 MVA Auto Transformer-1, HV-1 and LV1-1 Breakers, CTs and LAS
During the above shutdown period, the Eachangadu 230 KV S.S Loads will be fed from Auto Transformer-II (50MVA).loads will be with in one Auto Transformer capacity since 110 KV Viruthachalam SS Loads are already transferred to 110 KV
Neyveli- deviakurichi feeder.
SUB TO LOAD CONDITION
Kayathar 400 KV
400KV Karaikudi-1 feeder Main Breaker(407-52),Reactor Breaker (407-52R) and CT only
During the LC period there will be no supply in 400KV Karaikudi-1 feeder Main Breaker(407-52),Reactor Breaker
(407-52R) and CT only Hence no SS will be affected.
APP IN 131 OCC VIDE ITEM
NO.134DEVIAKURICHI 230 KV
110 KV Thalaivasal Feeder Breaker, CTs and Line Isolator
subject to thalaivasal ss availing tsd
110 KV ARASUR-SOMANUR FEEDER BREAKER AND ITS CTS.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 110 K V SOMANUR SS WILL BE UNDER TOTAL SHUTDOWN.
subject to somanur ss availing tsd
METTUR AUTO 230 KV
100MVA Auto transformer-I & 110KV Anthiyur feeder with 110KV Main bus portion MBS1 to Western side,110KV Auxiliary bus portion ABS1 to western side.
Monthly Maintenance work and bus conductor dropper tightness checking work
1. 100MVA Auto transformer-II & Other 110KV feeders will be in service.2. 110KV Main bus portion MBS1 to Eastern
side,110KV Auxiliary bus portion ABS1 to Eastern side will be in service.
subject to the other auto tr loading limit
and kr thoppur ss auto tr 3 loading limit
SAMAYAPURAM 230 KV
During the above Shutdown Period 1) 230KV SMPM SS will be radial from 230KV Trichy Auto SS . 2) 230 KV SMPM-Trichy#
Breaker will be substituted thro' 230 KV Bus-coupler Breaker. 3) The other end 230 KV Poyyur # will be available radial upto
line isolator no 2.29L of 230KV SMPM SS and 230KV SMPM - Poyyur # Breaker will be in H/T condition. 4) Autor Tr. I, HV & LV Breaker H/T 5) Auto Tr. II will cater all the loads of the 230
KV SMPM SS. 6) 230KV Bus Coupler Isolator 29 BS-1 kept opened 7) No interruption to any other 110 KV SS.
SUBJECT TO LOADING OF ALDR ICTs
ANUPPANKULAM 230 KV
For erection of earth wire from Loc. No. 302 to 307
During the LC period 230 KV APKM - Sterlite feeder entire no supply.
LC MAY BE COMBINED WITH LC ON
02.06.17CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Theni feeder entire For monthly maintenance work and Line maintenance work
During LC Period there will be no supply in the entire feeder. Veerapandi, Cumbum, Bodi and Kadamalaikundu SS availing
shutdown.
LC MAY BE PROGRAMMED ON 02.06.17
230KV Theni - Checkannurani # Br. CT,line isolator and entire line
For monthly mtce and line mtce works & attending premonsoon remarks
Total shutdown to be proposed in the following 110KV Substations for load relief of 62MW (110/22KV, Cumbum SS, Ayyampalayam SS, Batlagundu SS, Veerapandi SS,and Bodi
SS)
NOT POSSIBLE
DUE TO 230 SBT-TNI # LC
EACHANGADU 230 KV
50 MVA Auto Transformer-1, HV-1 and LV1-1 Breakers, CTs and LAS
During the above shutdown period, the Eachangadu 230 KV S.S Loads will be fed from Auto Transformer-II (50MVA).loads will be with in one Auto Transformer capacity since 110 KV Viruthachalam SS Loads are already transferred to 110 KV
Neyveli- deviakurichi feeder.
Subject to EE/SLDC/ Madurai concurrence
110 KV Suruliyar - Kayathar feeder breaker with CTs only.
During the LC period the feeder will be radial from Kayathar up to Suruliyar PH. Hence no SS will be affected.
GENERATING
STATIONS
FOR MONTHLY MAINTENANCE WORK.
other units will be available
110 KV THIRUVACHI FEEDER BREAKER AND CT
DURING LC PERIOD METTUKKADAI SS WILL BE UNDER TOTAL SHUTDOWN
subject to the feeder being kept radial
from ingur ss
DURING LC PERIOD 110 KV SURIAMPALAYAM SS WILL BE UNDER TOTAL SHUTDOWN
subject to the feeder being kept radial
from bph 4 end
UNJANAI 230 KV.110KV CAPACITOR BANK NO :I BREAKER, CT'S , CELLS AND LINESIDE ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WORK
DURING THE L.C PRIOD CAPACITOR BANK NO :II WILL CATER THE STATION WAR LOADS
subject to the voltage profile
in the gridTHINGALUR 230 KV
Auto Transformer I, HV I and LV I Breakers with CTs.
110KV Valampalayam SS availing Total shutdown.No SS will be affected.
subject to the other auto tr loading limit
THINGALUR 230 KV
110KV Arasur Feeder Breaker, CTs and Line Isolator.
110KV Valampalayam SS availing SS Total shutdown.Feeder will be back charged.
subject to the feeder being kept radial
from arasur ss end230kv Auto transformer-1 and its
accessioriesFOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
KAYATHAR 230 KV
on 230/110 KV Auto Transformer II, HV II and LV II breaker with CT only
During the LC period Loads of Auto II will be shared by Auto I & III. Hence, No SS affected
SUB TO WIND GEN.
SINGARAPET 230 KV
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period, 1) Auto transformer III and LV III breaker will be in off condition 3) The Auto transformer I and II will be in service,4) All the 110 KV feeders will be in service5) 110KV
Pappireddipatty SS total shutdown approved and hence no interruption of supply.
subject to the other auto trs loading limit
During 400/230 KV Auto Transformer I LC Period, 400/230 KV Auto Transformer II will be in Service Condition. Hence there
will be no interruption of supply.
occ approved and srldc to be
addressed; subject to the other auto tr 2 loading limit
APPROVED IN 131 OCC VIDE ITEM NO.142
KAYATHAR 230 KV
110 KV Kakyathar - Thalaiyuthu Express Feeder, Breaker with CT only
During the LC period the feeder will be radial from other end. Hence no SS affected.
230KV Arani-Sriperumpudhur feeder Breaker, CT's and Line isolators.
For monthly maintenance work under split bus arrangement. 230KV New LILO Line jumper releasing and re-jumpering work at location no.761 & 762 by TLC wing Chennai.
During the period of LC,Others 4 No's 230KV feeder will be in service.The 230KV Bhavini - I & Bhavini - II Feeder loads (Sirucheri SS Loads 70MW ) will be transferred to 230KV Singarapet SS by Split bus arrangements in 230KV Arani
SS.Hence no interruption of supply please.
UNJANAI 230 KV110KV Nallur-Jedarpalayam feeder line portion between Jedarpalayam and Kabilarmalai SS
subject to the load condition
existing
KODIKURICHY 230 KV
110 KV Kodikurichi WF # Breaker with CT & Line Isolators
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
THUDIALUR 230 KV
11O GC BREAKER, 110 KV PNP FEEDER BREAKER,110 KV BOTTOM BUS ENTIRE,110 KV BUS PT-II,110 KV TOP BUS EASTERN SIDE, 110 KV BUS COULER
FOR 110/22KV THUDIYALUR SS MONTHLY MAINTENANCE, 110 KV GC BAY EXTENSION WORK
1. 110 KV TDLR SS UNDER TOTAL S/D2. 110 KV PNP SS WILL BE FED THROUGH 110 KV PYKARA FEEDER AND SWITCH
TOWARDS TDLR KEPT OPEN AT PNP SS.3. 110 KV MEDAMPALLAYAM SS WILL FED FROM KARAMADAI SS.4. ALL 110 KV FEEDERS & TRANSFORMERS TRANSFERRED TO TOP BUS WITH PT1.5. 110 KV ARASUR AND 110 KV KARAMADAI II FEEDERS RADIAL FROM OTHER END.6. 110 KV BUS COUPLER KEPT ONEN CONDITION.7. EASTERN SIDE SERIES SWITCH IN
THE TOP BUS SWITCH KEPT OPEN.8. LC AVAILED FOR CARRYING OUT THE ERECTION WORKS FOR GC BAY CROSS
BEEN GALARY WORK.
subject to thudiyalur ss
tsd, load transfers and
the load condition existing
PUDUKOTTAI 230 KV
110 KV T.NALLUR FEEDER BREAKER, CT AND LINE (ENTIRE RADIAL FEEDER
FOR MONTHLY MAINTENANCE WORK OF BREAKER, CT, CVT, ISOLATORS 110 KV EHT LINE AND GRT TESTING WORKS
110 KV T.NALLUR SS ALSO AVAILING TOTAL SHUT DOWN AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY.
SRPUDUR 230 KV
110 KV SRP-KDR I # section between PPI to KDR PH II .110 KV SRP-KDR II # section between KDR to PPI series switch( for safety purpose)
During the LC period the 110 KV SR Puthur - KDR I feeder will be radial from SRP upto PPI SS (incl).110 KV SR Puthur - KDR II feeder will be radial from SRP upto PPI SS (Excl). Concurreance
to be obtained from Railway athoritise.Hence no SS will be affected.
CONC. TO BE OBTAINED
FROM SE/NCES/TIN &
RAILWAYS
KARAMADAI 230 KV
110KV Karamadai- ArasurII feeder section between Karamadai and KalapattySS
PMI by AE/Lines/Arasur in section between Karamadai and Kalapattyss and 110KV Karamadai- ArasurII feeder Breaker, CT& CVT maintenance works
During LC period Both Kalapatty and NeelamburSS will be fed from 230KV ArasurSS
subject to the feeder being kept radial
from arasur ss end
KARAIKUDI 230 KV
110 KV KKDI- PDKT # BKR & CTs and110KV PDKT # S/B KKDI- Tmym
Monthly Maintenance works on 110 KV KKDI- PDKT # BKR & CTs110KV PDKT # S/B KKDI- Tmym (For Tree clearance work)
1) All other feeders will be in service.2) During the L.C period the 110KV K.Kadhan will be TSD. Thirumayam and Konnaiyur
SS will be fed from 230KV PDKT SS.
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
i) AUTO TRANSFORMER II WILL BE CUT OFF.ii) AUTO TRANSFORMER II LOAD WILL BE SHARD WITH OTHER TOW
AUTOS.iii)CAPACITOR BANK I ,II WILL BE CUT OFF.iv) ENTIRE 110KV POOLAVADI ,THUNGAVI SS LOAD WILL BE FED FROM
230 KV PONNAPURUM SS.v) 110KV RANGANATHAPURUM LOAD WILL BE FED FROM 230 KV RANGANATHAPURUM SS.vi) 110KV SEMPATTY FEEDER LOAD UPTO ELAYAMUTHUR SS FED FROM
230KV SEMPATTY SS.
subject to the load condition existing and
the wind generation
support being available
Udumalpet 400 KV
230 KV Myvadi-Kadamparai-1 feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
other feeders will cater to the
loads
Approved Subject to Grid condition
95 Erode 56170 230 KV Both end LC appyied 0 Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Repeat
96 Madurai 56200 230 KV EE / O / ANPKM has also programmed POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 Approved
97 Madurai 56213 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 Approved
98 Chennai 56489 110 KV MOSUR 230 KV Possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 0 Approved
99 Madurai 56511 110 KV POSSBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
100 Madurai 56520 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
101 Chennai 56554 110 KV 16MVA Power Tr.III Monthly maintenance work 16MVA pOWER Transformer I & II will be in service. Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 12:00 1 0
102 Chennai 56584 230 KV KITS 230 KV 100MVA Auto Transformer-I Possible Sat, 03-Jun-2017 10:00 Sat, 03-Jun-2017 17:00 1 Approved
103 Madurai 56591 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
104 Erode 56629 PUSHEP UNIT-3 CAPITAL OVERHAULING WORK 0 Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 0:00 1
105 Madurai 56634 110 KV POSSIBLE Sat, 03-Jun-2017 8:00 Sat, 03-Jun-2017 15:00 1 Approved
106 Madurai 56639 230 KV LINE MAINTENANCE WORKS POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
107 Madurai 56738 230 KV Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1
108 Madurai 56753 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
109 Chennai 56760 230 KV Guindy 230 KV 100MVA AUTO TRANSFORMER-I Routine Maintenance Work 0 Sat, 03-Jun-2017 10:00 Sat, 03-Jun-2017 16:00 1 0
110 Chennai 56761 230 KV 100 MVA AUTO TRANSFORMER-IV Maintenance work other 3 Auto Transformers will be in service Possible Sat, 03-Jun-2017 10:00 Sat, 03-Jun-2017 17:00 1 0 Approved
111 Chennai 56771 230 KV Guindy 230 KV 100MVA Auto Transformer-I Routine Maintenance work Possible Sat, 03-Jun-2017 10:00 Sat, 03-Jun-2017 16:00 1 0 Approved
112 Chennai 56813 110 KV MOSUR 230 KV Thiruvallur Feeder Line Line Clear There will be no interruption of supply. Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 0 Repeat
113 Erode 55769 110 KV Monthly maintenance work. possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
114 Erode 55779 230 KV KUNDAH PH3 230KV KPH3 – KARAMADAI FEEDER For PMI Work possible Sat, 03-Jun-2017 8:00 Sat, 03-Jun-2017 17:00 1 Approved
115 Chennai 55840 110 KV ARNI 230 KV Possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
116 Erode 55855 110 KV For Monthly Maintenance work Capacitor Bank I will be in service possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
117 Madurai 56229 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 18:00 1 Approved
118 Erode 56230 230 KV ARASUR 230 KV possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
119 Erode 56304 110 KV possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 Approved
120 Madurai 56335 110 KV POSSIBLE Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 13:00 1 0 Approved
121 Chennai 56407 110 KV 110 KV SVC-Kanchi Feeder entire For Monthly mtce work Possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
122 Erode 56437 230 KV AUTO-II ,HV-II,LV-II Breaker and Its CTs For monthly maintenance works possible Sat, 03-Jun-2017 10:00 Sat, 03-Jun-2017 17:00 1 Approved
123 Madurai 56444 110 KV POSSIBLE Sat, 03-Jun-2017 10:00 Sat, 03-Jun-2017 17:00 1 0 Approved
124 Madurai 56454 110 KV POSSIBLE Sat, 03-Jun-2017 8:00 Sat, 03-Jun-2017 16:00 1 0 Approved
125 Chennai 56460 230 KV MOSUR 230 KV Possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 14:00 1 0 Approved
126 Chennai 56463 230 KV 230KV SPK-OMEGA FEEDER Possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 0 Approved
127 Erode 56466 230 KV postponed Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1
128 Erode 56469 110 KV possible Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 15:00 1 Approved
Udumalpet 400 KV
230 KV Myvadi-Kadamparai-1 feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
repeat of 56170
PASUMALAI 230 KV
1) 230 KV Pasumalai - Anupankulam # BKR,CT and LI only. 2).Line Entire.
a) Maintenance Works of BKR & CT,LI b)T-T inspection works
SUB TO WIND GEN
PASUMALAI 230 KV
110 KV Pasumalai - ( Tirumangalam) -Kinnimangalam 3 # section between Kappalur SS and Kinnimangalam SS - Line LC.
Tree cutting works in the section between Kappalur SS and Tirumanglam SS .
1)Feeder will be kept radial from Pasumalai upto Kappalur SS 2) At Kappalur SS the switch towards Kinnimangalam SS will be
kept opened 3) At Kinnimanglam SS the Line switch will be kept opened 4) Tirumangalam SS will be under total shutdown
5)Hence No interruption of Supply to any SS 6) EE/O Kiinimanglam SS has applied for Bkr, CT LC at their end.
SUB TO PSQ AUTO LOADING
110 KV Mosur – Thiruvallur feeder Breaker, CT’s & line isolators
For attending Monthly Maintenance work.
1)The 110 KV Kadambattur SS (08 MW ) and 110 KV Kakkalur SS Load (20 MW) total shutdown 2) Hence there will be no
interruption of supply please.
VALUTHUR 230 KV
110KV Valuthur - Perungulam feeder entire.
1. For attending breaker and it's CT's and isolators Monthly Maintenance work.2. For attending tower to tower inspection work.
During the LC period 110KV Perungulam SS will be availed total shut down.
ALUNDUR 230 KV
110KV Alundur - Thanjavur Feeder breaker,CT's, and Isolators.
a)Preventive Monthly maintenance work.b)Premonsoon inspection and Tree cutting work.c)Relay testing work.
a)Intermediate 110KV Ambigapuram & 33KV Varaganeri SS also avail total shutdown.b)All other 110 KV feeders will be in service.c)There will be no interruption of supply to any other
feeder's and ss.
SUB TO LOAD CONDITION
KADAPPERI 230 KV
SE/Operation approval
Approval from SE/Operation
For Monthly maintenance work and OLTC Oil replacing work
During the above shutdown period 100MVA Auto Tr.III and 80MVA Auto Tr. II will be in service feeding the entire KITS SS
loads except 110KV Perumbakkam feeder-II loads which will be transferred to 230KV Siruseri SS
Subject to load transfer
kinnimangalam 230 KV
110KV KNMLM-PSQ III(Thirumagalam) Feeder
Monthly Maintenance works for Breaker and CT
During the LC period the feeder will be radially fed from 230KV PSQ. Thirumangalam SS availing Total shutdown
GENERATING
STATIONS
1. UNIT -3 TO BE IN SHUTDOWN CONDITION2. LC IS PROPOSED FOR 45 DAYS.
to be discussed with se ld & go
chennai
45 days LC Not approved in OCC, pending
KAYATHAR 110 KV
110KV KANARPATTI-UTHUMALAI ENTIRE LINE
FOR PROVIDING JUMBER AT LOC 48 TOWARDS VANNIKONETHAL & OPENING THE ISOLATOR NO 1 TOWORS UTHUMALAI AT VANNIKONENTHAL SS AND JUMBER JOINT TIGHTNESS CHECKING TENSION LOCATIONS ON UTHUMALAI&VANNIKONENTHAL SECTION.
DURING THE LC PERIOD THERE IS NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
UTHUMALAI SS AND PARTIAL
LOADS OF VSMI TO BE
TRANSFERRED TO 110
KANRAPATTY-KEELAVEERANA
M #. SUB TO WIND GEN AND NO BLOCKING
OF WIND GENCONC. TO BE OBTAINED
FROM SE/NCES/TIN
KAVANOOR 230 KV
110 KV KARAIKUDI-VALUTHUR # SEC. BET. R.S.MANGALAM AND THIRUVADANAI (INCLUDING ANANDUR SPUR LINE)
FEEDER TO BE KEPT RADIAL FROM VALUTHUR UPTO R.S.MANGALAM AND TO KEPT RADIAL FROM KARAIKUDI UPTO
THIRUVADANAI. ANANDUR SS TO BE UNDER SHUTDOWN
THANJAVUR 230 KV
100 MVA Auto Transformers-1 & 2, HV- 1 & 2, LV- 1 & 2 Breakers & CTs. (one by one)
1) Monthly maintenance works by the AEE/Mtce/Thanjavur,2) Relay replacement works (i.e. Transformer differential relay from static to numerical) in Auto Transformer-2 by the AEE/P&C/Thanjavur.
During the LC period,1) Thanjavur 110 KV Grid SS will avail shutdown in 33 KV feeders,2) further only if required, 110 KV
Thanjavur-NTKudi Feeder's tie may be kept opened at Thanjavur 230 KV SS for containing autotransformer's load,3) all 230 KV & other 110 KV feeders will be in tied condition,4)
no supply interruption to any SS.
NOT POSSIBLE
DUE TO AUTO LOADING. MORE S/D
NEEDED TO CONTAIN AUTO
LOAD
Subject EE/SLDC / Madurai Concurrence
SEMBATTY 230 KV
110KV SBT-RNPM 2 # Bkr, CTs and sec between SBT and Gandhigramam SS.
1. Monthly maintenance work2. Tree cutting work
During the LC period the feeder will be radial from other end up to Gandhigramam SS. Hence no interruption to any SS.
SUB TO LOAD CONDITION
Load of Auto Transformer-I will be transferred to other two Auto Transformers
Sub to load condition
THARAMANI 230 KV
Load of Auto Transformer-I will be transferred to other two Auto Transformers
Repeat 56489
SALEM AUTO 230 KV
110KV K.R.Thoppur-I feeder Breakers and CT's
110KV K.R.Thoppur-I feeder will be radially fed from other end. Railway traction SS will be fed from 110KV K.R.Thoppur-II
feeder.
subject to the feeder being kept radial
fromkr thoppur ss end
Both end breaker open condition.Both bus & line mods open condition.Earth Switch Closed Condition.
subject to completion of work in 230 kv kph 3 to kph 4
feeder
110KV Arani Kancheepuram Feeder Breaker, CTs and Line Isolator
For 110KV Breaker Monthly maintenance work. Also 110KV Feeder cut point jumper tightness checking work by Lines Arani.
During the period of LC 110 KV Vembakkam SS availing Total shut down.The 110KV Mangal SS load transferred to 110KV
Kancheepuram SS.Hence there will be no interruption of supply
DEVIAKURICHI 230 KV
110 KV Capacitor bank II Breaker CTs, Capacitor side Isolator, LAS
subject to the voltage profile
in the grid
PERAMBALUR 230 KV
Line portion between Thirupananthal 110KV SS and Pappakudy 110KV SS in 110KV Neyveli TS1 - Aduthurai feeder.
1) The Dismantling of Existing PA tower & Erection of GCR tower at location No. 9, 10 & 11 in 110KV Jayankondam spur line by TLC viruthachalam. 2) Restringing of old conductor the newly erected towers.
110KV Jayankondam SS availing total shutdown on 03.06.2017. No interruption to any other SS.
REASON FOR DISMANTLING
OF TOWER
230 KV ARASUR-PGCIL LINK-II FEEDER BREAKERS, CTS AND ITS LINE SIDE ISOLATOR.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, REMAINING 5 NOS. 230 K V FEEDERS WILL BE IN SERVICE.
occ approved and srldc to be
addressedOTHAKKAL MANDABAM 230 KV
110 KV OKM-R.S.Puram I Feeder (Breaker, CT's & Line Switch)
For monthly maintenance works by AEE/MTC/OKM
110 KV OKM-RSPM I # loads will be transferred to 110 KV OKM-RSPM II feeder. and 110KV Ukkadam SS total S/D
subject to load transfer to feeder 2
ANUPPANKULAM 230 KV
110 APKM - T. Kallupatti # Br., CT. and line switch only.
Monthly Maintenance Works of BKR & CT, Line switch only.
During the LC period,110 KV Valayapatti SS, Watrap SS, Erichnatham SS will be availing Total Shut down and 110 KV TTL SS & T. Kallupatti SS load will be transferred to 110KV
PPTY feeder. Hence no SS will be affected.Sunguvarchatram 400 KV
During the Period of LC, the 110KV SVC-Kanchi # entire will be in OFF condition.
PONNAPURAM 230 KV
1. WITH MEDIUM WIND POWER GENERATION IT IS EXPECTED THAT THE LOAD WILL BE WITH IN THE OTHER TWO AUTO
TRS.2. HENCE NO SS WILL BE AFFECTED
subject to the other auto trs loading limit
SAMAYAPURAM 230 KV
110 KV SMPM-Kallakudi -I # CT's , Breakers and entire line portion (tied feeder) .
Monthly Maintenance Works and Line Patrol Work.
1. During the above LC Period, 110Kv Kallakudy I # Breaker is in H/T condition at 230KV Tahtchankurichy SS . 2.110Kv Thatchankurichy I# Breaker is in H/T condition at 110KV kallakudy Grid SS. 3.Bus and Line Isolator towards 110KV Kallakudy Grid SS will be kept in open condition at 230KV
Thatchankurichy SS. 4.Line Isolator towards 230KV Thatchankurichy SS will be kept in open condition at 110KV
Kallakudy Grid SS. 5. Earth switch will be kept in closed condition at 110Kv Kallakudy grid ss and 230KV
Thatchankurichy SS. 6.110 KV Kallakudi-II # will be in tied condition. 7.There will be no interruption to any other SS.
KAYATHAR 110 KV
110KV KAYATHAR-TALAYUTH EXPRESS FEEDER ENTIRE LINE
LINE INSPECTION & RECTIFICATION WORK
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
AUTO TRANSFORMER NO-IV, HV -IV , LV- IV, CT'S AND LAS only
For attending Monthly Maintenance work.
1). On 03.06.2017 the 110 KV Kakkalur SS,110 KV Kadambathur SS availing Total Shutdown work. 2) Auto
Transformers I,,&III are in service condition3) Hence there will be no interruption of supply please.
S.P.KOIL 230 KV FOR QUARTERLY MTCE AND LINE MTCE WORK
DURING THE PERIOD OF SHUT DOWN, ALL OTHER 230KV FEEDERS WILL BE IN SERVICE
PALLADAM 230 KV
Auto Transformer I HV,LV Breakers ,CT's and LAS
To carryout monthly maintenance work by AEE/M/Palladam
1)Other three Auto Transformers (II,III and IV)will be in service 2)110 KV Veerapandy SS and 110 KV Naranapuram SS availing
Total Shutdown3)No other SS will be affected
long lc recommended for auto tr 4 at
palladam ss
Postponed to July
PALLADAM 230 KV
110KV Veerapandy # Breaker,Ct's and Line entire
To carryout monthly maintenance work by AE/M/Palladam and to carryout premonsoon inspection work by AE/L/Palladam
1)110 KV Veerapandy SS and 110 KV Naranapuram SS availing total shutdown2)No other SS will be affected
subject to veerapandy ss
and naranapuram ss availing tsd
129 Chennai 56821 230 KV KORATTUR 230KV Korattur - Kilpauk all other feeders will be in service Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 17:00 1 Approved
130 Madurai 56354 230 KV 0 Sat, 03-Jun-2017 9:00 Sat, 03-Jun-2017 13:00 1 0
150 Erode 55787 230 KV KUNDAH PH3 230KV KPH.3 – KARAMADAI FEEDER For PMI Work postponed Sat, 03-Jun-2017 8:00 Sat, 03-Jun-2017 17:00 1 Approved
241 Erode 55789 230 KV KUNDAH PH3 230KV KPH.3 – KARAMADAI FEEDER For PMI Work postponed Sat, 03-Jun-2017 8:00 Sat, 03-Jun-2017 17:00 1 Approved
131 Erode 55520 KUNDAH PH4 Unit I Monthly maintenance work Standby possible Sun, 04-Jun-2017 8:00 Sun, 04-Jun-2017 17:00 1 Approved
132 Erode 55528 KUNDAH PH3 Unit I For monthly maintenance Unit under shutdown condition,SF6 Breaker open condition possible Sun, 04-Jun-2017 8:00 Sun, 04-Jun-2017 17:00 1 Approved
133 Chennai 55637 400 KV Monthly maintenance work Sun, 04-Jun-2017 9:00 Sun, 04-Jun-2017 17:00 1 Approved
134 Erode 56050 110 KV possible Sun, 04-Jun-2017 9:00 Sun, 04-Jun-2017 17:00 1 Approved
135 Erode 56051 KUNDAH PH1 UNIT 1 For Monthly Maintenance work possible Sun, 04-Jun-2017 9:00 Sun, 04-Jun-2017 17:00 1 Approved
136 Chennai 55687 230 KV 230KV NCTPS-2 FEEDER ROUTINE MAINTENANCE WORKS. Possible Sun, 04-Jun-2017 9:00 Sun, 04-Jun-2017 16:00 1 0 Approved
137 Erode 55751 KUNDAH PH2 0 Sun, 04-Jun-2017 9:00 Sun, 04-Jun-2017 17:00 1 0 Approved
138 Erode 56421 PUSHEP UNIT-2 MONTHLY MAINTENANCE WORK UNIT-2 IN SHUTDOWN CONDITION possible Sun, 04-Jun-2017 9:00 Sun, 04-Jun-2017 17:00 1 Approved
139 Chennai 56537 230 KV 230KV Bus Section Possible Sun, 04-Jun-2017 5:00 Sun, 04-Jun-2017 9:00 1 0 Approved
140 Chennai 56621 230 KV KOYAMBEDU 100 MVA Auto Transformer-III Possible Sun, 04-Jun-2017 10:00 Sun, 04-Jun-2017 17:00 1 Approved
141 Chennai 56643 230 KV 100MVA AUTO TRANSFORMER-I Possible Sun, 04-Jun-2017 10:00 Sun, 04-Jun-2017 17:00 1 Approved
142 Chennai 56700 230 KV 230KV NCTPS-II FEEDER Sun, 04-Jun-2017 9:00 Sun, 04-Jun-2017 16:00 1 0 Repeat
143 Chennai 56704 110 KV 110KV VYASARPADI FEEDER Possible Sun, 04-Jun-2017 10:00 Sun, 04-Jun-2017 13:00 1 0 Approved
144 Madurai 54027 230 KV TTPS 230kV TTPS-SIPCOT feeder entire POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
145 Erode 55345 230 KV possible Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 Approved
146 Erode 55695 110 KV PYKARA SUPPLY WILL NOT BE INTERRUPTED TO SARATHA EHT. possible Mon, 05-Jun-2017 8:00 Mon, 05-Jun-2017 17:00 1 Approved
147 Erode 55736 110 KV possible Mon, 05-Jun-2017 8:00 Mon, 05-Jun-2017 15:00 1 Approved
148 Erode 55749 230 KV Monthly Maintenance Work. Feeder is already in radial. possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 idle line Approved
149 Erode 55770 230 KV Monthly maintenance work. possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
151 Erode 55793 230 KV INGUR 230 KV 230 KV Ingur – MTPS # Premonsoon inspection. 1. No SS will be affected during LC period. possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 14:00 1 Approved
152 Erode 55825 230 KV 230KV KR THOPPUR feeder 1. Both Ends. possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
153 Chennai 54672 230 KV Monthly maintenance work Possible Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 0 Approved
154 Erode 55507 230 KV MTPS MTPS.I TO INGUR 230KV FEEDER Monthly maintenance work. Programed LC possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
155 Erode 55573 230 KV Salem 400 KV Monthly Maintenance Work Both end monthly maintenance work possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
156 Madurai 55595 110 KV PERIYAR POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 13:00 1 0 Approved
157 Madurai 55603 110 KV 0 Mon, 05-Jun-2017 0:00 Fri, 09-Jun-2017 23:00 5 Pending
158 Erode 55620 230 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS OTHER END ALSO AVAIL LC ON THAT DAY possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
159 Erode 55913 230 KV Salem 400 KV possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
160 Erode 55942 110 KV Jumper tightness checking possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
161 Erode 55951 230 KV ALIYAR 230 KV 230KV ALR-KPH feeder will caters the load possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 16:00 1 Approved
162 Erode 55968 110 KV For monthly maintenance works. 0 Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 13:00 1 0 Approved
163 Erode 55969 110 KV For monthly maintenance works. 0 Mon, 05-Jun-2017 14:00 Mon, 05-Jun-2017 17:00 1 0 Repeat
Jumper tightness checking work at various locations
Preponed to 03/06/2017
Due to 230 kV NCTPS-TPT&
BB-TPT feeder LC
ANUPPANKULAM 230 KV
230 KV Anuppankulam - Madurai feeder Br., CT., and Line switch only.
(a) For monthly maintenance work. (b) For replacement of flash over disk in loc No. 255
During the LC period, the other end also availing LC on the same date. Hence no ss will be affected.
Approved Sub to grid condition
Both end breaker open condition.Both bus & line mods open condition.Earth switch closed condition.
recommended on 03.06.2017
Both end breaker open condition. Both bus & line mods open condition. Earth switch closed condition.
lc recommended on 03.06.2017GENERA
TING STATIO
NS
other unit to be available
GENERATING
STATIONS
other units to be available
Sriperumbudur 400 KV 400/230 KV, 315 MVA, Auto-Transformer-II During the period of shutdown Auto-Transformer-I & III in
service
Subject to OCC Concurrence
OCC approved 131st/item
no.147
THUDIALUR 230 KV
110 KV GC BREAKER,110 KV PNP FEEDER BREAKER, 110 KV BUS PT-II, 110 KV BUS COUPLER, 110 KV BOTTOM BUS ENTIRE, 110 KV TOP BUS EASTERN SIDE
FOR 110 KV GC BAY EXTENSION WORK
1. 110 KV MADDAMPALAYAM SS WILL BE TRANSFERRED TO 230 KV KARAMADAI SS.2. 110 KV PNP SS WILL BE FED THROUGH 110 KV PYKARA FEEDER AND THE SWITCH
TOWARDS THUDIYALUR WILL BE KEPT OPEN AT 110 KV PNP SS.3. ALL 110 KV FEEDERS & TRANSFORMERS TRANSFERRED TO TOP BUS WITH BUS PT-14. ALL 22 KV FEEDERS IN 110 KV TDLR SS LOCAL WILL BE FED FROM OTHER ENDS OF OTHER
SUBSTATIONS AND 110 KV GC BREAKER WILL BE DEPT OFF.5. 110 KV BUS COUPLER & BUS PT -II KEPT OFF.6. 110 KV
ARASUR AND 110 KV KARAMADAI-II FEEDERS WILL BE RADIAL FROM OTHER END.7. EASTERN SIDE SERIES SWITCH IN THE TOP BUS SWITCH KEPT OPEN.8. LC AVAILED FOR CARRYING
OUT THE ERECTION WORKS FOR CROSS BEEM GALARY WORK.
already applied on 03.06.2017; to be discussed with ee o tdlr
GENERATING
STATIONS
During the monthly maintenance period unit under stand by condition
other units to be available
TONDIARPET 230 KV
DURING THE PERIOD OF SHUTDOWN,EXCEPT 230 KV NCTPS-II FEEDER ALL OTHER FEEDERS AND EQUIPMENTS WILL BE IN
SERVICE.GENERA
TING STATIO
NS
UNIT-1 GENERATTOR SF6 BREAKER, POWER TRANSFORMER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
GENERATING
STATIONS
other units to be available
BASIN BRIDGE(GMRVASAVI) 230 KV
Replacement of B phase damaged jumper at 230 KV Tondiarpet feeder main bus side support insulator.
1. 230 KV Tondiarpet Feeder will not be in service. 2. Auto I & II will not be in service. 3. 230KV Bus Section Breaker will not be in service. 4. 230KV Mylapore feeder will be in service. 5. Auto
III will be in service.6. Load may be restricted to 70 MW.For attending Oil Leak using Devcon putties
All the SS Load may be restricted within the Auto transformers I & II only.
Subject to load condition
SIRUSERI 230 KV
Maintenance & OLTC Oil changing work
DURING THE PERIOD OF SHUTDOWN 1) 100MVA AUTO Transformer-I will not be in service .2) The 110KV
Sholinganallur SS load will be transferred to 230KV KITS PARK SS. 3)110KV Bus coupler breaker will be in closed condition
Subject to load condition
TONDIARPET 230 KV
FOR ROUTINE MAINTENANCE WORKS
DURING THE PERIOD OF SHUTDOWN EXCEPT 230KV NCTPS-II FEEDER ALL OTHER FEEDERS AND EQUIPMENTS WILL BE IN
SERVICE.Repeat 55687
TONDIARPET 230 KV
FOR ROUTINE MAINTENANCE WORKS.
EXCEPT 110KV VYASARPADI FEEDER, ALL OTHER FEEDERS AND EQUIPMENTS WILL BE IN SERVICE.
Maintenance work and MRT testing of LAS
Both end breakers to be tripped conditions Both end isolator to be opened conditions Both end Earth switches closed
conditions
THIS LC MAY BE PROGRAMMED AFTER NORM.
OF 230 KV BUS SEC. IV AT TTPS
PONNAPURAM 230 KV
230 KV Ponnapuram – S.D.PALAYAM # Breaker, CTs & line Entire
For monthly maintenance works & Annual testing by P&C Wing
1. 230 KV GRID FEEDER, HENCE NO SS WILL BE AFFECTED 2. 230KV S.D.PALAYAM SS END ALSO PROPOSED LC ON THIS DAY
subject to the load condition
existing110KV PYKARA - BHAVANI BARRIAGE 1# (FROM PYKARA TO KATTAPETTU SWITCHING STATION)
FOR MONTHLY MAINTENANCE, LAS MEGGERING AND GRT RELAY TESTING.
eht supply to be fed from bb
1
UNJANAI 230 KV110KV CAPACITOR BANK NO :II BREAKER, CT'S , CELLS AND LINESIDE ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WORK
DURING THE L.C PERIOD, CAPACTOR BANK NO :I WILL CATER THE STATION WAR LOADS.
subject to the voltage profile
in the gridTHINGALUR 230 KV
230KV MTPS- II Feeder Breaker and CTs with Line Isolator.
SALEM AUTO 230 KV
100MVA Auto Transformer-I, HVI, LVI Breakers & their CTs and 110KV Sankari feeder Breaker, CT’s & Line Isolator
1. 2Nos. 100 MVA Auto Transformer-II & III will be in service. 2. 110KV Sankari feeder will be radially fed from other end upto
Veerapandai 110KV SS feeding Veerapandai 110KV SS only. 3. Mallasumathram 110KV SS will be availing total shutdown. 4.
The series switch towards Salem will be kept opened at Veerapandai 110KV SS and Mallasamudram 110KV SS. 5.
There will be no interruption to any SS or Feeders
subject to the other auto trs loading limit
subject to the load condition
existingSINGAPURAM 230 KV
Monthly Maintenance of Breaker and CT , Isolator at both ends.
subject to the load condition
existingTHARAMANI 230 KV
100 MVA Auto Transformer IV (Newly commissioned)
Other 3 Auto Transformers (each 100 MVA Capacity) will be in service
subject to the load condition
existing230KV Singapuram # Bkr,CTs & Line switch
subject to the load condition
existing110KV PERIYAR-SURULIYAR FEEDER- BREAKER WITH CT AND LINE SECTION BETWEEN PERIYAR PH AND SURULIYAR PH
For Monthly maintenance of Breaker, CT and line side switches
110KV PYR-SLR # will be in condition of both end tripped and no ss will be affected
TUTICORIN -AUTO 230 KV
110KV TTN-Sipcot-III feeder (Section between 230KV Auto SS and 110KV Town SS)
To replace existing leopard conductor with Panther conductor between Location No: 1 and 69
No SS affected .During above LC period 110KV Town SS will be radially fed from 230KV Meelavittan SS.(Continuous LC from
01/06/17 -0900 Hrs to 25/06/17 upto 1700Hrs)LONG LC:NOTE TO BE PUT UP
230KV MTPS # Breaker, CT’s, ,Isolators and Line side Isolator and 230 KV main Bus & Auxillary Bus switch
subject to the load condition
existing
230KV KR Thoppur Singapuram feeder entire
Tension point jumpers checking work.
1. 230KV KR Thoppur – Singapuram feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. Both ends are availing breaker and line switches
LC on that day.4. There will be no interruption to any SS.
subject to the load condition
existing
UNJANAI 230 KV110KV Unjanai-Paruthipalli # line portion betweenParuthipalli SS and Mallasamuthiram SS
During the LC period the mallasamuthiram SS availing total shutdown
subject to mallasamudram ss availing
tsd230KV ALR-UDT feeder CB, CT and line entire
For Monthly Mtce works and line patrol works
subject to the load condition
existingPudhanchanthai 230kv
110KV Namakkal feeder CB, CTs and Line Switch.
During LC period110KV Erumapatty SS availing Total Shut down. 110KV Namakkal SS will be transferred to 110KV PSI-
Valayapatty feeder. No supply interruption.Pudhanchanthai 230kv
110KV Valayapatty feeder CB, CTs and Line Switch.
During LC period110KV Erumapatty SS availing Total Shut down. 110KV Valayapatty SS will be transferred to 110KV PSI-
Namakkal feeder. No supply interruption.
164 Madurai 56013 230 KV For Monthly Maintenance Work. 0 POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
165 Erode 56026 230 KV MTPS MTPS.I TO INGUR FEEDER Programmed LC possible Mon, 05-Jun-2017 9:00 Tue, 06-Jun-2017 6:00 2 Approved
166 Madurai 56073 230 KV Tree clearance work POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
167 Erode 56086 110 KV 110KV Karamadai-Arasur I feeder possible Mon, 05-Jun-2017 11:00 Mon, 05-Jun-2017 13:00 1 Approved
168 Chennai 56089 110 KV 110KV Madurapakkam- I &II # For maintenance works, Possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
169 Chennai 56092 110 KV For monthly maintenance works. Possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
170 Madurai 55829 230 KV MONTHLY MAINTENANCE WORK POSSIBLE Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 0 Approved
171 Chennai 55841 230 KV 0 Mon, 05-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 4 0
172 Erode 55866 230 KV GOBI 230 KV possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
173 Erode 56255 110 KV ARASUR 230 KV possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 11:00 1 Approved
174 Erode 56291 230 KV 100MVA Auto Transformer II For Monthly Maintenance work possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
175 Erode 56305 230 KV possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
176 Madurai 56338 230 KV 230 KV APKM - Sterlite feeder entire POSSIBE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
177 Madurai 56445 110 KV POSSIBLE Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 0 Approved
178 Madurai 56114 230 KV 230KV KKDI- KVNR- 2 # Entire All other 230KV #’s Tied with Grid. POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
179 Chennai 56128 110 KV 110KV Villupuram-Neyveli-I# For monthly maintenance works. Possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
180 Erode 56161 230 KV 230KV Aliyar # Breaker & Line entire possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
181 Madurai 56214 110 KV POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 14:00 1 0 Approved
182 Erode 56487 230 KV MTPSII 230/400KV ICT-I possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
183 Erode 56491 110 KV Monthly Maintenance Work THE WILL BE RADIAL FROM OTHER END possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
184 Chennai 56496 110 KV MOSUR 230 KV Possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
185 Chennai 56667 230 KV 230KV Suryadev feeder Possible Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 Approved
186 Madurai 56457 110 KV POSSIBLE Mon, 05-Jun-2017 8:00 Mon, 05-Jun-2017 17:00 1 SUB TO WIND Approved
187 Erode 56458 110 KV MOYAR Periyakodiveri - Moyar Feeder Annual Relay testing by GRT wing. possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
188 Erode 56755 230 KV 1. LC PROPOSED IN 230KV OKM - CBE FEEDER AT OKM SS possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 16:00 1 Approved
189 Chennai 56764 110 KV 110 KV Tidel park I feeder maintenance work 110 KV Tidel park II feeder will be in service Possible Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 0 Approved
190 Madurai 56768 230 KV During the LC period, other end is also availing LC. POSSSIBLE Mon, 05-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 3
191 Chennai 56815 110 KV MOSUR 230 KV Line Clear There will be no interruption of supply. Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Repeat
192 Madurai 56816 230 KV POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
193 Madurai 56912 230 KV POSSIBLE Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
194 Chennai 56924 110 KV Possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
195 Erode 56950 230 KV 230KV Singapuram – K.R.Thoppur Feeder possible Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
196 Chennai 56669 230 KV 230KV Suryadev feeder Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 0 Repeat
KODIKURICHY 230 KV
230 KV Amuthapuram I # Breaker with CT & Line Isolators
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:SUB. TO NORM. OF 230 KV KODI-
VRNMTo replace the existing Static distance relay ( Main.2 ) by new CG make Numerical distance protection relay.( by P & C WING )
2 days lc can be issued
subject to wind generation
being adequate only
SRPUDUR 230 KV
110 KV SRP-KDR I # section between PPI to KDR PH II .110 KV SRP-KDR II # section between KDR to PPI series switch( for safety purpose)
During the LC period the 110 KV SR Puthur - KDR I feeder will be radial from SRP upto PPI SS (incl).110 KV SR Puthur - KDR II feeder will be radial from SRP upto PPI SS (Excl). Concurreance
to be obtained from Railway athoritise.Hence no SS will be affected.
SUB TO WIND GEN:CONC.
FROM SE/NCES/TIN
AND RAILWAYS. THE SAME LC APPLIED FOR
3RD AND 5TH.
KARAMADAI 230 KV
Monthly maintenance works of Breakers& CT,s.
During LC period 110KVMGC Palayam,&110KV EllapalayamSS will be under total shutdown and 110KV KaduvettipalayamSS
will be radially fed from 230KV ArasurSS
subject to the feeder being kept radial
from arasur ss end after the maintenance works at their
endVILLUPURAM 230 KV
During the period of LC:MPKM, Vanur,Vikravandi & TCBLM SS availing total shutdown.
VILLUPURAM 230 KV
110KV VPM- Madurapakkam II #(Between MPKM & TCBLM)
During the period of LC:(1)Replacing of Weak insulator at loc 87.Line insulator towards Vanur SS at MPKM Will be K/O. Vanur
& TCBLM availing TSD. No interruption of supply to any SS.EACHANGADU 230 KV
230 KV Bus Coupler Breaker & B'Bus CVT Only
230 KV Bus Coupler and B'Bus CVT are in stand by equipment since load flow does not affected.
Arani 230 kV SS
230KV Arani- Singarapet Feeder Breaker, CTs and 230KV Line
For 230KV Arani-Sinagrapet feeder take of tower location 598 shifting work and Line stringing work between location no.597 to 598 by TLC Wing / Thiruvannamalai for Additional 80MVA Auto Transformer Bay extension work.
During the period of LC,the other 4 No's 230KV feeders will be in service. The 230KV Bavini I & II feeders will be in common Bus.( No Split Bus). Hence no interruption of supply please.
Postponed to July
Auto Transformer-II HV, LV Breaker and CTs with Bus coupler breaker and CT’s
FOR MONTHLY MAINTENANCE WORK
AUTO TRANSFORMER I AND III ARE IN SERVICE,IT MAY CATER THE LOAD AND SUBJECT TO THE LOAD CONDITION
subject to the other auto trs loading limit
110 KV ARASUR-KARAMADAI-I FEEDER BREAKER AND ITS CTS.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V M.G.C PALAYAM SS AND 110 K V ELLAPALAYAM SS WILL BE UNDER TOTAL
SHUTDOWN.2) 110 K V KADUVETTIPALAYAM SS WILL BE RADIALLY FED FROM 230 K V KARAMADAI SS.
lc to be availed in the forenoon and completed
METTUR AUTO 230 KV
During the LC period 100MVA Auto transformer I will be in service
subject to the other auto tr loading limit
OTHAKKAL MANDABAM 230 KV
230 KV OKM-Coimbatore Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
For Monthly mtce works and PMI works by lines TDLR wing
During the lc period the other 230 KV feeders are in service to cater the ss loads.
subject to the load condition
existingANUPPANKULAM 230 KV
For erection of earth wire from Loc. No. 298 to 302
During the LC period 230 KV APKM - Sterlite feeder entire no supply.
SUB TO TTPS GEN
SAMAYAPURAM 230 KV
110KV Samayapuram - Trichy Grid feeder breaker, CT's and line portion between 230KV Thatchankurichy SS and 110KV Poovalur SS.
For Monthly Maintenance work and premansoon EHT line inspection work.
During the above period of shut down a)110KV Poovalur SS avail Total shutdown on the same day. b)110KV Thennur
SS,110KV T.V.Koil SS, 110KV Valady SS,M/s.Kothari EHT sc. will be fed radially from 110KV Trichy Grid SS. C). The line Isolator towards 230KV Thatchankurichy SS at 110KV Poovalur ss will be Kept opened and earth switch closed. d)The line Isolator
towards 110KV Poovalur ss at 230KV Thatchankurichy SS will be Kept opened and earth switch closed. e)Necessary
concurrence has been obtained from M/s.Kothari EHT Service for the interuptions during the switching operations. f)There
will be no interuption to any other SS/EHT consumers.KARAIKUDI 230 KV
230KV KKDI- KVNR- 2 # Entire (Replacing Flash over Disc L.No: 225,226)
Villapuram 110 KV
During the period of LC:1. The 110KV Neyveli-I feeder at Thirupachanur SS towards Villupuram side will be kept open
condition.2. The feeder will be kept radial from Neyveli TS/end.3. Arasur SS in Neyveli-II # availing total shut down.4. Neyveli-II #, Thiruvannamalai and Acharapakkam # are in tied
condition & jumper Tightening works in the Traction Line.5. Hence no interruption of supply in any SS.
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
THE ABOVE FEEDER LOADS WILL BE FED FROM 230KV MYVADI LINK I & II FEEDERS
subject to the load condition
existing
PASUMALAI 230 KV
1)110 KV Pasumalai -( Tirumangalam) -Kinnimangalam 3 # BKR & CT,LI only. 2) LC in section between Pasumalai and Kappalur SS.
1) Maintenance Works of BKR & CT, LI only. 2) Tree cutting works .
1)Feeder will be kept radial from Kinnimangalam upto Kappalur SS 2) At Kappalur SS the switch towards Pasumalai
will be kept opened 3) Feeder Line isolator at Pasumalai SS will be kept Opened. 4)Hence No interruption of Supply to any SS
MONTHLY MAINTENANCE WORKS AS APPROVED BY OCC.
UNIT IN SERVICE.ALL 230KV FEEDERS AND 400KV FEEDERS EXCEPT THINGALUR FEEDER ARE IN SERVICE.
occ approved and srldc to be
addressed
Udumalpet 110 KV
110 KV UDT –O.K.M -I #r breaker, CT’s and line. Between UDT and Anthiyur
subject to the feeder being kept radial
from okm ss end
110 KV Mosur L:ink-I Feeder, 110 KV Denny Feeder Breaker & 110 KV Mosur Link-II CTs and Line Isolators
For attending Monthly Maintenance work & Re arranging of 110 KV feeder bays to accomdate 110 Ichiputhur Village
i. 110 KV Mosur SS (34 MW) will be availed total shut down. ii. 110 KV Railway-I & II Feeders will be in service. iii. Hence there
will be no interruption of supply
GUMMIDIPOONDI 230 KV
Annual Relay test and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
Concurance to be obtained from M/s.Suryadev, during the period of LC the generated loads of M/s. Suryadev fed to
Sriperambadur 400KV SS through 230KV LILO switch yard
Subject to Concurance to
be obtained from
M/s.Suryadev.KAYATHAR 110 KV
110KV MELAKALLUR-SANKANERI FEEDER SEC B/W MELAPALYAM & KARISALPATTY
LINE INSPECTION & RECTIFICATIONWORK
DURING THE LC PERIOD,1.KARISALPATTI SS WILLBE RADIALLY FED FROM MELAKALLUR.2.MELAPALYAM SS WILLBE RADIALLY
FED FROM SANKANERI HENCE NO SS AFFECTEDUnit- 2 under COH. Otherwise all other feeders will be in
service.subject to the load condition
existingCOIMBATORE 230 KV
1. 230KV CBE - OKM feeder entire (Breaker,89L Isolator, CTs and CVTs)
1. PMI works by AE / LINES / COIMBATORE2. MONTHLY MAINTENANCE WORK AT CBE SS
subject to the load condition
existingTHARAMANI 230 KVSEMBATTY 230 KV
230KV SBT - Myvadi # Bkr, CTs, line switch and line entire
1. Line isolator replacement work by SSE2. Monthly maintenance work3. Tree cutting work
SUB TO LOAD CONDITION
Approved Sub to grid condition
Link I Feeder Line, Link II Feeder Line Denny Feeder Lines
Repeat 56496
THIRUVARUR 230 KV
230 KV Thiruvarur -Nemmelithippiyakudi feeder
Feeder pre monsoon line rectification works,Breaker,ct's and isolator
During the LC period all other 230KV feeders are in tied condition. Hence there will be no interruption of supply to any
other SSSUB TO LOAD CONDITION
ALUNDUR 230 KV
230KV 'A'-Bus Entire. Erection work of 'A' Bus PT.
a)Erection work 'A' Bus PT by GCC/Trichy.b)'A'- Bus Entire Maintenance work.
a)100 MVA Auto 1 & 2 Will be in service.b)All 230Kv Feeder In 'A' Bus will be Transfered to 'B' Bus , Bus coupler in Tripped
Condition, ICT,I & 2 In 'B' Bus.c)230KV Alundur- Trichy-I feeder radial from other end.d)There will be no interruption of supply
to any other feeders.
CUDDALORE 230 KV
The 110KV Cuddalore – LANCO # 110 KV line between B.Mutlur and Chidambaram Auto transformer III HV & LV breakers with CTs
For worn out conductor strand strengthening works at B.Mutlur SS gantry towards chidambaram SS and jumper tightness checking and maonthly maintanance
All the 110 KV ss under total shutdown . Station supply will be from the LANCO end Semmankuppam , B.mutlur, Chidambaram 110 KV SS, chemplast shutdown
DEVIAKURICHI 230 KV
230KV Singapuram – K.R.Thoppur line jumper tightness work
1) The singapuram & K.R.Thoppur both 230KV SS availing Breaker, CT’s maintenances work .2) There will be no
interruption any other SS.
subject to the load condition
existingGUMMIDIPOONDI 230 KV
Annual Relay test and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
Concurance to be obtained from M/s.Suryadev, during the period of LC the generated loads of M/s. Suryadev fed to
Sriperambadur 400KV SS through 230KV LILO switch yardRepeat 56667
197 Madurai 55635 230 KV TRICHY 230 KV 0 Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 16:00 1 Approved
198 Madurai 56187 230 KV Monthly Maintenance Work 0 Mon, 05-Jun-2017 10:00 Mon, 05-Jun-2017 17:00 1 Approved
199 Madurai 56926 230 KV 230KV Cuddalore- TAQA # Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 0 Approved
200 Madurai 56680 230 KV 0 Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
201 Madurai 56655 230 KV 230 KV KAVANOOR-KARAIKUDI # 2 0 Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
264 Madurai 56898 230 KV 0 Mon, 05-Jun-2017 9:00 Mon, 05-Jun-2017 17:00 1 Approved
202 Madurai 55494 230 KV POSSIBLE Tue, 06-Jun-2017 10:00 Tue, 06-Jun-2017 17:00 1 Approved
203 Madurai 55525 230 KV POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
204 Erode 55548 230 KV 230KV Arani feeder and 230KV South Bus possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 14:00 1 Approved
205 Erode 55574 230 KV Salem 400 KV Monthly Maintenance Work Both End Monthly Maintenance Work possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
206 Madurai 55596 110 KV PERIYAR For monthly Maintenance work POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 13:00 1 Approved
207 Erode 55622 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
208 Erode 55916 230 KV Salem 400 KV possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
209 Erode 55933 230 KV Other end avail LC on that day 0 Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0
210 Erode 55936 METTUR TPH Machine -I and its auxilaries Eor monthly maintenance possible Tue, 06-Jun-2017 7:00 Tue, 06-Jun-2017 17:00 1 Approved
211 Erode 55943 230 KV Arching horn repositioning work During the LC period KR thoppur SS avaling LC on the same#. possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
212 Madurai 55995 110 KV Monthly Maintenance Work POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
213 Madurai 55996 110 KV Monthly maintenance works. POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
214 Madurai 56015 110 KV For monthly maintenance work. 0 POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
215 Madurai 56040 110 KV POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
216 Erode 56054 110 KV 110 KV KOTHAGIRI SPUR LINE LOC 01-07 PMI works possible Tue, 06-Jun-2017 7:00 Tue, 06-Jun-2017 17:00 1 Approved
217 Madurai 56082 230 KV AUTO TR I HV I&LV I Bkr,CT&LAS Monthly Mtce work POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 16:00 1 Approved
218 Madurai 56088 230 KV 110KV ALKL-PASUMALAI I # Bkr&CT Monthly Mtce work POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 16:00 1 Approved
219 Chennai 56094 110 KV 110KV Villupuram-Acharapakkam-II # For monthly maintenance works. Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0 Approved
220 Erode 56111 110 KV possible Tue, 06-Jun-2017 7:00 Tue, 06-Jun-2017 17:00 1 Approved
221 Madurai 56116 110 KV POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
222 Chennai 56132 110 KV 110KV Villupuram-Neyveli-II# For monthly maintenance works. Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0 Approved
223 Erode 56163 110 KV possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
230 KV TRICHY - ALUNDUR I Feeder breaker,CTs, Line isolator and line entire.
1. For monthly maintenance works . 2. Premonsoon inspection.
During the LC period, a) other end also availing LC on the same feeder. b) All other 230KV feeders will be in tied
condition. c) Hence there will be no interruption of supply to any of the feeder and SS.
LC MAY BE PROGRAMMED ALONG WITH ALDR END ON
5.6.17 FOR THE A BUS LC AT
ALDR
AMUTHAPURAM 230 KV
Amuthapuran-Kodikurichi-1 230KV #,breakers,CT's and its isolators
1) During the LC period there will be NO supply in this feeder. 2) Other End also avail LC on same day. 3) Cocurrence
obtained from SE/NCES/TIN.
LC MAY BE PROGRAMMED ALONG WITH
KDKRI ON 05.6.17.
CUDDALORE 230 KV
For replacement of flashed over insulators in Loc no 40 and jumper tightness checking 230 KV Cuddalore – TAQA # breaker ,CT line isolator
All the loads will be transferred to 230 KV Cuddalore – Neyveli TS -1 # . Hence no interruption of supply.
Preponed to 05/06/2017
NEMALITHIPIYAKUDI 230 KV
A)230KV NEMMELI THIPPIYAKUDI-THIRUVARUR FEEDER BREAKER, CT's AND LINE ISOLATOR. B)230KV NEMMELI THIPPIYAKUDI-THIRUVARUR FEEDER ENTIRE
A)FOR MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ NEMMELI THIPPIYAKUDI. B)FOR PREMONSOON INSPECTION BY AE/LINES /PATTUKKOTTAI.
1)DURING THE LC PERIOD 230/110KV NEMMELI THIPPIYAKUDI SS RADIALLY FED FROM 230KV KARAIKUDI SS. 2) NO
INTERRUPTION TO ANY SS AND ALL OTHER FEEDERS ARE TIED CONDITION.
LC MAY BE PROGRAMMED ALONG WITH
TVR ON 05.6.17
KAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER
LC MAY BE PROGRAMMED ON 05.06.2017 ALONG WITH
KKDI
ALUNDUR 230 KV
230KV Alundur -Trichy I feeder breaker, CT'S, CVT'S and line isolators.
a)Preventive Monthly maintenance work.b)Premonsoon inspection and tree cutting work.c)Relay Testing Work.
a)Other end also avail shutdown.b)All other 230 KV feeders will be in service.c)There will be no interruption of supply to any
other feeders.
LC MAY BE PROGRAMMED ALONG WITH ALDR END ON
5.6.17 FOR THE A BUS LC AT
ALDR
VEERANAM 230 KV
230Kv Veeranam-Kayathar Feeder Breaker,CT with line switch
For Half yearly and Momthly Maintenance Work.
During the LC period there will be no supply in the entire 230Kv Veeranam-Kayathar Feeder.Concurrence obtained from
SE/NCES/TIRUNELVELI.
SUB TO WIND GEN.SUBJECT TO NORM. OF 230 KV KODI-VEERANAM #
KAYATHAR 230 KV
On 230 KV Kayathar - Veeranam Feeder breaker with CT and Entire Line
a) For Monthly Maintenance workb) Tower to tower Inspection work
During the LC period other end also avails LC and there will be no supply in the entire line. Hence, no ss affected.
SUB TO WIND GEN.SUBJECT TO NORM. OF 230 KV KODI-VEERANAM #
SINGARAPET 230 KV
To carry maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period a). 230KV Salem #, 230 KV Tiruvannamalai # Breakers will be in off condition at
Singarapet end and radially charged condition from respective other end. b). 230 KV Arani # breaker will be in hand trip
condition at both ends. c). 230 KV MTPS, 230KV Vinnamangalam, 230KV Thiruvalam and 230 KV Gurubarapally
feeder’s will be in service. d) All 110KV Feeders and all Auto Transformers will be in service and hence no interruption of supply. e). 230KV Arani SS spit bus loads (230KV BHAVIN I &
II feeders loads) may be transferred to other sources of Chennai LDC region.
subject to the load condition
existing
230KV Pallakapalayam # Bkr,CTs & Line switch
subject to the load condition
existing110KV Periyar-KG Patti Feeder- Breaker with ct only
110 KV PYR-KG PATTI # will be radial from KG PATTI SS up to Periyar PH. Hence no SS will be affected
SUB TO WIND GEN
110 KV Bus Coupler Breaker , CT’s,Isolatorsubject to the load condition
existing
230KV KR Thoppur – Pllakkapalayam feeder entire
Railway crossing jumpers checking work.
1. 230KV KR Thoppur – Pallakkapalayam feeder breakers kept hand tripped at both ends.2. Bus and line switches kept
opened at both ends. 3. K.R.Thoppur 400KV SS is availing breaker and line switche LC on that day. 4. There will be no
interruption to any SS.
subject to the load condition
existing
PALLAKAPALAYAM 230 KV
CT's, Breakers,Bus & Line Switches and 230KV Bus-II
Monthly Maintenance and Rectify the defect in Bus-II isolator
Subject to EE/SLDC/ Erode concurrence
GENERATING
STATIONS
During above LC period 230 KV MTPS feeder and AUTO SS feeder in service,Machine 2,3&4 stand by condition. The PWD
demand at present meet out to PWD Dam.
no water to run tunnel power
house machines
UNJANAI 230 KV 230KV KR Thoppur-Pallakapalayam # line entire
subject to the load condition
existing
PUGALUR 230 KV
110KV Pugalur - Puliyur Feeder Breaker, CTs
During the LC period,110KV Puliyuy ss,kaniyalampatty ss availing total s/d. the reamaing Thanthondrimalai ss,velliyanai ss,mayanur ss,chinthamanipatty ss and pachampatty ss will be
radial from Trichy ss.
SUB TO LOAD CONDITION. CONDITION
NOT MENTIONED
PUGALUR 230 KV
110 KV Pugalur - Elumathur feeder Breaker, CTs only
During the L.C Period, 110KV Kodumudi SS proposed total shutdown and the remaining 110KVEllumathur SS,110KV New Nadupalayam SS,110KV Sivagiri load fed from 110KV Erode SS
through 110KV Elumathur SS.
SUB TO CONCURRENCE FROM ERODE
KODIKURICHY 230 KV
110 KV Kadayanallur # Breaker with CT & Line Isolators
SUB TO WIND GEN
KODIKURICHY 230 KV
110KV Kodikurichi -Tenkasi - Papanasam feeder section between 110 KV Kadayam SS -papanasam PH -Rastha SS
i) For Replacement of Defective Disc at loc No:105,5&replacement of defective jumber bolt at loc no:95.
During LC period, i)110 KV Tenkasi SS ,110 KV Shencottai SS,110 KV Keelapavoor SS,and 110 KV Kadayam SS will be
Radialy fed from 230KV Kodikurichi SS. ii)110 KV Rastha SS will be fed from 110KV Kayathar - Papanasam feeder by closing of
AB switch at 110 KV Rastha SS end. III) 110 KV Isolators towards Papanasam PH kept opened at Kadayam SSiv) 110 KV Isolators towards Papanasam PH kept opened at Rastha SS V) 110 KV Isolators towards Kadayam kept opened at Papanasam
PH VI)Hence no SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
THUDIALUR 230 KV
1. During LC period 110 KV switch No. 3 bottom open condition at kattabettu switching switching station.2. 110 KV Kotagiri &
Kattabettu are under total S/D.
subject to kothagiri and kattabettu ss availing tsd
ALAGARKOIL 230 KV
AUTO TR II will be in service.Industrial estate SS,Samayanallur ,Uranganpatty,NarasingampattySS,S/D.If necessary 110kv Alkl-Sembatty 1 feeder tie will be kept
opened at ALKL end
SUB TO LOAD CONDITION
ALAGARKOIL 230 KV
Feeder will be radial from other end.Avaniapuram SS,INDUSTRIAL Estate SS will be under S/D.If necessary
Anupanadi SS loads will be transferred to 110KV PSQ-Sakthi sugar feeder
SUB TO LOAD CONDITION
VILLUPURAM 230 KV
During the period of LC:(1)110KV Elamangalam SS availing Total shutdown.
KARAMADAI 230 KV
1.110KV Pykara- BBI feeder2.110KV MTP-Madampalayam feeder section Nellithurai switching station to Kattabettu3.110KV Kothagiri spur line from tapping tower to KothagiriSS
1.Stringing of conductor between Pykara- MTP feeder and DP location 1.2.Opening of Jumpers towards Kattabettu side in Switch NO.1 & 2 At kattabettu,opening of jumpers towards Madampalayam 110KV feeder side in Switch NO. 3 at Katabettu. Stringing of conductor between new tower LOC. 5&6 and then to existing 1Xarm at Katabettu LILO tower by AEE/TLC/MTP3.PMI works by AE/lines/ Kothagiri in 110KV Kothagiri spurline from LOc.1 to LOc.17
During LC period Both Kothagiri& Kattabettu SS will be under total shutdown.
subject to kothagiri and kattabettu ss availing tsd
KARAIKUDI 230 KV
110 KV KKDI -TVNI- VLDR # BKR & CTs and 110KV KKDI-TVDI- VLDR # S/B KKDI-TVDI
110 KV KKDI -TVNI- VLDR # BKR & CTs - Monthly Mtnce works andReplace the Flash over Disc at L.No: 21,33,34, 40
During the L.C period the 110KV A.Pudur will be TSD. The 110 KV Valuthur # will be tied with grid through 110 KV Devakottai
#.SUB TO LOAD CONDITION
Villapuram 110 KV
During the period of LC:1. The 110KV Neyveli-II # at Arasur SS towards Villupuram side will be kept open.2. The feeder will be
kept radial from Neyveli TS-I end.3. Thirupachanur SS in Neyveli-I feeder is availing total shutdown.4. 110KV Neyveli-I #,110KV Thiruvannamalai and 110KV Acharapakkam # are in
tied condition.5. Hence no interruption of supply in any SS.
UDUMALPET 230 KV
110KV Sempatty # Breaker & Line section up to Elayamuthur
FOR MONTHLY MAINTENANCE WORKS
DURING LC PERIOD SEC BETWEEN SEMPATTY & ELAYAMUTHUR FED FROM 230KVSS SEMPATTY
subject to the feeder being kept radial
from sempatty ss end
224 Erode 56173 230 KV Both end LC appyied possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
225 Madurai 56211 110 KV POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 16:00 1 Approved
226 Erode 56231 230 KV ARASUR 230 KV possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 15:00 1 Approved
227 Madurai 56258 230 KV POSSIBLE Tue, 06-Jun-2017 10:00 Tue, 06-Jun-2017 16:00 1 Approved
228 Madurai 56340 110 KV For Monthly Maintenance Work. POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 13:00 1 Approved
229 Erode 56384 110 KV ARASUR 230 KV Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 18:00 1 Approved
230 Erode 56399 230 KV 230/33 KV POWER TRANSFORMER - 1 Possible Tue, 06-Jun-2017 10:00 Tue, 06-Jun-2017 17:00 1 Approved
231 Chennai 56426 230 KV MONYHLY MAINTENANCE ALL OTHER FEEDERS ARE IN SERVICE Cancelled Tue, 06-Jun-2017 7:00 Tue, 06-Jun-2017 10:00 1 0 Wrong Entry
232 Chennai 56427 230 KV 230 KV S P KOIL FEEDER @ CTS MONTHLY MTC Posssible Tue, 06-Jun-2017 7:00 Tue, 06-Jun-2017 10:00 1 Approved
233 Erode 56438 230 KV For monthly maintenance works Possible Tue, 06-Jun-2017 10:00 Tue, 06-Jun-2017 17:00 1 Approved
234 Madurai 56446 230 KV Monthly Maintenance Work POSSIBLE Tue, 06-Jun-2017 10:00 Tue, 06-Jun-2017 17:00 1 0 Approved
235 Chennai 56464 230 KV 230KV SPK-ORAGADAM FEEDER FOR QUAETERLY MTCE WORK Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
236 Erode 56465 110 KV Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
237 Chennai 55688 110 KV 110 KV VYASARPADI FEEDER ROUTINE MAINTENANCE WORKS. Repeat Tue, 06-Jun-2017 6:00 Tue, 06-Jun-2017 10:00 1 Repeat
238 Erode 55716 110 KV Erode 110 KV MONTHLY MAINTENANCE WORK DURING LC PERIOD NO SS WILL BE AFFECTED possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
239 Erode 55740 PYKARA MUKKURTHY UNIT 1 NIL possible Tue, 06-Jun-2017 8:00 Tue, 06-Jun-2017 17:00 1 Approved
240 Madurai 55773 230 KV For monthly maintenance work. POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
242 Chennai 55797 110 KV 110KV Thiruporur # Quarterly Maintenance Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 14:00 1 0 Approved
243 Chennai 55803 230 KV ECHUR 230 KV Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 16:00 1 0 Approved
244 Chennai 55844 230 KV ARNI 230 KV Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
245 Madurai 55853 400 KV Kayathar400kv POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
246 Erode 56472 230 KV HOSUR 230 KV possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
247 Madurai 56517 230 KV Auto Transformer II POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0 Approved
248 Madurai 56519 400 KV 400KV/230KV ICT 1, HV 404 bay with CT Monthly Maintenance work No feeders at 230KV side so no feeders or SS affected POSSIBLE Tue, 06-Jun-2017 10:00 Tue, 06-Jun-2017 17:00 1 Approved
249 Madurai 56525 KODAYAR PH 1 Monthly Maintenance works No generation in KDR PH-1 POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 18:00 1 Approved
250 Madurai 56569 230 KV For monthly maintenance work. POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 14:00 1 Approved
251 Madurai 56580 110 KV KODAIYAR PH2 110 KV Link feeder No Generation in KDR PH-1 POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 18:00 1 Approved
252 Madurai 56583 230 KV POSSIBLE Tue, 06-Jun-2017 11:00 Tue, 06-Jun-2017 14:00 1 Approved
254 Erode 56617 110 KV Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 15:00 1 Approved
255 Madurai 56640 230 KV 230 KV KAVANOOR-KARAIKUDI #1 LINE MAINTENANCE WORKS POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0 Approved
256 Chennai 56736 110 KV For Monthly Maintenance Works Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 15:00 1 0
257 Madurai 56739 110 KV POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
258 Madurai 56742 110 KV POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0 Approved
259 Madurai 56772 110 KV POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
Udumalpet 400 KV
230 KV Myvadi-Kadamparai-2 feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
other feeders will cater to the
loadsRENGANATHAPURAM 230 KV
1) 110kv RNPM-Kovilur # Breaker ,CT 's and Line switch.2)110kv RNPM-Kovilur # Entire line
1)Monthly maintenance2)Tree cutting work
During Lc period there will be no supply in 110kv RNPM-Kovilur #.110kv Kovilur SS,33kv chatrapatty SS, 33kv Vallipatty SS avail total shutdown load relief (12+4+4=20 mw).Hence no
interuption to any ss.
