Field Period Assembly

35
1 Field Period Assembly Slides for discussion Rev 3

description

Field Period Assembly. Slides for discussion Rev 3. (VV Prep). Stage 1. (Half Period Assembly). Lower segment, shim and fasten. Stage 2. (MC installation). Stage 3. (Final FP Assembly). Stage 4. VV Prep Stage. Earlier installation orientation. Lower segment, shim and fasten. - PowerPoint PPT Presentation

Transcript of Field Period Assembly

Page 1: Field Period Assembly

1

Field Period Assembly

Slides for discussion

Rev 3

Page 2: Field Period Assembly

2

Stage 1

Stage 3

Stage 4

(VV Prep)

(MC installation)

(Final FP Assembly)

Stage 2

(Half Period Assembly)

Lower segment, shim and fasten

Page 3: Field Period Assembly

3

VV Prep Stage

Earlier installation orientation

Page 4: Field Period Assembly

4

MC segment alignment system

Lower segment, shim and fasten

Half Field Period Assembly

Page 5: Field Period Assembly

5

Module Coil Installation

Page 6: Field Period Assembly

6

Figure 7a Initial TF Placement Figure 7b) Initial TF Placement

Figure 7 Final Full Period Assembly

Final Field Period

Assembly

Page 7: Field Period Assembly

7

Page 8: Field Period Assembly

8

Page 9: Field Period Assembly

9

Page 10: Field Period Assembly

10

34.8’21.25’

Page 11: Field Period Assembly

11

Stage 2

Stage 1Stage 3

Stage 4

TF FP

Page 12: Field Period Assembly

12

It is assumed that there is some form of pre-assembly of the TF coils

Page 13: Field Period Assembly

13

Se185-009.asm 23,000 lbs

Se185-006.asm 3,203 lbs

Se185-005-01.asm 6,000 lbs

Se185-008.asm 4,012 lbs

Se185-007.asm 2,660 lbs

Se185-004.asm 2,825 lbs

Total 41,700 lbs

18,700

Page 14: Field Period Assembly

14

MCHP / Turning Fixture interface

Module Coil Half Period

Pivot and rotation component

Cradle component

Vertical guide component

Linear turntable structure

Linear motion structure

(25000 lbs)

(3200 lbs)

(6000 lbs)

(4000 lbs)

(2700 lbs)

(2800 lbs)

18,700 lbs

MCAF Component Details

Page 15: Field Period Assembly

15

Total Weight of Reference Turning

Fixture is ~18,700 lbs(assumes steel construction)

Design uses:

structural steel components

worm gear screw assemblies

rollers

DY = 140”

DZ = 16”

DX = 12”

RZ = 15°

Y

X

Z

RX = 5°RY = 13°

Page 16: Field Period Assembly

16

Page 17: Field Period Assembly

17

Vacuum Vessel Period

Module Coil Half Period

Module Coil Half Period

Page 18: Field Period Assembly

18

Sideways clearances between MC shell and secondary support structure shall be greater that 60”

Page 19: Field Period Assembly

19

Gantry Crane

Module Coil Half Period

Module Coil Half Period

Turning Fixture

Base Guide Rail

Type “A”

Type “B”

Type “C”

Turning Fixture / MC Interface Components

VV Support

Page 20: Field Period Assembly

20

Gantry Crane

Module Coil Half Period

Module Coil Half Period

Turning Fixture

Base Guide Rail

Page 21: Field Period Assembly

21

Page 22: Field Period Assembly

22

Page 23: Field Period Assembly

23

Y

X.Z

Y

X

XRxRz

XRy

Z

Page 24: Field Period Assembly

24

63” potential space savings.

Length of screw shown is 172”

If we allow a rotational extraction of the MCHP it looks like we can come under the 144” max length of the screw. A 144” screw would reduce the 63’ space savings by 28”, leaving 35” of space.

Page 25: Field Period Assembly

25

Page 26: Field Period Assembly

26

Page 27: Field Period Assembly

27

Max stress = 11 ksiMax Disp = .09 in

Load = 23,000 lbs

Total Unit weight = 36,410 lbs

Page 28: Field Period Assembly

28

Page 29: Field Period Assembly

29

Starting Position - CG Locations

18,300 MCFP

38,000 MCAF

(Base End and Front Views)

Page 30: Field Period Assembly

30

89.1”

18,300 MCHP

38,000 MCAF

Starting Position - CG Locations(End and Top Views from Vertical Guide Structure)

Page 31: Field Period Assembly

31

100.0”

Final Position - CG Locations

18,300 MCHP

38,000 MCAF

(Front and Top Views from Base Structure)

Page 32: Field Period Assembly

32

0.54”

82”

74”3

2

1

1

2

3

Page 33: Field Period Assembly

33

66.753”

60 DegXZ Y

Machine Coordinate

System

Baseline MCAF

Coordinate System

Page 34: Field Period Assembly

34

MC delivery Half Period Half PeriodSchedule Interfaces Assembly

C1C2A1C3 C2 - C3B1A2 A2 - A1A3A4 A3 - A4A5A6 A5 - A6B2 A2 / B2 / C2B3 A3 / B3 /C3B4B5B6C4C5 C4 - C5 A4 / B4 /C4C6 C1 - C6 A5 / B5 / C5

A6 / B6 /C6A1 / B1 / C1

A1

B1

C1

A2B2C2

A3

B3

C3

A4

B4

C4 A5B5C5

A6

B6

C6

Half Period Assembly Sequence – perform all alignment and hole placement at this stage.

Page 35: Field Period Assembly

35