FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

71
May 2021 FEDERAL FISCAL YEAR 202 2 -2025 TRANSPORTATION IMPROVEMENT PROGRAM A regional program of surface transportation improvement projects to enhance the movement of goods and people along the greater central Iowa region’s transportation system.

Transcript of FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Page 1: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

May 2021

FEDERAL FISCAL YEAR 2022-2025 TRANSPORTATION IMPROVEMENT PROGRAM

A regional program of surface transportation improvement projects to enhance the movement of goods and people along the greater central Iowa region’s transportation system.

Page 2: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

C H A P T E R O N E

Introduction

The FFY 2022-2025 TIP contains seven chapters covering the CIRTPA’s guidelines for choosing and

funding projects, status reports of the previous FFY projects, a listing of projects in the Federal

highway and Federal transit element, a financial plan for all Federal-aid projects, required

resolutions and certifications, and a summary of public comments.

Chapter One: General Overview of the TIP

The Introduction explains Federal transportation planning guidelines and provides background

information on the CIRTPA’s responsibilities, representatives, and committees. The chapter also

includes information about the CIRTPA’s public participation process procedures and provides an

overview of the TIP, including its purpose, requirements, and the methodology to adopt, implement,

amend, or modify the plan.

Chapter Two: Project Selection Procedures

This chapter provides background into the CIRTPA’s project selection procedure, including eligibility

requirements, basis of funding projects, and project scoring process.

Chapter Three: Funding Programs

This chapter provides a summary of the various funding programs available for project within the

CIRTPA planning area including Federal, State, and local funding sources. The chapter also discusses

the intent of each of these programs.

Chapter Four: Federal Fiscal Year 2021 Status Reports

The Federal Fiscal Year 2021 Status Reports chapter is a status listing of all Federal-aid projects

programmed to utilize Federal funding in FFY 2021.

Chapter Five: Federal Highway Administration Projects

The Federal Highway Administration Projects chapter provides a listing of all Federal-aid and State

SWAP projects programmed to utilize FHWA and Iowa DOT funds during the next four FFYs (FFY

2022-2025).

2

Page 3: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Chapter Six: Federal Transit Administration Projects

The Federal Transit Administration Projects chapter provides a listing of all Federal-aid projects

programmed to utilize FTA funds during the next four FFYs (FFY 2022-2025).

Chapter Seven: Financial Plan

The Financial Plan chapter summarizes the financial availability of the CIRTPA to implement surface

transportation improvements. The chapter includes the fiscal constraint of the STBG and TAP funds,

listing the forecasted operations and maintenance expenditures, and forecasted non Federal-aid

revenues. The chapter also includes a section discussing the transit funding Federal-aid by year.

Chapter Eight: Public Comment

The public comment chapter includes a summary on the disposition of comments made as part of the

public review of the TIP on June 23, 2021, and any subsequent written comments submitted to the

CIRTPA before July 15, 2021.

Appendices

Resolutions and Certifications

The resolutions and certifications chapter includes the TIP’s resolution of adoption by the CIRTPA, a

self-certification of the planning process, and a certification of the financial capacity analysis.

3

Page 4: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

G e n e r a l O v e r v i e w o f t h e T I P

The transportation system in a regional planning area is vital for the movement of people and goods

to, though, from, and within the area. A transportation system takes on two primary roles: the

movement of people and the movement of goods. The transportation improvement program (TIP) is

a regionally agreed upon list of surface transportation improvements that received Federal funding

to move goods and people in a defined area’s transportation system.

The TIP and Federal Guidance

Congress passed the Federal-Aid Highway Act of 1962, requiring regional agencies to conduct a

"continuing, comprehensive, and coordinated" (3-C) transportation planning process. Congress took

additional steps in drafting the Federal-Aid Highway Act of 1973 by establishing Metropolitan

Planning Organizations (MPO) in urbanized areas over 50,000 persons in population, and by

dedicating to MPOs a small portion of each state's funding from the Highway Trust Fund. The

Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) empowered and provided for

flexibility in the use of funding, improved state-regional cooperation, and enhanced public

participation. The Transportation Equity Act for the 21st Century (TEA-21) legislation of 1998

expanded the role and responsibilities of metropolitan areas exceeding 200,000 persons in

population with the designation of Transportation Management Areas (TMA). In 2005, Congress

passed the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users

(SAFETEA-LU).

SAFETEA-LU guaranteed funding for highways, highway safety, and public transportation through

Federal Fiscal Year (FFY) 2009 (September 30, 2009). Then the United States Senate passed

continuing resolutions to extend SAFETEA-LU and to provide appropriations for transit programs

through 2012 at funding levels consistent with authorized 2009 levels. SAFETEA-LU addressed the

many challenges facing transportation systems including improving safety, reducing traffic

congestion, improving efficiency in freight movement, increasing intermodal connectivity, and

protecting the environment. SAFETEA-LU promoted more efficient and effective Federal surface

transportation programs by focusing on transportation issues of national significance, while giving

state and local transportation decision makers more flexibility to solve transportation problems in

4

Page 5: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

their communities.1

On July 6, 2012, Moving Ahead for Progress in the 21st Century Act (MAP-21) was signed into law

replacing SAFETEA-LU. MAP-21 provides essential funds for transportation projects ranging from

passenger rail, freight transportation, highway and bridge projects, and bicycle and pedestrian

projects. MAP-21 took effect on October 1, 2012, and funds surface transportation projects through

September 30, 2014. The bill provides $105 billion in funding per year for Federal Fiscal Year’s (FFY)

2013 and 2014. An extension was signed in 2014, which authorizes surface transportation funding

through May 31, 2015. Continuing resolutions were signed that then extended funding until

December of 2015. MAP-21 includes a number of major changes including the elimination of the

Surface Transportation Program Transportation Enhancements Program, expansion of the

Transportation Infrastructure Finance Innovation Act (TIFIA), and streamlining of the

environmental review process. Federal transit program also chance slightly with Job Access and

Reverse Commute (JARC) and New Freedom funds being consolidated into the Urbanized Area

Formula Grants.2

On December 4, 2015 the Fixing America’s Surface Transportation Act (FAST) was signed into law

replacing MAP-21. The FAST Act authorized $305 billion over fiscal years 2016 through 2020 for

highway, highway and motor vehicle safety, public transportation, motor carrier safety, hazardous

materials safety, rail, and research, technology, and statistics programs. MAP-21 included provisions

to make the Federal surface transportation more streamlined, performance-based, and multimodal,

and to address challenges facing the U.S. transportation system. The FAST Act builds on the changes

made by MAP-21. The FAST ACT establishes and funds new programs to support critical

transportation projects to ease congestion and facilitate movement. It also builds on the reforms of

MAP-21 by incorporating changes aimed at ensuring the timely delivery of transportation projects.

