Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

109
PRESENTED TO THE FEDERAL EXECUTIVE COUNCIL (FEC) By THE HONOURABLE MINISTER OF WORKS ARC. MIKE ONOLEMEMEN, fnia, fnim, fnis Federal Ministry of Works TRANSFORMING NIGERIAN ROADS: ACHIEVEMENTS AND CHALLENGES IN 2012 April , 2013

description

Presented to the Federal Executive Council (FEC) by The Honorable Minister of Works Arc. Mike Onolememen. April 2013

Transcript of Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Page 1: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Federal'Ministry'of'Works'

'

PRESENTED(TO(THE'FEDERAL(EXECUTIVE(COUNCIL((FEC)(By#

#

THE(HONOURABLE(MINISTER(OF(WORKS(ARC.(MIKE(ONOLEMEMEN,(fnia,&fnim,&fnis&

(

(

'

Federal Ministry of Works

TRANSFORMING(NIGERIAN(ROADS:(ACHIEVEMENTS(AND(CHALLENGES(IN(2012(

April(,(2013(

Page 2: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

HIS'EXCELLENCY'DR.(GOODLUCK(EBELE(JONATHAN(GCON,(GCFR(PRESIDENT,'COMMANDER''IN''CHIEF'OF'THE'ARMED'FORCES'

FEDERAL'REPUBLIC'OF'NIGERIA'

Page 3: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

HIS'EXCELLENCY'ARC.(MOHAMMED(NAMADI(SAMBO,(GCON(

VICE'PRESIDENT''FEDERAL'REPUBLIC'OF'NIGERIA'

Page 4: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

ARC.(MIKE(ONOLEMEMEN,(fnia,&fnim,&fnis&HONOURABLE'MINISTER'OF'WORKS'

Page 5: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

AMBASSADOR((BASHIR((YUGUDA(HONOURABLE'MINISTER'OF'STATE'FOR'WORKS'

Page 6: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

HEADQUARTERS(OF(THE(FEDERAL(MINISTRY(OF(WORKS'

Page 7: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

7'©2013,'Federal'Ministry'of'Works'

Outline.... SecJon(A(M(IntroducJon(M  Statutory'Mandate'M  Our'Vision'&'Mission'M  Departments'&'Agencies'M  Background'

SecJon(B(M(AcJviJes(M  Revenue'&'Expenditure'Profile'M  Stakeholders'Engagement'M  Monitoring'Visits'&'Reports'M  Conferences,'Seminars'&'Training'

SecJon(C(–(Key(Outputs(M  Policy'IniXaXves'M  Achievements'in'2012'(Completed/OnM

going'Projects)'M  SHIFT'to'Public'Private'Partnership'M  Future'Plans'of'the'Ministry'M  CollaboraXon'with'MulXMLateral'

Agencies'(RSDT)'M  Road'Maintenance'(FERMA)'

SecJon(D(–(Key(Outcomes(Delivered(M  Outcomes'Performance'Matrix'M  Number'of'Jobs'Created'by'the'

Ministry'M  Status'of'New'LegislaXon'M  Regulatory'and'AdministraXve'Services'

SecJon(E(–(Challenges/Constraints(M  Challenges'M  What'Has'Worked'&'What'Has'Not'M  MiXgaXon'Steps'

SecJon(F(–(Conclusion((M  Conclusion'M  Appendix'

Page 8: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 8'

SECTION(A(M(INTRODUCTION(

Page 9: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 9'

Mandate(of(the(Ministry(

'To'manage,'direct'and'control'Federal'Highways'in'Nigeria,'through'Planning'(including'research'and' design' of' federal' highways),' construcXon,'maintenance' and' the' supervision' of' user' of'such' highways' and' the' regulaXon' of' traffic'thereon' (Federal' Highways' Act' CAP.' 135),' as'well' as' surveying' and' mapping' the' NaXon’s'internal'and'external'boundaries.''

Page 10: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 10'

Vision(and(Mission(Statements'

Mission'To' use' the' intellectual,' managerial' and' material'resources'available'to'the'Federal'Ministry'of'Works'to'make'Nigerian'roads'funcXonal'at'all'Xmes'

Vision'Our' vision' is' to' elevate' Nigerian' roads' to' a'standard' where' they' become' veritable' naXonal'assets' and' a' tool' for' naXonal' integraXon,'contribuXng' to' naXonal' growth' and' development'and' help' to' reMinvent' the' trust' and' confidence' of'Nigerians'in'the'Federal'Government.'

Page 11: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 11'

OrganizaJonal(Structure(of(the(Ministry'

KEY(DEFINITIONS:M(HPD(–'''''''Highways'Planning'&'Development'HBD(–'''''''Highways'Bridge'Design'HRD(–'''''''Highways'Roads'Design'M,GT&QC'–'Material,'GeoMTechnics'and'Quality'Control HPPP(–'''''Highways'Public'Private'Partnership'HRSDT(–'''Highways'Roads'Sector'Development'Team'

HRM(–'''''Human'Resource'Management'F&A(–''''''Finance'&'Accounts''PRS(–'''''''Planning'Research'&'StaXsXcs'PP(–'''''''''Public'Procurement'EMS(–''''''Engineering'Management'Services'ESLS(–''''''Electrical'Street'LighXng'Services'CWEM'''''''Central'Workshop'&''Equipment'

HZO(–(Highways(Zonal(OperaJons(HNC(((–''''''Highways'North'Central(HNE((((–'''''Highways'North'East'HNW((–'''''Highways'North'West'HSE((((–''''''Highways'South'East'HSS((((–''''''Highways'South'South'HSW(((–''''''Highways'South'West''

Honourable(Minister(

HPD(DEPT.(

OSGOF' FERMA'

UNITS'–'(Press,'Internal'Audit,'

Protocol,'Reforms/Servicom,'Store'VerificaXon'

Permanent'Secretary'

Honourable'Minister'of'State'

HRD(DEPT( HZO(DEPT( RSDT( F(&(A(DEPT( PROC(DEPT( ESLS(DEPT(

HBD(DEPT( HGT(DEPT( HPPP(DEPT( HRM(DEPT( PRS(DEPT( EMS(DEPT( CWE(DEPT(

Director'Legal'Services' Director'Perm.'Sec.'Office'

Page 12: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Nigeria'has'a'total'road'network'of'200,000km'owned'by'the'Federal,'State''and'Local'Governments.'Only'about'65,000km'of'the'200,000km'are'paved'mostly'in'bituminous'layers.'Out'of'this,'the'Federal'Government'owns'about'35,000km'represenXng'54%'of'the'enXre'bituminous'road'network'in'Nigeria.'The'balance'is'shared'between'the'36' States' and' the' 774' Local' Government' Areas.' Currently' most' of' the' goods' and'passengers'transportaXon'in'the'country'are'carried'by'road.''

©2013,'Federal'Ministry'of'Works' 12'

Background:(

Nigeria(Bituminous(Paved(Road(Ownership(Structure(

!  Although' Federal' roads' consXtute' 54%' of' the' total'bituminous' naXonal' ' road' network,' they' carry' more' than'80%'of'the'NaXonal'vehicular'traffic.'

"  About( 80%( of( the( 35,000km( of( federal( roads( were(constructed(as(at(1983.((

!  In' 1983,' only' about' 150,000' vehicles' were' plying'Nigerian'roads.'

!  ' In' 2000,' about' 1.3million' vehicles' were'moving' on'Nigerian'roads'

!  In' 2012,' the' numbers' of' vehicles' on' Nigerian' roads'rose' to' 9million.' Yet,' the' total' kilometer' of'bituminous' roads' in' Nigeria' did' not' witness' any'appreciable'increase'to'meet'the'demand'

!  This' has' led' to' increased' pressure' on' our' roads,'coupled'with'the'nonMavailability'of'rail'transportaXon'for'haulage'these'past'20'years.'

54%(35%(

11%(

Federal'Roads' State'Roads' LGA'Roads'

Page 13: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

''

©2013,'Federal'Ministry'of'Works' 13'

CondiJon(of(Federal(Roads(as(at(May(2011(

Consequences(of(Road(Network’s(Decay(! A' 2010' study' of'

the' condiXon' of'Federal' roads'revealed' that'only' 27%' of' the'roads' were' in'good' condiXon'with'devastaXng'consequences'to't h e' n a X o n ’ s'economy.'

N88b(LOSS(due(to(increased((

Vehicle((OperaJng(Costs((

(((((((((((((((((((((((&(12b(LOSS(due(to((

((((((((((((((((((((delayed(turnMaround(

(((((((((((((((((((((((((((((and((increased(

((((((((((((((((((((((((((((((travel(Jme(

(

N75b(loss(due(to(reducJon(in(asset(value(

Total(annual(LOSS(to(the(economy(in(the(order(of(N175(billion.(

SOURCE:(“Roads'Vision'2000”'M'The'loss'calculated'at'2.5%'of'GDP'

Page 14: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Leveraging'on'the'major'structural/management'changes'of'2011,'the'FMW'set'out'to'achieve'the'following:'

©2013,'Federal'Ministry'of'Works' 14'

Mandate(of(the(Ministry(in(2012(

Improve( the( Federal( Road( Network(through:((!  Beoe r' p l a nn i n g ,' d e s i g n ,'

construcXon'and'maintenance'of'Federal'road'infrastructure.(

!  The' compleXon'of' road' projects'that' have' aoained' about' 70%'compleXon'and'above.'

Make( SubstanJal( Progress( in( the(OnMgoing(Work(on(Major(Economic(Routes(Such(as:((1.''''Abuja'–'Lokoja'–'Benin'DualisaXon'Project.'2.' ' Kano' –' PoXskum' –' Maiduguri' DualisaXon'Project'3.' ' 'Onitsha'–'Enugu'Expressway'RehabilitaXon'Project'4.' Benin' –' Ore' –' Shagamu' Expressway'RehabilitaXon'Project.'

FastMTrack( Procurement(and(Ground(Breaking(On:(((

1.  2nd'Niger'Bridge'2.  Oweto'Bridge'

Our(M

anda

te(

"  FastMTrack(CompleJon(((((((of(Roads(to(the(Seaports,(Airports(and(Refineries'

"  Commence(and(Complete(Maintenance(Works(on(3rd(Mainland(Bridge.'

Page 15: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 15'

ConsJtuJng(Departments(&(Agencies((To'reinvigorate'and'make'the'management'of'the'naXon’s'road'network'and'onMgoing'projects'more'effecXve,'the'exisXng'two'highway'departments'were'restructured' into'twelve'departments,'viz:'

#  Six' (6)' Departments' of'Highway' ConstrucXon' &'RehabilitaXon'are'domiciled'in' each' of' the' six' geoMpol iXca l' zones' of' the'country'for'closer'and'more'effecXve' supervision' and'management' of' highway'projects.'

#  The' SHIFT' in' InsXtuXonal'Structures' has' brought'about' the' revival' of' many'underperforming' projects'like'the'DualizaXon'of'Abuja'–' Lokoja' Highway' and' the'Kano' –' Maiduguri' Highway'which' earlier' had' design'challenges.'

(

DIREC

TORA

TE(OF(

HIGHWAYS(

Highway(Department(for((Planning(and(Development(

NC(Highways(Const.((&(Rehab.(Dept.(

Dept.(for(Materials,(Geotechnics(&(Q/Control(

Road(Sector(Development((Team((RSDT)(

Department(for((PublicMPrivate(Partnership(

Highway(Department(for((Road(Design(

Highway(Department(for((Bridge(Design(

NW(Highways(Const.((&(Rehab.(Dept.(

SE(Highways(Const.((&(Rehab.(Dept.(

SS(Highways(Const.((&(Rehab.(Dept.(

SW(Highways(Const.((&(Rehab.(Dept.(

NE(Highways(Const.((&(Rehab.(Dept.(

Page 16: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 16'

Also' the' Engineering' Services' department'was' restructured'to'three'departments,'viz:'

Departments(&(Agencies((Cont.):(M(

DIRECTORATE(OF(

ENGINEERING(SERVICES(

Electrical(&(Street(LighJng'

Engineering(Management((Services'

Central(Workshop(&(Equipment'

OTHER(AGENCIES(AND(

DEPARTMENTS(

FERMA'OSGOF'

Page 17: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 17'

SECTION(B(M(ACTIVITIES(

Page 18: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

The'ministry’s'Revenue'and'Expenditure'in'the'period'under'review'is'stated'as'follows:'

©2013,'Federal'Ministry'of'Works' 18'

Revenue(and(Expenditure(Profile:(

B u d g e t(Breakdown!

