FIDIC and FIDIC Contracts - Dr. Ahmed H....

25
Fédération Internationale des Ingénieurs-Conseils FIDIC CONTRACTS

Transcript of FIDIC and FIDIC Contracts - Dr. Ahmed H....

Page 1: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

FIDIC CONTRACTS

Page 2: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

What is FIDIC ?

• An international federation of consulting engineers,

founded in 1913 with its headquarters located in

Lausanne, Switzerland, whose objective is to promote the

common interests of the member associations and

disseminate information to its members for the

development of consulting industry.

• What does FIDIC do?

• Arrange seminars and conferences and prepare standard

documents, in the furtherance of its goals.

Page 3: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

FIDIC CONTRACTS

Conditions of Contract for Construction (Red Book)

Conditions of Contract for Plant and Design-Build (Yellow Book)

Conditions of Contract for EPC/Turnkey Projects(Silver Book)

Short Form of Contract ( Green Book)

CLIENT/CONSULTANT MODEL SERVICES AGREEMENT

Page 4: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

The New Red Book

• For Construction of major building or engineering projects

in general

• Employer’s Responsibility for Design

• Unit Price Contract/Remeasurement (monthly payment)

• Administration of Contract by Engineer

• Pro-contractor in terms of risk allocation

Page 5: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

The New Yellow Book

• For provision of mechanical and electrical plant, and for

design and execution of building or engineering projects

• Contractor’s Responsibility for Design(design extent?)

• Lump-sum, with adjustments (stage/milestone or monthly

payment)

• Administration of Contract by Engineer

• Pro-contractor in terms of risk allocation

Page 6: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

The Silver Book

• For provision on a turnkey basis of a process or power

plant, etc.

• Contractor’s Total Responsibility for Design

• Normally fixed Lump-sum, with few adjustments

(stage/milestone or monthly payment)

• Administration of Contract by Employer’s Representative

• Pro-employer in terms of risk allocation

Page 7: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

The Green Book

• For Building or Engineering Works of Small Capital Value

or containing mostly simple or repetitive work

• Contractor’s or Employer’s Responsibility for Design

• Lump-sum, with adjustments (monthly payment)

• Administration of Contract by Employer’s Representative

• Pro-contractor in terms of risk allocation

Page 8: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

CONDITIONS OF CONTRACT

Guide

published 2001

published 1999

Page 9: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

WHICH BOOK TO USE?

STRAIGHTFORWARD

PROJECT ? EMPLOYER DESIGN ?

CONTRACTOR DESIGN

plant and/or high

unforeseen risks

fixed price - lump sum

little employer involvement

no major unforeseen risks

no

no

no

DISCUSS IN DETAIL

Employer ’s requirements

with the Contractor, and

negotiate a modified

FIDIC contract

no

yes yes

yes yes

Page 10: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

FEATURES AND ADVANTAGES

fair apportioning of risks, rights and obligations between the parties

BALANCED

WELL TRIED

long case history for earlier contracts

ACCEPTED

known and recognized; in wide use for international contracts

SUPPORTED

recommended or required by development banks,

EFFECTIVE

clear and complete conditions; time limits; provisions for attribution

Page 11: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

Key points: CONSTRUCTION

• Employer designs

• Engineer, working for the Employer

• Bill of Quantities

• Payments based upon measurements

• Certification of payments by Engineer

Page 12: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

Key points: PLANT & DESIGN-BUILD

• Contractor designs

• Engineer, working for the Employer

• Lump sum pricing

• Payments according to progress

• Certification of payments by Engineer

Page 13: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

Key points: EPC/TURNKEY PROJECTS

• Contractor designs and takes full responsibility

• Employer may appoint a Representative

• Fixed price, to cover risks taken on by Contractor

• Payments according to progress

Page 14: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

Key points: SHORT FORM

• Simple projects

• Design by either party

• Employer may appoint a Representative

• Valuation as appropriate; to be agreed

• Payments according to value of Works executed and

Materials and Plant delivered to site

Page 15: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

Key points: CLIENT/CONSULTANT

• Agreed Scope of Services: Appendix A (the agreed scope

of services)

• Normal, Additional and Exceptional Services

• Normal Services priced as agreed

• Additional and Exceptional Services at rates agreed

• Payment schedule as agreed

Page 16: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

USE OF FIDIC CONTRACTS

• Match contract and project

• Decide the form of contract early

• Appoint Dispute Arbitration Board early

• preparation of the contract should be done by

professionals

• Do not touch the General Conditions

Page 17: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

PRINCIPLES OF PROCUREMENT

• Effectiveness

• Economy

• Efficiency

• Accountability

• Transparency / confidentiality

• Strong competition

• Publicity, wide participation

• Fair and equal conditions

• Standard procedures

• Standard documentation

Page 18: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

PROCUREMENT CATEGORIES

• Goods

• Works

Versus

• Consultant services

Page 19: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

TENDERING PROCEDURES

• Development bank / public procurement procedures

• Open tendering / International Competitive Bidding

• Local tendering / National Competitive Bidding

• Restricted tendering / Limited Bidding

• Two stage tendering

Page 20: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

SELECTION PROCEDURES/CRITERIA

• Criteria defined and published in advance

• Economically most advantageous offer

• Quality based selection for intellectual services

• Quality and cost based selection

Page 21: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

PROCUREMENT STEPS

• Preparation

• Publication

• Pre-qualification / short-listing

• Invitation

• (Submission)

• Evaluation

• Award, contracting

• Supervision, contract administration

• Lessons learned

Page 22: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

PREPARATION OF PROCUREMENT

• Determination of needs and objectives

• Determination of constraints

• Identification of parties

• Planning, budgeting, financing

• Contract type

• Selection procedure

• Requirements / Specifications / Bills of Quantities /

Terms of Reference

• Pre-qualification and evaluation criteria

• Particular conditions

• Tender documents

• Publicity

Page 23: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

CONTRACT ADMINISTRATION

• Supervision

• Implementation of rule

• Quality and quantity

• Invoice verification

• Payments

• Extensions, variation orders, modifications

• Termination

• Disputes and their resolution

Page 24: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

RISKS IN PROCUREMENT

• Wrong goods, works, services

• Bad value for money

• Fraud

• Corruption

Page 25: FIDIC and FIDIC Contracts - Dr. Ahmed H. Elyamanydrahmedelyamany.weebly.com/uploads/7/0/1/0/7010103/7._fidic.pdf · F I e d I s-C s What is FIDIC ? • An international federation

Fédéra

tion Inte

rnationale

des Ingénie

urs

-Conseils

QUESTIONS?

25

Contact:

Ahmed Elyamany

019-4100-824

[email protected]