Field change request Zenitaka-Hyundai JV Design Office Request Nr. 13 Location Batching plant (Sand bin separator) Date 05-11-2014 Ref. Drawings ZHJV-W-I-SI-0034-1 Applicant Zenitaka-Hyundai JV Sketch SEE ATTACHED SKETCH Request reason: - Side cover for sand bin - Drainage provision for sand bin roof Description of the change: - The sides are to be covered with 32 gauge iron sheets to increase protection of sand stock from heavy rain. This has been considered because the height of the structure (8m) will allow rainfall in, from the sides. - The roof edges need drainage to avoid runoff pouring into the adjacent bin and stagnating between the sand bins and the retaining walls. Contractor Representative Consultant Representative Engineer

description

Pile Construction

Transcript of Field Change 13

Page 1: Field Change 13

Field change request

Zenitaka-Hyundai JV Design Office

Request Nr. 13

Location Batching plant (Sand bin separator)

Date 05-11-2014

Ref. Drawings ZHJV-W-I-SI-0034-1

Applicant Zenitaka-Hyundai JV

Sketch

SEE ATTACHED SKETCH

Request reason:

- Side cover for sand bin - Drainage provision for sand bin roof

Description of the change:

- The sides are to be covered with 32 gauge iron sheets to increase protection of sand stock

from heavy rain. This has been considered because the height of the structure (8m) will allow rainfall in, from the sides.

- The roof edges need drainage to avoid runoff pouring into the adjacent bin and stagnating between the sand bins and the retaining walls.