SUB TO LOAD CONDITION
230 KV ARASUR-PGCIL LINK-I FEEDER BREAKERS, CTS AND ITS LINE SIDE ISOLATOR.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, REMAINING 5 NOS. 230 K V FEEDERS WILL BE IN SERVICE.
occ approved and srldc to be
addressedPERAMBALUR 230 KV
230KV Perambalur-TAQA feeder breaker CT's wave trap & Line Isolater.
For monthly maintenance maintenance work.
During the above period of shut down 230KV Perambalur SS will be radially fed from 230KV Trichy SS
SUB TO LOAD CONDITION
ANUPPANKULAM 230 KV
110KV APKM - NSPM feeder Breaker CT and line Switch only.
During the LC period, the other end also availing LC on the same date. Hence no ss will be affected.
SUB TO LOAD CONDITION
AND WIND GEN
110 KV Arasur - Thingalur feeder (line section between 110 KV Poomalur SS-110 KV Velampalayam SS-110 KV Vanjipalayam SS)
For Stringing of 110 KV DC line for making LILO of 110 KV Arasur-Thingalur feeder at sanctioned 110 KV Thingalur SS
During the LC period 110 KV Poomalur SS total shutdown,During the LC period 110 Vanjipalayam SS load transfer to 230 KV Karuvalur SS,During the LC period 110 Velampalayam SS Already fed from 230 KV Thingalur SS.
Subject to Poomalur110
total shutdown and transfer of Vanjipalayam
to Karuvalur230
SADAYAMPALAYAM 230 KV
MONTHLY MAINTENANCE WORKS AND P&C CHECKS
CONNECTED 33 KV LOADS WOULD BE SHARED BY POWER TRANSFORMERS 3&4 IF WITHIN THE LIMIT.
Already Pr. Tr. 2 under LC. Sub to other power transformers load condition
ORAGADAM 230 KV
230 KV SRIPERUMBUDUR FEEDER BREAKER & CTS
ORAGADAM 230 KV
ALL OTHER FEEDERS ARE IN SERVICE.ALREADY APPLIED LC IN 230 KV SRIPERUMBUDUR FEEDER HAS TO BE CANCELLED DUE
TO WRONG ENTRY .(REF ID 56426)Subject to load
condition
PONNAPURAM 230 KV
110 KV Ponnapuram - Maruthur # Breaker, CTs & Line up to Maruthur SS
1.110KV KARADIBAVI SS & 110KV SALAIPUTHUR SS WILL AVAIL TOTAL SHUTDOWN, 2.WITH MEDIUM WIND POWER
GENERATION, THE 110KV MARUTHUR # WILL BE FED FROM 230KV ARASUR SS /110KV KANIUR # UPTO 110KV MARUTHUR
SS.3. HENCE NO SS WILL BE AFFECTED
Sub to TSD availed and
wind generation
SAMAYAPURAM 230 KV
100 MVA Auto Transformer-I, HV-I, LV-I, Breakers , CT's, and isolators
During the above Shutdown Period 100 MVA Auto Transformer II will be in service. No interruption to any other SS
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, ALL OTHER 230KV FEEDERS WILL BE IN SERVICE
Subject to load condition
KARIAMANGALAM 230 KV
1.110KV Vellichandai feeder breaker, CTs,Line switch2.Auto Transformer -II with HV-II Breaker and CTs & LV-II Breaker CTs. 3. Palavadi (Already Mettur #) 230KV feeder breaker and CT`s and Line Switch 4. 230 KV Northen Bus
Carryout Monthly SS Maintenance works by maintenance wing and GRT Relay testing 230 KV Palavadi (Already Mettur #) and Auto Transformer - II
110 KV Vellichandai SS,110 KV Pennagaram SS availing Total Shutdown Total Relief : 25 MW, the Station load will Managed
by keeping Auto Transformer I & III and 230 KV Shoolagiri Feeder, 1 No Grid feeder in service.
1,2 3,4) Possible
Vellichandai TSD.
Pennagram already fed
from Palavadi400. 2)
Sub to other Autos load
condition. 3) Subject to
230KV Karimangalam -
Soolagiri # TONDIARPET 230 KV
DURING THE PERIOD OF SHUTDOWN,EXCEPT 110 KV VYASARPADI FEEDER ALL OTHER FEEDERS AND EQUIPMENTS
WILL BE IN SERVICE.Alreadyapproved on 4/6/2017
110 KV CAPACITOR BANK I BREAKER ,CT AND ITS CELL
subject to the voltage profile
in the gridGENERA
TING STATIO
NS
FOR MONTHLY MAINTENANCE WORK AND GRT RELAY TESTING.
for monthly maintenance
TUTICORIN -SIPCOT 230 KV
On 230 /110 KV Auto-II, HV-II and LV-II breakers with CTs and LAS only.
During the L.C period, Auto Transformer I will be in service and no SS will be affected please.
SUB TO LOAD CONDITION
VEERAPURAM 230 KV
110KV-Thirukazhukundram ss- proposed total shutdown and other SS loads will have to be transferred to 230 KV Omega SS
Auto Transformer I Monthly Maintenance work
Monthly Maintenance work in Auto Transformer I in HV, LV and Breakers, CT's and isolators.
At the Time of LC 1. Auto Transformer I in off condition and Auto Transformer II in service condition.2. After completion of
work Auto Transformer I put in service condition.Hence No interruption of supply to any of the Substation.
230KV Arani-Singarapet feeder Breaker,CT's and Line isolator
For Monthly maintenance work(Both at Arani and Singarapet 230KV SS end).
During the period of LC,other 4 No's 230KV feeders will be in service.Both 230KV Bavini I & II feeders will be in common
BUs.Hence no interruption of supply please.Subject to grid
condition400 KV Kamudhi feeder Main Breaker (409-52), Reactor Breaker (409-52R), Reactor & CT, only
For Monthly Maintenance Work and Annaul Relay Test by AEE/P&C/Kayathar
During the LC period there will be no supply in 400 KV Kamudhi feeder Main Breaker (409-52), Reactor Breaker (409-
52R), Reactor & CT. Hence no SS will be affected.
APP IN 131 OCC VIDE ITEM
NO.162230KV ENTIRE BUS, 110KV ENTIRE BUS, 230KV SHOOLAGIRI, 230KV YERRANDAHALLY,230KV METTUR FEEDERS, 100MVA AUTO TRANSFORMER 1,2,3 - HV, LV BREAKERS, 110KV ZUZUVADI,BAGALUR,GURUPARAPALLY, UDDANAPALLY,KEMPATTY,110/11KV,110/33KV GC'S BREAKERS AND 110KV CAPACITOR BANK 1&2 BREAKERS AND 110KV PENNAGARAM FEEDERS AND 110KV VELLICHANDAI FEEDERS ENTIRE.
FOR ANNUAL MAINTENANCE, 1] 230KV SHOOLAGIRI FEEDER
DURING THE ABOVE LINE CLEAR PERIOD THERE WILL BE NO SUPPLY TO THE HOSUR 230KVSS AND 230KV,110KV,33KV AND
11KV FEEDERS. AND THE 110KV ZUZUVADI SS, 110KV BAGALUR SS, 110KV MINNAGAR SS,110KV NARIGANAPURAM SS,110KV UDDANAPALLY SS,110KV KEMPATTY SS AND 110KV
HOSUR SS ALSO AVAILING SD ON THE SAME DAY. THE CONCURRANCE OF SE/KEDC/KRISHNAGIRI,
SE/DEDC/DHARMAPURI, SE/O/TVLM AND CE/D/VELLORE HAD OBTAINED. THE CONCURRANCE OF EE/YERRANDAHALLY HAD
OBTAINED.
subject to all the tsd being realized; occ
revised approval to be
had for shoolagiri
feeder
VALUTHUR 230 KV
For Attending Auto Transformer II HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
During the LC period Auto Transformer I & III will be in service. Hence there is 'no' interruption in power evacuation
KANARPATTY 400 KV
APP IN 131 OCC VIDE ITEM
NO.158GENERA
TING STATIO
NS
Generator Transformer SF6 breaker 110KV AB switch Runner Inspection & Governor oil circulation
SUB TO GRID CONDITION
ALAGARKOIL 230 KV AUTO TRFR I HV&LV Breaker,CT, LAS only.
During the L.C period AUTO II will be in service, Industrial Estate SS, uranganpatty SS,Manickampatty SS,
Thaniamangalam SS, are under S/D. if,necessary, 110KV ALKL-SMPTY 1 # tie will be opened at ALKL end.
SUB TO LOAD CONDITION
Monthly maintenance of breaker CT, LAS
SUB TO GRID CONDITION
ALAGARKOIL 230 KV
110KV ALKL- Pasumalai 1 # breaker with CT only.
FOR MONTHLY MAINTENANCE WORK.
During the L.C period the feeder will be radial from other end INDUSTRIAL ESTATE WILL BE UNDER TOTAL S/D, if, necessary, Anuppanadi SS loads will be transferred to 110KV PSQ-Sakthi
sugar #
SUB TO LOAD CONDITION
Singarapet 110 KV
110KV SAMALPATTI RAILWAY # ii ENTIRE LINE
FOR MONTHLY MAINTENANCE AND VARIOUS LOCATION CUT POINT JUMPER TIGHTNESS WORK
DURING LC PERIOD 1. 110KV SAMALPATTI RAILWAY # I IN SERVICE.2. HENCE, NO INTERRUPTION OF SUPPLY.
#2 will cater the Traction
loadKAVANOOR 230 KV
SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER
THIRUVALAM 230 KV
i)On 110KV Capacitor Bank-I and 110KV Capacitor Bank -II Breaker and CT’s one by one
During the period of LC i) Auto-Tr-I ,HV-I,LV, Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV,
will be in service and cater the SS Loads. ii)The 110KV Capacitor Bank –I and 110KV Capacitor Bank-II one by one will be in ‘OFF’ Condition iii)The 230KV Link-II, 230KV Chittoor interstate feeders,230KV Link-I # and 230KV Mosur
feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
Approval from SE/Operation
Approval from SE/Operation
THANJAVUR 230 KV
1)110 KV Thanjavur Link - 1 & 2 feeders' breakers, CTs & LIs(one after another), 2)110 KV thanjavur link-1 line portion entier
1) For monthly maintenance works by the AEE/Mtce/Thanjavur.2) For lines rectification work in thanjavur link-1 by AEE/Lines/Thanjavur
During the LC period,1) the other end (i.e. Thanjavur 110 KV Grid SS) will avail LC on the same day, 2) 110 KV Ayyampettai
SS will avail shutdown,3) all other 110 KV feeders will be in tied condition, 4) no supply interruption to any SS.
SUB TO LOAD CONDITION
THANJAVUR 230 KV
110 KV Thanjavur - Thiruvarur feeder (Line portion between 110 KV Mariammankovil SS and 110 KV Poondi SS)
For rectification works by the AEE/Lines/Thanjavur.
During the entire LC period,1) This feeder will be radial from Thanjavur 110 KV Grid SS upto Mariammankovil 110 KV SS,2)
110 KV Ayyampettai SS will avail shutdown on the same day.3) 110 KV Poondy SS Supply will be radially fed from 230 KV Thiruvarur SS.4) no supply interuption of supply to any SS.
SEMBATTY 230 KV
110KV SBT - RNPM I # Bkr, CTs and section bet. SBT and Reddiyarchatram SS
1. Monthly maintenance work2. Tree cutting work
During the LC period, Kannivadi SS is availing total shutdown, the feeder will be radial from other end upto Reddiyarchatram
SS. Hence no interruption to any SS.SUB TO LOAD CONDITION
260 Chennai 56785 230 KV Monthly maintenance work. Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0 Approved
261 Madurai 56852 230 KV 230KV BUS I 230KV BUS I Maintenance work POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 0 Approved
262 Erode 56879 110 KV possible Tue, 06-Jun-2017 8:00 Tue, 06-Jun-2017 17:00 1 Approved
263 Madurai 56883 110 KV then I 230 KV Monthly Mtc work No Interruption POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
265 Chennai 56919 110 KV Monthly maintenance work Possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 15:00 1 0 Approved
266 Erode 56951 110 KV possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
267 Erode 55856 110 KV For Monthly Maintenance work possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
268 Madurai 55857 400 KV Kayathar400kv 400KV BUS-1 For Monthly Maintenance Work POSSIBLE Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
269 Erode 55871 110 KV GOBI 230 KV Capacitor Bank I Breaker and CTs only possible Tue, 06-Jun-2017 9:00 Tue, 06-Jun-2017 17:00 1 Approved
270 Madurai 55495 110 KV POSSIBLE Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 Approved
271 Erode 55498 110 KV Postponed Tue, 06-Jun-2017 8:00 Tue, 06-Jun-2017 17:00 1 Approved
272 Erode 55508 230 KV MTPS MTPS.I TO SALEM 400KV SS.I Monthly maintenance work Programed LC Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
273 Erode 55549 230 KV Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 Approved
274 Erode 55575 230 KV Salem 400 KV 230KV MTPS-I # Bkr,CTs & Line Switch Monthly Maintenance Work Both End Monthly Maintenance Work Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
275 Madurai 55597 110 KV PERIYAR For monthly Maintenance work POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 13:00 1 Approved
276 Madurai 55599 230 KV TTPS 230KV TTPS-AUTOSS FEEDER-I ENTIRE POSSBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
277 Madurai 55611 230 KV 230KV TTPS-AUTO-I feeder entire Jumper tightness work No SS affected POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
278 Madurai 55681 230 KV 230KV Auto TRFR ,HV & LV BR POSSIBLE Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 Approved
279 Erode 55696 PYKARA UNIT 2 NIL Possible Wed, 07-Jun-2017 8:00 Wed, 07-Jun-2017 17:00 1 Standby unit Approved
280 Erode 55717 110 KV Erode 110 KV DURING LC PERIOD NO SS WILL AFFECTED Approved Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1
281 Madurai 55723 230 KV For monthly Maintenance work No SS will be affected. POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
282 Erode 55753 110 KV KUNDAH PH2 Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
283 Erode 55774 230 KV 230KV Bus entirely Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
284 Chennai 55846 110 KV ARNI 230 KV For Monthly Maintenance work. Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 0 Approved
285 Chennai 55849 230 KV ARNI 230 KV Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 0 Approved
286 Erode 55623 230 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS SIPCOT - II TOTAL SHUT DOWN ON THAT DAY Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
287 Madurai 55636 230 KV TRICHY 230 KV POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 Approved
288 Chennai 55640 230 KV 230 KV SPR - Oragadam feeder Quarterly maintenance work Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 0 Approved
289 Madurai 55887 230 KV n For monthly maintenance work POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
290 Erode 55970 110 KV For monthly maintenance works. 0 Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 0
291 Madurai 55997 230 KV Monthly maintenance work POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
Ulundurpet 230 KV
Auto transformer I & 110 kV Pillayarkuppam feeder
110kVThiyagadurgam SS, Navalur SS & Pilllayarkuppam SS availing total shutdown and 230/110 KV Auto Transformer &
HV,LV Breakers & 110 KV Feeder Breakers with line side isolators Monthly maintenance work. On that day Ulundurpet 110/33 KV SS load will be fed by Villupuram Auto SS roughly
above 24 MW & Ko-Poovanur SS load will be fed by Neyveli TS I Deviyakurichi feeder.M/S Dharani sugars Co-Generation plant will be instructed to go home load.Hence No interruption of
supply to any of the SS.THIRUVARUR 230 KV
During the Lc period 230Kv BUS II will be inservice. Hence there will be no interruption of supply to any SS.
LOWER METTUR 1
110KV common bus and its associated equipments, structures, all 110KV Feeder equipments and Earth pit's, etc.,
a)110KV additional bus PT's commissioning work by AEE/P&C/Mettur b)To carry out annual relay tests in 110KV BPH1 to MDPH Feeder and 110KV BPH1 to BPH2 Feeder by AEE/P&C/Mettur c)To attend AOH works on 110KV common bus , 110KV bus PT, Bus side isolator, 110KV GC breaker, Feeder breakers, 110KV Earth switch and Pit, ACD & DCD panels, station battery charger with their sets, etc.,
a) During the above LC period Unit 1&2 will be in Non-Standby. b)PWD demand will be met by Barrage gates c)At present the LMBPH-1/CKR pondage level is at HRL (190.82m) is lower then
the FRL(193.25m)
subject to the load condition
existing
110KV Theni - Kinnimangalam I & II # Br.with CT only (one by one )
SUB TO WIND GEN
THIRUVANNAMALAI 230 KV
110 KV Tiruvannamalai - Villupuram #, Breaker, CT's and Line Isolator
During the period of L/C time,1. 110 KV Mangalam SS availing total S/D,2. 110 KV Vettavalam SS, 110 KV Rajanthangal SS,
110 Kv thandarai Traction # & 110 Kv Kilpennathur SS will be radially fed from 110 KV Villupuram Grid SS. Radial upto 110 KV Kilpennathur SS. Hence there is no interruption of supply
please.
DEVIAKURICHI 230 KV
110KV Deviakurichi – Thammampatty Feeder (Section between Deviakurichi SS to Gudamalai 110KV SS)
110KV Deviakurichi – Thammampatty line (Section between Deviakurichi SS to Gudamalai 110KV SS) jumper tightness work.
1)Deviakurichy 230KV SS Thammampatty feeder monthely maintenances work Breaker,CT ‘s and Thedaoor 110KV SS
availing total shutdown .2)Pudhanchandai 230KV SS radial fed from upto Gudamalai 110KV SS End 3)There will be no
interruption of supply any other SS.
subject to transfer of loads to
puthansanthai ss feed
DEVIAKURICHI 230 KV
110 KV Thammampatty Feeder Breaker, CTs
110KV Thedavoor SS availing Total Shutdown. Goodamalai SS; Thammampatty SS and Mettala SS availing back feeding
Supply from 230KV pudansandhai SS by closing series switch at110 KV Namagiripet SS towards Deviyakurichy side
subject to transfer of loads to
puthansanthai ss feedDuring the LC period there will be no supply in 400KV BUS-1,
ICT-1 Main Breaker(406-52) and ICT-3 Main Breaker(412-52).ICTs will be in service through Tie Breakers. Hence no SS
will be affected
APP IN 131 OCC VIDE ITEM
NO.159FOR MONTHLY MAINTENANCE WORK
CAPACITOR BANK II IS IN SERVICE AND SUBJECT TO THE VOLTAGE CONDITION
subject to the voltage profile
in the grid
VEERANAM 230 KV
Power Transformer I,HV-BR I,LV-BRI,and 33Kv Feeder Micon 3,4&5.
For Half yearly and Monthly Maintenance Work.
during the lc period there will be no supply in the Power Transformer I,HV-BR I,LV-BRI,and 33Kv Feeder Micon 3,4&5.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
LOWER METTUR 1
110KV common bus and its associated equipments, structures, all 110KV Feeder equipments and Earth pit's, etc.,
a)110KV additional bus PT's commissioning work by AEE/P&C/Metturb)To carry out annual relay tests in 110KV BPH1 to MDPH Feeder and 110KV BPH1 to BPH2 Feeder by AEE/P&C/Metturc)To attend AOH works on 110KV common bus , 110KV bus PT, Bus side isolator, 110KV GC breaker, Feeder breakers, 110KV Earth switch and Pit, ACD & DCD panels, station battery charger with their sets, etc.,
a) During the above LC period Unit 1&2 will be in Non-Standby.b)PWD demand will be met by Barrage gatesc)At
present the LMBPH-1/CKR pondage level is at HRL (190.82m) is lower then the FRL(193.25m)
Preponed by the applicant
on 06.06.2017
Sub to load condition existing
SINGARAPET 230 KV
230 KV Vinnamangalam # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
Sub to Soolagiri # load
condition. Both end LC appliedSub to load
condition existing
110 KV Periyar - Theni-II Feeder- Breaker with CT only
110KV PYR-THENI-II # will be radial from THENI SS up to Periyar PH. Hence no SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN1.CAPACITANCE & TAN DELTA TEST ON 230KV WBCT&CVT.2.HIGH VOLTAGE TEST ON 230KV LAS3.ANNUAL RELAY TESTING WORK BY GRT/TTN.
BOTH END BREAKER TRIPPED CONDITION, BOTH ENDS ISOLATOR,LINE SWITCHES OPENDED CONDITION,BOTH ENDS
EARTH SWITCH CLOSED CONDITIONS.SUB TO TTPS
GEN AND WIND
TUTICORIN -AUTO 230 KV
SUB TO TTPS GEN AND WIND
UDAYATHUR 230 KV
monthly Mtce work & GRT relay test will be carried out by AEE/P&C /Srpudur
110KV Radhapuram SS , 110KV Samugarangapuram ss & 110 KV Navaladi SS will be fed through 230 KV Auto Trfr at 230 KV
SankaneriSS
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENGENERA
TING STATIO
NS
FOR MONTHLY MAINTENANCE WORK
110 KV CAPACITOR BANK II BREAKER ,CT AND ITS CELL
CONDUCTING OF ANNUAL RELAY TEST BY AEE / P&C-I/ERODE AND MONTHLY MAINTENANCE WORK
Sub to 110KV bus voltage
Subject to EE/SLDC/ Erode concurrence
TUTICORIN -AUTO 230 KV
On 230 KV TTN - TTPS -I feeder Breaker with CT bus & line side switches.
SUB TO TTPS GEN AND WIND
110KV KUNDAH FEEDER NO 1&2 SF6 BREAKER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
Sub to load condition (one
by one)
SALEM AUTO 230 KV
Monthly maintenance work and to replace the
1. 110KV Capacitor Bank-I and II will be in hand trip condition. 2. 110KV K.R.Thoppur-I, II and 110KV Sankari feeders will be
radially fed from other end. 3. Mallur 110KV SS will be fed from Pudansandai 230KV SS.4. Mallasamuthram 110KV SS will be
fed from Sankari 110KV SS or Unjanai 230KV SS through Paruthipalli feeder whichever is possible.5. 110KV Singapuram-
I and II feeder will be in tie condition. 6. 3Nos. Auto Transformer will be in hand trip condition. 7. 230KV Link-I, II, MTPS and Singarapet feeder will be radially fed from other
end. 8. 110KV GC-I will be in hand trip condition. 9. 110KV GC-II will be feeding Salem 110/22KV SS10. There will be no
interruption to any SS or feeder.
Sub to load condition and
all #s and loads kept radial from other
end . 110KV bus in servive
with Singapuram
#1&2, will feed the Salem GC
loads110KV Arani - Link feeder Breaker and CTs with line Isolator
During the period of LC the 110KV Arani SS availing Total Shut down. Hence there will be no interruption of supply.
230KV Auto Transformer I 80MVA, HVI Breaker, LV I Breaker and Isolators
For Monthly Maintenance work and Bus selector Isolator maintenance work
During the period of LC the 110KV Arani SS availing Total SD. The Auto Transformer II & III will be in service and catering the
station loads.Hence there will be no interruption of supply
110KV Sipcot II Breaker, CT’s, Isolators , and Line side Isolator
Sub to Sipcot II TSD and # kept
radial from Pldm230 end
230 KV TRICHY - ALUNDUR II Feeder breaker,CTs, Line isolator and line entire.
1. For monthly maintenance works . 2. Premonsoon inspection.
During the LC period, a) other end also availing LC on the same feeder. b) All other 230KV feeders will be in tied
condition. c) Hence there will be no interruption of supply to any of the feeder and SS.
SUB TO LOAD CONDITION
Sriperumbudur 400 KV
During the period of shutdown other 230 KV feeders will be in service
KAYATHAR 230 KV
During the LC period the feeder will be radial from other end. Hence no ss affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENpudhanchanthai 230kv
110KV Namagiripet feeder CB, CTs and Line Switch.
During LC period110KV Namagiripet SS availing Total Shut down.No supply interruption.
Subject to EE/SLDC/ Erode concurrence
PUGALUR 230 KV
230 KV Pugalur - Paramathy I feeder Breaker, CT & line switch and line entire only
During the LC period, there will be no supply in 230 KV Pugalur - Paramathy I feeder. Hence There is no interruption to any
SS,LC approved in 131 th OCC meeting
SUB TO LOAD CONDITION:
APP IN 131 OCC VIDE ITEM
NO.112
292 Madurai 55998 230 KV Monthly maintenance work. POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
293 Madurai 55999 230 KV For Monthly Maintenance Work POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
294 Madurai 56000 230 KV 230KV Eastern Side Bus For Half Yearly Maintenance work. POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
295 Madurai 56017 230 KV For Monthly Maintenance Work. 0 POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
296 Madurai 56060 230 KV POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
297 Madurai 56075 230 KV 230 KV BUS I POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
298 Madurai 56095 110 KV 110KV ALKL-Sembatty I # Bkr with C.T Monthly Mtce work Feeder will be radial from other end.. 0 Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 WRONG ENTRY WRONG ENTRY
299 Erode 56118 230 KV During LC period other two ICT's will be in service Possible Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 Approved
300 Erode 56165 110 KV 110KV Udt link III # Breaker & Line entire Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
301 Erode 56167 110 KV 110KV Udt link I # Breaker & Line entire Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
302 Madurai 56191 230 KV Monthly maintenance work POSSIBLE Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 Approved
303 Madurai 56217 110 KV POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 0 Approved
304 Madurai 56218 230 KV During LC period other end also programmed for availing LC POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 Approved
305 Erode 56221 230 KV ARASUR 230 KV Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 Approved
306 Chennai 56224 230 KV Routine maintenance work. Possible Wed, 07-Jun-2017 11:00 Wed, 07-Jun-2017 17:00 1 0 Approved
307 Erode 56306 230 KV 230 KV OKM-Coimbatore Feeder Entire PMI works by Lines/TDLR wing Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
308 Erode 56308 110 KV For Monthly mtce works. Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 Approved
309 Erode 56319 230 KV 230KV Bus coupler breaker Monthly Maintenance work During the LC Period 230KV Main Bus will be in service Possible Wed, 07-Jun-2017 8:00 Wed, 07-Jun-2017 17:00 1 Approved
310 Madurai 56336 230 KV During LC period there will be no supply in the entire feeder POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
311 Madurai 56343 230 KV For Monthly Maintenance Work. POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
312 Chennai 56408 400 KV For Monthly mtce. work Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
313 Chennai 56417 400 KV 400 KV Bus section I For Maintenance work Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 Approved
314 Chennai 56428 230 KV MONTHLY MTC ALL OTHER FEEDERS ARE IN SERVICE Possible Wed, 07-Jun-2017 7:00 Wed, 07-Jun-2017 10:00 1 0 Approved
315 Erode 56439 110 KV For monthly maintenance works Possible Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 Approved
316 Madurai 56447 110 KV POSSIBLE Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 Approved
317 Erode 56459 110 KV MOYAR Moyar - Pykara Feeder No.I Annual Relay Testing by GRT Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
318 Erode 56477 110 KV Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 15:00 1 Approved
319 Madurai 56485 110 KV JUMPER TIGHTNESS WORK POSSIBLE Wed, 07-Jun-2017 8:00 Wed, 07-Jun-2017 17:00 1 Approved
320 Erode 56495 110 KV Monthly Maintenance Work THE WILL BE RADIAL FROM OTHER END Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
PUGALUR 230 KV
230KV Pugalur - Renganathapuram feeder Breaker, CTs & line switch and entire line only
During the LC period there will be no supply in 230 KV Pugalur - Renganathapuram feeder since other end also availing L.C on
the same periodSUB TO LOAD CONDITION
PUGALUR 230 KV
Auto transformer I, HV I and LV I Breaker,CT's and LAS only.
During the L.C Period HV I and LV I are tripped condition. The 110KV AC Palayam SS proposed total shutdown.There is no
interruption to any SS. Load contain with in two auto transformer (II & III)
SUB TO LOAD CONDITION
PUGALUR 230 KV
During the L.C Period 1)Auto Tr HV I and LV I are tripped condition. 2)230KV Paramthi I # Breaker under tripped
condtion.3)230KV Renganathapuram # Breaker under tripped condtion. 4)230KV Eastern side Bus coupler switch under open condition.There is no interruption to any SS. Load contain with
in two auto transformer (II & III)
SUB TO LOAD CONDITION
KODIKURICHY 230 KV
230 KV Amuthapuram II # Breaker with CT & Line Isolators
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:SUB. TO NORM. OF KODI-VRNM &
WIND GEN.
PUDUKOTTAI 230 KV
AUTO I, HV I, LV I AND 110 KV ALANGUDY EID PARRY FEEDER LINE PORTION BETWEEN 230 KV SS AND EID PARRY AND 110 KV ADHANAKKOTTAI FEEDER LINE PORTION BETWEEN 110 KV MALAIYUR SS TO 110 KV VADAKADU SS.
AUTO I, BREAKER,CT,ISOLATORS AND EHT LINE MAINTENANCE WORKS AND GRT TESTING WORKS.
110 KV ALANGUDY SS, 110 KV NAGUDY SS, 110 KV KODIKKULAM SS IN 110 KV ALANGUDY EID PARRY FEEDER
AVAILING TOTAL SHUT DOWN AND 110 KV SUPPLY FOR ALIYANILAI SS AND EID PARRY CO GENERATION IS TO BE BACK FED THROUGH 110 KV SIPCOT FEEDER. 110 KV PUDUKKOTTAI SS IN 110 KV SIPCOT FEEDER AND 110 KV VADAKADU SS IN
110 KV ADHANAKKOTTAI FEEDER ALSO AVAILING TOTAL SHUT DOWN AND HENCE THERE WILL BE NO INTERUPTION OF
SUPPLY TO ANY SS.
SUB TO LOAD CONDITION
SRPUDUR 230 KV
230 KV isolator no 45 alignment work
During the LC period The 230 KV SRP KDM # radial from KDM upto SRP (excl). 100 MVA AUTO Tr I will ben service in Transfer
Bus through Tie breaker.100 MVA AUTO Tr IIIwill not be service.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENALAGARKOIL 230 KV
KARAMADAI 230 KV
400/230KV ICT3 HV/LV Breakers and CT,s and LAS
Monthly maintenance of ICT 3,HV/LV Breakers,HV/LV CTs and LAS
Sub to load condition. OCC
approved. SRLDC BLR to be addressed. Other two ICTs will cater the
loadUDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 110KV UDT I & II FEEDERS
Sub to wind generation and other #s load
condition
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 110KV UDT II&III FEEDERS.(link I already applied one after
another)
Sub to wind generation and other #s load
condition (after completion of
link #3 LC)
AMUTHAPURAM 230 KV
Amuthapuran-kodikurichi-2 230KV #,breakers,CT's and its isolators
1) During the LC period there will be NO supply in this feeder. 2) Other End also avail LC on same day. 3) Cocurrence
obtained from SE/NCES/TIN.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:SUB. TO NORM. OF KODI-VRNM &
WIND GEN.
PASUMALAI 230 KV
1)110 KV Pasumalai - Sembatty # BKR & CT,LI only. 2)Section between Pasumalai and Achampathu
1) Maintenance Works of BKR,CT and LI.
1) The Feeder will be kept radial from Other end upto Achampathu SS. 2)110KV AB Switch towards Pasumalai at
Achampathu will be under open condition 3)110KV Line isolator at Pasumalai SS will be under open condition.
RENGANATHAPURAM 230 KV
1)230 KV RNPM - PGLR# Breaker CT's & Line switch2)230 KV RNPM - PGLR# Entire Line.
1)Monthly Maintenance 2)Tree cutting work
SUB TO LOAD CONDITION
230/110 KV AUTO TRANSFORMER-III,HV-III, LV-III BREAKERS,CTS ,LAS AND ITS ASSOCIATED EQUIPMENTS.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD,1) REMAINING 3 NOS. AUTO TRANSFORMERS WILL BE IN SERVICE.2) 110 K V SULUR SS
AND 110 K V NEELAMBUR SS WILL BE UNDER TOTAL SHUTDOWN.
Sub to Neelambur
Sulur TSD and other Autos
load conditionATHIPET 230 KV 230KV Bus-I entire and 230KV Bus
Coupler Switch-IDuring the period of shutdown 230KV Bus-II ( Spare Bus) will
be in service.OTHAKKAL MANDABAM 230 KV
During the lc period the other 230 KV feeders are in service to cater the ss loads.
Sub to load condition
OTHAKKAL MANDABAM 230 KV
110 KV OKM-Sulur Feeder breaker and CT's only
1.110 KV Sulur SS total S/D2.110 KV Peedampalli ss and 110 KV L&T EHTsc loads will be transferred to 230 KV ARASUR
SS,3.No ss will be affected.
Sub to Sulur TSD and other loads fed from
ASR230. (Already Asr
Auto 3 lc recommended)METTUR AUTO
230 KVAll loads will be in Main bus A
CHECKANURANI SW STATION 230 KV
230 KV Kinnimangalam - TTPS feeder entire
For monthly maintenance work and line maintenance work
SUB TO LOAD CONDITION
ANUPPANKULAM 230 KV
100 MVA AUTO TR. II ,HV-II and LV-II Breaker with CT only.
Durin the LC period the Auto Tr. II already under shut down. The Auto Tr. I & III will cater the load of Auto Tr. II. Hence No
SS affected.SUB TO LOAD CONDITION
Sunguvarchatram 400 KV
315 MVA, 400/230 KV Auto Transfomer- 1 entire with Tie-4 Breaker
During the period of LC, the 400/230 KV Auto-II will be in service and cater the load of Auto-I without interruption
Subject to OCC concurrence
APP IN 131 OCC VIDE ITEM
NO.167
Thiruvalam 400 KV
1.400 KV Bus-I in OFF condition & 400 KV Bus-II in service.2.400 KV Alamathy I&II # and Palavadi I&II # in service
from 400 KV Bus II through its Tie Breakers.3.ICT 1&2 in service from 400 KV Bus II through its HV Breakers.
Subject to OCC concurrence
APP IN 131 OCC VIDE ITEM
NO.169ORAGADAM 230 KV
230 KV SRIPERUMBUDUR FEEDER BREAKER &CTS
PONNAPURAM 230 KV
110 KV Ponnapuram # Breaker & CTs & Line entire
1.WITH MEDIUM WIND POWER GENERATION GC II OF 110KV PNPM SS WILL BE TRANSFERED TO 110KV INGUR II # 2.NO SS
WILL BE AFFECTED.
Sub to wind generation and transfer of GC II
of PPM110 to 110 KV PPM -
Ingur #2
SAMAYAPURAM 230 KV
110KV Samayapuram - Trichy Grid feeder line portion between 110KV Poovalur SS and 110KV Thiruvanaikoil SS.
For premansoon EHT line inspection work.
During the above period of shut down a) 110KV Valadi SS avial toal shutdown on the same day. b) 110KV Thennur SS , 110KV Thiruvanaikoil SS will be fed radially from 110KV Trichy Grid
SS. c) 110KV Poovalur SS, M/s.Kothari EHT SC will be fed radially from 230KV Samayapuram Auto SS. d). The line
Isolator towards 110KV Valadi SS at 110KV Thirvanaikoil ss will be Kept opend and earth switch closed. e)The line Isolator
towards 110KV Valady ss at 110KV Poovalur SS will be Kept opend and earth switch closed. f) Necessary concurrence has
been obtained from M/s.Kothari EHT Service for switching operation. g)There will be no interuption to any other SS/EHT
consumers.
SUB TO LOAD CONDITION
Unit-2 under COH. Otherwise all other feeders will be in service.
Other # will cater the load
PALLADAM 230 KV
110 KV Palladam-Palladam # Breaker CT's and line entire
To carryout monthly maintenance work by AE/M/Palladam and to carryout premonsoon inspection work by AE/L/Palladam
1)110 KV Palladam SS will be fed from Arasur 230 KV SS 2)No other SS will be affected
Sub to transfer of PLDM 110 to
ASR230
KAYATHAR 110 KV
110 KAYATHAR-PAPANASAM FEEDER SEC B/W KYTHR & RASTHA
DURING THE LC PERIOD,RASTHA SS WILL BE RADIALLY FED FROM PAPANASAM PH HENCE NO SS AFFECTED
SUB TO S/D OF 110KV
SANNATHUPUKUDI SS: SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Udumalpet 110 KV
110 KV UDT –Link – I #rs breaker, CT’s and Entire line
Sub to wind generation and other #s load
condition (after completion of
link #3 LC)
321 Erode 56497 110 KV Monthly Maintenance Work BOTH END LC Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
322 Chennai 56501 230 KV MOSUR 230 KV For attending monthly maintenance work wrong entry Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 0 WRONG ENTRY
323 Chennai 56504 230 KV MOSUR 230 KV Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 0 Approved
324 Madurai 56523 110 KV POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 0 Approved
325 Chennai 56558 230 KV 100MVA Auto Transformer I Monthly maintenance work. Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 12:00 1 Approved
326 Chennai 56590 110 KV KITS 230 KV 110KV Veerapuram feeder For quarterly maintenance work Possible Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 14:00 1 0 Approved
327 Madurai 56593 110 KV For monthly maintenance work. Feeder will be radial from OTHER end. POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 0 Approved
328 Madurai 56596 230 KV 230KV KNMLM-TTPS Feeder POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
329 Chennai 56613 230 KV Wed, 07-Jun-2017 4:00 Wed, 07-Jun-2017 8:00 1 Approved
330 Erode 56626 110 KV Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 15:00 1 Approved
331 Madurai 56642 110 KV LINE MAINTENANCE WORKS POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 0 Approved
332 Chennai 56652 110 KV 110KV Mambakkam# Maintenance work Possible Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 0 Approved
333 Erode 56677 230 KV There will be no interruption of power supply. Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 Approved
334 Erode 56762 230 KV 1. 230KV OKM-CBE FEEDER ENTIRE. Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 16:00 1 Approved
335 Chennai 56778 110 KV 110KV PERUNGUDI-I# Maintenance work. 110kv perungudi-II# will be in service Possible Wed, 07-Jun-2017 10:00 Wed, 07-Jun-2017 17:00 1 0 Approved
336 Chennai 56787 230 KV MONTHLY MAINTENANCE WORK. Possible Wed, 07-Jun-2017 5:00 Wed, 07-Jun-2017 10:00 1 0 Approved
337 Chennai 56817 110 KV MOSUR 230 KV Pallur Feeder Line Line Clear There will be no interruption of supply. Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 14:00 1 0 Approved
338 Madurai 56853 230 KV 230/110 KV Auto Transformer I POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
339 Erode 56878 110 KV Possible Wed, 07-Jun-2017 8:00 Wed, 07-Jun-2017 17:00 1 Approved
340 Madurai 56884 110 KV then I 230 KV Monthly Mtce work No Interruption POSSIBLE Wed, 07-Jun-2017 0:00 Wed, 07-Jun-2017 0:00 1 0 Approved
341 Madurai 56900 230 KV POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
342 Chennai 56928 110 KV Possible Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
343 Madurai 55862 400 KV Kayathar400kv POSSIBLE Wed, 07-Jun-2017 9:00 Wed, 07-Jun-2017 17:00 1 Approved
344 Madurai 56222 230 KV For monthly maintenance Work 0 Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 14:00 1 Approved
345 Madurai 55526 230 KV POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
346 Chennai 55562 230 KV For monthly maintenance works. Possible Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 17:00 1 0 Approved
347 Erode 55576 230 KV Salem 400 KV Monthly Maintenance Work possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
348 Erode 55577 230 KV Salem 400 KV Monthly Maintenance work possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
349 Erode 55624 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
350 Madurai 55638 230 KV TRICHY 230 KV POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 16:00 1 Approved
351 Chennai 55642 230 KV 230 KV SPR- Mambakkam feeder Quarterly maintenance work Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
352 Madurai 55683 230 KV POSSIBLE Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 14:00 1 Approved
353 Chennai 55689 230 KV ROUTINE MAINTENANCE WORKS. Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 15:00 1 0 Approved
354 Erode 55697 110 KV PYKARA 110KV PYKARA - MOYAR 1# ENTIRE LINE NIL possible Thu, 08-Jun-2017 8:00 Thu, 08-Jun-2017 17:00 1 Approved
355 Erode 55718 110 KV Erode 110 KV 110 KV THINGALORE I FEEDER AND CT MONTHLY MAINTENANCE WORK DURING LC PERIOD NO SS WILL BE AFFECTED possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
356 Erode 55750 110 KV Monthly Maintenance Work. Other end also availing LC. possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 14:00 1 Approved
357 Erode 55775 110 KV Monthly maintenance work. possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
358 Erode 55815 230 KV KUNDAH PH3 230KV KPH4 – THUDIYALUR FEEDER For PMI Work possible Thu, 08-Jun-2017 8:00 Thu, 08-Jun-2017 17:00 1 Approved
359 Erode 55827 110 KV 110KV SALEM I FEEDER possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
360 Madurai 55830 110 KV MONTHLY MAINTENANCE WORK POSSIBLE Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 17:00 1 0 Approved
Udumalpet 110 KV
110 KV UDT –Link –III #rs breaker, CT’s and Entire line
Sub to wind generation and other #s load
conditionFor attending monthly maintenance work
i)110 KV Pallur SS & 110 KV Thakkolam SS availing total shutdown work.ii) Hence there will be interruption of Supply
AUTO TRANSFORMER NO-I , HV -I , LV- I Breaker CT'S only
For attending Monthly Maintenance work.
1)110 KV Pallur SS availing Total Shutdown work. 2) The 110 KV Kakkalur SS Load (20 MW) transferred to 110KV Avadi Grid
SSHence there will be no interruption of supply please.VALUTHUR 230 KV
110KV Valudur - Karaikudi feeder section between Valuthur and R.S.Mangalam SS
For attending breaker and it's CT's and isolators Monthly Maintenance work.
During the LC period supply will be radially fed from 230KV Karaikudi SS up to R.S.Mangalam SS and also 110KV
Salaigramam SS will be proposed to avail Total Shut Down.KADAPPERI 230 KV
110KV Korattur - Kadapperi I and 110KV S.Pkoil feeder radial from Other end.
Subject to load transfer
During the bove shutdown period 110KV Veerapuram # will be radial from 230KV Veerapuram SS
ALAGARKOIL 230 KV
110 KV ALKL-SMPTY 1 # breaker with C.T only.
kinnimangalam 230 KV
Maintenance works of Breaker,CT and Line
EE/O/CKNI has also programmed for lines maintenance work . During the LC period there will be no supply in the entire
feederSUB TO LOAD CONDITION
KADAPPERI 230 KV
230KV Kalivanthapattu - Tharamani feeder
Insulator and jumper replacement work.
230KV Sriperumbudur - Tharamani feeder and 230KV KITS- Tharamani feeder will be in service.
Already applied on 6/6/2017
Possible for 4 hours to 8
hours
Singarapet 110 KV
11KV SINGARAPET - METTUR # I ENTIRE LINES UP TO THOPPUR SS.
FOR MONTHLY MAINTENANCE WORK AND VARIOUS LOCATION FOREST AREA TREE CUTTING WORK.
DURING THE LC PERIOD 1. BOMMIDI TRACTION LOAD TRANSFERRED TO METTUR # II.2. BLINK FOR OPENING OF
110KV THOPUR SS TOWARDS SINGARAPET SIDE ISOLATORS.3. HENCE, NO INTERRUPTION OF SUPPLY.
Bommidi traction
transferred to #2.
KAVANOOR 230 KV
110 KV KARAIKUDI-VALUTHUR # SEC. BET. VALUTHUR & R.S.MANGALAM (INCLUDING SALAIGRAMAM SPUR LINE)
FEEDER TO BE KEPT RADIAL FROM KARAIKUDI UPTO R.S.MANGALAM. SALAIGRAMAM TO BE AVAILED SHUTDOWN
SIRUSERI 230 KV
DURING THE PERIOD OF SHUTDOWN 1)The Idely charged 110KV Mambakkam# will not be inservice
VINNAMANGALAM 230 KV
230 KV Vinnamangalam– Singarapet feeder breaker, CT’s & line isolators
For attending monthly maintenance works and for jumper tightness checking works in cut point towers of 230 KV VNM - Singarapet feeder.
Other #s will cater the load. Both end LC
appliedCOIMBATORE 230 KV
1. PMI WORKS BY AE/LINES / COIMBATORE
1. 230KV COIMBATORE SS WILL BE FED FROM 230KV THUDIYALUR FEEDER.
Sub to load condition
THARAMANI 230 KVMYLAPORE 230 KV
230/110KV/100MVA AUTO TRANSFORMER 1
During the above shutdown period AUTO TRANSFORMER 1-will not be in service.The load may be restricted with in the
capacity of 1NO AUTO TRANSFORMER 2.
THIRUVARUR 230 KV
1. HV & LV Breaker's, CT's and Line isolator maintenance works
During the Auto Transformer-I LC period the Auto Transformer - II & III will be in service,the maximum auto load between
09.00 HRS TO 14.00 HRS,the load will be managed by Auto II & III. Hence there will be no interruption of supply.
SUB. TO LOAD & MAJOR TOTAL
SHUTDOWN FOR ABOUT 70
MW
LOWER METTUR 1
BHAVANISAGAR - MHPH - 110 / 11 KV, 25 MVA POWER TRANSFORMER
For essential maintenance works in 110 / 11 KV, 25 MVA Power Transformer at MHPH / Bhavanisagar
1. During LC period, it is expected that all machines at MHPH will be in standby condition due to NIL or insufficient PWD
demand in the river to run the machines. Hence generation loss will not arise at MHPH / Bhavanisagar.2. During LC period, PWD demand in canal will be 5 c/s only. Hence generation loss
will not arise at RBCPH / Bhavanisagar.3. During LC period, only 110 KV GC & 11 KV LV breakers will be hand tripped. 110
KV feeders will not be affected.
Sub to PWD demand
110KV Theni - Sempatty I & II # Br.with CT (one by one )
ALUNDUR 230 KV
230KV Alundur -Trichy II feeder breaker, CT'S, CVT'S and line isolators.
a)Preventive Monthly maintenance work.b)Premonsoon inspection and tree cutting work.c)Relay Testing work.
a)Other end also avail shutdown.b)All other 230 KV feeders will be in service.c)There will be no interruption of supply to any
other feeders.SUB TO LOAD CONDITION
CUDDALORE 230 KV
110 KV neyveli Deviakurichi feeder I (section between TSI- Adari SS)
checking jumper tightness at railway crossing locations. Loc.Nos205-205A
110 KV Adari Ss to be radially fed from Deviakurichi end M.Parur SS total shutdown
SLDC Erode concurrence
400 KV Main Breaker for ICT1(406-52), Tie Breaker 405-52 and 110 KV LV Breaker 101-52, 110 KV Ayyanarithu Line 1,Line 2 and Keelaveeranam Breaker, 400/110KV ICT1 & 110KV Bus -1 & 2 - PT
For Monthly Maintenance Work and Annaul Relay Test by AEE/P&C/Kayathar
During the LC period there will be no supply in 400 KV Main Breaker for ICT1(406-52), Tie Breaker 405-52 and 110 KV LV
Breaker 101-52, 110 KV Ayyanarithu Line 1,Line 2 and Keelaveeranam Breaker, 400/110KV ICT1 & 110KV Bus -1 & 2 -
PT.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: APP IN 131 OCC VIDE ITEM
NO.166
SANKANERI 230 KV
230KV Sankaneri- Kayathar feeder Breaker CTs& Lineswitches. .
During the LC period thre will be no supply in the Entire feeder.Other end also LC applied.
LC MAY BE PROGRAMMED ALONG WITH
KDKRI ON 08.6.17.
KAYATHAR 230 KV
on 230 KV Kayathar - Sanganeri Feeder, breaker with CT and Entire Line
A) For monthly maintenance workb) Tower to tower Inspection work
During the LC period other end also avails LC and there will be no supply in the entire line and no ss affected.
SUB TO WIND GEN.
SPR SIPCOT(MAMBAKKAM) 230 KV
230KV SIPCOT - Sriperumbudur feeder - Breaker, Current Transformers & Line side isolator only.
During the period of shutdown the entire load of 230KV SIPCOT Mambakkam SS [Approximately: 45MW] will be fed from
400KV SV.Chatram SS through 230KV SIPCOT- SV.Chatram feeder without interruption.
230KV Steelplant-I # Bkr,CTs & Line Switch
230 KV SSP – II # will be in service condition. Concurrence Already obtained from M/s. SAIL Ltd.,
subject to sail concurrence
230KV Steelplant-II # Bkr,CTs & Line Swithch
230 KV SSP – I # will be in service condition. Concurrence Already obtained from M/s. SAIL Ltd.,
subject to the completion of work in the
above feeder only
110KV Thingalore # Breaker, CT’s, Isolators and earth switch
subject to the feeder being kept radial
from thingalur ss end
230 KV Trichy – Samayapuram feeder Breaker,CTs , Line Isolator and line entire.
1. For monthly maintenance works . 2. Premonsoon inspection.
During the LC period, a) other end also availing LC on the same feeder. b) all other 230KV feeders will be in tied
condition. c) there will be no interruption of supply to any of the feeders and SS.
SUB TO LOAD CONDITION
Sriperumbudur 400 KV
During the period of shutdown 230 KV Mambakkam SS fed by 400 KV Sunguvarchatram SS
UDAYATHUR 230 KV
230/33 KV Power Transformer II HV & LV Br
monthly Mtce Works & GRT relay test will be carried out
Including Monthly Mtce works will be carried out on 33KV #s (SRSPL,SRL, SPG RPH) due to condition of Wind generation.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
TONDIARPET 230 KV
50 MVA POWER TRANSFORMER- I AND 33 KV TOLLGATE FEEDER ONE BY ONE
DURING THE PERIOD OF SHUTDOWN,50 MVA POWER TRANSFORMER- I WILL NOT BE IN SERVICE AND 33 KV TOLLGATE FEEDER LOADS TO BE TRANSFERRED TO
ALTERNATE FEEDING.FOR MONTHLY MAINTENANCE WORK.
subject to the load condition
existingsubject to the load condition
existingTHINGALUR 230 KV
110KV Erode -I Feeder Breaker, CTs and Line Isolator.
subject to the load condition
existing
SALEM AUTO 230 KV
110KV Singapuram-II feeder Breaker and CT'S
1. 110KV Singapuram -II feeder will be radically fed from other end.2. There will be no interruption to any other SS or feeder
subject to the feeder being kept radial
from singapuram ss
endBoth end breaker open condition. Both bus & line mods open
condition. Earth switch closed condition.
subject to the normalization
of 230 kv kph 3 to kph 4 feeder
SINGAPURAM 230 KV
Monthly Maintenance on Breaker, CT.
1. 110KV Salem I Feeder will be fed radially from Salem End.2. No auto LC at Salem End.
subject to the feeder being kept radial
from salem ss end
EACHANGADU 230 KV
110 kv MCL-1 Feeder BREAKER , CT'S ONLY
DURING THE ABOVE SHUTDOWN PERIOD THERE WILL BE NO INTERRUPTION TO EHT CONSUMER .Since the feeder is in idly
charged
361 Erode 55858 110 KV For Monthly Maintenance work possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
362 Madurai 55865 400 KV Kayathar400kv For Monthly Maintenance Work. POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
363 Erode 55876 230 KV GOBI 230 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
364 Madurai 56236 230 KV For monthly maintenance Work POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 14:00 1 Approved
365 Madurai 56260 110 KV For monthly maintenance work POSSIBLE Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 15:00 1 0 Approved
366 Erode 56261 110 KV ARASUR 230 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 12:00 1 Approved
367 Erode 56266 110 KV ARASUR 230 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
368 Erode 56286 230 KV Programmed LC at 400 KV Switch yard MTPS-2 on 08.06.2017 possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 14:00 1 Approved
369 Erode 56292 110 KV 110KV Malco II Feeder For monthly Maintenance work possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
370 Erode 56310 230 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
371 Madurai 56350 110 KV 110 KV Northern side CT Monthly maintenance work POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 13:00 1 0 Approved
372 Erode 56440 230 KV AUTO-III,HV-III,LV-III Breaker and Its CTs For monthly maintenance works possible Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 17:00 1 Approved
373 Madurai 56448 230 KV POSSIBLE Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 17:00 1 Approved
374 Chennai 56467 230 KV 230KV SPK-KALPAKKAM-I FEEDER FOR LINE MTCE WORK Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
375 Erode 56481 400 KV MTPSII 400KV KARAMADAI-I FEEDER possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1
376 Erode 56498 110 KV Monthly Maintenance Work BOTH END LC possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
377 Madurai 56527 230 KV 230KV Valuthur - Karaikudi feeder entire POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
378 Madurai 56540 400 KV Monthly Maintenance work POSSIBLE Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 17:00 1 Approved
379 Madurai 56600 110 KV 110KV KNMLM-THENI 1 Feeder POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 7:00 1 Approved
380 Madurai 56602 110 KV 0 Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 14:00 1 REPEAT REPEAT
381 Erode 56633 110 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 15:00 1 Approved
382 Madurai 56645 110 KV Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1
383 Chennai 56696 110 KV ARNI 230 KV For EHT Line Maintenance work. Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 14:00 1 0 Approved
384 Erode 55880 230 KV GOBI 230 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
385 Erode 55882 110 KV GOBI 230 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
386 Chennai 55902 110 KV ARNI230KV 0 Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
387 Chennai 55903 110 KV ARNI 230 KV Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
388 Chennai 55904 230 KV ARNI 230 KV Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
389 Erode 55935 230 KV 230KV GOBI # CT,Breaker,Switches Monthly Maintenance Other End also LC on that Day possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
390 Erode 55953 110 KV ALIYAR 230 KV 110KV Bus coupler CB and CT For Half yearly mtce work No SS will be affected during LC. possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 16:00 1 Approved
DEVIAKURICHI 230 KV
110 KV Thirukovilur Feeder Breaker and CTs.
110 KV Thirukovilur feeder will be kept radial from Villupuram 230KV SS end.
subject to the feeder being kept radial
from villupuram ss end
400 KV Tie Breaker for Karaikudi (1 & 2) feeder
During the LC period there will be no supply in 400 KV Tie Breaker for Karaikudi (1 & 2) feeder. Hence no ss will be
affected.
APP IN 131 OCC VIDE ITEM
NO.179230 KV GOBI – Pallakapalayam Feeder Breaker, CT’s and entire line
FOR MONTHLY MAINTENANCE WORK
230 KV ARASUR FEEDER,230 KV ANTHIYUR FEEDER AND 230 KV MTPS II FEEDERS ARE IN SERVICE,IT MAY CATER THE
LOAD.OTHER END MAY ALSO AVAIL LC
subject to the load condition
existing
SANKANERI 230 KV
230KV Sankaneri-Abisekapatti feeder Breaker CTS&Line switches. .
During the LC Period there willbe no supply in the Entire feeder.
SUB TO WIND GEN: APP IN
131 OCC VIDE ITEM NO.119.
PERAMBALUR 230 KV
110KV Kallakudy-II(Thuraiyur) feeder Breaker CT's only
During the above LC period 110KV Thuraiyur Feeder Loads will be transfer to 110KV Perambalur -II Feeder of Kallakudy Grid SS and also 110KV Koppampatty SS avaling total shutdown
110 KV ARASUR-THINGALUR FEEDER BREAKER AND ITS CTS.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V POOMALUR SS WILL BE UNDER TOTAL SHUTDOWN.2) 110 K V VANGIPALAYAM SS WILL
BE TRANSFERED AND FED THROUGH 110 K V KARUVALUR-ARASUR-IFEEDER FROM 230 K V KARUVALUR SS.3)110 K V SULUR SS WILL BE TRANSFERED AND FED FROM 230 K V
OTHKKALMANDABUM SS.
subject to poomalur ss
availing tsd and transfer of
loads
110 KV ARASUR-THINGALUR FEEDER LINE SECTION BETWEEN POOMALUR SS- VANJIPALAYAM SS AND VELAMPALAYAM SS.
FOR PMI WORKS BY AEE/LINES / PALLADAM.
DURING THE L.C PERIOD, 1) 110 K V POOMALUR SS WILL BE UNDER TOTAL SHUTDOWN.2) 110 K V VANGIPALAYAM SS WILL
BE TRANSFERED AND FED THROUGH 110 K V KARUVALUR-ARASUR-IFEEDER FROM 230 K V KARUVALUR SS.3)110 K V SULUR SS WILL BE TRANSFERED AND FED FROM 230 K V
OTHKKALMANDABUM SS.
subject to poomalur ss
availing tsd and transfer of
loads
METTUR AUTO 230 KV
400KV-MTPS-2-Karamadai feeder circuit-I entire
Jumber Tightnees checking at 400 KV MTPS-2 - Karamadai Bay at MTPS-2
occ approved and subject to
the load condition existingMETTUR AUTO
230 KVDuring the LC period 110KV Malco I & III feeders will be in
serviceother two
feeders will be in service
OTHAKKAL MANDABAM 230 KV
230/110 KV Auto Transformer - III (HV & LV Breakers, CTs & LAS)
for monthly maintenance works and Defective switch attending work in 89-T Isolators.
1.110KV Madhampatti SS, 110KV Devarayapuram SS, 110KV Peedampally SS, 110KV Anthiyur SS under Total Shut down.
2.Auto Transformer - III under cutoff condition. 3.The remaining Two Auto Transformers are in service to cater the ss loads with
support wind generation.
subject to the other auto trs loading limit
ANUPPANKULAM 230 KV
During the LC Period the 110 KV Anuppankulam SS will be availing total shut down. Hence no SS will be affected.
PONNAPURAM 230 KV
1. WITH MEDIUM WIND POWER GENERATION IT IS EXPECTED THAT THE LOAD WILL BE WITH IN THE OTHER TWO AUTO
TRS.2. HENCE NO SS WILL BE AFFECTED
subject to the other auto trs loading limit
SAMAYAPURAM 230 KV
230KV SMPM-TRICHY # Breaker & CT's , Line isolators and entire line portion.
Monthly Maintenance work, line Patrol work by AE/Lines/kallakudy.
1. During the shutdown period 230 KV SMPM SS will be radially fed from 230 KV SS Poyyur. 2.The other end 230 KV SS Trichy also availing LC on the same date & time. 3.No interruption to
any other 110 KV SS.
SUB TO LOAD CONDITION
S.P.KOIL 230 KVDURING THE PERIOD OF SHUT DOWN, 230KV SPK-KALPAKKAM-II,ACKPM-KALPAKKAM,ECHUR-KALPAKKAM FEEDERS WILL BE IN
SERVICE
MONTHLY MAINTENANCE WORKS AS APPROVED BY OCC .
UNIT IN SERVICE. ALL 400KV PALAVADI-I&II, KARAMADAI-II & ICT-I&II ARE IN SERVICE.ALL 230KV FEEDERS EXCEPT
THINGALUR FEEDER ARE IN SERVICE.
occ approved and subject to
the load condition existing
APPROVED IN 131 OCC VIDE ITEM NO.121
Udumalpet 110 KV
110 KV UDT –Link – II #r breaker, CT’s and Entire line
subject to the other link
feeders loading limit
VALUTHUR 230 KV
1. For attending breaker and it's CT's and isolators Monthly Maintenance work.2. For attending tower to tower inspection work.
During the LC period 230KV Valuthur - Kavanoor and Alagarkovil feeders will be in service. Hence, there is
KANRAPATTY 400 KV
400KV Abishekappatti feeder Main Breaker with CT (401 Bay)
400KV bus will be have supply through Tie breaker. No ss affected
APP IN 131 OCC VIDE ITEM
NO.178:SUB. TO WIND GEN.
kinnimangalam 230 KV
Monthly maintenance works for breaker and CT
During the LC period the feeder will be radial from 230KV THENI SS.
SUB TO WIND GEN
ALAGARKOIL 230 KV
110KV ALKL-KARAIKUDY # breaker with C.T.
FOR MONTHLY MAINTENANCE WORK.
Feeder will be radial from Karaikudy end upto Narasingampatty SS. Feeder will be radial from sakthi sugars upto Uranganpatty SS. A.Thekkur, S.Pudur,Thuvarankuruchy
SS loads will transferred to KOTTAMPATTY #.
Singarapet 110 KV
110KV METTUR # II ENTIRE LINE UP TO MECHERI SS
FOR MONTHLY MAINTENANCE WORK AND VARIOUS LOCATION FOREST AREA TREE CUTTING WORK.
DURING THE LC PERIOD,1. BOMMIDI RAILWAY TRACTION LOAD TRANSFERRED TO METTUR # I.2. BLINK FOR OPENING OF
110KV MECHERRY SS TOWARDS SINGARAPET SIDE ISOLATORS.3. HENCE, NO INTERRUPTION OF SUPPLY
subject to the feeder being kept radial
from mettur ss end
KAVANOOR 230 KV
110 KV KAVANOOR-MMDU-SVGA # SEC. BET. KAVANOOR & MANAMADURAI
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
FEEDER TO BE KEPT RADIAL FROM SIVAGANGA TO MANAMADURAI
NOT POSSIBLE
DUE TO LOAD CONDITION:
PROGRAMMED WITH TOTAL
S/D OF INTERMEDIATE
SS
Subject to EE/SLDC/ Madurai concurrence
110 KV Arani - Kanamangalam feeder in between 110 KV Kilpalipet and 110 KV Thorapadi SS.
During the period of LCi. 110 KV Arani - Kanamangalam feeder line LC in between from 110 KV Kilpalipet and 110 KV
Thorapadi SS. ii. The 110KV Kilpalipet SS & 10KV Sathumadurai SS are availing total shutdown.Hence there will
be no interruption of supply please.Auto Transformer-I HV, LV Breaker and CTs with Bus coupler breaker and CT’s
FOR MONTHLY MAINTENANCE WORK
110 KV BHAVANISAGAR SS,110 KV THOPPAMPALKAYAM SS,110 KV KARATTUPALAYAM SS AND 110 KV NAMBIYUR SS MAY
AVAIL TOTAL SHUTDOWN AND SUBJECT TO THE LOAD CONDITION.
subject to the other auto trs loading limit
110 KV Bhavani Sagar Feeder breaker, CTs with Entire line
FOR MONTHLY MAINTENANCE WORK
110 KV BHAVANISAGAR SS,110 KV THOPPAMPALKAYAM SS,110 KV KARATTUPALAYAM SS AND 110 KV NAMBIYUR SS MAY
AVAIL TOTAL SHUTDOWN AND SUBJECT TO THE LOAD CONDITION.
subject to the tsd relief being
realized
110KV Arani-Kannamangalam Feeder Breaker, CT's and Line Isolators.
Auto Transformer Bay extension work with shifting of 230KV Arani-Singarapet feeder tower and line stringing work in 230KV Arani SS between location no: 597 to 598 (110KV Kannamangalam Feeder Line Crossing) by TLC Wing / Thiruvannamalai, Provision of loop jumper for 110KV Kannamangalam # and 110KV Kaveripakkam # take off tower for replacement of damaged Line side gantry structure in 110KV Kannamangalam # by TLC Wing. Also 110KV Breaker Monthly maintenance work.
During the period of Shut down, the 110KV Kilpallipet SS (Kannamangalam SS) and 110KV Sathumadurai SS are availing Total shut down.Hence there will be no interruption of supply
110KV Arani-Kaveripakkam Feeder Breaker CTs and Line Isolator
For Additional Auto Transformer Bay extension work with shifting of 230KV Arani-Singarapet feeder tower and line stringing work in 230KV Arani SS between location no: 597 to 598 (110KV Kaveripakkam Feeder Line Crossing) by TLC Wing / Thiruvannamalai and also 110KV Breaker Monthly maintenance work.
During the period of Shut down the 110KV Timiri SS availing Total Shut down. Hence there will be no interruption of supply.
230/110 KV 80MVA Auto Transformer II,HV II and Isolators
For Monthly Maintenance of 80MVA Auto Transformer No II and 230KV Isolator MOM Box repair works.
During the period of shut down the 110KV Arani SS,110KV Kilpallipet SS (Kannamangalam SS),110KV Sathumadurai SS,110KV Timiri SS are availing total shut down. The Auto Transformer I&III will be in service and cater the station
load.Hence there will be no interruption of supply.PALLAKAPALAYAM 230 KV
subject to the load condition
existingsubject to the load condition existing and
the division of loads
391 Chennai 56701 110 KV ARNI 230 KV Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 14:00 1 0 Approved
392 Chennai 56711 230 KV Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 15:00 1 0 REPEAT
393 Madurai 56774 230 KV 230/110KV Auto II, HV II and LV II Monthly maintenance work During the LC period Auto I and III will be in service. POSSIBLE Thu, 08-Jun-2017 10:00 Thu, 08-Jun-2017 17:00 1 Approved
394 Madurai 56775 110 KV POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
395 Chennai 56824 230 KV Korattur 230KV NCTPS - Gummidipoondi all other feeders in service Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
396 Madurai 56885 110 KV then I 230 KV monthly mtce work No Interruption POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
397 Chennai 56929 110 KV Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
398 Chennai 56931 230 KV 230 KV Bus Coupler Breaker with CT’s For monthly maintenance works Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
399 Erode 56952 110 KV possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
400 Madurai 56018 230 KV Auto Transformer - I For Monthly Maintenance Work. 0 POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
401 Madurai 56042 110 KV 0 POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
402 Madurai 56076 110 KV Tree clearance work POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
403 Madurai 56099 110 KV 110KV ALKL-KKDI # Bkr with C.T Monthly Mtce work POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 16:00 1 Approved
404 Madurai 56119 230 KV All other 230KV #’s Tied with Grid. POSSIBLE Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
405 Chennai 56135 110 KV 110KV Villupuram to link Auto # For monthly maintenance works. Possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 0 Approved
406 Erode 56162 230 KV GOBI 230 KV 230 KV BUS COUPLER BREAKER AND CT'S possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
407 Erode 56169 110 KV 110KV Udt link II # Breaker & Line entire possible Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
448 Madurai 56164 230 KV GOBI 230 KV 230 KV BUS COUPLER BREAKER AND CT'S postponed Thu, 08-Jun-2017 9:00 Thu, 08-Jun-2017 17:00 1 Approved
498 Erode 55817 230 KV KUNDAH PH3 230KV KPH.4 – THUDIYALU FEEDER For PMI Work postponed Thu, 08-Jun-2017 8:00 Thu, 08-Jun-2017 17:00 1 Approved
408 Madurai 55641 230 KV TRICHY230KV POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 16:00 1 Approved
409 Chennai 55643 110 KV 110 KV SPR -Arani feeder Quarterly maintenance work Possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
410 Madurai 55686 110 KV SURULIYAR For monthly maintenance work. POSISBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 15:00 1 0 Approved
411 Madurai 55724 230 KV For Monthly Maintenance Work No SS will be affected. POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
412 Erode 55737 230 KV postponed Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1
413 Erode 55741 PYKARA MUKKURTHY UNIT 2 NIL possible Fri, 09-Jun-2017 8:00 Fri, 09-Jun-2017 17:00 1 Approved
414 Erode 55776 230 KV Monthly maintenance work. possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
415 Madurai 55786 110 KV For monthly maintenance works. POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
416 Erode 55509 230 KV MTPS MTPS.I TO SALEM 400.II FEEDER. Monthly maintenance work. Programen LC possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
417 Madurai 55515 110 KV PAPANASAM 110KV PPM-OT PATTI FEEDER POSSIBLE Fri, 09-Jun-2017 10:00 Fri, 09-Jun-2017 12:00 1 Approved
418 Madurai 55527 110 KV 0 Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1
419 Erode 55550 230 KV possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 14:00 1 Approved
420 Erode 55578 230 KV Salem 400 KV 230KV MTPS-II # Bkr,CTs & Line Switch Monthly maintenance work Both End Monthly maintenance worknd possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
421 Madurai 55602 230 KV TTPS 230KV TTPS-AUTOSS FEEDER-II ENTIRE POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
422 Madurai 55612 230 KV 230KV TTPS-Auto-II feeder entire Jumper tightness work No SS affected POSISBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
423 Erode 55621 230 KV Monthly maintenance work possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 15:00 1 Approved
424 Erode 55625 230 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS OTHER END ALSO AVAIL LC ON THAT DAY possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
425 Erode 55795 230 KV INGUR 230 KV 230 KV Ingur – Karamadai # Premonsoon inspection 1. No SS will be affected during LC period. possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 14:00 1 Approved
426 Chennai 55802 110 KV 110KV S.P.Koil-II Monthly Maintenance 110KV S.P KOIL #-I-Tied condition Possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 14:00 1 0 Approved
110 KV Arani - Kaveripakkam feeder(LC in between from 110 KV Timiri SS to 110 KV Kaveripakam SS).
For attending conductor strands cut rectification work at Loc 67.
During the period of LCi. 110 KV Arani - Kaveripakkam line LC in between from 110 KV Timiri SS to 110 KV Kaveripakam SS.ii. 110 KV Timiri SS is availing total Shutdown.Hence there will be
no interruption of supply please.
TONDIARPET 230 KV
50MVA POWER TFR-I & 33KV TOLLGATE FEEDER
FOR ROUTINE MAINTENANCE WORKS.
DURING THE PERIOD OF S/D EXCEPT 50MVA POWER TFR-I AND 33KV TOLLGATE FEEDER,ALL OTHER FEEDERS AND
EQUIPMENTS WILL BE IN SERVICE.33KV LOADS TO BE TRASFERED ONE POWER TFR
Repeat 55642
SEMBATTY 230 KV
SUB TO LOAD CONDITION
SEMBATTY 230 KV
110 KV SBT - Alagarkovil II # Bkr, CTs and sec. bet. SBT and Kosavapatti SS
1. Monthly maintenance work2. Tree cutting work
During the LC period the feeder will be radial from other end upto Kosavapatti SS. Hence no interruption to any SS.
Jumper tightness checking work at various locations
110KV Theni - Periyar I & II # Br.with CT ( one by one )
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
CUDDALORE 230 KV
110 KV Neyveli –Vadakuthu feeder (Section between Vadakuthu and Sethiyathoppu)
For worn out conductor strand strengthening works at Vadakuthu SS gantry towards sethiyathoppu and jumper tightness checking .
110 KV Keezhakuppam and Vadakuthu to be fed from NEyveli TSI end and 110 KV kurinjipady Ss from Cuddalore Auto SSVadakuthu Sethiathopu , M.T.Kuppam total shutdown
CUDDALORE 230 KV
230 KV BUS A will be in service and 230 KV BUS B will be in stand by
DEVIAKURICHI 230 KV
110KV Deviakurichi – Thirukovilur Feeder (Section between Deviakurichi SS to E.V.Natham 110KV SS)
110KV Deviakurichi – Thirukovilur line jumper tightness work.
