Filed Sub-Bid Coordination and Communication
Mark Kalin FAIA FCSI LEED - Kalin Associates Specifications [email protected]
We have work to do
5,000,000 people move to citiesevery monthTriumph of the City - Ed Glaeser
We have to get it right during design
Even sustainability is a point of view
DCAMM Standard Specifications Update
MGL Chapter 149 filed sub-bidsMGL Chapter 149A trade bidsDivision 1 issued with CM RFQFiled sub-bids and trade bids$ 25,000 trade bid thresholdPrequalify trade bidders
DCAMM Standard Specifications
Overview of 2018 Update
DBB / CMR Versions DifferentDCAMM E-bid RoomCAMIS Equipment TemplatesCommissioningProduct/Standards UpdatesLEED V4MEP/FP Specs by Engineers
DCAMM Standard Spec – Sub Sub-Bids
Section 210001 - Fire ProtectionNone
Section 220001 - PlumbingPlumbing Insulation
Section 230001 - HVACHVAC InsulationHVAC Ducts and CasingsStartup, Testing and BalancingTemperature Control System
Section 260001 - Electrical WorkFacility Lightning ProtectionCommunications SystemsAudiovisual SystemsSecurity Systems
Filed Sub-Bids – Spec Hot Topics
RFIs / Bid ProtestsPrior to Receipt of BidsAfter Bids ReceivedProprietary Specs
Scope of Filed Sub-BidsExterior Glazing not in FSBDiv 27/28 part of Div 26
Construction Management IssuesTrade CrossoversSupplemental Scope Req’ts
© 2009 Autodesk
Programming
Conceptual Design
Detailed Design Analysis
Documentation
Fabrication
Construction4D/5D
ConstructionLogistics
Operation and Maintenance
Demolition
Renovation
BuildingInformationModeling
Questions? Opinions? [email protected]