Projected(Investmen t( P l a n(under( 1st(NIP(!

((N)!

((((((((((((((((((((((((((((Budgetary(AllocaJon! Internal ly(Generated(Revenue!

D o n o r /(P r i v a t e(S e c t o r(Cont.!

(N)!

Total(Exp.!(

(N)!

AppropriaJon!(!(!

(N)!

Budget( Warrant(Released!

(N)!

Amount( Cash(Backed!

(N)!

Capital! (! 143,592,745,847! 111,030,619,810! 111,030,619,810! 'N/A! USD492m i l l i o n'f r o m'I D A'(Wo r l d'Bank)' &'AfDB!

1 1 0 , ( 1 9 4 ,(309,674!

Recurrent! ! 609,525,460! 609,525,460! N/A! 564,758,532! ! 569,142,541.32!

Page 19: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 19'

Projected(Investment(Plan(under(1st(NIP(&(TransformaJon(Agenda(

S/NO.( PROJECT(TITLE( STATUS(TOTAL(COST(TO(

COMPLETE((BILLION)(IMPLEMENTATION(

STRATEGY(1( ConstrucJon(of(2nd(Niger(Bridge(Across(River(Niger(at(Onitsa/Asaba( NEW( 80.00( PPP(&(SUREMP(2( DualizaJon(of(IbadanMIlorin(SecJon(II( ONMGOING( 34.19( BUDGET(3( DualizaJon(of(ObajanaMBenin( NEW( 120.00( BUDGET(4( DualizaJon(of(OnithsaMOwerri(and(Onitsha(Easter(Bypass(C/N.5660( COMPETED( 4.52( BUDGET(

5( KanoMKazaureMDauraMMai(Adua(Road(in(Katsina(State,(C/N.5997( COMPETED( 0.63( BUDGET(6( Kano(Western(Bypass(C/N.5960( ONMGOING( 8.11( BUDGET(7( LokoMOweto(Bridge( ONMGOING( 30.70( BUDGET(&(SUREMP(8( PanyamMBokkosMWamba(C/N.5944( ONMGOING( 2.42( BUDGET(9( AbujaMLokoja(Road( ONMGOING( 85.40( BUDGET(&(SUREMP(10( TotoMNasarawaMAbaji(Road( ONMGOING( 0.34( BUDGET(11( DualizaJon(of(OnithsaMOwerriSecJon(II(C/N.5660( COMPETED( 1.65( BUDGET(12( RehabilitaJon(of(KadunaMKano(Road( NEW( 66.30( BUDGET(13( DualizaJon(of(KanoMMaiduguri(Road( ONMGOING( 96.73( BUDGET(&(SUREMP(

14( RehabilitaJon(of(MaiduguriMDikwaMGamboru(Road(SecJon(II:(DikwaMGamboru(in(Bornu(State(

ONMGOING( 12.68( BUDGET(

15( RehabilitaJon(of(OkeneMAjaokuta(Road( ONMGOING( 2.76( BUDGET(

16( RehabilitaJon(of(ApapaMOshodi(Expressway(in(Lagos( ONMGOING( 69.54( BUDGET(

17( RehabilitaJon(of(EnuguMPort(Harcourt(Dual(Carriageway( NEW( 57.00( BUDGET(&(SUREMP(

18( RehabilitaJon(of(FuntuaMYashiMDayiMKano(State(Border(Road(C/N.5264( ONMGOING( 1.22( BUDGET(

19( RehabilitaJon(of(LafiaMObiMAweMTunga(Road((in(Nasarawa(State( ONMGOING( 4.82( BUDGET(20( ShagamuMBenin(Expressway( ONMGOING( 80.46( BUDGET(&(SUREMP(21( DualizaJon(of(IlorinMJebbaMMokwaMTeginaMKaduna( NEW( 580.00( PPP(

22( DualizaJon(of(EnuguM9th(MileMOtukpoMMakurdi(with(a(Spur(through(OtukpaMLokoja.(

NEW( 54.00( PPP(

23( ApakunMMurtala(Muhammed(InternaJonal(Airport(road(,(Lagos( NEW( 10( PPP(24( ConstrucJon(of(a(Bridge(across(River(Niger(at(Nupeko( NEW( 80( PPP(25( Others( (( 97.60( BUDGET(

TOTAL( 1,581.07( ((

Page 20: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 20'

Stakeholder(Engagements('

During' the' last' 12' months,' the' Ministry' conducted' the' following'stakeholders'engagements:'! MeeJng( with( Contractors( and( other( Stakeholders,( held( in( October,(

2012;(!  Public( Private( Partnership( (PPP)( Procurement( Seminar( with(

Stakeholders,(held(in(November,(2012;(! MeeJng(with(COREN;(! MeeJng(with(Nigerian(Society(of(Engineers(in(May,(2012;(! MeeJng(with(SURCON;(! MeeJng(with(the(AFDB(led(by(Country(RepresentaJve;(! MeeJng(with(the(World(Bank(FRDP(Team(led(by(the(Country(Director,(

held(in(may,(2012,(October,(2012(and(December,(2012;(! MeeJng(with(Tanker(and(Road(Workers(

Page 21: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 21'

Stakeholder(Engagements(MeeJng(with(the(AFDB(led(by(Country(RepresentaJve'

Page 22: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 22'

Stakeholder(Engagements(

MeeJng(with(Nigerian(Society(of(Engineers(in(May,(2012'

Page 23: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 23'

Stakeholder(Engagements(

MeeJng(with(Tanker(and(Road(Workers'

Page 24: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

The'Ministry'conducted'the'quarterly'monitoring'visits'and'also'parXcipated'in'the'following'monitoring'exercise:'

©2013,'Federal'Ministry'of'Works' 24'

Monitoring(Visit(Conducted(&(Reports(Issued:(

$  The( 1st,( 2nd( ,( 3rd( and( 4th( Quarters’( Monitoring( Exercise;( the(reports( of( the( 1st,( 2nd( and( 3rd( quarters( were( prepared( and(forwarded( accordingly,( while( the( 4th( quarter( report( has( been(collated(for(producJon(

$ Carried( out( a( monitoring( exercise( on( some( of( FERMA’s(selected( road( maintenance( projects( and( the( report( have(already(been(collated(

$ Carried( out( joint( monitoring( exercise( on( some( selected(Federal(Roads(Network( in(collaboraJon(with(Office(of( the(Secretary(to(the(Government(of(the(FederaJon(and(Budget(Office(of(the(FederaJon(

Page 25: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

During'the'period'under'review,'the'Ministry'organized/aoended'the'following:'

©2013,'Federal'Ministry'of'Works' 25'

%  Seminar to set up a Right-of-Way Community was organized to sensitize the staff of the Ministry and general public on the right of the Ministry over the management of Right-of-Way on all Federal Highways within the country;

!

%  Meeting of Directors of Planning, Research and Statistics organized by the Office of the Head of Service of the Federation in collaboration with National Planning Commission;!

Conferences,(Seminars(&(Training(

Page 26: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 26'

19th(NaJonal(Council(on(works(in(Lagos(in(April,(2012(with(the(theme(“Towards(an(Improved(Road(sector(for(SocioMeconomic(TransformaJon”'

Conferences,(Seminars(&(Training(

Page 27: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 27'

COREN(InternaJonal(Workshop(held(at(Rockview(Hotel('

Conferences,(Seminars(&(Training(

Page 28: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 28'

Estate(Surveyors(and(Valuers(Conference'

Conferences,(Seminars(&(Training(

Page 29: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

%  During( the( last( 12( months,( the(Ministry( revived( and( commenced(training( at( the( three( (3)( Nos.(Highway( Training( Centres( in(Kaduna( in( Kaduna( State,( Badagry(in(Lagos(State(and(Ugoneki( in(Edo(State.(

©2013,'Federal'Ministry'of'Works' 29'

% A( total( of( 260( Officers( benefited(from(the(Local(Training(programme,(9( officers( aqended( Overseas(Courses,( and( 86( officers( benefited(from( the( trainings( programmes(organized( by( OHCSF( and( other(training(InsJtuJons.((

Lecture&session&on&training&for&soil&CBR&test&at&the&Highway&Training&Centre&

Kaduna&'

Conferences,(Seminars(&(Training(

Page 30: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 30'

Conferences,(Seminars(&(Training(Training&on&the&use&of&Total&Sta=on&at&the&Highway&Training&Centre&Ugoneki&

&

Training&prac=cal's&on&soil&CBR&test&at&the&Highway&Training&Centre&Badagry

Page 31: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

The'following'Official'engagements'(both'domesXc'and'foreign)'were'carried'out'in'2012'

©2013,'Federal'Ministry'of'Works' 31'

Official(Engagements:(

2) ( Infrastructure( Conference(held( in( Washington( D.C.( United(States(of(America(and(China(aimed(at( promoJng( Direct( Foreign(Investment( (FDI)( in( the( Nigeria’s(infrastructural(sector;(

3) ( Engaged( the( Media( on(Govt.(commitments(on(the(flooded(areas( and( conducted( roads(inspecJons( on( impacted( Highways(resulJng(from(flooding( (of(parts(of(the(country.(

1) (MeeJng(with( DFID( on(the(2013(Gender(Budget(of( the(Federal( Ministry( of( Works( and(its( Parastatals( in( line( with( the(Federal( Government( and( DFID(iniJaJve( as( regards( the( four(idenJfied( key(MDAs( to( deliver(concrete( results( for( girls( and(women(in(2013(Gender(Budget;(

Page 32: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

U S - N i g e r i a I n f r a s t r u c t u r e S u m m i t i n Wa s h i n g t o n D C , O c t o b e r 2 0 1 2

©2013,'Federal'Ministry'of'Works' 32'

Official(Engagements:(

Page 33: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

•  Hon. (Min i s te r (o f (Works ( v i s i t (to ( Ind ia ’ s (Min i s te r (o f (Road (T ranspor taJon (and (H ighways (dur ing (a (Work ing (Tour (in (New(De lh i , (Ind ia ( in (March (2012 (

©2013,'Federal'Ministry'of'Works' 33'

Official(Engagements:(

Page 34: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Meeting with Infrastructure Leasing & Financial Services Limited (IL&FS) in February, 2012 at their office in India(

©2013,'Federal'Ministry'of'Works' 34'

Official(Engagements:(

IL&FS is one of India's leading infrastructure development and finance companies. IL&FS is widely recognised as the pioneer of Public Private

Partnership in India'

Page 35: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 35'

SECTION(C(–(KEY(OUTPUTS(

Page 36: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

(Programmes(and(IniJaJves(Put(in(Place:((To'deliver'on'Mr.'President’s'TransformaXon'Agenda'in'the'road'sector,'the'Ministry'put'in'place'the'following'iniXaXves':M'

36'©2013,'Federal'Ministry'of'Works'

INITIATIVES((

Prepared(dras(Bills(for(the(Establishment(of(the(Road(Fund(and(the(Federal(Roads(Authority(

OperaJon(Safe(Passage(((

Strategic(Highway(Investment(for(TransformaJon((SHIF)'

A(New(Template(for(Interim(CerJficates(

(Permanent(Works(only)(

Approved(the(use(of(bitumen(emulsion(in(place(of(cutMback(bitumen(on(all(road(projects(in(line(with(the(Kyoto(Protocol(to(

discourage(emission(

Bold(Approach(to(Road(Development(

DocumentaJon(and(training(of(455(engineers(and(technical(officers(

recruited(by(the(Federal(Civil(Service(

Page 37: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 37'