The current transportation bill is the America’s Transportation Infrastructure Act of 2019. Its is the

largest amount of funding provided for highway reauthorization legislation in history. The bill

authorizes $287 billion from the Highway Trust Fund over five years in investments to maintain and

repair America’s roads and bridges and to keep our economy moving. The legislation includes

1 http://www.fhwa.dot.gov/safetealu/summary.htm 2 http://www.nlc.org/Documents/Influence%20Federal%20Policy/Advocacy/Legislative/summary-map21-transportation-jul2012.pdf

5

Page 6: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

provisions to improve road safety, accelerate project delivery, improve resiliency to disasters, reduce

highway emissions, and grow the economy.

Federal Transportation Planning Process Title 23 of the United States Code of Federal Regulations (CFR), Section 450, Subpart C, states that

MPOs are to carry out a:

“…continuing, cooperative, and comprehensive multimodal transportation planning

process, including the development of a metropolitan transportation plan and a

transportation improvement program (TIP), that encourages and promotes the safe and

efficient development, management, and operation of surface transportation systems to

serve the mobility needs of people and freight (including accessible pedestrian

walkways and bicycle transportation facilities) and foster economic growth and

development, while minimizing transportation-related fuel consumption and air

pollution.”

Section 450.306 identifies ten planning factors to identify the “scope of the metropolitan

transportation planning process.” These include:

1. Support the economic vitality of the metropolitan area, especially by enabling

global competitiveness, productivity, and efficiency;

2. Increase the safety of the transportation system for motorized and non-

motorized users;

3. Increase the security of the transportation system for motorized and non-

motorized users;

4. Increase accessibility and mobility of people and freight;

5. Protect and enhance the environment, promote energy conservation, improve the

quality of life, and promote consistency between transportation improvements

and State and local planned growth and economic patterns;

6. Enhance the integration and connectivity of the transportation system, across and

between modes, for people and freight;

7. Promote efficient system management and operation;

8. Emphasize the preservation of the existing transportation system;

6

Page 7: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

9. Improve the resiliency and reliability of the transportation system and reduce or

mitigate stormwater impacts of surface transportation; and

10. Enhance travel and tourism.

Central Iowa Regional Transportation Planning Alliance

The Central Iowa Regional Transportation Planning Alliance (CIRTPA) serves as the formal

transportation planning body for the greater central Iowa regional area, carrying out the intent of

Title 23 of the United States Code of Federal Regulations, Section 450. The CIRTPA works to carry out

a 3-C multimodal transportation planning process for the greater central Iowa regional area,

excluding the areas within the Des Moines Area Metropolitan Planning Organization (MPO) and the

Ames Area MPO.

Responsibilities

The CIRTPA provides a regional forum to assure local, state, and Federal agencies and the public

coordinate transportation planning issues, and to prepare transportation plans and programs. The

CIRTPA develops both long and short-range multimodal transportation plans, selects, and approves

projects for Federal funding based on regional priorities, and develops methods to reduce traffic

congestion.

The CIRTPA is responsible for these transportation planning activities within the geographic area

identified as the Regional Planning Area (RPA). The CIRTPA approved its current RPA on January 10,

2008. The RPA includes all portions of Boone, Dallas, Jasper, Madison, Marion, Polk, Story, and

Warren Counties except for the planning area of the Des Moines Area Metropolitan Planning

Organization and the Ames Area Metropolitan Planning Organization.

Membership

Full voting membership to the CIRTPA is open to any county or city government located, wholly or

partially, in the designated RPA containing a minimum population of 3,000 persons that adopts the

CIRTPA's 28E Agreement (agreement entered into under Chapter 28E, Code of Iowa, establishing the

CIRTPA and its responsibilities). Currently, CIRTPA membership includes the following cities,

counties, and organizations:

7

Page 8: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Figure 1.1: CIRTPA Membership

Cities Counties Organizations

Adel Pella Boone County HIRTA

Boone Perry Dallas County

Huxley Story City Jasper County

Indianola Winterset Madison County

Knoxville Marion County

Nevada Polk County

Newton Story County

Warren County

The Iowa Department of Transportation (DOT), the Des Moines Area Regional Transit Authority

(DART), the Federal Highway Administration (FHWA), the Federal Transit Administration (FTA), and

the Ames Area Metropolitan Planning Organization (AAMPO) serve as advisory non-voting,

representatives to the CIRTPA.

Organization

Two designated committees form the structure of the CIRTPA: The Transportation Technical

Committee (TTC) and the Transportation Policy Committee (TPC). The CIRTPA member

governments’ and agencies’ boards and councils appoint their own representatives to the TTC and to

the TPC.

The CIRTPA TTC is comprised primarily of representatives of member governments’ and agencies’

technical staffs, including planners, engineers, and city administrators. The CIRTPA TPC is primarily

comprised of elected officials that include mayors, city council members, city managers, and county

supervisors.

The CIRTPA staff supports the TTC and the TPC. The TTC offers technical guidance and

recommendations to the TPC. The TPC takes formal actions on transportation topics after reviewing

and considering the TTC’s recommendations.

Additionally, the CIRTPA supports, as needed, other subcommittees, roundtables, working groups,

and advisory committees of the Des Moines Area MPO on various transportation-related topics

relevant to the CIRTPA's responsibilities.

8

Page 9: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Representation

Each member government is entitled to one representative each on the CIRTPA TPC and on the

CIRTPA TTC. As previously noted, the Iowa DOT, DART, FHWA, FTA, and the AAMPO serve as

advisory representatives to the CIRTPA and each have one representative.

Transportation Improvement Program

The CIRTPA’s Federal Fiscal Years 2022-2025 Transportation Improvement Program (FFY 2022-2025

TIP) serves as a list of Federal-aid eligible surface transportation improvements for the CIRTPA’s

MPA. The TIP covers a period of no less than four years and is updated annually for compatibility

with the Statewide Transportation Improvement Program development and approval process. The

TIP identifies all Federal funds programmed during the four-year period (FFY 2022-2025).

