Field Period Assembly
description
Transcript of Field Period Assembly
1
Field Period Assembly
Slides for discussion
Rev 3
2
Stage 1
Stage 3
Stage 4
(VV Prep)
(MC installation)
(Final FP Assembly)
Stage 2
(Half Period Assembly)
Lower segment, shim and fasten
3
VV Prep Stage
Earlier installation orientation
4
MC segment alignment system
Lower segment, shim and fasten
Half Field Period Assembly
5
Module Coil Installation
6
Figure 7a Initial TF Placement Figure 7b) Initial TF Placement
Figure 7 Final Full Period Assembly
Final Field Period
Assembly
7
8
9
10
34.8’21.25’
11
Stage 2
Stage 1Stage 3
Stage 4
TF FP
12
It is assumed that there is some form of pre-assembly of the TF coils
13
Se185-009.asm 23,000 lbs
Se185-006.asm 3,203 lbs
Se185-005-01.asm 6,000 lbs
Se185-008.asm 4,012 lbs
Se185-007.asm 2,660 lbs
Se185-004.asm 2,825 lbs
Total 41,700 lbs
18,700
14
MCHP / Turning Fixture interface
Module Coil Half Period
Pivot and rotation component
Cradle component
Vertical guide component
Linear turntable structure
Linear motion structure
(25000 lbs)
(3200 lbs)
(6000 lbs)
(4000 lbs)
(2700 lbs)
(2800 lbs)
18,700 lbs
MCAF Component Details
15
Total Weight of Reference Turning
Fixture is ~18,700 lbs(assumes steel construction)
Design uses:
structural steel components
worm gear screw assemblies
rollers
DY = 140”
DZ = 16”
DX = 12”
RZ = 15°
Y
X
Z
RX = 5°RY = 13°
16
17
Vacuum Vessel Period
Module Coil Half Period
Module Coil Half Period
18
Sideways clearances between MC shell and secondary support structure shall be greater that 60”
19
Gantry Crane
Module Coil Half Period
Module Coil Half Period
Turning Fixture
Base Guide Rail
Type “A”
Type “B”
Type “C”
Turning Fixture / MC Interface Components
VV Support
20
Gantry Crane
Module Coil Half Period
Module Coil Half Period
Turning Fixture
Base Guide Rail
21
22
23
Y
X.Z
Y
X
XRxRz
XRy
Z
24
63” potential space savings.
Length of screw shown is 172”
If we allow a rotational extraction of the MCHP it looks like we can come under the 144” max length of the screw. A 144” screw would reduce the 63’ space savings by 28”, leaving 35” of space.
25
26
27
Max stress = 11 ksiMax Disp = .09 in
Load = 23,000 lbs
Total Unit weight = 36,410 lbs
28
29
Starting Position - CG Locations
18,300 MCFP
38,000 MCAF
(Base End and Front Views)
30
89.1”
18,300 MCHP
38,000 MCAF
Starting Position - CG Locations(End and Top Views from Vertical Guide Structure)
31
100.0”
Final Position - CG Locations
18,300 MCHP
38,000 MCAF
(Front and Top Views from Base Structure)
32
0.54”
82”
74”3
2
1
1
2
3
33
66.753”
60 DegXZ Y
Machine Coordinate
System
Baseline MCAF
Coordinate System
34
MC delivery Half Period Half PeriodSchedule Interfaces Assembly
C1C2A1C3 C2 - C3B1A2 A2 - A1A3A4 A3 - A4A5A6 A5 - A6B2 A2 / B2 / C2B3 A3 / B3 /C3B4B5B6C4C5 C4 - C5 A4 / B4 /C4C6 C1 - C6 A5 / B5 / C5
A6 / B6 /C6A1 / B1 / C1
A1
B1
C1
A2B2C2
A3
B3
C3
A4
B4
C4 A5B5C5
A6
B6
C6
Half Period Assembly Sequence – perform all alignment and hole placement at this stage.
35