Treasury(Funded(Projects:(M(

168(road(projects,(mostly(abandoned.(

Where(‘we’(were(in(Jan.(2012(

At( the( beginning( of( 2012,( the(Ministry’s( 168Nos.(onMgoing( road( projects( at( various( stages( of(compleJon,( were( prioriJzed( to( 80( Nos.( projects.(Within( 12(months( of( assumpJon( of( duty( as( Hon.(Minister( of( works,( the( Ministry( under( my((leadership( progressed( 32Nos.( road( projects( to(substanJal(compleJon.((

!  35%(of(projects(have(been(Completed(

!  20%(are(proposed(for(alternaJve(funding(under(the(PPP(Scheme.(

!  7%(of(projects(are(@(Procurement(Stage(at(the(PPP(department(and(RSDT(Unit(of(the(Ministry.(

!  38%( of( the( projects( are( onMgoing( at( various(stages(of(compleJon(.(

80Nos.(OnMGoing(Road(Projects(

35%(

38%(20%(

7%(

Page 38: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

0(

15(

30(

45(

60(

75(

90(

105(

(Km)(Achieved(in(2012( Total((Km)(Achieved(to(Date( Total(Length(

©2013,'Federal'Ministry'of'Works' 38'

Achievements(in(2012:(M((•  A(total(of(651km(of(roads(was(paved(in(bituminous(layers(in(2012(under(the(

Ministry.( Below( is( a( graphical( ( presentaJon( of( some( of( the( roads( depicJng(progress(achieved(in(kilometers(over(the(last(twelve(months.(

Road

(Len

gth((km)(

196km( 552.7km(234.2km(

324km(154.6km(125km(

Page 39: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 39'

Completed(Projects(CompleJon(of(32(OnMgoing(Road(Projects(with(details(as(follows:(

!  RehabilitaXon' of' FuntuaMGusauMSokoto' road' (secXon' II:'GusauMTalata'Mafara)'C/NO.'5694'

!  RehabilitaXon' of' ObiozaraMUburuMIshiagu' Road' C/NO.'5828'

!  Access'road'to'Kaduna(Refinery(C/NO.'6027'

!  RehabilitaXon' of' OmuoMIfaki( road' in' EkiX' State,' C/NO.'5999'

!  RehabilitaXon'of'UbaMMbalala'road'C/NO.'6062'

!  DualizaXon' of' IbadanMIlorin' road' secXon' I' (Ibadan' M'Oyo)'C/NO.'1793'

!  Emergency' reinstatement'of' collapsed'secXon'of'GombeMPoJskum(Road,'(KM'12)'in'Gombe'State'C/No.'6121'

IbadanMIlorin(DualizaJon(Sec.(1(

UbaMMbalala(road(

GomdeMNumanMYola(road(

Page 40: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 40'

!  RehabilitaXon/ReconstrucXon' of' Lafenwa( Bridge( in'Abeokuta'C/NO.6064'

!  RehabilitaXon' of' GombeMNumanMYola' road' secXon' II:'NumanMGombe'in'Adamawa/Gombe'States,'C/NO.'5979'

!  Repairs' of' Third( Mainland( Bridge( Phase( II,' AddiXonal'works' for' the' repairs' of' 8No.' expansion' joints' in' Lagos'State' C/No.' 6125' (This' was' completed' 10' days' ahead' of'scheduled'compleXon'date.)'

!  RehabilitaXon' of'Oqa–Owode( road( in' Ogun' State,' C/No.6022'

!  Limited' RehabilitaXon' of' ShagamuMAjebandele( road' in'Ogun'State,'C/No.'6012'

!  Emergency'reinstatement'of'gully'erosion'at'KM'127+000'along'BeninMOkene'road'Route'50(A2)'&'KM'14+000'along'AuchiMAgenebode'Road'in'Edo'State'C/No.6120'

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Repairs(of(Third(Mainland(Bridge(

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Completed(Projects(

Reinstatement(of(BeninMOkene(gully(erosion(

ShagamuMAjebandele(road(Sec.(II(

Page 41: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 41'

!  RehabilitaXon' of' AnkaMDaki( TakwasMGummi' road' in'Zamfara'State;'C/NO.6090'

!  Periodic'maintenance'of'Jebba'M'Lafiaji'Road'in'Niger'State'FRDP/2010/NCB/W/01'

!  Periodic' maintenance' of' Takai' M' Albasu' M' Gaya' Road' in'Kano'State'FRDP/2010/NCB/W/02'

!  Periodic' maintenance' of' Hong' M'Mubi' Road' in' Adamawa'State'FRDP/2010/NCB/W/04'

!  RehabilitaXon' of' MararabaMPambeguwaMSaminakaMJos(road' secXon' I' (MararabaMPanbeguwa' in' Kaduna' State)' C/NO.'5996'

!  RehabilitaXon'of'access' roads' to'Warri(Refinery' in'Warri,'Delta'State;'C/NO.6051'

!  Periodic' maintenance' of' Nafada' –' Gombe' Abba' Road' in'Gombe'State'FRDP/2010/NCB/W/03'

KurfiMChiranchi(road(

JebbaMLafiaji(road(

Access(road(to(Kaduna(Refinery((

Completed(Projects(

Page 42: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 42'

!  Periodic'maintenance'of'Okpala' M' Igwurita'Road'in'Imo'State'FRDP/2010/NCB/W/06'

!  Periodic'maintenance'of'Ado'M'Ilumoba'M'Agbado'M'Ikare'Road'SecXon'A'in'EkiX'State'FRDP/2011/ICB/PMW/07'

!  Periodic'maintenance'of'Dingaya'M'Galambi'M'Rungo'Road'in'Sokoto'State'FRDP/2011/ICB/PMW/08'

!  Periodic' maintenance' of' Rumukurshi' M' Chokocho'Road'in'Cross'River'State'FRDP/2011/ICB/PMW/09'

!  Periodic' maintenance' of' Akure' M' Owo' Road' in'Ondo'State'FRDP/2011/ICB/PMW/10'

!  Periodic'maintenance'of'Ado' M' Ilumoba' M'Agbado' M'Ikare'Road'SecXon'B' in'EkiX'State'FRDP/2011/ICB/PMW/11'

GombeMNafadaMAbba(road((

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

ObiozaraMUburuMIshiagu(road((

Completed(Projects(

LafiaMDoma(road((

Page 43: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 43'

!  Periodic'maintenance'of'Lafiagi'M'Mokwa'Road'in'Niger'State'FRDP/2011/ICB/PMW/12'

!  Periodic' maintenance' of' EastWest' M' Odi'Road'in'Bayelsa'FRDP/2011/ICB/PMW/13'

!  Periodic' maintenance' of' Lafia' M' Doma' Road' in'Nassarawa'state'FRDP/2011/ICB/PMW/14'

!  ReconstrucXon' of' AbakalikiMMbok' (Ogoja'JuncXon)'SecXon'of'Route'25/A.343'(Lot'1)'

!  Pavement' Strengthening' of' IkomMMfum'SecXon'of'Route'90/A.4M2'(Lot'2).''

!  Periodic' maintenance' of' Kurfi' M' Chiranchi'Road' in' Katsina' State' FRDP/2010/NCB/W/05'

AbakalikiMMbok((Ogoja(JuncJon)(road((

IkomMMfum(road(

DingayaMGalambiMRungo(road(

Completed(Projects(

Page 44: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

!  Also( the( Ministry( completed( the( sevng( up( of( a( design( office( and(equipping( same( with( contemporary( hardware( and( sosware( (The& first&ever&design&office&in&the&Ministry)(

©2013,'Federal'Ministry'of'Works' 44'

Completed(Projects(

Page 45: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

!  Following(the(recent(effects(of(floods( in(some(parts(of(the(country,(the(Ministry(intervened(by(carrying(out(the(following(works:(

©2013,'Federal'Ministry'of'Works' 45'

$ ConstrucXon'of'75M'span'bridge'at'Kolo,'along'Yenegoa'–'Kolo'–'Nembe'–'Brass'Road'F227,'spur'to'Kolo'town,'Bayelsa'state.'

$ ConstrucXon'of'two'bridges'at'CH.11+850'(two'span)'&'CH.12+850(three'span)'along'Kano'–'Katsina'Highway'to'replace'collapsed'7'cell'and'11'cell'box'culvert'respecXvely.'

$ Reinstatement'of'Washout'on'Bridge'approach'&'Embankment'at'CH.0+100'along'Shendam'–Yelwa'–'Ibi'Road,Plateau'State'

$ Reinstatement'of'Embankment'Washout'at'CH.15+025'along'Langtang'M'Lalin'–Tunkus–'Shendam'Road,Plateau'State'

$ Reinstatement'of'washout'and'reconstrucXon'of'collapsed'triple'cell'culvert'at'4th'Interchange,'Enugu'–'Port'Harcourt'Dual'Carriageway.'

•  POST(FLOODING(INTERVENTIONS(

IntervenJon(along(KanoMKatsina(rd.(

IntervenJon(along(ShendamMYelwaMIbi(rd.(

Page 46: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 46'

•  OPERATION(SAFE(PASSAGE:(M(

With( the( support(of(Mr.(President,( the(Ministry( was( able( to( embark( on(OperaJon( Safe( Passage( in( 2012.( The(programme( which( is( unprecedented((aimed(at(recovering(deplorable(secJons(of( our( major( roads( to( ameliorate( the(sufferings( usually( experienced( by( road(users( during( the( fesJve( period( ranging(from(December,(2012(to(January,(2013.(A(total(of(32No.(roads(along(the(Federal(roads( network( were( idenJfied( and(recovered(within(the(period.(

Page 47: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 47'

OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(OperaJon(Safe(Passage(are(as(follows:((

A)  North(Central(Zone(%  AbujaMLokojaMOkene'rd'(2'SecXons)'%  Ilorin'–'Jebba'–'MokwaMTeginaMKaduna'rd'''''''''''(4'SecXons)'%  SulejaMMinna'rd'('1'SecXon)'%  LafiaMMakurdi'–'Aliade'–'OturkpoM9th'Mile'road''''''''''(4'SecXons)'%  Emergency'reconstrucXon'of'3'collapsed'

bridges/culverts'in'Plateau'State'(3'SecXons)'

LafiaMMakurdi(–(Aliade(–(Oturkpo(road(

JebbaMMokwa(rd.(

IlorinMJebba(rd.(km(92+190(

B) (North(East(Zone(%  Reinstatement'of'washout'and'construcXon'

of'double'3mx3m'culvert'at'km7+850Mkm8+000'(longvel'bridge)'along'ShendamMYelwaMIbiMTaraba'State'Border'in'Plateau'State'('1'SecXon)'

%  Replacement'of'3Nos.'Culvert'in'JalingoMKonaMLau'rd'('1'SecXon)'

Page 48: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 48'

OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(OperaJon(Safe(Passage(are(as(follows:((

C)(((North(West(Zone(%  KanoMZariaMKaduna'road'''''''''(2'SecXons)'%  KanoMBichiMKatsinaMJibia''''''''''''''''Niger'border'road'(2'SecXons)(

D) (South(East(Zone(%  EnuguMOkigweMUmuahiaMAbaM'

Port'Harcourt'road''''''''(3'SecXons)'%  AbaMIkot'Ekpene'road'('1'SecXon)'

EnuguMOkigwe((Km65(+(284(

OkigweMUmuahia((Km85(+(000(

Page 49: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 49'

OPERATION(SAFE(PASSAGE(CONTD:(M(Some(of(the(roads(worked(upon(by(the(Ministry(under(the(OperaJon(Safe(Passage(are(as(follows:((B)(((South(South(Zone(%  OdukpaniMItu'road'('1'SecXon)'%  OkeneMAuchiMBenin'road'(2'SecXons)'%  IrruaMIlushi'road'('1'SecXon)'