Additionally, the TIP identifies all projects by Federal funding program and by FFY.

TIP Requirements

Title 23 of the CFR, Section 450.324, indicates the TIP must cover a period of no less than four years,

be updated at least every four years, and be approved by the CIRTPA (or in the case of the State of

Iowa, the TIP will be approved by the Iowa DOT). Additionally, Section 450.324 states the TIP shall

include:

▪ Capital and non-capital surface transportation projects within the boundaries of the

metropolitan planning area proposed for funding;

▪ Contain all regionally significant projects requiring an action by the FHWA or the FTA

whether or not the projects are to be funded;

▪ All regionally significant projects proposed to be funded with Federal funds other

than those administered by FHWA or the FTA, as well as all regionally significant

projects to be funded with non-Federal funds;

▪ A financial plan that demonstrates how the approved TIP can be implemented,

indicates resources from public and private sources that are reasonably expected to

be made available to carry out the TIP, and recommends any additional financing

strategies for needed projects and programs;

9

Page 10: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

▪ A project, or a phase of a project, only if full funding can reasonably be anticipated to

be available for the project within the time period contemplated for completion of the

project; and,

▪ Sufficient descriptive material, estimated total project cost, amount of Federal funds

proposed to be obligated during each program year, and identification of the agencies

responsible for each project or phase.

Plan Consistency

Each project or project phase included in the TIP must be consistent with other CIRTPA plans,

including the Horizon Year 2040 Metropolitan Transportation Plan (HY 2040 MTP). In addition, the

CIRTPA requires consistency among the TIP and member governments’ and agencies’ capital

improvement plans. In particular, the CIRTPA requires consistency among proposed short- and long-

range projects, strategies, plans, and programs.

TIP Adoption

Adoption of the CIRPTA’s FFY 2022-2025 TIP is subject to the CIRPTA’s review and approval. The

review process consists of a public comment period that offers opportunities for review and

comment of the draft FFY 2022-2025 TIP. At the conclusion of the public review period, CIRTPA staff

reviews and summarizes all submitted comments and presents the findings to the CIRTPA

committees for consideration into the final FFY 2022-2025 TIP. The CIRTPA submits the final

(approved) FFY 2022-2025 TIP, with a copy of the formal resolution, to the Iowa DOT. The Iowa DOT

then reviews the plan to ensure compliance with Federal regulations.

Revising the TIP

Under Federal law, the CIRTPA may revise the TIP at any time under procedures agreed to by the

cooperating parties consistent with the procedures established. Revisions are changes that occur

between annual updates.

The Iowa DOT identifies two types of revisions to the TIP: major revisions (amendments) and minor

revisions (administrative modifications). The Iowa DOT considers the following criteria when

determining the type of TIP revision.

10

Page 11: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Amendments

An amendment is a major change to a project in the TIP, including the addition or deletion of a project,

a major change in project cost or project phase initiation dates, or a major change in the design

concept or scope (e.g., changing project termini or the number of through lanes). The Iowa DOT

considers amendments to the FFY 2022-2025 TIP any proposed changes that meet any of the

following criteria:

• Project cost – Projects in which the recalculated project costs increase Federal aid by

more than 30 percent or increase total Federal aid by more than $2,000,000 from the

original amount;

• Schedule changes – Projects which are added or deleted from the TIP;

• Funding sources – Adding an additional federal funding source; and,

• Scope changes – Changing the project termini, project alignment, the amount of

through traffic lanes, the type of work from an overlay to reconstruction, or the

change to include widening of the roadway.

If the Iowa DOT considers a change to the TIP to be an amendment, the CIRTPA Policy Committee

must approve the requested change and must follow the public participation process identified in the

CIRTPA’s Public Participation Plan (PPP). The PPP states the CIRTPA would schedule a public meeting

to receive public comments at the Policy Committee meeting prior to the Policy Committee taking

action on the proposed amendment. If the Policy Committee approves the amendment, the CIRTPA

would notify the Iowa DOT, the FHWA, and the FTA.

Administrative Modifications

An administrative modification is a minor change to a project in the TIP, including minor changes to

project phase costs, funding sources or previously included projects, and project or project phase

initiation dates. The Iowa DOT considers as administrative modification to the FFY 2022-2025 TIP

proposed changes that meet any of the following criteria:

• Project cost – Projects in which the recalculated project costs do not increase Federal

aid by more than 30 percent or do not increase total Federal aid by more than

$2,000,000 from the original amount;

• Schedule changes – Changes in schedules to projects which are included in the first

four years of the TIP;

11

Page 12: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

• Funding sources – Changes to funding from one source to another; and,

• Scope changes – All changes to the projects scope are amendments.

If the Iowa DOT considers a change to the TIP to be an administrative modification, the CIRTPA would

conduct a thorough review of the proposed administrative modification and would process the

revision administratively by notifying the Iowa DOT, FHWA, and FTA.

Redemonstration of Fiscal Constraint

The Iowa DOT is required to ensure that the STIP is fiscally constrained not only at the time of

approval but also throughout the fiscal year. As part of the draft STIP process the DOT adjusts its

federal aid participation to utilize all remaining federal funds after local project sponsors have

programmed their federal aid projects. Based on this approach, at the time of approval by FHWA and

FTA, no additional federal aid funds are available to be added to the STIP and maintain fiscal

constraint of the document.

To maintain fiscal constraint of the STIP document any revision to the STIP that adds a new federal

aid project or increases a project’s STIP limit will require that a corresponding change be made to

another programming entry to ensure that the STIP remains fiscally constrained. The federal aid

funds moved to make way for the additional programmed federal aid need to be of the same federal

aid program type. This requirement pertains to both administrative modifications and amendments

to the STIP and therefore also applies when moving projects up from the out years of the STIP. To

facilitate the STIP approval process a programming note should be added to both TPMS entries

noting the TPMS number of the other project.

The requirement to ensure fiscal constraint does not apply to accomplishment year projects that have

been already programmed at their full federal aid participation rate (typically 80 percent) and whose

programming entry is being adjusted based on an updated cost estimate.

