Fiber Optics 1-2-3 · PDF fileFiber Optics 1-2-3 cation ETA International Fiber Optic...
Transcript of Fiber Optics 1-2-3 · PDF fileFiber Optics 1-2-3 cation ETA International Fiber Optic...
© 2014, The Light Brigade, all rights reserved. Speci�cations are subject to change without notice
206.575.0404 • 800.451.7128 • www.lightbrigade.com
2015 Training Classes
This four-day class has been developed with 16 hours of classroom lecture and 16 hours of hands-on skills labs to provide practical understanding and skills required to properly design,
This course is also available in a two-day version with 16 hours of classroom lecture.
on-the-job safety as well as reduce cost and downtime.
systems for voice, video, and data applications.
April 21-24, 2015Phoenix, Arizona
Fiber Optics 1-2-3 cation
ETA InternationalFiber Optic Installer
Course Fees
Four-day course . . . . . . . . . . . .$1700Two-day course . . . . . . . . . . . . .$900Optional ETA FOI exam . . . . . . .$150Discounts10% Multiple attendees10% USTelecom members15% IMSA, UTC, and FTTH Council members25% Light Brigade alumni25% GSA #GS02F0012R
To RegisterBetty Kosiczky, Inside Sales ManagerIndustrial Fiber Optics480-804-1227
Classroom (16 Hours)Introduction to Fiber Optics
Standards • Terminology
Fiber Theory and Optical FibersSingle-mode • Multimode • New Generation
Fiber Optic CablesIndoor/Outdoor • Special Types
ConnectorsSingle-mode • Multimode • SFF StylesAttenuators and Terminators
Connector Cleaning and Inspection
Fiber Optic SplicingFusion Splicing • Mechanical SplicingCleaving Tools
Cable ManagementPanels • Closures • PedestalsFTTx Products
InstallationOutside Plant • Underground • AerialPremises / LAN
Test Equipment and TestingOptical Loss Test Sets
Visual Inspection EquipmentDispersion Testers
Optical TestingPremises • Outside Plant • Systems
Restoration/MaintenanceOutside Plant • PremisesEmergency Restoration
Safety
System DesignSources / Detectors
Passive DevicesWDM • DWDM • CWDMLoss Budgets • Integration
Systems OverviewEthernet • HDTV • SONET • FTTx/PON
Hands-On (16 Hours)Station #1 – Splicing
Fusion / Mechanical / Pigtail SplicingFiber Handling and Cleaving
Station #2 – ConnectorizationMultiple Bonding MethodsVisual Inspection and CleaningCable Assembly Testing
Station #3 – Cable PreparationLoose Tube Cable PreparationBreakout and Distribution Cable PreparationPatch Panel and Splice Closure PreparationMid-Entry Practices
Station #4 – OTDR Operation
Span Testing and Splice LossEmergency Restoration • Troubleshooting
Station #5 – Optical Loss TestingLink Loss MeasurementTransmit and Receive PowerVariable and Fixed Attenuators
CANCELLED