C)(((South(West(Zone(%  LagosMIbadan'expressway'(2'SecXons)'%  IbadanMIlorin'road'(2'SecXons)'%  ApapaMOshodi'road'(2'SecXons)'

Odukpani(JuncJon( IbadanMIlorin(road(

ShagamuMIbadan(Expressway(LagosMShagamu(Expressway(

Page 50: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

ZONAL(PROJECT(BUDGET((bn)(North(Central((NC)( North(East((NE)(

North(West((NW)( South(East((SE)(

South(South((SS)( South(West((SW)(

OnMGoing(Projects(Funded(by(the(Treasury(

©2013,'Federal'Ministry'of'Works' 50'

S/N( ZONE(NUMBER(OF(PROJECTS(

LENGTH((KM)(

PROJECT(COST((bn)(

1' North'Central' 31' 1,054' 262.3'

2' North'East' 30' 1,461' 332.9'

3' North'West' 23' 1,028' 255.5'

4' South'East' 40' 978' 149.6'

5' South'South' 34' 876' 159.4'

6' South'West' 37' 1,230' 236.9'

TOTAL( 195( 6,628( 1,397(

•  The' FMW'has' a' total' of' 195' onMgoing' projects' amounXng' to' a'poruolio' of' N1.397' Trillion.' The' summary' of' the' projects' on'Zonal'basis'is'shown'below'

262.3(B((NC)(

332.9(B((NE)(

255.5(B((NW)(

149.6(B((SE)(

159.4(B((SS)(

236.9(B((SW)(

Page 51: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

(LOOKING(AHEAD:(The(Inevitability(of(Paradigm(SHIFT(

(In' line' with' the' new' policy' IniXaXves,' the' Ministry' has' adopted' a' new'paradigm,'“Strategic(Highway(Investment(for(TransformaJon((SHIFT)”.(This'will'entail'a'shi''in:M'

51'©2013,'Federal'Ministry'of'Works'

InsJtuJonal(Structure(

Ownership(from(Public(to(Private(through(PPP(SHIFT(

CollaboraJon(with(Devt(&(MulJMlateral(Agencies((RSDT)(

Introduce(Annuity(

ContracJng(

Page 52: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 52'

BOLD(APPROACH(TO(ROAD(DEVELOPMENT(

BOLD(

HolisJc(Improvement(&(Expansion(of(ExisJng(economic(routes(

Strategic(Increase(of(Federal(Roads(Network(

Consequently,' the'Ministry'has'been'championing'a'BOLD'approach' in'the'development' and' improvement' of' Our' Federal' Roads' network' in' the' last'one'year.'Our'BOLD'Approach'entails:'

1.(OnMGoing(RehabilitaJon(of(exisJng(Dual(Carriageway(Highways(%  ShagamuMOreMBenin'Road'%  LagosMIbadan'Road'%  OnitshaMEnugu'Road'%  EnuguMPort'Harcourt'Road'2.( OnMGoing( Upgrade( of( exisJng( Single(Carriageway(to(Dual(Carriageway(Highways(%  OnitshaMOwerri'Road'(Completed)'%  KanoMMaiduguri'Road'(40%'Completed)'%  Abuja'MLokoja'Road'(65%'Completed)'%  IbadanMIlorin'Road'(70%'Completed)'%  SulejaMMina'Road'(26.6%'Completed)'%  Lokoja'(Obajan'JuncXon)MBenin'Road''''''''''''(5%'Completed)'

1.( Golden( Triangle( SuperMHighway:(M(will'comprise'of'4'to'6'lanes'enXrely' new' superMhighway# that' will'connect' key' hubs' of' economic' acXvity' in'the' country.' The' Super' Highway' when'completed'will' cut'across'about'20'states'of' the' FederaXon' &' will' add' approx.'5,000km'to'the'naXonal'network'of'roads'in'Nigeria.'(2.(2nd(Lagos(Outer(Ring(Road:(M(is'conceived' to' reduce' the' current'chaoXc' traffic' coming' from' the' Port'&'Tank' Fa rms' w i th in' the' Lagos'metropolis.(

Massive(intervenJon(on(failed(federal(roads(across(the(

country(

Massive((integrity(assessments((

and(repairs(of(bridges(&(replacement((of(guard(rails(

Page 53: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

•  The' finance' of' road' projects' has' been'through' budgetary' provisions' which' have'been' too' inadequate' to' fund' the' projects'and'most'oven'not'fully'implemented.''

•  Outlay' of' annual' funding' aga inst'requirement'is'highlighted'below:'

©2013,'Federal'Ministry'of'Works' 53'

Road(Financing(Mechanism:(M(

•  The' addiXonal' funding' of' N85.5b' from'SUREMP' in' 2012' helped' to' reduce' the'funding'gap'in'the'Road'Sector.'

•  The' Ministry' is' currently' working' on'alternaXve' ways' of' funding' Highway'infrastructure'by'the'Federal'Government.'

2012(Budget(Provision(&(Release(for(Road(Projects(in((%)(

In(2012,(out(of(the(budgetary(provision( of( N133b( for(highway(projects,(only(N102b((77%)( was( released( with( a(shoryall(of(N31b.(

Annual'Funding'Requirement' N500billion(

Average'Annual'Budgetary'Provision'

N120billion(

AddiXonal'Funding'Required' N380billion(

77%(

23%(

Amount(Released( Shoryall(

Such(shoryalls(have(negaJve(consequences(for(Road(development(

Page 54: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

•  The(FMW(in(2012(received(addiJonal(funding(of(N85.5(billion(from(the(SUREMP(for(selected(projects.(The(project(details(are(as(follows(

©2013,'Federal'Ministry'of'Works' 54'

Road(Financing(Mechanism((Contd.):(M(

S/N( PROJECT(DESCRIPTION( 2012(SUREMP(PROVISION((N)(

1' DualizaXon' of' AbujaMAbajiMLokoja' road' (4'secXons)

25.0bn'

2' ReconstrucXon'of'BeninMOreMShagamu'(3'secXons)

22.5bn'

3' RehabilitaXon' of' OnitshaMEnuguMPort' Harcourt'road'(3'secXons)

8bn'

4' DualisaXon'of'KanoMPoXskumMMaiduguri'road'(5'secXons)

20bn'

5' ConstrucXon' of' Loko/Oweto' bridge' across'Benue'River

5bn'

6' ConstrucXon' of' 2nd' Niger' bridge' at' Onitsha/Asaba

5bn'

TOTAL( 85.5bn(

Page 55: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Some( of( the( alternaJve( sources( of( funding( Highway(infrastructure(being(explored(by(the(Ministry(include:(M(

©2013,'Federal'Ministry'of'Works' 55'

$ Borrowing( from( MulJlateral(Agencies(and(Pension( fund( for(key(Economic( Highways( Infrastructure(that(can(Repay(the(Capital(

$  FloaJng( of( Road( Bonds( for(Highway(projects(

$  ConvenJona l( P PP( F i n an c e(Contracts(

$ Viability( Gap( Funding( through( the(Road(Fund((when(created)(

Page 56: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

(60%(

(40%(

©2013,'Federal'Ministry'of'Works' 56'

SHIFT(to(PublicMPrivate(Partnership((PPP):(•  The'PPP'Department'is'undertaking'comprehensive'studies'of'proposed'PPP'projects'to'determine'the'viability'of'each'project.' The' progress'made' in' 2012' on' PPP' projects' is' as'follows:'

•  60%(are(awaiJng(“No(ObjecJon”(from(ICRC(to(Proceed(

•  40%(are(at(Procurement(Stage(Progress(on(PPP(Projects(

Page 57: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 57'

#  The# following# PPP# Projects# are# under#procurement#at#the#following#stages:;'

PPP(PROJECTS(UNDER(PROCUREMENT'

''ConstrucJon( of(2nd( Niger( bridge(at(Asaba/Onitsha'

' ''

Access( ( Road( to(M u r t a l a(M o h a m m e d(I n t e r n a J o n a l(Airport(Road,(Lagos'

' ''

ConstrucJon(of(a(bridge(over(River(Niger( at(Nupeko,(Niger(State'

The( Ministry( has( concluded( the(process( for(award(of( the(PPP(project(&(a(concessioner((JBNMAIIM)(emerged(as( the( preferred( Bidder( and( a( leqer(of(Intent(given(to(the(ConsorJum.(

OBC( Completed( and( RFPs( issued( to(shortlisted( ConsorJa( have( been(returned( and( is( undergoing( analysis.(A(preferred(bidder(will(be(announced(shortly ((

OBC( Completed( and( RFPs( issued( to(shortlisted( ConsorJa( have( been(returned( and( is( undergoing( analysis.(A(preferred(bidder(will(be(announced(shortly ((

Page 58: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 58'

PROPOSED&PPP&HIGHWAY&PROJECTS&WITH&OBC&&COMPLETED&'

# OBC# has# been# completed# by# the# TA# for# all# the# under# listed#projects.#The#Ministry##is#awaiBng#a#“No#ObjecBon”#from#ICRC#to#proceed.#'"  Lagos&–&Iseyin&–&Kishi&–&Kaiama&Road&&Q&414#Km##&(

"  Kaiama&–&Bahama&–& Kaoje& –&Gwambu&–& Fokku& –&Sokoto&Road&Q&631#Km#(

"  Construc=on&of&a&bridge&over&River&KatsinaQAla&at&Buruku,&Benue&State&Q&1#Km#(

"  Construc=on& of& a& bridge& over& River& Benue& at& Ibi&along&Shendam&Q&Wukari&Road.&(

Page 59: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

The'Ministry'as'part'of'its'BOLD'approach'to'road'development'has'plans'to'develope'green'field'projects'to'bridge'the'huge'gap'in'Road'Infrastructure'in'Nigeria.'The'two'major'projects'that'have'been'idenXfied'are:'

©2013,'Federal'Ministry'of'Works' 59'

PPP(PROJECTS(ON(THE(DRAWING(BOARD(

1.   The(Golden(Triangle(SuperMHighway(2.   The(2nd(Lagos(Outer(Ring(Road(Golden(Triangle(SuperMHighway('

The'Golden'Triangle'SuperMHighway' is'one'of' the'projects' conceived' to'bridge' the'huge' gap' in' Road' Infrastructure' in' the' country,' thereby' reinforcing' the'TransformaXon' Agenda' of' the' President' Jonathan’s' AdministraXon.( The' Golden'Triangle'SuperMHighway'will'be'private'sector'driven,'and'at'minimal'managerial'cost'to' the' Federal' Government.(The' Federal' Government' is' simply' required' to' create'the'enabling'environment,'provide'the'Right'of'Way'(ROW)'and'offer'guarantees'in'form'of'Viability'Gap'Funding'(VGF)'whenever'required.'The'major'alignment'of'the'Golden'Triangle'is'comprised'of'three'segments,'namely:''

Lagos'–'Port'Harcourt'segment'(Coastal'alignment)''–'approx.'560km,(Port'Harcourt'–'Kano'segment'–'approx.'800km,'and(Lagos'–'Kano'segment'–'approx.'870km.(

Page 60: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 60'

2nd(Lagos(Outer(Ring(Road('

The' 2nd' Lagos' Outer' Ring' Road,' which' is' 73.2km' in' length,' is'conceived' to' reduce' the' current' chaoXc' traffic' situaXon'within' the'Lagos'metropolis.(All' Trucks/Tankers'originaXng' from' the'Ports'and'Tank' farms'will'be'diverted' to' the'Ring'Road' to' reduce' the'current'traffic' gridlock' being' experienced' on' ApapaMOshodi' Expressway'among'others.(The'route'is'divided'into'two'secXons;''SecXon'1:' Tin'Can' Island'–' Igando'–' Lagos/Ooa' road' interchange'–'Lagos/Ibadan'expressway;''SecXon'2:'Lekki'–'Ikorodu'–''Shagamu/Benin'expressway.''The'Project' is'conceived'to'be' implemented' in'partnership'with'the'Lagos'and'Ogun'State'Governments.''