1)Deviakurichy 230KV SS Thirukovilur feeder monthely maintenances work Breaker,CT ‘s.2)Villupuram 230KV SS
radial fed from upto E.V.Natham 110KV SS End. 3There will be no interruption of supply any other SS.
subject to the feeder being kept radial
from villupuram ss end
KODIKURICHY 230 KV
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONDITION
NOT MENTIONED
KODIKURICHY 230 KV
On 110KV Kanarpatti -Uthumalai # section between Veerasigamani SS -Uthumalai SS.
i)For Replacement of Defective Insulator at location no 3, 14,16, 24 & ii)Replacement of Defective Jumper Bolt at loc No: 23.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONDITION
NOT MENTIONED
SRPUDUR 230 KV
110 KV SRP-KDR I # section between PPI to KDR PH II .110 KV SRP-KDR II # section between KDR to PPI series switch( for safety purpose)
During the LC period the 110 KV SR Puthur - KDR I feeder will be radial from SRP upto PPI SS (incl).110 KV SR Puthur - KDR II feeder will be radial from SRP upto PPI SS (Excl). Concurreance
to be obtained from Railway athoritise.Hence no SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENALAGARKOIL 230 KV
Feeder will be radial from kkdi end.upto Narasingampatti SS. Feeder will be radial from Sakthi sugars
end.uptourpty.A.Thekkur,S.Pudur SS Duvaragurichy SS loads will be transferred to Kottampatty feeder
SUB TO LOAD CONDITION
KARAIKUDI 230 KV
230KV KKDI-VLDR # BKR & CTs and 230KV KKDI- VLDR # Entire
For Bkr and CT monthly mtnce worksTo replace Flash Over Disc At L.No: 232, 234,256, 259
Villapuram 110 KV
During the period of LC:1. The feeder will be kept radial from 230KV Auto SS end.2. Hence no interruption of supply in any
SS.FOR RELAY TESTING WORK BY GRT/GOBI ALONG WITH 230 KV PALLAKAPALAYAM FEEDER
ALL FEEDERS AND AUTO TRANSFOMERS ARE CONNECTED WITH BUS I,BUS II IDLY CHARGED THROUGH 230 KV BUS
COUPLER BREAKER
subject to the loads being catered by a single bus
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 110KV UDT I&III FEEDERS
subject to the other link
feeders loading limitFOR RELAY TESTING WORK BY
GRT/GOBI ALONG WITH 230 KV ANTHIYUR FEEDER
ALL FEEDERS AND AUTO TRANSFOMER ARE CONNECTED WITH BUS I,BUS II IDLY CHARGED THROUGH 230 KV BUS COUPLER
BREAKER
already recommended on 08.06.2017
Both end breaker open condition. Both bus & line mods open condition. Earth switch closed condition.
already recommended for 08.06.2017
230KV Trichy - Perambalur feeder Breaker , CTs, Line Isolator and line entire.
1. Monthly maintenance works. 2. Premonsoon maintenance,
During the L.C period, 1) other end also availing L.C on the same Feeder. 2) All other 230KV feeders will be in tied
condition. 3) There will be no interruption of supply to any of the feeder and SS.
SUBJECT TO ICT LOADING AT
NEYSriperumbudur 400 KV
During the period of the shutdown other 110 KV feeders will be in service
110 Kv Suruliyar - Periyar Feeder breaker with CTs and Line switch only.
During the LC period the entire feeder will be under shutdown condition because both ends will be availed the LC on this period. No SS will be affected because there is no SS in the
Feeder.TUTICORIN -AUTO 230 KV
On 230 KV TTN - TTPS -II # breaker with CT bus and line side switches
SUB TO TTPS GEN
UNJANAI 230 KV 1. 230& 110KV BUS SECTION BREAKERS AND IT'S CT'S ONLY.
FOR MONTHLY MAINTENANCE WORK AND GRT ANNUAL RELAY TEST DUE ON 110KV BUS SECTION BREAKER FROM 06/16
DURING THE L.C PERIOD,1. AUTO TR NO :I LOADS WILL BE FED FROM SALEM 400KVSS 230KV FEEDER AND AUTO TR NO :II LOADS WILL BE FED FROM P.CHANTHAI 230KV FEEDER .2.
110KV NALLUR FEEDER LOADS WILL BE FED FROM P.CHANTHAI 230KVSS.3.SANKARI 110KV FEEDER TIE WILL BE
KEPT OPENED AT UNJANAI END IF NECESSARY.
annual relay tests
completed on 230 kv bc on
15.09.2016 and on 110 kv bc
on 17.10.2016
Subject to EE/SLDC/ Erode concurrence
GENERATING
STATIONS
FOR MONTHLY MAINTENANCE WORK AND GRT RELAY TESTING.
for monthly maintenance
works
SALEM AUTO 230 KV
230KV Singarapet feeder & 110KV Capacitor Bank-I,II Breaker, CTs, Line isolator and Capacitor.
1.230KV Singarapet feeder LC will be availed at both end. 2.3Nos 230KV feeders will be in service. 3.110KV Capacitor
Bank-I and II will be in hand trip condition. 4.There will be no interruption to any SS or feeder.
subject to the load condition existing and the voltage
profileTUTICORIN -SIPCOT 230 KV
On 110 KV Sipcot- Eppodumvendran Feeder breaker with CT's only.
During the L.C period 110 KV Aypm shut down condition and 110KV optm SS will be radially fed from other end No SS will
be affected please.SUB TO
WINDGENsubject to the other feeder loading limit
110KV PPM-OT PATTI FEEDER BREAKER WITH CT MAINTENANCE WORK AT PPM END.
Present PWD demand is 200 CUSECS. During the LC period the feeder will be radial from other end.No SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
KAYATHAR 230 KV
on 110 KV Kayathar - Gangaikondan feeder, breaker with CT and entire Line
a) For monthly maintenance workb) Tower to tower inspection work
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no SS affected.
GANGAIKONDAN SS
CONDITION NOT
MENTIONED
Subject to EE/SLDC/ Madurai concurrence
SINGARAPET 230 KV
230 KV Salem # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
subject to the load condition
existingsubject to the other feeder loading limit
1.ANNUAL RELAY TESTING WORK BY JE/MRT-I/TTPS2.DISTANCE PROTECTION RELAY TESTING WORK BY GRT/TTN3.QUARTERLY MAINTANENCE WORK BY AE/EM-I/TTPS
1.BOTH ENDS BREKAR TRIPPED CONDITION2.BOTH ENDS ISOLATERS,LINE SWITCHES ARE KEPT OPENED
CONDITION3.BOTH ENDS EARTH SWITCHES CLOSED CONDITION
SUB TO TTPS GEN
TUTICORIN -AUTO 230 KV
SUB TO TTPS GEN
ANTHIYUR 230 KV
230KV GOBI Feeder Breaker, CT and line switch
During the LC period 230KV MTPS feeder will be in service. 230KV Gobi end also programmed to avail LC . No SS will be
affected.
subject to the load condition
existing230KV Karamadai # Breaker, CT’s,Isolators and Line side Isolator and 230 KV main Bus & Auxillary Bus switch
subject to the load condition
existingsubject to the load condition
existingVEERAPURAM 230 KV
427 Chennai 55806 230 KV ECHUR 230 KV Possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 16:00 1 0 Approved
428 Erode 55859 110 KV For Monthly Maintenance work Capacitor Bank II will be in service possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
429 Madurai 56223 110 KV Tree cutting works POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 14:00 1 0 Approved
430 Madurai 56235 230 KV POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 16:00 1 Approved
431 Madurai 56239 230 KV For monthly maintenance Work POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 14:00 1 Approved
432 Madurai 56264 230 KV POSSIBLE Fri, 09-Jun-2017 10:00 Fri, 09-Jun-2017 16:00 1 Approved
433 Erode 55627 230 KV 230KV Bus Coupler Breaker and CT. Monthly Maintenance work possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 15:00 1 Approved
434 Erode 55885 230 KV GOBI 230 KV possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
435 Erode 55921 230 KV 230KV Salem -Singarapet feeder entire possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
436 Erode 55937 METTUR TPH For Monthly Maintenance possible Fri, 09-Jun-2017 7:00 Fri, 09-Jun-2017 17:00 1 Approved
437 Erode 55944 110 KV 110KV Puthansanthai-Nallur # line entire Jumper tightness checking Namakkal SS total shutdown possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
438 Erode 55971 230 KV For monthly maintenance works. 0 Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
439 Madurai 56001 230 KV Monthly Maintenance work POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
440 Madurai 56020 230 KV Auto Transformer - II For Monthly Maintenance Work. 0 POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
441 Madurai 56041 110 KV 0 POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
442 Erode 56058 110 KV KUNDAH PH1 110 KV PH1 - PH2 #2 During the LC period feeder radially feed from PH2 end only. possible Fri, 09-Jun-2017 0:00 Fri, 09-Jun-2017 0:00 1 Approved
443 Erode 56059 110 KV KUNDAH PH1 110 KV PH1 - PH2 #2 During the LC period feeder radially feed from PH2 end only. 0 Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 14:00 1 REPEAT
444 Erode 56064 110 KV Jagathala, Kothagiri & Kattabettu will be fed from Pykara. possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
445 Madurai 56077 110 KV Tree clearance work POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
446 Madurai 56122 230 KV 230 KV GC BKR & CTs POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
447 Erode 56126 230 KV LC programmed at other end also. possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
449 Erode 56274 110 KV ARASUR 230 KV possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 12:00 1 Approved
450 Erode 56311 230 KV possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
451 Madurai 56341 110 KV POSSBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
452 Erode 56400 230 KV 230/33 KV POWER TRANSFORMER - 3 possible Fri, 09-Jun-2017 10:00 Fri, 09-Jun-2017 17:00 1 Approved
453 Chennai 56471 230 KV 110KV SPK-VEERAPURAM-II FEEDER FOR QUARTERLY MTCE WORK Possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
454 Chennai 56567 230 KV 16MVA Power Transformer II Monthly maintenance work. 16MVA Pr. Tr. I & III will be in service. Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 12:00 1 0
455 Chennai 56598 110 KV KITS 230 KV 110KV Velachery feeder For quarterly maintenance work Possible Fri, 09-Jun-2017 10:00 Fri, 09-Jun-2017 14:00 1 0 Approved
456 Madurai 56603 230 KV AUTO TRANSFORMER 1 Monthly maintenance work POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
457 Chennai 56674 230 KV Concurance may be obtained from OD/NCTPS Possible Fri, 09-Jun-2017 10:00 Fri, 09-Jun-2017 17:00 1 Approved
458 Madurai 56688 110 KV POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
459 Madurai 56746 110 KV Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1
460 Madurai 56779 110 KV Tree cutting work POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 0 Approved
461 Madurai 56819 230 KV POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
462 Chennai 56826 230 KV 230KV NCTPS - Gummidipoondi all other feeders in service Possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
Auto transformer II Monthly maintenance work.
Monthly maintenance work in Auto transformer II, HV, LV CT's, Breakers and isolators.
At the Time of LC1. Auto Transformer II in off condition and Auto Transformer I in service condition.2. After completion of work Auto Transformer II put in service condition.Hence no
interruption of supply to any of the substation.DEVIAKURICHI 230 KV
110 KV Capacitor bank I Breaker CTs, Capacitor side Isolator, LAS
subject to the voltage profile
in the grid
PASUMALAI 230 KV
1)110 KV Pasumalai - Sembatty Feeder Section between Achampathu and Sithargalnatham
1) The Feeder will be kept radial from Sembatty end upto Sithargalnatham and from Pasumalai end upto Achampathu
SS. 2)110KV AB Switch towards Pasumalai at Sithargalnatham will be under open condition 3)110KV AB Switch towards
Sembatty at Achampathu SS will be under open condition . 4) 110/11KV Ramarajapuram and Vadipatty SS will be under
shutdown.RENGANATHAPURAM 230 KV
1)230/110 KV Auto Transformer-I Hv & Lv Breaker & CT's 2)110 KV RNPM -SBT-I# Breaker,CT
1)Monthly Maintenance Work2)Monthly Maintenance Work 1& 2 Anuual relay Test
1)During LC period 230 KV Auto Transformer-II will be in service and cater station load.2)110 KV RNPM SS avail total
shutdown load relief 18MW. 3)110 KV RNPM-SBT-I# radially fed from SBT end.Hence no interruption to any SS.
SUB TO LOAD CONDITION
SANKANERI 230 KV
230/110KV AutoTransformer-I HV&LV Breaker CTS&Lineswitches.
During the LC Period AutoTransformer-I willnot be inservice.AutoTransformer-II willbe Carriedout the Entire Load.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENPERAMBALUR 230 KV
230KV Perambalur-Trichy feeder breaker CT's wave trap & Line Isolater.
For monthly maintenance maintenance work.
During the above period of shut down 1) 230KV Trichy SS also avaling LC. 2)230KV Perambalur SS will be radially fed from
230KV TAQA end
SUBJECT TO ICT LOADING AT
NEY
ANTHIYUR 230 KV
During the LC period Auto transformer I & II will avail 230KV MTPS feeder supply. 230KV Bus I will not have supply , since
LC also applied for 230KV Gobi Feeder on the same day vide ID no 55621.No SS will be affected.
subject to the load condition
existing
230 KV Anthiyur Feeder breaker, CTs and entire line
FOR MONTHLY MAINTENANCE WORK
230 KV MTPS II FEEDER,230 KV ARASUR FEEDER AND 230 KV PALLAKAPALAYAM FEEDER ARE IN SERVICE,IT MAY CATER THE
LOAD.OTHER END MAY ALSO AVAIL LC
subject to the load condition
existing
SALEM AUTO 230 KV
Tension point jumper checking work
1. 230KV Salem – Singarapet feeder breakers kept hand tripped at both ends.2. Bus and line switches kept opened at
both ends. 3. Both ends are availing breaker and line switches LC on that day. 4. There will be no interruption to any SS.
subject to the load condition
existingGENERA
TING STATIO
NSMachine-2 generator and all its auxiliaries.
During above LC period 230KV MTPS feeder and AUTO SS feeder in service, Machine 1,3&4 stand by condition. The PWD
demand at present meet out Through PWD Dam.tph machines cannot be run
UNJANAI 230 KVsubject to
namakkal ss tsd
Pudhanchanthai 230kv
Auto-I, HV & LV-I CBs, CTs, LASs and 230KV Switches.Auto-I Bus B Side 230KV Switch.
During LC period110KV Namakkal SS availing Total Shut down. 110KV Namagiripet SS will be transferred to 110KV DVK-Thammampatty feeder. or 110KV Rasipuram SS will be transferred to 110KV Salem- Mallur feeder. No supply
interruption.
PUGALUR 230 KV
230 KV Paruthiyur feeder breaker, CT & Line switch only
During the LC period, there will be no supply on the above feeder. Concurrence obtained from M/s Regen power
Tech.Paruthiyur.
SUB TO WIND GEN AND GRID
CONDITION: CONCURRENCE
FROM WIND GENERATORS
KODIKURICHY 230 KV
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONDITION
NOT MENTIONED
KODIKURICHY 230 KV
On 110KV Kanarpatti -Keelaveeranam # section between Keelaveranam SS and Surandai SS
For replacement of defective insulators at Loc No:9, 7, 21 & replacement of defective Jumper Bolt at Loc No:4
SURANDI TO BE TRANSFERRED TO UTHUMALAI
#: SUB TO WIND GEN AND NO BLOCKING OF WIND GEN:
CONDITION NOT
MENTIONEDFor Annunciation relay coil replacement and maintenance work.
subject to the load condition
existingFor Annunciation relay coil replacement and maintenance work.
repeat of 56058
THUDIALUR 230 KV
110 KV Sandinella-thudiyalur feeder LOC 96-112 (section between Sandinella to Mrudoor SS)110 KV Pykara feeder breaker, CTs.
PMI works & take off arrangements at take off tower in main feeder.Monthly Maintenance works
subject to the feeder being kept radial
from pykara end
SRPUDUR 230 KV
110 KV SRP - KDR I # section between VNR to PPI
During the LC period 110 KV SR Puthur - KDR I feeder will be radial from SRP upto VNR SS (incl) and radial from KDR upto
PPI (Incl).Hence no ss will be affected.
SUB TO WIND GEN AND LOAD
CONDITIONKARAIKUDI 230 KV
230 KV GC BKR & CTs (by substituting 230 KV BUS COUPLER BKR)
During the L.C Period the 230KV B.C Bkr in service in place of 230KV G.C Bkr.
KARAMADAI 230 KV
230KV Karamadai- Ingur feeder line entire and Breaker and CT's
Monthly maintenance works of Breakers, CT's and CVT's and PMI by AE/Lines/Arasur
subject to the load condition
existing
110 KV ARASUR-PALLADAM FEEDER BREAKER, CTS ONLY.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V KALIVELAMPATTY SS WILL BE UNDER TOTAL SHUTDOWN.2) REMAINING LOADS OF THE 110 K V ARASUR-PALLADAM FEEDER WILL BE FED THROUGH 110 K V ARASUR-KANIYUR FEEDER BY 230 K V ARASUR SS BY CLOSING THE BUS COUPLER SWITCH AT 110 K V KANIYUR SS.
subject to transfer of loads to
kaniyur feederOTHAKKAL MANDABAM 230 KV
230 KV OKM-Myvadi Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
Monthly mtce works and PMI works by lines TDLR wing and lines UDPT wing
During the lc period the other 230 KV feeders are in service to cater the ss loads.
subject to the load condition
existingPASUMALAI 230 KV
110KV Pasumalai - Sembatti# Vadipatti spurline
For tower to tower inspection and flashover disc replacement work
During the LC period # Vadipatti under total shutdown. Hence no interruption
SADAYAMPALAYAM 230 KV
MONTHLY MAINTENANCE WORKS AND P&C CHECKS.
CONNECTED 33 KV LOADS WOULD BE SHARED BY POWER TRANSFORMERS 1&4 IF WITHIN THE LIMIT.
subject to the other power trs
loading limitS.P.KOIL 230 KV DURING THE PERIOF OF SHUT DOWN,230KV SPK-VRPM &
110KV SPK-VRPM-I FEEDER WILL BE IN TIED CONDITIONKADAPPERI 230 KV
Approval from SE/Operation
Approval from SE/Operation
During the above shutdown period 110KV Velachery feeder loads will be transferred to 230KV Tharamani SS
kinnimangalam 230 KV
During the LC period other two Auto transformers will be in service and scatter the load
GUMMIDIPOONDI 230 KV
230KV NCTPS Feeder, Breaker, CT, Line Isolators
Breaker isolator rectification work and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
Already approved on
8/6/17
NEMALITHIPIYAKUDI 230 KV
A) 110KV NEMMELI THIPPIYAKUDI-KOVILKALAPPAL (VIA:VADASERI) FEEDER BREAKER, CT's, AND LINE ISOLATOR. B) 110KV NEMMELI THIPPIYAKUDI-KOVILKALAPPAL (VIA:VADASERI) FEEDER (LP: 230KV N T KUDI SS TO 110KV VADASERI SS)
A) FOR MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ N.T.KUDI. B) FOR PREMONSOON INSPECTION WORK BY AE/LINES/ PATTUKKOTTAI.
1) DURING THE LC PERIOD, 110/33-11KV VADASERI SS SUPPLY FED FROM T(K)GTPS.2) NO INTERRUPTION TO ANY
SUBSTATIONS AND ALL OTHER 110KV FEEDERS ARE TIED CONDITION.
THANJAVUR 230 KV
110 KV Thanjavur - NTKudi feeder, breaker, CT and LI. (Line portion between 230 KV Thanjavur SS and 110 KV Thirukkanurpatti SS)
1) For rectification works by the AEE/Lines/Thanjvur, 2) For monthly maintenance works by the AEE/Mtce/230 KV SS/Thanjavur.
During the LC period,1) This feeder will be radial from NTKudi 230 KV SS upto 110 KV Thirukkanurpatti SS, 2) 110 KV
Thirukkanurpatti SS will avail shutdown on the same day,3) all other 110 KV feeders will be in tied condition,4) no supply
interruption to any SS.
NOT POSSIBLE
DUE TO NTKDI AUTO
LOADING: LC PROGRAMMED WITH MORE S/D
Subject to EE/SLDC/ Madurai concurrence
SEMBATTY 230 KV
11oKV SBT - Pasumalai # sec. bet. Sithargalnatham and Achampathu SS
During the LC period the feeder will be radial from SBT upto Sithargalnatham SS and radial from other end upto Achampathu SS. Hence no interruption to any SS.
THIRUVARUR 230 KV
110KV THIRUVARUR-MYILADUTHURAI FEEDER ( lINE PORTION BETWEEN THIRUVARUR TO PERALAM )
Line premansoon inspection and rectification work, Breaker, CT's and Line side isolator maintenance work
DURING THE LC PERIOD THERE WILL BE NO INTERRUPTION TO ANY SS. 110KV PERAMBUR SS AND 110 KV SS PERALAM WIIL BE RADIALLY FED FROM 110KV SS MYILADUTHURAI. HENCE
THERE WILL BE NO INTERRUTION SUPPLY TGO ANY OTHER SS.
SUB TO LOAD CONDITION
GUMMIDIPOONDI 230 KV
Jumper tightness checking work at various locations
Already approved on
8/6/17
463 Madurai 56886 110 KV then I 230 KV 110KV Theni - Periyar # III Br.with CT only monthly mtce work No Interruption POSSIBLE Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 13:00 1 Approved
464 Erode 56171 230 KV Autotransformer.NoI , HV.I, LV.I entire. possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
465 Erode 56175 230 KV Both end LC appyied possible Fri, 09-Jun-2017 9:00 Fri, 09-Jun-2017 17:00 1 Approved
466 Madurai 55604 110 KV 0 Sat, 10-Jun-2017 0:00 Wed, 14-Jun-2017 0:00 5 Pending
467 Madurai 56228 110 KV POSSIBLE Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 14:00 1 0 Approved
468 Madurai 56333 230 KV 0 Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 12:00 1 POST PONED
469 Madurai 56334 230 KV 0 Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 12:00 1 POST PONED
470 Madurai 56344 230 KV 230 KV Checkanurani - Sembatty feeder POSSIBLE Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 17:00 1 Approved
471 Chennai 56473 230 KV 230KV KLPKM-ECHUR FEEDER FOR LINE MTCE WORK Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 17:00 1 0 Approved
472 Chennai 56751 110 KV 110kv Western bus Routine maintenance work Possible Sat, 10-Jun-2017 6:00 Sat, 10-Jun-2017 11:00 1 0 Approved
473 Chennai 56758 230 KV Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 17:00 1 Approved
474 Chennai 56776 230 KV Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 17:00 1 Approved
475 Madurai 56783 230 KV During the LC period other end is also availing LC. POSSIBLE Sat, 10-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 3
476 Chennai 56828 230 KV Korattur lines 230KV NCTPS - SPR all other feeders in service Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 17:00 1 0 Approved
477 Chennai 56542 110 KV 110 KV High court feeder Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 17:00 1 0 Approved
478 Madurai 56605 230 KV AUTO TRANSFORMER 2 Monthly maintenance work POSSIBLE Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 17:00 1 0 Approved
479 Chennai 56703 110 KV For EHT Line Maintenance Works. Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 14:00 1 0 Approved
480 Chennai 56705 230 KV 230KV Thiruvalam - Link II feeder. For EHT Line Maintenance Works. Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 14:00 1 0 Approved
481 Chennai 56706 110 KV 110 KV Railway I & II feeder one by one. For EHT Line Maintenance Works. Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 14:00 1 Approved
482 Chennai 56708 110 KV For EHT Line Maintenance Works. Possible Sat, 10-Jun-2017 9:00 Sat, 10-Jun-2017 14:00 1 0 Approved
253 Chennai 56610 230 KV Sun, 11-Jun-2017 6:00 Sun, 11-Jun-2017 9:00 1 0 Approved
483 Madurai 54383 110 KV i)For monthly maintenance work POSSIBLE Sun, 11-Jun-2017 10:00 Sun, 11-Jun-2017 15:00 1 0 Approved
484 Erode 55698 110 KV PYKARA 110KV PYKARA - MOYAR 2# ENTIRE LINE NIL possible Sun, 11-Jun-2017 8:00 Sun, 11-Jun-2017 17:00 1 Approved
485 Erode 55755 KUNDAH PH2 0 Sun, 11-Jun-2017 9:00 Sun, 11-Jun-2017 17:00 1 0 Approved
486 Erode 56424 PUSHEP UNIT-1 UNIT -1 TO BE IN SHUTDOWN CONDITION postponed Sun, 11-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 3 Pending
487 Chennai 56831 230 KV 230KV NCTPS -SPR all other feeders in service Sun, 11-Jun-2017 9:00 Sun, 11-Jun-2017 17:00 1 0
488 Chennai 56859 230 KV 230KV GIS Thiruverkadu# Sun, 11-Jun-2017 6:00 Sun, 11-Jun-2017 9:00 1 0 Approved
489 Chennai 56608 230 KV 230 KV thiruverkadu feeder 230 KV Thiruverkadu feeder will not be in service. Sun, 11-Jun-2017 6:00 Sun, 11-Jun-2017 9:00 1 0 Approved
490 Chennai 56616 230 KV 230KV Sriperumbudur- Tharamani feeder Sun, 11-Jun-2017 6:00 Sun, 11-Jun-2017 9:00 1 0 Approved
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENUDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
3 AUTOS ARE IN PARALLEL . LOADS ARE SHARED WITH OTHER TWO AUTOS.
subject to the other auto trs loading limit
Udumalpet 400 KV
230 KV Myvadi-othakalmandabam feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
subject to the load condition
existingTUTICORIN -AUTO 230 KV
110KV TTN-Sipcot-III feeder (Section between 230KV Auto SS and 110KV Town SS)
To replace existing leopard conductor with Panther conductor
No SS affected . During the Lc period 110KV Town SS will be radially fed from 230KV Meelavittan SS.(Continious LC from
01/06.17 from 0900 Hrs and 25.06.17 up to 1700Hrs)LONG LC:NOT TO BE PUT UP
PASUMALAI 230 KV
1).110 KV Pasumalai - Alagarkoil-II # BKR & CT, LI only. 2)Line LC in Section between Pasumalai - Anaiyur SS.
1) Maintenance Works of BKR & CT, LI only. 2) Loc 11 to 20 / Tree cutting works.
1) 110 KV Anaiyur and Ellis Nagar SS will be under Shut down. 2) 110 KV Arasaradi SS loads are in 110KV Pasumalai -
Arasaradi - SC Feeder at 110KV Pasumalai SS 3) Switch No 1 at 110KV Pasumalai Grid SS is under Open Condition 4) The
feeder will be kept radial from Alagarkoil SS upto Anaiyur SS feeding Tirupalai SS only 5) The 110KV isolator towards
Pasumalai at Anaiyur SS and the 110KV Line isolator at 230KV Pasumalai SS will be under open condition.
ANUPPANKULAM 230 KV
230KV Southern Bus entire. (from 1 - 89 B switch to south side end)
For providing of dropper jumper in 230KV Anuppankulam - Sterlite feeder Bus Bar to 230KV strung Bus, and HV-II isolator. line switch to terminal tower and HV-I isolator. ( Augmentation of 100MVA to 160MVA Auto Transformer work)
For providing of dropper jumper in 230KV Anuppankulam - Sterlite feeder Bus Bar to 230KV strung Bus, and HV-II isolator. line switch to terminal tower and HV-I isolator. ( Augmentation
of 100MVA to 160MVA Auto Transformer work)
Subject to normalisation of 110 kV PSQ-KNMGLM#1&2 LC
ANUPPANKULAM 230 KV
230KV Southern Bus entire. (from 1 - 89 B switch to south side end)
For providing of dropper jumper in 230KV Anuppankulam - Sterlite feeder Bus Bar to 230KV strung Bus, and HV-II isolator. line switch to terminal tower and HV-I isolator. ( Augmentation of 100MVA to 160MVA Auto Transformer work)
During the LC period, a) Auto Transformer-II & III, HV-II & III, LV-II & III will be under hand tripped condition and 230KV
Anuppankulam - Sterlite feeder hand tripped condition and Auto Transformer-I will be fed from 230KV Anuppankulam-
Madurai and 230KV Anuppankulam - Kayathar feeder sources. 230 KV Anuppankulam - Sterlite feeder will be no supply. 110KV Aruppukottai SS loads will be transferred to 110KV
Kavanoor - Kamuthi feeder and 110KV APKM - PSQ # Radial fed from other end. 110 KV Aviyoor SS load will be transfer to
110 KV Thulukkapatti - PSQ feeder. Hence No SS affected.
Subject to normalisation of 110 kV PSQ-KNMGLM#1&2 LC
CHECKANURANI SW STATION 230 KV
For monthly maintenance work and line maintenance work
During LC Period There will be no supply in the entire feeder. EE/O/SBT has also applied for LC
SUB TO WIND GEN AND LOAD
CONDITIONS.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN,230KV SPK-KLPKM-I&II,
ACKPM-KLPKM FEEDERS WILL BE IN SERVICE
KILPAUK 230 KVDuring the period of shutdown1) 110kv KWW I # load will be
transferred to KWW II # 2)110kv Annanagar load will be transferred to 230kv korattur SS 3)100 MVA Auto transformer I
will not be in service
THIRUVALAM 230 KV
i) On Auto Transformer –II, HV-II, LV-II Breaker and CT’s, For Replacement of damaged strung bus and strengthening work in middle bus and western bus, Auto-Tr-II for monthly maintenance work , there will be interruption for Railway traction for 4 HRS.ii)On 110KV Vellore-I Feeder,110KV Vellore-II Feeder,110KVGudiyattam Feeder, Breaker and CT’s, for monthly maintenance work AND 110KV Railway I AND 110kv Railway –II Feeder there will be interruption for railway traction SS
i) On Auto Transformer –II, HV-II, LV-II Breaker and CT’s,for Replacement of damaged strung bus and strengthening work in middle bus and western bus, Auto-Tr-II for monthly maintenance work , there will be interruption for Railway traction for 3 HRS.ii)On 110KV Vellore-I Feeder,110KV Vellore-II Feeder,110KVGudiyattam Feeder, Breaker and CT’s, for monthly maintenance work AND 110KV Railway I AND 110kv Railway –II Feeder there will be interruption for railway traction SS for monthly mtce.workiii)On 230KV Link-II Feeder Breaker and its CT’s for monthly mtce.work
During the period of LCi) The 110KV Karnambut SS, 110KV Katpadi SS, 110KV Sathuvachari SS, 110KV Arcot SS,110KV
Vaduganthangal SS,110KV Thorapadi SS of VEDC/Vellore are availing Total shutdown on 10.06.2017.The Total Shutdown
approved and concurrence obtained by Chief Engineer/Distribution / Velloreii) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-III ,HV-III,LV-III, Auto –Tr-IV,HV-IV,LV-IV , will be in service and cater the SS Loads.iii) Auto-Tr-II ,HV-II,LV-II will be in
‘OFF’ Condition.iv) The 110KV Vellore-I and Vellore-II Feeder,110KV Gudiyattam feeder will be in ‘OFF’ Condition , 110KV Railway Feeder I and II there will be
interruption v) The 230KV Link-II Feeder will be in ‘OFF’ Condition vi) The 230KV Link-I, 230KV Chittoor interstate
feeders, and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply
please.
LC approved one by one
THIRUVALAM 230 KV
i) On Auto Tr. –III, HV-III, LV-III Breaker and CT’s, For Replacement of damaged strung bus and strengthening work in middle bus and western bus, Auto-Tr-III for monthly maintenance work , there will be interruption for Railway traction for 4 HRS.ii)On 110KV Vellore-I Feeder,110KV Vellore-II Feeder,110KVGudiyattam Feeder, Breaker and CT’s, for monthly maintenance work & 110KV Railway I & II Feeder there will be interruption for railway traction SSiii)On 230KV Link-II # Breaker & CTS
i) On Auto Transformer –III, HV-III, LV-III Breaker and CT’s, For Replacement of damaged strung bus and strengthening work in middle bus and western bus, Auto-Tr-III for monthly maintenance work , there will be interruption for Railway traction for 3 HRS.ii)On 110KV Vellore-I Feeder,110KV Vellore-II Feeder,110KVGudiyattam Feeder, Breaker and CT’s, for monthly maintenance work AND 110KV Railway I AND 110kv Railway –II Feeder there will be interruption for railway traction SS for monthly mtce.workiii)On 230KV Link-II Feeder Breaker and its CT’s for monthly mtce.work
During the period of LCi) The 110KV Karnambut SS, 110KV Katpadi SS, 110KV Sathuvachari SS, 110KV Arcot SS,110KV
Vaduganthangal SS,110KV Thorapadi SS of VEDC/Vellore are availing Total shutdown on 10.06.2017.The Total Shutdown
approved and concurrence obtained by Chief Engineer/Distribution / Velloreii) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-II ,HV-II,LV-II, Auto –Tr-IV,HV-IV,LV-IV will be in service and
cater the SS Loads.iii) Auto-Tr-III ,HV-III,LV-III will be in ‘OFF’ Condition.iv) The 110KV Vellore-I and Vellore-II
Feeder,110KV Gudiyattam feeder will be in ‘OFF’ Condition , 110KV Railway Feeder I and II there will be
interruption v) The 230KV Link-II Feeder will be in ‘OFF’ Condition vi) The 230KV Link-I, 230KV Chittoor interstate
feeders, and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply
please.
LC approved one by one
SEMBATTY 230 KV
230KV SBT - CKNI # Bkr, CT, line switch and line entire, relays
1. Line isolator replaced by SSE 2. Monthly maintenance work3. Tree cutting work 4. Relay testing work
SUB TO WIND GEN AND LOAD
CONDITION
Approved Subject to Grid condition
Jumper tightness checking work at various locations
BASIN BRIDGE(GMRVASAVI) 230 KV
Annual relay test by GRT & routine maintenance work.
1. 110KV High Court Feeder will not be in service.2. All other 110KV Feeders, 230KV Feeders, Auto I, II & III will be in service.
kinnimangalam 230 KV
During the LC period other two Auto transformers will be in service and scatter the load
THIRUVALAM 230 KV
110 KV Thiruvalam – Vellore I feeder (In between 110 KV Karnambut SS to 110kv Arcot SS).
During the period of LC i The 110KV Vellore-I Feeder breaker will be in ‘OFF’ Condition(In between 110 KV Karnambut
SS to 110kv Arcot SS). ii The 110KV Karnambut SS, 110KV Sathuvachari SS, 110KV Arcot SS, are availing total Shutdown.
Hence there will be no interruption of supply please.
THIRUVALAM 230 KV
During the period of LC i. 230KV Thiruvalam – Link II feeder Breakers both end will be in “ OFF†condition at 400KV �
Thiruvalam & 230KV Thiruvalam SS. ii. All other 230 KV feeders 230KV Link I, Singarapet, S.P.Koil feeders are in service.Hence
there will be no interruption of supply please.THIRUVALAM 230 KV
During the period of LCi. 110 KV Railway I & II feeder breaker will be in “ OFF†condition at both end one by one.Hence �
there will be no interruption of supply please.
Subject to Railway
concurrence
THIRUVALAM 230 KV
110 KV Thiruvalam – Gudiyatham feeder entire.
During the period of LCiii. 110 KV Thiruvalam – Gudiyatham feeder line LC in between from 230 KV Thiruvalam SS to 110 KV Pakkam SS.iv. 110 KV Vaduganthangal SS of VEDC/Vellore and 110KV Pakkam SS of TEDC/Thirupattur are availing total
Shutdown.Hence there will be no interruption of supply please.KADAPPERI 230 KV
230KV Kalivanthapattu - Tharamani feeder
insulator and jumper replacement work.
230KV Sriperumbudur- Tharamani feeder and 230KV KITS - Tharamani feeder will be in service.
Postponed to 11/06/2017
PERAMBALUR 230 KV
110KV Kallakudy-I(Thuraiyur) feeder Breaker CT's only
During the above LC period 1) 110KV Thuraiyur Feeder Loads will be transfer to 110KV Perambalur -II Feeder of Kallakudy
Grid SS and also 110KV Koppampatty SS avaling total shutdown
FOR MONTHLY MAINTENANCE WORK.
subject to the load condition
existingGENERA
TING STATIO
NS
UNIT-2 GENERATTOR SF6 BREAKER, POWER TRANSFORMER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
GENERATING
STATIONS
NEED BASED MAINTENANCE WORKS1. ANNUAL RELAY TESTING2. 87GT NEW NUMERICAL RELAY COMMISSIONING WORK
pusheph unit 3 long lc
recommended
KORATTUR LINES
Jumper tightness checking work at various locations
already approved on 10/06/2017
Approved Subject to Grid condition
Alamathy 400 KV
To attend glow in 'Y' phase B isolator towards LV side
During the period of shutdown 230KV GIS Thiruverkadu # will not be in service.
To be discuss
Alamathy 400 KV
For attending glow in Y phase ,B isolator switch end clamp.
To be discuss
KADAPPERI 230 KV
Insulator and jumper replacement work.
230KV Kalivanthapattu - Tharamani feeder and 230KV KITS - Tharamani feeder will be in service.
Preponed to 11/06/2017
491 Madurai 56589 110 KV KODAIYAR PH2 110KV SR Pudur #-1 110KV radial from SR Pudur to pechipparai ss Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 13:00 1 Approved
492 Chennai 55644 230 KV 230 KV SVChatram - Mambakkam feeder Possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 9:00 1 0 Approved
493 Erode 55674 110 KV INGUR 230 KV possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 14:00 1 Approved
494 Erode 55675 110 KV INGUR 230 KV 0 Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 14:00 1 Repeat
495 Erode 55719 110 KV Erode 110 KV MONTHLY MAINTENANCE WORK postponed Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1
496 Madurai 55727 230 KV On 100 MVA Auto Tr - II , HV-II, LV-II For monthly maintenance work POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
497 Erode 55777 230 KV Monthly maintenance work. possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
499 Erode 55510 230 KV MTPS MTPS.I TO SALEM 230KV SS Monthly maintenance work. Programed LC possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
500 Chennai 55563 230 KV For monthly maintenance works. Possible Mon, 12-Jun-2017 10:00 Mon, 12-Jun-2017 17:00 1 0 Approved
501 Erode 55579 230 KV Salem 400 KV 230KV Bus- Monthly maintenance work possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
502 Erode 55626 110 KV INGUR 230 KV 110KV Capacitor Bank I entire MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
503 Chennai 55908 110 KV ARNI 230 KV Possible Mon, 12-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 2 0 Approved
504 Erode 55922 230 KV 230KV Salem – MTPS feeder entire possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
505 Erode 55956 110 KV ALIYAR 230 KV possible Mon, 12-Jun-2017 8:00 Mon, 12-Jun-2017 18:00 1 Approved
506 Erode 55959 230 KV ALIYAR 230 KV 110KV ALR-SPH I # No.II will caters the load possible Mon, 12-Jun-2017 8:00 Thu, 15-Jun-2017 18:00 4
507 Erode 55972 110 KV 110KV Bus Coupler CB and CTs. For monthly maintenance works. 0 Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0
508 Erode 56028 230 KV MTPS MTPS.I TO SALEM 230KV FEEDER Programmed LC possible Mon, 12-Jun-2017 9:00 Tue, 13-Jun-2017 6:00 2 Approved
509 Madurai 56048 110 KV POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
510 Erode 56074 230 KV possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
511 Madurai 56080 110 KV 110 KV BUS III POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
512 Madurai 56124 110 KV 110KV KKDI-SVGA # S/B M.Patty-SVGA Tower to Tower Inspection work. POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
513 Erode 56172 110 KV 110KVPonnapuram # Line Upto Patspin possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
514 Madurai 56195 230 KV Monthly Maintenance Work POSSIBLE Mon, 12-Jun-2017 10:00 Mon, 12-Jun-2017 17:00 1 Approved
515 Madurai 56202 230 KV Maintenance Works of BKR & CT,LI EE / O / CKNI has also programmed POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 14:00 1 0 Approved
516 Erode 56492 110 KV possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 15:00 1 Approved
517 Erode 56499 110 KV Monthly Maintenance Work THE FEEDER WILL BE RADIAL FROM OTHER END possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
518 Madurai 56510 110 KV POSSIBLE Mon, 12-Jun-2017 8:00 Mon, 12-Jun-2017 17:00 1 Approved
519 Madurai 56532 110 KV For attending tree cutting work POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
520 Madurai 56544 110 KV Monthly Maintenance work POSSIBLE Mon, 12-Jun-2017 10:00 Mon, 12-Jun-2017 13:00 1 Approved
521 Madurai 56609 230 KV AUTO TRANSFORMER 3 Monthly maintenance work POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
522 Madurai 56747 230 KV POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
523 Madurai 56749 110 KV POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
524 Chennai 56832 230 KV Korattur 230KV Korattur - SPR all other feeders in service Possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
525 Madurai 56854 230 KV 230/110 KV Auto III Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1
Monthly maintenance of breaker, CT, LAS
NOT POSSIBLE
DUE TO VEYANOOR
AND PEACHIPARAI
LCSriperumbudur 400 KV
Jumper tightness and line maintenance
During the period of shutdown Mambakkam SS fed by 400 KV SPR SS
110 KV Elumathur – Pugalur # section Between 110 KV Elumathur SS & 110 KV Kodumudi SS
Jumper Tightness work at tower location No:110 near Othakadai
1.During Lc period no SS will be affected 2.110 KV Elumathur SS, Sivagiri SS& Nadupalayam SS has programmed total
shutdown on 12/06/17 3.110 KV Kodumudi SS supply will be fed from Pugalur 230 KV SS
subject to the tsd relief being
realized
110 KV Elumathur – Pugalur # section Between 110 KV Elumathur SS & 110 KV Kodumudi SS
Jumper Tightness work at tower location No:110 near Othakadai
1.During Lc period no SS will be affected 2.110 KV Elumathur SS, Sivagiri SS& Nadupalayam SS has programmed total
shutdown on 12/06/17 3.110 KV Kodumudi SS supply will be fed from Pugalur 230 KV SS
repeat of 55674
110 KV ELUMATHUR FEEDER BREAKER AND CT
DURING LC PERIOD SIVAGIRI,NADUPALAYAM AND ELUMATHUR SS UNDER TOTAL SHUTDOWN,KASPAPETTAI SS WILL BE FED
FROM ELUMATHUR SS
line section lc recommended for ingur lines; kaspapettai ss to be fed from
erode ss
Subject to EE/SLDC/ Erode concurrence
TUTICORIN -AUTO 230 KV
No ss will be affected. During this L.C period all 110 KV feeders will be fed from 230KV Sipcot SS & 110KV Arni SS .
SUB TO LOAD CONDITION
SALEM AUTO 230 KV
230KV MTPS feeder Breaker, CT’s & Line Isolator.
1. 230KV MTPS feeder LC will be availed at both ends. 2. 3 Nos. 230 KV feeders will be in service. 3. There will be no
interruption to any sub station or feeders.
subject to the load condition
existingsubject to the load condition
existingSPR SIPCOT(MAMBAKKAM) 230 KV
230KV SIPCOT- SV.Chatram feeder - Breaker, Current Transformers & Line side isolator only.
During the period of shutdown the entire load of 230KV SIPCOT Mambakkam SS [Approximately: 45MW] will be fed from
400KV Sriperumbudur SS through 230KV SIPCOT- Sriperumbudur feeder without interruption.
During 230 KV Bus B LC Period, 230 KV Bus A will be in service condition. Hence there will be no interruption of supply.
bus A to be in service
subject to the voltage profile
in the grid
110KV Arani- Sandavasal Feeder Breaker CTs and Line Isolators
For Replacement of Damaged Gantry structure in 110KV Sandavasal Feeder Line side Takeoff by TLC wing T.V Malai.Also Breaker Monthly maintenance work.
During the period of Shut down 110KV sandavasal SS availing Total Shutdown upto 13.00Hrs on 12.06.2017. Also 110KV
Arani-Singarapet Feeder I supply will be extended for 110KV sandavasal SS as alternate supply till 13.06.2017 @17.00Hrs. Necessary railway concurance will be obtained for LC work.
SALEM AUTO 230 KV
Tension point jumper checking work
1. 230KV Salem – MTPS feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. Both ends are availing breaker and line switches LC on that
day. 4. There will be no interruption to any SS.
subject to the load condition
existing
110KV SPH I # No.I and II CB,CT and line upto Iyyerpadi SS
1. Releasing of 3. Nos. Exg. Wolf Conductors from Exg. Tower Loc. No. 37 - Exg. T. Loc. No. 36 - Exg. T.Loc. No. 35. 2. Stringing of 3 Nos. Panther Conductors from Exg. T. Loc. No. 37 - New T. Loc. No. 37 - Exg. T. Loc. No. 35 - Temporary arrangements for Aliyar - Sholayar feeder II3.Monthly Mtce works at Aliyar SS
During LC period 110KV Iyarpadi SS and UA Dam SS will be on total S/D.
subject to iyerpadi ss and upper aliyar ss
availing tsd
110KV ALR-SPH I # No.I CB,CT and line upto Iyyerpadi from Aliyar 230 KV SS
1. Releasing of 3. Nos. Exg. Wolf Conductors from Exg. Tower Loc. No. 37 - Exg. T. Loc. No. 36 - Exg. T.Loc. No. 35. 2. Stringing of 3 Nos. Panther Conductors from Exg. T. Loc. No. 37 - New T. Loc. No. 37 - Exg. T. Loc. No. 35 - Temporary arrangements for Aliyar - Sholayar feeder II
subject to feeder 2 being
in service
Approved Subject to Grid condition
Pudhanchanthai 230kv
During LC period110KV West & East Bus loads will be fed By Auto-I & Auto-II separately/independantly. No supply
interruption.
Subject to EE/SLDC/ Erode concurrence
To replace the existing Static distance relay ( Main.2 ) by new CG make Numerical distance protection relay.( by P & C WING )
2 days lc subject to the load condition
existing
KODIKURICHY 230 KV
On 110KV Kodikurichi-Kanarpatti # section between 110 KV AlangulamSS &110 KV Kanarpatti SS
i.) For Replacement of defective Disc at Loc No:24
i) 110KV Keelapavoor SS and 110 KV Alungulam SS , Keelaveeranam ,and 10(1) New Alangulam SS will be radialy
fed from 230KV Ananthapuram SS
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTHUDIALUR 230 KV
1. 230 KV Thudiyalr-OKM feeder line entire2. 230 KV Thudiyalur-OKM feeder breaker,CTs
1. PMI works2. Monthly maintenance works. 230 KV OKM SS load will manage from 230 KV OKM-CBE feeder
subject to the load condition
existing
SRPUDUR 230 KV
110 KV SRP -KDR II # Bus isolator 37 R phase glow attending work.
110 KV SRP - ARMI # I & II will be radial from ARMI SS upto SRP (excl).110 KV SRP- Kodayar II #.radial from Kodayar upto SRP
(excl) and Parasala (Incl). 110 /11KV SRP SS will avail total Shutdown. Approved by SE/KKEDC/NGL.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENKARAIKUDI 230 KV
During the L.C period the 110KV Kalayarkoil,110KV MadaguPatty will be TSD. 110KV KKDI- SVGA # Radial upto
Kallal SS.
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
DURING LC PERIOD SEC BETWEEN PATSPIN EHT SERVICE AND PONNAPURAM SUPPLY WILL BE FED FROM 230 KV
PONNAPURAM SS
subject to the feeder being kept radial
from ponnapuram ss
endAMUTHAPURAM 230 KV
230/33KV Power Transformer-1 HV,LV Breakers with CT's and its 33KV feeder
1) During the LC period there will be NO supply in P.Tr-1 and its 33KV feeders. 2) If there is wind generation its 33KV
feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENPASUMALAI 230 KV
1)230 KV Pasumalai - Checkanurani # - I BKR & CT,LI only
PALLADAM 230 KV
110 KV Palladam-Sipcot II # Breaker CT's and line entire
To carryout monthly maintenance work by AE/M/Palladam and to carryout premonsoon inspection work by AE/L/Palladam
1)110 KV Alagumalai SS availing total Shutdown2)110 KV Mudalipalayam SS will be fed from Ingur 230 KV SS 3)No other
SS will be affected
subject to the tsd being realized
Udumalpet 110 KV
110 KV UDT –Aliyar – I #r breaker, CT’s and section between UDT – Poolanginar SS.
subject to the feeder being kept radial
from aliyar ss end
KAYATHAR 110 KV
110KV MELAKALLUR-SANKANERI FEEDER SEC B/W MELAPALYAM& KARANTHANERI
LINE INSPECTION & RECTIFICATION WORK
DURING THE LC PERIOD,1.MELAPALYAM SS WILL BE RADIALLY FED FROM MELAKALLUR 2.KARANTHANERI SS WILL BE
RADIALLY FED FROM SANKANERI HENCE NO SS AFFECTEDSUB TO WIND
GENVALUTHUR 230 KV
110KV Arkay - Mandapam - Perungulam feeder entire.
During the LC period 110KV Mandapam SS will be availed total shut down.
KANARPATTY 400 KV
110KV Manoor feeder Breaker with CT 102Bay
110KV Manoor SS availing monthly shutdown work on the same day, no SS affected.
SUB TO WIND GEN
kinnimangalam 230 KV
During the LC period other two Auto transformers will be in service and scatter the load
THANJAVUR 230 KV
110 KV and 230 KV Bus-Coupler breakers (one by one)
For monthly maintenance works by the AEE/Mtce/Thanjavur.
During the LC period,1) all 110 KV & 230 KV feeders will be in tied condition,2) 230 KV Bus-Coupler breaker is already kept in
standby condition,3) no supply interruption to any SS.
THANJAVUR 230 KV
110 KV Thanjavur - Thiruvarur feeder (Line portion between 110 KV Ayyampettai SS and 110 KV Poondi SS)
For rectification works by the AEE/Lines/Thanjavur.
During the entire LC period,1) This feeder will be radial from Thanjavur 110 KV Grid SS upto Ayyampettai 110 KV SS,2) 110
KV Poondy SS will avail shutdown on the same day.3) no supply interuption of supply to any SS.
Jumper tightness checking work at various locations
THIRUVARUR 230 KV
1. HV III & LV III Breaker's and their respective CT's and Line isolator maintenance works and relay testing by P&C wing.
During the Auto transformer-III LC period, the Auto Transformer - I & II will be in service and Load will be shared
by Auto Transformer I & II. Hence there will be no interruption of supply.
NOT POSSIBLE
DUE TO AUTO LOADING:
EVERY TNOCC, IT IS INFORMED
THAT LC PROGRAMMED ALONG WITH TOTAL S/D TO
MANAGE LOAD.
Subject to total shutdown 50 Mw
526 Chennai 56934 110 KV For monthly maintenance works Possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
527 Erode 55834 110 KV 110KV Deviakurichi I Feeder possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
528 Erode 56225 230 KV ARASUR 230 KV possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 16:00 1 Approved
529 Madurai 56249 230 KV POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 16:00 1 Approved
530 Erode 56313 230 KV possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
531 Madurai 56347 230 KV During LC Period There will be no supply in the entire feeder POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
532 Madurai 56358 230 KV For Monthly Maintenance Work. POSSIBLE Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 Approved
533 Chennai 56409 230 KV 230 KV SVC-Sipcot mamabakkam # entire For Quarterly Mtce. work Possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
534 Chennai 56418 400 KV 315MVA ICT-I For Maintenance work Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 16:00 1 Approved
535 Chennai 56419 400 KV 315MVA ICT-1 For maintenance work Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 16:00 1 REPEAT Repeat
536 Chennai 56476 230 KV 230KV KLPKM-ACKPM FEEDER FOR LINE MTCE WORK Possible Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1 0 Approved
537 Erode 56482 230 KV postponed Mon, 12-Jun-2017 9:00 Mon, 12-Jun-2017 17:00 1
538 Madurai 56039 230 KV 0 0 Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
539 Chennai 56932 230 KV 230KV Cuddalore- Neyveli TS-1# Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
540 Madurai 55499 230 KV POSSIBLE Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 Approved
541 Erode 55522 230 KV KUNDAH PH4 Power house 4 to 3 feeder Monthly maintenance work Standby postponed Tue, 13-Jun-2017 8:00 Tue, 13-Jun-2017 17:00 1 Cancelled
542 Madurai 55532 230 KV POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
543 Erode 55534 230 KV KUNDAH PH3 230KV PH3 -PH4 Feeder For monthly maintenance postponed Tue, 13-Jun-2017 8:00 Tue, 13-Jun-2017 17:00 1 Cancelled
544 Erode 55551 230 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 Approved
545 Erode 55552 230 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 Approved
546 Madurai 55564 110 KV For Monthly maintenance work POSSIBLE Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 14:00 1 Approved
547 Erode 55580 110 KV Salem 400 KV Monthly maintenance work Concurrence Already obtained from M/s. JSW Ltd., possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
548 Madurai 55645 230 KV TRICHY 230 KV 1. Monthly maintenance works. POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 16:00 1 Approved
549 Chennai 55690 230 KV ROUTINE MAINTENANCE WORKS. Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 15:00 1 Approved
550 Erode 55699 PYKARA UNIT 5 NIL possible Tue, 13-Jun-2017 8:00 Tue, 13-Jun-2017 17:00 1 Approved
551 Erode 55709 230 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
552 Erode 55720 110 KV Erode 110 KV MONTHLY MAINTENANACE WORK possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
553 Erode 55752 110 KV Monthly Maintenance Work. possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 Approved
554 Madurai 55605 230 KV TTPS 230KV TTPS-KAYATHER FEEDER-I ENTIRE POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
555 Madurai 55613 230 KV 230KV TTPS-Kayathar-I feeder entire Jumper tightness work No SS affected POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
556 Erode 55889 110 KV GOBI 230 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
557 Madurai 55893 110 KV For monthly maintenance work POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
CUDDALORE 230 KV
110 KV CUD-Chitharasur # breaker, CT’s & Line side isolator.
EID Co – Generation, 110 KV Sornavoor SS & 110KV Nallathur SS, loads will be transferred to the 110 KV Cuddalore –
Nathapattu feeder. Hence, no interruption of supply.The 110 KV Chitharasur SS will be availing
SINGAPURAM 230 KV
Monthly Maintenannce on Breaker and CT.
1. 110KV Deviakurichi I Feeder will be fed radially from Dvky. end.2. No auto LC at DVK end on 12.06.2017
subject to the feeder being kept radial
from deviakurichi ss
end230/110 KV AUTO TRANSFORMER-IV,HV-IV, LV-IV BREAKERS,CTS ,LAS AND ITS ASSOCIATED EQUIPMENTS.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD,1) REMAINING 3 NOS. AUTO TRANSFORMERS WILL BE IN SERVICE.2) 110 K V
KADUVETTIPALAYAM SS WILL BE UNDER TOTAL SHUTDOWN.
subject to the other auto trs loading limit
RENGANATHAPURAM 230 KV
1)230/110 KV Auto Transformer II HV & LV Breaker and CT's 2)110 KV RNPM-SBT-III# Breaker and CT's
(1)&(2)Monthly Maintenance (1)&(2)Annual Relay Test
1)During LC period 230/110 KV Auto Transformer-I will be in service and cater station load.2)110 KV RNPM-SBT-II# radially
fed from SBT end. 110 KV vadamadurai SS avail total shutdown (L/R-13 MW)3)110 KV RNPM -SBT-III# radially fed from SBT end. 110 KV vedasandur SS avail total shutdown
(L/R-27 MW)Hence no interruption to any SS
SUB TO LOAD CONDITION
OTHAKKAL MANDABAM 230 KV
230 KV OKM-Thudiyalur Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
For Monthly mtce works and PMI works by lines TDLR wing.
During the lc period the other 230 KV feeders are in service to cater the ss loads.
subject to the load condition
existingCHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Pasumalai I feeder entire
For monthly maintenance work and line maintenance work
ANUPPANKULAM 230 KV
100 MVA AUTO TR. I, HV-I and LV-I Breaker with CT only.
Durin the LC period the Auto Tr. II & III will cater the load of Auto Tr. I. Hence No SS affected.
SUB TO LOAD CONDITION
Sunguvarchatram 400 KV
During the period of LC, the 230 Kv SVC- Sipcot will be in OFF condition, the 400 KV SPR SS will cater the load 230 KV SIPCOT
SS via 230 KV SPR - Sipcot #. Hence there will be no interruption to the 230 KV Sipcot SS.
Thiruvalam 400 KV
1.ICT-I in OFF Condition and ICT-2 in service for 230KV feeders.2.230KV TVLM-SINGARAPET # may be hand tripped if load on ICT-2 reached above 280 MW.3.400KV Alamathy-I # in
service through main breaker from 400KV Bus-I.
Subject to OCC approval
APP IN 131 OCC VIDE ITEM
NO.191
Thiruvalam 400 KV
1.ICT-1 in OFF condition and ICT-2 in service for 230KV feeders.2.230KV TVLM-Singarapet # may be hand tripped if
load on ICT-2 reached above 280MW.3.400KV Alamathy-1 # in service from 400KV Bus-I through its main breaker.
Subject to OCC approval
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, 230KV SPK-KLPKM-I&II, KLPKM-ECHUR FEEDERS WILL BE IN SERVICE
PALLADAM 230 KV
Auto Transformer II, HV,LV Breaker CT's and LAS
To carryout monthly maintenance work by AEE/M/Palladam
1)Other Three Auto transformers (I,III and IV) will be in service 2)110 KV Alagumalai SS availing total Shutdown3)110 KV
Muthalipalayam SS will fed from 230 KV Ingur SS4)No other SS will be affected
long lc recommended for auto tr 4
Subject to normalisation of Auto Tr 4
KODIKURICHY 230 KV
230 KV Veeranam - Abisegapatti feeder entire Line
Rectification of Jumper Bolts at Loc No:56, 65, 70 and 73
LC MAY BE PROGRAMMED
ON 13.6.17.SINCE OCC APP AS ITEM NO.139 ON 13.6.17
CUDDALORE 230 KV
For replacement of flashed over insulators in Loc no 40,41,49 Breaker monthly maintenance works
All the loads will be transferred to 230 KV Cuddalore – TAQA # . Hence no interruption of supply.
Postponed to 13/06/2017
During 110 KV Kullanchavadi
SS110 KV Thoppukollai SS
,110 KV Koranapattu SS will be availing total shutdown
VEERANAM 230 KV
230Kv Veeranam-Abisegapatti Feeder BR,CT with line switch
For Half yearly and Monthly Maintenance work.
During the LC period there will be no supply in the entire 230Kv Veeranam-Abisegapatti Feeder.Concurrence obtained
from SE/NCES/TIRUNELVELI.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN:APP
IN 131 OCC VIDE ITEM
NO.139new breaker erection is going on in
long lcKAYATHAR 230 KV
on 230 KV kayathar - TTPS I feeder breaker with CT, entire line and GRT testing.
a) For monthly maintenance workb) Tower to tower Inspection workC) GRT annual relay and breaker testing
during the LC period other end also avails LC and there will be no supply in the entire feeder. Hence, no ss affected.
SUB TO TTPS GEN
SF6 breaker open condition, Line and Bus MODS are open condition
new breaker erection is going on in
long lc
SINGARAPET 230 KV
110 KV Ramiyanahalli # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the shutdown period,1) 110 KV Ramiyanahalli SS programmed to avail total shutdown 2) 110 KV Harur SS and 110 KV Pappireddipatti SS loads will be fed from 230 KV SS
Karimangalam through 110 KV Karimangalam - Ramiyanahalli #hence no interruption of supply.
subject to ramiyanahalli ss availing tsd and transfer of
loads to karimangalam
ss feedSINGARAPET 230 KV
230 KV Gurubarapally # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
subject to the load condition
existingNALLAPPANAYAKANPATTY 230 KV
110KV Kodikuruchi Feeder Breaker with CT
110KV Kodikuruchi -Kadayanallur feeder radial from 230KV Kodikuruchi SS and concurrance obtained from other end.
Hence no SS affected.SUB TO WIND
GEN110KV Nangavally # Bkr,CTs & Line switch
jsw to be addressed
100MVA Auto Transformer I, LV I BR, HV & LV LAS, CTs and Isolators.
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to
any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.
SUB TO LOAD CONDITION
TONDIARPET 230 KV
50 MVA POWER TRANSFORMER- II AND 33 KV OHP FEEDER ONE BY ONE.
DURING THE PERIOD OF SHUTDOWN,50 MVA POWER TRANSFORMER- II WILL NOT BE IN SERVICE AND 33 KV OHP
FEEDER LOADS TO BE TRANSFERRED TO ALTERNATE FEEDING.Subject to CBD Concurrence
GENERATING
STATIONS
FOR MONTHLY MAINTENANCE WORK.
subject to the availability of
the other machines
GURUPARAPALLI 230 KV
230KV Shoolagiri and Singarapet feeder breakers, HV-I, HV-II, Auto I , Auto II, LV-I and LV-II breakers, GC-I and GC-II breakers, Pr Tr 110/33KV and Pr Tr 110/11KV, LV I and II breakers, 33KV and 11KV feeder breakers
Monthly maintenance work in 230KV Shoolagiri and Singarapet feeders, HV I and II, Auto I and II, LV I and II, 110KV Hosur and Karimangalam feeder breakers and GC-I and GC-II breakers, Pr Tr 110/33KV and Pr Tr 110/11KV, LV I and II breakers, 33KV and 11KV feeder breakers
1. 230KV Shoolagiri and Singarapet feeder breakers, HV-I and HV-II breakers to be hand tripped, BS/LS isolators of Shoolagiri and Singarapet breakers, HV I and HV II to be opened.2. LV I and LV II, 110KV Hosur and Karimangalam feeder breakers to be hand tripped ( Krishnagiri 110KV SS will be transferred and
fed by 230KV Karimangalam SS ). BS/LS isolators to be opened.3. GC I and II to be hand tripped, BS/LS isolators to be
opened. LV I and II breakers and all 11KV and 33KV feeder breakers to be hand tripped, BS/LS isolators to be opened.
11KV LV will be hand tripped after availing station supply from the feeder fed from Krishnagiri 110KV SS. Concurrence
obtained from SE/O/Thiruvalam, SE/KEDC/Krishnagiri, total shut down proposed at 230/110/33-11KV SS as per approval
received from CE/Distn/Vellore
occ approved and srldc to be addressed for
shoolagiri feeder; for the entire station lc tsd realization
is a must
110 KV ERODE-THINGALORE FEEDER BREAKER AND CT
DURING LC PERIOD 110 KV GANDHI NAGAR SS WILL BE UNDER TOTAL SHUTDOWN
subject to gandhinagarss
availing tsdTHINGALUR 230 KV
110KV Erode -II Feeder Breaker, CTs and Line Isolator.
110KV Gandhi Nagar SS availing Total shutdown.Other end also availing LC.
subject to gandhinagarss
availing tsd1.MEASUREMENT OF OPERATING TIME & CONTACT RESISTANCE OF 230KV SF6 BREAKER.2.DISTANCE PROTECTION RELAY TESTING WORK BY GRT/TTN
1.BOTH ENDS BREAKAR TRIPPED CONDITION2.BOTH ENDS ISOLATERS, LINE SWITCHES OPENED CONDITION3.BOTH ENDS
EARTH SWITCHES CLOSED CONDITION.SUB. TO TTPS &
WIND GEN.
TUTICORIN -AUTO 230 KV
SUB. TO TTPS & WIND GEN.
110 KV Capacitor Bank II Breaker and CTs only
FOR MONTHLY MAINTENANCE WORK
CAPACITOR BANK I IS IN SERVICE AND SUBJECT TO THE VOLTAGE CONDITION
subject to the voltage profile
in the gridKAYATHAR 230 KV
110 KV Kayathar - N.S.Puram feeder breaker with CT only
During the LC period the feeder will be radial from other end. Hence no ss affected.
SUB TO WIND GEN
558 Erode 55938 METTUR TPH machine -3 generator and all auxiliaries For Monthly maintenance possible Tue, 13-Jun-2017 7:00 Tue, 13-Jun-2017 17:00 1 Approved
559 Erode 55960 110 KV ALIYAR 230 KV 110KV Aliyar-Udumalpet-I will caters the load possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 16:00 1 Approved
560 Erode 55981 230 kv 0 Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0
561 Madurai 56002 230 KV For Monthly Maintenance Work. POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
562 Erode 56003 110 KV Monthly Maintenance possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
563 Madurai 56024 230 KV Auto Transformer - III For monthly maintenance work. 0 POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
564 Erode 56081 110 KV postponed Tue, 13-Jun-2017 7:00 Tue, 13-Jun-2017 17:00 1 Postponed
565 Madurai 56083 230 KV 100 MVA AUTO TR III HV III & LV III Br Monthly Maintenance work During the LC period Auto Tr I & II will be in service. POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
566 Chennai 56096 230 KV 230KV Acharapakkam # For monthly maintenance works. Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
567 Chennai 56097 110 KV For monthly maintenance works. Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
568 Madurai 56102 110 KV Monthly Mtce work 0 Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 16:00 1 0
569 Madurai 56127 230 KV 230 KV PGCIL-I # BKR &CTs All other feeders will be in service. POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
570 Erode 56174 230 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
571 Erode 56177 230 KV Both end LC appyied possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
572 Madurai 56208 230 KV Monthly Maintenance Works POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 Approved
573 Madurai 56243 110 KV For monthly maintenance Work POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 Approved
574 Madurai 56254 110 KV POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 0 Approved
575 Madurai 56268 110 KV For monthly maintenance work POSSIBLE Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 14:00 1 0 Approved
576 Erode 56278 110 KV ARASUR 230 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 12:00 1 Approved
577 Erode 56293 110 KV 110KV MDPH Feeder II For Monthly maintenance work During the LC period 110KV MDPH Feeder I will be in service possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
578 Madurai 56361 110 KV For Monthly Maintenance Work. POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 0 Approved
579 Erode 56401 230 KV 230/33 KV POWER TRANSFORMER -4 possible Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 Approved
580 Chennai 56429 230 KV 230 KV TIE BREAKER & CTS MONTHLY MTC ALL FEEDERS ARE IN SERVICE Possible Tue, 13-Jun-2017 7:00 Tue, 13-Jun-2017 10:00 1 0 Approved
581 Erode 56441 110 KV 110 KV Northern Bus Entire For monthly maintenance works possible Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 Approved
582 Madurai 56449 230 KV Monthly Maintenance Work No Interruption POSSIBLE Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 0 Approved
583 Chennai 56479 110 KV 110KV SPK-ORAGADAM-II FEEDER FOR QUARTERLY MTCE WORK Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
584 Madurai 56524 110 KV POSSIBLE Tue, 13-Jun-2017 8:00 Tue, 13-Jun-2017 17:00 1 Approved
585 Madurai 56535 110 KV POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
586 Madurai 56549 400 KV Monthly Maintenance work No feeder at 230KV bus so no SS affected. POSSIBLE Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 Approved
587 Chennai 56620 230 KV 230KV Sriperumbudur - Tharamani feeder Possible Tue, 13-Jun-2017 6:00 Tue, 13-Jun-2017 9:00 1 Approved
588 Erode 56636 110 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 15:00 1 Approved
589 Chennai 56648 230 KV Auto transformer - II. For routine maintenance work. Possible Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 0 Approved
GENERATING
STATIONS
During above LC period 230KV MTPS feeder and AUTO SS feeder in service, Machine 1,3&4 stand by condition. The PWD
demand at present meet out Through PWD Dam.low mettur dam
level
110KV Aliyar-Udumalpet-II # CB, CT& Line sec betw ALR & Dev.pudur SS
For Monthly Mtce works and line patrol works
subject to the feeder being kept radial
from udumalpet ss
end
Pudhanchanthai 230kv
230KV Bus-B MEHRU Makr PTs-3 Nos.230KV Deviakurichy feeder SCT make CTs-3 Nos.110KV Namakkal, Rasipuram, Pudhansandai, Namagiripet, KN Patty, Valayapatty #s LAMCO make CTs-18 Nos.110KV LV-I and LV-II LAMCO make CTs-6 Nos.110KV Bus Coupler LAMCO make CTs-3 Nos.
For Tan Delta Testing of 110KV LAMCO make, 230KV & 110KV SCT make CTs. and 230KV MEHRU make PTs.Wherein the last Tan Delta test Values were noticed in rising trend.
During LC period 1.230KV Bus-B idly charged through Bus Coupler CB & CTs will be hand tripped for 30 minutes for Tan Delta testing of MEHRU PTs. 2.230KV Deviakurichy feeder will be kept radially charged from Dvk end for 30 minutes for Tan
Delta testing of SCT make CTs. 3.110KV Namagiripet SS will be transferred to 110KV DVK-Thammampatty feeder. 4.110KV
Pudhansandai SS will be back fed through 110KV PSI-Rasipuram feeder for 30 minutes. 5.110KV KN Patty SS will be back fed through 110KV PSI-Rasipuram feeder for 30 minutes and then, 6.110KV Rasipuram SS will be transferred to 110KV
Salem-Malllur feeder. 7.110KV Namakkal and Valayapatty feeder loads will be fed vice-versa for Tan Delta testing of
LAMCO make CTs in both these feeder. 8.110KV East and West Buses fed by Auto-II & I, will be separated for 30 minutes for LAMCO Bus Coupler CTs Tan Delta testing. 9.110KV LV-I and
LV-II LAMCO make CTs will be tested for TAN Delta values one after other for 30 minutes. No supply interruption.
Subject to load condition
PUGALUR 230 KV
Auto transformer II, HV II and LVII Breaker,CT's and LAS only.
During the L.C Period HVII and LV II are tripped condition. There is no interruption to any SS. 110KV Velliyanai SS 110KV Manmangalam SS are proposed total shutdown. Load contain
with in two auto transformer (I & III)
SUB TO LOAD CONDITIONN
PALLAKAPALAYAM 230 KV
110 KV Bus Coupler, CT, Breaker and Switches
1) BKB-I and Sankari-I feeder load will be managed by Auto-I.2) Sankari-II, Barriage-IV and Thevur feeder load will be managed
by Auto-II
subject to the division of
loads
KODIKURICHY 230 KV
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONDITION
NOT MENTIONED
THUDIALUR 230 KV
110 KV Kothagiri spur line section between Kattabettu & Kothagiri
Stringing 3 Nos. Panther conductor and 1 No. Earth wire from LOC No. 17-21 (GCC works)
Approval to be obtained from CE/D/CBE for 110 KV Kothagiri SS S/D.
ce d cbe has deferred the
work to 17.06.2017
SRPUDUR 230 KV
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENVILLUPURAM 230 KV
During the period of LC:(i)Other 230KV feeders Thiruvannamalai & Ulundurpet will be in service condition.
