FIELD OF DREAMS Hospitality, Tourism, and Sports.

22
FIELD OF DREAMS Hospitality, Tourism, and Sports
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    215
  • download

    0

Transcript of FIELD OF DREAMS Hospitality, Tourism, and Sports.

Page 1: FIELD OF DREAMS Hospitality, Tourism, and Sports.

FIELD OF DREAMS

Hospitality, Tourism,

and Sports

Page 2: FIELD OF DREAMS Hospitality, Tourism, and Sports.

FRENZIED NEWSTADIUM CONSTRUCTION

Trend began in late 1980s w/ teams threatening to leave a market or not come into a market at allTeam owners wanted facilities that would have myriad of revenue sourcesMany cities have opted to replace their multi-use stadiums with separate facilities for baseball and football

Page 3: FIELD OF DREAMS Hospitality, Tourism, and Sports.

CASE STUDIES

DenverCoors Field

PittsburghPNC ParkHeinz Field

St. LouisNew Busch Stadium

Page 4: FIELD OF DREAMS Hospitality, Tourism, and Sports.

COORS FIELD - DENVER

Page 5: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE DETAILS

Located in Denver’s Lower Downtown (LoDo) neighborhoodOwner: Denver Metropolitan Baseball Stadium DistrictTenant: Colorado RockiesConstruction began in October 1992Opened in April 1995Seating capacity: 50,200Surface: Grass

Page 6: FIELD OF DREAMS Hospitality, Tourism, and Sports.

PROJECTFINANCING

$215 MillionPaid for with a sales tax increaseCoors Brewing Company purchased the naming rights to the stadium prior to its completion in 1995

Page 7: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE RESULT

Built within an urban context

All green seats w/ exception of a single purple row of upper deck seatsHas had a positive economic impact on the LoDo neighborhood

                         

Page 8: FIELD OF DREAMS Hospitality, Tourism, and Sports.

PNC PARK - PITTSBURGH

                                   

                      

Page 9: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE DETAILS

Located on the North Shore of the Allegheny River (Greater Downtown)Owner: City of Pittsburgh Sports & Exhibition AuthorityTenant: Pittsburgh PiratesConstruction began in April 1999Opened in March 2001Seating Capacity: 38,365Surface: Grass

Page 10: FIELD OF DREAMS Hospitality, Tourism, and Sports.

PROJECTFINANCING

$262 MillionPart of an $803

million package developed to fund PNC Park, Heinz Field, retire the $40M debt on Three Rivers Stadium and demolish the stadium, and expand the David L. Lawrence

Convention Center (called Regional Destination Development Plan or ‘Plan B’)

Page 11: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE RESULT

Stadium built with public $$

after long political debateOften noted for its physical beauty – right field view offers a wide view of the Downtown Pittsburgh skylineESPN study named it ‘the best stadium in baseball’Host of the 2006 All-Star Game

Page 12: FIELD OF DREAMS Hospitality, Tourism, and Sports.

HEINZ FIELD - PITTSBURGH

                                                                                                                 

              

                                    

                                                      

                                    

                                                      

                                    

                                                      

Page 13: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE DETAILS

Located west of old 3 Rivers StadiumOwner: City of Pittsburgh Sports & Exhibition AuthorityTenants: Pittsburgh Steelers & University of Pittsburgh PanthersConstruction began in June 1999Opened in August 2001Seating Capacity: 64,450Surface: Grass

Page 14: FIELD OF DREAMS Hospitality, Tourism, and Sports.

PROJECTCOST

$281 MillionPart of an $803

million package developed to fund PNC Park, Heinz Field, retire the $40M debt on Three Rivers Stadium and demolish the stadium, and expand the David L. Lawrence

Convention Center (called Regional Destination Development Plan or ‘Plan B’)

Page 15: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE RESULT

Stadium built with public $$

after long political debate

Includes a massive 48’x27’ scoreboardHome to many amenities such as several entertainment areas, team stores, restaurants, and a Steelers Hall of Fame

Page 16: FIELD OF DREAMS Hospitality, Tourism, and Sports.

FINANCING PLAN - PITTSBURGH

SOURCE OF FUNDS AMOUNTRegional Asset District $170,000,000County Hotel Tax 99,000,0005% Surcharge on Tickets 22,000,0001% Wage Tax on Non-Resident Players 7,000,000State Matching Funds 300,000,000Interest Earnings 36,000,000Federal Infrastructure Improvements 28,000,000Convention Center Parking Garage Revenue 11,000,000Pittsburgh Investment Capital Fund 45,000,000Pirates & Steelers 85,000,000

TOTAL $803,000,000

Page 17: FIELD OF DREAMS Hospitality, Tourism, and Sports.

NEW BUSCH STADIUM –ST LOUIS

                     

             

Page 18: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE DETAILS

Located in Downtown St. LouisOwner: St. Louis CardinalsTenant: St. Louis CardinalsConstruction began in January 2004Opened in Spring 2006Seating capacity: 46,000+Surface: Grass

Page 19: FIELD OF DREAMS Hospitality, Tourism, and Sports.

PROJECTFINANCING

$344.8 million$45 million long-

term loan from St. Louis County$90.1 million from the Cardinals$9.2 million in interest earned on construction fund$200.5 million in bonds to be paid over a 22-year period ($15.9 million per year)Anheuser-Busch agreed to a 20-year naming rights deal through 2025 season

Page 20: FIELD OF DREAMS Hospitality, Tourism, and Sports.

THE RESULT

Spectators have dramatic views of the Gateway Arch and

downtown St. Louis skylineEmerging urban neighborhood - Ballpark VillageMix of uses to be created in Ballpark Village, including retail, entertainment, office, and residential facilities

Page 21: FIELD OF DREAMS Hospitality, Tourism, and Sports.

ROSENTRAUB’S FRAMEWORK FOR SUCCESS

Establish reasons for a new stadiumProvide framework for discussing use of public and private fundsEstablish perspective on the team’s financial status & revenues anticipated from new facilityIdentify public benefits generated by the teamReview implications of different financing optionsDetermine best location for new stadium

Page 22: FIELD OF DREAMS Hospitality, Tourism, and Sports.

ROMANI’S COMMENTS

Location, Location, LocationIt’s All About TimingGo Big Or Go HomeHave A Vision & Sell It EverydayBuild Your TeamSprint Through The Finish LineIf You Built A Legacy, Treat It Like One