PPP(PROJECTS(ON(THE(DRAWING(BOARD((Contd.)(

Page 61: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

''

41'

KANO(

MAIDUGURI(

KADUNA(

ABUJA(

LOKOJA(

BENIN'

ASABA/(ONITSHA( ENUGU(

PORT(HARCOURT(

WARRI(

SHAGAMU(

LAGOS(

ILORIN(

OGBOMOSO(

OYO(

EXISTING(DUAL(CARRIAGEWAY(LEGEND

KEFFI( AKWANGA(

IBADAN(

ILESHA(MAKURDI(

OTURKPO(

MOKWA(

JEBBA(

TEGINA(

BIRNIN(GWARI(

JOS(

KATSINA(

MINNA(

BAUCHI(

POTISKUM(

GOMBE(

YOLA(

OTTA(

SOKOTO(

AJAOKUTA(

ONMGOING(DUALIZATION(

(EXISTING,(ONMGOING(&(PLANNED(FUTURE(DUAL(CARRIAGEWAYS(

SINGLE(CW((PLANNED(FOR(FUTURE(DUALIZATION(

Page 62: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 62'

GOLDEN((ECONOMIC)(TRIANGLE(SUPERMHIGHWAY(

Page 63: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 63'

CollaboraJon(with(MulJMLateral(Agencies(through((ROAD(SECTOR(DEVELOPMENT(TEAM((RSDT)(

(

Page 64: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 64'

RSDT(Projects(Financed(by(IDA:(M(Under' the' framework' of' the' FRDP,' RSDT' is'currently' implemenXng' road' rehabilitaJon,'upgrading' and( maintenance,' insJtuJonal(strengthening'and'policy( reform,'and'road(safety(improvements' with' the' credit' from' the' World'Bank;' and' addiXonal' funding' from' the' Africa'Development'Bank'(AfDB)'for'the'rehabilitaXon'of'two' road' secXons' under' the' NigeriaMCameroon'transport' facility' project' (Abakaliki( M( Ogoja(JuncJon( road' Route' 25/A.343' and' IkomMMfum'road'Route'90/A.4M2).'Works'in'these'two'secXons'have' been' completed.' One' of' the' secXons' i.e'IkomMMfum' is' being' proposed' as' a' pilot' program'for'the'OPRC'maintenance'concept.''

These( projects( are( being( executed( with( 90%(World(bank(funding(and(10%(counterpart(funding(from(the(Nigerian(Government.((

Page 65: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

45%(

45%(

10%(

©2013,'Federal'Ministry'of'Works' 65'

REHABILITATION/MAINTENANCE(PROJECTS(M(RSDT'

%  45%(of(Project(have(been(Completed(

%  45%(of(Project(are(OnMGoing(

%  10%(are(Under(Procurement(Stage(

21No.((RehabilitaJon/Maintenance(Projects(by(RSDT(

$  The(RehabilitaJon(projects(Under(RSDT(are:(

%  Enugu(–(Abakaliki(Road:(M(Project(OnMGoing((24%(Completed/(18km)(

%  Ogoja(JuncJonMIkom(Road:(M(Project(OnMGoing((32%(Completed/(16km)(

%  MokwaMBida(Road:(M(Project(OnMGoing((Bids(have(been(announced(to(be(awarded(in(June(2013)(%  AkureMIlesha(Road:(M(Project(OnMGoing((Bids(have(been(announced(to(be(awarded(in(June(2013)(

%  Abakaliki(–(Ogoja(juncJon(Road:(M((Completed(100%/(85km)(%  Ikom(M(Mfum(Road:(M((Completed(100%/(25km)(

Page 66: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 66'

Road

(Len

gth((km)(

The( RSDT( in( collaboraJon(with(MulJMLateral( Agencies( rehabilitated/maintained( a( total( of(257km(of( road( length( in(2012.(Below( is(a(graphical( (presentaJon(of( the( roads(depicJng(progress(achieved(in(kilometers(over(the(last(twelve(months.(

REHABILITATION/MAINTENANCE(PROJECTS((Cont.)'

0(

20(

40(

60(

80(

100(

(km)(Achieved(in(2012( ( ( ( ( ( ( ( ( OnMgoing( projects( while( the( rest( have( been(completed(

Page 67: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 67'

&INSTITUTIONAL&STRENGTHENING,&POLICY&REFORM&&&&CAPACITY&BUILDINGQ&RSDT'

%  Review(of(NaJonal( Road(Design( Standards((6months(duraJon)(–'Commenced'in'August'2012'

%  Development( of( an( Asset( Management(System( (2years( duraJon)( –' Commenced' in'September'2013'

%  CalibraJon( and( AdaptaJon( of( HDMM4( (for(planning( and( prioriJzaJon( purpose( with(9months( duraJon)( –' Commenced' in'October'2012'

%  Provision(of( (GOODS(AND(EQUIPMENTS( to(Pavement( EvaluaJon( Unit( &( Bridge(Maintenance(Unit(of(the(Ministry'

Page 68: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 68'

&ROAD&SAFETY&COMPONENTQ&RSDT'

!  Procurement' of' CommunicaXon' and'Road'Safety'Equipment'

!  Procurement' of' Vehic les' and'Equipment'

!  Procurement' of' Consultancy' services'for' Capacity' Building' and' Training'Program'

!  ConstrucXon'of'Six'(6)'No.'Pedestrian'Overhead'Bridges'in'Abuja,'FCT.''

!  Support' to' Federal' Capital' Territory'AdministraXon'(FCTA)'on'Road'Safety'IntervenXon'

Page 69: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 69'

RSDT(Projects(Financed(by(AfDB:(M(

Under' the' NigeriaMCameroon' MulXnaXonal'Highway' and' Transport' FacilitaXon' Programme'for' the' BamendaMMamfeMEkok' /MfumMAbakalikiMEnugu' Corridor,' RSDT' has' concluded' the'reconstrucXon' of' Ogoja( JuncJon( –( Abakaliki(SecXon'of'Route'25/A.343' (Lot'1)'and'Pavement'Strengthening' of' IkomMMfum' SecXon' of' Route'90/A.4M2' (Lot' 2).' Lot' 1' is' currently' under' the'defect' liability' warranty' period' while' Lot' 2' is'being' proposed' as' a' pilot' scheme' for' the' OPRC'concept.'

!  Percentage(CompleJon(of(Project:(('

Lot(1 'M'''''100%'completed;'Defects'Liability'Period'(DLP)'commenced'in'January'2013.''

Lot(2 'M '100%'completed;'Defects'Liability'Period'(DLP)'ended'31st'July'2012.'

Page 70: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 70'

Proposed(Project(Under(RSDT(to(be(Financed(by(China(EXIM(Bank(loan:(

!  Dualiza=on&of&Keffi& Q& Lafia& Q&Makurdi& Q& Enugu& (9thMile)&Roads,& in' Nassarawa,' Benue' and' Enugu' State' is'conceived' to' reduce' the' number' of' traffic' related'accidents,' provide' an' alternaXve' to' the' AbujaMLokoja'route'for'SouthMbound'traffic'and'further'improve'safety'on'our'roads.'

The' Ministry' is' currently' working' out'modaliXes' towards' the' execuXon' of' the'following'project'with'funds'from'the'ExportMImport'Bank'of'China.'

Page 71: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 71'

FEDERAL(ROAD(MAINTENANCE(AGENCY((FERMA)((

ROAD&MAINTENANCE&WORKS&COMPLETED&&&&IN&PROGRESS&ALONG&WITH&&THE&ZERO&POTHOLE&PROGRAMME&ON&MAJOR&HIGHWAYS&NATIONWIDE'

Page 72: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 72'

Road(Maintenance(Projects(by(FERMA:(M(Road' maintenance' under' the'Ministry' is' carried' out' by' the' Federal'Roads'Maintenance' Agency' (FERMA).( In' the' last' one' year,'We' have'embarked' on' aggressive' repairs' of' Federal' Highways' with' the'acquisiXon' of' FP5' Mobile' Pothole' Patchers' and' producXon' of' cold'asphalt'for'prompt'intervenXon.''

48%(of(Maintenance(Project(have(been(Completed(

52%( of( Projects( are( OnMGoing( (Most( of( them,(SubstanJally(Completed.(

44No.(OnMGoing(Maintenance(Projects(by(FERMA(

52%( 48%(

Page 73: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 73'

Road

(Len

gth((km)(

Road(Maintenance(Projects((Cont.):(FERMA(was( involved( in(recovering(of(road(washouts,(general(maintenance(and(vegetaJon(control( in( some( federal( highways( in( the( country.( A( total( of( 1,380KM(of( road( corridors(were(maintained(in(2012.(Below(is(a(graphic(summary(representaJon(of(some(of(the(works.(

0(20(40(60(80(

100(120(140(160(180(200(

Length(Achieved((KM)(

Page 74: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 74'

110

Acquired)Pothole)Patchers and)a)Pothole)Patcher in)Operation

Acquired(Pothole(Patchers

(

A(Pothole(Patcher(in(OperaJon(in(one(of(the(35(locaJons(deployed

Page 75: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 75'

SECTION(D(–(KEY(OUTCOMES(DELIVERED(

Page 76: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 76'

Outcomes(Performance(Matrix:(

S/N( Performance(Indicators( 2012((Planned(Target)(

2012((Actual(as(at(Dec(2012(

Improved(Travel(Time(on(Federal(Roads(

1.' Average'travel'Xme'on'Federal'Roads' 70km/hr'' 90km/hr'

Provision(of(Good(and(Motorable(Roads(

2.' Km'of'roads'constructed' 454.375km''1,007.29km'

651km''976km''3.' Km'of'roads'rehabilitated'

4.' Km'of'Roads'Maintained'through'Donor'Funding'Generated'

100km' 257km'

5.' Area/m2'''of'pothole'patched'by'FERMA''''' 862,077.17sqm' 1,002,343sqm'

6.' Km'of'roads'maintained'by'FERMA' 3,787km' 1,380km'

7.' No.'of'bridges'constructed' 15No.' 5No.'

8.' No.'of'bridges'maintained' 33No.' 28No.'

Level' of' Performance' on' the' Outcome' Indicators' Agreed,' as' per' the' 2012' Ministerial'Performance'Contract:'

Note:M(If(the(2012(budget(of(the(Ministry(was(fully(released,(set(targets(for(items(3,(6,(7(&(8(would(have(been(substanJally(met.(

Page 77: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 77'

Outcomes(Performance(Matrix((ConJnued):(S/N( Performance(Indicators( 2012((Planned(

Target)(2012((Actual(as(at(Dec(2012(

Provision(of(Comfort(and(Safety(to(Road(Users(

9.' No'of'signage'and'safety'features'installed;'$  No.'of'Road'Signs''

$  Km'of'Road'Markings'

''440''1,461.665km'

''176No''58Km'

10.' Lm'of'bridges'with'guardrails' 4,120lm' 1,130lm'

11.' Lm'of'roads'with'surveillance' 34,120km' 34,120km'

12.' Rate'of'accident' 3,998' 4,183'

Provision(of(Policy(Regulatory(and(AdministraJve(Services'

13.' No'of'Policy'IniXaXve'implemented' 7' 7'

14.' No'of'M&E'Reports'produced'and'disseminated'

4' 4'

15.' No'of'stakeholders'engagements'undertaken'

4' 6'

i.   Note:M(Item(9(was(hampered(due(to(the(removal(of(the(budgetary(provision(of(750m(by(NASS(ii.   While(we(thought(the(improvement(in(the(road(network(would(lead(to(a(reducJon(of(accident,(

FRSC(has(reported(a(slight(increase(due(to(overMspeeding(and(poor(driving(habits(

Page 78: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 78'

Outcomes(Performance(Matrix((ConJnued):(16.' No'of'Government'staff'trained' 400' 715'

17.' Donor'Funding'Generated'(N)' N10,850,000,000.00'($70M)'

N12,400,000,000.00'($80M)'

18.' Number'of'Jobs'Created' 3,555' 3,660'(+720'FERMA'SUREMP)'

19.'''''20.''''21.'