CIRTPA Participation in the SWAP Program

Since the inception of the SWAP program by the Iowa DOT, whereby eligible projects can “SWAP”

funding from STBG to PRF, CIRTPA has participated in the program. CIRTPA will continue to

participate at the discretion of the Policy Committee. Any references to federal aid made within this

12

Page 13: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TIP may also apply to SWAP projects as well. This is due to the overall distribution of federal funds

to CIRTPA and SWAP funding is utilized on a project by project basis.

13

Page 14: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

CHAPTER TWO

Project Selection Procedures

The CIRTPA, when considering project requests for STBG funds, should place primary emphasis upon

region-wide transportation system improvement needs as identified in the CIRTPA’s Long-Range

Transportation Plan (Plan), with how those needs impact the movement of people and goods

throughout the regional area, and how the requested project will have potential benefits and

potential impacts on all communities in central Iowa. The CIRTPA should consider funding regionally

significant transportation projects in the Plan.

Surface Transportation Program Project Selection

The purpose of the STBG program is to provide flexible funding that may be used by localities for

improvements on any Federal-aid highway, bridge projects on any public road, and intracity and

intercity bus terminals and facilities. The STBG program is also intended to provide funding for

transit capital improvements, bicycle and pedestrian facilities, and regional transportation planning

activities.

The method for the distribution of the CIRTPA’s STBG funding occurs through a sub-allocation

process to all CIRTPA member governments with populations over 5,000 and HIRTA, the regional

transit agency. The calculations used in the CIRTPA’s STBG sub-allocation process reflect the

formulas used by the Iowa DOT in distributing STBG funds to Iowa’s regional planning affiliations

and HIRTA receives 2.2% of the overall STBG allocation. Each CIRTPA member government eligible

to receive STBG funds makes individual decisions on where to request expenditures of those

resources within their respective jurisdictions. Many CIRTPA members save their STBG allocation

for several years to build more substantial projects. However, jurisdictions can “borrow ahead” up to

4 years’ worth of allocation in order to ensure the timely expenditures of CIRTPA funding. This

process has allowed CIRTPA to keep an STBG balance at or below one years’ worth of allocations.

Before sub-allocation communities can program projects in the TIP, they are required to submit

funding requests directly to the CIRTPA Technical and Policy Committees for review and approval.

Requests include information such as the amount requested, project location, project description,

14

Page 15: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

how the goals and objectives of the LRTP are being met, and additional information that may be

relevant.

Additionally, a portion of CIRTPA’s STBG funding is made available to non-sub-allocation entities,

communities, and the Iowa DOT. Approximately 4.4% of STBG funding is made available in the

accomplishment year for the upcoming TIP. Only road and bridge projects eligible to receive STBG

may apply for funding. All eligible projects are considered and are not dependent upon approval by

any other jurisdiction. A project application period is held with a formal application process and

scoring criteria. Criteria is based upon the goals and objectives of the LRTP, however scoring is not

the sole rational for project selection. The CIRTPA Funding Subcommittee reviews projects and

makes a recommendation to the CIRTPA Technical and Policy Committees for a final decision.

Transportation Alternatives Program Project Selection

The CIRTPA follows the FHWA’s Guidance for Transportation Enhancement Activities in the

administration of the TAP project selection, which may be publicly accessed at

http://www.fhwa.dot.gov/environment/transportation_alternatives/guidance/.

Starting in FFY 2018, the Iowa DOT is responsible for reviewing TAP funding within the CIRTPA

planning area. CIRTPA will still be responsible for collecting and scoring projects using the locally

approved scoring process. CIRTPA will also make recommendations to the state as to which projects

should be funded.

CIRTPA will continue to use the established scoring process to collect, score, and recommend projects

to the Iowa DOT. The scoring process is outlined below:

1. The CIRTPA TTC’s TAP Subcommittee evaluates TAP projects using the Iowa

DOT’s scoring process:

The CIRTPA TTC and the CIRTPA TPC will be provided with the TAP

Subcommittee representative scores, an average score, and the percentage points

received for each project submitted. The CIRTPA TTC will develop a TAP

recommendation to the CIRTPA TPC that identifies projects that the CIRTPA TTC

15

Page 16: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

recommends for inclusion in the draft CIRTPA TIP. The final projects selected for

inclusion in the draft CIRTPA TIP will be determined by the CIRTPA TPC.

2. The CIRTPA and its staff will continue to work with the Iowa DOT and other MPOs

and RPAs in the state to refine the TAP application and implementation process.

3. Representation on the TAP Subcommittee will be updated annually prior to the

solicitation of the TAP applications. The TAP Subcommittee will have one

representative from each county not applying for that year. Additionally,

communities outside of the CIRTPA planning area and organizations related to

TAP funded projects will have some representation on the subcommittee

The scoring criterion for TAP projects is located in Appendix C.

Highway Bridge Program Project Selection

The primary factor in Highway Bridge Program project selection is condition. Counties annually

review the results from the bridge inspections and make funding decisions based on these reports.

Other factors that are considered include traffic counts, freight movement, and detour lengths. For

example, a bridge posted for weight limits that is on an important freight and farm goods route

might be replaced before other bridge that are in worse condition but don’t have a significant

impact on traffic movements.

16

Page 17: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

CHAPTER THREE

Funding Programs The following chapter summarized the various funding program available for projects in the

CIRPTA’s planning area.

Surface Transportation Block Grant Program (STBG)

The purpose of the STBG is to provide flexible funding that may be used by localities for

improvements on any Federal-aid highway, bridge projects on any public road, and intracity and

intercity bus terminals and facilities. The STBG is also intended to provide funding for transit capital

improvements, bicycle and pedestrian facilities, and regional transportation planning activities. The

CIRTPA is allocated approximately $5 million per year in STBG funding.

Transportation Alternatives Program Setaside (TAP) The purpose of the TAP is to provide funding for programs and projects defined as transportation

alternatives, including on- and off-road pedestrian and bicycle facilities, infrastructure projects for

improving non-driver access to public transportation and enhanced mobility, community

improvement activities, and environmental mitigation; recreational trail program projects; safe

routes to school projects; and projects for the planning, design or construction of boulevards and

other roadways largely in the right-of-way of former Interstate System routes or other divided

highways.