VILLUPURAM 230 KV
110KV VPM – TKR# (Between Karanaiperichanur & TKR)
During the period of LC:(1)Replacement of Weak Insulator at location No .4 of Karanaiperichanur LILO.The Line Insulator
towards TKR will be K/O at Karanaiperichanur.The feeder will be radial from VPM upto Karanaiperichanur and from DVK upto TKR SS .Devaradiyarkuppam, Pudupattu & Sankarapuram SS
availing Total shut down.(2)Hence no Interruption to any of the SS.
ALAGARKOIL 230 KV
110KV ALKL-KOTTAMPATTY # (Radial) Bkr with C.T
Kottampatty, Singampunari,A.Thekkur,S.PudrThuvarangurichy loads will be transferred to 110KV ALKL-Karaikudi # feeding radial from kkdi..110kv Alkl –KKDI # loads will be fed from
AlkluptoThaniyamangalam SS
Subject to EE/SLDC/ Madurai concurrence
KARAIKUDI 230 KV
230 KV PGCIL-I # BKR &CTs - Monthly maintenance works
APP IN 131 OCC VIDE ITEM NO.
UDUMALPET 230 KV
230KV Myvadi link I # Breaker & Line entire
FOR MONTHLY MAINTENANCE WORKS
MYVADY I- DURING THE LC PERIOD 230KV MYVADY LINK II FEEDER WILL CATER THE 230 KV MYVADY LINK I FEEDER
subject to the load condition
existingUdumalpet 400 KV
230 KV Myvadi-Udumalpet Link-1 feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
subject to the load condition
existing
PASUMALAI 230 KV
100 MVA AUTO - I, HVB - I, LVB - I , CT only.
1)Auto Transformer - 2 will be in Service. 2)110KV Pasumalai - Sembatty feeder will be kept radial from Sembatty end. 3) 110KV Pasumalai - Alagarkoil -1 Feeder is kept radial from
Pasumalai feeding Anupanadi SS 4) 110KV Pasumalai - Sakthisugars Feeder section between Pasumalai to
Uranganpatti will be under LC 5) 110/33-11KV Villapuram SS and 110/11KV Kappalur SS will be under Shutdown Relief -
43.51 MW. 6)Hence there is No interruption of Supply to any SS.
SUB TO LOAD CONDITION
SANKANERI 230 KV
110KV Sankaneri-Melakallur feeder Breaker CTS&Lineswitches. .
During the LC Period 110KV Melakallur Supply Radialy upto 110KV VadakkanKulamSS. Hence no SS will be affaected.
SUB TO WIND GEN
PASUMALAI 230 KV
110KV Pasumalai - Sakthi Sugars # Section between Pasumalai and Uranganpatty
1) Maintenance Works of BKR & CT, LI only. 2) Tree Cutting and Tower to Tower Inspection works .
1) The sakthisugars feeder is kept fed from Alkl end through 110KV Alagarkoil - Karaikudi Feeder feeding Uranganpatty SS,
Nattarmanaglam , Nelmudikarai and Arasanoor SS upto Sakthisugars. 2) At Uranganpatty SS the switch towards
Pasumalai SS is kept opened 3)110KV Sakthisugar -Sivaganga Feeder will be in grid . 4)110KV Alagarkoil - Karaikudi Feeder is
radial from Karaikudi upto Narasingampatti SS. 5) At Narasingampatti SS the switch towards Alagarkoil is kept open.
6) 110/33-11KV Villapuram SS will be under Shutdown.PERAMBALUR 230 KV
110KV Siruvachur Feeder breaker CT's only
During the above period of shut down 1)110KV Siruvachur SS also avaling total shut down. 2)110KV Pudukurichy SS and MRF
load will be fed from 110KV Kalakudy Grid SS.
110 KV ARASUR-KARUVALUR-I FEEDER BREAKER AND CTS ONLY.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V ARASUR-KARUVALUR FEEDER RADIAL FROM 230 K V KARUVALUR SS AND FED THE
LOADS.
subject to the feeder being kept radial
from karuvalurss endMETTUR AUTO
230 KVsubject to feeder 1
loading limitANUPPANKULAM 230 KV
110 KV APKM-Thulukkapatti-II feeder Br., CT., and Line entire.
During the LC period the 110 KV Thulukkapatti I feeder will cater the load of 110 KV Thulukkapatti II feeder. Hence no SS
will be affected.SADAYAMPALAYAM 230 KV
MONTHLY MAINTENANCE WORKS AND P&C CHECKS.
CONNECTED 33 KV LOADS WOULD BE SHARED BY POWER TRANSFORMERS 1&3 IF WITHIN THE LIMIT.
subject to the other power trs
loading limitORAGADAM 230 KV
PONNAPURAM 230 KV
WITH MEDIUM WIND POWER GENERATION, 1.110KV PNPM SS GC II WILL BE TRANSFERRED TO 110KV INGUR II #2.110KV MARUTHUR # WILL BE FED FROM 230KV PALLADAM SS /
110KV PALLADAM # UP TO THIS END 3.AUTO TR II WILL BE CUT OFF & IT IS EXPECTED THAT THE LOAD WILL BE WITH IN
LIMIT OF OTHER TWO AUTO TRSHENCE NO SS WILL BE AFFECTED.
subject to the load condition
existing
SAMAYAPURAM 230 KV
230KV Bus Coupler Breaker & isolotors (idle)
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT, 110KV SPK-ORAGADAM-I & 230KV SPK-ORAGADAM FEEDERS WILL BE IN SERVICE
KAYATHAR 110 KV
110KV KAYATHAR-N.SUBBIAHPURAM FEEDER SEC B/W KAYATHAR&VIJAYAPURI
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION
DURING THE LC PERIOD,VIJAYAPURI SS WILL BE RADIALLY FED FROM N.S.PURAM.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENVALUTHUR 230 KV
110KV Arkay -Keelakarai-Valinokkam-Kavanoor feeder section between Arkay and Keelakarai
For attending Tower to Tower Inspection and Tree cutting work.
110KV supply radially fed to 110KV Keelakarai ss from 110KV kavanoor - Volinokkam feeder fed from Kavanoor SS
KANARPATTY 400 KV
400/230KV ICT 2, HV breaker with ct 406 Bay and tie breaker with CT 405 Bay
SUB TO WIND GEN: APP IN
131 OCC VIDE ITEM NO.195
KADAPPERI 230 KV
Insulator and jumper replacement work.
230KV Kalivanthapattu - Tharamani feeder and 230KV KITS - Tharamani feeder will be in service.
Subject to CBD Concurrence
Singarapet 110 KV
110KV SINGARAPET - VINNAVANNUR # UP TO CHENGAM SS
FOR MONTHLY MAINTENANCE WORK AND VARIOUS LOCATION FOREST AREA TREE CUTTING WORK AND CUT POINT JUMPER TIGHTNESS WORK.
DURING THE LC PERIOD,1. BLINK FOR OPENING OF 110KV CHENGAM SS TOWARDS SINGARAPET SIDE LINE SIDE ISOLATORS2. HENCE, NO INTERRUPTION OF SUPPLY.
chengam ss to be fed from
vinnavanur ss end from
thiruvannamalai ss end
THIRUVERKADU 230 KV
During the period of shutdown 230/110kV,100MVA Auto transformer -I will be in service,Hence no interruption.
590 Chennai 56676 110 KV Possible Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 0 Approved
591 Madurai 56693 110 KV POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
592 Chennai 56719 230 KV Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 15:00 1 0 Repeat
593 Chennai 56740 230 KV i)For Monthly Maintenance Works Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 15:00 1 0 Approved
594 Madurai 56789 230 KV POSSIBLE Tue, 13-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 3 Approved
595 Madurai 56793 110 KV POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
596 Madurai 56814 230 KV 230KV Bus entire POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 Approved
597 Madurai 56829 110 KV 110kv Thiruvarur - T.R. Pattinam feeder POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
598 Madurai 56889 110 KV then I 230 KV for Tree cutting works POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 13:00 1 Approved
599 Chennai 56913 230 KV Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 16:00 1 0 Approved
600 Chennai 56920 110 KV Monthly maintenance work Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 15:00 1 0 Approved
601 Chennai 56921 110 KV 110 KV Bus Section Breaker & CT's only Monthly maintenance work Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 14:00 1 0 Approved
602 Chennai 56936 110 KV For monthly maintenance works Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
603 Chennai 56937 230 KV 230 KV Taqa-Perambalur entire FEEDER 230 KV Perambalur SS will be fed from 230 KV Trichy SS Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
604 Erode 56953 110 KV possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
605 Erode 55756 KUNDAH PH2 0 Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 0 Approved
606 Chennai 55811 110 KV ECHUR 230 KV 110 KV Echur-Mazhayur# Possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 16:00 1 Approved
607 Madurai 55831 110 KV For Monthly Maintenance work POSSIBLE Tue, 13-Jun-2017 10:00 Tue, 13-Jun-2017 17:00 1 0 Approved
608 Erode 55861 230 KV For Monthly Maintenance work possible Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
609 Madurai 55869 400 KV kayathar400kv For Monthly Maintenance Work. POSSIBLE Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 Approved
610 Madurai 55870 400 KV kayathar400kv For Monthly Maintenance Work. 0 Tue, 13-Jun-2017 9:00 Tue, 13-Jun-2017 17:00 1 REPEAT Repeat
935 Erode 55722 230 KV KUNDAH PH4 Thudiyalur feeder Monthly maintenance work Standby postponed Tue, 13-Jun-2017 8:00 Tue, 13-Jun-2017 17:00 1 Approved
611 Erode 55496 110 KV possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 16:00 1 Approved
612 Madurai 55500 230 KV POSSIBLE Wed, 14-Jun-2017 0:00 Wed, 14-Jun-2017 0:00 1 Approved
613 Erode 55511 230 KV MTPS MTPS.I TO SINGARAPET FEEDER Monthly maintenance work. Programed LC possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
614 Madurai 55535 110 KV POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
615 Erode 55553 230 KV possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 14:00 1 Approved
616 Madurai 55628 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
617 Erode 55629 230 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
618 Erode 55639 110 KV 110KV Bus coupler breaker & CT only. Monthly Maintenance work. possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 15:00 1 Approved
619 Chennai 55022 230 KV 230 KV Athipet-Mosur feeder All other feeder will be in services Possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 0 Approved
620 Chennai 55646 400 KV 400 KV HV-III breaker (1652) Quarterly maintenance work Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
GUMMIDIPOONDI 230 KV
110KV Periyapalayam feeder, Breaker, CT Line Isolators
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
During the Period of Shut down the 110KV Periyapalayam SS availing Total Shut down. Concurance to be obtained from JR
Metals EHT
NEMALITHIPIYAKUDI 230 KV
110KV Pattukkottai-Karambayam-N.T.kudi-II feeder (line portion between pattukkottai ss to karambayam 110kv ss)
For Premonsoon inspection work by AE Lines pattukkottai
1) During the LC period 110 KV N.T.kudi-pattukkottai-I feeder in service. 2) If necessary, 110KV Pattukkottai SS will be fed
from Kovilkalappal by closing 110KV line isolator No.2 at Madukkur SS (Kovilkalappal-Madukkur-Pattukkottai) and 110KV
Madukkur feeder Breaker hand tripped at 230KV Nemmeli Thippiyakudi SS. 3) 110KV KARAMBAYAM SS Radially fed from 230KV N T KUDI SS. 4) 110KV NT KUDI-II Feeder Breaker Hand
Tripped condition at 110KV Pattukkottai SS.
TONDIARPET 230 KV
50MVA POWER TFR-II & 33KV OHP FEEDER
FOR ROUTINE MAINTENANCE WORKS.
DURING THE PERIOD OF S/D EXCEPT 50MVA POWER TFR-II AND 33KV OHP FEEDER,ALL OTHER FEEDERS AND EQUIPMENT'S WILL BE IN SERVICE.33KV OHP LOADS TO BE TRANSFERRED
TO ONE POWER TFR.
Repeat 55690
THIRUVALAM 230 KV
i)On 110KV Sugar Mill Feeder Breaker and CT’s
During the period of LC i) Auto-Tr-I ,HV-I,LV, Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV, will be in service and cater the SS Loads.ii) The 110KV Sugar
Mill Feeder will be in ‘OFF’ Condition iii) The 230KV Link-II, 230KV Chittoor interstate feeders,230KV Link-I # and 230KV Mosur feeders will be in service and cater the SS Loads. Hence
there will be no interruption of supply please.
SEMBATTY 230 KV
230KV SBT - Theni # Bkr, CTs, line switch and line entire
1. Line isolator replaced by SSE2. Monthly maintenance work3. Tree cutting work Hence no interruption to any SS.
During the LC period other end is also availing LC and Line LC programmed by TLC Wing from 13.06.17 to 24.06.17
ALREADY LONG LC FROM
13.6.17 TO 24.6.17
SEMBATTY 230 KV
1. 110KV Theni I # Bkr, CTs and sec. bet. SBT and Ayyampalayam SS2. 110KV Theni II # Bkr, CTs and sec. bet. SBT and Nilakkottai SS
1. Monthly maintenance work2. Tree cutting work
During the LC period, 1. Ayyampalayam SS is availing total shutdown, the # will be radial from other end upto AYPM.2.
Batlagundu SS is availing total shutdown, the # will be radial from other end upto BTL.Hence no interruption to any SS.
SUBJECT TO LOAD & WIND
GEN.
PASUMALAI 230 KV
For erection of new breaker in 230KV Checkanurani-2 feeder.
During the LC Period, 1.Auto Tr.1&2 will not be in service. 2.230kv Checkanurani-2 feeder kept already RFOE.3.230kv
Anuppankulam,TTPS,Kayathar,Alagarkovil and Checkanurani-1 feeders will be kept RFOE.4.110kv Bus will be in grid. 5.110KV
Villapuram and Kappalur SS will be under total shutdown.6.Hence,there is no interruption of supply to any
Sub-Station.
SUB TO LOAD CONDITION
THIRUVARUR 230 KV
1)Line pre-monsoon inspection and rectification works, ii)Breaker ,C.T, Line isolator Maintenance works
110KV Thiruvarur - T.R. Pattinam feeder is an idel feeder. Hence there will be no interruption of supply to any SS.
110KV Periyar - Theni Feeder II (Kadamalaigundu 110KV SS spur line)
110KV Kadamalaigundu SS will be under total shut down No other SS affected
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONCURRENCE
FROM WIND GENERATORS
ACHRAPAKKAM 230 KV
110KV Western bus maintenance & 230/110KV 100MVA Auto Transformer-I HV and LV Breaker anc CT's
To Carryout Half yearly Maintenance work and monthly Maintenance work
1.100MVA Auto Transformer -I, HV&LV Breaker will be hand tripped condition.2.100MVA Auto Transformer -II will be in
service condition.3.110KV ACK-Villupuram I & II Feeder will be radially charged from other end.4.110KV ACk-Murukeri Feeder will be hand tripped condition and 110KV Murukeri SS load will be transferred to 110KV S.P.koil-II Feeder through 110KV illedu
SS Via.5.110KV bus tie isolator will be opened and locked condition.
THIRUVANNAMALAI 230 KV
110 KV T.V.Malai-Kanji # , Breaker, CT's and line Isolator
During the period of L/C time,1. 110 Kv Kanji SS availing total S/d,2. 110 KV Solar Generation and 110 KV Adhamangalam SS
loads will be fed from 230 Kv Arni SS. Hence there is no interruption of supply please.
THIRUVANNAMALAI 230 KV
During the period of L/C time Autotransformer I & II will be independently fed the station loads please. There is no
interruption of supply to any of the SS
CUDDALORE 230 KV
The 110KV Cuddalore – Kulanchavadi # breaker with CT’s and line side isolatorAuto transformer I HV & LV breakers with CTs
.110 KV Cuddalore –Kullanchavadi feeder .110 KV Kurunjipadi SS loads will be transferred to 110 KV Neyveli TS - I –
Vadakuttu # .110 KV Kullanchavadi SS110 KV Thoppukollai SS ,110 KV Koranapattu SS will be availing total shu Hence no
interruption of supply
CUDDALORE 230 KV
Replacement of flashed over insulators at loc. No 76,92,153,171 and for checking jumper tightness at railway crossing locations. Loc.Nos. 82-83 & 30-31.
Subject to EE/SLDC/Madurai concurrence
DEVIAKURICHI 230 KV
110 KV Singapuram- Deviakurichi I Feeder (Section between Singapuram 230KV SS - Attur ss) Thumbal Spar line.
110 KV Singapuram- Deviakurichi I Feeder Thumbal Spar line jumper tightness work
1)Thumbal 110KV SS availing total shutdown .2)Deviakurichi 230KV SS radial fed from upto Attur 110KV SS End 3)There will
be no interruption of supply any other SS.
subject to thumbal ss
availing tsd and the feeder being kept
radial from dvki ss after thatGENERA
TING STATIO
NS
UNIT-5 GENERATTOR SF6 BREAKER, POWER TRANSFORMER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
Monthly maintenance work in 110 KV Echur- Mazhayur# 110 KV Breakers, CT’s,Pt’s & Isolators
at the time of LC1.110 KV Echur - Mazhayur # the 110 KV Mazhayur # Bkr will be H/T, and Entire load of 110 KV
Mazhaiyur, Chetpet and Thayanur SS Load transferred to 230 KV Villupuram SS.2. After completion of work Entire load is
bring back to Echur SS, and 110 KV Mazhaiyur # Bkr will be in charged condition.Hence No interruption of supply to any of
the substation
Subject to Load condition
EACHANGADU 230 KV
110KV ICL-I & ICL-II feeder Breaker and CT's only One by one.
During the shutdown period, there will be No interruption to the EHT Consumer . Concurence also obtained from the
concerned.DEVIAKURICHI 230 KV
100 MVA Auto Transformer – II HV & LV Breakers and CTs
Auto Transformer I will be in service. 110 KV Deviakurichy-Singipuram feeder I and II will be kept radial from Singipuram
230kv ss end
subject to the other auto tr loading limit
400 KV Main Breaker for ICT2 (410-52) 400KV Tie Breaker for ICT2 & ICT3 (411-52) & 230 KV LV Breaker for ICT2 (206-52), 400/230KV ICT2
During the LC period there will be no supply in 400 KV Main Breaker for ICT2 (410-52) 400KV Tie Breaker for ICT2 & ICT3 (411-52) & 230 KV LV Breaker for ICT2 (206-52), 400/230KV
ICT2. Hence No SS affected.
SUB TO WIND GEN:APP IN 131 OCC VIDE ITEM
NO.196400 KV Main Breaker for ICT2 (410-52) 400KV Tie Breaker for ICT2 & ICT3 (411-52) & 230 KV LV Breaker for ICT2 (206-52), 400/230KV ICT2
During the LC period there will be no supply in 400 KV Main Breaker for ICT2 (410-52) 400KV Tie Breaker for ICT2 & ICT3 (411-52) & 230 KV LV Breaker for ICT2 (206-52), 400/230KV
ICT2. Hence No SS affected.ph 2 to ph 3
feeder lc recommeded
LOWER METTUR 1
110KV BPH1-BPH2 Feeder, line side Isolator and Earth Switch
Monthly maintenance works in Feeder equipment and its line side Isolator and Earth Switch
a) During the LC period Unit 1&2 will be in Non-Standby conditionb) The other end BPH-2/NPT applied LC on that day on 14.06.2017c) 110KV BPH1-DPH Feeder will be in Service.
subject to the load condition
existing
VEERANAM 230 KV
Power Transformer-II,HV-II BR,LV-II BR and 33kv Feeders Ramco,Windfarm &Enercon.
For Half Yearly and Monthly Maintenance Work.
During the LC Period there will be no supply in the entire Power Transformer-II,HV-II BR,LV-II BR and 33kv Feeders Ramco,Windfarm &Enercon.Concurrence obtained from
SE/NCES/TIRUNELVELI.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENsubject to the load condition
existingKAYATHAR 230 KV
on 110 KV Kayathar - Arumuganeri feeder, breaker with CT and sec between Kayathar and Palayakottai
a) For monthly maintenance workb) Tower to Tower inspection work
During the LC period palayamkottai SS will be fed from 110 KV arumuganeri SS, Hence no ss affected.
SUB TO LOAD CONDITION
SINGARAPET 230 KV
230 KV MTPS # Breaker, CTs& line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
subject to the load condition
existing110KV Thiruvachi # Breaker, CTs, ,Isolators and Line side Isolator
subject to the load condition
existingAuto Transformer III and its HV & LV Breakers with CT’s ,Isolators and Line side Isolator
SIPCOT - I TOTAL SHUT DOWN ON THAT DAYDEPENDING UPON LOAD COPNDITION
subject to the other auto trs loading limit
ANTHIYUR 230 KV
during the LC period Auto Transformer I will feed 110KV Malco , 110KV Barrage III and 110KV Anthiyur feeders. Auto Transformer II will feed 110KV Thalavaipet and 110KV Gobi
feeders. No SS will be affected.
subject to the division of
loadsKORATTUR 230 KV
Jumper Tightness work at various location
Sriperumbudur 400 KV
During the period of shutdown Auto-Transformer-III fed by 400 KV tie-II breaker
Subject to OCC concurrence
APP IN 131 OCC IDE ITEM NO.205
621 Erode 55758 110 KV KUNDAH PH2 0 Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 0
622 Madurai 55788 230 KV For monthly maintenance work. During the LC period, no other SS will be affected please. POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
623 Chennai 55805 230 KV 230KV Kalivanthapattu -Feeder Quarterly Maintenance 1.OCC Approved 2.230KV S.P.Koil #, will be in service. Possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 14:00 1 Approved
624 Madurai 55873 110 KV kayathar400kv 110 KV Bus Coupler Breaker (104-52) For Monthly Maintenance Work. POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 0 Approved
625 Erode 55945 110 KV Jumper tightness checking Villipalayam SS total shutdown possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
626 Madurai 56027 110 KV 0 POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
627 Chennai 56232 110 KV Possible Wed, 14-Jun-2017 11:00 Wed, 14-Jun-2017 17:00 1 Approved
628 Madurai 56251 110 KV EE / O / Kinnimangalam has also programmed POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 14:00 1 Approved
629 Erode 56281 110 KV ARASUR 230 KV possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 15:00 1 Approved
630 Erode 56314 230 KV 230 KV OKM-Thudiyalur Feeder Entire PMI works by Lines TDLR wing possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
631 Erode 56315 110 KV For Monthly mtce works. possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 14:00 1 Approved
632 Erode 56322 230 KV possible Wed, 14-Jun-2017 8:00 Wed, 14-Jun-2017 17:00 1 Approved
633 Erode 56331 110 KV KUNDAH PH6 110 KV KPH6 - S'Nallah # @ KPH6 Annual relay testing work # will be radial from other end possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
634 Madurai 56359 230 KV 230 KV A BUS ENTIRE For monthly maintenance work During the LC period all the 230 KV feeders are in B Bus POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 0 Approved
635 Madurai 56364 110 KV For monthly maintenance work. POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 14:00 1 0 Approved
636 eROde 56085 230 KV possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
637 Chennai 56100 230 KV For monthly maintenance works. Possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 0 Approved
638 Erode 56131 230 KV 400KV Karamadai-MTPS stage 3 feeder II During LC period other 400KV feeders will be in service. possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 Approved
639 Chennai 56140 110 KV 110KV Villupuram-Kandamangalam # For monthly maintenance works. Possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 0 Approved
640 Erode 56176 230 KV possible Wed, 14-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 4 Approved
641 Erode 56178 230 KV 230KV Idukki # Breaker & Line entire . possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
642 Erode 56179 230 KV Both end LC appyied possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
643 Madurai 56197 230 KV Monthly Maintenance Work POSSIBLE Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 Approved
644 Chennai 56410 400 KV For Monthly Mtce. work Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
645 Madurai 56450 110 KV Monthly Maintenance Work. POSSIBLE Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 Approved
646 Erode 56461 230 KV MTPSII 230KV METTUR AUTO SS FEEDER possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
647 Erode 56470 110 KV It is Tie feeder hence there is no interruption of power supply. possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
648 Chennai 56507 230 KV MOSUR 230 KV Possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 14:00 1 0 Approved
649 Chennai 56545 400 KV 400/230 KV ICT#4 will be in service via Tie breaker 8(1)52. Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 Approved
650 Chennai 56570 110 KV 16MVA Power Transformer I Monthly maintenance work. 16MVA Power Tr. II & III will be in service. Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 12:00 1 0
651 Erode 56594 230 KV possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
652 Chennai 56756 110 KV MANALI 230 KV 110 KV METRO WATER FEEDER Possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 0 Approved653 Chennai 56818 230 KV MOSUR 230 KV Athipattu Feeder Line Line Clear There will be no interruption of supply. Possible Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 14:00 1 0 Approved
654 Madurai 56833 110 KV POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
655 Chennai 56860 110 KV 110KV Local Alamathy #. Possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 0 Approved
656 Erode 56862 110 KV For monthly maintenance works possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 Approved
657 Erode 56870 BHAVANISAGAR - MHPH - UNITS I & II possible Wed, 14-Jun-2017 8:00 Wed, 14-Jun-2017 17:00 1 Approved
658 Madurai 56890 230 KV then I 230 KV monthly mtce works No Interruption POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 13:00 1 Approved
659 Chennai 56897 230 KV CMRL 230 KV Auto Transformer - II Monthly maintenance Possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 16:00 1 0 Approved
660 Madurai 56611 110 KV 110KV KNMLM - PSQ II Feeder EE/O/PSQ has also programmed POSSIBLE Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
661 Chennai 56619 110 KV 110 Alamathy feeder and its equipments 110 KV Alamathy feeder will not be in service. Possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 0 Approved
662 Chennai 56653 110 KV 110KV Siruseri-II # Maintenance work Possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 0 Approved
663 Chennai 56671 110 KV 110 KV Velachery UG feeder Maintenance works load will be transferred to some other SS Possible Wed, 14-Jun-2017 10:00 Wed, 14-Jun-2017 17:00 1 0 Approved
110KV THUDIYALUR FEEDER NO 1&2 SF6 BREAKER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
Subject to EE/SLDC/ Erode concurrence
TUTICORIN -SIPCOT 230 KV
On 230 KV Sipcot- Chekkanoorani feeder breaker with CTs and line isolators only. (Through Bus Transfer Breaker)
SUB TO LOAD CONDITION
VEERAPURAM 230 KV
Subject to load condition
During the LC Period there will b e no supply in 110 KV Bus Coupler Breaker (104-52). Hence no SS will be affected.
UNJANAI 230 KV 110KV Pugalur- Kabilarmalai# line portion between Kabilarmalai SS and P.Velur SS
subject to villipalayam ss
avaling tsd
KODIKURICHY 230 KV
1)110 KV Kayathar # Breaker with CT & Line Isolators2)On 110 KV Kodikurichi - Kayathar #- Kanarpatti# Section between Kodikurichi - Keelapavoor SS
1)Monthly maintenance work2)for replacement of defective insulators and Jumper bolt at locNo:37,12,11 and 27
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
ATHIPET 230 KV 110KV Bus entire & 100MVA AutoTransformer
Routine Maintenance work and insulators cleaning to avoid corona discharge.
1) Back feeding to 110KV L&T # will be arranged from Manali 230KVSS.2) 10KV CCTL # and 25MVA Power Transformer will
be placed under Shutdown.Subject to CBD
concurrencePASUMALAI 230 KV
1) 110 KV Pasumalai - Kinnimangalam (Theni) # - II BKR & CT,LI only. 2) Line Entire
1)Maintenance Works of BKR & CT,LI 2) Tree Cutting works
SUB TO LOAD CONDITION
110 KV ARASUR-KARUVALUR-II FEEDER BREAKER AND CTS ONLY.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V ARASUR-KARUVALUR-II FEEDER RADIAL FROM 230 K V KARUVALUR SS AND FED THE
LOADS.
subject to the feeder being kept radial
fromkaruvalur ss end
OTHAKKAL MANDABAM 230 KV
During the lc period the other 230 KV feeders are in service to cater the ss loads.
subject to the load condition
existingOTHAKKAL MANDABAM 230 KV
110 KV OKM-R.S.Puram 2 Feeder (Breaker, CT's & Line Switch)
1.110KV Rspuram total S/D2.110KV OKM-RSPM 2 # loads will be transferred to 110KV OKM-RSPM I feeder.3.During the lc
period no ss will be affected.
subject to transfer of
loads to feeder 1
METTUR AUTO 230 KV
230KV MTPS-II FEEDER & 230KV Hosur Feeder with Auxiliary bus entire and 230kv bus coupler breaker
230KV Auxiliary bus Y phase damaged bus conductor replacement work
1 230KV palavadi & 230KV MTPH Feeders will be in service2 230KV Main bus will be in service
subject to the load condition
existing in bothsubject to the load condition
existingCHECKANURANI SW STATION 230 KVANUPPANKULAM 230 KV
110 KV Capacitor Bank - II Br., CT. and line switch only.
During the LC period the 110 KV Capacitor Bank - II will be Hand Tripped condition.
THUDIALUR 230 KV
1. 230 KV TDLR-OKM feeder line entire2. 110 KV Karamadai -II feeder Breaker , CTs3. 110 KV sandinalla feeder Breaker, CTs
1. For PMI works.2. For Monthly Maintenance works.
1. 230 KV OKM SS load will manage from 230 KV OKM - CBE feeder.
subject to the load condition existing in all
VILLUPURAM 230 KV
Auto Transformer-I & Southern Bus,110KV T.V.Nallur
During the period of LC:(1)T.V.Nallur SS availing total shutdown.(2)Auto Transformer-I will be OFF condition and Auto
Transformer-II will be in service condition.
KARAMADAI 230 KV
Monthly maintenance works of main and tie breakers and CT's, line side CVT's and isolators
occ approved and subject to
the load condition existing
Villapuram 110 KV
During the period of LC:1.110KV AB Switch at Valavanur SS towards Villupuram SS side will be kept open.2.110KV
Valavanur SS& 110KV Kandamangalam SS will be availing Total shutdown. The line insulator towards Valavanur at Villupuram.3.Hence no interruption of supply in any SS.
UDUMALPET 230 KV
Auto transformer.NoII , HV.II,Vertical Switch & Main bus Switch
Vertical Switch & Main bus Switch concrete Supporting structure chemical treatment
3 AUTOS ARE IN PARALLEL . LOADS ARE SHARED WITH OTHER TWO AUTOS.
long lc already approved
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 230KV Myvadi I&II FEEDERS
occ approved and srldc to be
addressedUdumalpet 400 KV
230 KV Myvadi-Sempatty feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
subject to the load condition
existing
AMUTHAPURAM 230 KV
230/33KV Power transformer-2 HV,LV Breakers with CT's and its 33KV feeder
1) During the LC period there will be NO supply in P.Tr-2 and its 33KV feeders. 2) If there is wind generation its 33KV
feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENSunguvarchatram 400 KV
315 MVA, 400/230 KV Auto Tr.-II entire with Tie-4 breaker
During the period of LC, the 400/230 Kv Auto - I will be in service and cater the load of Auto Tr.-II without interruption
Subject to OCC concurrence
APP IN 131 OCC IDE ITEM NO.204
SAMAYAPURAM 230 KV
110 KV SMPM- Srirangam # Breaker and CT's only (Tied feeder)
(A)During the LC period 110KV SMPM-Srirangam feeder will be radially fed from 230 KV Auto SS-Trichy. (B) 110KV
Samayapuram SS is also availing shutdown on that day. (C) Concurrence obtained from 230KV Auto SS, Trichy. (D) No
interuption to any other 110 KV SS
SUB TO LOAD CONDITION
MONTHLY MAINTENANCE WORKS TO BE CARRY OUT
UNIT IN SERVICE. ALL 400KV PALAVADI-I&II AND KARAMADAI-I&II & ICT-I&II ARE IN SERVICE. ALL 230KV MTPS-I,GOBI AND
STANDBY TRANSFORMER EXCEPT THINGALUR FEEDER ARE IN SERVICE.
subject to the load condition
existing
KARIAMANGALAM 230 KV
1.110 KV Ramiyanahally feeder breaker,CTs, Line switch
Carryout Monthly Maintenance works by Maintenance wing
subject to the feeder being kept radial
from singarapet ss end
230 KV Mosur - Athipattu feeder Breaker, CT’s and Line isolators only
For attending monthly maintenance work
i). 230 KV Thiruvalam feeder and 230 KV Alamathy feeder are in service.ii) 110 KV Feeders all are in service. iii). Hence there
will no interruption of supply please.Alamathy 400 KV
400/230 KV ICT#4 main breaker only 7(1)52
For maintenance work and CT tan delta testing work.
Subject to OCC concurrence
APP IN 131 OCC IDE ITEM NO.203
KADAPPERI 230 KV
Approval from SE/Operation
Approval from SE/Operation
PALLADAM 230 KV
230 Palladam - Kurukathi # breaker CT's and line entire
To carryout monthly maintenance work by AEE/M/Palladam and to carryout premonsoon inspection work by AE/Lines/Palladam
1)Other three 230 KV Feeders (PGCIL,Othakalmandapam and Sadayapalayam )will be in service 2)110 KV SS loads will be transferred to 230 KV Ingur SS 3)No other SS will be affected
subject to the wind
generation support being available for
the 110 kv endFor Jumper Tightening Work and Clearing of Trees
110KV Metro Water Feeder will not be in serviceAfter LC Work : 110KV Metro Water Feeder will be in service
THIRUVARUR 230 KV
110 KV Thiruvarur - Mannargudi feeder BKR
Line premansoon inspection and rectification work, Breaker, CT's and Line side isolator maintenance work
During the LC period the 110KV Ullikottai SS, 110KV Okkanadu Kelaiyur SS, 110KV Mannargudy SS Supply will be fed from
T(K)GTPS Generting station. Hence there will be no interruption supply to any SS.
SUB TO LOAD CONDITION
Alamathy 400 KV
Maintenance work and to attend isolator alignment in 'R' phase 'B' switch
During the period of shutdown 110KV Local Alamathy # will not be in service.
PONNAPURAM 230 KV
110KV Pethapampatty # breaker & CTs & line upto Kottamangalam SS
1. 110KV PETHAPPAMPATTY # WILL BE KEPT RADIAL FROM 230KV UDT SS /110KV PNPM # UP TO THIS END2. HENCE NO
SS WILL BE AFFECTED.
subject to the feeder being kept radial
from udpt ss endGENERA
TING STATIO
NS
LOWER METTUR 1
For GRT Annual Relay Tests in Units I & II at MHPH / Bhavanisagar
1. During LC period, the PWD demand if any will be met by Units III & IV. Hence generation loss will not arise.2. At present, PWD demand is 150 c/s being released through PWD sluice. All
units at MHPH are kept as standby.
other units will be available
230Kv Auto Tr.III, HV & LV Breaker with CT only
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN1.AEE/Mtce For Monthly maintenance work.2.Approved by SE/O/North Chennai.3.No Load Transfer required and No
interruption to the Consumer.4.Auto Transformer-I will be in service.kinnimangalam
230 KVMonthly maintenance works for breaker and CT
SUB TO LOAD CONDITION
Alamathy 400 KV
For maintenace works and tan delta testing.
SIRUSERI 230 KV
DURING THE PERIOD OF SHUTDOWN 1)The Idely charged 110KV Siruseri-II # will not be inservice.
THARAMANI 230 KV
664 Madurai 55538 230 KV 0 Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
665 Madurai 56373 230 KV During LC period there will be no supply in the entire feeder 0 Wed, 14-Jun-2017 9:00 Wed, 14-Jun-2017 17:00 1 Approved
666 Madurai 55730 230 KV For monthly maintenance work During the Lc period No SS will be affected. 0 Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
667 Madurai 55536 230 KV POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
668 Erode 55554 230 KV Auto transformer II & LV II Breaker possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1 Approved
669 Erode 55581 400 KV Salem 400 KV Monthly Maintenance Work possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1
670 Madurai 55598 110 KV PERIYAR POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 13:00 1 Approved
671 Madurai 55607 110 KV 0 Thu, 15-Jun-2017 0:00 Mon, 19-Jun-2017 23:00 5 Pending
673 Erode 55630 230 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS OTHER END ALSO AVAIL LC ON THAT DAY possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
674 Chennai 55647 230 KV TRICHY 230 KV 1. Monthly maintenance works. POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 16:00 1 Approved
675 Madurai 55685 230 KV 230/33KV Power Trfr III HV & LV Breaker 0 POSSIBLE Thu, 15-Jun-2017 10:00 Thu, 15-Jun-2017 14:00 1 Approved
676 Chennai 55691 230 KV 100 MVA AUTO TRANSFORMER-I Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 18:00 1 Approved
677 Erode 55701 PYKARA UNIT 6 NIL possible Thu, 15-Jun-2017 8:00 Thu, 15-Jun-2017 17:00 1 Approved
678 Erode 55754 230 KV Monthly Maintenance Work. Other end also availing LC. possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
679 Erode 55800 230 KV INGUR 230 KV 230 KV Ingur – Thingalur # Premonsoon inspection 1. No SS will be affected during LC period. possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1 Approved
680 Erode 55818 230 KV KUNDAH PH3 230KV KPH2 – ARASUR FEEDER For PMI Work possible Thu, 15-Jun-2017 8:00 Thu, 15-Jun-2017 17:00 1 Approved
681 Erode 55842 230 KV Auto Transformer II possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
682 Erode 55890 110 KV GOBI 230 KV possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
683 ERode 55961 110 KV ALIYAR 230 KV possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 16:00 1 Approved
684 Erode 55962 110 KV ALIYAR 230 KV For TAN DELTA measurement. 1X60MW Aliyar PH M/c is under AOH. possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 13:00 1 Approved
685 Erode 55973 230 KV For monthly maintenance works. 0 Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 0 Approved
686 Erode 55974 230 KV For monthly maintenance works. 0 Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 0 Approved
687 Madurai 56045 110 KV 0 POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
688 Madurai 56061 230 KV For monthly maintenance work 0 Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
689 Madurai 56062 230 KV POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
690 Madurai 56087 110 KV Tree clearance work POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
691 Erode 56091 230 KV For monthly maintenance works possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 15:00 1 Approved
692 Madurai 56104 230 KV Monthly Mtce work & line patrol Other end also has proposed L C. 0 Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 16:00 1 0 Approved
693 Madurai 56129 230 KV Monthly maintenance works Auto Tr-II Load will be Contained Other Auto. Tr-I & III. POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
694 Madurai 56130 230 KV 230KV VLDR- A.Koil# Tower to Tower Inspection work. Programmed at ALKVL end. POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
695 Erode 56180 230 KV Auto transformer.NoII , HV.II, LV.II possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
696 Madurai 56242 110 KV POSSIBLE Thu, 15-Jun-2017 8:00 Thu, 15-Jun-2017 11:00 1 Approved
697 Madurai 56244 110 KV For monthly maintenance Work POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1 Approved
KAYATHAR 230 KV
on 230 KV Kayathar - Abishegapatty feeder, breker with CT and Entire Line
a) For monthly maintenance workb) For Tower to Tower inspection work
During the LC period other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
LC PROGRAMMED
ON 14.6.17:SINCE
APP IN 131 OCC VIDE ITEM
NO.142
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Meelavittan feeder entire
For monthly maintenance work and line maintenance work
LC MAY BE PROGRAMMED ALONG WITH SIPCOT ON
14.6.17
TUTICORIN -AUTO 230 KV
On 230 KV TTN -Kayathar feeder breaker with CT bus and line side switches
LC MAY BE PROGRAMMED
ON 15.6.17 ALONG WITH KAYATHAR
KAYATHAR 230 KV
On 230 KV Kayathar - TTN Auto feeder, breaker with CT, entire line and GRT
a) For Monthly Maintenance workb) Tower to Tower Inspection workc) GRT Annual relay and Breaker testing
During the LC period other end also avails LC and there will be no supply in the entire line. Hence, no ss affected
SUB TO TTPS GEN
SINGARAPET 230 KV
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the period of LC, 1) Auto transformer II and LV II breaker will be in off condition 3)The Auto transformer I and III will be in service,4) All the 110 KV feeders will be in service5)
110 KV Singarapet Grid SS total shutdown approved and hence no interruption of supply.
subject to the other auto trs loading limit
400/230KV Auto-II, HV & LV side Bkrs & CTs
During 400/230 KV Auto Transformer II LC Period, 400/230 KV Auto Transformer I will be in Service Condition. Hence there
will be no interruption of supply.
occ approved and srldc to be
addressed; subject to the other auto tr 1 loading limit
APPROVED IN 131 OCC VIDE ITEM NO.213
110KV Periyar-Theni-I Feeder- Breaker with ct and Entire line
For monthly Maintenance work of Breaker, CT and Line side swithes
During the LC Period, Uthamapalayam SS load will be transferred to 110KV-PYR-THENI-II # and no supply to
Gamesha SS and Regen Kamatchipuram wind farm SS.Further on the same day in this Feeder LC applied from THENI end for
attending pre monsoon remarks.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONCURRENCE
FROM WIND GENERATORS
TUTICORIN -AUTO 230 KV
110KV TTN-Sipcot-III feeder ( Section between 230KV Auto SS and 110KV Town SS)
To replace existing leopard conductor with Panther conductor between location No;1 to 69
No SS affected .During the lc period 110KV Town SS will be radially fed from 230KV Meelavittan SS (Continious LC from
01.06.17 from 0900 Hrs and 25.06.17 up to 1700 hrs)LONG LC NOTE TO BE PUT UP
230KV Thingalur # Breaker, CT’s, ,Isolators and Line side Isolator and 230 KV main Bus & Auxillary Bus switch
subject to the load condition
existing100MVA Auto Transformer II, HV II & LV II BRs, HV II & LV II and their LAS,CTs and isolators.
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to
any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.
SUB TO LOAD CONDITION
UDAYATHUR 230 KV
monthly Mtce Works & GRT relay test will be carried out AEE/P&C/ SRpudur
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTONDIARPET 230 KV
ROUTINE MAINTENANCE WORKS AND OIL LEAK ASSESSMENT BY TRB/AMBATTUR WING.
DURING THE PERIOD OF SHUTDOWN,100 MVA AUTO TRANSFORMER- I WILL NOT BE IN SERVICE.ALL OTHER
FEEDERS AND EQUIPMENTS WILL BE IN SERVICE.Subject to CBD Concurrence
GENERATING
STATIONS
FOR MONTHLY MAINTENANCE WORK.
other units to be available
THINGALUR 230 KV
230KV Ingur Feeder Breaker and CTs with Line Isolator.
subject to the load condition
existingsubject to the load condition
existingBoth end breaker open condition. Both bus & line mods open
condition. Earth switch closed condition.subject to the load condition
existing
SINGAPURAM 230 KV
Monthly Maintenance on Auto Transformer II, HV LAS, LV LAS, 230 CT Junction BOX, HV, LV Breaker
1. There is only one Auto.2. Auto II will not be in service.3. Intermediate SS Loads will be fed radially from other ends via
110KV Bus.4. 230KV Feeders will be fed radially from other ends via 230KV Main Bus.5. No auto Lc proposed at DVK end
and at Salem end.
subject to the load condition
existing as only one auto tr is
available110 KV Kavundapadi Feeder Breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
110 KV KAVUNDAPADI SS MAY AVAIL TOTAL SHUTDOWN,NO OTHER SS WILL AFFECTED
subject to kavundapadi ss
availing tsd110KV ALR-Negamam # CB, CT& LINE Entire
For Qtrly Mtce works and line patrol works
110KV Pollachi SS will be total S/D during LC period and load relief:About 45MW
subject to pollachi ss availing tsd
110KV ALR Link feeder-I and II one after another.
subject to the return of lc in
aliyar phpudhanchanthai230kv
230KV Deviakurichy feeder CB, CTs, CVTs, Wave Traps and 230KV Switches.
During LC period230KV Unjanai and Pugalur feeders will be kept tied with grid. 230KV Deviakurichy SS also availing LC in
the same feeder at Opposite end. No supply interruption.pudhanchanthai230kv
230KV Deviakurichy feeder CB, CTs, CVTs, Wave Traps and 230KV Switches.
During LC period230KV Unjanai and Pugalur feeders will be kept tied with grid. 230KV Deviakurichy SS also availing LC in
the same feeder at Opposite end. No supply interruption.
KODIKURICHY 230 KV
On 110KV O.T.patti-Kayathar # section between O.T.patti SS - Seethaparpanallur SS
Special Line partrol work and restringing of Earth wire at location no:82 - 85
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
TUTICORIN -AUTO 230 KV
On 230 KV TTN -Kayathar feeder breaker with CT bus and line side switches
During the Lc period No SS will be affected. Already applied Lc (ID 55730) may be cancelled. This modification is to match LC
by Kayathar 230KV Lines.
LC MAY BE PROGRAMMED
ON 15.6.17 ALONG WITH KAYATHAR
PUDUKOTTAI 230 KV
AUTO II, HVII, LVII AND 110 KV ADHANAKKOTTAI FEEDER LINE PORTION BETWEEN 230 KV SS AND MALAIYUR SS.
AUTO II, HVII, LVII, BREAKER, ISOLATORS AND EHT LINES MAINTENANCE AND GRT TESTING WORKS.
110 KV ADHANAKKOTTAI SS, 110 KV GANDARVAKOTTAI SS AND 110 KV MALAIYUR SS IN 110 KV ADHANAKKOTTAI FEEDER AVAILING TOTAL SHUT DOWN. 110 KV ALIYANALAI SS IN 110
KV ALANGUDY EID PARRY FEEDER AVAILING TOTAL SHUT DOWN. 110 KV SIPCOT SS, IN 110 KV SIPCOT FEEDER ALSO
AVAILING TOTAL SHUT DOWN. 110 KV SUPPLY FOR VADAKADU SS IS TO BE BACK FED THROUGH 110 KV ALANGUDY EID
PARRY FEEDER AND HENCE THERE WILL BE NO INTERRUPTION OF SUPPLY TO ANY SS.
SUB TO LOAD CONDITION
SRPUDUR 230 KV
110 KV SRP-KDR I # section between SRP to TKY .110 KV SRP-KDR II # section between SRP to TKY ( for safety purpose)
During the LC period the 110 KV SR Puthur - KDR I & II feeder will be radial from KDR PH II upto Thuckalay SS (incl).The
110/11 KV Chembonvilai, Cheramangalam and Karungal SS will avail total Shutdown to be approved by SE/KKEDC/NGL and
SE/O/TIN. Concurreance to be obtained from Railway athoritise.Hence no SS will be affected.
SUBJECT TO LOAD CONDNS,
CONC. FROM S.RLY AND
SE.NCES, TIN)- LC APPLIED
FOR 14.06.17 ALSO.
THUDIALUR 230 KV
230/110 KV Auto Trannsformer-III with HV,LV breaker & CTS
1. Other 230/1110 KV auto transformer 1 & 2 are in service and station load will be managed with other two auto
transformers
subject to the other auto trs loading limit
ALAGARKOIL 230 KV
230KV ALKL-Valuthur # Bkr,CT,&Line entire
KARAIKUDI 230 KV
230 KV Auto TR -II and its allied equipments
SUB TO LOAD CONDITION
KARAIKUDI 230 KV
SUB TO LOAD CONDITION
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
3 AUTOS ARE IN PARALLEL . LOADS ARE SHARED WITH OTHER TWO AUTOS.
long lc recommended
PASUMALAI 230 KV
1)110KV Pasumalai - Alagarkoil -1 # BKR & CT,LI . 2) Line LC Section between Pasumalai - Avaniyapuram SS.
1)Maintenance Works of BKR & CT, LI 2) Replacement of worn out Y Phase outgoing Jumper from the Line isolator
1) The Feeder will be kept radial from Alagarkoil SS upto Avaniyapuram SS feeding Othkadai, IT Park, Industrial Estate SS, Vandiyur SS and Avaniyapuram 2)110/ 11 KV Anupanadi
SS loads will be transferred to 110KV Pasumalai - Sakthisugars Feeder which is kept radial from Pasumalai SS upto
Uranganpatti Line links feeding Villapuram SS
SUB TO LOAD CONDITION
SANKANERI 230 KV
110KV Sankaneri-SRputhoor feeder Breaker CTS&Lineswitches. .
During the LC Period 110KV SRputhoor Supply Radial from SRputhur to 110KV Irrukkandurai SS. Hence no SS will be
affaected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
698 Madurai 56256 110 KV 110KV RNPM-SBT-II# Breaker & CT's POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1 0 Approved
699 Madurai 56272 110 KV For monthly maintenance work POSSIBLE Thu, 15-Jun-2017 10:00 Thu, 15-Jun-2017 14:00 1 0 Approved
700 Erode 56283 110 KV ARASUR 230 KV possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 12:00 1 Approved
701 Erode 56316 230 KV For Monthly mtce works. possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
702 Madurai 56351 230 KV 230 KV Checkanurani - TTPS feeder entire During LC period there will be no supply in the entire feeder POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
703 Chennai 56486 230 KV 230KV SPK-KLPKM-II FEEDER FOR LINE MTCE WORK Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 0 Approved
704 Erode 56500 110 KV Monthly Maintenance Work THE FEEDER WILL BE RADIAL FROM OTHER END possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
705 Chennai 56509 230 KV MOSUR 230 KV Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1 0 Approved
706 Chennai 56522 110 KV MOSUR 230 KV Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 EHT consumer? Approved
707 Madurai 56538 230 KV 230KV Valuthur - Alagarkovil feeder entire POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 0 Approved
708 Madurai 56555 400 KV Monthly Maintenance work 110KV load will be feed by ICT4 and ICT5, no ss affected. POSSIBLE Thu, 15-Jun-2017 10:00 Thu, 15-Jun-2017 17:00 1 Approved
709 Chennai 56599 230 KV KITS 230 KV 80MVA Auto transformer-II For monthly maintenance work Possible Thu, 15-Jun-2017 10:00 Thu, 15-Jun-2017 15:00 1 0 Approved
710 Madurai 56607 230 KV Other end also proposed L.C. POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 15:00 1 0 Approved
711 Erode 56641 110 KV possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 15:00 1 Approved
712 Madurai 56657 110 KV LINE MAINTENANCE WORKS POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 0 Approved
713 Chennai 56679 110 KV Possible Thu, 15-Jun-2017 10:00 Thu, 15-Jun-2017 17:00 1 0 Approved
714 Madurai 56698 110 KV POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
715 Chennai 56709 110 KV Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1 0 Approved
716 Chennai 56713 110 KV MOSUR 230 KV Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1
717 Chennai 56723 230 KV 100MVA AUTO TFR-I Possible Thu, 15-Jun-2017 10:00 Thu, 15-Jun-2017 15:00 1 0 Approved
718 Chennai 56741 230 KV Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 0 Approved
719 Madurai 56752 230 KV Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1
720 Madurai 56757 110 KV POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
721 Madurai 56796 110 KV Tree cutting work POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
722 Chennai 56820 230 KV MOSUR 230 KV Thiruvalam Feeder Line Line Clear There will be no interruption of supply. Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 14:00 1 0 Approved723 Chennai 56822 230 KV MOSUR 230 KV Link II and Sholinghur Feeder Lines Line Clear There will be no interruption of supply. Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 EHT consumer? Approved
724 Erode 56863 110 KV 110 KV Southern Bus Entire For monthly maintenance works possible Thu, 15-Jun-2017 10:00 Thu, 15-Jun-2017 17:00 1 Approved
725 Madurai 56891 230 KV then I 230 KV POSSIBLE Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 13:00 1 Approved
726 Chennai 56922 230 KV Monthly maintenance work. Possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 15:00 1 Approved
727 Erode 56954 230 KV possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
728 Erode 55863 230 KV For Monthly Maintenance work possible Thu, 15-Jun-2017 9:00 Thu, 15-Jun-2017 17:00 1 Approved
798 Erode 55820 230 KV KUNDAH PH3 230KV KPH2 – ARASUR# For PMI Work postponed Thu, 15-Jun-2017 8:00 Thu, 15-Jun-2017 17:00 1 Approved
672 Madurai 55614 230 KV 230KV TTPS-Koodenkulam feeder entire Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
729 Erode 55512 230 KV MTPS MTPS.I TO MTPS.II LINK FEEDER Monthly maintenance work. Programed LC possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
RENGANATHAPURAM 230 KV
1)Monthly Maintenance2)Annual Relay Test
During LC period 110KV RNPM-SBT-II# radially fed from SBT end. 110 KV Gandhigram SS avail total shutdown L/R-
9MW.Hence no interruption to any SS.PERAMBALUR 230 KV
110KV Koothur-Ariyalur-Poyyur feeder(Ariyalur) Breaker CT's only
During the above period of shut down i)110KV Koothur -Ariyalur -Pioyyur Feeder Radially fed from 230KV Poyyur SS.
ii)There will be no interruption to any other SS/EHT Consumer
110 KV ARASUR-COIMBATORE FEEDER BREAKER AND CTS ONLY.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V ARASUR-COIMBATORE FEEDER RADIAL FROM 230 K V COIMBATORE SS AND FEED THE
LOADS.
subject to the feeder being kept radial
from coimbatore ss
endOTHAKKAL MANDABAM 230 KV
230/110 KV Auto Transformer 1 (HV & LV Breakers, CTs & LAS)
1. 110KV Madhukkarai SS, 110KV Kinathukkadavu SS, 110KV Sidco SS, under Total Shut down.2. Auto Transformer 1 under cutoff condition3. The remaining Two Auto transformers are in
service to cater the ss loads with support wind generation.
subject to the other auto trs loading limit
CHECKANURANI SW STATION 230 KV
For monthly maintenance work and line maintenance work
SUBJECT TO TTPS GEN. & LESS THAN 3
MACHINE SINCE TTN-KYR # LC
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, 230KV SPK-KLPKM-I,ACKPM-KLPKM & KLPKM-ECHUR FEEDERS WILL BE IN SERVICE
Udumalpet 110 KV
110 KV UDT –Aliyar – II #r breaker, CT’s and line. between Udt and Devanoorputhur SS
subject to the feeder being kept radial
from aliyar ss end
230 KV Mosur - Thiruvalam feeder Breaker, CT’s and Line isolators only
For attending monthly maintenance works and
i). 230 KV Athipattu feeder and 230 KV Alamathy feeder are in service. ii) 110 KV Feeders all are in service. iii). Hence there
will no interruption of supply please.
110 KV Mosur Link-II Feeder, 110 KV SHLR CTs and Line Isolators
For attending Monthly Maintenance work & Re arranging of 110 KV feeder bays to accomdate 110 Ichiputhur Village
i. 110 KV Mosur Link-I will be in service ii. 110 KV Railway-I & II Feeders will be in service. iii. Hence there will be no
interruption of supply
VALUTHUR 230 KV
1. For attending breaker and it's CT's and isolators Monthly Maintenance work.2. For attending tower to tower inspection work.
During the LC period 230KV Valuthur - Karaikudi and Kavanoor feeders will be in service. Hence, there is
KANARPATTY 400 KV
400/110KV ICT 3, HV breaker with CT (410 Bay), LV breaker with CT (101 Bay)
SUB TO WIND GEN: APP IN
131 OCC VIDE ITEM NO.212During the above shutdown period 100MVA Auto Tr.I and
100MVA Auto Tr. III will be in service feeding the entire KITS SS loadsALAGARKOIL
230 KV230KV ALKL-Valuthur feeder breaker with CT & lINE ENTIRE.
For monthly maintenance work & tree clearance work.
Singarapet 110 KV
110KV GRID SS SINGARAPET NORTHERN BUS ONLY
FOR MONTHLY MAINTENANCE WORK.
DURING THE LC PERIOD,1. 110KV SAMALPATTI RAILWAY # I AND II LOAD TRANSFERRED TO BOMMIDI RAILWAY SS2. THE
110KV POCHAMPALLI SIPCOT SS TOTAL SHUTDOWN AVAILED.3. 110KV SINGARAPET SS 110/33/11KV TOTAL
SHUTDOWN AVAILED.4. 110KV BUS PT NO:1 OFF CONDITION.5. HENCE, NO INTERRUPTION OF SUPPLY.
subject to the 110 kv grid ss
tsd
KAVANOOR 230 KV
110 KV KAVANOOR-PARAMAKUDI # SEC. BET. PARAMAKUDI TO ILAYANGUDI & MARAVAMANGALAM
PMDI SS FED BY 110 KV KVNR-PMKDI # AND ILYNGDI & MRVMNGLM TOTAL S/D
GUMMIDIPOONDI 230 KV
110KV Panjetty feeder, Breaker, CTs, Line Isolators
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
During the Period of Shut down the 110KV Panjetty SS availing Total Shut down.
THIRUVARUR 230 KV
110KV T(K)GTPS - THIRUVARUR FEEDER (VIA: 110KV ULLIKKOTTAI SS, 110KV OKKANADU KEELAIYUR SS & 110KV MANNARGUDI SS), LINE PORTION BETWEEN T(K)GTPS TO 110KV ULLIKKOTTAI SS.
FOR PREMONSOON INSPECTION BY AE/LINES/ PATTUKKOTTAI.
1) DURING THE LC PERIOD, 110KV ULLIKKOTTAI SS, 110KV OKKANADU KEELAIYUR SS AND 110KV MANNARGUDI SS
RADIALLY FED FROM 230KV THIRUVARUR SS. 2) NO INTERRUPTION TO ANY SUBSTATIONS.
SUB TO LOAD CONDITION
THIRUVALAM 230 KV
110 KV Thiruvalam – M.V.Puram feeder entire.
For EHT Line Maintenance Works and Jumper tightness work in new spur line.
During the period of LCi. 110 KV Thiruvalam – M.V.Puram feeder line LC in between from 230 KV Thiruvalam SS to 110
KV Sholinghur SS.ii. The 110KV M.V.Puram SS, 110KV Mukundrayapuram SS, 110KV Sholinghur SS (11kv loads), are availing Total Shutdown Hence there will be no interruption of
supply please.110 KV Mosur – Sholinghur feeder in between 230KV Mosur SS and 110 KV Sholinghur SS.
For replacement of sag Jumper at Loc 113.
During the period of LCi. 110 KV Mosur– Sholinghur feeder line LC in between from 230KV Mosur SS and 110 KV
Sholinghur SS.ii. The 110KV Sholinghur SS (33kv loads), are availing Total Shutdown Hence there will be no interruption of
supply please.
To be discuss
No total shutdown mentioned
Approved subject to total shutdown
TONDIARPET 230 KV
FOR ROUTINE MAINTENANCE WORKS.
EXCEPT 100MVA AUTO TFR-I, ALL OTHER FEEDERS AND EQUIPMENTS WILL BE IN SERVICE.
THIRUVALAM 230 KV
i) On Auto Transformer –I, HV-I, LV-I Breakers and its Cts. For monthly maintenance work.ii)On 110KV M.V.Puram Feeder Breaker and its CT’s
i) On Auto Transformer –I, HV-I, LV-I Breakers and its Cts. For monthly maintenance work.ii)On 110KV M.V.Puram Feeder Breaker and its CT’s
During the period of LCi)The 110KV M.V.Puram SS, 110KV Mukundrayapuram SS, 110KV Sholinghur SS, are availing Total Shutdown on 15.06.2017. The Total Shutdown approved and
concurrence obtained by Chief Engineer/Distribution / Velloreii) Auto-Tr-II ,HV-II,LV-II, Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV, will be in service and cater the SS
Loads.iii) Auto-Tr-I ,HV-I,LV-I will be in ‘OFF’ Condition.i) The 110KV M.V.Puram Feeder will be in ‘OFF’ Condition v) The 230KV Link-II, 230KV Link-I, 230KV Chittoor interstate
feeders, and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply
please.
THANJAVUR 230 KV
100 MVA Auto Transformers-1 & 2, HV- 1 & 2, LV- 1 & 2 Breakers & CTs. (one by one)
1) Monthly maintenance works by the AEE/Mtce/Thanjavur,2) Relay replacement works (i.e. Transformer differential relay from static to numerical) in Auto Transformer-2 by the AEE/P&C/Thanjavur.
During the LC period,1) Eachankottai 110KV SS entire and Thanjavur 110 KV Grid SS will avail shutdown in 11 KV
feeders,2) further only if required, 110 KV Thanjavur-NTKudi feeder's tie may be kept opened at Thanjavur 230 KV SS for
containing autotransformer's load,3) all 230 KV & other 110 KV feeders will be in tied condition,4) no supply interruption to
any SS.
NOT POSSIBLE
DUE TO AUTO LOADING: LC
MAY BE PROGRAMMED ALONG WITH MORE TOTAL
S/D
Subject to total shutdown 50 Mw
THANJAVUR 230 KV
110 KV Thanjavur - NTKudi feeder (Line portion between 110 KV Eachankottai SS and 110 KV Thirukkanurpatti SS)
For rectification works by the AEE/Lines/Thanjvur.
During the LC period,1) 110 KV Thirukkanurpatti SS will be fed from 230 KV Thanjavur SS, 2) 110 KV Eachankottai SS will avail
shutdown on the same day,3) 110 KV Orathanadu SS will be fed from 230 KV N.T.Kudi SS4) all other 110 KV feeders will be
in tied condition,5) no supply interruption to any SS.
SUB TO NTKUDI AUTO LOADING
SEMBATTY 230 KV
110KV SBT - RNPM III # sec. bet. C.K.Patti and RNPM 230KV SS
During the LC period, C.K.Patti is availing total shutdown, the # will be radial from SBT upto Vedasandur SS(Incl). Hence no
interruption to any SS.SUB TO LOAD CONDITION
PONNAPURAM 230 KV
WITH MEDIUM WIND POWER GENERATION,1. 110KV INGUR - I # WILL BE KEPT RADIAL FROM 230KV KURUKATHI SS UP TO THIS END2. 110KV INGUR - II # WILL BE KEPT RADIAL FROM
230KV INGUR SS UP TO THIS END3. 110KV PETHAPPAMPATTY # WILL BE KEPT RADIAL FROM 230KV UDT SS / 110KV PNPM # UP TO THIS END4. 110KV THUNGAVY # WILL BE KEPT RADIAL
FROM 230KV UDT SS / 110KV POOLAVADY # UP TO THIS END5. HENCE NO SS WILL BE AFFECTED
subject to the load condition
existing
230KV Auto Tr. I, HV & LV Br.with CT, 110KV Theni - Periyar I # Entire
for attending premonsoon remarks & tree cutting works
Uthamapalayam SS will be under total shutdown No supply to Gamesa and Regen kamachipuram Wind SS
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
THIRUVANNAMALAI 230 KV
230 Kv T.V.Malai- Neyvely # Breaker, CT's and Line Isolator
During the period of L/C time,1. 230 Kv T.V.Malai -Neyvely # will be OFF condition2. Other 2 Nos 230 KV T.V.Malai-
Singarapet & Villupuram Feeders will be in service.Hence there is no interruption supply please.
230 kV Tvmalai-SGPT
# to be tie condition
DEVIAKURICHI 230 KV
230KV Deviakurichy -Pudhanchanai Feeder
230KV Deviakurichy -Pudhanchanai line jumper tightness work
1)The Deviakurichy & Pudhanchanai both 230KV SS availing Breaker, CT’s maintenances work .2)There will be no
interruption any other SS.
subject to the load condition
existingDEVIAKURICHI 230 KV
230 KV Deviyakurichy – Pudanchandai # Breaker, CTs, and Line side isolator both end
230 KV Deviakurichy- STCMS & Singapuram Feeders will be in service
subject to the load condition
existingBoth end breaker open condition. Both bus & line mods open
condition. Earth switch closed condition.lc
recommended on 15.06.2017TUTICORIN -
AUTO 230 KVTower to tower inspection and remarks rectification
No SS affected.During the LC period 230KV Koodenkulam SS will be radially fed fro 230KV SR Pudur SS
NOT POSSIBLE
DUE TO KYR-TTN # LC
subject to the load condition
existing
730 Erode 55555 110 KV possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 14:00 1 Approved
731 Madurai 55566 230 KV For monthly maintenance work POSSIBLE Fri, 16-Jun-2017 10:00 Fri, 16-Jun-2017 16:00 1 Approved
732 Erode 55582 230 KV Salem 400 KV 230KV Thingalur # Bkr,CTs & Line Switch Monthly Maintenance Work Both End Monthly Maintenance Work possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
733 Madurai 55879 230 KV Kayathar400kv For Monthly Maintenance Work. POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
734 Madurai 55895 110 KV For monthly maintenance work POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
735 Erode 55905 110 KV GOBI 230 KV possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
736 Erode 55939 METTUR TPH For monthly maintenance possible Fri, 16-Jun-2017 7:00 Fri, 16-Jun-2017 17:00 1 Approved
737 Erode 55963 230 KV ALIYAR 230 KV For TAN DELTA measurement. 230 KV Aliyar- Udt feeder will caters the load possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 12:00 1 Approved
738 Chennai 55648 110 KV 110 KV SPR - Thiruverkadu-I feeder Quarterly maintenance work Possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 0 Approved
739 Madurai 55650 110 kv TRICHY230KV POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 16:00 1 Approved
740 Erode 55757 230 KV Other end also availing LC. possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
741 Madurai 55790 230 KV For monthly maintenance work. POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
742 Erode 55864 110 KV For Monthly Maintenance work possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
743 Erode 56245 110 KV ARASUR 230 KV possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 15:00 1 Approved
744 Erode 56279 230 KV 230KVSS - MTPS-2-MTPS-1 Feeder entire possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 14:00 1 Approved
745 Erode 56294 110 KV 110KV Malco III Feeder For monthly maintenance work possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
746 Madurai 56300 110 KV POSSIBLE Fri, 16-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 2 Approved
747 Erode 56318 110 KV For Monthly mtce works. possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 14:00 1 Approved
748 Madurai 56337 230 KV 100 MVA AUTO TR II HV II & LV II Br Annual Relay testing During the LC period Auto Tr I & III will be in service. POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
749 Madurai 56352 110 KV POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
750 Madurai 56355 230 KV During LC period there will be no supply in the entire feeder POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
751 Madurai 56367 230 KV For monthly maintenance work. POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 13:00 1 Approved
752 Erode 56402 230 KV NO SS WILL BE AFFECTED. possible Fri, 16-Jun-2017 10:00 Fri, 16-Jun-2017 17:00 1 Approved
753 Erode 55964 230 KV ALIYAR 230 KV For TAN DELTA measurement. Auto Transformer-I will caters the load possible Fri, 16-Jun-2017 11:00 Fri, 16-Jun-2017 14:00 1 Approved
754 Erode 55975 230 KV For monthly maintenance works. 0 Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 0 Approved
755 Erode 55987 230 KV For Monthly Maintenance work possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
756 Erode 55988 110 KV 110KV Annur SS total shut down possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 15:00 1 Approved
757 Erode 56004 230 KV possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
758 Madurai 56093 230 KV 0 0 0 0 Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 0 Wrong entry
759 Erode 56098 110 KV 110- KV OKM I & II feeder loads will manage from other end. possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
760 Madurai 56108 110 KV Tree cutting works 0 Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 16:00 1 0
761 Erode 56181 230 KV Both end LC appyied possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
762 Erode 56182 230 KV possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
763 Madurai 56198 230 KV Monthly Maintenance Work POSSIBLE Fri, 16-Jun-2017 10:00 Fri, 16-Jun-2017 17:00 1 Approved
764 Madurai 56203 230 KV EE / O / CKNI has also programmed POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 14:00 1 Approved
765 Madurai 56799 110 KV Monthly maintenance work POSSIBLE Fri, 16-Jun-2017 10:00 Fri, 16-Jun-2017 17:00 1 Approved
766 Madurai 56801 110 KV 110KV SBT - Dindigul # Bkr, CTs and relay POSSIBLE Fri, 16-Jun-2017 10:00 Fri, 16-Jun-2017 17:00 1 0 Approved
767 Madurai 56836 110 KV 110Kv Thiruvarur - Karaikkal feeder POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
SINGARAPET 230 KV
110 KV Link I # Breaker and CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
subject to the other link
feeder loading limit
NALLAPPANAYAKANPATTY 230 KV
230 KV NNPT - AMUTHAPURAM feeder Breaker with CT and Line isolators.
During the LC period there will be no supply in the entire feeder and other end also will be applying LC on the same day.
Hence no SS affected during the L.C. period .
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:SUB. TO NORM. OF
230 KODI=VRNMsubject to the load condition
existing230 KV Anuppankulam Feeder, Breaker (210-52) & CT, CVT, LAS
During the LC period there will be no supply in 230 KV Anuppankulam Feeder, Breaker (210-52) & CT, CVT, LAS.
Hence no ss will be affected.SUB TO WIND
GENKAYATHAR 230 KV
110 KV Kayathar - Suruliyar breaker with CT only
During the LC period the feeder will be radial from other end. Hence no ss affected.
SUB TO LOAD CONDITION
110 KV GOBI Feeder breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
110 KV GOBI SS MAY AVAIL TOTAL SHUTDOWN,NO OTHER SS WILL AFFECTED
subject to gobi ss availing tsd
GENERATING
STATIONS
MACHINES -4 generator and all its auxiliaries
During above LC period 230KV MTPS feeder and AUTO SS feeder in service, Machine 1,2&3 stand by condition. The PWD
demand at present meet out Through PWD Dam.low mettur dam
level
230 KV Aliyar- Kadamparai feeder CB, CT only.
subject to the load condition
existingSriperumbudur 400 KV
During the period of shutdown Thiruverkadu-II feeder will be in service
110KV Trichy – Srirangam feeder Breaker, CTs, line isolator and line portion between 230KV Trichy SS and 110KV Kambarasampettai SS only.
For a) Monthly Maintenance works b) Premonsoon inspection.
During the LC period, a) 110KV Trichy-Srirangam feeder will be radially fed from 230kv samayapuram SS upto 110KV
Kambarasampettai SS. b) All other 110KV feeders are in tied condition. c) there will be no interruption of supply to any
other feeder and SS. d) Necessary concurrence obtained from other 230KV Samayapuram SS end.