No'of'Maps'produced:'M''

Boundary(DemarcaJon:((

I)  InternaXonal'Boundaries'II)  Interstate'Boundaries''Right(of(Way:('

I)  Rail'II)  Road''

Flood(Plains(

5,568'(51%'OnMgoing)'''2,100km'(500km)''

2,277km'(296km)'''''

304.8km'(141km)''

1,870.45km'(410km)''ConXnuous'implementaXon'of'the'2011'project'

386'''1,979km'(376km)''

2,206km'(225km)''''223.8km'(60km)'''

1,530.45km'(70km)''Flood'Plain'Monitoring'of'Usman'River'within'Kubwa'&'IdenXficaXon'of'community'prone'to'flooding'in'Cross'River'state'

Page 79: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 79'

Outcomes(Performance(Matrix((ConJnued):(22.''23.''24.''''25.'

'

Topographic(Maps(and(Others:('Establishment(of(Core(StaJon('

'

(ConstrucJon(of(Control(Beacons:('

I)  Primary'Beacons''

'Replacement(on(Control(Pillars('((

Digital'Street'Guide'Maps'of'8'State'capitals''

Establishment'of'2'New'locaXons'''

''

'

'88''

'''

218''''

6'States'''

Establishment'at'2'LocaXons'(Kano'and'Owerri)''''

63''

''

'170''''

26.' Number'of'Surveyors'Registered' 90' 65'

27.' Number'of'Engineers'Registered' 2,550' 2,173'

Note:M(FMW(conJnues(to(experience(challenges(in(Road(Signs(&(Markings(as(NASS(conJnues(the(pracJce(of(removing(proposed(sums(on(these(items(from(the(budget(

Page 80: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 80'

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

S/No.(AGREED'POLICY'AND'

PROGRAMME'PRIORITIES'FOR'2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

1'

DUALISATION'OF'ABUJAMABAJIMLOKOJA'ROAD'(SECTION'1,INTERNATIONAL'AIRPORT'LINK'ROAD'JUNCTIONMSHEDA'VILLAGE'JUNCTION)'C/NO.5862'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'''

Km/hr''

Km'Km'L/m'No.''''

No.'''''

No.'

''

60km/hr''

12.00'16.00'

12,846.49'159''''2'''''

440'

''

90km/hr''

26.40'29.75'

15,045.49'236''''4'''''

746'

''

30km/hr''

14.4'13.75'

2,200.00'77''''2'''''

303'

2'

DUALISATION'OF'ABUJAMABAJIMLOKOJA'ROAD'(SECTION'11,SHEDA'VILLAGE'JUNCTIONMABAJI)'C/NO.5863'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''

Km/hr'''

Km'Km'L/m'No.''''

No.''''

No.'

60km/hr'''0'

14.40'14,439.00'

152''''3''''

234'

90km/hr'''15'

60.00'28,890.00'

156''''4''''

635'

30km/hr'''15'

45.60'14,451.00'

4''''1'

'(Bridges'Completed)'''

401'

Page 81: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 81'

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

S/No.(AGREED'POLICY'AND'

PROGRAMME'PRIORITIES'FOR'2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(JANUARYMDECEMBER'2012'

ACHIEVEMENTS'(NOT'ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

'' 3'

DUALISATION'OF'ABUJAMABAJIMLOKOJA'ROAD'SECTION'III'(ABAJIMKOTONKARFI)'C/NO.5884'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'''

Km/hr'''

Km'Km'L/m'No.''''

No.'''''

No.'

60km/hr'''M'

21.52'11,230'97''''2'''''

108'

90Km/hr'''M'

29.75'23,742.00'

105''''2'''''

199'

30Km/hr''''

8.23'12,512'

8''''0'''''91'

'' 4'

DUALISATION'OF'ABUJAMABAJIMLOKOJA'ROAD'SECTION'IV'(KOTON'KARFIMLOKOJA)'C/NO.5885'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'''

Km/hr'''

Km'Km'L/m'No.''''

No.'''''

No.'

60km/hr'''

19.70'25.30'651.20'64''''7'''''

254'

90km/hr'''

20.90'28.30'

5,432.00'74''''7'''''

303'

30km/hr'''

1.20'3.00'

4,780.80'10''''

3'bridges'in'progress'''''49'

Page 82: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(S/No.(

AGREED'POLICY'AND'PROGRAMME'PRIORITIES'FOR'

2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'

ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

5'

REHABILITATION'AND'ASPHALT'OVERLAY'OF'BENINMSHAGAMU'EXPRESS'WAY'(BENINMOFOSU'SECTION)'IN'EDO'STATE'C/NO.'5900'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''

Km/hr'''Km'Km'L/m'No.''''No.''''No.'

''60km/hr'''20.00'43.00'5,000.00'''''''''350'

70km/hr'''

86.39'87.05'

21,600.00'''''''''

200'

10km/hr'''

66.39'44.05'

14,600.00'''''''''

(150)'

6'

REHABILITATION'OF'SHAGAMUMAJEBANDELEMORE'ROAD'SECTION'I:'AJEBANDELEMOFOSU'ROAD'IN'ONDO'STATE,'C/NO.'6000'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''

Km/hr''Km'Km'L/m'No.''''No.''''No.'

60km/hr''

N/A'19.6'

6,680.03'M''''''''

126'

70km/hr''

0.06'35.68'

9,798.56'2''''''''

126'

10km/hr''

0.06'16.8'

3,118.53'2''''''''M'

82'©2013,'Federal'Ministry'of'Works'

Page 83: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

©2013,'Federal'Ministry'of'Works'

S/No.(AGREED'POLICY'AND'

PROGRAMME'PRIORITIES'FOR'2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'

ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

7'

RECONSTRUCTION'OF'THE'OUTSTANDING'SECTIONS'OIF'BENIMOFOSUMOREMAJEBANDELEMSHAGAMU'EXPRESSWAY'PHASE'III,'C/NO.6133'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'''

Km/hr''

Km'Km'L/m'No.''''

No.''''

No.'

60km/hr''M'M'M'M''''''''M'

70km/hr''

22.23'15.35'

'''''''''

929'

10km/hr''

22.23'15.35'

'''''''''

929'

8'

DUALISATION'OF'KANOMMAIDUGURI'ROAD'(SECTION'I,'KANOMWUDILMSHUARIN)'C/NO.5878'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges'''Number'of'Jobs'Created:'''

Km/hr''

Km'Km'L/m'No.''''

No.''''

No.'

60km/hr''

43.14'51.30'

54,500.00'172''''3''''

293'

95km/hr''

43.14'55.41'

126,000.00'190''''3''''

378'

35km/hr''M'

4.11'71,500.00'

18''''M''''85'

83'

Page 84: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

©2013,'Federal'Ministry'of'Works' 84'

S/No.( AGREED'POLICY'AND'PROGRAMME'PRIORITIES'FOR'2012( AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'

ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

9'DUALISATION'OF'KANOMMAIDUGURI'ROAD'(SECTION'II,SHUARINMAZARE)'C/NO.5879'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''''

Km/hr'''

Km'Km'L/m'No.''''

No.'''''

No.'

60km/hr'''

93.24'93.20'

115,000.00'152''''3'''''

115'

95km/hr'''

102.39'105.79'

155,000.00'167''''3'''''

412'

35km/hr'''

9.15'12.55'

40,000.00'15''''

Completed'''''

297'

10'DUALISATION'OF'KANOMMAIDUGURI'ROAD'(SECTION'III,AZAREMPOTISKUM)'C/NO.5880'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'''

Km/hr'''

Km'Km'L/m'No.''''

No.''''''

No.'

60km/hr'''

97.00'119.00'

155,000.00'9''''M''''''

342'

95km/hr'''

121.97'131.69'

160,000.00'10''''1''''''

392'

35km/hr'''

24.97'12.69'5,000'1''''1''''''50'

Page 85: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

©2013,'Federal'Ministry'of'Works'

S/No.(AGREED'POLICY'AND'

PROGRAMME'PRIORITIES'FOR'2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'

ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

11'

DUALISATION'OF'KANOMMAIDUGURI'ROAD'(SECTION'IV,POTISKUMMDAMATURU)'C/NO.5881'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''

Km/hr''Km'Km'L/m'No.''''No.'''''No.'

60km/hr''

54.00'54.00'

3,616.40'124''''2'''''

170'

95km/hr''

73.00'74.00'

17,988.00'144''''2'''''

274'

35km/hr''

19.00'20.00'

14,371.60'20''''

Completed'''''

104'

12'

DUALISATION'OF'KANOMMAIDUGURI'ROAD'(SECTION'V,'DAMATURUMMAIDUGURI)'C/NO.5869'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''

Km/hr'''Km'Km'L/m'No.''''No.''''No.'

60km/hr'''

13.98'64.80'

105,400.00'221''''1''''

249'

95km/hr'''

27.00'72.20'

105,400.00'221''''1''''

331'

35km/hr'''

3.02'7.40'

Completed'Completed'

'''

Completed''''82'

85'

Page 86: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

©2013,'Federal'Ministry'of'Works' 86'

S/No.(AGREED'POLICY'AND'

PROGRAMME'PRIORITIES'FOR'2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'

ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

13'

REHABILITATION'OF'ENUGU'BOUND'CARRIAGEWAY'OF'THE'ONITSHAMENUGU'ROAD,'PHASE'I'OF'SECTION'I)'IN'ANAMBRA'STATE'C/NO.5929'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''

Km/hr''

Km'Km'L/m'No.''''

No.''''

No.'

40km/hr''

1.59'1.59'

2,245.00'172''''''''

136'

60km/kr''

18.85'12.83'

2,521.00'193''''''''

136'

20km/kr''

17.26'11.24'276.00'21''''''''M'

14'

REHABILITATION'OF'ONITSHAMBOUND'CARRIAGEWAY'OF'THE'ONITSHAMENUGU'ROAD,'PHASE'I'OF'SECTION'II)'IN'ANAMBRA'STATE'C/NO.5929A'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''Provision'of'Policy'and'Regulatory'and'AdministraXve'Services:''Number'of'Jobs'Created:''

Km/hr'''

Km'Km'L/m'L/m''''

No.''''

No.'

40km/hr'''''

2,600'M''''''''

121'

60km/hr''''

0.25'64,150'15''''''''

121'

20km/hr''''

0.25'38,150'15''''''''M'

Page 87: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

©2013,'Federal'Ministry'of'Works'

S/No.(AGREED'POLICY'AND'

PROGRAMME'PRIORITIES'FOR'2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'

ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

15'

REHABILITATION'OF'ONITSHAMENUGU'DUAL'CARRIAGEWAY'SECTION'II'(ANAMBRA'STATE'BORDERM'ENUGU)'IN'ENUGU'STATE,'C/NO.'5988'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'''

Km/hr'''Km'Km'L/m'L/m''''No.''''No.'

40km/hr'''

0.10'13.60'26,000'

70,000.00''''''''83'

60km/hr'''

1.37'19.79'

29,460.00'70,000.00'

'''''''83'

20km/hr'''

1.24'3,460.00'Completed'

''''''''M'

16'

REHABILITATION'OF'ENUGUMPORT'HARCOURT'DUAL'CARRIAGEWAY'SECTION'I:'ENUGUMOKIGWE'IN'EBONYI/ABIA'STATE''

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'

Km/hr''Km'''''No.'''''No.'

'''30''M''''''''''M'

'''80''

85km(Dual)''''''''''65''

'''50''

85km(Dual)''''''''''65'' 87'

Page 88: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Outcomes(Performance(Matrix((ConJnued):(Highlights(of(priority(projects(including(SUREMP(funded(

©2013,'Federal'Ministry'of'Works'

S/No.(AGREED'POLICY'AND'

PROGRAMME'PRIORITIES'FOR'2012(

AGREED'KEY'PERFORMANCE'INDICATORS'(KPI)'FOR'2012'AS'RELATED'TO'THE'TRANSFORMATION'AGENDA( '(

JANUARYMDECEMBER'2012'ACHIEVEMENTS'(NOT'

ACTIVITIES)(

'( '( '( UNIT( JANUARY''2012(

DECEMBER'2012( '(

17'

REHABILITATION'OF'ENUGUMPORT'HARCOURT'DUAL'CARRIAGEWAY'SECTION'II:'OKIGWEMPORTMHARCOURT'IN'ABIA/RIVERS'STATES'

''Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:'

Km/hr''''Km''''''No.''''No.'