The CIRTPA groups activities into categories as follows:

Bicycle/Pedestrian Facilities: Provision of on-street and off-street facilities for

pedestrians and bicycles and the conversion and use of abandoned railway corridors.

New Construction subcategory is for projects creating a new facility, whereas the

Major Reconstruction subcategory is for projects that result in a major rehabilitation

of an existing facility.

17

Page 18: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Historic Preservation: Historic preservation and rehabilitation of historic

transportation facilities.

Streetscape: Improvements to pedestrian facilities along a transportation corridor;

sidewalks, lighting, safety-related infrastructure, signalization, and, traffic calming.

Environmental: Control and removal of outdoor advertising; address storm water

management, control, and water pollution due to highway runoff or reduce vehicle-

caused wildlife mortality while maintaining habitat connectivity; vegetation

management practices in transportation rights-of-way to improve roadway safety,

prevent against invasive species, and provide erosion control.

Safe Routes to Schools: Infrastructure related projects.-planning, design, and

construction of infrastructure-related projects in the vicinity of schools that will

substantially improve the ability of students to walk and bicycle to school. Non-

infrastructure related activities to encourage walking and bicycling to school.

The list of activities is intended to be illustrative, not exclusive. Measures in the activities listed, which

go beyond what is customarily provided as environmental mitigation, are considered as

Transportation Alternatives Programs. TAP projects are non-motorized transportation-related

activities.

Transportation Alternative Program projects must have a relationship to surface transportation.

Proximity to a roadway or transportation facility alone is not sufficient to establish a relationship to

surface transportation. Project sponsors should provide a clear and credible description of this

relationship in their project’s proposal. The focus is on a clear and credible description of how the

proposed TAP project relates to the surface transportation system. Several questions should be

asked:

1. In what way(s) is the project related to surface transportation through

present or past use as a transportation resource?

2. Is there a direct connection to a person or event nationally significant in the

development of surface transportation?

18

Page 19: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

3. What is the extent of the relationship(s) to surface transportation?

4. What groups and individuals are affected by the relationship(s)?

5. When did the relationship(s) start and end or does the relationship(s)

continue?

6. Is a relationship substantial enough to justify the investment of

transportation funds?

The TAP guidance states that proximity to a transportation facility alone is not sufficient to establish

a relationship. The following application types generally have been considered ineligible by the

FHWA, in cooperation with the Iowa DOT:

1. Surfacing or resurfacing of existing roads or construction of new roads;

2. Construction or surfacing of parking lots (unless trailhead parking lot);

3. Construction of low water crossings on roads;

4. Picnic shelters, picnic tables, grills (unless directly related to a trailhead);

5. Construction of new buildings (unless they are rest rooms or trailhead

shelters in conjunction with trails that will accommodate bikes or

pedestrians);

6. Mitigation or National Environmental Policy Act Section 106 documentation

of a bridge replacement;

7. Applications without a public sponsor (city, State, or county agency);

8. Historic applications where the facility or structure is not eligible for the

National Register of Historic Places (please review with the State Historic

Preservation Office);

9. Historic preservation activities that do not demonstrate some significant

historic connection with transportation system; and,

10. Normal environmental mitigation work.

Federal Funding Programs

Some FHWA funds are distributed by statutory formulas, while other funds are “discretionary”

(congressionally earmarked). The primary sources of FHWA formula funding to Iowa include:

Congestion Mitigation and Air Quality Improvement Program (CMAQ): CMAQ

provides flexible funding for transportation projects and programs tasked with helping

to meet the requirements of the Clean Air Act. These projects can include those that

reduce congestion and improve air quality.

19

Page 20: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Demonstration Funding (DEMO): Demonstration funding is a combination of

different programs and sources. The FHWA administers discretionary programs

through various offices representing special funding categories. An appropriation bill

provides money to a discretionary program, through special congressionally directed

appropriations or through legislative acts, such as the American Recovery and

Reinvestment Act of 2009 (ARRA).

Highway Safety Improvement Program (HSIP): This is a core federal‐aid program

that funds projects with the goal of achieving a significant reduction in traffic fatalities

and serious injuries on public roads. A portion of this funding is targeted for use on local

high‐risk rural roads and railway‐highway crossings.

Metropolitan Planning Program (PL): FHWA provides funding for this program to

the State of Iowa based on urbanized area population. The funds are dedicated to

support transportation planning projects in urbanized areas with more than 50,000

persons.

National Highway Performance Program (NHPP): NHPP funds are available to be

used on projects that improve the condition and performance of the National Highway

System (NHS), including some state and U.S. highways and interstates.

State Planning and Research (SPR): SPR funds are available to funds statewide

planning and research activities. A portion of SPR funds are provided to RPAs to support

transportation planning efforts.

Surface Transportation Block Grant Program (STBG): This program is designed to

address specific issues identified by Congress and provides flexible funding for projects

to preserve or improve the condition/performance of transportation facilities, including

any federal‐aid highway or public road bridge. STBG funding may be utilized on:

‐Roadway projects on federal‐aid routes

‐Bridge projects on any public road

‐Transit capital improvements

‐TAP eligible activities

‐Planning activities

Iowa targets STBG funding to each of its 27 MPOs and RPAs on an annual basis for

programming based on regional priorities. Iowa has implemented a Swap program that

20

Page 21: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

allows MPOs and RPAs, at their discretion, to swap targeted federal STBG funding for

state Primary Road Fund dollars.

Iowa also targets a portion of its STBG funding directly to counties for use on county

bridge projects. Iowa’s swap program allows counties, at their discretion, to swap

federal STBG funding for state Primary Road Fund dollars. These funds can be used on

either on‐system or off‐system bridges however off‐system bridge investments must be

continued to maintain the ability to transfer the federal STBG set‐aside for off system

bridges.

Transportation Alternatives Setaside Program (TAP): This program is a

setaside from the STBG program. The TAP program provides funding to expand travel

choices and improve the transportation experience. Transportation Alternatives

Program projects improve the cultural, historic, aesthetic, and environmental aspects of

transportation infrastructure. Projects can include creation of bicycle and pedestrian

facilities, and the restoration of historic transportation facilities, among others. It is

important to note that some types of projects eligible under the SAFETEA‐LU program

Transportation Enhancements are no longer eligible, or have modified eligibility, under

the TAP. All projects programmed with TAP funds should be verified to ensure

compatibility with TAP eligibility.

