Field Experience with the HVAC-System of the Flemish Institute for Biotechnology Building at the...
description
Transcript of Field Experience with the HVAC-System of the Flemish Institute for Biotechnology Building at the...
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Field Experience with the HVAC-System of the Flemish Institute for Biotechnology Building at
the Ghent UniversityM. De Paepe, B. Raeymaekers, Ch. T’Joen
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Introduction
• Field study on the new building of the Flemisch Institute for Biotechnology (VIB)
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Building Lay Out & data
• 3 floors – 36 m wide• 300 people• 13000 m² - 8000 m² laboratories• HVAC system :
summer 18°C/>30% winter 21.5°C/>30%
• Heating : condensing boilers (gas)• Cooling : two screw compressor
machines• Humidification : vapor injection, gas
fired boiler
Patio
N
West
Wing
East
Wing
Main Building
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Energy Use - 2004
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Cooling system
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Measurements – January 2005
100
200
300
400
18:15:00 18:15:00 18:15:00 18:15:00 18:15:00 18:15:00 18:15:00 18:15:00 18:15:00 18:15:00 18:15:00
Time [h]
Pow
er [k
W]
0
2
4
6
8
10
CO
P [-]
Cooling load [W] Electric power [W] COP cooling machine [-] COP cooling installation [-]
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Measurements – April-May 2005
0
5
10
15
20
25
30
35
14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00 14:20:00
Time [h]
Tem
pera
ture
[°C
]
Condenser Outlet Condenser outlet Evaporator inlet Evaporator Outlet
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Measurements – April-May 2005
100
200
300
400
500
600
700
15:00:00 15:00:00 15:00:00 15:00:00 15:00:00 15:00:00 15:00:00
Time [h]
Pow
er [k
W]
0
1
2
3
4
5
6
7
8
9
10
CO
P [-]
Cooling Load [W] Electric Power [W] COP [-] COP cooling installation [-]
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Cooling system
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Free cooling - COP
Fanspumps PPQ
COP
100
200
300
400
0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00
Time [h]
Pow
er [k
W]
0
1
2
3
4
5
6
7
8
9
10
CO
P [-]
Cooling Load [W] COP [-]
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Free cooling – Plate Heat Exchanger
0
1
2
3
4
5
6
7
8
9
10
0:00 0:00 0:00 0:00
Time [h]
Tem
pera
ture
[°C
]
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Hea
t Exc
hang
er E
ffect
iven
ess
[-]
Ice water, in Ice water, out Cooling water, in Cooling water, out Effectiveness
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Free cooling – Design errors
• Plate heat exchanger : design 1307 kWoperation 200 kW
• Effectiveness : 0.37• Ice water temperature :
design 4 °Coperation 1°C
• Use of large cooling tower : high fan and pumping power
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Simulation of amelioration
18%
28%
1%14%1%
2%
36%
Lighting
Electrical appliances
Heating support system
Cooling
Cooling towers
Pumps
Fans
20%
30%
1%7%1%
2%
39%
Ghent University - UGent Department of Flow, Heat and Combustion Mechanics
www.FloHeaCom.UGent.be
Conclusion
• Measurement campaign on high technology laboratory building
• Part load – Full load• Free cooling system, low performance• Changes in the design could give bether
performance• Future : follow up of changes