SUB TO LOAD CONDITIN
THINGALUR 230 KV
230KV K.R.Thoppur Feeder Breaker, CTs and Line Isolator.
Monthly Maintenance Work. (Wind season. LC was not availed for the past one year due to non availability of 230KV MTPS -II Feeder).
subject to the load condition
existingTUTICORIN -SIPCOT 230 KV
On 230/110 KV Auto-I, HV-I and LV-I breakers with CTs and LAS only.
During the LC period, Auto Transformer II will be in service and there will be no interruption in supply please.
SUB TO LOAD CONDITION
DEVIAKURICHI 230 KV 110 KV Krishnapuram Feeder Breaker ,CTs 110 KV Krishnapuram Feeder radial from 230KV SS Perambalur
end
subject to the feeder being kept radial
from perambalur ss
end110 KV CAPACITOR BANK-I BREAKER, CTS AND CELL UNITS
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, REMAINING 2 NOS. 110 K V CAPACITOR BANKS WILL BE IN SERVICE.
subject to the voltage profile
in the gridMETTUR AUTO 230 KV
Jumber cone tightness checking at 230KVSS Switch yard MTPS-2 on 16.06.2017
Programmed LC at 230KVSS Switch yard MTPS-2 on 16.06.2017
subject to the load condition
existingMETTUR AUTO 230 KV
During the LC period 110KV Malco I & II Feeders will be in service
other two feeders will be
in service
PERAMBALUR 230 KV
110KV Koothur-Ariyalur-Poyyur feeder (Ariyalur) lines section between 110KV Perali to 110KV Koothur SS.
Deviation of existing 110KV Perambalur - Koothur - Ariyalur - Poyyur feeder by shifting the tower at location No. 48 & 57 for formation of new reservoir across marudhaiyar river in perambalur district as per the request of PWD/Ariyalur on DCW basis
During the above period of LC 1) 110KV Perali SS will be fed from 230KV SS perambalur. 2) 110KV Koothur, Ariyalur SS will be fed from 230KV SS poyyur 3) No interruption to any other
110KV SS/EHT SC
SUB TO SUBMISSION OF
APPROVAL COPY FOR
DEVIATION OF TOWER(2DAYS)
OTHAKKAL MANDABAM 230 KV
110 KV OKM-Negamam 1 Feeder (Breaker, CT's & Line Switch)
During the lc period 110KV Panapatty SS under total S/D, Hence no ss will be affected.
subject to the load condition
existing
SRPUDUR 230 KV
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
kinnimangalam 230 KV
110 KV Kinnimangalam - Theni I feeder section between 110KV Checkanurani SS and 110KV Valanthur SS
For Tower to tower inspection and line maintenance work. Providing polymer insulators
During LC period the feeder will be radial from Theni upto Valandur and radial from Kinnimangalam upto Checkanurani
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENCHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Pasumalai II feeder entire
For monthly maintenance work and Line maintenance work
SUB TO WIND GEN
ANUPPANKULAM 230 KV
230 KV Anuppankulam - Kayathar feeder Br., CT., and Line switch only.
During the LC period, the other end also availing LC on the same date. Hence no ss will be affected.
SUB TO WIND GEN
SADAYAMPALAYAM 230 KV
230 KV SADAYAPALAYAM - PONNAPURAM FEEDER BREAKER, CTs AND ISOLATORS
ANNUAL RELAY TESTING AND MONTHLY MAINTENANCE WORKS.
subject to the load condition
existing3X33.33MVA, 230/110KV Auto Transformer-I with HV and LV CBs,CTs
subject to the other auto tr loading limit
pudhanchanthai230kv
230KV idle Bus-B, its PTs, Bus Coupler CB, CTs and 230KV Bus-B side Switch.
During LC period230KV BUS-B is idly charged through Bus Coupler CB and CTs. All 230KV feeders, Auto-I & II, HV CBs are connected to 230KV Bus-A. 230KV Bus Coupler CB will be hand
tripped. No supply interruption.KARUVALUR 230 KV
230/110 KV Auto transformer I ,HV,LV BKR,CTs and LAS
110KV Annur SS and Sellappampalayam SS total shut down and 110kV Arasur 2 feeder kept radial from 230kV Arasur SS
subject to the other auto tr loading limit
KARUVALUR 230 KV
110 Kv Karuvalur -Annur feeder Breaker,CTs and line side isolator.
For Monthly maintenance work and PMI of PLDM/Lines
subject to annur ss
availing tsdPALLAKAPALAYAM 230 KV
1.Auto Transformer- II entire , LAS,CT's, Breaker and Switches and 230 kV Bus-I&2. 110 KV Thevur # CT,Breaker and Switches.One after another.
Monthly Maintenance and rectify the defect in BUS-I isolator and BHEL pending work to be attended.
1. Auto Transformer - I will manage the load and Bus I load will be transferred to BUS-II.2. Other end also avail LC on that day.
subject to the other auto trs loading limit
SRPUDUR 230 KV
THUDIALUR 230 KV
1. 110 KV TDLR-Arasur feeder section between Thudiyalur and 110 KV S.V.Patty2. 110 KV OKM I & II feeder breaker , CTs.
1. PMI works 2. For Monthly maintenance works one by one
subject to the feeders being
kept radial from the other
endsALAGARKOIL 230 KV
110KV ALKL-KOTTAMPATTY # (Radial)Section between AlagarkoilSS &Singampunari SS
Singampunari SS loads will be transferred to KKDI feeding.Kottampatty SS S/d
Subject to EE/SLDC/Madurai Concurrrence
Udumalpet 400 KV
230 KV Myvadi-Anikadavu feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
subject to the load condition
existingMETTUR AUTO 230 KV
230KVSS-K.R.Thoppur - Thingalur feeder entire
For checking of Jumber cone tightness at River Crossing Tower Loc.No. 198 &199
Both K.R.Thoppur SS & Thingalur SS have programmed for Maintenance work on that day.
subject to the load condition
existing
AMUTHAPURAM 230 KV
230KV Amuthapuram-N.M.Patty Feeder with Breakers,CTs and its isolators
1) During the LC period there will be NO supply in this feeder. 2) Other end also avail LC on same day. 3) Concurrence
obtained from SE/NCES/TIN.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:SUB. TO NORM. OF
230 KODI=VRNM
PASUMALAI 230 KV
1)230 KV Pasumalai - Checkanurani # - II , BKR & CT,LI only 2) Line Entire.
a)Maintenance Works of BKR & CT,LI b)Tree cutting works and T-T inspection works
SUB TO WIND GEN
SEMBATTY 230 KV
110KV SBT - Pasumalai # Bkr and CTs only
During the LC period, the # will be radial from other end. Hence no interruption to any SS.
SUBJECT TO LOAD CONDNS.
SEMBATTY 230 KV
1. Monthly maintenance work2. Relay testing work
During the LC period, Dindigul SS is availing total shutdown, railway traction will be transferred to AKL II #. Hence no
interruption to any SS.
THIRUVARUR 230 KV
Line premansoon inspection and rectification work, Breaker, CT's and Line side isolator maintenance work
During the Lc period 110Kv T.R. Pattinam feeder will fed supply to the 110Kv Surakkudy SS. Hnece there there will be no
interruption of supply to any ss.
SUB TO ARRANGEMENTS FOR TAKING
METER READING AT TR
PTNM
768 Erode 56864 230 KV possible Fri, 16-Jun-2017 10:00 Fri, 16-Jun-2017 17:00 1 Approved
769 Madurai 56892 230 KV then I 230 KV 230KV Auto Tr. II HV , LV Br. with CTs monthly mtce work No Interruption POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 13:00 1 Approved
770 Chennai 56411 400 KV For quarterly mtce. work Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
771 Chennai 56420 400 KV 315MVA ICT-2 For maintenance work. Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 16:00 1 Approved
772 Erode 56468 230 KV MTPSII 230KV MTPS-I FEEDER possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
773 Madurai 56530 110 KV POSSIBLE Fri, 16-Jun-2017 8:00 Fri, 16-Jun-2017 17:00 1 0 Approved
774 MAdurai 56552 KODAYAR PH 1 Generator PH-1 Machine No generation in PH-I POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 18:00 1 Approved
775 MAdurai 56604 KODAIYAR PH2 PH-2 Machine No generation in PH-2 POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
776 Erode 56646 110 KV possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 15:00 1 Approved
777 MAdurai 56893 110 KV then I 230 KV POSSIBLE Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
778 Erode 56955 110 KV possible Fri, 16-Jun-2017 9:00 Fri, 16-Jun-2017 17:00 1 Approved
779 Chennai 55652 110 KV TRICHY230KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 16:00 1 Approved
780 Erode 55662 110 KV Monthly Maintenance work. possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 15:00 1 Approved
781 Erode 55669 230 KV Monthly maintenance works possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 15:00 1 Approved
782 MAdurai 55700 230 KV Monthly Mtce works POSSIBLE Sat, 17-Jun-2017 10:00 Sat, 17-Jun-2017 14:00 1 Approved
783 Erode 55725 110 KV Erode 110 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
784 Erode 55759 230 KV Monthly Maintenance Work. 110KV Erode SS availing Total shutdown. possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
785 Erode 55760 230 KV KUNDAH PH2 0 Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
786 Erode 55778 110 KV postponed Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1
787 Madurai 55537 230 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
788 Erode 55556 110 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 Approved
789 Madurai 55606 230 KV TTPS 230KV TTPS-KAYATHAR FEEDER-II ENTIRE POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
790 Madurai 55615 230 KV 230KV TTPS-Kayathar-II feeder entire Jumper tightness work No SS affected 0 Sat, 17-Jun-2017 0:00 Sat, 17-Jun-2017 0:00 1 REPEAT Repeat
791 Madurai 55618 230 KV 230KV TTPS-Kayathar-II feeder entire Jumper tightness work No SS affected POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
792 Erode 55631 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
793 Erode 55632 230 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
794 Madurai 55881 230 KV kayathar400kv POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
795 Madurai 55791 230 KV For monthly maintenance works. POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 13:00 1 Approved
796 Madurai 55804 110 KV On 110 KV Northern Bus entire POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
797 Chennai 55812 110 KV ECHUR 230 KV Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 16:00 1 Approved
799 Madurai 55843 110 KV monthly maintenance works Sat, 17-Jun-2017 10:00 Sat, 17-Jun-2017 15:00 1 Approved
800 Erode 55867 110 KV For Monthly Maintenance work 110 KV Neyveli # II will be kept radial from TS -I end. possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
801 Erode 56234 230 KV ARASUR 230 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 15:00 1 Approved
PONNAPURAM 230 KV
230 KV Ponnapuram – S.D.PALAYAM # Breaker, CTs & line Entire
For monthly maintenance works & Annual testing by P&C Wing
1. 230KV GRID #, HENCE NO SS WILL BE AFFECTED,2. OTHER END SS ALSO PROPOSED TO AVAIL LC
subject to the load condition
existingSUB TO WIND GEN AND NO BLOCKING OF
WIND GENSunguvarchatram 400 KV
400 KV NCTPS Stg.II feeder 1 and 2 entire with tie - 2 breaker
During the period of LC the 400 KV NCTPS stg.II Feeder 1 and 2 will be in OFF condition.
Subject to OCC concurrence
APPROVED 158 / 131 ST
OCC
Thiruvalam 400 KV
1.ICT-2 in OFF condition and ICT-1 in service for 230KV feeders.2.230KV TVLM-Singarapet # may be hand tripped if
load on ICT-1 reached above 280MW.3.400KV Alamathy-2 # in service from 400KV Bus-I through its main breaker.
Subject to OCC concurrence
APPROVED 217 / 131 ST
OCC
MONTHLY MAINTENANCE WORKS TO BE CARRY OUT.
UNIT IN SERVICE. ALL 400KV PALAVADI-I&II AND KARAMADAI-I&II & ICT-I&II ARE IN SERVICE.ALL 230KV FEEDERS METTUR
AUTO SS ,GOBI AND STANDBY TRANSFORMER EXCEPT THINGALUR FEEDER ARE IN SERVICE.
subject to the load condition
existingKAYATHAR 110 KV
110KV MALAYANKULAM-VEERASIGAMANI FEEDER ENTIRE LINE
LINE INSPECTION RECTIFICATION WORK
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE
GENERATING
STATIONS
Exciter cleaning,Back washing of UGB , LGB & TGB oil coolers
SUB TO GRID CONDITION
GENERATING
STATIONS
Generator and allied equipment of Exciter & Cleaning of Spherical valve water servomotor filter
AFTER S/D OF KOD PH2 M/C
Singarapet 110 KV
110KV LINK FEEDER I ENTIRE LINE AT BOTH ENDS
FOR MONTHLY MAINTENANCE WORK.
DURING THE LC PERIOD,1. LINK # II IN SERVICE.2. HENCE, NO INTERRUPTION OF SUPPLY
subject to the other link
feeder loading limit
110KV Theni - Kinimangalam I # (Gandamanur spur line only )
110KV Gandamanur Spur line I # line switch mtc works
During spure line LC Gandamanur SS under Total shutdown No other SS affected
SUB TO WIND GEN AND
CONCURRENCE FROM WIND
GENERATORS
DEVIAKURICHI 230 KV
110 KV Deviakurichi-Krishnapuram Feeder(Section between Deviakurichy ss – Dhanalashmi Srinivasan Sugar Pvt Ltd) .
110 KV Deviakurichi-Krishnapuram Line jumper tightness work.
1)Deviakurichy 230KV SS Krishnapuram feeder monthely maintenances work Breaker,CT ‘s.2)Perambalur 230KV SS radial fed from upto Dhanalashmi Srinivasan Sugar Pvt Ltd End. 3)There will be no interruption of supply any other SS.
subject to the feeder being kept radial
from perambalur ss
end
110 KV Trichy – Punalkulam feeder Breaker , CTs , line isolator and line portion between 230 KV, Trichy SS and 110 KV Mathur SS.
For a) Monthly Maintenance works b) Premonsoon inspection.
During the LC period , a) 110KV Trichy - Punalkulam feeder will be radially fed from Punalkulam 110 KV Grid SS upto 110KV
Mathur SS. b) 110 KV Punalkulam feeder line switch at 110 KV Mathur SS towards 230 KV Trichy SS will be kept open. c)
110KV Mathur SS also availing total shutdown. d) Necessary concurrence obtained from other end 230KV Tanjore SS. e)All
other 110KV feeders will be In tied condition. f) No interruption of supply to any of the SS.
SUB TO LOAD CONDITION
AND TJR AUTO LOADING
ANTHIYUR 230 KV
110KV Anthiyur feeder Breaker,CT & Line Switch only
During the LC period 110/22KV Anthiyur SS will avail Total Shut down as approved by CE/D/Erode. No SS will be affected.
subject to anthiyur ss availing tsd
ANTHIYUR 230 KV
230/110 KV Auto Transformer I HV and LV breakers & it's CTs only
During the LC period Auto Transformer II will be in service and 110/22 KV Anthiyur SS availing total Shut Down as approved
by CE / D / Erode. No SS will be affected.
subject to the other auto tr loading limit after the tsd
reliefUDAYATHUR 230 KV
230/33 KV Power Transformer I HV & LV Breaker
Including Monthly Mtce works will be carried out on 33KV #s (SIL I,II,III,IV) subject to wind generation
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENENTIRE 110 KV TOP AND BOTTOM BUS .ALL 110 KV FEEDER BREAKERS AND ITS CT AND 110 KV CAPACITOR BANKS
MONTHLY MAINTENANCE OF ALL 110 KV BUS ISOLATORS AND POWER TRANSFORMERS
DURING LC PERIOD 1. 110 KV ERODE SS AND KASPAPETTAI SS WILL BE UNDER TOTAL SHUTDOWN2. ALL OTHER FEEDERS BE
KEPT IN BACK CAHRGED CONDITION
subject to erode and
kaspapettai ss availing tsd
THINGALUR 230 KV
Auto Transformer- II, HV II and LV II Breaker with CTs.
subject to the other auto tr loading limit after the tsd
relief230KV AUTO TRANSFORMER -2 AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
SALEM AUTO 230 KV
110KV Southern Bus from Bus Coupler switch no.1989
Monthly maintenance work and to replace the
1. 110KV Capacitor Bank-I and II will be in hand trip condition. 2. 110KV K.R.Thoppur-I, II, 110KV Singapuram-I, II and 110KV Sankari feeders will be radially fed from other end. 3. Mallur
110KV SS will be fed from Pudansandai 230KV SS.4. Mallasamuthram 110KV SS will be fed from Sankari 110KV SS or Unjanai 230KV SS through Paruthipalli feeder whichever is possible.5. 3Nos. Auto Transformer will be in service.6. 110KV
GC-II will be in hand trip condition. 7. 110KV GC-I will be feeding Salem 110/22KV SS 8. There will be no interruption to
any SS or feeder.
to be scheduled with tsd only
Subject to EE/SLDC/Erode Concurrrence
KAYATHAR 230 KV
On 230 KV Kayathar - TTPS II feeder, breaker with CT and entire line
a) For monthly maintenance workb) Tower to Tower Inspection Work
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
SUB TO TTPS GEN
SINGARAPET 230 KV
110 KV Link II # Breaker and CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
subject to the other link
feeder loading limit1.MEASUREMENT OF OPERATING
TIME & CONTACT RESISTANCE OF 230KV SF6 BREAKER2.DISTANCE PROTECTION RELAY TESTING WORK BY GRT/TTN
1.BOTH ENDS BREAKER TRIPPED CONDITION2.BOTH ENDS ISOLATORS,LINE SWITCHES OPENED CONDITION.3.EARTCH
SWITCHES CLOSED CONDITION.SUB TO TTPS
GEN
TUTICORIN -AUTO 230 KVTUTICORIN -AUTO 230 KV
SUB TO TTPS GEN
110KV Ponnapuram # I Breaker, CTs, ,Isolators and Line side Isolator
subject to the wind
generationAutotransformer I and its HV & LV I Breakers with CT’s and Isolators
1.KANGEYAM TOTAL SHUT DOWN ON THAT DAY2.DEPENDING UPON LOAD CONDITION
subject to the other auto trs loading limit
230 KV Vellappaneri Feeder, Breaker (210-52) & CT, CVT, LAS
For Monthly Maintenance Work and Annaul Relay Test by AEE/P&C/Kayathar
During the LC period there will be no supply in 230 KV Vellappaneri Feeder, Breaker (210-52) & CT, CVT, LAS. Hence
no ss will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONCURRENCE
FROM WIND GENERATORS
TUTICORIN -SIPCOT 230 KV
On 110KV Sipcot-TTN-III feeder breaker with CTs only.
During the L.C period, the 110KV Town SS will be in shutdown condition and no other SS will be affected please.
SUB TO S/D OF 110 TOWN SS
TUTICORIN -AUTO 230 KV
a) Arni-I feeder switch No.94 allignment work. b) 110KV Arumuganeri -I CT to switch Jumper changing
No SS will be affected . During the above LC period all 110KV radial feeders will be fed from 100 MVA Auto Transformer-II.
110KV Arni-I, II, Sipcot-I, II, & III will be kept in Off condition at Auto SS end and are radial from other end. 110KV
Manjalneerkayal SS will be radialy fed from 110KV Arni-SS. 110KV Vagaikulam SS, 110KV Kombukaranatham SS and 110KV Town SS will be radily fed from 230KV Sipcot SS.
SUB TO LOAD CONDITION
AND WIND GEN
110 KV Echur- Vandavasi, Maintenance work
110 KV Echur- Vandavasi, Breakers, CT’s,Pt’s & Isolators, Maintenance work
At the time of LC1. 110 KV Echur – Vandavasi # the 110 KV Vandavasi # Bkr will be H/T and Load transferred to 230 KV Acharapakkam SS.2. After completion of work the 110 KV
Vandavasi load is bring back to Echur SS, and 110 KV vandavasi Breaker will be Charged.Hence No interruption of to
supply any of the substation
Subject to load transfer
UDAYATHUR 230 KV
110KV Radhapuram feeder Breaker,CT & Line Switch
1)During the LC period the 110KV Radhapuram SS is proposed to avail total SD on 17.06.17 from 09 hrs to 17 hrs 2) If
Radhapuram SS not availing SD ,the RDPM SS will be fed from 110 KV SR Pudur -Arumuganeri #2
NOT POSSIBLE
DUE TO NORTHERN
BUS LC AT TTN
DEVIAKURICHI 230 KV
110 KV TASPL Feeder( Neyveli Feeder- II) Breaker and CTs.
subject to the feeder being kept radial
from ts 1 end230 KV ARASUR-KARAMADAI FEEDER BREAKERS, CTS AND ITS LINE SIDE ISOLATOR.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, REMAINING 5 NOS. 230 K V FEEDERS WILL BE IN SERVICE.
subject to the load condition
existing
802 Chennai 55911 230 KV ARNI 230 KV Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 13:00 1
803 Chennai 55915 230 KV ARNI 230 KV Sat, 17-Jun-2017 13:00 Sat, 17-Jun-2017 17:00 1
804 Chennai 55920 110 KV ARNI 230 KV For Monthly Maintenance work Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 13:00 1 0 Approved
805 Erode 55965 110 KV ALIYAR 230 KV 110KV Aliyar-Skpy # CB, CT& LINE Entire 1X30MW Skpy M/c is under S/D condition possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 16:00 1 Approved
806 Erode 55989 230 KV For Monthly Maintenance work During LC period the Suzlon EHT will be under total Shut down. possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 Approved
807 Erode 56005 230 KV Auto Transformer- II will manage the load. possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
808 Madurai 56029 230 KV 230 KV Tie Breaker & All Isolaters For monthly maintenance work. 0 POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
809 Madurai 56030 110 KV For Monthly Maintenance Work. 0 POSSIBLE Sat, 17-Jun-2017 0:00 Sat, 17-Jun-2017 0:00 1 Approved
810 Madurai 56247 230 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 Approved
811 Madurai 56259 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 0 Approved
812 Erode 56295 230 KV 230KV Palavadi Feeder For Monthly Maintenance work During the LC period other 230KV feeders will be in service possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
813 Erode 56320 230 KV For monthly maintenance works. possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
814 Madurai 56339 110 KV 110 KV SRP-MPL # Br,and CT Annual relay testing work POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
815 Madurai 56346 110 KV Tree clearance work POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
816 Madurai 56356 230 KV During LC period there will be no supply in the entire feeder POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
817 Madurai 56370 230 KV 230 KV Bus entire 0 Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1
818 Madurai 56046 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
819 Chennai 56101 110 KV 110KV Villupuram Link # For monthly maintenance works. Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
820 Erode 56107 110 KV possible Sat, 17-Jun-2017 0:00 Sat, 17-Jun-2017 0:00 1 Approved
821 Erode 56147 230 KV possible Sat, 17-Jun-2017 7:00 Sat, 17-Jun-2017 17:00 1 Approved
822 Chennai 56488 230 KV Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
823 Erode 56503 230 KV 0 Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
824 Erode 56506 110 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
825 Erode 56514 110 KV 110 KV MIDDLE BUS possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
826 Chennai 56528 110 KV MOSUR 230 KV Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
827 Madurai 56533 110 KV POSSIBLE Sat, 17-Jun-2017 10:00 Sat, 17-Jun-2017 16:00 1 Approved
828 Chennai 56534 230 KV MOSUR 230 KV Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 0 Approved
829 Madurai 56541 230 KV Auto Transformer III POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
830 Madurai 56614 230 KV 230KV KNMLM - CKNI Feeder POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
831 Erode 56647 110 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 15:00 1 Approved
832 Madurai 56659 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 13:00 1 0 Approved
833 Madurai 56661 230 KV LINE MAINTENANCE WORKS POSSIBLE Sat, 17-Jun-2017 13:00 Sat, 17-Jun-2017 17:00 1 0 Approved
834 Chennai 56672 230 KV GRT relay test other 3 Auto Transformers will be in service Possible Sat, 17-Jun-2017 10:00 Sat, 17-Jun-2017 17:00 1 Approved
835 Erode 56681 230 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 Approved
230KV Arani-Bavini I feeder Breaker CTs and 230KV Bus selector Isolators.
Monthly Maintenance of 230KV Breaker and Bus selector Isolators defect attending work.
During the period of LC the 230KV Arani Bavini II Feeder will be in service.Also The Bavini II feeder will be in Common Bus arrangement (No split Bus arrangement for Isolator defect
attending work) The Arani Bavini I feeder loads will also fed by Arani Bavini II feeder.Hence there will be no interruption of
supply.
To be discuss
Subject to CBD Concurrence
Approved Subject to Grid condition
230KV Arani-Bavini II feeder Breaker CTs and 230KV Bus selector Isolators(one by one)
Monthly Maintenance of 230KV Breaker and Bus selector Isolators defect attending work.one by one
During the period of LC the 230KV Arani Bavini I Feeder will be in service.Also The Bavini I feeder will be in Common Bus arrangement (No split Bus arrangement for Isolator defect
attending work) The Arani Bavini II feeder loads will also fed by Arani Bavini I feeder.Hence there will be no interruption of
supply.
To be discuss
Subject to CBD Concurrence
Approved Subject to Grid condition
110KV Arani- Singarapet Feeder I, CTs and Isolators
During the period of shutdown,(i)The 110KV Polur availing total shutdown,The 110KV Adamangalam Sub-Station loads will be fed from T.V Mali 230KV SS via 110KV Kanchi feeder.Hence
there will be no interruption of supplyFor Qtrly Mtce works and line patrol works
sarkarpathy machine is under sd
KARUVALUR 230 KV
230KV Karuvalur-Suzlon feeder Breaker and its CTs.
subject to eht concurrence
PALLAKAPALAYAM 230 KV
Auto Transformer - I entire, LAS, CT's , Breakers, Jumpers and Switches
Monthly Maintenance and BHEL pending work to be attended.
subject to the other auto tr loading limit
KODIKURICHY 230 KV
KODIKURICHY 230 KV
110 KV Veerasigamani I # Breaker with CT & Line Isolators
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
SANKANERI 230 KV
230/33KV PowerTransformer-I HV&LV Breakers,CTs only. .
For monthly maintenance & GRT Annual Relay Testing.
During the LC Period PowerTransformer-I will not beinservice.PowerTransformer-II&III willbe Carriedout the
EntireLoad.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
PASUMALAI 230 KV
1)110 KV Pasumalai - Anupankulam # BKR & CT, LI only. 2) Line entire
1)Maintenance Works of BKr & CT,LI 2) Tree cutting works and T-T Inspection works
1) 110/33-11KV Virudhunagar and Aviyur SS will be under total shutdown 2) 110kv Railway Traction loads will be transferred
to 110KV Pasumalai - Thullukkapatti Feeder.3) Hence No interruption of Supply to any SS
METTUR AUTO 230 KV
subject to the load condition
existingOTHAKKAL MANDABAM 230 KV
Auto Transformer 2 (HV & LV Breakers, CTs & LAS)
1.Auto Transformer 2 under the cutoff condition.2.The remaining Two Auto Transformers are in service to cater the ss
loads with support wind generation.
subject to the other auto trs loading limit
SRPUDUR 230 KV
During the LC period the 110/11 KV Aralvaimozhi SS will avail total shutdown approved by SE/NCES/TIN and Muppandal SS will avail supply from 110 KV SRPuthur - Sanganeri feeder .
Hence no ss will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
SRPUDUR 230 KV
110 KV SRP-KDR I # section between Veeyanoor and pechiparai
During the LC period the 110 KV SR Puthur - KDR I feeder will be radial from SRPUDUR upto Veeyanoor SS (incl) and radial
from KDR up to PPI SS incl.hence no ss will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENCHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Kinnimangalam feeder entire
For monthly maintenance work and line maintenance work
ANUPPANKULAM 230 KV
For 230 KV Strung Bus entire replacement b) temporary removal of over hang loop jumper of bus coupler switch 2-89b
During the LC Period the Auto Tr. I, II , III & HV -I, II, III and LV I, II, III Br., under hand tripped condition. 110 KV APKM - RJPM - I feeder and110 KV APKM - MDU feeder will be radial from other end. 110 Kv APKM - T.Kallupatti feeder load will be transfer to 110 KV APKM - MDU feeder. 110 KV PPTY SS, VDR SS, TTL SS,
VBK SS & APK SS will be availing total shut down. 230 KV APKM - MDU, KYTR, Sterlite feeder will be hand tripped condition.
TO BE COMBINED
WITH LONG LC
LC may be combine with Long LC Period
KODIKURICHY 230 KV
On 110KV O.T.patti-Papanasam # section between Papanasam PH & VK puram SS
Special Line partrol work and Restringing of Earth wire at loc no:8-9
i) 110KV Ambai SS & V.K.Puram SS will be radialy fed from 110KV OT Patti SS.ii) Hence no SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENVILLUPURAM 230 KV
During the period of LC:(1)Feeder will be kept radial from other end.
THUDIALUR 230 KV
1. 110 KV Kothagiri spur line section between Kattabettu & Kothagiri2. Jagathala spur line loc. No. 01-213. 110 KV Bus coupler breaker, CTs.
1. Stringing 3 nos. Panther conductor and 1 No. earth wire from Loc 17-21(GCC works)2. PMI works3. Monthly maintenance works
1. During the LC period 110 KV kothagiri & Katttabettu SS will be fed from 110 KV Mettupalayam - Mathampalayam feeder
subject to the load condition existing and
subject to ce d cbe
concurrence
KARAMADAI 230 KV
1.230KV Karamadai- Arasur feeder2.110KV Kothagiri spur line S/B KattabettuSS and KothagiriSS110KV Jagathala spurline loc between 1-21
1.Monthly maintenance work of Breakers, CT's, CVT's and P&C testing work.2.Stringing 3 nos Panther conductor and 1 no. earthwire from loc 17-18,19-20,20-21 by AEE/TLC/MTP3.PMI by AE/Lines/ Kattabettu between loc 1-21
1.Lc programmed at other end also.2.Concurrence for interuption to Kothagiri and Kataabettu substation shall be
obtained by SE/GCC/CBE from SE/Nilgiris3Jagathalla SS will be under total shutdown..
subject to the load condition existing and
subject to ce d cbe
concurrence
S.P.KOIL 230 KV 1) 100MVA AUTO TR.I2) 230KV KLPKM-ECHUR FEEDER
FOR MONTHLY MTCE WORK & LINE MTCE WORK
DURING THE PERIOF OF SHUT DOWN, 100MVA AUTO TR.II & IV WILL BE IN SERVICE DURING THE PERIOF OF SHUT DOWN, 230KV SPK-KLPKM-I&II,ACKPM-KLPKM FEEDERS WILL BE IN
SERVICE
PALLADAM 230 KV
230 KV Palladam-PGCIL feeder breaker CT's and line entire
To carryout monthly maintenance work by AEE/M/Palladam and to carryout premonsoon inspection work by AE/Lines/Palladam
1)110 KV Santhaipet SS ,110 KV Kumar Nagar SS and 110 KV Arulpuram SS availing total shutdown 2)Other three 230 KV (Othakalmandapam,Sadayapalayam and Kurukathi) feeders
will be in service 3)No other SS will be affected
PALLADAM 230 KV
110 KV Santhaipet # Breaker,Ct's and line entire
To carryout monthly maintenanc work by AE/M/Palladam and to carryout premonsoon inspection work by AE/Lines/Palladam
1)110 KV Santhaipet SS and 110 KV Arulpuram SS availing Total Shutdown2)No other SS will be affected
subject to santhaipettai ss and arulpuram ss availing tsd
PALLADAM 230 KV
To carryout annual maintenance work by AE/M/Palladam
1)110 KV Santhaipet SS and 110 KV Arul puram SS availing total shutdown2)110 KV Veerapandy SS will fed through 110
KV Palladam feeder3)No other SS will be affected
subject to santhaipettai ss and arulpuram ss availing tsd
110 KV Thiruttani feeder & 110 KV SHLR feeder Breaker, CT’s and Line isolators only
For attending Monthly Maintenance work & Re arranging of 110 KV feeder bays to accomdate 110 Ichiputhur Village
i). 110 KV Thiruttani feeder 110 KV Poonimangadu feeder, 110 KV A.J.Pet feeder SS Will be availing total shut down work.ii).
Hence there will no interruption of supply please.
KADALANGUDI 230 KV
110KV Kadalangudy- Aduthurai- Neively TS I feeder portion between Kadalangudy, Aduthurai and Thirupanandal SS.
1)Line inspection and rectification work 2)Monthly maintenance work
No interruption to any SS. The 110KV Thirupanandal and Thirupurambium SS proposed to shutdown. The 110KV Aduthurai SS supply fed from 110KV KGTPS- Palaiyur-
Aduthurai feeder. The 110KV Jayankondam and Papakudy SS supply fed from Neyveli TS I.
SUB TO LOAD CONDITION
AND CONCURRENCE FROM CNI SLDC
Auto Transformer No-II, and its HV-II breaker, LV – II Breaker, CT’s and LAS only.
For attending Monthly maintenance work
1). On 17.06.2017 the 110 KV Thiruttani feeder & 110 KV SHLR feeder availing Total Shutdown work. 2)Auto Transformers
I,&III are in service condition3) Hence there will be no interruption of supply please.
VALUTHUR 230 KV
For Attending Auto Transformer I HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
During the LC period Auto Transformer I & II will be in service. Hence there is 'no' interruption in power evacuation
kinnimangalam 230 KV
Maintenance works of Breaker and CT
EE/O/CKNI has also programmed. During the LC period there will be no supply in the entire feeder
Singarapet 110 KV
110KV LINK FEEDER II ENTIRE LINE AT BOTH ENDS.
FOR MONTHLY MAINTENANCE WORK.
DURING THE LC PERIOD,1. 110KV LINK # I WILL BE IN SERVICE.2. HENCE, NO INTERRUPTION OF SUPPLY.
subject to the other link
feeder loading limit
KAVANOOR 230 KV
110 KV KAVANOOR-KAMUTHI # SEC. BET. KAVANOOR & KAMUTHI (INCLUDING KADALADI SPUR LINE)
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
FEEDER TO BE KEPT RADIAL FROM KAMUTHI 400 KV SS TO KAMUTHI 110 KV SS INCLUDING KAMUTHI, TAMILPADI.
KADALADI TO BE UNDER TOTAL SHUTDOWN
KAVANOOR 230 KV
110 KV KAVANOOR-KAMUTHI # SEC. BET. KAMUTHI 110 KV SS TO TAMILPADI 110 KV SS
FEEDER TO BE KEPT TIED BET. KVNR & KMTHI 400 KV SS. SEC. BET. KMTHI TO TMPDI WILL BE UNDER LC. TAMILPADI SS
LOADS TO BE TRD. TO ANPKM FEEDING OR TAMILPADI SS TO BE UNDER TOTAL SHUTDOWN
THARAMANI 230 KV
100 MVA Auto Transformer I & III one by one
Subject to CBD Concurrence
VINNAMANGALAM 230 KV
Auto Transformers No.II & 110KV V.patty #, Tirupattur # breakers, CT’s
For replacing the defective surge monitors in 230 /110 KV LAS and for carrying out routine monthly maintenance works.
During the total shutdown on 17.06.2017 , there will be no supply to following 110/11 KV sub station, 1) Chinnavarikkam SS, 2) Pernambut SS, 3) Paravakkal SS, 4) Vaniyambadi SS, 5)
Alangayam SS. 6) Vinnamangalam (GC) SS.
subject to the other auto tr loading limit
836 Madurai 56710 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
837 Chennai 56716 110 KV Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 0 Approved
838 Madurai 56717 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
839 Madurai 56759 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
840 Madurai 56763 230 KV 230 KV Kadalangudi - Neyveli feeder POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
841 Chennai 56767 230 KV Guindy 230 KV 100MVA AUTO TRANSFORMER-II Possible Sat, 17-Jun-2017 10:00 Sat, 17-Jun-2017 16:00 1 Approved
842 Madurai 56786 110 KV 110 KV Bus entire POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
843 Chennai 56792 230 KV MONTHLY MAINTENANCE WORK. Possible Sat, 17-Jun-2017 5:00 Sat, 17-Jun-2017 10:00 1 0 Approved
844 Madurai 56802 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
845 Madurai 56804 110 KV Tree cutting work POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
846 Chennai 56808 110 KV 110 KV Ulundurpet Feeder Monthly maintenance work Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved847 Chennai 56823 110 KV MOSUR 230 KV Thiruttani and Sholinghur Feeder Lines Line Clear There will be no interruption of supply. Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
848 Madurai 56838 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
849 Chennai 56923 230 KV Auto Transformer-I, Breaker, CT's and LAS Monthly maintenance work Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
850 Chennai 56925 230 KV 230 Kv Eastern Main Bus Monthly maintenance work Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
851 Chennai 56927 230 KV Monthly maintenance work Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
852 Chennai 56939 110 KV For monthly maintenance works Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
853 Chennai 56941 110 KV Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 0 Approved
854 Erode 56956 110 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
855 Madurai 56377 110 KV POSSIBLE Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 13:00 1 Approved
856 Madurai 56379 110 KV For Monthly Maintenance Works. POSSIBLE Sat, 17-Jun-2017 13:00 Sat, 17-Jun-2017 17:00 1 0 Approved
857 Erode 56416 110 KV 110KV Karimangalam # breaker Monthly maintenance work possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 Approved
858 Chennai 56430 230 KV MONTHLY MTC ALL OTHER FEEDERS ARE IN SERVICE Possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 14:00 1 0 Approved
859 Madurai 56452 230 KV POSSIBLE Sat, 17-Jun-2017 10:00 Sat, 17-Jun-2017 17:00 1 Approved
860 Erode 56475 110 KV possible Sat, 17-Jun-2017 9:00 Sat, 17-Jun-2017 17:00 1 Approved
861 Madurai 55704 110 KV Monthly Mtce works on breaker 0 Sat, 17-Jun-2017 10:00 Sat, 17-Jun-2017 14:00 1 Approved
862 Erode 55521 KUNDAH PH4 Unit II Monthly maintenance work Standby possible Sun, 18-Jun-2017 8:00 Sun, 18-Jun-2017 17:00 1 Approved
863 Erode 55529 KUNDAH PH3 Unit II For monthly maintenance work unit under shutdown condition,SF6 Breaker open condition possible Sun, 18-Jun-2017 8:00 Sun, 18-Jun-2017 17:00 1 Approved
864 Erode 56052 KUNDAH PH1 Unit 2 For Monthly maintenance work During the LC period unit under stand by condition possible Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 17:00 1 Approved
865 Erode 56110 110 KV 110 KV Geddai I & II feeder breaker ,CTs possible Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 15:00 1 Approved
867 Chennai 56765 110 KV 110kv Kilpauk water works I and II feeder Routine maintenance work Possible Sun, 18-Jun-2017 6:00 Sun, 18-Jun-2017 11:00 1 0 Approved
868 Chennai 56766 230 KV MANALI 230 KV 230KV Manali - Alamathy-I Feeder Possible Sun, 18-Jun-2017 10:00 Sun, 18-Jun-2017 17:00 1 Approved
NEMALITHIPIYAKUDI 230 KV
110 KV NEMMELI THIPPIYAKUDI-THANJAVUR FEEDER BREAKER,CT's & LINE ISOLATOR.
FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/NEMMELI THIPPIYAKUDI.
1)DURING THE LC PERIOD, 110KV ORATHANADU SS (11KV ONLY) SHUTDOWN AVAILED AND 110KV THIRUKKANURPATTY
SS, 110KV ECHANKOTTAI SS AND 110KV ORATHANADU SS RADIALLY FED FROM 230KV THANJAVUR SS. 2) ALL OTHER
FEEDERS ARE TIED CONDITION AND NO INTERRUPTION TO ANY SS.
THIRUVALAM 230 KV
110 KV Thiruvalam – Vellore II feeder (In between 110KV Katpadi SS to110KV Vellore SS).
For replacement of aged disc at loc: 90.
During the period of LC i. 110 KV Thiruvalam – Vellore II feeder line LC in between 110KV Vellore SS-110KV Katpadi SS. ii. The 110KV Vellore SS is availing total Shutdown.Hence there
will be no interruption of supply please.
NEMALITHIPIYAKUDI 230 KV
110KV PATTUKKOTTAI-MADUKKUR FEEDER (VIA: 110/11KV PATTUKKOTTAI URBAN SS), ENTIRE.
FOR PREMONSOON INSPECTION BY AE/LINES/PATTUKKOTTAI.
1) DURING THE LC PERIOD, 110KV PATTUKKOTTAI URBAN SS WILL AVAILED TOTAL SHUTDOWN. 2) NO INTERRUPTION TO
ANY SUBSTATION. 3) 110KV PATTUKKOTTAI- MADUKKUR FEEDER BREAKER HAND TRIPPED AT 110KV PATTUKKOTTAI SS.
THANJAVUR 230 KV
110 KV Thanjavur - Alundur feeder, breaker, CT & LI.(Line portion between Thanjavur 230 KV SS and Thuvakudi 110 KV SS)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur. 2) For rectification works by the AEE/Lines/Thanjavur
During the LC period,1) this feeder will be radial from Alundur 230 KV SS upto Thuvakudi 230 KV SS,2) 110 KV Thuvakudi SS
will avail shutdown on the same day,3) all other 110 KV feeders will be in tied condition,4) concurrence has been obtained from Alundur 230 KV SS for radial feeding,5) no
supply interruption to any SS.
SUB TO LOAD CONDITION
THANJAVUR 230 KV
For rectification works by the AEE/Lines/Thanjavur.
During the LC period,1) all other 230 KV feeders will be in tied condition at Kadalangudi 230 KV SS,2) no supply interruption
to any SS.Routine Maintenance work & Annual Relay Testing.
Load of Auto Transformer-II will be transferred to other two Auto Transformers
Subject to CBD Concurrence
THIRUVARUR 230 KV
Erection of Bus sectionalizing arrangement work, erection of 110KV Bus Coupler Breaker -II Work, Shifting, Erection of 1No. 110KV Bus PT & 110KV Bus Maintenance works
Kovilvenni SS (7)110KV Vaduvur SS (8) 110 KV Kodavasal (9) 110KV Thiruvarur SS.(10) 110 KV Thiruvarur - Thanjavur feeder breaker tie will be opened at Thiruvarur end.110 KV Thanjavur urban SS,110KV Manimandapam SS, 110 KV Mariamman kovil SS, 110 KV Ayyampettai SS, 110 KV Poondi SS and loads will be fed radially from 110KV Grid SS/Thanjavur. (11) 110 KV
Mannargudi SS load will be fed radially from T(K)GTPS, 110KV Mannargudi feeder tie opened at Thiruvarur end. (12) 110 KV
Peralam SS load will be fed radially from 110KV Grid SS Mayiladuthurai, 110KV Mayiladuthurai feeder tie opened at
Thiruvarur end. (13) 110 KV Kumbakonam SS will be fed from KGTPS. (14) 110KV KGTPP feeder tie opened at Thiruvarur end.
(15) 110 KV T(K)GTPS express feeder tie will be opened at Thiruvarur end. (16) 110 KV Narimanam I and II feeders will be tripped at Thiruvarur end. (17) 110 KV T.R.Pattinam feeder will be tripped at Thiruvarur end. (18) Auto Transformer I , II & III
will be kept isolated. (19) All the 230 KV feeders will be in tied condition. (20) 110KV back feeding supply to be availed from 110kv Thiruvarur – Thanjavur feeder By closing ABS at 110KV
MYLAPORE 230 KV
230/33KV/100MVA POWERTRANSFORMER 1
During the above shutdown period POWER TRANSFORMER 1-will not be in service.The load may be restricted with in the
capacity of 1NO APOWER TRANSFORMER 2.
SEMBATTY 230 KV
1. 110KV RNPM II # sec. bet. Gandhigramam SS and RNPM 230KV SS.2. 110KV Alundur # Bkr, CTs and sec. bet. SBT and Sengurichi SS
1. Monthly maintenance work2. Tree cutting work
During the LC period 1. Angunagar SS is availing total shutdown, Vadamadurai SS will be changed over to Alundur # and the # will be radial from SBT upto Gandhigramam SS.2. the # will be radial from other end upto Sengurichi SS.Hence
no interruption to any SS.
SUB TO LOAD CONDITION
SEMBATTY 230 KV
110KV SBT - Udumalpet # sec. bet. Pappampatti and M.N.Patti
During the LC period, Palani SS is availing total shutdown, the # will be radial from SBT upto Pappampatti and radial from
other end upto M.N.Patti SS. Hence no interruption to any SS.SUB TO WIND
GENUlundurpet 230 KV
Ulundurpet 110 KV SS Total shutdown , Pillayarkuppam supply fed from 230 KV Villupuram SS Tv Nallur feeder
THIRUVARUR 230 KV
110 KV Thiruvaru - Thiruthuraipoondi feeder
Line pre-monsoon inspection and rectification work, Breaker, CT's and Line side isolator maintenance work.
During the LC period 110KV Thiruthuraipoondi SS, 110 KV Voimedu SS, 110 KV Thirukuvalli SS avail total shutdown and 110 KV Bus LC at 230 KV SS Thiruvarur Hence there will be no
interruption of supply to any other ss.
THIRUVANNAMALAI 230 KV
During the period of L/C time ,1. 110 KV Samuthirm SS availing total S/D.2. Autotaransformer-I will be OFF condition.3.
Autotransformer-II will be inservice and cater the station loads.Hence there is no interruption of supply please.
THIRUVANNAMALAI 230 KV
During the period of L/C time,1. Autotransformer-I and 230 Kv T.V.Malai-Villupuram # will be OFF condition2. 230 KV T.Malai-
Neyveli & singarapet feeders will be in service.3. Autotransformer-II will be inservice and cater the station
loadsHence there is no interruption of supply please.
THIRUVANNAMALAI 230 KV
230 Kv t.V.Malai-Villupuram #, Br, CT's and Line Isolator
during the period of L/C time,1. 230 KV T.V.Malai - Villupuram # will be OFF condition,2. Other 2 Nos 230 Kv T.V.Malai-
Neyveli and Singarapet # will be in service.Hence there is no interruption of supply please.
CUDDALORE 230 KV
110 KV Cuddalore - Nathapattu # breaker with CT’s and Line side isolator.Auto transformer I I HV & LV breakers with CTs
Naththapattu Semmandalam Nallaththur Total shutdown Hence no interruption of supply. For monthly maintenance
worksCUDDALORE 230 KV
110 KV neyveli Deviakurichi feeder II ( section between TSI-TASL Co-gen
checking jumper tightness at railway crossing locations. Loc.217-218
China salem SS to be radially fed from Deviakurichi endVeppur and tholudur total shutdown Hence no interruption of supply.
DEVIAKURICHI 230 KV
110 KV Deviakurichi-Neyveli II Feeder(Section between Deviakurichy ss – Veepur 110KV SS).
110 KV Deviakurichi-Neyveli II Feeder jumper tightness work.
1)Deviakurichy 230KV SS Neyveli II feeder monthely maintenances work Breaker,CT ‘s.2)Neyveli TS-I radial fed from
upto Veepur 110KV SS End 3)There will be no interruption of supply any other SS.
subject to the feeder being kept radial
from ts 1 end
ANUPPANKULAM 230 KV
110 KV Anuppankulam - Kayathar feeder Br., & CT. and Line Switch only.
(a) For monthly maintenance work. (b) For premonsoon inspection work
During the LC period the 110 KV Kovilpatti SS under total shut down and 110 KV Duraisamipuram SS will be radially fed from
Kayathar SS end, Hence no SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
ANUPPANKULAM 230 KV
110 KV APKM - MADURAI # Br., CT., and line switch only.
During the LC period 110 KV Virudhunagar SS will be availing total shut down. 110 KV Aviyoor SS & Railway Traction SS load
will be transferred to 110 KV PSQ - Thulukkapatti feeder. Hence no ss affected
GURUPARAPALLI 230 KV
110KV Karimangalam # Breaker will be hand tripped.BS / LS Isolators will be opened.110KV Krishnagiri SS will avail total shut down as per CE/D/VLR approvalConcurrence obtained
from SE/O/Thiruvalam and SE/KEDC/Krishnagiri
subject to krishnagiri ss availing tsd
ACHRAPAKKAM 230 KV
AUTO I, AUTO II ONE BY ONE AND 110 KV GC BRAKER & CTS
SAMAYAPURAM 230 KV
230KV SMPM-Poyyur # Breaker,CT's , Line Isolators and entire line portion.
Monthly Maintenance work, line Patrol work by AE/Lines/Kallakudy.
1.During the above Shutdown Period 230KV SMPM SS will be radial from 230KV TRICHY SS . 2.Other end 230KV Poyyur SS also availing LC on that day. 3.Concurrence obtained from Trichy Auto SS 4. No interruption to any other 110 KV SS.
SUBJECT TO LOADING OF ICT AT NEY
SINCE KDGI-NEY # ALSO
PROPOSED LC
KARIAMANGALAM 230 KV
1.110 KV Samalpatty feeder breaker,CTs, Line switch 2.110 KV Gurubarapally feeder breaker,CTs, Line switch and Line Between 230 KV Karimangalam SS - 110 KV Krishnagiri SS.3.Auto Transformer - III with HV- III Breaker and CTs & LV- III Breaker CTs. 4.230 KV Bus Coupler Breaker with Isolators.
Carryout Monthly SS Maintenance works by maintenance wing, Lines wing Programed 1.Coconut Tree Branches removing work at Loc No: 55 to 62, 2.Earth bond tightness work at Loc No: 5, 3.Disc Replacement work at Loc No: 34.and GRT Relay testing Auto Transformer - III and Buscoupler Breaker.
110 KV Pochampally SS, 110 KV Uthangarai SS, 110 KV Adhiyamankottai SS and 110 KV Krishnagiri SS availing Total Shutdown Total Relief : 60 MW, the Station load will Managed by keeping Auto Transformer I& II and also 230 KV Shoolagiri and Palavadi (Alredy in Mettur) Feeder, 1 No Grid feeder in
service and SSREL Supply fed through 230 KV Singarapet SS
subject to the load condition existing after the tsd relief
UDAYATHUR 230 KV
110KV Radhapuram feeder Br & Line switch
During LC period 110KV Radhapuram SS will be switchover to 110KV SRPUDUR-Arumuganeri II #
ALREADY APPLIED ON
17.6.17GENERA
TING STATIO
NS
subject to the grid condition
existingGENERA
TING STATIO
NS
subject to the grid condition
existingGENERA
TING STATIO
NS
subject to the grid condition
existing
THUDIALUR 230 KV
For monthly maintenance works one by one.
110 KV Geddai source feeder load will be manage with other 110 KV Geddai feeder
subject to the load condition
existing
KILPAUK 230 KV1) During the period of shutdown of KWWI feeder loads of
KWWI feeder will be transferred to KWW II feeder 2) During the period of time KWW II feeder loads of KWW II will be
transferred to KWW I feederFor Jumper Tightening Work and Clearing of Trees
230 KV Alamathy-I Feeder will not be in serviceAfter LC Work : 230KV Metro Alamathy-I Feeder will be in service
Subject to CBD concurrence
869 Chennai 55649 400 KV Monthly maintenance work Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 17:00 1 Approved
870 Erode 55702 110 kv PYKARA NIL possible Sun, 18-Jun-2017 8:00 Sun, 18-Jun-2017 17:00 1 Approved
871 Erode 55762 KUNDAH PH2 0 Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 17:00 1 0 Approved
872 Chennai 56546 230 KV Auto Transformer I Routine maintenance work Possible Sun, 18-Jun-2017 6:00 Sun, 18-Jun-2017 10:00 1 Approved
873 Chennai 56628 230 KV KOYAMBEDU 50 MVA 110/33 KV Power transformer-II 33 KV Load may be restricted within the Power transformer-I. Sun, 18-Jun-2017 10:00 Sun, 18-Jun-2017 17:00 1 0
874 Chennai 56656 230 KV Maintenance work Possible Sun, 18-Jun-2017 10:00 Sun, 18-Jun-2017 17:00 1 Approved
875 Chennai 56664 230 KV 100 MVA 230/110 KV AUTO TR. NO.III General Maintenance work Possible Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 17:00 1 Approved
876 Chennai 56718 110 KV Possible Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 14:00 1 0 Approved
877 Chennai 56721 230 KV 230KV Thiruvalam - Link I feeder. For EHT Line Maintenance Works. Possible Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 14:00 1
878 Chennai 56724 230 KV For EHT Line maintenance work. Possible Sun, 18-Jun-2017 9:00 Sun, 18-Jun-2017 14:00 1 Approved
879 Madurai 55833 230 KV For monthly maintenance works Mon, 19-Jun-2017 10:00 Mon, 19-Jun-2017 17:00 1 Approved
880 Madurai 55516 110 KV PAPANASAM 110KV PPM- KYTR FEEDER. Mon, 19-Jun-2017 10:00 Mon, 19-Jun-2017 12:00 1 Approved
881 Chennai 56834 230 KV KTR 230KV Alamathy - Mosur all other feeders in service Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
882 Erode 55660 230 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
883 Erode 55703 110 KV PYKARA possible Mon, 19-Jun-2017 8:00 Mon, 19-Jun-2017 17:00 1 Approved
884 Erode 55726 110 KV Erode 110 KV MONTHLY MAINTENANACE WORK possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
885 Erode 55738 110 KV possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
886 Erode 55761 110 KV Monthly Maintenance Work. possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 Approved
887 Erode 55780 230 KV Monthly Maintenance work possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
888 Erode 55821 230 KV KUNDAH PH3 230KV KPH2 – ARASUR# For PMI Work possible Mon, 19-Jun-2017 8:00 Mon, 19-Jun-2017 17:00 1 Approved
889 Erode 55868 110 KV For Monthly Maintenance work possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
890 Madurai 56250 110 KV POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 Approved
891 Erode 55513 230 KV MTPS MTPS.I TO MTPH FEEDER Monthly maintenance work. Programed LC possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
892 Erode 55557 110 KV possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 Approved
893 Erode 55583 230 KV Salem 400 KV 230KV Unjanai # Bkr,CTs & Line Switch Monthly Maintenance Work Both End Monthly Maintenance Work possible Mon, 19-Jun-2017 0:00 Mon, 19-Jun-2017 0:00 1 Approved
894 Erode 55633 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
895 Madurai 55896 110 KV For monthly maintenance work POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 0 Approved
896 Erode 55906 110 KV GOBI 230 KV possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
897 Erode 55917 230 KV Salem 400 KV 230KV KR Thoppur –Unjanai feeder entire possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
898 Erode 55940 230 KV METTUR TPH 230KV MTPS#SF6 Breaker and its CT's For monthly maintenance possible Mon, 19-Jun-2017 7:00 Mon, 19-Jun-2017 17:00 1 Approved
899 Erode 55946 110 KV Pugalur SS avaling LC on the same feeder possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
900 Madurai 56267 110 KV POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 Approved
901 Erode 56290 110 KV ARASUR 230 KV possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 Approved
902 Erode 56321 230 KV For monthly maintenance works. possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 Approved
903 Madurai 56360 230 KV During LC period there will be no supply in the entire feeder POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
904 Madurai 56380 230 KV For Monthly Maintenance Work. POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
905 Erode 56393 110 KV 110kv singarapet feeder 1 Monthly maintenance work possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
906 Chennai 56490 110 KV 110KV SPK-ACHARAPAKKAM-I FEEDER FOR QUARTERLY MTCE WORK Possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 0 Approved
907 Chennai 56539 230 KV MOSUR 230 KV Possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 0 Approved
Sriperumbudur 400 KV
400/110 kv, 200 MVA, Auto-Transformer-IV
During the period of shutdown Auto-Transformer-V will be in service
Subject to OCC concurrence
APP IN 131 OCC IDE ITEM NO.222
110KV PYKARA - SANDYNALLAH # ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK.
subject to the load condition
existingGENERA
TING STATIO
NS
UNIT-3 GENERATTOR SF6 BREAKER, POWER TRANSFORMER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
BASIN BRIDGE(GMRVASAVI) 230 KV
1. Auto I only will not be in service.2. All other 110KV Feeders, 230KV Feeders, Auto II & III will be in service.
Subject to CBD concurrence
For attending oil leak using Devcon putties.
Approval from SE/Operation
Approval from SE/Operation
SIRUSERI 230 KV
100MVA Auto Transformer-II & 110KV Sholinganallur#
DURING THE PERIOD OF SHUTDOWN 1)100MVA AUTO TRANSFORMER-II ,110KV Sholinganallur# will not be inservice. 2)110KV Sholinganallur SS load will be transferred to 230KV
KITS PARK SS.
Subject to load condition
KORATTUR 230 KV
During the period of S/D, other 2 Nos.100 MVA Auto transformers will be in service
Subject to CBD concurrence
THIRUVALAM 230 KV
110 KV Thiruvalam – Kaveripakkam feeder (In between 230 KV Thiruvalam SS and 110 KV Kaveripakkam SS).
For replacement of incoming line isolator Jumper at 110 KV Sipcot SS.
During the period of LCi The 110KV Kaveripakkam Feeder will be in ‘OFF’ Condition(In between 230 KV Thiruvalam SS and 110 KV Kaveripakkam SS).ii The 110KV Kaveripakam SS
and 110 KV Sipcot SS are availing total Shutdown. Hence there will be no interruption of supply please.
THIRUVALAM 230 KV
During the period of LC i. 230KV Thiruvalam – Link I feeder Breakers both end will be in “ OFF†condition at 400KV �
Thiruvalam & 230KV Thiruvalam SS. ii. All other 230 KV feeders 230KV Link II, 230KV S.P.Koil & 230 KV Singarapet feeders are in service.Hence there will be no interruption of supply please.
Subject to load condition
Approved Subject to load condition
THIRUVALAM 230 KV
230KV Thiruvalam – Mosur feeder entire.
During the period of LC i. 230KV Thiruvalam – Mosur feeder Breakers both end will be in “ OFF†condition at 230KV �Thiruvalam & 230KV Mosur SS. ii. All other 230 KV feeders 230KV Link I, Link II, Chittoor feeders are in service.Hence
there will be no interruption of supply please.
Subject to grid condition
EACHANGADU 230 KV
230 KV Eachangadu-Neyvely TS I # Breaker & CT's
During the above shutdown period the 230 KV Eachangadu ss will be Radially fed from 230KV Samayapuram ss.
NOT POSSIBLE
DUE TO ALDR ICT LOADING
110KV PPM- KYTR FEEDER BREAKER WITH CT MAINTENANCE WORK AT PPM END.
Present PWD demand is 200 CUSECS. During the LC period the feeder will be radial from other end.No SS will be affected.
NOT POSSIBLE
DUE TO 110 OT PATTI -
PAPANSAM# LC
Jumper tightness checking work at various locations
Postponed to 19/6/2017
Due to 230kv Alamathy-
Manali feederAuto Transformer II and its HV & LV Breakers with CT’s and Isolators
1.110 KV INGUR SS TOTAL SHUT DOWN ON THAT DAY2.DEPENDING UPON LOAD CONDITION
subject to the other auto trs loading limit
110KV GC BREAKER AND 66KV CALICUT & CANNANORE FEEDERS (ENTIRE 66KV BUS)
FOR MONTHLY MAINTENANCE WORK AND GRT RELAY TESTING WORK.
66KV ATHIPALLI SS, 66KV CHERAMBADI SS, 66KV GUDALUR SS AND 66KV UPPATTI SS WILL AVAIL TOTAL SHUT DOWN ON
THAT DAY.subject to the tsd realization
110 KV ERODE - INGUR III FEEDER BREAKER AND ITS CELL
DURING LC PERIOD INGUR SS WILL BE UNDER TOTAL SHUTDOWN
subject to ingur ss tsd
UNJANAI 230 KV
1.110KV UNJANAI - SANKARI FEEDER BREKAER,CT;S AND LINEISOLATOR ONLY.2.230KV UNJANAI - SALEM400KVSS 230KV FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK.
DURING THE L.C PERIOD,1. UNJANAI 230KVSS LOADS WILL BE FED BY P.CHANTHAI 230KV FEEDER.2.SALEM 400KVSS AND
SANKARI 110KVSS ALSO PROGRAMMED TO AVAIL L.C ON THE SAME FEEDER ON THAT DAY.
subject to the load condition
existing
THINGALUR 230 KV
110KV Gobi Feeder Breaker, CTs and Line Isolator.
110KV Getticheviyur SS availing Total Shutdown.Other end also availing LC.
subject to getticheviyur ss
availing tsdSALEM AUTO 230 KV
100MVA Auto Transformer-II, HVII, LVII Breakers & their CTs.
1. 2Nos. 100MVA Auto Transformer-I & III will be in service2. There will be no interruption to any SS or feeder.
subject to the other auto trs loading limit
Both end breaker open condition. Both bus & line mods open condition. Earth switch closed condition.
subject to getticheviyur ss
availing tsd
DEVIAKURICHI 230 KV
110 KV Deviakurichy-Singipuram feeder- II Breaker, CTs and Line side isolator
110KV Deviakurichy - Singipuram feeder- II will be kept radial from Singipuram 230KV SS end.
subject to the feeder being kept radial
from singapuram ss
endSANKANERI 230 KV
110KV Sankaneri-Udayathur feeder Breaker CTS&Lineswitches.
For monthly maintenance & GRT Annual Relay Testing.
During the LC Period 110KV Udayathoor feeder Supply Radially upto NavalladySS.Hence NO ss will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENsubject to the load condition
existingSINGARAPET 230 KV
110 KV Capacitor bank II Breaker, CTs and Capacitor units
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period 110KV Capacitor bank II breaker will be in hand trip condition
subject to the voltage profile
in the gridsubject to the load condition
existing110KV Erode III # Breaker, CTs, Isolators and Line side Isolator
subject to ingur ss tsd
KAYATHAR 230 KV
110 KV Kayathar - GC Breaker with CT only
During the LC period shutdown will be availed during that date and backfeeding will be availed through Kayathar - Maniyatchi
feeder. Hence no ss affected110 KV Thingalur Feeder Breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
110 KV GETTICHEVIYUR SS MAY AVAIL TOTAL SHUTDOWN,NO OTHER SS WILL AFFECTED
subject to getticheviyur ss
availing tsd
Railway crossing and Road crossing jumpers checking work.
1. 230KV KR Thoppur Unjanai feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. K.R.Thoppur 400KV SS is availing breaker and
line switche LC on that day.4. There will be no interruption to any SS.
subject to the load condition
existingDuring above LC period 230KV AUTO SS feeder in service, Machine 1,2,3&4 stand by condition. The PWD demand at
present meet out Through PWD Dam.
subject to the load condition
existing
UNJANAI 230 KV 110KV Pugalur-Kabilarmalai# line portion between Pugalur SS and Kabilarmalai SS.
Coconut tree leaves nearer to line clearing work
subject to the concurrence of
ld maduraiPASUMALAI 230 KV
1).110 KV Pasumalai - Thullukkapatty # Breaker & CT, LI only. 2) Line LC in Section between Pasumalai - Soolakarai SS.
1) Monthly Maintenance Works of BKR & CT,LI 2) Tree cutting works and T-T Inspection works
1) Feeder will be kept radial from Thullukapatty upto Soolakarai SS. 2) Hence there is No interruption of Supply to
any SSSUB TO LOAD CONDITION
110 /11 KV ARASUR LOCAL SUB STATION GCCB AND 110 K V CB-III.
TOTAL SHUT DOWN FOR MAINTENANCE WORKS IN EQUIPMENT.
DURING THE L.C PERIOD, 1) 110 K V ARASUR LOCAL SS WILL BE UNDER TOTAL SHUTDOWN.
subject to arasur ss tsd
OTHAKKAL MANDABAM 230 KV
110 KV OKM-Negamam 2 Feeder (Breaker, CT's & Line Switch)
1.During the lc period 110KV EDPM SS under Total S/D, 2.110 KV Kurunellipalayam ss will be fed from 110 KV Negamam
ss.3.Hence no ss will be affected.
subject to the feeder being kept radial
from negamam ss end
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Amuthapuram feeder entire
For monthly maintenance work and line maintenance work
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:SUBJECT TO NORM. OF
230 KODI-VRNMANUPPANKULA
M 230 KV100 MVA AUTO TR. III, HV-III and LV-III Breaker with CT only.
Durin the LC period the Auto Tr. III already under total shut down. The Auto Tr. I & III will cater the load of Auto Tr. II.
Hence No SS affected.SUB TO LOAD CONDITION
METTUR AUTO 230 KV
During the lc period radialy fed from singarapet ss up to 110kv thoppurss
subject to the feeder being kept radial
from singarapet ss end
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, THE ABOVE FEEDER WILL BE RADIALLY FED FROM OTHER END
230 KV Alamathy Feeder Breaker, CT’s and Line Isolator’s only.
For attending Monthly Maintenance work
i. 230 KV Athipattu and Thiruvalam Feeder in service ii. All 110 KV Feeders in Service iii. Hence there will be no interruption
please
908 Madurai 56547 110 KV POSSIBLE Mon, 19-Jun-2017 8:00 Mon, 19-Jun-2017 17:00 1 Approved
909 Madurai 56625 110 KV KODAIYAR PH2 110KV melakallur feeder Feeder may be tripped at both end, No SS will be affected. POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 13:00 1 0 Approved
910 Chennai 56683 230 KV Mon, 19-Jun-2017 10:00 Mon, 19-Jun-2017 17:00 1 0
911 Madurai 56691 110 KV LINE MAINTENANCE WORKS FEEDER TO BE KEPT RADIAL FROM ARKAY UPTO VALINOKKAM POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
912 Chennai 56803 110 KV 110 KV Ko-Poovanur feeder Monthly maintenance work. Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
913 Madurai 56805 110 KV Tree cutting work POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
914 Madurai 56806 230 KV 230KV Auto I, HV I and LV I Monthly maintenance work During the LC period Auto II and III will be in service. POSSIBLE Mon, 19-Jun-2017 10:00 Mon, 19-Jun-2017 17:00 1 0 Approved915 Chennai 56825 230 KV MOSUR 230 KV Alamathy Feeder Lines Line Clear There will be no interruption of supply. Possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 14:00 1 0 Approved916 Chennai 56835 230 KV Korattur lines 230KV Alamathy - Mosur All other feeders in service Possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 0 Approved
917 Madurai 56841 110 KV 110 Kv Thiruvarur - KGTPS feeder POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 0 Approved
918 Madurai 56842 110 KV 110 Kv Thiruvarur - KGTPS feeder 0 Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 REPEAT Repeat
919 Madurai 56903 110 KV POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
920 Chennai 56943 230 KV Possible Mon, 19-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 3
921 Erode 56957 110 KV possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
922 Erode 55967 110 KV ALIYAR 230 KV possible Mon, 19-Jun-2017 8:00 Mon, 19-Jun-2017 18:00 1 Approved
923 Erode 55990 110 KV possible Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 15:00 1 Approved
924 Madurai 56090 110 KV Monthly Maintenance work. POSSIBLE Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
925 Erode 56153 230 KV possible Mon, 19-Jun-2017 8:00 Mon, 19-Jun-2017 17:00 1 Approved
926 Erode 56183 230 KV possible Mon, 19-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 4
927 Erode 56185 230 KV Both end LC appyied possible Mon, 19-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 4
928 Madurai 56199 230 KV Monthly Maintenance Work POSSIBLE Mon, 19-Jun-2017 10:00 Mon, 19-Jun-2017 17:00 1 Approved
951 Erode 55941 230 KV METTUR TPH for monthly maintenance postponed Mon, 19-Jun-2017 7:00 Mon, 19-Jun-2017 17:00 1 Approved
974 Erode 56394 230 KV Monthly maintenance work postponed Mon, 19-Jun-2017 9:00 Mon, 19-Jun-2017 17:00 1 Approved
929 Chennai 55651 230 KV 230 KV SVChatram - Nokia feeder Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
930 Madurai 55655 230 kv TRICHY230KV For a) Monthly Maintenance works POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 16:00 1 Approved
931 Erode 55661 110 KV INGUR 230 KV 110KV Capacitor Bank II entire MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
932 Madurai 55679 110 KV For Monthly Maintenance work POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 13:00 1 Approved
933 Chennai 55692 230 KV 100 MVA AUTO TRANSFORMER-II ROUTINE MAINTENANCE WORKS. Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 15:00 1 Approved
934 Madurai 55707 110 KV Monthly Mtce works POSSIBLE Tue, 20-Jun-2017 14:00 Tue, 20-Jun-2017 17:00 1 Approved
936 Madurai 55792 230 KV For monthly maintenance works. POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
937 Madurai 55501 230 KV 0 Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 17:00 1
938 Erode 55533 230 KV KUNDAH PH3 230KV PH3 - PH2 Feeder For monthly maintenance work possible Tue, 20-Jun-2017 8:00 Tue, 20-Jun-2017 17:00 1 Approved
939 Erode 55558 230 KV possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 Approved
940 Chennai 55565 230 KV For monthly maintenance works. Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
941 Madurai 55567 230 KV For monthly maintenance work POSSIBLE Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 17:00 1 Approved
942 Erode 55584 230 KV Salem 400 KV 230KV Bus- Monthly Maintenance Work possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
943 Chennai 55807 230 KV 100MVA AUTO TR-II 110 KV Kits park feeder should be Tied condition Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
KAYATHAR 110 KV
110KV KAYTHAR-K.G.PATTI FEEDER SEC B/W PERUMALPATTI&SEITHUR
FOR LINE INSPECTION & RECTIFICTION
DURING THE LC PERIOD,1.PERUMALPATTI SS WILL BE RADIALY FED FROM KAYATHAR 2.SEITHUR SS WILL BE RADIALY FED
FROM K.G.PATTI
SUB TO WIND GEN AND LOAD
CONDITIONMonthly maintenance of breaker, CT & LS
GUMMIDIPOONDI 230 KV
230KV Sulurpet feeder, Breaker, CTs, Line Isolators
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
During the Period of Shut down the 230KV Sulurpet feeder Tie open at 230KV Gummidipoondi SS end , Concurance to be
obtained from OD/230KV SS Sulurpet
Subject to OCC concurrence
Subjec to OCC concurrence
KAVANOOR 230 KV
110 KV KAVANOOR-VALINOKKAM-ARKAY # SEC. BET. KAVANOOR & VALINOKKAM
SUB TO ARKAY GEN
Ulundurpet 230 KV
110 KV Ko-Poovanur feeder Breaker with CT's & Line side isolators. Ko-Poovanur total shutdown availed
To be discuss
SEMBATTY 230 KV
110KV AKL II # sec. bet. V.K.Patti and Natham SS
During the LC period, the # will be radial from SBT upto V.K.Patti and radial from other end upto Natham SS. Hence no
interruption to any SS.