'30''''M''''''

N/A''''M'

80''''

126''''''

N/A'''80'

50''''

126''''''

N/A''''80'

18'DUALISATION'OF'IBADANMILORIN'SECTION'II'CONTRACT'NO.1793A'

Improved'Travel'Time'on'Federal'Roads:'Average'Travel'Time'on'Route''Km'of'Roads'Constructed/Rehabilitated:'Wearing'Course'Binder'Course'Lined'Drains'Culverts''No.'of'Bridges'Constructed/'Rehabilitated:''Bridges''''Number'of'Jobs'Created:''

Km/hr'''Km'Km'L/m'L/m''''No.''''No.'

'0'''M'M'M'14''''''''

350''

0'''M'

7.15'6,914'25''''''''

400'

0''M''

7.15'6,914'11''''''''50'

88'

Page 89: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 89'

Number(of(Jobs(Created:($  During( the( year( 2012,( the(Ministry( in( collaboraJon(with( the( Federal( Civil( Service(

Commission(employed(455(engineers(and(technical(officers(to(fill(vacancies(declared(by(the(Ministry.(

$  Also( the( total( of( 3,660( jobs( were( created( on(major( on( going( projects( across( the(country(

Training(of(newly(recruited(Engineers(

Page 90: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 90'

Status(of(New(LegislaJon:(!  Submission(of(Report/(dras(Bills(to(BPE(and(the(Ministry(

(April,(2012)(!  The(Bill(have(been(reMaligned(with(those(of(the(BPE(and(have(

been(approved(by(the(NCP(for(onward(transmission(to(the(Ministry(of(JusJce(before(presentaJon(at(the(Federal(ExecuJve(Council(for(approval(

Highlights(of(the(Bill:(!  'Establish'a'NaXonal'Road'Fund'and'a'Road'Fund'Board'!  Create' a' Federal' Road' Authority' as' obtainable' in' other' countries' and' free' this'

important'tool'for'naXonal'development'from'the'jackboot'of'bureaucracy,'leaving'the'ministry' to' focus' on' policy' issues' and' seyng' standards' and' project'monitoring.' The'World' Bank' has' already' provided'USD' 5million' for' the' takeMoff' of' the' Federal' Roads'Authority.'

!  The' Federal' Roads' Authority' to' be' professionalized,' with' a' governing' body' and' two'operaXonal'departments;'a)(ConstrucJon(&(RehabilitaJon.((b)(Maintenance.(

Page 91: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 91'

Regulatory(and(AdministraJve(Services:M(

! (The(Ministry(introduced(the(use(of(Bitumen(Emulsion((to(replace(Cut(Back(Bitumen(in(road(construcJon.(The(Emulsion(is(cheaper(and(more(environmentally(friendly;(

! New(Guidelines(were(introduced(by(the(Ministry(for(the(management(of(the(Right(of(Way(as(it(concerns(provision(of(ducts(for(laying(of((TelecommunicaJon(Cables(

! Circular(issued(to(Field(officers(and(Contractors((that(only(protected(permanent(works(are(cerJfied(for(payment(

Page 92: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 92'

SECTION(E(–(CHALLENGES/CONSTRAINTS(

Page 93: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 93'

Challenges(

(((((((((((((((((

Large(Number(of(Ongoing(Road(Projects(despite(FMW’s(efforts(at(prioriJsaJon(of(projects(

Lack(of(Appropriate(Governance(of(the(Road(Sector(

Heavy(Reliance(on(Road(TransportaJon(Leading(to(Excessive(Pressure(on(the(Roads(

Abuse(of(Road(Infrastructure(

Funding(Constraints(leading(to(unpaid(Interim(CerJficates(

InsJtuJonal(Problems(

CHALLEN

GES(

Challenges' faced' in' the' development' of' road' infrastructure' in' Nigeria' in' the' year'under'review'include:'

Page 94: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 94'

What(Has(Worked/What(Has(Not(Worked:(M(

What(Has(NOT(Work('

What(Has(Work('

•  Decades'of'inappropriate'maintenance'

•  Funding'shortages'•  Lack'of'insXtuXonal'capacity''•  ConXnuous'economic'

instability'

%  InjecJon( of( extraMbudgetary( funds(from( the( SURE( Programme( has(help( the( ministry( to( achieve(appreciable( progress( on( selected(key(road(projects.(

%  PrioriJsaJon( of( Projects( (Reduce(the( number( of( onMgoing( project(from(168( to(80),(although(19(new(projects(were(added(by(NASS(

%  Reduced( dependence( on( Public(finance( by( facilitaJng( PPP( &(encouraging( funding( by( mulJMlateral(Agencies(

•  ReducXon'of'projects'budgeted'sums'by'NASS'

•  Inclusion'of'projects'without'design'by'NASS'

Page 95: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 95'

MITIGATION(STEPS(TOWARDS(THE(CHALLENGES(OF(THE(MINISTRY:(M(

Challenges(

Inadequate(funding(of(road(projects(which(result( in(delayed(implementaJon(of(the(projects(

BudgeJng( cycle( limits( maximal( uJlizaJon( of( funds(during(the(dry(season(

IntroducJon(of(new(projects(in(the(budget(for(which(the(Ministry(does(not(have(ready(Engineering(Design(for(their(execuJon.(

Heavy(reliance(on(road(transportaJon((

Abuse(of( road( infrastructure( such(as(excessive(axle(loading,(blockage(of(drainage(structures,(e.t.c(

AlteraJon( of( the( Ministry’s( proposed( annual(budgets(which(adversely(affects(projects(execuJon(

MiJgaJon(

We( are( exploring( other( sources( of( funding( road(projects( besides( the( yearly( budgetary( allocaJon,(including(introducing(Annuity(ContracJng(

We( are( making( a( case( for( the( extension( of( the(budgetary( cycle( for( road( construcJon( to(extend(up(to(March( of( the( subsequent( year,( as( the( period( is(the(major(construcJon(period((Dry(season)(

The(Ministry( has( engaged( the( NaJonal( Assembly’s(commiqees( on( Works( towards( addressing( the(situaJon(

The( Federal(Government( is( addressing( the( shoryall(in(other(modes(of(transportaJon(with(the(onMgoing(rehabilitaJon(of(Railway(

We(are(currently(installing(weighbridges(at(strategic(locaJons(along( the( Federal( Roads( network.( However,( management(problem( is( being( encountered( due( to( the( absence( of( Road(Plazas/(tolling(points(to(enhance(enforcement.((

We( have( engaged( the( NaJonal( Assembly’s(commiqees(on(Works(and(the(Min.(of(Finance.(

Page 96: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

Some#on;going#highway#projects#across#the#country'

©2013,'Federal'Ministry'of'Works' 96'

PAVING(THE(WAY(TO(A(GREATER(NIGERIA(

COMPLETED(SECTION(OF(KANOMMAIDUGURI(DUAL(CARRIAGE(WAY'

Page 97: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 97'

DualizaJon(of(KanoMMaiduguri(road'

DualizaJon(of(AbujaMLokoja(road((Giri(JuncJon)'

Page 98: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 98'

Refinery(Road(Warri

(

Vom(–(Manchok(Road

Page 99: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 99'

DualizaJon(of(AbujaMLokoja(road((SecJon(II)

Rehab.(of(OnitshaMEnugu(Dual(carriageway

Page 100: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 100'

GENERAL(MAINTENANCE(REPAIRS(OF(KADUNA(–(BIRNIN(GWARI(ROAD(IN(KADUNA(STATE(

((BEFORE( ((DURING( AFTER(

Page 101: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 101'

GENERAL(REPAIRS(OF(IFE(–(ILESHA(HIGHWAY((DUAL(CARRIAGEWAY)((

((BEFORE( ((DURING( AFTER(

Page 102: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 102'

SECTION(F(M(CONCLUSION(

Page 103: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 103'

CONCLUSION(

•  Road( Infrastructure( development( and( economic(growth( are( mutually( reinforcing,( as( road(infrastructure( development( plays( a( vital( role( in(wealth( creaJon.( In( Nigeria,( road( infrastructure( is(central( to( economic( growth.( It( is( at( the( core( of(good(governance(and(public(welfare.(

•  Any( investment( in( Road( infrastructure( in( Nigeria,(posiJvely(impacts(the(naJon’s(GDP.(

•  There( is( an( urgent( need( for( Government( to(increase( its(annual(budget( for( road(construcJon( if(the(objecJves(of(the(TransformaJon(Agenda(are(to(be(fully(realized.(((

Page 104: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 104'

Thank(YOU!'

Page 105: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 105'

Page 106: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

The(80Nos.((PrioriJsed)(onMgoing(projects(of(the(ministry(in(2012(are(as(follows:(

©2013,'Federal'Ministry'of'Works' 106'

APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(

S/N Project(Title Dec.2012(%CompleJon(to(Date(

1 ABUJAMABAJI(ROAD(SECTION(1,INTERNATIONAL(AIRPORT(LINK(ROAD(JUNCTIONMSHEDA(VILLAGE(JUNCTION)(C/NO.5862 46.00%

2 ABUJAMABAJI(ROAD(SECTION(11,SHEDA(VILLAGE(JUNCTIONMABAJI)(C/NO.5863 50.17% 3 ABUJAMLOKOJA(ROAD(SECTION(III((ABAJIMKOTONKARFI)(C/NO.5884 20.05% 4 ABUJAMLOKOJA(ROAD(SECTION(IV((KOTON(KARFIMLOKOJA)(C/NO.5885 19.43% 5 KANOMMAIDUGURI(ROAD((SECTION(I,(KANOMWUDIMSHUARI)C/NO.5878 34.04% 6 KANOMMAIDUGURI(ROAD((SECTION(II,SHUARIMAZARE)C/NO.5879 54.66% 7 KANOMMAIDUGURI(ROAD((SECTION(III,AZAREMPOTISKUM)C/NO.5880 57.61% 8 KANOMMAIDUGURI(ROAD((SECTION(IV,POTISKUMMDAMATURU)C/NO.5881 45.13% 9 KANOMMAIDUGURI(ROAD((SECTION(V,(DAMATURUMMAIDUGURI)(C/NO.5869 24.28% 10

DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(1((OBAJANA(JUNCTION(TO(OKENE) 0.15%

11 DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(II(((OKENE(TO(AUCHI) 0.15%

12 DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(III((AUCHI(TO(EHOR) 0.15% 13 DUALISATION(OF(OBAJANA(JUNCTION(TO(BENIN(PHASE(2:(SECTION(III(((EHORMBENIN) 0.15% 14 DUALISATION(OF(SULEJAMMINNA(ROAD 22.48% 15 CONSTRUCTION(OF(KADUNA(EASTERN(BYMPASS,(C/NO.(5346 58.52% 16 CONSTRUCTION(OF(KANO(WESTERN(BYE(PASS(C/NO.(5960 49.58% 17

REHABILITATION(OF(ENUGU(BOUND(CARRIAGEWAY(OF(THE(ONITSHAMENUGU(ROAD,(PHASE(I(OF(SECTION(I)(IN(ANAMBRA(STATE(C/NO.5929 28.62%

18 REHABILITATION(OF(ONITSHAMBOUND(CARRIAGEWAY(OF(THE(ONITSHAMENUGU(ROAD,(PHASE(I(OF(SECTION(II)(IN(ANAMBRA(STATE(C/NO.5929A 10.17%

19 REHABILITATION(OF(ONITSHAMENUGU(DUAL(CARRIAGEWAY(SECTION(II((ANAMBRA(STATE(BORDERM(ENUGU)(IN(ENUGU(STATE,(C/NO.(5988 41.73%

