Figure 02-01.ai; Date:08/01/2014; User: Serkan Bozkurt, LCI...File path:...
Transcript of Figure 02-01.ai; Date:08/01/2014; User: Serkan Bozkurt, LCI...File path:...
File
pat
h: S
:\100
5\05
1\Fi
gure
s\N
orm
\Fig
ures
_TR
14_0
8\Fi
gure
_02-
01.a
i; D
ate:
08/0
1/20
14; U
ser:
Serk
an B
ozku
rt, L
CI
HAZARD SENSITIVITY AND IMPACT EVALUATION
2-1Pacific Gas and Electric Company Figure
Deterministic Response Spectra (5% Damping)for the Power-Block Foundation Level
Ch13.GEO.DCPP.TR.14.08 R0
File
pat
h: S
:\100
5\05
1\Fi
gure
s\N
orm
\Fig
ures
_TR
14_0
8\Fi
gure
_02-
02.a
i; D
ate:
08/
01/2
014;
Use
r: Se
rkan
Boz
kurt,
LC
I
HAZARD SENSITIVITY AND IMPACT EVALUATION
2-2Pacific Gas and Electric Company Figure
Deterministic Response Spectra (5% Damping)for the Turbine-Building Foundation Level
Ch13.GEO.DCPP.TR.14.08 R0
File
pat
h: S
:\100
5\05
1\Fi
gure
s\N
orm
\Fig
ures
_TR
14_0
8\Fi
gure
_02-
03.a
i; D
ate:
08/
01/2
014;
Use
r: Se
rkan
Boz
kurt,
LC
I
HAZARD SENSITIVITY AND IMPACT EVALUATION
2-3Pacific Gas and Electric Company Figure
Deterministic Response Spectra (5% Damping)for the Power-Block and Turbine-BuildingFoundation Level for the Scenario with the
Shoreline Fault Rupture Linked to the Hosgri Fault
Ch13.GEO.DCPP.TR.14.08 R0