SUBJECT TO AUTO TR.
LOADING AT ALKL
SEMBATTY 230 KV
Jumper tightness checking work at various locations
THIRUVARUR 230 KV
1)Line pre-monsoon inspection and rectification works, ii)Breaker ,C.T, Line isolator Maintenance works
During the LC period there will be no interruption of power supply to any other Substations.
THIRUVARUR 230 KV
1)Line pre-monsoon inspection and rectification works, ii)Breaker ,C.T, Line isolator Maintenance works
During the LC period there will be no interruption of power supply to any other Substations.
ALUNDUR 230 KV
110KV Alundur - Sempatty feeder Breaker's,CT'S and Line section between 230 KV SS Alundur up to vaiyamppatty 110 KV SS.
a)Monthly maintenance work.b)Premonsoon inspection and tree cutting work.c)Relay testing work.
a)110KV Alundur - Sempatty feeder radially fed from 230 KV SS sempatty SS up to vaiyampatty 110 KV SS.b)110 KV
vaiyampatty SS availing total shutdown.c)All other 110 KV feeder's will be in service.d)There will be no interruption of
supply to any other feeder's and ss.
SUB TO LOAD CONDITION
CUDDALORE 230 KV
230 KV Neyveli TS –Eachangadu feeder( Between TSI and 230 Kv Eachangadu Ss)
LC has been requested in the existing 230 KV SC line of Neyveli TS-I to Eachangadu feeder from Loc.No 16 to Loc. 134 for replacing the existing balance aged Kundha conductors by Zebra conductors.
230 KV eachangadu SS will be fed from 230 KV Samyapuram feeder from Trichy end. During the period of LC the loads of
110 KV Vridhachalam Ss and Pennadam SS are to be transferred to the 110 KV Neyveli -deviakurichi IIfeeder.
Concurrence from EE/O/Eachangadu to be obtained The LC programe will be continued till 30/06/2017 as requested by the
TLC wing .Continuation LC will be applied subject to grid condition
Subject to EE/SLDC/Madurai concurrence
Approved Subject to Grid condition
DEVIAKURICHI 230 KV
110 KV Deviakurichi-Singapuram II Feeder (Section between Deviakurichi ss - Attur ss ).
110 KV Deviakurichi-Singapuram II Line jumper tightness work
1)Deviakurichy 230KV SS Singapuram II feeder monthely maintenances work Breaker,CT ‘s.2)Singapuram 230KV SS radial fed from upto Attur 110KV SS End 3)There will be no
interruption of supply any other SS.
subject to the feeder being kept radial
from singapuram ss
end110KV ALR-SPH I # No.I and II CB,CT and line upto Iyyerpadi SS
For normalization of 110KV ALR-SLR feeder-I and II tower and line works. Qtrly mtce works at Aliyar SS.
110KV Iyarpadi SS and UA Dam SS will be on total S/D during LC period.
subject to the tsd being realized
KARUVALUR 230 KV
110 KV Karuvalur-Arasur II feeder breaker and CT's
or Monthly Maintenance work and PMI by Palladam lines
110kV Paduvampalli SS total shutdown and 110KV Arasur-Karuvalur 2# kept radial from Arasur 230KV SS
subject to the feeder being kept radial
from arasur ss end
PUGALUR 230 KV
110KV Kabilarmalai Radial feeder Breaker,CTs
During the LC period 1) 110KV Vellur SS is proposed total shutdown,remaining 110KV Kabilurmalai SS load fed from
230KVUnjanai SS via 110KV Nallur SS and 110KV Valavanthi SS, Villipalayam SS load will be fed from 230KV SS
Pudansandai via 110KV Valayapatty feeder. Concurance obtained from EE/O/Pudansanthai and EE/SLDC/Erode. there is
No interruption to any SS.
SUB TO CONCURRENCE FROM ERODE
KARAMADAI 230 KV
1.230/110KV AutoII2.110KV Karamadai-Irumborai#3.110KV Karamadai-BBPH II #4.110KV Bus 'B' & Bus coupler
1.P&C testing and TAN delta testing2.110KV takeoff structure erection work at IrumboraiSS by AEE/SS erection/CBE, Monthly maintenance works of Breaker and CT's, P&C testing and Tandelta testing.3.Monthly maintenance work of Breaker and CT, P&C abd TANdelta testing4.Monthly maintenance work of Breaker and CT's, P&C testing and TANdelta testing.
During LC period MTPSS and IrumboraiSS will be under total shutdown.BBPHII# will be kept radial from PYkara. 110KV
Arasur I&II feeders will be fed radially from Arasurss.
subject to the other auto trs loading limit and the load
condition existing after
tsd
UDUMALPET 230 KV
230KV Myvadi link II # Breaker & Line entire
Panelboard replacement works by P&C wing
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL CATER WITH MYVADI LINK I FEEDER
subject to the load condition
existing
Approved Subject to Grid condition
Udumalpet 400 KV
230 KV Myvadi-Udumalpet Link-2 feeder Breaker,CT line entire.
For Monthly maintenance and C&R Panel replacement work by P&C wing Udumalpet.
subject to the load condition
existing
Approved Subject to Grid condition
AMUTHAPURAM 230 KV
230KV Amuthapuram-checkanoorani Feeder with Breakers,CTs and its isolators
1) During the LC period there will be NO supply in this feeder. 2) Other end also avail LC on same day. 3) Concurrence
obtained from SE/NCES/TIN.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN:SUBJECT TO NORM. OF
230 KODI-VRNM
230KV AUTO SS feeder#SF6 Breakers and its CT's
During above LC period 230KV MTPS feeder in service, Machine 1,2,3&4 stand by condition. The PWD demand at
present meet out Through PWD Dam.to be taken up on 19.06.2017
METTUR AUTO 230 KV
230kv mtph# with 230kv bus coupler breaker and auxiliary bus entire
During the lc period other 230kv feeder and 230kv main bus will be in service
to be taken up on 19.06.2017
Sriperumbudur 400 KV
Jumper tightness and line maintenance work
During the period of shutdown 230 KV Nokia SS will be fed by 400 KV SPR SS
100MVA Auto Transformer III, LV III BREAKER, LAS, CTs and ,LV III I/C Isolator.
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to
any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.
SUB TO LOAD CONDITION
subject to the voltage profile
in the gridUthumalai 110 KV
a) 110 KV Uthumalai - Surandai Feeder breaker with CT only b) 110 KV Uthumalai - Auromera Feeder breaker with CT only
a) No SS affected during the LC period. Since, it is radial upto 110 KV Surandai SSb) 110 KV Auromera power plant is under
DCSUB TO WIND
GEN
TONDIARPET 230 KV
DURING THE PERIOD OF SHUTDOWN,100 MVA AUTO TRANSFORMER-II WILL NOT BE IN SERVICE.ALL OTHER
FEEDERS AND EQUIPMENTS WILL BE IN SERVICE.Subject to CBD
concurrence
UDAYATHUR 230 KV
110 Kv SANKANEWRI # breaker, CT ,line sw
During LC period 110KV Navaladi SS will be fed by 230 KV sankaneriSS
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTUTICORIN -SIPCOT 230 KV
On 230 KV Sterlite - TTPS feeder breaker with CTs and line isolators only.
During the LC period, the other end has also proposed LC on the same date and no other SS will be affected and M/S.
Sterlite-CPP generation (if available) will be exported to 230KV APKM SS please.
SUB TO TTPS GEN
VEERANAM 230 KV
230Kv Veeranam-Kodikuruchi Feeder BR,CT with line switch
For Half yearly and Monthly Maintenance work.
During the LC period there will be no supply in the entire 230Kv Veeranam-Kodikuruchi Feeder.Concurrence obtained
from SE/NCES/TIRUNELVELI.
LC MAY BE PROGRAMMED DURING LONG
LC PERIOD
LC MAY BE PROGRAMMED DURING LONG LC PERIOD
SF6 breaker open condition, Line And BUS MODS are open condition
subject to the load condition
existingSINGARAPET 230 KV
230 KV Tiruvannamalai # Breaker & CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
subject to the load condition
existing
SPR SIPCOT(MAMBAKKAM) 230 KV
100MVA, 230/110 KV Auto Transformer-II - HV & LV Breakers and Current Transformers only
i)The 100MVA Auto Transformer-II is feeding load only to the 110KV GC of 230KV SIPCOT Mambakkam SS.ii)The 110KV GC load of 230KV SIPCOT Mambakkam SS will be “0 MW†�during the above proposed L.C. period, since there is total shutdown in the entire 11KV and 33KV side, for monthly
maintenance works.NALLAPPANAYAKANPATTY 230 KV
230/110 KV Auto Transformer I,230KV HV Breaker I with CT, 110KV LV Breaker I with CT, 110 KV Alangulam feeder breaker with C.T and 110KV Rajapalayam feeder breaker with C.T, 110KV Reddiapatti feeder breaker with C.T
During the LC period 110 KV Reddiyapatti SS, 110KV Rajapalayam SS and 110KV Alangulam Substation will be
availing total monthly shutdown on that day.. Hence no SS afftected.
SUB TO LOAD CONDITION
During 230 KV Bus A LC Period, 230 KV Bus B will be in service condition. Hence there will be no interruption of supply.
bus B to be in service
VEERAPURAM 230 KV
Quarterly Maintenance &OLTC Oil changing
Subject to load condition
945 Madurai 55836 230 KV POSSIBLE Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 17:00 1 Approved
946 Erode 55847 230 KV 230KV Main Bus. postponed Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1
947 Erode 55872 110 KV 110 KV Neyveli # I Breaker and CT’s For Monthly Maintenance work 110 KV Neyveli # I will be kept Radial from TS-I end possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
948 Madurai 55883 230 KV kayathar400kv 230 KV Bus Coupler For monthly maintenance work. POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
949 Madurai 55897 110 KV For monthly maintenance work POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
950 Erode 55925 110 KV possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
952 Erode 55947 110 KV 110KV BKB II- Thiruchengode # line entire Jumper tightness checking Thiruchengoge SS total shutdown possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
953 Erode 55948 110 KV Jumper tightness checking &PMI Pallipalayam SS will be fed from Unjanai 230KVSS. possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
954 Erode 56006 230 KV Monthly Maintenance Bus I load will be transferred to Bus-II possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
955 Madurai 56009 110 KV Monthly maintenance work. POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
956 Madurai 56012 230 KV For Monthly maintenance Work . POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
957 Madurai 56031 230 KV For Monthly Maintenance Work. 0 0 Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1
958 Chennai 56105 230 KV 230KV Thiruvannamalai # For monthly maintenance work. Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
959 Erode 56125 110 KV possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
960 Madurai 56134 110 KV POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
961 Erode 56156 230 KV LC programmed at other end also. possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
962 Erode 56212 230 KV For monthly maintenance works. 0 Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
963 Erode 56226 110 KV ALIYAR 230 KV For Annual Mtce works 1X60MW Aliyar PH m/c is under S/D for AOH works possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 16:00 1 Approved
964 Madurai 56253 230 KV POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 Approved
965 Madurai 56263 110 KV 110 KV RNPM-UDPT# Breaker and CT's Monthly Maintenance Work POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 Approved
966 Madurai 56275 230 KV 230KV Bus coupler Breaker only For monthly maintenance work Idle Breaker.There will be no interruption to the Consumer POSSIBLE Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 12:00 1 0 Approved
967 Erode 56288 110 KV ARASUR 230 KV possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 12:00 1 Approved
968 Erode 56323 230 KV possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
969 Madurai 56363 110 KV POSSIBLE Tue, 20-Jun-2017 0:00 Tue, 20-Jun-2017 0:00 1 Approved
970 Madurai 56365 230 KV 230 KV B BUS ENTIRE For monthly maintenance work During LC period All the 230 KV Feeders fed through A BUS POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
971 Madurai 56381 230 KV 0 Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 15:00 1
972 Madurai 56382 110 KV POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 0 Approved
973 Madurai 56383 110 KV For monthly maintenance work. POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 0 Approved
975 Chennai 56412 230 KV 230 KV SVC - Nokia feeder entire For Quarterly Mtce. work Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
976 Erode 56422 230 KV PUSHEP 230KV PUSHEPH- KARAMADAI# MONTHLY MAINTENENCE WORK possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved977 Chennai 56431 230 KV 230KV BUS 'B' MONTHLY MTC ALL OTHER FEEDERS ARE IN SERVICE Possible Tue, 20-Jun-2017 7:00 Tue, 20-Jun-2017 10:00 1 0 Approved978 Chennai 56435 230 KV NOKIA 230 KV MONTHLY MTC Possible Tue, 20-Jun-2017 7:00 Tue, 20-Jun-2017 10:00 1 0 Approved
979 Erode 56502 110 KV Monthly Maintenance Work THE FEEDER WILL BE RADIAL FROM OTHER END. possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
980 Madurai 56548 110 KV Feeder will be radial from Kavanur end. Hence, there will be POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
981 Madurai 56560 400 KV Monthly Maintenance work 110KV Load will be fed by ICT3 and ICT5, no ss affected POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 10:00 1 Approved
982 Chennai 56562 110 KV MOSUR 230 KV Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
983 Madurai 56563 110 KV POSSIBLE Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 16:00 1 Approved
984 Chennai 56572 230 KV MOSUR 230 KV Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 0 Approved
985 Chennai 56576 230 KV 100MVA Auto Transforme II Monthly maintenance work. 100MVA Auto Transformer I & III will be in service. Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 12:00 1 Approved
EACHANGADU 230 KV
230 KV Eachangadu- # poyyur (samayapuram), BREAKER, CT's, &LINE CVT
FOR MONTHLY MAINTENANCE WORK
During the above shutdown period the 230 KV Eachangadu ss will be Radially fed from 230 kv Eachangadu- Neyveli TSI
#.Samayapuram SS (POYYUR SS)end is also availing LC On that Day.
SUB TO ALDR ICT LOADING
SINGAPURAM 230 KV
Monthly maintenance on 230KV Main Bus.
1. There is only one Auto and it will not be in service.2. Intermediate 110KV SS Loads will be fed radially from other
ends via 110KV Bus.3. 230KV Feeders will be fed radially from other ends.4. No auto Lc proposed at DVK end and at Salem
end on 20.06.2017.
cannot be issued without
tsd
Subject to EE/SLDC/Erode Concurrrence
DEVIAKURICHI 230 KV
subject to the feeder being kept radial
from ts 1 endDuring the LC period there will be no supply in 230 KV Bus
Coupler. Hence no SS will be affected.KAYATHAR 230 KV
110 KV Kayathar - kodayar feeder breaker with CT only
During the LC period the feeder will be radial from other end. Hence no ss affected.
SUB TO WIND GEN
UNJANAI 230 KV
1. 110KV UNJANAI - NALLUR FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.2.110KV UNJANAI - TIRUCHENGODE FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.3. AUTO TR NO I & II BREAKER, & CT'S ONLY ( ONE BY ONE )
FOR MONTHLY MAINTENANCE WORK
DURING THE L.C PERIOD,1.NALLUR & T.GODE 110KVSS ALSO AVAILING PROGRAMMED TOTAL SHUTDOWN ON THAT
DAY.2.DURING AUTO I L.C PERIOD AUTO TR NO: II WILL CATER THE STATIONLOADS & VICEVERSA.
subject to the load condition
existing
UNJANAI 230 KVsubject to
thiruchengode ss tsd
UNJANAI 230 KV 110KV BKB II -Unjanai feeder line portion between BKB II and Pallipalayam SS
subject to the load condition
existingPALLAKAPALAYAM 230 KV
230 KV Bus Coupler CT, Breaker and switches.
subject to the other bus being
in service
PUGALUR 230 KV
110 KV Pugalur - Karur Radial feeder Breaker, CTs,
During the LC Period, 110KV Karur SS,is proposed total shutdown. The remaining 110KV Manmangalam,110KV
Veppampalayam SS load will be fed through 110KV Renganathapuram feeder and also 110KV Renganathapuram feeder # tie opened at 110KV Renganathapuram SS.Hence
there is no supply interruption to any SS.
SUB TO LOAD CONDITION
PUGALUR 230 KV
Auto transformer III, HV III and LV III Breaker,CT's andLAS only.
During the L.C Period HV III and LV III are tripped condition.110KV Karur SS & 110KV Thanthonimalai SS are proposed total shutdown.There is no interruption to any
SS.load contain with in two auto transformer(I &II)
KODIKURICHY 230 KV
230 KV Veeranam # Breaker with CT & Line Isolators
LC MAY BE PROGRAMMED DURING LONG
LC PERIOD
LC MAY BE PROGRAMMED DURING LONG LC PERIOD
VILLUPURAM 230 KV
During the period of LC:(1)Other 230KV feeders Acharapakkam & Ulundurpet will be in service condition.
THUDIALUR 230 KV
1.110 KV TDLR-Sandinella feeder loc. 96-112(Section between Sandinella to Marudoor SS)2. 230 KV Power House IV feeder breaker ,CTs
1. PMI works & Take off arrangements at take off tower in main feeder (GCC works)2. Monthly maintenance works
1. Jagathala, Kothagiri & Kattabettu will be fed from Pykara.2. PH -IV source load will fed through 230 KV Karamadai - PH-IV
feeder
subject to the load condition
existingKARAIKUDI 230 KV
110 KV KKDI-DVKT # BKR & CTs110 KV KKDI-DVKT S/B KKDI- DVKT
Monthly maintenance worksTo replace the Flash over Disc L.No: 21,23,29
During the L.C period the 110KV SakkaVayal will be TSD & 110KV DVKT # will be fed from 110KV KKDI-TVDNI.
KARAMADAI 230 KV
230KV Karamadai- Pushep feeder entire, Breaker, CT's &CVT's.
PMI by AE/lines/Katabettu location between 70-100. and Monthly maintenance works of breaker, CT,s and CVT's.
subject to the load condition
existing
Puthansanthai 230 kV SS
Auto-II, HV & LV-II CBs, CTs, LASs and 230KV Switches.Auto-II Bus B Side 230KV Switch.
During LC period 1.110KV Valayapatty SS and Senthamangalam SS availing Total Shut down. 2.110KV
Namagiripet SS will be transferred to 110KV DVK-Thammampatty feeder. or 3. 110KV Erumapatty SS will be transferred to 110KV Perambalur-Kallakudi-II feeder fed by
Samayapuram 230KV SS. No supply interruption.110KV Aliyar Link-I # CB,CT and Line switch
subject to the lc of aliyar machine
continuingSANKANERI 230 KV
230/33KV PowerTransformer-II,HV&LV Breakers.
For monthly maintenance & GRT Annual Relay Testing.
During the LC Period PowerTransformer-II willnot beinservice. PowerTransformer-I&III will be carriedout the EntireLoad.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
RENGANATHAPURAM 230 KV
During LC period 110 KV RNPM-UDPT# radially fed from UDPT end. 110 KV Oddanchatram SS avail total shutdown(L/R-
22MW).Hence no interruption to any SS.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN: CONCURRENCE FROM ERODE
PERAMBALUR 230 KV
110 KV ARASUR-KARAMADAI-II FEEDER BREAKER AND CTS ONLY.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V ARASUR-KARAMADAI-II FEEDER WILL BE RADIAL FROM 230 K V KARAMADAI SS AND
FEED THE LOADS.
subject to the feeder being kept radial
from karamadai ss endOTHAKKAL
MANDABAM 230 KV
230 KV OKM-Ponnapuram Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
For Monthly mtce works and PMI works by Lines/UDPT wing
During the lc period the other 230 KV feeders are in service to cater the ss loads.
subject to the load condition
existingkinnimangalam 230 KV
110 KV Kinnimangalam - Theni II feeder section between Kinnimangalam and K.Vilakku
For tower to tower inspection and flashover disc replacement work
During LC period there will be no interruption to any SS, 110 KV Elumalai and Chinnakattlai SS availing Total Shutdown
SUB TO WIND GEN
CHECKANURANI SW STATION 230 KV
ANUPPANKULAM 230 KV
230 KV Bus section between 1-89B to southern side bus end
For providing overhang jumper from 230 KV strung bus to bus coupler switch 1 - 89 B.
During the LC Period the Auto Tr. II , III & HV II, III and LV II, III Br., under hand tripped condition. 110 KV APKM - RJPM - I
feeder and110 KV APKM - MDU feeder, will be radial from other end. 110 KV Aruppukkottai SS load will be transfer to 110 KV Kavanoor - Kamuthi feeder. 230 KV APKM - Sterlite feeder will
be hand tripped condition. Hence no SS affected.
SUB TO APP OF LONG LC
Pending After 110 kV Kinnimangalam-PSQ # LC
ANUPPANKULAM 230 KV
110 KV NNPT - Reddiapatty feeder section between 110 KV Reddiapatti SS and 110 Kv SIVAKASI ESI SS
For providing loop jumper at Loc. No. 1 of 110 KV SIVAKSI ESI SS LILO line. Earth wire cut rectification work at LOC.No.02 to 10
During the LC period the 110 KV Reddiapatti, SS under total shut down . Hence no SS will be affected.
ANUPPANKULAM 230 KV
110 KV APKM- Rajapalayam - II feeder Br., CT. and line switch only.
During the LC period the feeder no supply in the feeder.110 KV Sivakasi ESI SS yet to be commissioned
Sunguvarchatram 400 KV
The 230 Kv SVC - Nokia # will be in OFF Condition. The 400 KV SPR SS will cater the load of 230 KV Nokia SS via 230 KV SPR-
Nokia # without interruption.230KV PUSHEPH - KARAMADAI # TO BE IN TRIPPED CONDITION to be taken up
on 19.06.2017Orgadam 230 KV 230 KV SRIPERUMBUDUR FDRBREAKER
&CTS230 KV S V CHATRAM FEEDER AND OTHER EQUIPMENTS ARE
IN SERVICE
Udumalpet 110 KV
110 KV UDT –Gudimangalam – #r breaker, CT’s and line between UDT and Gudimangalam
subject to the feeder being kept radial
from ponnapuram ss
endVALUTHUR 230 KV
110 KV VGTPS - RSmadai -Kavanur feeder section between VGTPS and R.S. Madai
For attending tower to tower Inspection and Tree cutting work
KANARPATTY 400 KV
400/110KV ICT 4, HV with CT (412 Bay), Tie breaker with CT (411 Bay), LV breaker with CT (106 Bay)
SUB TO WIND GEN:APP IN 131 OCC VIDE ITEM
NO.227110 KV Mosur – Salai feeder & 110 kv thirutani feeder Breaker, CT’s & line Isolators
For attending Monthly Maintenance work & Re arranging of 110 KV feeder bays to accomdate 110 Ichiputhur Village
i. 110 KV Salai SS (10 MW) total shutdownii. 110 KV Thiruthani feeder l.c
KADALANGUDI 230 KV
110KV Mayiladuthurai- KGTPS feeder entire
Line inspection and rectification work.
No interruption to any SS. All other feeders will be in tied condition. The 110KV Mayiladuthurai SS proposed to
shutdown.SUB TO LOAD CONDITION
AUTO TRANSFORMER NO-III, HV -III , LV- III , Its CT'S AND LAS only.
For attending Monthly Maintenance work.
1). On 20.06.2017 the 110 KV Salai SS & 110 KV TRT feeder availing Total Shutdown work. 2).The 110 KV Kakkalur SS Load (20 MW) transferred to 110KV Avadi 3). The Remaining 110 KV Feeder Load will be Catered by Auto Transformer No-I & Auto
Transformer No-IV Hence there will be no interruption of supply pleaseKADAPPERI 230
KVSubject to CBD
concurrence
986 Madurai 56592 110 KV POSSIBLE Tue, 20-Jun-2017 8:00 Tue, 20-Jun-2017 17:00 1 Approved
987 Madurai 56618 110 KV 110KV KNMLM - THENI II Feeder POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
988 Erode 56644 110 KV BKB - 2 Monthly Maintenance Work possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
989 Erode 56651 110 KV BKB - 2 Monthly Maintenance Work possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
990 Chennai 56685 110 KV concurance to be obtained from M/s.SRF Possible Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 17:00 1 Approved
991 Chennai 56728 230 KV 100MVA AUTO TFR-II Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 15:00 1 0 Repeat
992 Madurai 56770 110 KV POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
993 Madurai 56773 230 KV Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1
994 Madurai 56807 110 KV POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
995 Chennai 56827 230 KV MOSUR 230 KV Line Clear There will be no interruption of supply. Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
996 Madurai 56857 230 KV 230 KV Bus II entire POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
997 Erode 56865 230 KV For monthly maintenance works possible Tue, 20-Jun-2017 10:00 Tue, 20-Jun-2017 17:00 1 Approved
998 Erode 56872 BHAVANISAGAR - MHPH - UNITS III & IV possible Tue, 20-Jun-2017 8:00 Tue, 20-Jun-2017 17:00 1 Approved
999 Madurai 56894 110 KV then I 230 KV During the LC 110KV Rasingapuram SS under shutdown POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
1000 Madurai 56904 230 KV Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1
1001 Chennai 56914 110 KV Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 16:00 1 0 Approved
1002 Chennai 56933 230 KV 230 KV Western Main Bus Monthly maintenance work Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
1003 Chennai 56935 110 KV Monthly maintenance work Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 0 Approved
1004 Chennai 56938 110 KV Monthly maintenance work Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 14:00 1 0 Approved
1005 Chennai 56944 110 KV For monthly maintenance works Possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 0 Approved
1006 Erode 56958 110 KV possible Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
1007 Madurai 55608 230 KV TTPS 230KV TTPS-STERLITE FEEDER ENTIRE POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
1008 Madurai 55609 110 KV 0 Tue, 20-Jun-2017 0:00 Sun, 25-Jun-2017 17:00 6
1009 Madurai 55617 230 KV 230KV TTPS-Sterlite feeder entire No SS affected. POSSIBLE Tue, 20-Jun-2017 9:00 Tue, 20-Jun-2017 17:00 1 Approved
1010 Chennai 56930 230 KV Monthly maintenance work Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1011 Erode 55663 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1012 Erode 55670 110 KV Monthly Maintenance works. possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 15:00 1 Approved
1013 Erode 55705 PYKARA UNIT 7 NIL possible Wed, 21-Jun-2017 8:00 Wed, 21-Jun-2017 17:00 1 Approved
1014 Erode 55728 110 KV Erode 110 KV MONTHLY MAINTENANCE WORK DURING LC PERIOD NO SS WILL BE AFFECTED possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1015 Madurai 55731 110 KV For Monthly maintenance work POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 SUB TO WIND Approved
1016 Erode 55763 110 KV Monthly Maintenance Work. No SS will be affected. possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 14:00 1 Approved
1017 Erode 55765 230 KV KUNDAH PH2 0 Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 0 Approved
1018 Erode 55781 110 KV Monthly maintenance work. possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1019 Erode 55799 230 KV KUNDAH PH3 230 KV PH3 TO KARAMADAI FEEDER SF6 Breaker open condition, MODS are open condition possible Wed, 21-Jun-2017 8:00 Wed, 21-Jun-2017 17:00 1 Approved
1020 Chennai 55813 230 KV ECHUR 230 KV 230 KV Echur – Arni # Possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 16:00 1 0 Approved
1021 Erode 55497 110 KV possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 16:00 1 Approved
KAYATHAR 110 KV
110KV KAYATHAR-KODAYAR FEEDER SEC B/W KAYATHAR & VEERAVANALLUR
LINE INSPECTION &RECTIFICATION WORK
DURING THE LC PERIOD 1.VEERAVANALLUR SS WILL BE RADIALLY FED FROM KODAYAR POWER HOUSE
SUB TO WIND GEN
kinnimangalam 230 KV
Monthly maintenance works for breaker and CT
EE/O/CKNI has also programmed for lines maintenance work.During the LC period the feeder will be radial from Theni
SS upto Ganavilakku SS.SUB TO WIND
GEN
BKB II to Tiruchengode 110 KV # Breaker,CT,CVT & Bus & Line Isolators
In the above period Tiruchengode ss under total shut down and BKB II to Tiruchengode 110 KV line LC already applied by EE/O/Unjanai.In BKB II,Unit 1 & 2 will be under Non S/B and all other feeders will be in service except Unjanai 110KV Feeder
which will be also under LC availed by EE/O/Unjanai & EE/BKBPH'S/VPM .
subject to thiruchengode
ss tsd
BKB II to Unjanai 110 KV # Breaker,CT,CVT & Bus & Line Isolators
In the above period BKB II to Pallipalayam 110 SS KV line LC already applied by EE/O/Unjanai and Pallipalayam 110 SS will be fed from Unjanai SS .In BKB II,Unit 1 & 2 will be under Non
S/B and all other feeders will be in service except Tiruchengode 110KV Feeder which will be also under LC
availed by EE/O/Unjanai & EE/BKBPH'S/VPM .
subject to the load condition
existing
GUMMIDIPOONDI 230 KV
110KV SRF feeder, Breaker, Cts, Line Isolators
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
Subject to M/s.SRF
concurrenceTONDIARPET 230 KV
FOR ROUTINE MAINTENANCE WORKS.
EXCEPT 100MVA AUTO TFR-II,ALL OTHER FEEDERS AND EQUIPMENTS WILL BE IN SERVICE.
Repeat 55692
THANJAVUR 230 KV
110 KV Thanjavur - Punalkulam feeder Breaker, CT & Line Isolator.
For monthly maintenance works by the AEE/Mtce/Thanjavur.
During the LC period,1) 110 KV Punalkulam - Trichy feeder will be radial from Trichy 230 KV SS upto Punalkulam 110 KV SS,2) the other end also (i.e. Punalkulam 110 KV SS) will avail LC on
the same day,3) Punalkulam 110 KV Grid SS will avail shutdown on the same day,4) no supply interruption to any SS.
THANJAVUR 230 KV
230 KV Thanjavur - Alundur-1 feeder, breaker, CT & LI.
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For carrying out rectification works by the AEE/Lines/Thanjavur
During the LC period,1) other end also will avail LC on the same day,2) all other 230 KV feeders will be in tied
condition,3) no supply interruption to any SS.NOT POSSIBLE
DUE TO LOAD CONDITION: LC
MAY BE PROGRAMMED ALONG WITH TOTAL S/D
Pending During ICT LC at Trichy PG
SEMBATTY 230 KV
110KV RNPM III # bkr, CTs, relays and sec. bet. SBT and Vedasandur SS.
1. Monthly maintenance work2. Tree cutting work 3. Relay testing work
During the LC period, Thadicombu and V.N.Patti SS are availing total shutdown, the # will be already in radial from other end
upto Vedasandur SS. Hence no interruption to any SS.SUB TO TOTAL
S/DMosur-Salai Feeder Lines ; Thiruttani Feeder Lines
THIRUVARUR 230 KV
230 KV Bus II entire and 230 KV PT II maintenance work
During the LC period there will be no interruption of supply and 230 KV Bus I will be in service.
PONNAPURAM 230 KV
230 KV Ponnapuram - OKM# Breaker, CT& Line entire
1. 230KV GRID #, HENCE NO SS WILL BE AFFECTED,2. OTHER END SS ALSO PROPOSED TO AVAIL LC
subject to the load condition
existingGENERA
TING STATIO
NS
LOWER METTUR 1
For GRT Annual Relay Tests in Units III & IV at MHPH / Bhavanisagar
1. During LC period, the PWD demand if any will be met by Units I & II. Hence generation loss will not arise.2. At present,
PWD demand is 150 c/s being released through PWD sluice. All units at MHPH are kept as standby.
other units will be available
110KV Theni - Rasingapuram Radial Feeder, Breaker with CT & line
for line mtce work and attending premonsoon remarks
SUB TO WIND GEN AND
OCCURRENCE FROM WIND
GENERATORS
ALUNDUR 230 KV
230KV Alundur - Thanjavur-I Feeder Breaker, CT's, CVT's and Line Isolators.
a)Monthly Preventive Maintenance work.b)Premonsoon Inspection and tree cutting work. c)Relay Testing Work.
a)Other end also avail shutdown.b)All other 230 KV feeders will be in service.c)There will be no interruption of supply to any
other feeders.NOT POSSIBLE
DUE TO LOAD CONDITION: LC
MAY BE PROGRAMMED ALONG WITH TOTAL S/D
Pending During ICT LC at Trichy PG
ACHRAPAKKAM 230 KV
110KV Eastern Bus Maintenance & 100MV Auto Transformer -II HV &LV Breaker and CT's
To Carryout Half yearly Maintenance Work and Monthly Maintenance Work
1.100MVA Auto Transformer -II, HV&LV Breaker will be hand tripped condition.2.100MVA Auto Transformer -I will be in service condition.3.110KV ACK-S.P.Koil I & II Feeder will be radially charged from other end.4.110KV ACK-Vandavasi Feeder will be radially charged from other end.5.110KV
Acharapakkam Feeder will be hand tripped condition and 110KV Acharapakkam SS load and Traction load will be
transferred to 110KV S.P.koil-I Feeder Via.5.110KV bus tie isolator will be opened and locked condition.
THIRUVANNAMALAI 230 KV
During the period of L/C time,1. 110 Kv Thandrampet SS and 110 Kv Vinnavanur SS will be availing total S/D.2. 230 KV
T.V.Malai-Singarapet & Autotransformer _II will be OFF condition.3. 230 KV T.V.Malai - Neyveli # will be in service by substituting the 230 KV Bus coupler breaker through Transfer
Bus,4. 230 Kv T.V.Malai-Villupuram # will be in service.5. Autotransformer -I will be in service and cater the station
loadsHence there is no interruption of supply please.THIRUVANNAMALAI 230 KV
110 KV tiruvannamali-Thandrampet #, Breaker, Ct's and Line isolator
During the period of L/C time , 110 KV Thandrampet SS availing total S/D. Hence there is no interruption of supply
please.THIRUVANNAMALAI 230 KV
110 KV T.V.Malai-Vinnavanur# Breaker, CT's and Line isolator
During the period of L/C time,1. 110 Kv vinnavanur ss availing total S/D.2. 110 KV Bannari sugars and 110 KV Chengam SS
will be fed from 110 KV singarapet Grid SS. Hence there is no interruption of supply please.
CUDDALORE 230 KV
110 KV Bus Coupler breaker with CT’s and .
110 KV Bus A & B will be independent.The 110 KV Capperhills SS total shutdown Hence no interruption of supply
DEVIAKURICHI 230 KV
110 KV Deviakurichi-Neyveli-I Feeder (Section between Deviakurichy ss – Pethasumuthram ss)
110 KV Deviakurichi-Neyveli-I Line jumper tightness work
1)Deviakurichy 230KV SS Neyveli I feeder monthely maintenances work Breaker,CT ‘s.2)Neyveli TS-I radial fed from upto Pethasumuthram ss End 3)There will be no interruption of
supply any other SS.
subject to the feeder being kept radial
from ts 1 end1.MEASUREMENT OF OPERATING TIME & CONTACT RESISTANCE OF 230KV SF6 BREAKER2.DISTANCE PROTECTION RELAY TESTING WORK BY GRT/TTN.
1.BOTH ENDS BREAKER TRIPPED CONDITION2.BOTH ENDS ISOLATORS LINE SWITCHES OPENED CONDITION.3.BOTH ENDS
EARTH SWITCHES CLOSED CONDITION.SUB TO TTPS
GEN
TUTICORIN -AUTO 230 KV
110KV TTN-Sipcot-III feeder(Section between 230KV Auto SS and 110 KV Town SS)
To replace existing leopard conductor with Panther conductor
No SS affected .During the above lc period 110 KV Town SS will be radially fed from 230KV Meelavittan SS (Continious LC from
01.06.17-0990 Hrs and 25.06.17 up to 1700 HrsLONG L;C NOTE TO BE PUT UP
Pending During ICT LC at Trichy PG
TUTICORIN -AUTO 230 KV
Dameged conductor portion tobe rectified between location No; and 3
SUB TO TTPS GEN
THIRUVANNAMALAI 230 KV
230 Kv T.V.Malai - Singarapet #, Breaker, CT's and Line Isolator
During the period of L/C time,1.230 KV T.V.Malai - Singarapet # will be OFF condition.2. Other 2 Nos 230 Kv t.V.Malai -
Neyveli and Villupuram # will be in serviceHence there is no interruption of supply please.
To be discuss
Postponed to 21/06/2017
110KV Erode II # Breaker, CTs,Isolators and Line side Isolator
subject to the load condition
existingANTHIYUR 230 KV
110KV Mettur Feeder Breaker CT and CT only.
During LC period other end also programmed to avail Maintenance work.No SS will be affected.
subject to the load condition
existingGENERA
TING STATIO
NS
FOR MONTHLY MAINTENANCE WORK.
other units to be available
110 KV INGUR II FEEDER BREAKER AND CT
subject to the load condition
existingTUTICORIN -AUTO 230 KV
On 110 KV TTN - ARNI - II # breaker with C.T bus and line side switches .
No ss will be affected. During this Lc period 110 KV Manjalneerkayal ss will be radially fed from 110 KV
Arumuganeri ss.THINGALUR 230 KV
110KV Kavundapadi Feeder Breaker, CTs and Line Isolator.
subject to the feeder being kept radial
from gobi ss end230KV KPH3 FEEDER SF6 BREAKER AND
ITS ACCESSIORIESFOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
SALEM AUTO 230 KV
110KV Rasipuram feeder Breaker, CTs & Line Isolators
1. 110KV Rasipuram feeder will be radially fed from other end. 2. Mallur 110KV SS will be availing Total shutdown. 3. There
will be no interruption to any SS or feeder.subject to
mallur ss tsd
FOR MONTHLY MAINTENANCE WORK
subject to the load condition
existingMonthly maintenance work in 230 KV Echur – Arni # CT, PT and, isolators
At the time of LC1. 230 Kv Echur - Arni # Monthly maintenance work is carried. at the time 230 Arni - Echur # Lc is already
approved by LDC Chennai.Hence no interruption of supply to any of the Substation.
LOWER METTUR 1
110KV BPH1-MDPH Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
Monthly maintenance work in 110KV BPH1-MDPH Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
a) During the above LC period Unit 1&2 will be in Non-Standby.b) The other end DPH/Mettur applied LC on that day on 21.06.2017c) 110KV BPH1-BPH2 Feeder will be in Service.
subject to the load condition
existing
1022 Madurai 55502 230 KV POSSIBLE Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 Approved
1023 Madurai 55539 230 KV For monthly maintenance work POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1024 Madurai 55559 230 KV possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 14:00 1 Approved
1025 Madurai 55568 230 KV 0 For monthly maintenance work 0 Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 wrong entry Wrong entry
1026 Erode 55585 110 KV Salem 400 KV 110KV Barrage-II # Bkr,CTs & Line Switch Monthly maintenance Work possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1027 Erode 55586 110 KV Salem 400 KV Monthly Maintenance work possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1028 Erode 55587 400 KV Salem 400 KV 400/110KV Auto:III Hv&LV side Bkr & CTs Monthly Maintenance works postponed Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Postponed
1029 Madurai 55886 400 KV KAYATHAR For monthly maintenance work POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1030 Erode 55907 230 KV GOBI 230 KV possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1031 Erode 55918 110 KV Salem 400 KV possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1032 Erode 55919 230 KV ARNI 230 KV Possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 16:00 1 Approved
1033 Erode 55923 110 KV ARNI 230 KV For Monthly Maintenance Work. Possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 14:00 1 0 Approved
1034 Erode 55950 230 KV For attending strand cut Both the SS availing LC on the same feeder possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1035 Erode 55977 230 KV For monthly maintenance works. 0 Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 0
1036 Madurai 56014 110 KV Monthly maintenance work. POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 0 Approved
1037 Madurai 56016 230 KV Monthly maintenance work. POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1038 Madurai 56019 230 KV 0 Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 WRONG ENTRY Repeat
1039 Madurai 56032 110 KV 110 KV Bus section I For Monthly Maintenance Works. 0 POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1040 Madurai 56057 230 KV POSSIBLE Wed, 21-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 2 Approved
1041 Madurai 56112 230 KV 230 KV ALKL-Pasumalai # entire Other end also proposed L.C. 0 Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 16:00 1 0 Approved
1042 Erode 56137 110 KV possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1043 Erode 56158 400 KV possible Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1
1044 Erode 56166 230 KV GOBI 230 KV 230 KV BUS COUPLER BREAKER AND CT'S possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1045 Madurai 56201 230 KV Monthly Maintenance Work POSSIBLE Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 0 Approved
1046 Madurai 56209 110 KV POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 14:00 1 Approved
1047 Chennai 56241 230 KV Routine maintenance work. Possible Wed, 21-Jun-2017 11:00 Wed, 21-Jun-2017 17:00 1 0 Approved
1048 Madurai 56273 110 KV POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 14:00 1 0 Approved
1049 Erode 56287 110 KV ARASUR 230 KV possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 15:00 1 Approved
1050 Erode 56296 110 KV 110KV Anthiyur Feeder For Monthly Maintenance work During the LC period other 110KV feeders will be in service possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1051 Erode 56324 110 KV For monthly maintenance works. possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 14:00 1 Approved
1052 Madurai 56349 230 KV 230 KV SRP-KDM # entire Monthly Maintenance work POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
VEERANAM 230 KV
Power transformer-III,HV-BR III.LV-BR III and 33Kv feeders Micon 1,2 & 6.
For Half yearly and Monthly Maintenance work.
During the LC period there will be no supply in the Power transformer-III,HV-BR III.LV-BR III and 33Kv feeders Micon 1,2 &
6.Concurrence obtained from SE/NCES/TIRUNELVELI.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
KAYATHAR 230 KV
On 230/110 KV Auto Transformer I, HV I and LV I breaker with CT only.
During the LC period Loads of Auto I will be shared by Auto II and Auto III, Hence no ss affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENSINGARAPET 230 KV
230 KV Thiruvalam # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period both ends Maintenance work programmed and hence no interruption of supply
subject to the load condition
existing
NALLAPPANAYAKANPATTY 230 KV
During the LC period 110 KV Thottiapatti SS, 110KV Padikasuvaithanpatti SS , 110KV Srivilliputtur Substation and 110KV Nallamanaickenpatti SS will be availing total Monthly
shutdown on that day. Nallamanaickenpaty-Kodikurichi -Kadayanallur Feeder radial from other end and concurrence
obtained from other end.Hence no SS afftected.
During LC Period, 110 KV Edappady SS will be avail total shut down on 21.6.2017
subject to the load condition existing after
edapady ss tsd110KV Vembadithalam # Bkr,CTs & Line Switch
During LC Period, 110 KV Vembadithalam SS will be avail total shut down on 21.6.2017
subject to vembadithalam ss availing tsd
During 400/110 KV Auto Transformer III LC Period, 110 KV Salem # I&II # will be fed from Salem 230 KVSS , 110 KV
Vembadithalam # LC Proposed on 21.6.17110 KV Barrage:II # LC proposed on 21.6.17 110 KV Thumbipady # will be fed from Mettur 230 KVSS.110KV Nangavalli # will be fed from Mettur
230 KVSS. Hence there will be no interruption of supply.
auto tr 4 not in service
400 KV Main Breaker for ICT3 (412-52), 400 KV Tie Breaker for ICT2 & ICT3 (411-52), 230KV LV Breaker for ICT3 (203-52). 400/230KV ICT3
During the LC period there will be no supply in 400 KV Main Breaker for ICT3 (412-52), 400 KV Tie Breaker for ICT2 & ICT3
(411-52), 230KV LV Breaker for ICT3 (203-52). 400/230KV ICT3.Hence no SS will be affected.
SUB TO WIND GEN:APP IN 131 OCC VIDE ITEM
NO.233230 KV GOBI – MTPS II Feeder Breaker, CT’s and entire line
FOR MONTHLY MAINTENANCE WORK
230 KV ANTHIYUR FEEDER,230 KV ARASUR FEEDER AND 230 KV PALLAKAPALAYAS ARE IN SERVICE,IT MAY CATER THE
LOAD.other end may also avail LC
subject to the load condition
existing
110KV KR Thuppur – Vembadithalam feeder entire
Tension point jumpers checking work.
1. 110KV KR Thuppur – Vembadithalam feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. KR Thoppur 400KV SS is availing
breaker and line switche LC on that day.4. Vembadithalam 110KV SS is availing Total Shutdown on that day.5. There will
be no interruption to any SS.
subject to vembadithalam ss availing tsd
230KV Arani- Echur Feeder Breaker,230KV CTs and 230KV Line Isolatores ( Both 230KV SS end)
For Auto recloser relay setting by P&C wing and also for 230KV Breaker, Line Isolator and CT monthly maintenance work.
During the period of LC the 230KV Bhavini - I & Bhavini - II Feeder loads (Sirucheri SS Loads 70MW ) will be transferred to
230KV Singarapet SS by Split bus arrangements in 230KV Arani SS.Hence no interruption of supply please.
Subject to load condition
110KV Arani- Thazhanur Feeder Breaker, 110KV CTs,Line Isolator.
The 110KV Thazhanur Feeder is at present idly charged condition up to 110KV Chetpet SS Line side. Hence there will
be no interruption of Supply.
UNJANAI 230 KV 230KV Puthansanthai-Pugalur feeder line entire
subject to vembadithalam ss availing tsd
Puthansanthai 230 kV SS
230KV Pugalur feeder CB, CTs, CVTs, Wave Traps and 230KV Switches.230KV Pugalur feeder Bus-B side Switch.
During LC period230KV Unjanai and Deviakurichy feeders will be kept tied with grid. 230KV Bus-B now idly charged through Bus Section CB will be hand tripped. 230KV Pugalur SS also availing LC in the same feeder at Opposite end. No supply
interruption.
Subject to EE/SLDC/Erode Concurrrence
PUGALUR 230 KV
110KV Pugalur - Renganathapuram feeder Breaker, CTs
During the LC period,the 110KV Malaikovilur and 110KV Pallapatty SS are proposed total shutdown,The remaining 110KV AC Palayam SS,110KV Thalapatty ss load fed from
230KV Rengnathapuram SS. there will be no supply interruption in any 110KV SS. Concurrance obtained from
EE/O/Renganathapuram.PUGALUR 230 KV
230 KV Pugalur - Pudansanthai feeder Breaker, CT
During the LC period, there will be no supply in 230 KV Pugalur - Pudansanthai feeder since other end also availing L.C on the
same period.
SUB TO LOAD CONDITION:
CONCURRENCE FROM ERODE
PUGALUR 230 KV
230 KV Pugalur - Paramathy II feeder Breaker, CT & line switch and line entire only
Replacement of existing 230KV C&R Panel by new one and Monthly Mtce work. In coordination with P&C wing,Erode.
During the LC period, there will be no supply in 230 KV Pugalur - Paramathy II feeder. Hence There is no interruption to any
SS,Already LC approved in 131th OCC meeting. Note: 1) LC to be availed in 230KV Pudansanthai # on 21.6.17 2) The 110KV Chinthamanipatty SS,(12MW),110 KV Pugalur SS (9MW) are
proposed total shutdown on 22.06.17. Total load relief 21MW.KODIKURICHY 230 KV
SUB TO WIND GEN
PUGALUR 230 KV
230 KV Pugalur - Paramathy II feeder Breaker, CT & line switch and line entire only
Replacement of existing 230KV C&R Panel by new one and Monthly Mtce work. In coordination with P&C wing,Erode.
During the LC period, there will be no supply in 230 KV Pugalur - Paramathy II feeder. Hence There is no interruption to any
SS,Already LC approved in 131th OCC meeting. Note: 1) LC to be availed in 230KV Pudansanthai # on 21.6.17 2) The 110KV Chinthamanipatty SS,(12MW),110 KV Pugalur SS (9MW) are
proposed total shutdown on 22.06.17. Total load relief 21MW.
SUB TO LOAD CONDITION:APP
IN 131 OCC VIDE ITEM
NO.168 FOR 2 DAYS:ON
22.6.17 230 PGLR-RNPM#
TO BE OPENED::EROD
E CONCURRENCE
ALAGARKOIL 230 KV
Monthly Mtce work &tree clearance work
THUDIALUR 230 KV
1. 110 KV Coimbatore-I feeder breaker,CTs.2. 110 KV P.N.Palayam feeder breaker ,CTs.
For monthly maintenance works one by one.
110 KV Madampalayam and 110 KV koundampallayam SS under S/D
subject to tsd realization
KARAMADAI 230 KV
1.400KV Karamadai- PGCIL(Arasur) II feeder2.230KV Karamadai- KundahPH III feeder
1.Monthly maintenance works of Main& Tie breakers,CT's, line side CVT's and isolators.2.PMI by AE/Lines/ Thudialur
1.During LC period other 400KV feeders will be in service2.LC programmed at other end.
occ approved and subject to
the load condition existing
APPROVED IN 131 OCC VIDE ITEM NO.171
FOR RELAY TESTING WORK BY GRT/GOBI ALONG WITH 230 KV MTPS II FEEDER
ALL FEEDERS AND AUTO TRANSFOMERS ARE CONNECTED WITH BUS I,BUS II IDLY CHARGED THROUGH 230 KV BUS
COUPLER BREAKER
all loads connected to a
single bus
AMUTHAPURAM 230 KV
230/33KV Power transformer-3 HV,LV Breakers with CT's and its 33KV feeder
1) During the LC period there will be NO supply in P.Tr-3 and its 33KV feeders. 2) If there is wind generation its 33KV
feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
PASUMALAI 230 KV
1) 110KV Main Bus entire 2) 100 MVA AUTO - II, HVB - II, LVB - II, CT only.
1a)Attending to Hot spots in the Bus switches and Clamps 1b) Replacement of age old 2 1/2
1)Auto Transformer -1 will be in Service. 2)The 110KV Pasumalai - Sembatty feeder, 110KV Pasumalai - Alagarkoil-2 Feeder, 110KV Kinnimangalam 1,2 and 3, 110KV Pasumalai -Thullukkapatty and 110KV Pasumalai - Anupankulam Feeders
will be kept radial from other end. 3) 110KV Pasumalai - Arasaradi Feeder will be kept hand Tripped and 110KV
Pasumalai SS. 4) 110KV Pasumalai - Alagarkoil-1 Feeder will be kept radial from Alagarkoil end upto Avaniyapuram SS 5)
110KV Pasumalai - Sakthisugars Feeder will be kept radial from sakthisugars end upto Pasumalai SS feeding Arasanoor,
Uranganpatti and Villapuram SS. 6)110/33-11KV Arasaradi SS, 110KV Pasumalai SS, 110/33-11KV Anupanadi SS, 110/33KV
Nattarmangalam SS and 110/33-11KV Nelmudikarai SS will be under Shutdown Relief - 89 MW.
SUB TO LOAD CONDITIN
ATHIPET 230 KV 230KV NCTPS # Breaker, CTs and Line Isolator.
During the period of Shutdown 230KV Athipattu-Mosur Feeder alone will be in service.
PASUMALAI 230 KV
1).110 KV Pasumalai - Arasaradi SC Feeder # Breaker & CT, LI only. 2) Line LC in Section between Pasumalai - Arasaradi SS.
1) Monthly Maintenance Works of BKR & CT,LI 2) Tree cutting works
1) Arasaradi SS will be under shutdown. 2) Switch No 1 will be kept open at Pasumalai 110KV SS 3) At Arasaradi SS the Ellis Nagar breaker will be hand tripped and Bus and Line isolators
kept in open condition. 4) Hence there is no interruption of Supply to any SS
110 KV ARASUR-THUDIALUR FEEDER BREAKER AND CTS ONLY.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V ARASUR-THUDIALUR FEEDER WILL BE RADIAL FROM 230 K V THUDIALUR SS AND
FED THE LOADS.
subject to the feeder being kept radial
from thudiyalur ss end
METTUR AUTO 230 KV
subject to the load condition
existingOTHAKKAL MANDABAM 230 KV
110 KV OKM-Irugur Feeder (Breaker, CT's & Line Switch)
1.During the lc period 110 KV Podanur ss under total S/D, Hence no ss will be affected.
subject to pothanur ss availing tsd
SRPUDUR 230 KV
During the LC period 230 KV SR Puthur - Sankaneri feeder will be in service.Hence No SS will be affected.
SUB TO TTPS GEN AND WIND
GEN
1053 Madurai 56385 110 KV Monthly maintenance work POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 13:00 1 0 Approved
1054 Madurai 56392 230 KV For monthly maintenance work PO SSIBLE Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 Approved
1055 Chennai 56413 400 KV For Monthly mtce. work Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1056 Madurai 56453 230 KV Monthly Maintenance Work POSSIBLE Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 0 Approved
1057 Erode 56474 230 KV MTPSII 230KV GOBI FEEDER possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1058 Erode 56478 230 KV possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1059 Chennai 56493 230 KV 230KV SPK-VEERAPURAM FEEDER FOR QUARTERLY MTCE WORK Possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1060 Chennai 56551 400 KV 400 KV SVC-I feeder and its equipments Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 Approved
1061 Chennai 56582 230 KV 100MVA Auto Transformer III Monthly maintenance work. 100MVA Auto Transformer I & II will be in service Possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 12:00 1 0 Approved
1062 Madurai 56663 110 KV POSSIBLE Wed, 21-Jun-2017 8:00 Wed, 21-Jun-2017 16:00 1 Approved
1063 Chennai 56675 110 KV 110 KV Perungudi II feeder GRT relay test Perungudi I feeder will be in service Possible Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 Approved
1064 Madurai 56694 110 KV LINE MAINTENANCE WORKS POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 0 Approved
1065 Madurai 56722 110 KV POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 0 Approved
1066 Madurai 56777 230 KV Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1
1067 Madurai 56781 110 KV 110 KV Bus section I For Monthly Maintenance Works. 0 0 Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 REPEAT Repeat
1068 Erode 56782 110 KV 1. SCHEDULED SHUT DOWN AT KAVUNDAMPALAYAM SS possible Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 16:00 1 Approved
1069 Madurai 56845 230 KV 230 KV Thiruvarur - PPN Feeder POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
1070 Erode 56866 230 KV For monthly maintenance works possible Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 17:00 1 Approved
1071 Madurai 56895 110 KV then I 230 KV 110KV Capacitor bank Breaker with CT monthly mtce works No Interruption POSSIBLE Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 13:00 1 0 Approved
1072 Madurai 56905 230 KV Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1
1073 Madurai 55850 230 KV 230/33KV Power TrFr HV & LV Breaker Monthly Mtce Works Power Trfr Loads will be transfered to other Trfrs POSSIBLE Wed, 21-Jun-2017 10:00 Wed, 21-Jun-2017 15:00 1 Approved
1074 Madurai 56846 230 KV 230 KV Thiruvarur - PPN Feeder 0 Wed, 21-Jun-2017 9:00 Wed, 21-Jun-2017 17:00 1 Approved
944 Erode 55822 230 KV KUNDAH PH3 230KV KPH2 – ARASUR FEEDER For PMI Work postponed Thu, 22-Jun-2017 8:00 Thu, 22-Jun-2017 17:00 1 Approved
1075 Madurai 55658 110 KV TRICHY230KV POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 16:00 1 Approved
1076 Madurai 55659 110 KV TRICHY 230 KV 1) 110KV BUS ENTIRE POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 16:00 1 Approved
1077 Madurai 55680 110 KV For monthly maintenance work POSSIBLE Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 12:00 1 Approved
1078 Chennai 55693 230 KV 100 MVA AUTO TRANSFORMER-III ROUTINE MAINTENANCE WORKS. Possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 15:00 1 0 Approved
1079 Madurai 55710 230 KV Monthly mtce works During the LC period None feeder will be affected POSSIBLE Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 15:00 1 Approved
1080 Erode 55739 230 KV possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1081 Erode 55782 230 KV Monthly Maintenance work possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1082 Madurai 55794 110 KV For monthly maintenance works. POSISBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1083 Erode 55823 230 KV KUNDAH PH3 230KV KPH2 – ARASUR FEEDER For PMI Work possible Thu, 22-Jun-2017 8:00 Thu, 22-Jun-2017 17:00 1 Approved
ANUPPANKULAM 230 KV
110 KV APKM - RJPM - I feeder Br., CT. and Line switch only.
During the LC period the 110 KV Vembakkottai SS load will be transfer to 230 KV Nallamanaickenpatti SS. Hence no SS will
be affected.
NALLAPPANAYAKANPATTY 230 KV
1)230/110 KV Auto II, 230KV HV Breaker II with CT, 110KV LV Breaker II with CT 2)110 KV Thottiapatti # breaker with C.T and Bus & line isolators, 110KV Nallamanaickenpatti #breaker with C.T and Bus isolator and 110KV Bus Section II
During the LC period 110 KV Thottiapatti SS, 110KV Padikasuvaithanpatti SS , 110KV Srivilliputtur Substation and 110KV Nallamanaickenpatti SS will be availing total Monthly
shutdown on that day. Nallamanaickenpaty-Kodikurichi -Kadayanallur Feeder radial from other end and concurrence
obtained from other end.Hence no SS afftected.
SUB TO LOAD CONDITION
Sunguvarchatram 400 KV
200 MVA, 400/110 KV Auto Tr,-III with Tie - 3 breaker
During the period of LC, the 400/110 KV Auto-IV will be cater the load of Auto - III with out interruption.
Subject to OCC concurrence
APP IN 131 OCC IDE ITEM NO.234
SAMAYAPURAM 230 KV
100 MVA Auto Transformer-II, HV-II, LV-II, Breakers , CT's, and isolators
During the above Shutdown Period 100 MVA Auto Transformer I will be in service. No interruption to any other SS
MONTHLY MAINTENANCE WORKS TO BE CARRY OUT.
UNIT IN SERVICE. ALL 400KV PALAVADAI-I&II ,KARAMADAI-I&II AND ICI-I&II ARE IN SERVICE.ALL 230KV METTUR AUTO
SS,MTPS-I AND STANDBY TRANSFORMER EXCEPT THINGALUR FEEDER ARE IN SERVICE.
subject to the load condition
existing
KARIAMANGALAM 230 KV
1.110 KV Bargur feeder breaker, CTs & Line switch
Carryout Monthly SS Maintenance works by maintenance wing
110 KV Bargur and 110/33 KV Penneswaramadam are availing total shut down. Expected load relief : 33 MW. The station
loads will be managed by keeping Auto Transformer - I, II & III and 230 KV Shoolagiri and Mettur feeder are in service and
also 1 No Grid feeder in service.
subject to bargur ss and
penneeswramadam ss availing
tsdS.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, ALL OTHER 230KV
FEEDERS WILL BE IN SERVICESubject to CBD Concurrence
Alamathy 400 KV
For annual relay testing and maintenance works.
1. 400 KV SVC-I feeder will not be in service.2. 400 KV SVC-II feeder will be in service.
Subject to OCC concurrence
APP IN 131 OCC IDE ITEM NO.169
KADAPPERI 230 KV
KAYATHAR 110 KV
110KV KAYATHAR-K.G.PATTI FEEDER SEC B/W PERUMALPATTI & KARIVALMVANTHANALLUR
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION
DURING THE LC PERIOD,1.PERUMALPATTI SS WILL BE RADIALLY FED FROM K.G.PATTI.2.KARIVALMVANTHA NALLUR
SS WILL BE RADIALLY FED FROM KAYATHAR.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTHARAMANI 230 KV
Subject to CBD Concurrence
KAVANOOR 230 KV
110 KV KARAIKUDI-VALUTHUR # SEC. BET. THIRUVADANAI TO THONDI
MAIN LINE WILL BE KEPT IN TIED CONDITION. THONDI TO BE AVAILED SHUTDOWN
NEMALITHIPIYAKUDI 230 KV
110 KV NEMMELI THIPPIYAKUDI-THANJAVUR FEEDER (LP: 230KV NT KUDI SS TO 110KV ORATHANADU SS).
PREMONSOON INSPECTION WORK BY AE/LINES/PATTUKKOTTAI.
1)DURING THE LC PERIOD, 110KV THIRUKKANURPATTY SS, 110KV ECHANKOTTAI AND 110KV ORATHANADU SS RADIALLY FED FROM 230KV THANJAVUR SS. 2) ALL OTHER FEEDERS ARE
TIED CONDITION AND NO INTERRUPTION TO ANY SS. 3) IN 110 /33-11 KV ORATHANADU SS 33 KV ALONE WILL BE IN
SHUTDOWN.
THANJAVUR 230 KV
230 KV Thanjavur - Alundur-2 feeder, Breaker, CT, LI & CVT.
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For rectification works by the AEE/Lines/Thanjavur
During the LC period,1) the other end also will avail LC on the same day,2) all other 230 KV feeders will be in tied
condition,3) no supply interruption to any SS.NOT POSSIBLE
DUE TO LOAD CONDITION: LC
MAY BE PROGRAMMED ALONG WITH TOTAL S/D
Pending During ICT LC at Trichy PG
KODIKURICHY 230 KVCOIMBATORE 230 KV
1. 110 CBE - THUDIYALUR- I FEEDER ENTIRE (BREAKER AND CTs)
1. PMI WORKS BY AE / LINES / COIMBATORE2. MONTHLY MAINTENANCE WORKS
subject to kavundampalayam ss availing
tsdTHIRUVARUR 230 KV
Line premansoon inspection and rectification work, Breaker, CT's and Line side Isolator maintenance work.
During the LC period all 230KV feeder are in tied condition. Hence there will be no interruption of supply to any other ss.
SUB TO LOAD CONDITION
PONNAPURAM 230 KV
110 KV Ponnapuram - Thungavi # Breaker & CTs & line upto Thungavi SS
WITH MEDIUM WIND POWER GENERATION 1. 110KV THUNGAVI # WILL BE KEPT RADIAL FROM 230KV UDT SS/ 110KV
POOLAVADY # UP TO THIS END2. HENCE NO SS WILL BE AFFECTED
subject to thungavi being fed from udpt
ss
ALUNDUR 230 KV
230KV Alundur - Thanjavur-II Feeder Breaker, CT's, CVT's and Line Isolators.
a)Monthly Preventive Maintenance work.b)Premonsoon Inspection and tree cutting work. c)Relay Testing Work.
a)Other end also avail shutdown.b)All other 230 KV feeders will be in service.c)There will be no interruption of supply to any
other feeders.NOT POSSIBLE
DUE TO LOAD CONDITION: LC
MAY BE PROGRAMMED ALONG WITH TOTAL S/D
Pending During ICT LC at Trichy PG
UDAYATHUR 230 KV
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
THIRUVARUR 230 KV
Line premansoon inspection and rectification work, Breaker, CT's and Line side Isolator maintenance work & PPN Plant Testing work.
During the LC period all 230KV feeder are in tied condition. Hence there will be no interruption of supply to any other ss.
ALREADY APPLIED ON
21.6.17
Both end breaker open condition.Both bus & line mods open condition.Earth switch closed condition.
ph 2 to ph 3 feeder lc
recommeded
1. 110KV Trichy - Kovilur feeder breaker, CTs, line isolator and Line portion between 230KV SS Trichy and 110KV Kavalkaranpatti SS.
1. Monthly maintenance works. 2. Premonsoon inspection.
During LC period, 1) 110KV Kovilur feeder Line switch towards Trichy 230KV SS will be kept opened at 110KV Kavalkaranpatti
SS. 2) 110KV Kovilur feeder Line switch towards Kavalkaranpatti SS will be kept opened at Trichy 230KV SS.
3)110KV Manapparai SS availing total shut down for monthly maintenance works. 4) 110KV Trichy - Kovilur feeder will be
radial from 230KV Renganathapuram SS up to 110KV SS Kavalkaranpatti SS. 5) All other 110KV feeders will be in tied condition. 6) There will be no interruption of supply to any of
the intermediate SS. 7) Necessary concurrence to be obtained from 230 KV Renganathapuram SS.
SUB TO LOAD CONDITION
1. All 110KV bus isolator maintenance work, 2. 110KV bus coupler alignment checking and maintenance work.
condition. 2. All the three Auto Transformers will not be in service. 3. All the 7nos. 110KV feeder breakers will be in
tripped condition at Trichy 230KV SS. 4. 110KV Trichy link I & II, 110KV Trichy - Alundur I & II , 110KV Trichy - Srirangam and
110KV Trichy - Punalkulam feeder will be kept radial from respective other end. 5. 110KV Trichy - Kovilur feeder will be
radilal from Renganathapuram 230KV SS upto 110KV Kavalkaranpatti SS. 6. 110KV Manaparai SS availing total
shutdown. 7.Supply to Trichy 110 KV Grid SS Bus will be fed through 110KV Samayapuram - Trichy II feeder from 230KV Thatchankurichi SS and 110KV Pugalur - Ayyermalai - Trichy feeder from 230KV Pugalur SS. 8.If necessary supply will be extended to 110KV Trichy grid SS from 230KV Alundur SS through the bypass arrangment switches between 110KV
Alundur I feeder and 110KV Trichy Link I feeder (switvh no.48 & 49). 9. No interruption of supply to any other SS. 10.
Necessary concurrence obtained from SE/O/Trichy and the respective other 230 KV SS and 110 KV Grid SS. 11. All 230KV
SUB TO LOAD CONDITION
Uthumalai 110 KV
on 110 KV Uthumalai - vannikonandal Feeder breaker with CT only
110 KV Kanarpatty - K.Veeranam supply is to be extended upto this SS end by closing 110 KV lines to be closed towards
uthumalai SS at 110 KV Surandai SSNo SS Affected, 110 KV kanarpatty - Keela veeranam feeder. supply to be extended
upto 110 KV veerasigamani SS
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
TONDIARPET 230 KV
DURING THE PERIOD OF SHUTDOWN,100 MVA AUTO TRANSFORMER-III WILL NOT BE IN SERVICE.ALL OTHER
FEEDERS AND EQUIPMENTS WILL BE IN SERVICE.
UDAYATHUR 230 KV
230KV ABISHEKAPATTI FEEDER Breaker CT, CVT, Line Sw
SUB TO WIND GEN:APP IN 131 OCC VIDE ITEM
NO.180
UNJANAI 230 KV.230KV UNJANAI - P.CHANTHAI 230KV FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK
DURING THE L.C PERIOD, P.CHANTHAI 230KVSS ALSO PROGRAMMED TO AVAIL L.C ON THAT FEEDER SAME DAY
subject to the load condition
existing
SALEM AUTO 230 KV
100MVA Auto Transformer-III, HVIII, LVIII Breakers & their CTs and 110KV Singapuram Feeder-I Breakers, CT's and Line Isolators.
1. 2Nos. 100MVA Auto Transformer-I & II will be in service 2. 110KV Singapuram feeder-I will be fed radially from other end.
3. Udayapatty 110KV SS will be availing total shutdown. 4. There will be no interruption to any SS or feeder.
subject to the other auto trs loading limit
TUTICORIN -SIPCOT 230 KV
On 110KV Sipcot-TTN-I feeder breaker with CTs only.
During the L.C period, 110 KV Vagaikulam shut down condition &110 KV Sipcot SS SS and 110kv kombukaranatham SS will be radially fed from 230KV Auto SS/TTN end and no other SS will
be affected pleaseBoth end breaker open condition.Both bus & line mods open
condition.Earth switch closed condition.subject to the load condition
existing
1084 Madurai 55837 110 KV 110 kv MCL-II Feeder Breaker,CT's only For Monthly maintenance works At present there is no import/Export in M/s MCL . POSSIBLE Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1085 Erode 55874 230 KV For Monthly Maintenance work possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1086 Erode 56246 110 KV ARASUR 230 KV possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 15:00 1 Approved
1087 Madurai 56257 110 KV For monthly maintenance works POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 14:00 1 Approved
1088 Erode 56289 400 KV Programmed LC at 400 KV Switch yard MTPS-2 on 22.06.2017 possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 14:00 1
1089 Erode 56297 110 KV 110KV MDPH Feeder I For Monthly Maintenance work During the LC period 110KV MDPH Feeder II will be in service possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1090 Erode 56307 230 KV ALIYAR 230 KV Monthly Mtce work During LC period AUTO Transformer-I will caters the load possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 16:00 1 Approved
1091 Erode 56325 110 KV For monthly maintenance works. possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 14:00 1 Approved
1092 Madurai 56353 110 KV 110 KV SRP-KKY # Breaker ENTIRE. 110 KV SRP-KKY # Breaker, CT only POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1093 Madurai 56369 230 KV During LC period there will be no supply in the entire feeder POSSIBLE Thu, 22-Jun-2017 0:00 Thu, 22-Jun-2017 0:00 1 0 Approved
1094 Madurai 56386 110 KV For Monthly Maintenance Works. POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 13:00 1 0 Approved
1095 Erode 56480 110 KV possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1096 Erode 56484 400 KV MTPSII 400KV KARAMADAI-II FEEDER possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1
1097 Madurai 56553 230 KV 230KV Valuthur - Kavanoor feeder entire POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1098 Madurai 56564 400 KV Monthly Maintenance work 110KV load will be fed by ICT3 and ICT4, no ss affected. POSSIBLE Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 17:00 1 Approved
1099 Madurai 56615 230 KV For monthly maintenance work. Other end also proposed L.C. POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 14:00 1 Approved
1100 Madurai 56630 110 KV KODAIYAR PH2 110KV Kayathar feeder POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 13:00 1 Approved
1101 Erode 56649 110 KV possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 15:00 1 Approved
1102 Madurai 55540 230 KV POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1103 Erode 55560 110 KV possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 13:00 1 Approved
1104 Erode 55588 110 KV Salem 400 KV 110KV Salem-II # Bkr,CTs & Line switch Monthly Maintenance work possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1105 Madurai 55888 230 KV kayathar400kv For monthly maintenance work. POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1106 Erode 55910 230 KV GOBI 230 KV possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1107 Erode 55926 110 KV possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1108 Erode 55978 230 KV For monthly maintenance works. 0 Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1109 Madurai 56021 230 KV 0 Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1110 Chennai 56687 230 KV Possible Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1111 Madurai 56697 230 KV 230 KV KAVANOOR-VALUTHUR # LINE MAINTENANCE WORKS POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1112 Madurai 56731 110 KV POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1113 Chennai 56732 230 KV 100MVA AUTO TFR-III Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 15:00 1 0 Repeat
1114 Erode 56788 230 KV MONTHLY MAINTENANCE WORKS possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 16:00 1 Approved
1115 Madurai 56809 110 KV 110KV AKL I # Bkr and CT only Monthly maintenance work POSSIBLE Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1116 Madurai 56810 230 KV 230KV Auto III, HV III and LV III Monthly maintenance work During the LC period Auto I & II will be in service. POSSIBLE Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 17:00 1 Approved
1117 Erode 56867 110 KV possible Thu, 22-Jun-2017 10:00 Thu, 22-Jun-2017 17:00 1 Approved
1118 Erode 56869 110 KV possible Thu, 22-Jun-2017 13:00 Thu, 22-Jun-2017 17:00 1 Approved
1119 Madurai 56022 110 KV For Monthly maintenance work. POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1120 Madurai 56033 230 KV 230 KV Transfer Bus section For monthly maintenance work. 0 POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1121 Madurai 56120 230 KV Other end is also availing LC 0 Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 16:00 1 0 Approved
1122 Madurai 56136 230 KV Monthly maintenance works Auto Tr-III Load will be Contained Other Auto. Tr-I & II. POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
EACHANGADU 230 KVDEVIAKURICHI 230 KV
100 MVA Auto Transformer – I ,HV & LV Breakers and CTs
Auto Transformer II will be in service. 110 KV Deviakurichy-Singipuram feeder I and II will be kept radial from Singipuram
230kV SS end
subject to the other auto tr loading limit
110 KV CAPACITOR BANK-II BREAKER, CTS AND CELL UNITS
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, REMAINING 2 NOS. 110 K V CAPACITOR BANKS WILL BE IN SERVICE.
subject to the voltage profile
in the grid
SANKANERI 230 KV
110KV Sankaner- koodankulam feeder Breaker CTs & Lineswitches.