Federal Lands Access Program (FLAP) and Tribal Transportation Program

(TTP): The FLAP Program provides funding for projects that improve access within,

and to, federal lands. The FLAP funding will be distributed through a grant process

where a group of FHWA, Iowa DOT, and local government representatives will solicit,

rank, and select projects to receive funding. The TTP provides safe and adequate

transportation and public road access to and within Indian reservations and Indian

lands. Funds are distributed based on a statutory formula based on tribal population,

road mileage, and average tribal shares of the former Tribal Transportation Allocation

Methodology.

National Highway Freight Program (NHFP): NHFP funds are distributed to states

via a formula process and are targeted towards transportation projects that benefit

freight movements. Ten percent of NHFP funds will be targeted towards non DOT

sponsored projects.

21

Page 22: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

State Funding Programs

In addition to the distribution of Federal-aid formula funds, the Iowa Department of Transportation

administers several grant programs through application processes that need to be documented in

the TIP. They include the following:

City Bridge Program: portion of STBG funding dedicated to local bridge projects is set

aside for the funding of bridge projects within cities. Eligible projects need to be

classified as structurally deficient or functionally obsolete. Projects are rated and

prioritized by the Office of Local Systems with awards based upon criteria identified in

the application process. Projects awarded grant funding are subject to a federal‐aid

obligation limitation of $1 million.

Iowa has implemented a Swap program that allows cities, at their discretion, to swap

federal STBG funding for state Primary Road fund dollars.

Highway Safety Improvement Program – Secondary (HSIP-Secondary): This

program is funded using a portion of Iowa’s Highway Safety Improvement Program

apportionment and funds safety projects on rural roadways. Funding targeted towards

these local projects is eligible to be swapped for Primary Road Fund dollars.

Iowa Clean Air Attainment Program (ICAAP): The ICAAP funds projects that are

intended to maximize emission reductions through traffic flow improvements, reduced

vehicle‐miles of travel, and reduced single‐occupancy vehicle trips. This program

utilizes $4 million of Iowa’s CMAQ apportionment. Funding targeted towards these local

projects is eligible to be swapped for Primary Road Fund dollars.

Recreational Trail Program: This program provides federal funding for both

motorized and nonmotorized trail projects and is funded through a takedown from

Iowa’s TAP funding. The decision to participate in this program is made annually by the

Iowa Transportation Commission.

Iowa’s Transportation Alternatives Program: This program targets STBG funding

to MPOs and RPAs to award to locally sponsored projects that expand travel

choices and improve the motorized and nonmotized transportation experience.

22

Page 23: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Transit Funding Programs

Similar to the FHWA programs, the transit funding authorized by the FAST Act is managed in several

ways. The largest amount is distributed to the states or to large metropolitan areas by formula. Other

program funds are discretionary, and some are earmarked for specific projects. Program funds

include the following:

Metropolitan Transportation Planning program (Section 5303 and 5305): FTA

provides funding for this program to the state based on its urbanized area populations.

The funds are dedicated to support transportation planning projects in urbanized areas

with more than 50,000 persons.

Statewide Transportation Planning Program (Section 5304 and 5305): These

funds come to the state based on population and are used to support transportation

planning projects in non-urbanized areas. They are combined with the Section 5311

funds and allocated among Iowa’s RPAs.

Urbanized Area Formula Grants program (Section 5307): FTA provides transit

operating, planning, and capital assistance funds directly to local recipients in urbanized

areas with populations between 50,000 and 200,000. Assistance amounts are based on

population and density figures and transit performance factors for larger areas. Local

recipients must apply directly to the FTA.

Bus and Bus Facilities Program (Section 5339): This formula program provided

federal assistance for major capital needs, such as fleet replacement and construction of

transit facilities. All transit systems in the state are eligible for this program.

Enhanced Mobility of Seniors and Individuals with Disabilities Program (Section

5310): Funding is provided through this program to increase the mobility for the elderly

and persons with disabilities. Part of the funding is administered along with the Non-

Urbanized funding with the remaining funds allocated among urbanized transit systems

in areas with a population of less than 200,000. Urbanized areas with more than 200,000

in population receive a direct allocation.

Non-Urbanized Area Formula Program (Section 5311): This program provides

capital and operating assistance for rural and small urban transit systems. Fifteen

percent of these funds are allocated to Intercity Bus projects. A portion of the funding is

also allocated to support rural transit planning. The remaining funds are combined with

23

Page 24: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

the rural portion (30 percent) of Section 5310 funds and allocated among regional and

small urban transit systems based on their relative performance in the prior years.

Rural Transit Assistance Program (RTAP - Section 5311(b)(3)): This funding is also

used for statewide training events and to support transit funding fellowships for

regional and small urban transit staff or planners.

TAP Flexible Funds: Certain Title 23 funds may be used for transit purposes. Transit

capital assistance is an eligible use of STBG funds. Transit capital and start-up operating

assistance is an eligible use of ICAAP funds. When ICAAP and STBG funds are

programmed for transit projects, they are transferred to the FTA. The ICAAP funds are

applied for and administered by the Office of Public Transit. STBG funds for small urban

and regional transit systems are also administered by the Office of Public Transit.

State Transit Assistance (STA): All public transit systems are eligible for funding.

These funds can be used by the public transit system for operating, capital, or planning

expenses related to the provision of open-to-the-public passenger transportation. The

majority of the funds received in a fiscal year are distributed to individual transit

systems are the basis of a formula using performance statistics from the most recent

available year.

o STA Special Projects: Each year up to $300,000 of the total STA funds are set

aside to fund “special projects.” These can include grants to individual systems

to support transit services that are developed in conjunction with human

services agencies. Grants can also be awarded to statewide projects that improve

public transit in Iowa through such means as technical training for transit

system or planning agency personnel, statewide marketing campaigns, etc. This

funding is also used to mirror the RTAP to support individual transit training

fellowships for large urban transit staff or planners.

▪ STA Coordination Special Projects: Funds provide assistance with

startup of new services that have been identified as needs by health,

employment, or human services agencies participating in the passenger

transportation planning process.

Public Transit Infrastructure Grant Fund: This is a state program that can fund transit

facility projects that involve new construction, reconstruction, or remodeling. To

qualify, projects must include a vertical component.