20 CONSTRUCTION(OF(ELEME(JUNCTION(FLYOVER(AND(DUALISATION(OF(THE(ACCESS(ROADS(TO(ONNE(PORT(IN(RIVER(STATE.(C/NO.(5788 100.00%

Page 107: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 107'

21 REHABILITATION(AND(ASPHAT(OVERLAY(OF(BENINMSHAGAMU(EXPRESS(WAY(((BENINMOFOSU(SECTION)(IN(EDO(STATE(C/NO.(5900 84.49%

22 REHABILITATION(OF(SHAGAMUMAJEBANDELEMORE(ROAD(SECTION(I:(AJEBANDELEMOFOSU(ROAD(IN(ONDO(STATE,(C/NO.(6000 92.00%

23 REHABILITATION(OF(AGAIEMKATCHAMBARO(ROAD(IN(NIGER(STATE 19.00% 24 DUALISATION(OF(IBADANMILORIN(SECTION(II(CONTRACT(NO.1793A 28.18% 25 CONSTRUCTION(OF(OJU/LOKOMOWETO(BRIDGE(TO(LINK(LOKO(AND(OWETO(C/NO. 2.98% 26 REHABILITATION(OF(PAMBEGUWA(M(SAMINAKA(M(JOS(ROAD(C/NO.(6013 77.66% 27 ACCESS(ROADS(TO(ELEME(PORT(HARCOURT(REFINERY(C/NO.(6025 40.0% 28 ACCESS(ROADS(TO(NNPC(DEPOT((MOSIM)(ALONG(IKORODUMSHAGAMU(ROAD(C/NO.(6028 10.5% 29 ACCESS(ROADS(TO(APAPA/TINCAN(PORT,(NNPC(DEPORT((ATLASS(COVE)(TO(MILE(2(C/NO.(6005 50.05% 30 REHABILITATION(OF(ACCESS(ROADS(TO(NNPC(DEPOT(AT(EJIGBO(IN(LAGOS(STATE(C/NO.6026 77.30% 31

REHABILITATION(OF(9TH(MILEMOTURKPOMMAKURDI(ROAD((OTUKPAMOTURKPO(SECTION)(IN(BENUE(STATE,(C/NO.(5983 28.00%

32 REMALIGNMENT(AND(CONSTRUCTION(OF(DANGEROUS(CURVES(BETWEEN(AKWANGA(AND(LAFIA(ROAD((KM(10+300(M(KM(23+600)(IN(NASARAWA(STATE,(C/NO.(5972 53.11%

33 REHABILITATION(OF(OTUKPAMAYANGBAMAJAOKUTAMOKENE(ROAD(IN(KOGI(STATE((C/NO.(6030 53.19% 34

REHABILITATION(OF(GOMBEMNUMANMYOLA(ROAD(SECTION(II:(NUMAN(MGOMBE(IN(ADAMAWA/GOMBE(STATES,(C/NO.(5979 94.46%

35 REHABILITATION(OF(WUKARIMMUTUM(BIYUMJALINGOMNUMAN(ROAD(SECTION(I:(WUKARIMMUTUM(BIYU(ROAD(IN(TARABA(STATE,(C/NO.(5981 50.32%

36 REHABILITATION(OF(BAUCHI(M(DASS(M(TAFAWA(BALEWA(IN(BAUCHI(STATE(C/NO.(6068 55.72% 37 REHABILITATION(OF(SOKOTOMTAMBUWALMJEGAMKONTAGORAMMAKERA(SECTION(I 0.15% 38 REMCONSTRUCTION(OF(SOKOTOMTAMBUWALMJEGAMKONTAGORAMMAKERA(SECTION(II 0.15%

39 REHABILITATION(OF(VANDEIKYAMOBUDUMOBUDU(CATTLE(RANCH(ROAD((VANDEIKYAMOBUDU(SECTION)(IN(BENUE(STATE

0.15%

40 REHABILITATION(OF(ENUGUMPORT(HARCOURT(DUAL(CARRIAGEWAY(SECTION(I:(ENUGUMUMUAHIA(IN(ENUGU/ABIA(STATES

0.15%

APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(

Page 108: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 108'

41 REHABILITATION(OF(ENUGUMPORT(HARCOURT(DUAL(CARRIAGEWAY(SECTION(II:(UMUAHIAMPORTMHARCOURT(IN(ABIA/RIVERS(STATES

42 CONSTRUCTION(OF(NSUKKA(M(OBOLLO(M(AFOR(M(EHAMAFU(M(NKALAGU(C/NO.5962 19.13% 43 REHABILITATION(OF(APAPA(M(OSHODI(EXPRESS(WAY(IN(LAGOS(C/NO.(6074 79.70% 44 REHABILITATION(OF(APAPA(M(OSHODI(EXPRESS(WAY(IN(LAGOS(:(PHASE((II 45 ADDENDUM(III(TO(DUALIZATION(OF(LAGOSMOTTA(ROAD( 16.51% 46 CONSTRUCTION(OF(YENEGWEMOKAKIMKOLOMNEMBEMBRASS(ROAD(C/No.5990 36.73% 47

CONSTRUCTION(OF(BODOMBONNY(ROAD(WITH(A(BRIDGE(ACROSS(THE(OPOBO(CHANNEL.(C/NO.(5662 20.37%

48 REHABILITATION(OF(JEBBA(BRIDGE(C/NO.(6066 92.87% 49 OTUKPOMOWETO(ROAD(IN(BENUE(STATE(C/NO.(6076 55.60% 50

REHABILITATION(OF(MAIDUGURIMBAMAMGWOZAMHONG(ROAD(SECTION(II:(BAMAMGWOZA(IN(BORNO(STATE,(C/NO.(5975 62.01%

51 REHABILITATION(OF(WUKARI(M(TAKUM(ROAD(SECTION(II(C/NO.(6039 85.17% 52

POTISKUM(M(UDUBO(M(GAMAWA(M(GAMAYIN(ROAD((R333)(SECTION(II((UDUBO(M(GAMAWA(M(GAMAYIN(ROAD)(IN(BAUCHI(STATE(C/NO.(6067 54.48%

53 REHABILITATION(OF(KANOMKATSINAMKAURA(NAMODAMJIBIA(ROAD(SECTION(III:(KAURA(NAMODAMJIBIYA(IN(ZAMFARA/KATSINA(STATE,(C/NO.(6014 88.62%

54 REHABILITATION(OF(FUNTUA(M(YASHI(M(DAYI(M(KANO(STATE(BORDER(ROAD.(C/NO.(5264 78.75% 55 ZARIAMFUNTUAMGUSAUMSOKOTOMBIRNIN(KEBBI(C/NO.(6029 71.33% 56

REHABILITATION(OF(HADEJIAMNGURU(ROAD(IN(JIGAWA(STATE((((((PHASE(II:(KIRIKASAMAM(NGURU(IN(JIGAWA(STATE(C/NO.(6072 48.66%

57 REHAB.OF(HADEJIA(M(NGURU(ROAD(C/NO.(5927 88.41% 58

REHABILITATION(OF(CALABARMUGEPMMOGOJAMKATSINA(ALA(ROAD(SECTION(I(((CALABARMUGEP)(IN(CROSS(RIVER(STATE,(C/NO.(6011 77.00%

59 REHABILITATION(OF(CALABARMUGEPMKATSINA(ALA(ROAD(SECTION(II((UGEPMKATSINA(ALA)(IN(BENUE/CROSS(RIVER(STATES,(C/NO.(5991 79.26%

60 REHABILITATION(OF(KABBA(M(IPELE(M(IDOANI((M(ISUA(RAOD(C/NO.(6033 80.00%

APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(

Page 109: Federal Ministry of Works- Transforming Nigerian Roads: Achievements and Challenges in2012

©2013,'Federal'Ministry'of'Works' 109'

61 DAMASAKMDUTSE((NIGERIA)MDIFFA((NIGER(REPUBLIC)(ROAD(IN(BORNO(STATE(C/NO.(6071 30.59% 62

CONSTRUCTION(OF(OJIMACHIMMMAKWUMAWGUMNDEABOMMPUMAKAEZE(ROAD(SECTION(I((OJIMACHIMMMAKWUMAWGU)(C/NO.(6037 46.04%

63 CONSTRUCTION(OF(OJIMACHIMMMAKWUMAWGUMNDIABOHMMPUMAKAEZE(ROAD(SECTION(II((AWGUMMPUMOKPANKUMAKAEZE()C/NO.(6073 42.54%

64 REHABILITATION(OF(OZALLAMAKPUGOMAMAGUNZEMIHUOKPARAMNKOMOROMISUMONICHA(ENUGUMONICHA)(WITH(A(SPUR(TO(ONUNWEKE(C/NO.(6078 14.84%

65 REHABILITATION(OF(ABAKALIKIMAFIKPO(ROAD(SECTION(I:(ABAKALILKIMONUEKEMABOMEGA(ROAD(IN(EBONYI(STATE,(C/NO.(5989 26.90%

66 REHABILITATION(OF(ABAKALIKIMAFIKPO(ROAD(SECTION(II:(ABOMEGAMAFIKPO(WITH(SPUR(TO(UGBAMAKAM/AHABBA(JUNCTION(ROAD(IN(ENUGU(STATE,(C/NO.(5989A 71.24%

67 REHABILITATION(OF(LAFIAMOBIMAWEMTUNGA(ROAD(IN(NASARAWA(STATE(C/NO.(6065 50.75% 68

REHABILITATION(OF(SPUR(FROM(ONITSHAMOWERRI(ROAD(TO(OKIJAMIHEMBOSIMAFOR(UKPORMEBENATORMEZENIFITE(IN(NNEWI(SOUTH(LGA(IN(ANAMBRA(STATE 8.49%

69 REHABILITATION(OF(AKUREMONDOMORE(C/NO.6115 17.97% 70 CONSTRUCTION/REHABILITATION(OF(GBONGANMIWOMOYO(ROAD(IN(OYO(STATE(C/NO.6102 12.68% 71

REHABILITATION(OF(ODOMOBAMTAKIEMGAMBARIMOTTEMOYO(STATE(BORDER(ALONG(IBADANMOYOMOGBOMOSHOMILORIN(ROAD45.3KM(ROUTE(20)(IN(OYO(STATE(C/NO.6116 30.27%

72 REHABILITATION(OF((IJEBU(IGBOMOLOMI(OYO(STATE(BORDER)(ROAD(IN(OGUN(STATE(C/NO.6113 12.20%

73 REHABILITATION(OF(OBIOZARA(M(UBURU(M(ISHIAGU(ROAD(C/NO.(5828 100.00% 74

COMPLETION(OF(REHABILITATION(OF(ADAMOKEREMUKONIMAMEDOKHIOM(OLD(ROAD,(UROMI(EDO(STATE 1.88%

75 CONSTRUCTION(OF(2NO.(BRIDGES(ALONG(AUCHI((POLY)(EKPERIMAGENEBODE(ROAD(ROUTE(549(IN(EDO(STATE 0.15%

76 RECONSTRUCTION(OF(IKOTMEKPENEMODUKPANIMCALABAR(ROAD(

77 COMPLETION(OF(AUCHI(POLYMEKPERIMUZEAMEBHOJE(ROAD(AND(TWO(PEDESTRIAN(BRIDGES(AT(AUCHI(POLY(ENTRANCE

0.15%

78 COMPLETION(OF(THE(REHABILITATION(OF(IRRUAMUROMIMILLUSHI(SECTION(II((WATER(RESERVOIRMIVUE(TO(WATER(WORKSMIBORE(SECTION(ROAD)

0.15%

79 CONSTRUCTION(OF(NPOROMABIRIBAMOHAFIA(ROAD(IN(ABIA(STATE 4.23% 80 REHABILITATION(OF(ILORINMKABBAMOBAJANA(ROAD 0.15%

APPENDIX(1MTreasury(Funded(Projects((OnMGoing)(