During the LC Period 110KV Vijayapathy SS supply Radially fed from SRPuthoor-Arumuganeri feeder-II, By Closing Buscoupler-
II at 110KV Koodankulam SS.Hence no SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
METTUR AUTO 230 KV
400 KV MTPS-2 -Karamadai feeder circuit -2 entire
Jumber cone Tightness checking at 400 KV MTPS-2 - Karamadai feeder circuit -2 Bay at MTPS-2
occ approval not available
and hence srldc to be
addressed for the same
Approval to be obtained from SRLDC
METTUR AUTO 230 KV
subject to feeder 2 being
in serviceAUTO TRANSFORMER-II WITH HV&LV,CB,CT AND LAS
subject to the other auto tr loading limit
OTHAKKAL MANDABAM 230 KV
110 KV OKM-Udpt 2 Feeder (Breaker, CT's & Line Switch)
1.During the lc period 110 KV Millkoilpalayam SS under Total Shut down.2.110 KV Kongalnagaram ss will be fed from 110 KV
UDPT ss.3.Hence no ss will be affected.
subject to the feeder being kept radial
from udpt ss end
SRPUDUR 230 KV
During the LC period 110/11 KV Karungulam SS and will avail back feeding supply from 110 KV Palavoor # and 110/11 KV
Kannanallur SS will avail back feeding supply from 110 KV SRP-MPL #. Hence no SS will be affected
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENCHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Kayathar I feeder entire
For monthly maintenance work and line maintenance work
ANUPPANKULAM 230 KV
110 KV APKM - PPTY # Br., CT., and line switch only.
During the LC period the 110 KV Paraipatty SS load will be transferred to T.KALLUPATTI feeder. Hence no SS will be
affected.
KARIAMANGALAM 230 KV
1.110KV Karimangalam feeder breaker, CTs,Line switch 2.Auto Transformer -I with HV- I Breaker and CTs & LV- I Breaker CTs. 3.Shoolagiri 230KV feeder breaker and CT`s and Line switch, Line Between 230 KV Karimangalam SS to 230 KV Shoolagiri SS.
Monthly SS Maintenance works by maintenance wing and GRT Relay testing 230 KV Shoolagiri # and Auto Transformer - I and Lines wing Programed Jumper Bolt & Nut Tightness work in 230 KV Karimangalam SS - 230KV Shoolagiri SS at Loc No: 44-55
110 KV Kariyamangalam availing total shut down. Expected load relief : 50 MW. The station loads will be managed by
keeping Auto Transformer - II & III and 230 KV Mettur feeder in service and also 1 No Grid feeder in service.
subject to the tsd relief
MONTHLY MAINTENANCE WORKS AS APPROVED BY OCC.
UNIT IN SERVICE. ALL 400KV PALAVADI-I&II, KARAMADAI-I AND ICT-I&II ARE IN SERVICE.ALL 230KV FEEDERS EXCEPT
THINGALUR FEEDER ARE IN SERVICE.
occ approval not available
and hence srldc to be
addressed for the same
Approval to be obtained from SRLDC
VALUTHUR 230 KV
1. For attending breaker and it's CT's and isolators Monthly Maintenance work.2. For attending tower to tower inspection work.
During the LC period 230KV Valuthur - Karaikudi and Alagarkovil feeders will be in service. Hence, there is
KANARPATTY 400 KV
400/110KV ICT5, HV breaker with CT (413 Bay), LV breaker with CT (109 Bay)
SUB TO WIND GEN:APP IN 131 OCC VIDE ITEM
NO.240ALAGARKOIL 230 KV
230KV ALKL-Alanthur # breaker with CT @ Line entire.
SUB TO ALDR ICT LOADING
Monthly maintenance of breaker, CT & LS
Feeder will be in radial from 110KV kayathar SS upto 110KV Veeravanallur SS. No SS will be affected.
SUB TO WIND GEN
Singarapet 110 KV
110KV ARNI FEEDER II BREAKER, CT'S AND LINE SIDE ISOLATORS.
FOR MONTHLY MAINTENANCE WORK AND FOREST AREA TREE CUTTING WORK.
DURING THE LC PERIOD,1. 110KV ARNI # II RADIAL CHARGED AT SINGARAPET END.2. HENCE, NO INTERRUPTION OF SUPPLY.
feeder radially charged
KAYATHAR 230 KV
On 230 KV Kayathar - Checkanurani I feeder, breaker with CT and entire Line
a) For monthly Maintenance workb) Tower to Tower inspection work
During the LC period other end also avails LC and there will be no supply in the entire line. Hence, no ss asffected
SINGARAPET 230 KV
110 KV SSREL # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the LC period 1. Singarapet end breaker alreay in Handtrip condition2. By availing blink between 110 KV
Singarapet - SSREL feeder line isolators towards Singarapet at 110 KV Uthangarai SS will be opened. 3. 110 KV Uthangarai SS
loads already fed by Karimangalam SS
breaker already in hand tripped
condition
During LC Period, 110 KV Karuppur SS will be avail total shut down on 22.6.17
subject to karuppur ss availing tsd
230 KV Madurai # Main Breaker (202-52), & CT,CVT
During the LC period there will be no supply in 230 KV Madurai # Main Breaker (202-52), & CT,CVT. Hence no SS will be
affected.SUB TO WIND
GENAuto Transformer-III HV, LV Breaker and CTs with Bus coupler breaker and CT’s
FOR MONTHLY MAINTENANCE WORK
AUTO TRANSFORMER I AND II ARE IN SERVICE,IT MAY CATER THE LOAD
subject to the other auto trs loading limit
SALEM AUTO 230 KV
110 KV Salem – KR Thoppur II feeder section between KR Thoppur 400KV SS and Karuppur 110KV SS
Tension point jumper checking work
1. 110KV Salem II feeder breaker kept hand tripped at KR Thoppur end. 2. 110KV series switch at Karuppur 110KV SS towards KR Thoppur kept opened. 3. KR Thoppur 400KV SS availing breaker and line switch LC on that day. 4. Karuppur
110KV SS availing Total shutdown on that day.5. 110KV supply will be radial upto Karuppur 110KV SS from Salem 230KV SS.6.
There will be no interruption to any SS.
subject to karuppur ss availing tsd
pudhanchanthai230kv
230KV Unjanai feeder CB, CTs, CVTs, Wave Traps and 230KV Switches.230KV Unjanai feeder Bus-B side Switch.
During LC period230KV Pugalur and Deviakurichy feeders will be kept tied with grid. 230KV Bus-B now idly charged through Bus Section CB will be hand tripped. 230KV Unjanai SS also availing LC in the same feeder at Opposite end. No supply
interruption.
PUGALUR 230 KV
230 KV Pugalur - Paramathy II feeder Breaker, CT & line switch and line entire only
Replacement of existing 230KV C&R Panel by new one and Monthly Mtce work. In coordination with P&C wing,Erode.
During the LC period, there will be no supply in 230 KV Pugalur - Paramathy II feeder. Hence There is no interruption to any
SS,Already LC approved in 131th OCC meeting. Note: 1) LC to be availed in 230KV Pudansanthai # on 21.6.17 2) The 110KV Chinthamanipatty SS,(12MW),110 KV Pugalur SS (9MW) are
proposed total shutdown on 22.06.17. Total load relief 21MW.
2 DAYS LC FROM 21.6.17
GUMMIDIPOONDI 230 KV
110KV Durainallur feeder, Breaker, CT, Line Isolators
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
During the Period of Shut down the 110KV Durainallur SS availing Total Shut down.
KAVANOOR 230 KV
SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER
THIRUVARUR 230 KV
110KV T(K)GTPS - THIRUVARUR FEEDER (VIA: 110KV ULLIKKOTTAI SS, 110KV OKKANADU KEELAIYUR SS & 110KV MANNARGUDI SS), LINE PORTION BETWEEN 110KV ULLIKKOTTAI SS TO 110KV MANNARGUDI SS .
FOR PREMONSOON INSPECTION WORK BY AE/LINES/ PATTUKKOTTAI.
1) DURING THE LC PERIOD, 110KV OKKANADU KEELAIYUR SS AVAILED TOTAL SHUTDOWN. 2) 110KV MANNARGUDI SS RADIALLY FED FROM 230KV THIRUVARUR SS. 3) 110KV ULLIKKOTTAI SS RADIALLY FED FROM T(K)GTPS . 4) NO
INTERRUPTION TO ANY SUBSTATIONS.
SUB. TO LOAD CONDNS.
TONDIARPET 230 KV
FOR ROUTINE MAINTENANCE WORKS.
EXCEPT 100MVA AUTO TFR-III,ALL OTHER FEEDERS AND EQUIPMENTS WILL BE IN SERVICE.
Repeat 55693
COIMBATORE 230 KV
1. 230KV COIMBATORE - THUDIYALUR FEEDER BREAKER, CTS, 89L ISOLATORS
1. LC PROPOSED IN 230KV THUDIYALUR - COIMBATORE FEEDER AT 230KV THUDIYALUR SS
subject to the load condition
existingSEMBATTY 230 KV
During the LC period, the # will be radial from other end. Hence no interruption to any SS.
SEMBATTY 230 KV
SUBJECT TO LOAD CONDNS.
& AFTER AVAILING OF
BUS LC AT TRYPONNAPURAM 230 KV
110 KV Ponnapuram - Ingur I # Breaker, CTs & line upto Selampalayam SS
For monthly maintenance works & Annual testing by P&C Wing
WITH MEDIUM WIND POWER GENERATION 1. 110KV INGUR-I # WILL BE KEPT RADIAL FROM 230KV KURUKATHI SS UP TO THIS
END2. HENCE NO SS WILL BE AFFECTED
subject to the load condition
existingPONNAPURAM 230 KV
110 KV Ponnapuram - Ingur II # Breaker, CTs & line upto Kulathupalayam SS
For monthly maintenance works & Annual testing by P&C Wing
WITH MEDIUM WIND POWER GENERATION 1. 110KV INGUR-II # WILL BE KEPT RADIAL FROM 230KV INGUR SS UP TO THIS
END2. HENCE NO SS WILL BE AFFECTED
subject to the load condition
existingPUGALUR 230 KV
110KV Pugalur-Link feeder Breaker,CTs,Line switch and line entire
During the L.C period, 110 KV Pugalur SS proposing total shut down and concurrence obtained from EHT consumer M/s. EID
Parry/PugalurKODIKURICHY 230 KVALAGARKOIL 230 KV
230 KV ALKL-Alandhur # Bkr,CT,&Line entire
Monthly Mtce work &tree cutting works(Loc 163-198, 223-222)
KARAIKUDI 230 KV
230 KV Auto TR -III and its allied equipments
SUB TO LOAD CONDITION
1123 Erode 56145 230 KV 230 KV TDLR-CBE feeder breaker,CTs. For monthly maintenance works 230 KV TDLR-CBE feeder radial from other end. possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 14:00 1 Approved
1124 Madurai 56205 230 KV EE / O / 400 KV KYTR has also programmed POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 14:00 1 Approved
1125 Erode 56215 110 KV ALIYAR 230 KV For annual Mtce works 1X60MW Aliyar PH m/c is under S/D for AOH works. possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 16:00 1 Approved
1126 Madurai 56896 110 KV then I 230 KV POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 0 Approved
1127 Madurai 56906 230 KV POSSIBLE Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 17:00 1 Approved
1128 Chennai 56940 230 KV 230 KV Bus Coupler & Trnasfer Bus CVT Monthly maintenance work Possible Thu, 22-Jun-2017 9:00 Thu, 22-Jun-2017 14:00 1 0 Approved
1129 Madurai 56666 110 KV FOR JUMBER TIGHTNESS WORK 0 Fri, 23-Jun-2017 8:00 Fri, 23-Jun-2017 17:00 1 Approved
1130 Erode 55665 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1131 Erode 55729 110 KV Erode 110 KV 110 KV ERODE BKB -I FEEDER AND CT MONTHLY MAINTENACE WORK DURING LC PERIOD NO SS WILL BE AFFECTED possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1132 Madurai 55732 110 KV For monthly maintenance work . No SS will be affected. POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1133 Madurai 55798 110 KV For monthly maintenance works. POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1134 Madurai 55851 230 KV monthly Maintenance works 0 Fri, 23-Jun-2017 10:00 Fri, 23-Jun-2017 15:00 1 Repeat
1135 Madurai 56277 110 KV For monthly maintenance work. POSSIBLE Fri, 23-Jun-2017 10:00 Fri, 23-Jun-2017 16:00 1 Approved
1136 Erode 56285 110 KV ARASUR 230 KV possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 15:00 1 Approved
1137 Erode 56301 110 KV postponed Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1
1138 Erode 56303 110 KV For Quarterly maintenance Work. 0 Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Repeat
1139 Madurai 55541 230 KV POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1140 Erode 55616 110 KV BKB - 1 110 KV BKB-I-ERODE FEEDER possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1141 Madurai 55898 110 KV For monthly maintenance work POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1142 Erode 55928 110 KV possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1143 Erode 55952 110 KV Samayasangili SS total shutdown possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1144 Erode 55955 110 KV Jumper tightness &PMI Veepadai SS total shutdown possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1145 Erode 56007 110 KV Monthly Maintenance 110 KV Veppadai SS & Komarapalayam avail TSD on that day. possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1146 Madurai 56034 110 KV 110 KV Bus section II For monthly maintenance work. 0 POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1147 Madurai 56066 230 KV POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1148 Erode 56326 230 KV possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 14:00 1 Approved
1149 Madurai 56357 110 KV 110 KV SRP-PZR # entire POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1150 Madurai 56371 230 KV During LC period there will be no supply in the entire feeder POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1151 Madurai 56372 110 KV POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1152 Madurai 56387 230 KV 230 KV TTPS-Pasumalai # entire Premonsoon Inspection works POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 14:00 1 0 Approved
1153 Erode 56403 230 KV NO SS WILL BE AFFECTED DURING LINE CLEAR. possible Fri, 23-Jun-2017 10:00 Fri, 23-Jun-2017 17:00 1 tbc Approved
1154 Madurai 56455 110 KV POSSIBLE Fri, 23-Jun-2017 10:00 Fri, 23-Jun-2017 17:00 1 Approved
1155 Chennai 56512 230 KV 100MVA AUTO TR.II FOR MONTHLY MTCE WORK Possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1156 Erode 56521 230 KV possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1157 Erode 56531 110 KV possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1158 Chennai 56577 230 KV MOSUR 230 KV Tie Breaker NIL Possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 14:00 1 0 Approved
1159 Madurai 56635 110 KV KODAIYAR PH2 110KV SR pudur # No.2 POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 13:00 1 Approved
1160 Erode 56654 110 KV BKB - 2 Monthly Maintenance Work possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1161 Madurai 56702 110 KV LINE MAINTENANCE WORKS POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
THUDIALUR 230 KV
subject to the load condition
existingPASUMALAI 230 KV
1) 230 KV Pasumalai - Kayathar # BKR,CT and LI only. 2)Line Entire.
a)Maintenance Works of BKR & CT,LI b)T-T inspection works
SUB TO WIND GEN
110KV Aliyar Link-II # CB,CT and Line switch
subject to aliyar machine lc continuing
110KV Theni - sempatty II # line (Section between Theni SS & Eluvamapatty SS )
110KV Vaigai spur line switch ( II #) overhauling & Painting work
Periayakulam SS, Kodaikannal SS & Vaigai SS will be under total shutdown
ALUNDUR 230 KV
230KV Alundur - Alagarkoil Feeder Breaker CT'S,CVT'S and Line Isolators.
a)Preventive Monthly Maintenance Work.b)Relay testing Work.c)Premonsoon Inspection Work.
a)230KV Alundur - Alagarkoil feeder both end avaling Total Shut down.b)All other 230 KV feeder's will be in
service.c)There will be no interruption of supply to any other feeders & ss.
SUB TO ALDR ICT LOAING
THIRUVANNAMALAI 230 KV
During the period of L/C time, 230 KV transfer Bus will be OFF condition and there is no interruption of supply to any of the
SS
KAYATHAR 110 KV
230KV ABISEKPATTI-UDAYATHUR FEEDER ENTIRE LINE
DURING THE LC PERIOD ,THERE WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
PROGRAMMED ON
23.6.17:SINCE APP IN 131 OCC
VIDE ITEM NO.180
110KV Ponnapuram # II Breaker, CTs, ,Isolators and Line side Isolator
subject to the load condition
existingsubject to the load condition
existingTUTICORIN -AUTO 230 KV
On 110KV TTN-Sipcot-II feeder breaker with CT bus and line side switches
TUTICORIN -SIPCOT 230 KV
On 110KV Sipcot-TTN-II feeder breaker with CTs and line isolators only.
During the L.C period, the 110KV Sipcot -TTN#-II will be in `off ` condition at both ends. The other end has also proposed LC on the same date. Since there is no intermediate SS, no other
SS will be affected please.UDAYATHUR 230 KV
230 KV Abisekapatti Feeder Breaker, CT ,CVT & Line SW
During the Lc period there will be no supply on entire feeder,other end will be informed
ALREADY APPLIED ON
21.6.17PERAMBALUR 230 KV
110KV DSSL Feeder (Krishnapuram) breaker CT's only
During the above period of shut down i) 110KV Krishnapuram SS, 110KV Mangalamadu SS,110KV Esanai SS and
Dhanalakshmi sugars will be radially fed from 230KV Deviyakurichy SS.
CONCURRENCE FROM ERODE
110 KV ARASUR-KANIYUR FEEDER BREAKER AND CTS ONLY.
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, 1) 110 K V KANIYUR SS WILL BE UNDER TOTAL SHUT DOWN.
subject to kaniyur ss
availing tsdLOWER METTUR 3
On 110 KV BPH3-BPH4 # BKR, CT, Line isolator, entire line.
To carry out the monthly maintenance works.
During the LC period, 1) 110KV BPH3-BPH2 #, 110KV BPH3-ANTHIYUR #, both will be in service. 2) Unit - I, Unit – II will be in service/standby as per PWD Demand. 3) On the same day
Bph4 has also programmed to avail LC at Bph4 end.
bkb 1 to erode feeder lc
recoimmended
Subject to EE/SLDC/Erode Concurrrence
LOWER METTUR 4
On 110KV BPH4 - BPH3# Breaker, CT'S, line isolators, entire line
During the LC Period,1)110KV BPH4-PKPM#,110KV BPH4-NSPM# both will be in service . Unit-I and II both will be in service/standby as per existing PWD demand. 2)At BPH3 end,line isolator towards BPH4 should be kept opened &
earthed. 3)On the same day BPH3 also programmed to avail LC on 110kv BPH4-BPH3 #.
repeat of 56301
KAYATHAR 230 KV
on 230 KV Kayathar - Checkanurani II feeder, breaker with CT, Entire Line and GRT
a) Monthly Maintenance workb) Tower to Tower Inspection workc) GRT Annual relay and breaker testing
During the LC period other end also avails LC and there will be no supply in the entire line. Hence, No ss affected
FOR MAINTENANCE IN 110KV CTs, BREAKER AND LINE SIDE ISOLATOR
1)The 110KV BKB-1-pallakkapalayam and BKB-1-BKB-2 feeder will be in service 2)The unit-1 and unit-2 are in non stand by
condition 3)The Erode 110KV SS aiso proposed LC on the same day on that feeder 4)The PWD demand of 500 c/s will be met
out through barrage Gate.
subject to the load condition
existing
KAYATHAR 230 KV
110 KV Kayathar - Anupankulam feeder breaker with CT only
During the LC period the feeder will be radial from other end. Hence no ss affected.
SUB TO WIND GEN
UNJANAI 230 KV1.110KV UNJANAI - BKB-II FEEDER BREAKER, CT'S AND LINE ISOLATOR ONLY.2. AUTO TR NO :I BREAKER & CT'S ONLY.
FOR MONTHLY MAINTENANCE WORK
DURING THE L.C PERIOD,1.PALLIPALAYAM 110KVSS ALSO AVAILING PROGRAMMED TOTAL SHUTDOWN ON THAT DAY.2.
AUTO TRNO :II WILL CATER THE STATION LOADS.
subject to the load condition
existing
UNJANAI 230 KV 110KV BKB II -BKB I # line portion between BKB II and Samayasangili SS
Jumper replacement work at location 10.
subject to samayasangili
ss tsdUNJANAI 230 KV 110KV Pallakapalayam-Sankagiri I feeder
line entiresubject to
vepadai ss tsd
PALLAKAPALAYAM 230 KV
110 KV Sankari - I # & 110 KV Sankarei - II CT's, Breakers and Switches. One after another.
subject to samayasangili ss and vepadai
ss tsdKODIKURICHY 230 KV
SUB TO WIND GEN
PUDUKOTTAI 230 KV
230 KV PUDUKKOTTAI-ALUNDHUR FEEDER BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE
FOR MONTHLY MAINTENANCE OF BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE AND GRT TESTING WORKS
PUDUKKOTTAI 230 KV SS LOAD WILL BE MAINTAINED FROM 230 KV KARAIKKUDY PG FEEDER AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS. OTHER END ALSO
AVAILING SHUTDOWN.OTHAKKAL MANDABAM 230 KV
230 KV OKM-Anikkadavu Feeder Entire (Breaker, CT's, 89M1, 89M2 & 89L Isolators)
For Monthly mtce works and PMI works by Lines/UDPT wing
During the lc period the other 230 KV feeders are in service to cater the ss loads.
subject to the load condition
existing
SRPUDUR 230 KV
Line Mainteanace work,Annual relay testing work
During the LC period 110/11 KV Palavoor SS will avail supply from 110 KV SR Puthur - Kanyakumari feeder. Hence no ss will
be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENCHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Kayathar II feeder entire
For monthly maintenance work and line maintenance work
ALAGARKOIL 230 KV
110KV Alagarkoil - Sembatty #1 section between Samayanallur and Ammayanaickanur
For tower to tower inspection and flashover disc replacement work
During the LC period # will be radial from Sembatty upto Ammayanaickanur and radial from Alagarkoil upto
Sarmayanallur. Sholavandan under total shutdown. Hence no interruptionANUPPANKULA
M 230 KVDuring the LC period, the other end also availing LC on the
same Date & Time. Hence No SS will be affected.SADAYAMPALAYAM 230 KV
230 KV TRANSFER BUS COUPLER BREAKER, CTs AND ISOLATORS.
ANNUAL RELAY TESTING AND MONTHLY MAINTENANCE WORKS.
SAMAYAPURAM 230 KV
110 KV MUSIRI # Breaker & CTs and line portion between 230kV Samayapuram SS and 110KV Vengaimandalam SS.
Monthly Maintenance Work and Premansoon line patrol work.
During the above Shutdown Period, 1) 110 KV Musiri # will be fed thro'110 KV perambalur 2 # at 110KV KKDY SS by closing ABS.2 &3 at 110 KV Thathaingarpet SS and by closing Musiri
Breaker at 110 KV T.Pet SS. (Note: already in 110 KV Thuraiyur SS ABS 1&6 are in closed condition) 2) 110 KV Musiri #
Breaker at 230 KV SMPM SS will be in H/T condition and line isolator towards 110KV Vengaimandalam SS is Kept opened and earth switch closed . 3) At 110KV vengaimandalam SS towards 230KV Samayapuram SS Isolator is kept in open
condition and Earth switch closed condition. 4) 110KV Vengaimandalam SS is also availing total shutdown on that
same day. 5)Informed & necessary concurence obtained from Welpsun Solar Plant & EHT consumer (Arise) 6)There is no
interruption to any other 110 KV SS
SUB TO SOLAR GEN AND
CONCURRENCE FROM SOLAR
GEN FOR BLOCKING IF
OVER LOADED
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, 100MVA AUTO TR.I&IV WILL BE IN SERVICE
Subject to load condition
PALLADAM 230 KV
Auto Transformer III HV,LV Breaker CT's and LAS
To carryout monthly maintenance work by AEE/M/Palladam
1)Other Three Auto Transformers (I,II and IV) will be in service2)110 KV Palladam SS ,110 KV Elavanthy SS and 110 KV Pongalur SS availing total shutdown3)No other SS will be
affected
subject to the other auto trs loading limit
PALLADAM 230 KV
110 KV Elavanthy # Breaker,CT's and line entire
To carryout monthly maintenance work by AE/M/Palladam and to carryout premonsoon inspection work by AE/L/Palladam
1)110 KV Elavanthy SS and Pongalur SS availing total shutdown2)No other SS will be affected
subject to pongalur and elavanthy ss availing tsd
For attending Monthly Maintenance work.Monthly maintenance of breaker, CT, LS
Feeder will be radial from SR Pudur SS up to pechipparai 110KV SS. No SS will be affected.
SUB TO WIND GEN
BKB II to BKB I 110 KV # Breaker,CT,CVT & Bus & Line Isolators
In the above period Samayasangili ss under total shut down and BKB II to BKB I 110 KV # Line portion between BKB II to Samayasangili SS LC already applied by EE/O/Unjanai.In BKB
II,Unit 1 & 2 will be under Non S/B and all other feeders will be in service .
subject to samayasangili
ss tsdKAVANOOR 230 KV
110 KV KAVANOOR-VALINOKKAM-ARKAY # SEC. BET. VALINOKKAM & KEELAKARAI
FEEDER TO BE KEPT RADIAL FROM ARKAY UPTO KEELAKARAI & FROM KAVANOOR UPTO VALINOKKAM
SUB TO ARKAY GEN
1162 Chennai 56726 230 KV For EHT Line Maintenance Works Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 14:00 1 0
1163 Madurai 56735 230 KV POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1164 Chennai 56744 230 KV i)For Monthly Maintenance Works Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 15:00 1 0
1165 Chennai 56750 110 KV MANALI 230 KV 110KV ETPS-2 For Shifting to 110KV Manali GIS SS Possible Fri, 23-Jun-2017 10:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1166 Madurai 56811 110 KV 110KV capacitor bank I & II one by one Monthly maintenance work POSSIBLE Fri, 23-Jun-2017 10:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1167 Erode 56871 230 KV 230 KV Northern Bus Entire For monthly maintenance works possible Fri, 23-Jun-2017 10:00 Fri, 23-Jun-2017 17:00 1 Approved
1168 Erode 56875 110 KV possible Fri, 23-Jun-2017 8:00 Fri, 23-Jun-2017 17:00 1 Approved
1169 Madurai 56907 230 KV POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1170 Chennai 56109 230 KV 230KV Bus Coupler For monthly maintenance works. Possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 0 Approved
1171 Madurai 56139 230 KV All other 230KV #’s Tied with Grid. POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1172 Erode 56148 110 KV possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 16:00 1 Approved
1173 Erode 56160 230 KV 230KV Karamadai- Thudialur feeder LC programmed at other end also. possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 14:00 1 Approved
1174 Erode 56184 230 KV Auto transformer.NoIII , HV.III, LV.III possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1175 Erode 56190 110 KV possible Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 17:00 1 Approved
1176 Madurai 56206 230 KV EE / EM - III / TTPS has also programmed POSSIBLE Fri, 23-Jun-2017 9:00 Fri, 23-Jun-2017 14:00 1 0 Approved
866 Chennai 56743 230 KV Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1177 Madurai 55771 230 KV For monthly maintenance work. 0 Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1178 Madurai 56084 110 KV Tree clearance work 0 Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1179 Madurai 55664 110 KV TRICHY 230 KV POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 16:00 1 Approved
1180 Erode 55667 230 KV INGUR 230 KV 230 KV Bus Coupler Breaker, CT’s,Isolator MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 idle breaker Approved1181 Madurai 55711 230 KV During the LC period none feeder will be affected. POSSIBLE Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 14:00 1 Approved
1182 Erode 55766 230 KV KUNDAH PH2 0 Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1183 Erode 55783 110 KV Monthly maintenance work. postponed Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1
1184 Chennai 55809 110 KV 110 KV Kits park Feeder Quarterly Maintenance Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1185 Chennai 55816 230 KV ECHUR 230 KV 230 KV Echur – Kalapakkam # Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 16:00 1 0 Approved
1186 Madurai 55514 110 KV For Monthly Maintenance Work POSSIBLE Sat, 24-Jun-2017 15:00 Sat, 24-Jun-2017 17:00 1 Approved
1187 Madurai 55517 110 KV PAPANASAM 110KV PPM-SERVALAR FEEDER - 1 POSSIBLE Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 12:00 1 0 Approved
1188 Madurai 55542 230 KV POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1189 Erode 55561 110 KV possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 Approved
1190 Erode 55589 110 KV Salem 400 KV Monthly Maintenance Work possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
THIRUVALAM 230 KV 230KV Thiruvalam - Chittoor feeder entire.
During the period of LC i. 230KV Thiruvalam – Chittoor feeder Breakers both end will be in “ OFF†condition at �230KV Thiruvalam & 220KV Chittoor SS. ii. All other 230 KV
feeders 230KV Link II, Mosur, Link I feeders are in service.Hence there will be no interruption of supply please.
Subject to OCC concurrence
Subject to OCC concurrence
NEMALITHIPIYAKUDI 230 KV
A)230KV NEMMELI THIPPIYAKUDI-KARAIKUDI FEEDER BREAKER, CT's AND LINE ISOLATOR. B)230KV NEMMELI THIPPIYAKUDI-KARAIKUDI FEEDER.C)AUTO TRANSFORMER-II, HV-II, LV-II BREAKERS AND CT's.
A) MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ NEMMELI THIPPIYAKUDI. B) PREMONSOON INSPECTION AND RECTIFICATION WORK BY AE/LINES/PATTUKKOTTAI.C) FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/N T KUDI.
1) DURING THE LC PERIOD, 110KV PERAVURANI (LR: 20MW), 110KV SETHUBAVACHATHITRAM SS(LR: 8 MW), 110/33-11KV
MADUKKUR SS (11KV ONLY LR:11MW), 110KV URANIPURAM SS (LR: 8MW), 110KV PATTUKKOTTAI SS (LR:20MW), 110/33-11KV
VADASERI SS (LR: 18MW), 110KV KARAMBAKUDI SS ENTIRE (LR:25MW) AND 110KV KEERAMANGALAM (LR: 12MW) WILL AVAIL TOTAL SHUTDOWN (TOTAL LOAD RELIEF: 122 MW).2) AUTO TRANSFORMER-I in service. 3) NO INTERRUPTION TO
ANY OTHER SS. 4) IF NECESSARY, 110KV N T KUDI-THANJAVUR FEEDER TIE WILL BE OPENED AT 230KV N T KUDI SS.5)
230/110KV NEMMELI THIPPIYAKUDI SS RADIALLY FED FROM 230KV THIRUVARUR SS.
SUB TO LOAD CONDITION
THIRUVALAM 230 KV
i)On 230KV Chittoor interstate feeder Breakers and its CT’s and Line Isolators
During the period of LC i) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-
IV, will be in service and cater the SS Loads.ii) The 230KV Chittoor Interstate feeder will be in ‘OFF’ Condition iii) The 230KV Link-II, 230KV Link-I # and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be
no interruption of supply please.
Subject to OCC concurrence
Subject to OCC concurrence
110KV ETPS -2 will not be in service . After LC Work: ETPS-2 Will be in service
SEMBATTY 230 KV
During the LC period capacitor bank I & II will be in service one by one.
PONNAPURAM 230 KV
WITH MEDIUM WIND POWER GENERATION 1. 230KV OKM # WILL ER TWO AUTO BE CUT OFF AT THIS END,2. 230KV
SADAYAPALAYAM # WILL BE CUT OFF AT THIS END,3. IT IS EXPECTED THAT THE LOAD WILL BE WITH IN THE LIMIT OF OTHER TWO AUTO TR AND HENCE AUTO TR-II WILL BE CUT
OFF, 4. HENCE NO SS WILL BE AFFECTED
subject to the load condition existing and
the other auto trs loading limit
LOWER METTUR 1
BHAVANISAGAR - MHPH - 110 KV GC & 11 KV COMMON LV BREAKERS
For GRT Annual Relay Tests in 110 KV GC & 11 KV Common LV Breakers at MHPH / Bhavanisagar
1. During LC period, it is expected that all machines at MHPH will be in standby condition due to NIL or insufficient PWD
demand in the river to run the machines. Hence generation loss will not arise at MHPH / Bhavanisagar.2. During LC period, PWD demand in canal will be 5 c/s only. Hence generation loss
will not arise at RBCPH / Bhavanisagar.
for annual relay tests
ALUNDUR 230 KV
230KV Alundur - Pudukkottai Feeder breaker, CT'S, CVT'S and Line Isolators.
a)For monthly preventive maintenance works by the AEE/Mtce/Alundur.b)premonsoon inspection and tree cutting work.c)Relay Testing Work
a)Other end also avail shutdown.b)All other 230 KV feeders will be in service.c)There will be no interruption of supply to any
other feeders.
VILLUPURAM 230 KV
During the period of LC:(1)230KV Bus II in service and 230KV Bus I not in service.
KARAIKUDI 230 KV
230 KV KKDI – NT KUDI # BKR & CTs and230KV KKDI- N.T KUDI # Entire
Monthly maintenance works andTree Clearance work.
SUB TO LOAD CONDITION
THUDIALUR 230 KV
1. 110 KV arasur feeder Breaker, CTs2. 230 KV TDLR-Karamadai feeder Breaker, CTs
For monthly maintenance works one by one
110 KV arasur feeder radial from other end230 KV TDLR - Karamadai feeder radial from other end.
subject to the load condition
existingKARAMADAI 230 KV
Monthly maintenance works of Breakers, CT's and CVT's and P&C testing works
subject to the load condition
existing
UDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
3 AUTOS ARE IN PARALLEL . LOADS ARE SHARED WITH OTHER TWO AUTOS.
all other auto trs to be
available and within loading
limitMETTUR AUTO 230 KV
110KV Sankari- Salem feeder section between Sankari- 110 KVSS & Veerapandi 110 KVSS only.
For Jumber cone tightness checking at Tension Tower between Tower Loc.No.66 - 88
Veerapandi 110 KVSS have Programmed for total shut down on that day
subject to veerapandi ss availing tsd
PASUMALAI 230 KV
11)230 KV Pasumalai - TTPS #, BKR & CT,LI only. 2).Line Entire.
a)Maintenance Works of BKR & CT,LI b)Tree Cutting works at Loc 469 and 470 and T-T inspection works
THIRUVALAM 230 KV
i) On Auto Transformer –IV, HV-IV, LV-IV Breakers and its Cts Auto Tr -IV,HV -IV,LV-IV, and 230Kv Link -I,230KV Mosur feeder(Northern Bus) For Rectiffication of Bus Isolators in 230KV Northern Bus and monthly maintenance workii)On 230KV Link-I and 230KV Mosur feeder Breaker and CT’s, for monthly maintenance workiii)On 110KV Kaveripakkam feeder Breaker and its CT’s, for fixing of E/L,O/L Relay in Kaveripakkam feeder by GRT Wing Thiruvalam
i)For Auto Tr -IV,HV -IV,LV-IV, and 230Kv Link -I,230KV Mosur feeder(Northern Bus) For Rectiffication of Bus Isolators in 230KV Northern Bus and monthly maintenance workii)On 230KV Link-I and 230KV Mosur feeder Breaker and CT’s, for monthly maintenance workiii)On 110KV Kaveripakkam feeder Breaker and its CT’s, for fixing of E/L,O/L Relay in Kaveripakkam feeder by GRT Wing Thiruvalam
During the period of LCi) 110KV Kaveripakkam SS,110kv SIPCOT SS are availing Total shutdown on 18.06.2017.The total
shutdown approved and concurrence obtained by CE/Distribution/Velloreii) Auto-Tr-I ,HV-I,LV-I, Auto –Tr-II,HV-
II,LV-II, and Auto –Tr-III,HV-III,LV-III, will be in service and cater the SS Loads.iii) Auto-Tr-IV ,HV-IV,LV-IV will be in
‘OFF’ Condition.iv) The 230KV Link-I Feeder and 230KV Mosur feeder will be in ‘OFF’ Conditionv) The 230KV Chittoor interstate feeders,230KV Link-II # will be in service
and cater the SS Loads. Hence there will be no interruption of supply please.
Subject to load condition
TUTICORIN -SIPCOT 230 KV
On 230 KV SIPCOT-TTPS Feeder breaker with CTs and line isolators only.
During the L.C period, the other end has also proposed LC on the same date and no SS will be affected please.
POSTPONED TO 24.6.17
SRPUDUR 230 KV
110 KV SRP-KDR II # section between TKY to KDR .110 KV SRP-KDR I # section between VNR PPI( for safety purpose)
During the LC period the 110 KV SR Puthur - KDR II feeder will be radial from SRP upto TKY SS (excl).110 KV SR Puthur - KDR I
feeder will be radial from SRP upto VNRI SS (Incl). Concurreance to be obtained from Railway athoritise.Hence no
SS will be affected.
(SUBJECT TO LOAD CONDNS,
CONC. FROM S.RLY AND
SE.NCES, TIN LC MAY BE
PROGRAMMED ON 24.6.17:
APP IN 131 OCC VIDE ITEM
NO.184
110 KV Trichy Link I & II feeder breaker , CTs & Line Isolator and line entire one by one.
a) For monthly maintenance works. b) Pre monsoon inspection
During the LC period a) Trichy 110 KV Grid SS availing total shut down for monthly maintenance works. b) 110 KV
Iyyarmalai SS and 110 KV Pettavaithalai SS loads will be managed through 110KV Pugalur - Puliyur - Trichy feeder and M/s Welspun Solar power. c) All other 110 KV feeders will be in service. d) there will be no interruption of supply to any of the
SS.
SUB TO LOAD CONDITION
UDAYATHUR 230 KV
230KV Kayathar feeder Breaker CT CVT & Line SW
Monthly Mtce Works will b e carried out
SUB TO WIND GEN
230KV AUTO TRANSFORMER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
SALEM AUTO 230 KV
110KV Northern Bus upto Bus coupler switch no.1989
1. 110KV Capacitor Bank-I and II will be in hand trip condition. 2. 110KV K.R.Thoppur-I, II and 110KV Sankari feeders will be
radially fed from other end. 3. Mallur 110KV SS will be fed from Pudansandai 230KV SS. 4. Mallasamuthram 110KV SS will be
fed from Sankari 110KV SS or Unjanai 230KV SS through Paruthipalli feeder whichever is possible. 5. 110KV
Singapuram-I and II feeder will be in tie condition. 6. 3Nos. Auto Transformer will be in hand trip condition. 7. 110KV GC-I will be in hand trip condition. 8. 110KV GC-II will be feeding
Salem 110/22KV SS 9. There will be no interruption to any SS or feeder.
cannot be issued without
tsd
Subject to EE/SLDC/Erode Concurrrence
VEERAPURAM 230 KV
110 KV Kits park feeder load ( 110 KV Madampakkam SS ) To be transferred to 230 KV SS Kits park
Monthly maintenance work in 230 KV Echur - Kalpakkam Feeder CT, PT and , isolator,including all tightening work.
At the time of LC1.230 KV Echur - Kalpakkam # breaker will be H/T, 2.At the time, The Entire Load is fed from 230 Echur -Arni
# to all 110 KV Substation.3. After completion of work 230 Kalpakkam # breaker will be charged and Entire load is normalised and fed from 230 KV Kalpakkam #.Hence no
interruption of supply to any of the Substation.Uthumalai 110 KV
110 KV Uthumalai - Veerasigamani # breaker with CT only
No SS affected since, total shutdown will be availed at 110 KV veerasigamani SS between 13.00 to 17.00 Hrs.
SUB TO WIND GEN
110KV PPM-SERVALAR FEEDER - 1 BREAKER WITH CT MAINTENANCE WORK AT PPM END
Present PWD demand is 200 CUSECS. During the LC period the feeder will be radial from other end.No SS will be affected.
KAYATHAR 230 KV
On 230 KV Kayathar - Udhayathur feeder, breaker with CT and entire line
a) For monthly Maintenance workb) Tower to Tower inspection work
During the LC period other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
SUB TO WIND GEN
SINGARAPET 230 KV
110 KV Tirupattur # Breaker, CTs & line isolators and Auto Transformer I
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
During the period of LC 1)110 KV Tirupattur SS end Total shutdown programmed and2)110 KV Tirupattur Railway
traction SS load will be fed to 230 KV SS Vinnamangalam through 110 KV Vinnamangalam – Tirupattur #.3). Auto
Transformer I and LV I Breaker will be in hand trip condition4) Auto transformer II and III will be in servicehence no
interruption of supply.
subject to thiruppathur ss
tsd
110KV Thumdipady # Bkr,CTs & Line Switch
During LC Period, 110 KV Thumbipady SS will be avail total shut down on 24.6.17
subject to thumbipady ss
tsd
1191 Erode 55590 400 KV Salem 400 KV 400KV Tie Bkr-I & Its CTs Monthly Maintenance work possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1
1192 Erode 55909 230 KV GOBI 230 KV possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1193 Erode 55912 110 KV GOBI 230 KV 110 KV BUS COUPLER BREAKER AND CT'S possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1194 Erode 55824 110 KV KUNDAH PH3 110KV KPH.2 – THUDIYALUR FEEDER For PMI Work possible Sat, 24-Jun-2017 8:00 Sat, 24-Jun-2017 17:00 1 Approved
1195 Erode 55848 230 KV 230KV Deviakurichi Feeder. 1. At Both Ends. possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1196 Erode 55875 230 KV For Monthly Maintenance work 230 KV STCMS & Pudanchandai Feeders will be in service. possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1197 Erode 56237 230 KV ARASUR 230 KV possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 16:00 1 Approved
1198 Madurai 56262 230 KV POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 Approved
1199 Madurai 56270 110 KV 110 KV RNPM- PGLR# Breaker & CT's Monthly Maintenance Work POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1200 Madurai 56280 230 KV POSSIBLE Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 16:00 1 0 Approved
1201 Erode 56327 110 KV For monthly maintenance works. possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1202 Madurai 56388 110 KV For Monthly Maintenance Works POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1203 Erode 56395 110 KV 110kv RC Plant # Monthly maintenance work possible Sat, 24-Jun-2017 8:00 Sat, 24-Jun-2017 17:00 1 Approved
1204 Erode 56396 110 KV 110kv RC Plant # Monthly maintenance work 0 Sat, 24-Jun-2017 8:00 Sat, 24-Jun-2017 17:00 1 Repeat
1205 Erode 56397 110 KV 110kv main bus Entire During the lc period 110kv main bus will be in service 0 Sat, 24-Jun-2017 7:00 Sat, 24-Jun-2017 21:00 1 invalid lc Wrong entry
1206 Erode 56398 110 KV 110kv main bus entire During the lc period 110kv auxiliary bus will be in service possible Sat, 24-Jun-2017 7:00 Sat, 24-Jun-2017 21:00 1 Approved
1207 Chennai 56434 230 KV NOKIA 230 KV MONTHLY MTC Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1208 Erode 56483 110 KV possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1209 Madurai 56556 110 KV 110KV VGTPS - Phase II line 3 POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1210 Madurai 56574 110 KV 110KV KGTPS- Kumbakonam feeder entire POSSIBLE Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 16:00 1 Approved
1211 Madurai 56575 110 KV Monthly Maintenance work POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 13:00 1 Approved
1212 Madurai 56581 110 KV 110KV Uthumalai feeder breaker with CT Monthly maintenance work POSSIBLE Sat, 24-Jun-2017 14:00 Sat, 24-Jun-2017 17:00 1 Approved
1213 Chennai 56585 110 KV 110KV Korattur I feeder Quarterly maintenance work. 110KV Korattur feeder I radial from other end. Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 12:00 1 0 Approved
1214 chennai 56586 230 KV MOSUR 230 KV Bus Coupler feeder Breaker &CT'S Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1215 Chennai 56601 230 KV KITS 230 KV 100MVA Auto transformer III For monthly maintenance work Possible Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 15:00 1 0 Approved
1216 Madurai 56624 230 KV AUTO II HV &LV breaker CT&LAS.only. POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 Approved
1217 Madurai 56631 110 KV for monthly maintenance work. Feeder will be radial from other end. Thiruppalai SS S/D. POSSIBLE Sat, 24-Jun-2017 11:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1218 Madurai 56637 KODAIYAR PH2 PH-2 Machine No generation in PH-2 POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1219 Erode 56658 110 KV BKB - 2 Monthly Maintenance Work possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1220 Madurai 56670 110 KV POSSIBLE Sat, 24-Jun-2017 0:00 Sat, 24-Jun-2017 0:00 1 Approved
1221 Madurai 56673 110 KV 0 Sat, 24-Jun-2017 8:00 Sat, 24-Jun-2017 17:00 1 REPEAT Repeat
1222 Chennai 56678 230 KV 230 KV Sriperumpudhur feeder Maintenance works other two 230 KV Feeders will be in service Sat, 24-Jun-2017 5:00 Sat, 24-Jun-2017 9:00 1 Approved
1223 Chennai 56684 230 KV possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 Approved
1224 Chennai 56690 110 KV Possible Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 17:00 1 Approved
1225 Madurai 56712 110 KV LINE MAINTENANCE WORKS POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1226 Erode 56730 110 KV 110 KV Anaicut – V.Patty feeder entire. For EHT Line Maintenance Works. Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1227 Madurai 56780 230 KV POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1228 Madurai 56784 110 KV 110 KV KGTPS - Saakkottai feeder POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1229 Erode 56790 110 KV 1. SCHEDULED SHUT DOWN AT 110/11KV COIMBATORE SS possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 16:00 1 Approved
1230 Erode 56794 230 KV MONTHLY MAINTENANCE WORKS 1. SCHEDULED SHUT DOWN AT 110/11KV COIMBATORE SS possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 16:00 1 Approved
1231 Chennai 56837 230 KV Korattur lines 230KV NCTPS - Alamathy all other feeders in service Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1232 Madurai 56847 230 KV 230 KV Thiruvarur - Thanjavur Feeder POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1233 Madurai 56855 230 KV 230/110 KV Auto Transformer II Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1
1234 Madurai 56858 110 KV SERVALAR POSSIBLE Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 15:00 1 0 Approved
HV Breaker I & II will be in service condition,Hence there will be no interruption of supply to 400 / 230 KV Auto transformers
I & II.
occ approved and srldc to be
addressed
APPROVED IN 131 OCC VIDE ITEM NO.245
230 KV GOBI – Arasur Feeder Breaker, CT’s and entire line
FOR MONTHLY MAINTENANCE WORK
230 KV ANTHIYUR FEEDER,230 KV MTPS II FEEDER AND 230 KV PALLAKAPALAYAS ARE IN SERVICE,IT MAY CATER THE
LOAD.other end may also avail LC
subject to the load condition
existingFOR MONYHLY MAINTENANCE WORK
110 KV N.G.PALAYAM SS AND 110 KV SHENBAGAPUDUR SS MAY AVAILING TOTAL SHUTDOWEN AND SUVJECT TO THE
LOAD CONDITION OF 110 KV EASTERN BUS
subject to the division of
loadsBoth end breaker open condition.Both bus & line mods open
condition.Earth switch closed condition.subject to the load condition
existingSINGAPURAM 230 KV
Monthly maintenance on Breaker & CT, Isolators.
subject to the load condition
existingDEVIAKURICHI 230 KV
230 KV Deviyakurichy – Singipuram # Breaker, CTs and Line side isolator both end.
subject to the load condition
existing230 KV ARASUR-GOBI FEEDER BREAKERS, CTS AND LINE ENTIRE.
FOR MONTHLY MAINTENANCE ALONG WITH LINE PMI WORKS.
DURING THE L.C PERIOD, REMAINING 5 NOS. 230 K V FEEDERS WILL BE IN SERVICE.
subject to the load condition
existing
SANKANERI 230 KV
230/110KV AutoTransformer-II,HV&LV Breakers.
For monthly maintenance & GRT Annual Relay Testing purpose.
During the LC Period Auto Transformer-II willnot beinservice. AutoTransformer-I will be carriedout the EntireLoad.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENRENGANATHAPURAM 230 KV
During LC period 110 KV RNPM- PGLR# radially fed from Pugalur end.Hence no interruption to any SS.
PERAMBALUR 230 KV
1)230/110KV Auto Transformer I (100MVA), HV I Breaker & LV I breaker, CT's, Isolators.
1)For monthly maintenance work . 2)For annual relay test by wing GRT/Trichy.
During above period of shut down 1)110KV Kallakudy -I ( Siruvachur) feeder tie will be opened at Perambalur SS. 2)The
remaining loads will be fed Through Auto Transfermer III(100MVA) of Perambalur Auto SS.
OTHAKKAL MANDABAM 230 KV
110 KV OKM-Udpt 1 Feeder (Breaker, CT's & Line Switch)
During the lc period 110 KV UDPT 1 feeder radially fed from 110 KV UDPT ss, Hence no ss will be affected.
subject to the feeder being kept radial
from udpt ss endANUPPANKULA
M 230 KV110 KV APKM - Thulukkapatti I feeder Br., CT and Line entire.
During the LC period 110 KV Sattur SS will be availing total shut down. Hence No SS will be affected.
METTUR AUTO 230 KV
During the lc period radialy up to RC plant end fed from singarapet ss end
subject to the feeder being kept radial
from singarapet ss endMETTUR AUTO
230 KVDuring the lc period radialy up to RC plant end fed from
singarapet ss endrepeat of
56395METTUR AUTO 230 KV
110kv main bus conductor replacement work Between mbs1 to mbs2METTUR AUTO
230 KVMain bus conductor replacement work portion between MBS1 to MBS2
auxiliary bus will be in serviceAUTO I AND 110 KV GC AND 110 KV
NOKIA FDR BREAKER &CTS230 KV SV CHATRAM FEEDER AND 230 KV SRIPERUMBUDUR
FEEDER WILL BE IN SERVICE
KARIAMANGALAM 230 KV
1.110 KV Dharmapuri feeder breaker, CTs and Line Switch
Carryout Monthly SS Maintenance works by maintenance
110 KV Dharmapuri SS Availing total Shutdown Expected Load Relief : 24 MW hence there is no interruption of power supply
and 110 KV Adhiyamankottai SS Feed through 110 KV Ramiyanahalli feeder from 230 KV Karimangalam SS.
subject to dharmapuri ss
tsdVALUTHUR 230 KV
For attending breaker and it's CT's and isolators Monthly Maintenance work.
During the LC period 110KV VGTPS - Phase I line 3 and VGTPS Phasse I line 4 will be in service. Hence there is
KADALANGUDI 230 KV
Line inspection and rectification work.
No interruption to any SS. All other feeders will be in tied condition. The 110KV Sakkottai and APDRP(Urban) SS
proposed to shutdown.SUB TO TOTAL
S/D
KANARPATTY 400 KV
110KV Keelaveranam feeder breaker with CT Bay no 104
110KV Keelaveranam ss will be feed from 110KV Uthumalai ss Via 110KV surandai feeder, in the same day 110KV Surandai ss and 110KV Veerasigamani ss availing monthly shutdown. No ss
affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
KANARPATTY 400 KV
110KV Uthumalai ss is availing monthly shutdown on the same date and time. 110KV Veerasigamani ss will be feed through
110KV Keelaveranam feeder via surandai feeder at Uthumalai ss. No ss affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENKADAPPERI 230 KV
For attending Monthly Maintenance work
i. All 10KV Feeders are in serviceii.All 230/110KV Auto Transformers are in service.iii. Hence there will be no
interruption of supplyDuring the above shutdown period 100MVA Auto Tr.I and 80MVA Auto Tr. II will be in service feeding the entire KITS SS
loads except 110KV Perumbakkam feeder-II loads which will be transferred to 230KV Siruseri SS
ALAGARKOIL 230 KV
fOR MONTHLY MAINTENANCE WORK.
AUTO I will be in service, Thiruppalai ,Vandiyur MELUR, NARASINGAMPATTY SS will be under S/D, if necessary 110KV
ALKL-SMPTY I feeder will be kept opened at ALKL end.SUB TO LOAD CONDITION
ALAGARKOIL 230 KV
110KV ALKL-Pasumalai II # BREAKER WITH CT only.
GENERATING
STATIONS
Generator and allied equipment's of Back washing of Thrust cooler, UGB,LGB oil coolers & Cleaning of Butterfly valve water servomotor filer
AFTER S/D OF KOD PH 2 M/C
BKB II to Tiruchengode 110 KV # Breaker,CT,CVT & Bus & Line Isolators
In the above period Tiruchengode ss fed by other feeder and BKB II to Tiruchengode 110 KV line LC already applied by
EE/O/Unjanai.In BKB II,Unit 1 & 2 will be under Non S/B and all other feeders will be in service.This will be availed subject to
the non availability of LC on 20.06.2017.
subject to the load condition
existing
KAYATHAR 110 KV
110KV KAYATHAR-KODIKURUCHI FEEDER SEC B/W THERKUPATTI&KEELAVEERANAM
FOR DEFECTIVE DISC REPLCEMENT AT VARIOUS LOCATION
DURING THE LC PERIOD,THERKUPATTI SS WILL BE RADIALLY FED FROM KAYATHAR HENCE NO SS AFFECTED
SUB TO WIND GEN
KAYATHAR 110 KV
110KV KAYATHAR-KODIKURUCHI FEEDER SEC B/W THERKUPATTI&KEELAVEERANAM
FOR DEFECTIVE DISC REPLCEMENT AT VARIOUS LOCATION
DURING THE LC PERIOD,THERKUPATTI SS WILL BE RADIALLY FED FROM KAYATHAR HENCE NO SS AFFECTED
THARAMANI 230 KV
To be discuss
subject to CBD concurrence
Vinnamangalam 230kv
Auto Transformers No.I & 110 KV Ambur # (GC ) breakers & its CT’s
For replacing the defective surge monitors in 230 /110 KV LAS and for carrying out routine monthly maintenance works.
During the total shutdown on 24.06.2017 ,there will be no supply to following 110/11 KV sub station,1) Anaicut SS,2)
Pakkam SS, 3)Ambur SS, 4)Somalapuram SS,6) Vadakathipatty SS and the Valathur Railway Traction loads will be transferred
230 KV Thiruvalam SS.
subject to the other auto tr loading limit
GUMMIDIPOONDI 230 KV
110KV TCPL I feeder, breaker, CTs line Isolators
Annual Relay test and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
During the period of LC, TCPL I Loads fed through TCPL II feeder and concurance may be obtained from M/s.TCPL
Subject to M/s.TCPL
concurrenceKAVANOOR 230 KV
110 KV KAVANOOR-PARAMAKUDI # SEC. BET. KAVANOOR AND PARAMAKUDI
PMKDI, ILYNGDI AND MRVMNGLM LOADS TO BE TRD. TO 110 KVNR-MMDU # AND KEPT IN TIED CONDN.
SUB TO LOAD CONDITION
VINNAMANGALAM 230 KV
During the period of LCiii. 110 KV Anaicut – V.Patty feeder line LC in between from 110 KV Anaicut SS and 110 KV V.Patty SS.iv. The 110KV Anaicut SS, 110KV V.Patty are availing Total Shutdown Hence there will be no interruption of supply please.
THANJAVUR 230 KV
230 KV Thanjavur - Thiruvarur feeder, Breaker, CT, LI & CVT.
For monthly maintenance works by the AEE/Mtce/Thanjavur
During the LC period,1) other end also will avail LC on the same day, 2) all other 230 KV feeders will be in tied
condition,3) no supply interruption to any SS.SUB TO LOAD CONDITION
THANJAVUR 230 KV
For carrying out rectification works by the AEE/Lines/Thanjavur.
During the LC period,1) 110 KV Kumbakonam Urban SS and 110 KV Saakkottai SS will avail shutdown on the same day,2)
no supply interruption to any SS.SUB TO TOTAL
S/DCOIMBATORE 230 KV
1. 110KV COIMBATORE FEEDER BREAKER AND CTs 1. MONTHLY MAINTENANCE WORKS subject to
coimbatore tsdCOIMBATORE 230 KV
1. AUTO TRANSFORMER - I2. HV - I & LV- I BREAKERS, CTs AND LAs
subject to coimbatore tsd
Jumper tightness checking work at various locations
THIRUVARUR 230 KV
Line premansoon inspection and rectification work, Breaker, CT's and Line side Isolator maintenance work.
During the LC period all 230KV feeder are in tied condition. Hence there will be no interruption of supply to any other ss.
SUB TO LOAD CONDITION
THIRUVARUR 230 KV
1. HV II & LV II Breaker's and respective CT's and Line isolator maintenance works and relay testing work by P&C
During the Auto transformer-II LC period the Auto Transformer - I & III will be in service,and the load will be managed by Auto
I & III. Hence there will be no interruption of supply.NOT POSSIBLE
DUE TO AUTO LOADING: LC
MAY BE PROGRAMMED ALONG WITH TOTAL S/D
Subject to total shutdown 50 Mw
110KV SWITCH YARD ENTIRE FOR MONTHLY MAINTENANCE WORK
FOR MONTHLY MAINTENANCE WORK
THE WORK WILL BE CARRIED OUT DURING THE SERVALAR MACHINE STANDBY CONDITION. HENCE THERE WILL BE NO
LOSS OF GENERATION.PWD DEMAND IS 100 C/S.
1235 Chennai 56899 230 KV OCC has already approved for both end LC POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1236 Madurai 56908 230 KV POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1237 Chennai 56942 230 KV Autotransformer-II, Breaker, CT's and LAS Monthly maintenance work Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1238 Chennai 56945 110 KV Monthly maintenance work Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1239 Chennai 56946 110 KV Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1240 Erode 56959 230 KV 230KV Deviakurichy -Singapuram Feeder possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1241 Erode 55914 110 KV GOBI 230 KV possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1242 Chennai 55924 110 KV ARNI 230 KV For Monthly Maintenance Work. Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 14:00 1 0 Approved
1243 Erode 55954 110 KV 110KV BKB II -Thiruchengode # line entire Jumper tightness checking &PMI Other feeders will cater the load. possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1244 Erode 55991 230 KV FOR Monthly Maintenance work possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1245 Erode 55992 110 KV possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 15:00 1 Approved
1246 Erode 56010 110 KV Monthly Maintenance Urachikottai 110 KV SS avail TSD on that day. possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1247 Madurai 56035 110 KV For Monthly Maintenance Works. 0 POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1248 Madurai 56043 110 KV POSSIBLE Sat, 24-Jun-2017 10:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1249 Madurai 56070 110 KV POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1250 Chennai 56115 230 KV For monthly maintenance works. Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1251 Madurai 56121 230 KV POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 Approved
1252 Madurai 56133 230 KV AUTO TR II HV II &LV II Bkr,CT&LAS Monthly Mtce work 0 Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 16:00 1 0 Approved
1253 Madurai 56138 110 KV 110KV ALKL-PASUMALAI II # Bkr&CT Monthly Mtce work Feeder will be radial from other end..ThiruppalaiSS S/D 0 Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 16:00 1 0
1254 Madurai 56141 110 KV During the L.C period the 110KV KKDI SS will be TSD. POSSIBLE Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1255 Madurai 56142 110 KV 110KV KKDI-A.Koil # S/B KKDI-TPTR Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1
1256 Chennai 56144 110 KV 110KV Villupuram-Acharapakkam # For monthly maintenance works. Possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 0 Approved
1257 Erode 56150 110 KV During LC period one of the capacitor bank in service. possible Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 15:00 1 Approved
1258 Erode 56196 230 KV 0 Sat, 24-Jun-2017 9:00 Sat, 24-Jun-2017 17:00 1 invalid lc Wrong entry
1259 Chennai 56622 230 KV For maintenance works. 230 KV Korattur feeder will not be in service. Sun, 25-Jun-2017 10:00 Sun, 25-Jun-2017 17:00 1 Approved
1260 Chennai 56861 230 KV 230KV Korattur # Sun, 25-Jun-2017 10:00 Sun, 25-Jun-2017 17:00 1 Approved
1261 Erode 55530 KUNDAH PH3 Unit III For monthly maintenance work Unit under shutdown condition, SF6 Breaker open condition possible Sun, 25-Jun-2017 8:00 Sun, 25-Jun-2017 17:00 1 Approved
1262 Erode 55531 KUNDAH PH3 Unit III For monthly maintenance work Unit under shutdown condition, SF6 Breaker open condition 0 Sun, 25-Jun-2017 8:00 Sun, 25-Jun-2017 17:00 1 Repeat
1263 erode 56053 KUNDAH PH1 UNIT 3 For monthly maintenance work During the LC period unit under stand by condition possible Sun, 25-Jun-2017 9:00 Sun, 25-Jun-2017 17:00 1 Approved
1264 Chennai 56754 110 KV MANALI 230 KV 110KV METRO WATER For shifting to 110KV GIS SS Possible Sun, 25-Jun-2017 10:00 Sun, 25-Jun-2017 17:00 1 Approved
1265 chennai 56769 110 KV 110kv Annanagar feeder Routine maintenance work Possible Sun, 25-Jun-2017 6:00 Sun, 25-Jun-2017 11:00 1 Approved
1266 Chennai 55653 110 KV 110 KV SPR - I.G.Kottai feeder Sun, 25-Jun-2017 9:00 Sun, 25-Jun-2017 17:00 1 Approved
1267 Erode 55706 PYKARA UNIT 3 NIL possible Sun, 25-Jun-2017 8:00 Sun, 25-Jun-2017 17:00 1 Approved
1268 Erode 55767 KUNDAH PH2 0 Sun, 25-Jun-2017 9:00 Sun, 25-Jun-2017 17:00 1 0 Approved
1269 Chennai 56432 110 KV MONTHLY MTC Sun, 25-Jun-2017 7:00 Sun, 25-Jun-2017 10:00 1 0
1270 Erode 56536 230 KV possible Sun, 25-Jun-2017 9:00 Sun, 25-Jun-2017 17:00 1 Approved
1271 Chennai 56550 230 KV Auto Transfomer III Routine maintenance work Possible Sun, 25-Jun-2017 6:00 Sun, 25-Jun-2017 10:00 1 Approved
1272 Chennai 56660 110 KV Maintenance work Possible Sun, 25-Jun-2017 10:00 Sun, 25-Jun-2017 17:00 1 0 Approved
1273 Chennai 56665 230 KV 100 MVA 230/110 KV AUTO TR. NO.II General Maintenance work Possible Sun, 25-Jun-2017 9:00 Sun, 25-Jun-2017 17:00 1 0 Approved
ACHRAPAKKAM 230 KV
230KV Theni - Mooliyar # Breaker with CT and line
monthly mtce and premonsoon inspection works
APP IN 131 OCC VIDE ITEM
NO.185ALUNDUR 230 KV
230KV Alundur - Paramathy Feeder Breaker, CT's, CVT's and Line Isolators.(Alundur End Only)
a)Monthly Preventive Maintenance work.b)Relay Testing Work.
a)Alundur End Only LC work.b)All other 230 KV feeders will be in service.c)There will be no interruption of supply to any other
feeders.
APP IN 131 OCC VIDE ITEM
NO.181
THIRUVANNAMALAI 230 KV
During the period of L/C time,1. 110 KV Tiruvannamalai SS availing total S/D,2. Autotransformer - II will be OFF
condition.3. Autotransformer - I will be in service and cater the station loads. Hence there is no interruption of supply please.
THIRUVANNAMALAI 230 KV
110 KV tiruvannamalai Link #, Breaker Ct's and Line Isolator
During the period of L/C time, 110 KV tiruvannamalai SS availing total S/D. Hence there is no interruption of supply
please.CUDDALORE 230 KV
110 KV Cuddalore - Spic Pharma # breaker, CT’s & Line side isolator.110 KV Cuddalore - J.K. Pharma # breaker, CT’s., Line side isolator.
First tower in the feeder to be maintained by lines .For monthly maintenance works
Spic Pharma - Under D.C. from 21.11.2011.J.K. Pharma - Under D.C. from 25.06.2004
DEVIAKURICHI 230 KV
230KV Deviakurichy -Singapuram line jumper tightness work
1)The Deviakurichy & Singapuram both 230KV SS availing Breaker, CT’s maintenances work .2)There will be no
interruption any other SS.
subject to the load condition
existing110 KV Periyakodivery Feeder Breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
110 KV N.G.PALAYAM SS AND 110 KV SHENBAGAPUDUR SS MAY AVAILING TOTAL SHUTDOWEN AND SUPPLY TO OTHER
INTER SS MAY FED FROM MOYAR PH END
subject to the tsd being availed
110KV Arani-Sirungattur feeder Breaker,CT's and Line isolators.
During the period of shutdown,(i)The 110KV Mambakkam Sub-Station availing total shutdown,(ii)The 110KV Sirungattur Sub-Station availing total shutdown,Hence no interruption of supply
please.UNJANAI 230 KV
subject to the load condition
existingKARUVALUR 230 KV
230/110 KV Autotransformer - II, HV, LV, Breaker, CT’s and LAS only.
110kv Avinashi SS total shut down and 110kv kvlr- ASR II feeder kept radial from 230 ASR SS and 110 kv Earipalayam SS and TCS EHT radially fed thro 110kv ASR -KVLR feeder I from
230kv ASR SS
subject to the other auto tr loading limit
KARUVALUR 230 KV
110 KV Karuvalur- Arasur I feeder Breaker, CTs
For Monthly maintenance work and PMI by PLDM/Lines
110kv Avinashi SS total shut down and 110kv kvlr- ASR I feeder kept radial from 230kV ASR SS
subject to the feeder being kept radial
from arasur ss end
PALLAKAPALAYAM 230 KV
110 KV Barriage-IV # CT, Breaker and Switches
subject to uratchikottai ss
tsd
KODIKURICHY 230 KV
110 KV Tenkasi # Breaker with CT & Line Isolators
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENKODIKURICHY 230 KV
On 110KV Papanasam-Servalar I feeder entire line.
1)For tree cleareance work & rectification of jumper bolt at loc no:14
i) EE/O /Papanasam power house also applied monthly shutdown.ii) Servalar Feeder II will be in service
PUDUKOTTAI 230 KV
110 KV SIPCOT FEEDER BREAKER, CT AND 110 KV LINE PORTION BETWEEN 230 KV SS AND 110 KV SIPCOT SS IN 110 KV SIPCOT FEEDER
FOR MONTHLY MAINTENANCE WORK OF BREAKER, CT, ISOLATORS AND GRT TESTING WORKS
110 KV URBAN SS AVAILING TOTAL SHUT DOWN AND 110 KV SUPPLY FOR 110 KV SIPCOT SS, 110 KV PUDUKKOTTAI SS, 110
KV THIRUMAYAM SS AND 110 KV KONNAIYUR SS IN 110 KV SIPCOT FEEDER ARE TRANSFERRED TO KARAIKKUDY 230 KV SS. CONCURRANCE OBTAINED FROM EE/O/ KARAIKKUDY AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY
SS.
SUB TO KKDI AUTO LOADING
VILLUPURAM 230 KV
Auto Transformer II & Northern Bus,110KV Thirukoilur-#
During the period of LC:(1)110KV Thirukoilur # & Acharapakkam-II #, 110KV Thayanur feeder will be Radial from other end& Auto Transformer-I will be in service. & Replacing
of Weak insulator at loc 5 of Karanaiperichanur LILO.The feeder will be radial from Deviakurichi upto Thirukoilur SS.
Thirukoilur,Karanaiperichanur and Kallakurichi SS availing Total shutdown. (2)Hence no interruption of supply to any SS.
TUTICORIN -SIPCOT 230 KV
On 230 KV SIPCOT-TTPS Feeder breaker with CTs and line isolators only.
a) For monthly maintenance work. B) For fixing of numeric distance relay and ABT meter
1) This particular LC previously applied vide ID No. 55771 may be cancelled. 2) During the LC period, no other SS will be
affected please.SUB TO TTPS
GEN
ALAGARKOIL 230 KV
AUTO TR I will be in service.Thiruppalai SS , VandiyurSS,Melur,Narasingampatty SS S/D. If necessary 110kv
Alkl-Sembatty 1 feeder tie will be kept opened at ALKL end.
ALAGARKOIL 230 KV
Subject to EE/SLDC/ Madurai concurrence
KARAIKUDI 230 KV
110 KV KKDI SS # BKR & CTs and110KV KKDI # Entire
Monthly maintenance works andTree Clearance work
KARAIKUDI 230 KV
To replace Flash over Disc L.No: 65,64,62
During the L.C period the110KV Singampunari,110KV Mellur will be TSD. Feeder will be radial from ALKVL SS end.
NOT POSSIBLE
DUE TO AUTO LC AT ALKL
Subject to EE/SLDC/ Madurai concurrence
Villapuram 110 KV
During the period of LC:1. 110KV AB Switch at Tindivanam SS towards Villupuram 110KV SS side will be kept open.2. 110KV
Tindivanam SS will be availing total shut down.3. Hence no interruption of supply in any SS.
THUDIALUR 230 KV
110 KV Capacitor banks I & II with breaker, CTs
For monthly maintenance works one by one
subject to the voltage profile
in the gridMETTUR AUTO 230 KV
For checking of Jumber cone tightnees at Railway Crossing Tower Loc.No.41 & 42 and 66 &67
For checking of Jumber cone tightnees at Railway crossing Tower Loc.NO.41 & 42 AND 66 & 67
Thumbipady 110KVSS have programmed for total shut down on that day
Alamathy 400 KV
230 KV Korattur feeder and its equipments
Postponed to 25/06/2017
Subject to CBD concurrence
Alamathy 400 KV
To carry out routine maintenance work.