24

Page 25: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

FHWA Funding Transferred to FTA

STBG funds designated for transit investments are required to be transferred from FHWA to FTA for

administration. These projects must be programmed in the highway (FHWA) and transit (FTA)

section of the TIP in the FFY they are to be transferred. The process is initiated with a letter from the

RPA/MPO to the Iowa DOT’s Office of Program Management and to the Office of Public Transit

requesting the transfer of funds. The Office of Program Management will then review the request and

submit it to FHWA for processing.

STBG funds used for planning efforts require projects to be included in the CIRTPA’s Unified Planning

Work Program and TIP. Funds will be transferred to a Consolidated Planning Grant by request of the

Office of Systems Planning.

Finally, transit projects receiving awards through the ICAAP also require a transfer of funds. The

process for these types of transfers is the same as transferring STBG funds for transit investments,

except that no letter from the RPA/MPO requesting the transfer is required.

25

Page 26: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

CHAPTER FOUR

Federal Fiscal Year 2021 Status Reports

The following are status reports of all Federal-aid projects programmed to utilize FHWA or FTA funds

in FFY 2021. The status of projects may include a notice of receiving Federal authorization, letting,

canceling, rolling over, or scheduled letting before October 1, 2020.

TABLE 4.1 Boone County

Fund Category Project Number Location/Description TPMS Status

SWAP-HBP BROS-SWAP-C008(83)--SE-08 On QW LN, Over BIKE TRAIL, S35 T82 R26 35886 Let April

2021

ICAAP-SWAP ICAAP-SWAP-C008()--FH-08 On R AVE, S23 T84 R26 45465 Let FFY 2021

SWAP-STBG STBG-SWAP-C008(85)--FG-08 On Lower Ledges Rd and E-52, from Lower Ledges Easterly 4.2 Miles to Hwy 17

23591 Let

January 2021

TAP TAP-R-C008(086)--8T-08 High Trestle to Swede Point Park Trail, Division 1A 39404 Rolled to FFY 2022

TABLE 4.2 Dallas County

Fund Category Project Number Location/Description TPMS Status

CHBP BROSCHBP-C025(115)--NC-25 On 250TH ST, Over Walnut Creek, On the south line of S2, T79, R26, Walnut Township

36285 Letting

September 2021

SWAP-HBP BROS-SWAP-C025(120)--FE-25

On Pioneer Avenue, Over Slough Creek, S27 T81 R27, Beaver Township

24907 Rolled to FFY

2024

STBG-HBP BROS-C025(113)--8J-25 On 170th St, Over Slough Creek, S27 T81 R27 32547 Letting

October 2021

STBG-TAP TAP-R-C025(117)--8T-25 RRVT Bridge Improvements Phase 3 - Bridge D 39399 Rolled to FFY

2022

STBG-TAP TAP-R-C025(123)--8T-25 RRVT Bridge Improvements Phase 2 - Bridge S Over MOSQUITO CREEK, S34 T79 R29

45520 Rolled to FFY

2022

26

Page 27: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

RTP NRT-C025(116)--9G-25 On 130th Street, approx. 1,700 ft West of M Avenue to M Avenue

45471 Let April

2021

TABLE 4.3 City of Huxley

Fund Category Project Number Location/Description TPMS Status

SWAP-STBG STBG-SWAP-3630(606)--SG-85

In the city of Huxley, East 1st Street Rec Phase 1- From approx. 240' east of Parkridge Ave east approx. 650'

39410 Let March

2021

SWAP-STBG STBG-SWAP-3630(607)--SG-85

In the City of Huxley, on East 1st Street from approx. 100 feet east of Hwy 69 to approx. 240 feet east of Parkridge Ave

45469 Let March

2021

TABLE 4.4 Iowa Department of Transportation

Fund Category Project Number Location/Description TPMS Status

PRF IMN-80()--0E-50 I-80: SOUTH SKUNK RIVER 2.5 MI W OF IA 117 (EB & WB)

38097 Let February

2021

PRF NHSN-14()--2R-63 IA14: 0.6 MI S OF CO RD G18 39296 Let January

2021

PRF IMN-35()--0E-85 I-35: SE RAMP OF THE US 30 INTERCHANGE 39359 Let

December 2020

PRF BRFN-117()--39-50 IA117: STREAM 0.5 MI S OF CO RD F24 37956 Let

November 2020

STBG STP-IA17()--2C-08 IA17: 0.5 MI N OF US 30 TO 3.0 MI N (STATE SHARE) 38272 Let January

2021

PRF BRFN-5()--39-91 IA5: MIDDLE RIVER 1.5 MI S OF CO RD G16 (NB & SB) 38036 Let

November 2020

PRF NHSN-30()--2R-8 US30: 1.8 MI W OF DES MOINES RIVER TO W OF SNEDDEN DR (VAR LOC)

39175 Let

September 2020

PRF IMN-80()--0E-25 I-80: US 6 / US 169 INTERCHANGE 45446 Let January

2021

PRF IMN-80()--0E-25 I-80: S RACCOON RIVER AND N RACCOON RIVER E

OF US 169 (EB & WB) 45255 Let July 2020

NHPP IMX-80()--02-50 I-80: 0.9 MI E OF IA 224 TO 1.0 MI W OF IA 146 (EB & WB)

38096 Let

December 2020

STBG STP-65()--2C-85 US65: 0.5 MI S OF US 30 TO IA 175 IN HUBBARD 45415 December

2020

PRF IMN-80()--0E-50 I-80: WEIGH STATION 1.8 MI E OF MITCHELLVILLE 45426 Letting June

2021

PRF IMN-80()--0E-25 I-80: WEIGH STATION 2.0 MI E OF VAN METER 45425 Letting June

2021

27

Page 28: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Fund Category Project Number Location/Description TPMS Status

PRF IMN-35()--0E-85 I-35: SB REST AREA LAGOON 45272 Let July 2021

PRF STPN-69()--2J-91 US69: 120TH AVE 0.75 MI N OF CO RD G64 45243 Completed June 2020

NHPP IM-NHS-35()--03-91 I-35: N OF NORTH RIVER TO S OF BADGER CREEK (SB)

38156 Let

November 2020

NHPP IM-080-3()--13-25 I-80: US 6/169 IN DE SOTO TO CO RD R16 38066 ?