During the period of shutdown 230KV Korattur # will not be in service.
Postponed to 25/06/2017
Subject to CBD concurrence
GENERATING
STATIONS
subject to the grid condition
existingGENERA
TING STATIO
NS
repeat of 55530
GENERATING
STATIONS
subject to the grid condition
existing110 KV Metro Water will not be in serviceAfter LC Work: 110KV
Metro Water will be in ServiceSubject to CBD Concurrence
KILPAUK 230 KV During the period of shutdown 110kv Annanagar feeder loads may be transferred to 230kv Korattur SS
Subject to CBD Concurrence
Sriperumbudur 400 KV
Quarterly maintenance work & line maintenance work
During the period of the shutdown other 110 KV feeders will be in service
To be discuss
GENERATING
STATIONS
FOR MONTHLY MAINTENANCE WORK.
other machines to be available
GENERATING
STATIONS
UNIT-4 GENERATTOR SF6 BREAKER, POWER TRANSFORMER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
ORAGADAM 230 KV
110KV APOOLO TYRES FDR, S PKOIL I&II,PALAYASEEVARAM FDR,BUS COUPLER I ,KADAPERI AND NORTHERN BUS
ALL OTHER FDRSARE IN SERVICE.110KV SP KIOL I&II AND KADAPERI FDRS WILL BE RADIAL FROM OTHER END.
To be discuss
Approved Subject to load transfer
PALLADAM 230 KV
Auto transformer IV ,HV,LV breaker,CT's and LAS
1)To carryout monthly maintenance work by AEE/M/Palladam
1)Other Three Auto Transformers (I,II and III ) will be in service2)Sunday load relief expected
subject to the other auto trs loading limit
BASIN BRIDGE(GMRVASAVI) 230 KV
1. Auto III only will not be in service.2. All other 110KV Feeders, 230KV Feeders, Auto I & II will be in service.
Subject to CBD Concurrence
SIRUSERI 230 KV
110 KV Eastern Bus & Bus coupler Breaker ,110KV TCS #
DURING THE PERIOD OF SHUTDOWN1)110KV EASTERN BUS,100MVA Auto Transformer-I ,110KV Siruseri-I# & 110KV TCS # ,110KV Bus coupler Breaker will not be inservice. 2)
110KV Sholinganallur # load will be transferred to 230KV KITS PARK SS3) 110KV Siruseri-I# load will be fed by 110KV
Siruseri-II# of 230KV Siruseri SS.4)110KV TCS # load will be fed from 110KV Siruseri SS.KORATTUR 230
KVDuring the period of S/D, other 2 Nos. 100 MVA Auto
Transformers will be in service.
1274 Madurai 56689 110 KV POSSIBLE Sun, 25-Jun-2017 8:00 Sun, 25-Jun-2017 17:00 1 Approved
1275 Chennai 56839 230 KV KORATTUR 230KV NCTPS - Alamathy All other feeders in service Mon, 26-Jun-2017 9:00 Mon, 26-Jun-2017 17:00 1 0 Approved
1276 Chennai 56840 230 KV Korattur lines 230KV GMD - Sullurpet All other feeders in service Mon, 26-Jun-2017 9:00 Mon, 26-Jun-2017 17:00 1 0
1277 Chennai 55654 110 KV 110 KV SPR - Thiruverkadu-II feeder Quarterly maintenance work Possible Mon, 26-Jun-2017 9:00 Mon, 26-Jun-2017 17:00 1 0 Approved
1278 Chennai 56515 230 KV 230KV KLPKM-ECHUR FEEDER FOR LINE MTCE WORK Possible Mon, 26-Jun-2017 9:00 Mon, 26-Jun-2017 17:00 1 0 Approved
1279 Chennai 56566 110 KV 110KV SPK-CHENGALPATTU FEEDER FOR QUARTERLY MTC WORK Possible Mon, 26-Jun-2017 9:00 Mon, 26-Jun-2017 17:00 1 0 Approved
1280 Chennai 56623 230 KV Possible Mon, 26-Jun-2017 6:00 Mon, 26-Jun-2017 9:00 1 0 Approved
1281 Erode 55671 230 KV Monthly Maintenance works possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 15:00 1 Approved
1282 Madurai 55712 230 KV During The LC period none SS will be affected POSSIBLE Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 14:00 1 Approved
1283 Madurai 55733 110 KV For monthly maintanence work POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1284 Erode 55784 230 KV Monthly Maintenance work. possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1285 Madurai 55838 110 KV POSSIBLE Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1286 Madurai 55839 230 KV POSSIBLE Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1287 Erode 55877 110 KV For Monthly Maintenance work possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1288 Erode 56248 110 KV ARASUR 230 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 15:00 1 Approved
1289 Madurai 55503 230 KV POSSIBLE Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 17:00 1 Approved
1290 Madurai 55543 230 KV For Monthly maintenance work POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1291 Madurai 55569 230 KV For monthly maintenance work POSSIBLE Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 16:00 1 Approved
1292 Erode 55591 230 KV Salem 400 KV 230KV Link-I # Bkr,CTs & Line Switch Monthly Maintenance Work Both end Monthly Maintenance work possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1293 Madurai 55891 230 KV kayathar400kv For monthly maintenance work. POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1294 Madurai 55899 110 KV For monthly maintenance work POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1295 Erode 55927 230 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1296 Erode 55930 110 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1297 Erode 55957 110 KV Jumper tightness checking and PMI Elanagar SS totalshutdown possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1298 Erode 55979 110 KV For monthly maintenance works. 0 Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0
1299 Erode 55993 110 KV For Annual maintenance work possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1300 Erode 55994 110 KV for Monthly Maintenance work possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1301 Madurai 56036 230 KV 230 KV Bus section I Monthly maintenance work 0 POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1302 Erode 56067 110 KV KUNDAH PH3 110KV KPH.2 – THUDIYALUR FEEDER For PMI Work postponed Tue, 27-Jun-2017 8:00 Tue, 27-Jun-2017 17:00 1
1303 Chennai 56123 230 KV 230KV Ulundurpet # For monthly maintenance works. Possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1304 Madurai 56143 110 KV 110KV KKDI- SVGA # S/B KKDI- M.Patty Tower to Tower Inspection Work POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1305 Erode 56151 230 KV For monthly maintenance works Other Two Auto Transformer I & III are in service. possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 Approved
1306 Erode 56186 230 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1307 Erode 56188 230 KV Both end LC appyied possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1308 Madurai 56204 230 KV Monthly Maintenance Work POSSIBLE Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 17:00 1 Approved
1309 Madurai 56207 230 KV EE / O / Alagarkoil has also programmed. POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 Approved
1310 Erode 56543 230 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1311 Erode 56565 110 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1312 Chennai 56568 110 KV 110KV SPK-SIRUSERI FEEDER FOR QUARTERLY MTCE WORK Possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1313 Chennai 56595 110 KV MOSUR 230 KV Possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 0 Approved
1314 Madurai 56612 230 KV Other end also proposed L.C. POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 Approved
1315 Chennai 56627 230 KV 230kv Kalivathapattu - Tharamani feeder Possible Tue, 27-Jun-2017 6:00 Tue, 27-Jun-2017 9:00 1 0 Approved
KAYATHAR 110 KV
110KV KAYATHAR-K.G.PATTI SEC B/W KARIVALAMVANTHA NALLUR & KALINGA PATTI.
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION
DURING THE LC PERIOD,1.KARIVALAMVANTHANALLUR WILL BE RADIALLY FED FROM K.G.PATTI 2.KALINGA PATTI WILL BE RADIALLY FED FROM KAYATHARHENCE NO SS AFFECTED.
SUB TO LOAD CONDITION
AND WIND GENJumper tightness checking work at various locations
Postponed to 26/06/2017
Jumper tightness checking work at various locations
Subject to OCC concurrence
Subject to OCC concurrence
Sriperumbudur 400 KV
During the period of the shutdown 110 KV Thiruverkadu-I feeder will be in service
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, 230KV SPK-KLPKM-I&II, ACKPM-KLPKM FEEDERS WILL BE IN SERVICE
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, THE ABOVE FEEDER LOADS WILL BE FED FROM 230KV ACKPM SS
KADAPPERI 230 KV
230KV Kalivanthapattu - Tharamani feeder
Insulator and jumper replacement work.
230KV Sriperumbudur- Tharamani feeder and 230KV KITS - Tharamani feeder will be in service.
ANTHIYUR 230 KV
110KV Gobi feeder Breaker CT and Line switch only.
During the LC period 110KV Gobi feeder supply will be Radial up to 110/11KV T.N.Palayam SS.110/11KV T.N.Palayam SS will avail Total Shut down as approved by CE/D/Erode. No SS will
be affected.
subject to tn palayam ss availing tsd
UDAYATHUR 230 KV
230KV SANKANERI FEEDER Breaker CT CVt & Line SW
monthly Mtce works & GRT relay Test works by AEE /P&C /SRpudur
SUB TO WIND GEN
TUTICORIN -AUTO 230 KV
On 110KV TTN-Sipcot-I feeder breaker with CT bus and line side switches
No SS will be affected.During this LC period 110KV vagaikulam SS will be radially fed from 230KV meelavitan SS.
SALEM AUTO 230 KV
230KV Link Feeders I Breakers, CTs & Line Isolators
1. 230KV Link-I feeder LC will be availed at both ends. 2. 3Nos 230KV feeder will be in service 3. There will be no interruption
to any SS or feeder.
subject to the other link
feeder loading limit
EACHANGADU 230 KV
110 kv Pennadam (Radial) Feeder BREAKER , CT'S.
FOR MONTHLY MAINTENANCE WORK.
DURING THE ABOVE SHUTDOWN PERIOD 110 KV PENNADAM SS IS ALSO AVAILING TOTAL SHUT DOWN and normaly the
feeder is radial from Eachangadu 230 KV SS.EACHANGADU 230 KV
50 MVA ,Auto Transformer II &HV II, LV II Breaker,CT's & their related Equipments
For Monthly maintenance works & Annual Relay test by GRT/VPM.
During the above work, Eachangadu 230 KV SS loads will be fed from the other Auto Transformer -I. 110 KV Pennadam SS is also avail total shut down hence the Loads will be with in one
transformer capacity.
DEVIAKURICHI 230 KV
110 KV Deviakurichy-Singipuram feeder- I Breaker, CTs
110KV Deviakurichy - Singipuram feeder- I will be kept radial from Singipuram 230KV SS end.
subject to the feeder being kept radial
from singapuram ss
end110 KV CAPACITOR BANK-III BREAKER, CTS AND CELL UNITS
FOR MONTHLY MAINTENANCE WORKS.
DURING THE L.C PERIOD, REMAINING 2 NOS. 110 K V CAPACITOR BANKS WILL BE IN SERVICE.
subject to the voltage profile
in the grid
VEERANAM 230 KV
Power transformer-IV,HV-BR IV.LV-BR IV and 33Kv feeders Vestas 1,2 & Micno 7.
For Half yearly and Monthly Maintenance work.
During the LC period there will be no supply in the Power transformer-IV,HV-BR IV.LV-BR IV and 33Kv feeders Vestas 1,2 & Micno 7.Concurrence obtained from SE/NCES/TIRUNELVELI.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
KAYATHAR 230 KV
On 230/110 KV Auto Transformer III, HV III and LV III, Breaker with CT only
During the LC period Loads of Auto III will be shared by Auto Transformer I and Auto Transformer II. Hence no SS affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENNALLAPPANAYAKANPATTY 230 KV
230 KV NNPT - CHEKKANURANI feeder Breaker with CT&Line isolator
During the LC Period there will be no supply in the entire feeder and other end also will be applying LC on the same
day .No SS affected during the L.C period.SUB TO WIND
GENsubject to the
other link feeder loading
limit230 KV Sankaraperi 1 # Main Breaker (211-52) & CT, CVT
During the LC period there will be no supply in 230 KV Sankaraperi 1 # Main Breaker (211-52) & CT, CVT. Hence No
SS affected.SUB TO WIND
GEN
KAYATHAR 230 KV
110 KV Kayathar - O.T.Patty feeder, breaker with CT only
During the LC period, the feeder will be radial from other end. Hence no ss affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
SALEM AUTO 230 KV
230KV Salem KR Thoppur Link-I feeder entire
Tension point jumper checking work
1. 230KV Salem – KR Thoppur Link-I feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. Both ends are availing breaker and line switches
LC on that day. 4. There will be no interruption to any SS.
subject to the other link
feeder loading limit
UNJANAI 230 KV 1.110KV UNJANAI -ELANAGAR FEEDER BREAKER, CT'S AND LINE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK
DURING THE L.C PERIOD ELANAGAR 110KVSS ALSO AVAILING PROGRAMMED TOTAL SHUTDOWN
subject to elanagar ss availing tsd
UNJANAI 230 KV110KV Unjanai-Elanagar feeder line portion between Elanagar SS and Rasipuram SS
subject to elanagar ss availing tsd
Pudhanchanthai 230kv
110KV Rasipuram feeder CB, CTs and Line Switch.
During LC period110KV Elanagar SS now back fed through 110KV PSI-Rasipuram feeder will be transferred to UNJANAI
230KV SS. 110KV Rasipuram SS will be fed through 110KV PSI-Kalapannaickenpatty feeder. No supply interruption.
Subject to EE/SLDC/ Erode concurrence
KARUVALUR 230 KV
110 KV Main -2 Bus entire with 110kV Bus section breaker and CT's
Auto - 2 in service, 110KV Thekkalur SS total shut down and 110KV Annur SS fed from 230kV Karamadai SS through 110kV
Arasur-Karamadai 1# and 110kV Arasur-Karuvalur 2# kept radial from 230kV Arasur SS with 110kV KPR EHT load
subject to the load condition existing after
the tsd
KARUVALUR 230 KV
110 KV Karuvalur-Thekkalur feeder Breaker ,line switch and Its CTs.
110KV Thekalur SS Total shut down and KPR(EHT) loads transferred to 110kv Kvlr-ASR feeder II and kept radial from
230kV Arasur SS.
subject to thekkalur ss tsd and transfer of rest of loads to arasur ss feed
KODIKURICHY 230 KV
SUB TO WIND GEN
Both end breaker open condition.Both bus & line mods open condition.Earth switch closed condition.
to be scheduled on a sunday
Subject to EE/SLDC/Erode concurrence
VILLUPURAM 230 KV
During the period of LC:(1)Other 230KV feeders Thiruvannamalai & Acharapakkam will be in service condition.
KARAIKUDI 230 KV
During the L.C period 110KV Kallal will be TSD & 110KV KKDI-SVGA # Radial from SVGA upto M.Patty.
THUDIALUR 230 KV
230/110 KV auto transformer II,HV,LV Breaker ,CTs
subject to the other auto trs loading limit
UDUMALPET 230 KV
110KVPoolavady #Breakerand Lines bet Udumalpet&Thungavi .
FOR MONTHLY MAINTENANCE WORKS
1)POOLAVADY SS WILL BE ON TOTAL SHUTDOWN 2)THUNGAVI SS LOADS WILL BE FED FROM PONNAPURAM 230KV SS **
THUNGAVI SS FED FROM PONNAPURAM SS DURING THE LC PERIOD.
subject to poolavady ss
tsd
Udumalpet 400 KV
230 KV Myvadi-Ponnapuram-1 feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
subject to the load condition
existing
AMUTHAPURAM 230 KV
230/33KV Power transformer-4 HV,LV Breakers with CT's and its 33KV feeder
1) During the LC period there will be NO supply in P.Tr-4 and its 33KV feeders. 2) If there is wind generation its 33KV
feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENPASUMALAI 230 KV
1) 230 KV Pasumalai - Alagarkoil # BKR & CT,LI only. 2).Line Entire.
a)Maintenance Works of BKR & CT,LI b)Tree Cutting and T-T inspection works
SUB TO WIND GEN
PALLADAM 230 KV
230 KV Palladam-Sadayapalayam # Breaker ,CT's and line entire
To carryout monthly maintenance work by AEE/M/Palladam and to carryout premonsson inspection work by AE/L/Palladam
1)Other three 230 KV Feeders (Othakalmandapam,PGCIL and Kurukathi) feeders will be in service2)110 KV Mudalipalayam
SS Old Tirupur SS availing total shutdown3)110 KV Kumar Nagar SS will fed from 230 KV Ingur SS 4)No other SS will be
affected
subject to the load condition
existing
PALLADAM 230 KV
110 KV Palladam -Tirupur # breaker CT's and line entire
To carryout monthly maintenance work by AE/M/Palladam and to carryout premonsoon inspection work by AE/L/Palladam
1)110 KV Old Tirupur SS and Mudalipalayam SS availing total shutdown2)110 KV Kumar Nagar SS will fed from Ingur 230 KV
SS 3)No other SS will be affected
subject to the tsd being realized
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, THE ABOVE FEEDER WILL BE RADIALLY FED FORM 230KV VEERAPURAM SS
110 KV Sriperumbathur feeder Breaker, and CT’s line isolators only.
For attending Monthly Maintenance work
i). 110 KV Sriperubudur feeder already Tie opened condition in Mosur 230 KV Sub- stationii).All 230 KV feeders and 110 KV
feeders will be in service. Hence there will beALAGARKOIL 230 KV
230KV ALKL-Pasumalai breaker with C.T & LINE ENTIRE.
For monthly maintenance work AND TREE CLEARANCE WORK.
SUB TO WIND GEN
KADAPPERI 230 KV
Insulator and jumper replacement work.
230KV Sriperumbudur -Tharamani feeder and 230KV KITS - Tharamani feeder will be in service.
1316 Madurai 56662 110 KV 0 Tue, 27-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 4 Pending
1317 Erode 56686 230 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 Approved
1318 Chennai 56692 230 KV Possible Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 16:00 1 Approved
1319 Madurai 56707 110 KV POSSIBLE Tue, 27-Jun-2017 8:00 Tue, 27-Jun-2017 17:00 1 Approved
1320 Madurai 56791 230 KV POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1321 Chennai 56830 230 KV MOSUR 230 KV Sriperambadur Feeder Lines Line Clear There will be no interruption of supply. Possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 0 Approved
1322 Chennai 56843 230 KV Korattur lines 230KV GMD - Sullurpet All other feeders in service Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0
1323 Madurai 56848 230 KV 230 KV PPN - Thanjavur feeder POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1324 Madurai 56856 230 KV 230KV Bus Coupler During LC period there will no interruption of supply to any SS. POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1325 Erode 56873 230 KV possible Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 17:00 1 Approved
1326 Erode 56877 110 KV possible Tue, 27-Jun-2017 8:00 Tue, 27-Jun-2017 17:00 1 Approved
1327 Madurai 56901 110 KV THENI 230 KV 110KV Kamachipuram SS will be under total shutdown POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1328 Madurai 56909 230 KV POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 0 Approved
1329 Chennai 56915 110 KV Possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 16:00 1 0 Approved
1330 Erode 56960 110 KV possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1331 Madurai 56265 230 KV POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 Approved
1332 Madurai 56276 230 KV 230 KV TBC Breaker Monthly Maintenance Already TBC Breaker is in Stand by condition. POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 0 Approved
1333 Erode 56328 110 KV For Monthly mtce works. possible Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 14:00 1 Approved
1334 Madurai 56374 230 KV During LC Period there will be no supply in the entire feeder POSSIBLE Tue, 27-Jun-2017 9:00 Tue, 27-Jun-2017 17:00 1 Approved
1335 Erode 56404 230 KV NO SS WILL BE AFFECTED DURING LINE CLEAR. possible Tue, 27-Jun-2017 10:00 Tue, 27-Jun-2017 17:00 1 Approved
1336 Chennai 55656 400 KV 400 KV Tie-I breaker(352) Quarterly maintenance work Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1337 Erode 55668 110 KV INGUR 230 KV MONTHLY MAINTENANCE WORKS DEPENDING UPON LOAD CONDITION possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1338 Erode 55768 230 KV KUNDAH PH2 0 Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0
1339 Chennai 55810 230 KV 100MVA AUTO TR-I Quarterly Maintenance 110 KV Kits park feeder should be Tied condition Possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 14:00 1 Approved
1340 Chennai 55819 110 KV ECHUR 230 KV Possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 16:00 1 0 Approved
1341 Erode 55832 110 KV 110KV Salem II Feeder possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1342 Erode 56238 230 KV ARASUR 230 KV possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 16:00 1 Approved
1343 Madurai 56284 230 KV During LC period other end also programmed for availing LC. POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 16:00 1 Approved
1344 Erode 56309 110 KV ALIYAR 230 KV Quarterly Mtce work During LC period AKY SS under shutdown condition possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 16:00 1 Approved
1345 Madurai 55504 230 KV 230Kv Bus Coupler Breaker POSSIBLE Wed, 28-Jun-2017 10:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1346 Madurai 55544 230 KV POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1347 Erode 55592 400 KV Salem 400 KV 400KV Tie Bkr-II & Its CTs Monthly Maintenance Work possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1
1348 Erode 55593 110 KV Salem 400 KV 110KV Salem-I # Bkr,CTs & Line Switch Monthly Maintenance work possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1349 Madurai 55600 110 KV PERIYAR POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 13:00 1 Approved
1350 Madurai 55892 230 KV kayathar400kv For monthly maintenance work. POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1351 Chennai 55934 230 KV ARNI230KV 230KV Tie Breaker(Bus Coupler) For monthly maintenance work. Possible Wed, 28-Jun-2017 0:00 Wed, 28-Jun-2017 0:00 1 0 Approved
1352 Erode 55980 110 KV For monthly maintenance works. 0 Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0
1353 Erode 56329 110 KV For monthly maintenance works. possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 14:00 1 Approved
1354 Madurai 56362 230 KV 100 MVA AUTO TR I HV I & LV I Br During the LC period Auto Tr II & III will be in service. POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
PASUMALAI 230 KV
110KV PSQ - Alagarkovil 2#Section between Pasumalai and Anaiyur SS.
1.Conversion of SC towers at Loc.30,31 and 32 into Multi circuit QD and QA type towers at Loc 184A,184,183A 2.Stringing of existing SC Line with panther conductor from Loc 29 to 33 on the above erected Multi circuit towers by TLC wing/ madurai as requested by EE/TLC/madurai through E-Mail dated 19.05.2017.
1.110KV PSQ - Alagarkovil 2 # will be Kept radial from Alagarkovil upto Anaiyur SS feeding Thirupalai, Anaiyur and
Ellis nagar SS.2.110KV Sembatty - Alagarkovil 1 # kept radial from sembatty.3. If necessary 110KV Pasumalai - Sakthi sugar
feeder will be kept tied, to avoid over loading of Auto Transformers at Alagarkovil SS.Remarks: This LC is requested
from 27.06.2017 to 03.07.2017.
LONG LC(4 DAYS): NOTE TO BE PUT UP
Vinnamangalam230kv
230 KV Vinnamangalam - Shoolagiri feeder breaker, CT’s & line isolators
For attending monthly maintenance works and for jumper tightness checking works in cut point towers of 230 KV VNM - Singarapet feeder.
There will be no interruption of power supply to any sub stations.
occ approved and srldc to be
addressed
GUMMIDIPOONDI 230 KV
230KV Kamatchi feeder, CTs, Breaker, Line Isolators
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
Concurance to be obtained from M/s.Kamatchi During the Period of Shut down the 230KV Kamatchi private generation
may be floating, there is no intrupption at grid
Subject to M/s Kamatchi
ConcurrenceKAYATHAR 110 KV
110KV KAYATHAR-ANUPPANKULAM FEEDER SEC B/W KYTHR & DURAISAMYPURM
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION
DURING THE LC PERIOD,DURAISAMYPURM SS WILL BE RADIALLY FED FROM ANUPPANKULAM HENCE NO SS AFFECTED
SUB TO WIND GEN
THANJAVUR 230 KV
230 KV Thanjavur - PPN feeder, Breaker, CT, LI, CVT.
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For carrying out rectification works by the AEE/Lines/Thanjavur.
During the LC period,1) other end also will avail LC on the same day, 2) all other 230 KV feeders will be in tied
condition,3) no supply interruption to any SS.SUB TO LOAD CONDITION
Jumper tightness checking work at various locations
Subject to OCC concurrence
Subject to OCC concurrence
THIRUVARUR 230 KV
Line pre-monsoon inspection and rectification work
During the LC period all other 230KV feeders are in tied condition. Hence there will be no interruption of supply to any
other SSSUB TO LOAD CONDITION
THIRUVARUR 230 KV
230Kv Bus Coupler Breaker, CT, Isolator maintenance work
PONNAPURAM 230 KV
230 KV Ponnapuram - Myvadi I # Breaker, CTs & Line entire
For monthly maintenance works & Annual testing by P&C Wing
1. 230KV GRID #, HENCE NO SS WILL BE AFFECTED,2. OTHER END SS ALSO PROPOSED TO AVAIL LC
subject to the load condition
existing
LOWER METTUR 1
BHAVANISAGAR - MHPH - 110 / 11 KV, 25 MVA POWER TRANSFORMER
For GRT Annual Relay Tests in 110 / 11 KV, 25 MVA Power Transformer at MHPH / Bhavanisagar
1. During LC period, it is expected that all machines at MHPH will be in standby condition due to NIL or insufficient PWD
demand in the river to run the machines. Hence generation loss will not arise at MHPH / Bhavanisagar.2. During LC period, PWD demand in canal will be 5 c/s only. Hence generation loss
will not arise at RBCPH / Bhavanisagar.
for annual relay tests
110KV Theni - periyar II # ( section between Veerapandi SS and Thevaram SS )
spur line mtce and tree cutting work
SUB TO WIND GEN AND
CONCURRENCE FROM WIND
GENERATORSALUNDUR 230 KV
100 MVA Auto Transformer - I ,HV-I,LV-I Breaker's, CT's and Isolators.
a)Monthly maintenance work.b)Relay Testing work.
a)An Other 100 MVA Auto Transformer -II will be in service.b)All other 110 KV feeders will be in service.c)There will
be no interruption of supply to any other feeders.ACHRAPAKKAM 230 KV
110KV ACK -Villupuram Feeder-II Breaker and CT's
To Carryout Quarterly Maintenance Work & Annual Relay Test
1.110KV ACK-Villupuram Feeder-II will be radially charged from other end.
DEVIAKURICHI 230 KV
110 KV Deviakurichi-Singapuram I Feeder (Section between Deviakurichi - Attur ss )
110 KV Deviakurichi-Singapuram I Line jumper tightness work
1)Deviakurichy 230KV SS Singapuram I feeder monthely maintenances work Breaker,CT ‘s.2)Singapuram 230KV SS radial fed from upto Attur 110KV SS End 3)There will be no
interruption of supply any other SS.
subject to the feeder being kept radial
from singapuram ts
endSANKANERI 230 KV
230KV Sankaneri-Udayathoor feeder Breaker,CTs&Lineswitches.
For monthly maintenance & GRT Annual Relay Testing purpose.
During the LC Period There willbe no supply inthe Entire feeder, Other end also LC applied.
SUB TO WIND GEN
RENGANATHAPURAM 230 KVOTHAKKAL MANDABAM 230 KV
110 KV OKM-Tdlr 1 Feeder (Breaker, CT's & Line Switch)
During the lc period 110 KV TDLR 1 feeder Radially fed from 230 KV TDLR ss, Hence no ss will be affected.
subject to the feeder being kept radial
from thudiyalur ss endCHECKANURANI
SW STATION 230 KV
230 KV Checkanurani - Nallamanaikan patty feeder entire
For monthly maintenance work and line maintenance work
SUB TO WIND GEN
SADAYAMPALAYAM 230 KV
230 KV SADAYAPALAYAM - PALLADAM FEEDER BREAKER, CTs AND ISOLATORS
ANNUAL RELAY TESTING AND MONTHLY MAINTENANCE WORKS.
subject to the load condition
existingSriperumbudur 400 KV
During the period of the shutdown 400 KV HV-I & HV-II will be in service
Subject to OCC Concurrence
APP IN 131 OCC IDE ITEM NO.249
110KV Railway traction – I # Breaker, CTs, ,Isolators and Line side Isolator
other traction feeder to be
available230KV ARASUR FEEDER SF6 BREAKER AND ITS ACCESSIORIES
FOR MONTHLY MAINTENANCE WORK
SF6 BREAKER OFF IN CONDITION TOP AND BOTTOM BUS OPEN IN CONDITION
Subject to EE/SLDC/Erode Concurrrence
VEERAPURAM 230 KV
Subject to load condition
110 KV Echur - Kaliyampoondi # (ideally charged)
Monthly Maintenance Work in 110 KV Echur - Kaliyampoondi #, CT's , Breaker and Isolators.
At the time of LC1. 110 KV Echur - Kaliyampoondi # Breaker will be H/T condition, (hence it is ideally charged condition)2.
After completion of work 110 KV Echur - Kaliyampoondi # Breaker will be charged condition. (The feeder is in ideal
condition)SINGAPURAM 230 KV
Monthly Maintenance on Breaker & CT.
1. 110KV Mettupatyy SS is availing TSD on 28.06.2017.2. No auto LC at Salem End.
subject to the feeder being kept radial
from salem ss end
230 KV ARASUR-PUSHEP FEEDER BREAKERS, CTS AND LINE ENTIRE.
FOR MONTHLY MAINTENANCE ALONG WITH LINE PMI WORKS BY AEE/LINES/KOTHAGIRI.
DURING THE L.C PERIOD, REMAINING 5 NOS. 230 K V FEEDERS WILL BE IN SERVICE.
subject to the load condition
existingRENGANATHAPURAM 230 KV
1)230 KV RNPM-CKNI # Breaker & CT's & Line Switch.2)1)230 KV RNPM-CKNI # Entire Line.
1)Monthly Maintenance Work2)Tree Cutting1)Annual Relay Test
SUB TO WIND GEN
110KV ALR-AKY FEEDER CB,CT AND LINE SECTION ALR SS AND AKY SS
subject to angalakurichi
ss tsdVEERANAM 230 KV
For Half yearly and Monthly Maintenance work.
During the LC period no interruption of supply in 230Kv and 33Kv Feeders.Concurrence obtained from
SE/NCES/TIRUNELVELI.KAYATHAR 230 KV
On 230 KV Kayathar - 400 KV kayathar I Link feeder breaker with CT and entire Line
a) For Monthly maintenance workb) Tower to tower inspection work
During the LC period other end also avails LC and there will be no supply in the entire line. Hence, no ss affected.
HV Breaker III will be in service condition, Hence there will be no interruption of supply to 400 / 110 KV Auto transformers III
occ approved and srldc to be
addressed; subject to load
condition existing
APPROVED IN 131 OCC VIDE ITEM NO.250
During 110 KV Salem I # LC period, 110 KV Salem II # will be service condition. Hence, there will be no interruption of
supply.
subject to the load condition
existing110KV Periyar-Theni-III Feeder Breaker with CT and line section between Periyar PH and SR Puram SS
For Monthly Maintenance of Breaker , CT and Line side switches
During the LC Period, 110KV PYR-THENI-III # will be radial from THENI SS up to SR Puram SS. Further on the same day in this
Feeder LC applied from THENI end for LILO line Switch maintenance work at M.G. Kottai SS
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN230KV Kayathar 1 # Main Breaker (204-52) & CT,CVT,LAS
During the LC period there will be no supply in 230 KV Kayathar 1 # Main Breaker (204-52) & CT, CVT,LAS. Hence No
SS affected.During the period of LC, the other 5 No's 230KV feeders and 3 No's Auto-Transformer will be in service.Hence no interruption
of supply please.
pudhanchanthai230kv
110KV KN Patty feeder CB, CTs and Line Switch. 110KV East Bus, its PTs and Bus Side Switches-5 Nos.
During LC period110KV Kalappanaickenpatty SS availing Total Shut Down. 110KV Namagiripet SS will be transferred to 110KV DVK-Thammampatty feeder. 110KV Valayapatty feeder loads will be transferred to 110KV PSI-Namakkal feeder. or 110KV
Erumapatty SS will be transferred to 110KV Kallakudy-Thuraiyur feeder. No Supply interruption.
Subject to EE/SLDC/ Erode concurrence
OTHAKKAL MANDABAM 230 KV
110 KV OKM-Tdlr 2 Feeder (Breaker, CT's & Line Switch)
1.During the lc period 110 KV SNPalayamSS,110KV kuniamuthur SS under Total Shut down.2.110 KV
Somayampalayam ss will be fed from 230 KV TDLR ss3.Hence no ss will be affected.
subject to the feeder being kept radial
from tdlr ss end
SRPUDUR 230 KV
OLTC Oil changing work,Annual relay testing work .
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
1355 Madurai 56375 230 KV During LC period there will be no supply in the entire feeder POSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1356 Chennai 56414 400 KV 200 MVA, 400/110 KV Auto-IV entire For Monthly Mtce. work Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1357 Erode 56423 230 KV PUSHEP 230 KV PUSHEPH - ARASUR# MONTHLY MAINTENANCE WORK 230 KV PUSHEPH - ARASUR# TO BE IN TRIPPED CONDITION possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1358 Madurai 56559 110 KV 110 KV Valuthur-Arkay II feeder entire POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1359 Chennai 56571 230 KV 230KV S.V.CHATRAM-ORAGADAM FEEDER FOR LINE MTCE WORK Possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1360 Madurai 56578 110 KV 110KV Palaiyur- KGTPS feeder entire POSSIBLE Wed, 28-Jun-2017 10:00 Wed, 28-Jun-2017 16:00 1 Approved
1361 Madurai 56587 110 KV Monthly maintenance work POSSIBLE Wed, 28-Jun-2017 10:00 Wed, 28-Jun-2017 14:00 1 Approved
1362 Erode 56650 110 KV possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 15:00 1 Approved
1363 Chennai 56682 110 KV 110 KV Siruseri feeder GRT relay test Idly charged feeder Possible Wed, 28-Jun-2017 10:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1364 Madurai 56714 110 KV LINE MAINTENANCE WORKS FEEDER TO BE KEPT RADIAL FROM VGTPS POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1365 Madurai 56715 110 KV POSSIBLE Wed, 28-Jun-2017 8:00 Wed, 28-Jun-2017 17:00 1 Approved
1366 Madurai 56795 230 KV 230 KV Thiruvarur - Kadalangudi feeder POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1367 Madurai 56798 110 KV POSSIBLE Wed, 28-Jun-2017 8:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1368 Madurai 56812 110 KV Tree cutting work POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1369 Madurai 56849 230 KV 230 KV Thiruvarur - Kadalangudi Feeder POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1370 Madurai 56850 230 KV 230 KV Thiruvarur - Kadalangudi Feeder POSISBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1371 Madurai 56902 110 KV THENI 230 KV POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1372 Madurai 56910 230 KV POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1373 Chennai 56947 110 KV For monthly maintenance works 110 KV Capacitor Bank I will be in service Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0
1374 Madurai 56072 230 KV POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 Approved
1375 Madurai 56146 110 KV Inspection work POSSIBLE Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1376 Chennai 56154 110 KV 110KV Villupuram-Thiruvannamalai # For monthly maintenance works. Possible Wed, 28-Jun-2017 9:00 Wed, 28-Jun-2017 17:00 1 0 Approved
1377 Madurai 54821 110 KV For Monthly Maintenance work POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1378 Madurai 55672 230 KV 230 KV SPR - Nokia feeder Quarterly maintenance work Possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 0 Approved
1379 Erode 55673 110 KV Monthly Maintenance works possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 15:00 1 Approved
1380 Erode 55764 110 KV Monthly Maintenance Work. 110KV Thingalur SS availing Total shutdown. possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 14:00 1 Approved
1381 Erode 55796 110 KV Monthly Maintenance work. possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1382 Erode 55845 110 KV 110KV Northern Bus postponed Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1
1383 Erode 55878 230 KV For Monthly Maintenance work postponed Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1
1384 Erode 56240 230 KV ARASUR 230 KV possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 16:00 1 Approved
1385 Madurai 56269 230 KV POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 14:00 1 Approved
1386 Madurai 56282 230 KV POSSIBLE Thu, 29-Jun-2017 10:00 Thu, 29-Jun-2017 16:00 1 0 Approved
1387 Erode 56298 110 KV 110KV Malco I Feeder For Monthly Maintenance work possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1388 Erode 56299 110 KV possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1389 Erode 56330 110 KV 110 KV Bus Section Breaker and CTS For monthly maintenance works. possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 14:00 1 Approved
1390 Madurai 56368 230 KV 230 KV SRP-SNRI # BR and CT Annual relay testing work POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1391 Madurai 56376 230 KV 230KV Bus Coupler Breaker For monthly maintenance work Bus Couper in ideal condition POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 0 Approved
1392 Madurai 56389 110 KV POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 13:00 1 Approved
1393 Madurai 55545 230 KV POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1394 Madurai 55894 230 KV kayathar400kv For monthly maintenance work. POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1395 Madurai 55900 110 KV For monthly maintenance work Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1
CHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Renganathapuram feeder entire
For monthly maintenance work and line maintenance work
SUB TO WIND GEN
Sunguvarchatram 400 KV
During the period of LC, 400/110 Kv Auto-III will cater the load of Auto - IV with out interruption
Subject to OCC Concurrence
APP IN 131 OCC IDE ITEM NO.248
subject to the load condition
existing
VALUTHUR 230 KV
1. For attending breaker and it's CT's and isolators Monthly Maintenance work.2. For attending tower to tower inspection work.
During the LC Period,110KV Valudur-Arkay I , Arkay - Keelakarai- Volinokkam - Kavanoor and Arkay- Mandapam -
Perungulam feeders will be in service . Hence there will be no interruption in power evacuation at Arkay power plant
SUB TO ARKAY GEN
S.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, 230KV SPR-ORAGADAM FEEDER WILL BE IN SERVICE
Subject to load condition
KADALANGUDI 230 KV
Line inspection and rectification work.
No interruption to any SS. The 110KV Palaiyur SS proposed to shutdown. The 110KV Aduthurai SS load to be connected with
230KV Kadalangudy SS.SUB TO LOAD CONDITION
KANARPATTY 400 KV
110KV Alankulam feeder breaker with CT Bay no 111
the feeder will be in radial from Kodikurichi 230/110KV ss, no ss affected
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
Singarapet 110 KV
110KV SAMPATTI RAILWAY FEEDER I AND LINE SIDE ISOLATOR.
FOR MONTHLY MAINTENANCE WORK AND VARIOUS LOCATION CUT POINT JUMPER TIGHTNESS WORK.
DURING THE LC PERIOD,1. SAMALPATTI RAILWAY # I LOAD TRANSFERRED TO FEEDER II.3. HENCE, NO INTERRUPTION OF
SUPPLY.
traction feeder 2 will be in
serviceTHARAMANI 230 KVKAVANOOR 230 KV
110 KV KAVANOOR-R.S.MADAI-VGTPS # SEC. BET. KAVANOOR AND R.S.MADAI
KAYATHAR 110 KV
110KV KAYATHAR-O.T.PATTI FEEDER SEC B/W KAYATHAR&SEETHAPARPANALLUR
FOR DEFECTIVE DISC REPLACMENT AT VARIOUS LOCATION
DURING THE LC PERIOD,SEETHAPARPANALLUR SS WILLBE RADIALLYFED FROM O.T.PATTI
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTHANJAVUR 230 KV
For carrying out rectification works by the AEE/Lines/Thanjavur.
During the LC period,1) all other 230 KV feeders will be in tied condition,2) no supply interruption to any SS.
KARAIKUDI 230 KV
On 110 KV Karaikudi-Tiruvadanai-Valudur Feeder s/b 110 KV Tiruvadaanai-Amaravathipudur SS
To remove loop jumper and to normalise LILO EHT Line and to energise new 110 KV Poosalakudi SS
110 KV Amaravathipudur SS will be radially fed from 230 KV Karaikudi SS.110 KV Karaikudi-Valuthur feeder will be tied to Grid thro' 110 KV Devakottai Feeder.There will be no sypply
interruption to any SS.The BP issued for establishment of 110 KV Poosalakudi SS will be submitted separately.
SEMBATTY 230 KV
110KV SBT - AKL II # sec. bet. Kosavapatti and V.K.Patti SS
During the LC period, the # will be radial from SBT upto Kosavapatti and radial from other end upto V.K.Patti. Ambika cotton mills will be going to shutdown, concurrence obtained
from them. Hence no interruption to any SS.
SUB TO CONCURRENCE
FROM EHT CONSUMER
THIRUVARUR 230 KV
1.Line pre-monsoon inspection and rectification works 2. Breaker, CT's and line isolator maintenance works
During the LC period all other 230KV Feeders will be in tied condition. There will be no interruption of supply to any other
substations.THIRUVARUR 230 KV
1.Line pre-monsoon inspection and rectification works 2. Breaker, CT's and line isolator maintenance works
During the LC period all other 230KV Feeders will be in tied condition. There will be no interruption of supply to any other
substations.110KV Theni - Periyar III # (section between SR puram WF SS and Periyar power house)
for attending premonsoon remarks and M.G kottai SS LILO line switch mtce work
Up to SR.Puram WF SS will be radial from Theni SS. M.G.Kottai SS will be under total shutdown
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENALUNDUR 230 KV
100 MVA Auto Transformer - II ,HV-II,LV-II Breaker's, CT's and Isolators.
a) Monthly maintenance work.b)Relay Testing work.
a)An Other 100 MVA Auto Transformer -I will be in service.b)All other 110 KV feeders will be in service.c)There will be no
interruption of supply to any other feeders.CUDDALORE 230 KV
110 KV Capacitor Bank II with Breaker & CT’s
Approval from SE/Operation
Approval from SE/Operation
PUDUKOTTAI 230 KV
230 KV PUDUKKOTTAI-KARAIKKUDY PG FEEDER BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE.
FOR MONTHLY MAINTENANCE WORK OF BREAKER, CT, CVT, ISOLATORS 230 KV EHT LINE AND GRT TESTING WORKS
PUDUKKOTTAI 230 KV SS LOADS WILL BE MAINTAINED FROM 230 KV ALUNDHUR FEEDER AND HENCE THERE WILL BE NO
INTERUPTION OF SUPPLY TO ANY SS.
SUB TO ALDR ICT LOADING:
APP IN 131 OCC VIDE ITEM
NO.191KARAIKUDI 230 KV
110 KV KKDI – Valuthur # S/B A.Pudur to Thiruvadanai
During the LC period, A pudur SS will be radial from KKDI and TVDNI # will be tied with DVK #.
Villapuram 110 KV
During the period of LC:1. The 110KV isolator switch at Vettavalam Ss towards Villupuram side will be kept open condition.2. The feeder will be kept radial from T.V.Malai
230KV SS end.3. Vettavalam SS in Thiruvannamalai feeder is availing total shutdown.4 .Hence no interruption of supply in
any SS.KAYATHAR 230 KV
on 110 KV Kayathar - N.S.Puram feeder breaker with CT only
During the LC period other end will be radial from other end so No ss affected
SUB TO WIND GEN
Sriperumbudur 400 KV
During the period of the shutdown 230 KV Nokia SS will be fed by 400 KV SVChatram SS
ANTHIYUR 230 KV
110 KV Barrage III PH Feeder Breaker,CT and Line Switch only.
During the LC period 110/22KV Chennampatty SS Will avail Total Shut down as approved by CE/D/Erode.Other end also
programmed to avail maintenance work. No SS will be affected.
subject to chennampatty ss availing tsd
THINGALUR 230 KV
110KV Thingalur Link Feeder Breaker, CTs and Line Isolator.
subject to thingalur ss tsd
SALEM AUTO 230 KV
110 KV K.R.Thoppur Feeder -II Breaker CT's and line Isolators.
1. 110 KV K.R.Thoppur feeder - II will be radially fed from other end. 2. Kandampatty 110KV SS will be availing total shutdown.
3. There will be no interruption to any SS or feeder.
subject to kandampatty
ss tsdSINGAPURAM 230 KV
Monthly Maintenance on Bus, Jumperings,Bus Isolators.
1. There is only one Auto and it will be idle.2. Intermediate 110KV SS Loads will be fed radially from other ends.3. 230KV Feeders will be in Service.4. No auto Lc proposed at DVK end
and at Salem end.
cannot be issued without
tsd
Subject to EE/SLDC/Erode concurrence
DEVIAKURICHI 230 KV
230 KV STCMS # Breaker, CTs and line side isolator
230 KV Deviakurichy- Pudanchandai & Singapuram Feeders will be in service
to be scheduled with taqa sd
Subject to EE/SLDC/Erode Concurrrence
230 KV ARASUR-KUNDHA PH-II FEEDER BREAKERS, CTS AND LINE ENTIRE.
FOR MONTHLY MAINTENANCE ALONG WITH LINE PMI WORKS BY AEE/LINES/THUDIALUR.
DURING THE L.C PERIOD, REMAINING 5 NOS. 230 K V FEEDERS WILL BE IN SERVICE.
subject to the load condition
existingSANKANERI 230 KV
230KV Sankaneri-SRputhoor feeder Breaker,CTs&Lineswitches.
For monthly maintenance & GRT Annual Relay Testing purpose.
During the LC Period There willbe no supply inthe Entire feeder, Other end also LC applied.
SUB TO WIND GEN
PERAMBALUR 230 KV
1)230/110KV Auto-III,HV-III,LV-III Breakers CT'S & Isolaters only.
For monthly maintenance works and annual maintenance ralay test by wing /GRT/Trichy
During above period of shut down 1)110KV DSSL (Krishnapuram)feeder tie will be opened at Perambalur SS.
2)The remaining loads will be fed Through Auto Transfermer I(100MVA) of Perambalur Auto SS.
METTUR AUTO 230 KV
During the LC period 110KV Malco II & III Feeders will be in service
other two feeders will be
in service
LOWER METTUR 3
On 110KV BPH 3-Anthiyur # breaker, CTs & Line isolators only
To carryout Monthly maintenance works.
During the LC period, 110KV BPH 3-BPH 2 # and 110KV BPH 3-BPH 4 # will be in service. Unit1, 2 will be in service/standby as per the PWD Demand. On the same day, Chennampatty 110KV
SS has programmed to avail Total Shut down &Anthiyur 230 KV SS also programmed to avail LC on 110 KV BPH 3- Anthiyur
# at Anthiyur 230 KV SS end.
subject to chennampatty ss availing tsd
OTHAKKAL MANDABAM 230 KV
1.During the lc period 110 KV OKM-TDLR 1 feeder loads will be transferred to 230 KV TDLR SS2.Auto Transformer 1 will be
cater the Western bus loads with support of wind generation.3.Auto Transformer 2 and 3 will be cater the
Eastern bus loads with support of wind generation.
subject to the division of
loads
SRPUDUR 230 KV
During the LC period 230 KV SR Puthur - Koodankulam feeder will be in service.Hence No SS will be affected.
SUB TO WIND GEN
CHECKANURANI SW STATION 230 KV
ANUPPANKULAM 230 KV
110 KV Thulukkapatty-Aruppukottai # section between 110 KV MRPM SS & 110 KV Thulukkapatty SS
For providing GI Metal spike on tower cross arm .
During the LC period 110 KV MRPM SS,110 KV TKPTY SS,110 KV Velayuthapuram SS & 110 KV EHT Ramalinga mills under
total shut down.110 KV APK SS loads will be transfer to 110 KV Kavanoor-Kamuthi #.Hence No SS affected.
SUB. TO LOAD & SOLAR GEN.
KAYATHAR 230 KV
On 230 KV Kayathar - 400 Kayathar II link feeder breaker with CT and entire line
a) For monthly maintenance workb) Tower to tower inspection work
During the LC period other end also avails LC and there will be no supply in the entire feeder. Hence no ss affected.
SUB TO FORMALIZATIO
N OF LINK 1230KV Kayathar 2 # Main Breaker (205-52) & CT,CVT
During the LC period there will be no supply in 230 KV Kayathar 2 # Main Breaker (205-52) & CT, CVT,LAS. Hence No
SS affected.
SUB TO FORMALIZATIO
N OF LINK 1
KAYATHAR 230 KV
110 KV Kayathar - periyar feeder breaker with CT only
During the LC period the feeder will be radial from other end. Hence no ss affected.
NOT POSSIBLE
DUE TO WIND GEN AND LOAD
CONDITION
Subject to EE/SLDC/ Madurai concurrence
1396 Madurai 56023 110 KV Monthly Maintenance work. POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 0 Approved
1397 Madurai 56037 230 KV 230 KV Bus section II Monthly maintenance work 0 POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1398 Erode 56069 110 KV KUNDAH PH3 110KV KPH.2 – THUDIYALUR FEEDER For PMI Work postponed Thu, 29-Jun-2017 8:00 Thu, 29-Jun-2017 17:00 1
1399 Madurai 56149 110 KV 110KV DVKT # S/B Sakkavayal & TVDI Disc replacement L.No:27,29,30,33 POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 0 Approved
1400 Erode 56152 230 KV For monthly maintenance works Other Two Auto Transformer II & III are in service. possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 14:00 1 Approved
1401 Erode 56189 230 KV Both end LC appyied possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1402 Erode 56192 230 KV Capacitor Bank.I entire NO FEEDERS WILL BE AFFECTED DURING THE LC PERIOD possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1403 Chennai 56518 230 KV 100MVA AUTO TR.IV FOR MONTHLY MTCE WORK Possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1404 Erode 56573 230 KV 230KV TBC Breaker and Transfer Bus possible Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1405 Madurai 56588 230 KV POSSIBLE Thu, 29-Jun-2017 10:00 Thu, 29-Jun-2017 16:00 1 0 Approved
1406 Chennai 56695 230 KV 100MVA Auto II Possible Thu, 29-Jun-2017 10:00 Thu, 29-Jun-2017 17:00 1 Approved
1407 Madurai 56720 230 KV MONTHLY MAINTENANCE WORKS POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 0 Approved
1408 Madurai 56725 110 KV Thu, 29-Jun-2017 8:00 Thu, 29-Jun-2017 17:00 1
1409 Madurai 56737 110 KV POSSIBLE Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 Approved
1410 Erode 56874 230 KV possible Thu, 29-Jun-2017 10:00 Thu, 29-Jun-2017 17:00 1 Approved
1411 Chennai 56948 110 KV For monthly maintenance works 110 KV Capacitor Bank II will be in service Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1 0
1412 Erode 56961 230 KV 230KV Deviakurichy -STCMS Feeder postponed Thu, 29-Jun-2017 9:00 Thu, 29-Jun-2017 17:00 1
1413 Chennai 56433 230 KV NOKIA 230 KV MONTHLY MTC OTHER FEEDER (230 KV S V CHATRAAM) IS IN SRERVICE Possible Thu, 29-Jun-2017 7:00 Thu, 29-Jun-2017 10:00 1 0 Approved
1414 Madurai 55666 110 kv TRICHY230KV POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 16:00 1 0 Approved
1415 Erode 55676 110 KV Monthly Maintenance works. possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 15:00 1 Approved
1416 Erode 55677 230 KV Monthly maintenance works possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 15:00 1 Approved
1417 Madurai 55713 110 KV Monthly Mtce works POSSIBLE Fri, 30-Jun-2017 10:00 Fri, 30-Jun-2017 14:00 1 Approved
1418 Madurai 55734 110 KV For Monthly Maintenance Work. No ss will be affected. POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1419 Erode 55801 230 KV Monthly Maintenance work. possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1420 Erode 55835 110 KV 110KV Deviakurichi II Feeder possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1421 Madurai 56271 230 KV POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 14:00 1 Approved
1422 Madurai 56378 230 KV During LC period there will be no supply in the entire feeder POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1423 Madurai 56390 110 KV POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1424 Chennai 56415 400 KV For Monthly Mtce. work Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1425 Madurai 56456 110 KV POSSIBLE Fri, 30-Jun-2017 10:00 Fri, 30-Jun-2017 17:00 1 0 Approved
1426 Madurai 56561 110 KV 110KV Penna - Kavanoor feeder entire POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 0 Approved
1427 Chennai 56597 230 KV 230KV Sriperumbudur I feeder Quarterly maintenance work Fri, 30-Jun-2017 5:00 Fri, 30-Jun-2017 9:00 1
1428 Chennai 56632 230 KV 230KV Sriperumbudur- Kadapperi feeder I Fri, 30-Jun-2017 5:00 Fri, 30-Jun-2017 9:00 1
1429 Chennai 56699 110 KV concurance may be obtained from M/s.SANMAR Possible Fri, 30-Jun-2017 10:00 Fri, 30-Jun-2017 16:00 1 Approved
1430 Madurai 56727 110 KV 110 KV KAVANOOR-PIONEER (PENNA) PENNA-VALUTHUR TO BE IN SERVICE POSISBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 0 Approved
1431 Madurai 56729 230 KV MONTHLY MAINTENANCE WORKS POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1432 Madurai 56733 110 KV POSSIBLE Fri, 30-Jun-2017 8:00 Fri, 30-Jun-2017 17:00 1 Approved
1433 Erode 56797 110 KV possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 16:00 1 Approved
1434 Madurai 56800 110 KV POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 0 Approved
1435 Chennai 56844 110 KV Korattur lines 110KV KTR - Sembium 1 all other feeders in service Possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 0 Approved
PUGALUR 230 KV
110 KV TNPL feeder breaker, CT & Line switch only
During the LC period, there will be no supply on the above feeder. Concurrence obtained from EHT consumer M/s TNPL
Ltd.KODIKURICHY 230 KV
SUB TO WIND GEN
Both end breaker open condition.Both bus & line mods open condition.Earth switch closed condition.
to be scheduled on a sunday
Subject to EE/SLDC/Erode concurrence
KARAIKUDI 230 KV
During the L.C period 110KV DVKT SS will be TSD & 110KV KKDI-DVKT # Radial upto Sakkavayal SS.
THUDIALUR 230 KV
230/110 KV Auto Transformer - I,HV,LV Breaker,CTs
subject to the other auto trs loading limit
Udumalpet 400 KV
230 KV Myvadi-Ponnapuram-2 feeder Breaker,CT line entire.
For Monthly maintenance and PMI by lines wing.
subject to the load condition
existingUDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
subject to the voltage profile
in the gridS.P.KOIL 230 KV DURING THE PERIOD OF SHUT DOWN, 100MVA AUTO TR.I&II
WILL BE IN SERVICESubject to load
conditionPALLADAM 230 KV
To Carryout Monthly maintenance work by AEE/M/Palladam
1)All 230 KV Feeders and Auto Transformers will be inservice2)IDLE Breaker and Bus3)No other SS will be affected
main bus to be in service
KADALANGUDI 230 KV
110KV Vaitheeswarankoil- Manalmedu- Ltpcl feeder entire.
Line inspection and rectification work.
No interruption to any SS. The 110KV Manalmedu SS proposed to shutdown. The 110KV V.Koil, Poraiyar and Thiruvengadu SS loads will be connected with 230KV Kadalangudy SS via 110KV
Kadalangudy- V.Koil feeder.
GUMMIDIPOONDI 230 KV
protection Relay test and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
Concurance to be obtained for 1/2 an hour Supply interupption from M/s. Hi-tech carbon, M/s. OPG, M/s.TCPL and
M/s.Tulsian,110KV Panjetty SS back feeding arrangement from manali 230 KV SS & 110kv periyapalayam SS back feeding
arrangement from 400kv Alamathi SS
Subject to load condition
KAVANOOR 230 KV
230/110 KV AUTO TRANSFORMER 1 - 50 MVA, HV BR., LV BR.
AUTO TR. 1 WILL NOT BE IN SERVICE. LOADS TO BE CATERED BY THE OTHER AUTO TR.
KAYATHAR 110 KV
11O KV KAYATHAR-K.G.PATTI FEEDER SEC B/W KAYATHR & KALUGUMALAI
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATIONS
DURING THE LC PERIOD,KALUGUMALAISS WILLBE RADIALLYFED FROM K.G.PATTI HENCE NO SS AFFECTED
NOT POSSIBLE
DUE TO WIND GEN AND LOAD
CONDITION
Subject to EE/SLDC/ Madurai concurrence
NEMALITHIPIYAKUDI 230 KV
A) 110KV NEMMELI THIPPIYAKUDI - PATTUKKOTTAI-II FEEDER BREAKER, CT' s AND LINE ISOLATER. B) 110KV NEMMELI THIPPIYAKUDI - PATTUKKOTTAI-II FEEDER (LP: 230KV NT KUDI SS TO 110KA KARAMBAYAM SS).C) 110KV NEMMELI THIPPIYAKUDI-MADUKKUR FEEDER BREAKER, CT's AND LINE ISOLATOR.
A) MONTHLY MAINTENANCE WORK BY AEE/MTC/ N T KUDI. B) PREMONSOON INSPECTION BY AE/LINES/PATTUKKOTTAI.C) FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/N T KUDI.
1) During the LC period, 110KV Karambayam SS availed total shutdown (LR: 9MW) and 110KV Madukkur SS (33KV only , LR:
13MW) availed shutdown. 2) 110KV Nemmeli Thippiyakudi-Pattukkottai-I Feeder in service. 3) 110KV Kovilkalappal-Madukkur-Pattukkottai tie will be created (by closing the
110KV Line Isolator (switch No.2) at 110KV Madukkur SS) and 110KV Madukkur feeder Breaker hand tripped condition at
230/110KV N T Kudi SS. 4) No interruption to any Substation.
SUB TO LOAD CONDITION
PONNAPURAM 230 KV
230 KV Ponnapuram - Myvadi II # Breaker, CTs & Line entire
For monthly maintenance works & Annual testing by P&C Wing
1. 230KV GRID #, HENCE NO SS WILL BE AFFECTED,2. OTHER END SS ALSO PROPOSED TO AVAIL LC
subject to the load condition
existingCUDDALORE 230 KV
110 KV Capacitor Bank I with Breaker & CT’s
Approval from SE/Operation
Approval from SE/Operation
DEVIAKURICHI 230 KV
230KV Deviakurichy -STCMS line jumper tightness work.
1)The Deviakurichy 230KV SS availing Breaker, CT’s maintenances work .2)There will be no interruption any other
SS.to be scheduled
with taqa sdSubject to EE/SLDC/Erode Concurrrence
230 KV SRIPERUMBUDUR FEEDER BREAKER & CTS
110KV TRICHY - ALUNDUR II breaker,CTs & Line Isolator and line entire.
a) For monthly maintenance works. b) Pre monsoon inspection
During the LC period, a) other end also availing shutdown for monthly maintenance work b) Intermediate 110 KV
Manikandam SS also availing Total shutdown c) All other 110 KV feeders will be in service d) There will be no interruption of
supply to any other feeders & SS.ANTHIYUR 230 KV
110KV Thalavaipet Feeder breaker CT and Line Switch only.
During the Lc period 110/22KV Thalavaipet SS Will avail Total shut down.No SS will be affected.
subject to thalavaipettai ss availing tsd
ANTHIYUR 230 KV
230/110 KV Auto Transformer II HV and LV breakers & it's CTs only
During the LC period Auto Transformer I will be in service and 110/22 KV Thalavaipet SS availing total Shut Down as
approved by CE/D/Erode. No SS will be affected.
subject to the other auto tr loading limit
UDAYATHUR 230 KV
110KV Samugarangapuram Feedere Breaker
During the LC period 110KV samugarangapuram SS will be affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENTUTICORIN -AUTO 230 KV
On 110 KV TTN - ARNI - I # Breaker with CT and line side switch
SUB TO WIND GEN.
SALEM AUTO 230 KV
230KV Link Feeders II Breakers, CTs & Line Isolators
1. 230KV Link-II feeder LC will be availed at both ends. 2. 3Nos 230KV feeder will be in service 3. There will be no interruption
to any SS or feeder.
subject to the other link
feeder loading limit
SINGAPURAM 230 KV
Monthly Maintenance on Breaker & CT
1. 110KV Deviakurichi II Feeder will be fed radially from DVK. end.2.110KV Mallikarai SS is availing TSD on 30.06.2017.3. No
auto LC at DVK end on 30.06.2017.
subject to the feeder being kept radial
from deviakurichi ss
endSANKANERI 230 KV
230/33KV PowerTransformer-III,HV&LV Breaker,CTs only.
For monthly maintenance & GRT Annual Relay Testing purpose.
During the LC Period PowerTransformer-III willnot beinservice.PowerTransfomer-I&II willbe Carried out the
EntireLoad.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENCHECKANURANI SW STATION 230 KV
230 KV Checkanurani - Ind Bharath feeder entire
For monthly maintenance and line maintenance work
SUB TO CONCURRENCE
FROM IND BHARAH
ANUPPANKULAM 230 KV
(a) 110 KV K.G. Patti - Kayathar feeder section between 110 KV Perumal patti SS and 110 KV Mudangiar SS. (b) 110 KV Suruliyar - Kayathar feeder section between 110 KV Sangarankoil SS and Suruliyar PH
(a) For replacement of flash over disc at Loc. No. 6, 7 & 21. (b) Tree cutting works.
(a) During the LC Period 110 KV Perumal Patti SS will be radially fed from 110 KV Kayathar SS and 110 KV Mudangiar SS & Seithur SS will be under Total shut down (b) During the
LC period 110 KV Sangarankoil SS will be radially fed from 110 KV Kayathar SS. Hence no ss will be affected.
SUB TO WIND GEN
Sunguvarchatram 400 KV
400 KV SVC-Pondichery # entire with Tie-1 breaker
during the period of LC, the 400 KV SVC- Pondy # entire will be in OFF condition
Subject to OCC Concurrence
APP IN 131 OCC IDE ITEM NO.198
SAMAYAPURAM 230 KV
110 KV SMPM-Kallakudi -II # CT's , Breakers and entire line portion (tied feeder) .
Monthly Maintenance Works and Line Patrol Work.
1. During the above LC Period, 110Kv Kallakudy II # Breaker is in H/T condition at 230KV Tahtchankurichy SS . 2.110Kv Thatchankurichy II# Breaker is in H/T condition at 110KV kallakudy Grid SS. 3.Bus and Line Isolator towards 110KV Kallakudy Grid SS will be kept in open condition at 230KV
Thatchankurichy SS. 4.Line Isolator towards 230KV Thatchankurichy SS will be kept in open condition at 110KV
Kallakudy Grid SS. 5. Earth switch will be kept in closed condition at 110Kv Kallakudy grid ss and 230KV
Thatchankurichy SS. 6.110 KV Kallakudi-I # will be in tied condition. 7.There will be no interruption to any other SS.
VALUTHUR 230 KV
For attending tower to tower Inspection and Tree cutting work
During the LC period 110KV Valuthur - Penna feeder will be in service. Hence, there is no interruption in power evacuation.
KADAPPERI 230 KV
230KV Kalivanthapattu -Kadapperi feeder and 230KV Sriperumbudur II feeder will be in service. 110KV S.PKoil feeder
and 110KV Korattur I feeder radial from other end.To be discuss
Subject to CBD Concurrence
Approved Sub to grid condition
KADAPPERI 230 KV
Top phase insulator replacing at loc.No.19
230KV Sriperumbudur- Kadapperi II feeder and 230KV Kalivanthapattu -Kadapperi feeder will be in service.
To be discuss
Subject to CBD Concurrence
Approved Sub to grid condition
GUMMIDIPOONDI 230 KV
110KV Sanmar feeder, breaker, Cts, Line isolators
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
Subject to M/s. Sanmar
concurrenceKAVANOOR 230 KV
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
KAVANOOR 230 KV
230/110 KV AUTO TRANSFORMER 2 - 80 MVA, HV BR., LV BR.
AUTO TR. 2 WILL NOT BE IN SERVICE. LOADS TO BE CATERED BY THE OTHER AUTO TR.
SUB TO LOAD CONDITION
KAYATHAR 110 KV
110KV KAYATHAR-KODIKURUCHI FEEDER SEC B/W KAYATHAR & THERKUPATTI
FOR LINE INPECTION AND RECTIFICATION WORK
DURING THE LC PERIOD,1.THERKUPATTI SS WILLBE RADIALLY FED FROM KEELAVERANAM HENCE NO SS AFFECTED
SUB TO WIND GEN AND NO BLOCKING OF
WIND GENCOIMBATORE 230 KV
1. 110KV CBE- THUDIYALUR - II FEEDER ENTIRE, BREAKER AND CTs
1. PMI WORKS BY AE / LINES / COIMBATORE2. MONTHLY MAINTENANCE WORKS
1. LC PROPOSED AT 110KV CBE- THUDIYALUR- II FEEDER AT 230KV THUDIYALUR SS.
subject to the load condition
existingTHANJAVUR 230 KV
110 KV Veeramarasanpettai - Thirukkattuppalli feeder
For Rectification works by the AEE/Lines/Thanjavur.
During the LC period,1) 110 KV Thirukkattuppalli SS will avail shutdown,2) all other 110 KV feeders will be in tied condition,
3) no supply interruption to any SS.Jumper tightness checking work at various locations
1436 Madurai 56851 110 KV 110 KV Thiruvarur - T(K)GTPS Feeder POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 0 Approved
1437 Erode 56876 230 KV 230 KV Southern Bus Entire For monthly maintenance works possible Fri, 30-Jun-2017 10:00 Fri, 30-Jun-2017 17:00 1 Approved
1438 Madurai 56911 110 KV POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 0 Approved
1439 Erode 56962 110 KV possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1440 Madurai 55518 110 KV PAPANASAM 110KV PPM-SERVALAR FEEDER - 2 POSSIBLE Fri, 30-Jun-2017 10:00 Fri, 30-Jun-2017 12:00 1 0 Approved
1441 Erode 55594 230 KV Salem 400 KV 230KV Link-II # Bkr,CTs & Line switch Monthly Maintenance work Both end Monthly Maintenance work possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1442 Madurai 55901 110 KV For monthly maintenance work POSSIBLE Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1443 Erode 55929 230 KV possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1444 Erode 55931 110 KV possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1445 Erode 55958 110 KV 110KV Unjanai-Paruthipalli # line entire Jumper tightness checking &PMI Paruthipalli SS total s/d possible Fri, 30-Jun-2017 0:00 Fri, 30-Jun-2017 0:00 1 Approved
1446 Madurai 56044 110 KV For tree cleareance work POSSIBLE Fri, 30-Jun-2017 10:00 Fri, 30-Jun-2017 17:00 1 0 Approved
1447 Erode 56155 110 KV 110 KV Coimbatore II feeder Breaker, CTs For monthly maintenance works 110 KV Coimbatore - II feeder radial from other end. possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 14:00 1 Approved
1448 Erode 56193 230 KV 230 KV Myvadi-Bus Coupler Breaker only. Myvadi end only. possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
1449 Erode 56194 230 KV Capacitor Bank.II entire NO FEEDERS WILL BE AFFECTED DURING THE LC PERIOD possible Fri, 30-Jun-2017 9:00 Fri, 30-Jun-2017 17:00 1 Approved
THIRUVARUR 230 KV
Line Pre-monsoon Inspection and Rectification work, Breaker, CT's and Line side Isolator maintenance work.
During the LC period there will be no interruption of power supply to any other Substations.
PONNAPURAM 230 KV
WITH MEDIUM WIND POWER GENERATION 1. 230KV MYVADI - I # WILL BE CUT OF AT THIS END2. 230KV MYVADI - II # WILL BE
CUT OF AT THIS END3. 110KV THUNGAVI # WILL BE KEPT RADIAL FROM 230KV UDT SS/110KV POOLAVADI # UP TO THIS END4. 110KV PETHAPPAMPATTY # WILL BE KEPT RADIAL UP TO
KOTTAMANGALAM SS,5. 110KV INGUR-I # WILL BE KEPT RADIAL FROM 230KV KURUKATHI SS UP TO THIS END,6. 110KV INGUR-II # WILL BE KEPT RADIAL FROM 230KV INGUR SS UP TO
THIS END,7. AUTO TR-I WILL BE CUT OFF,8. AUTO TR-III WILL BE CUT OFF,9. HENCE NO SS WILL BE AFFECTED.
subject to the load condition
existing
ALUNDUR 230 KV
110KV Alundur - Trichy-II Feeder breaker,CT's, and Line Isolators.
a)Monthly maintenance work.b)Relay testing work.
a)other end also aviling shut down. and Intermediate 110KV Manikandam SS Also avail total shutdown.b)All other 110 KV feeders will be in service.c)There will be no interruption of
supply to any other feeder's and ss.
DEVIAKURICHI 230 KV
110 KV Singapuram – Deviakurichi 11 Feeder (Section between Singapuran ss –P.G.Palayam ss)
110 KV Singapuram – Deviakurichi 11 Line jumper tightness work.
1)Singapuram 230KV SS Deviakurichi II feeder monthely maintenances work Breaker,CT ‘s.2)Deviakurichi 230KV SS
radial fed from upto P.G.Palayam 110KV SS End 3)There will be no interruption of supply any other SS.
subject to the feeder being kept radial
from deviakurichi ss
end110KV PPM-SERVALAR FEEDER - 2 BREAKER WITH CT MAINTENANCE WORK AT PPM END.
Present PWD demand is 200 CUSECS. During the LC period the feeder will be radial from other end.No SS will be affected.
subject to the other link
feeder loading limit
KAYATHAR 230 KV
110 KV Kayathar - Kodikurichi feeder, breaker with CT only
During the LC period, the feeder will be radial from other end. Hence no ss affected.
SUB TO WIND GEN AND NO BLOCKING OF
WIND GEN
SALEM AUTO 230 KV
230KV Salem KR Thoppur Link-II feeder entire
Tension point jumper checking work
1. 230KV Salem – KR Thoppur Link-II feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept
opened at both ends. 3. Both ends are availing breaker and line switches LC on that day. 4. There will be no interruption to
any SS.
subject to the other link
feeder loading limit
UNJANAI 230 KV1.110KV UNJANAI - PARUTHIPALLY FEEDRE BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK
DURING THE L.C PERIOD PARUTHIPALLY110KVSS ALSO PROGRAMMED TO AVAIL TOTAL SHUTDOWN
subject to paruthipalli ss
tsdUNJANAI 230 KV
subject to paruthipalli ss
tsdKODIKURICHY 230 KV
On 110KV Papanasam-Servalar II feeder entire line.
EE/O /Papanasam power house also applied monthly shutdown. ii) Servalar Feeder I will be in service
THUDIALUR 230 KV
subject to the load condition
existingUdumalpet 400 KV
For Monthly maintenance Myvadi end only.
all the feeders are tied with
both busUDUMALPET 230 KV
FOR MONTHLY MAINTENANCE WORKS
subject to the voltage profile
in the grid