TABLE 4.5 Jasper County

Fund Category Project Number Location/Description TPMS Status

CHBP BRS-CHBP-C050(129)--GB-50 On F-24, Over Clear Creek, S2 T80 R21 15532 Let August

2021

SWAP-HBP BRS-SWAP-C050(128)--FF-50 On T38, Over SUGAR CREEK, S13 T80 R17 37403 Let August

2021

DEMO NRT-C050(123)--9G-50 From NSNWR entrance road to S 80th Avenue W and from Red Rock Park in Monroe to Jasper Street and IA 163 interchange

38330 Letting

September 2021

TABLE 4.6 City of Knoxville

Fund Category Project Number Location/Description TPMS Status

SWAP-STBP STBG-SWAP-4040(612)--SG-63 In the city of Knoxville, On Park Lane Dr, Larson St, Rock Island St, 2nd St, and Roche St

39160 Let

February 2021

TABLE 4.7 Madison County

Fund Category Project Number Location/Description TPMS Status

SWAP-HBP BROS-SWAP-C061()--FE-61 On R35 (10th Ave.), Over BRANCH BADGER CREEK, at S31 T77 R25

37672 Let 2021

SWAP-HBP BROS-SWAP-C061(116)--SE-61

On VALLEYVIEW AVE., Over DRAINAGE, S10 T75 R26

35066 Let

September 2020

SWAP-HBP BHS-SWAP-C061()--FC-61 On R21 (PERU RD), Over CLANTON CREEK, at NW S12 T74 R27

37566 Roll to FFY

2022

SWAP-HBP BRS-SWAP-C061(115)--FF-61 On R35 (BEV. PARK RD.), Over CLANTON CREEK, S12 T75 R26

37567 Letting

October 2021

28

Page 29: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

STBG-HBP BROS-C061(119)--5F-61 On Settlers Ave., Over STREAM, at SE S36 T77N R27W

38665 Let April

2021

CHBP BROSCHBP-C061(124)--NC-61 On HOGBACK BRIDGE RD, Over DRAINAGE, at S1/4 S23 T76 R28

37548 Letting

September 2021

CHBP BRS-CHBP-C061(125)--GB-61 On CLARK TOWER RD., Over North Fork Clanton Creek, S12 T74 R28

14749 Letting July

2021

TABLE 4.8 Marion County

Fund Category Project Number Location/Description TPMS Status

SWAP-STBG STBG-SWAP-C063(137)--FG-63 On T14, from Pella Corp. Limit to Jasper Co. Line S15 T77 R18

34906 Let January

2021

SWAP-HBP BRS-SWAP-C063(136)--FF-63 On G 62, Over WALNUT CREEK, S28 T75 R18 44728 Let

November 2020

TABLE 4.9 Polk County

Fund Category Project Number Location/Description TPMS Status

SWAP-HBP BROS-SWAP-C077(231)--SE-77 On NW 134 Ave 0.20 Mi E of NW 2nd St 38596 Let

February 2021

SWAP-STBG STBG-SWAP-C077(230)--FG-77 On NE 112 St/Camp Dr/SE 116 St, from Hwy 163 to E CL of Runnells

34601 Let

February 2021

TABLE 4.10 RPA-11

Fund Category Project Number Location/Description TPMS Status

STBG RGPL-PA11()--ST-00 HIRTA: Vehicle Purchase 36937 FHWA

Authorized

STBG STP-PA11()--2C-00 Pavement Data Collection Opt In 45521 FHWA

Authorized

29

Page 30: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 4.11 City of Story City

Fund Category Project Number Location/Description TPMS Status

SWAP-STBG STBG-SWAP-7430(616)--SG-85 In the City of Story City, on Broad Street from Lafayette to Grand

45470 Let May

2021

TABLE 4.12 Story County

Fund Category Project Number Location/Description TPMS Status

CHBP BRS-CHBP-C085(155)--GB-85 On E18, Over East Indian Creek, on NLINE S19 T85 R22

29272 Let

November 2020

TABLE 4.13 Warren County

Fund Category Project Number Location/Description TPMS Status

CHBP BROSCHBP-C091(132)--GA-91 On R35 (10TH AVE), Over BRANCH BADGER CREEK, S31 T77 R25

32785 Let

November 2020

CHBP BRS-CHBP-C091(133)--GB-91 On S23, Over COTTON CREEK, S27 T74 R22 32798 Letting July

2021

CHBP BROSCHBP-C091(134)--NC-91 On IDAHO ST, Over BRANCH MIDDLE RIVER, from 50TH AVE 0.3 miles S15 T76 R25

24850 Letting July

2021

CHBP BRS-CHBP-C091(133)--GB-91 On S23, Over MILL CREEK, S27 T74 R22 32798 Letting July

2021

TABLE 4.14 City of Winterset

Fund Category Project Number Location/Description TPMS Status

SWAP-STBG STBG-SWAP-8497(603)--SG-61 In the city of Winterset, 10th Street Reconstruction, from Iowa 92 and Benton Street.

36920 Let

January 2021

TABLE 4.15 City of Zearing

Fund Category Project Number Location/Description TPMS Status

SWAP-HBP BROS-SWAP-8612(602)--SE-85 On S PEARL ST, Over MIDDLE MINERVA CREEK, S21 T85 R21

45461 Let March

2021

30

Page 31: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

CHAPTER FIVE

Federal Highway Administration Projects

The first FFY in the FFY 2022-2025 TIP is referred to as the Annual Element. Projects for the entire

four years (FFY 2022-2025) are listed together by funding program and in order of FFY. The CIRTPA’s

program for FFY 2022-2025 contains 104 projects with a total cost of approximately $257,393,170.

Of the 104 projects in the CIRTPA’s program, 96 projects totaling $252,594,820 are roadway

transportation improvements. Eight projects totaling $3,861,000 are bicycle and pedestrian

improvements.

Program Format

The project listing is organized by TIP funding program. The sponsor name, project number, project

location, project description, project funding, programmed amounts in $1,000s by year, and

Transportation Program Management System (TPMS) identification number are shown for each

project within the different TIP funding categories. The TPMS identification number is a unique

number given to each project included in the CIRTPA’s TIP.

Projects are listed in alphabetical order by county, then by city. Project funding amounts are listed

by year and are listed in $1,000s. Project Total refers to the total cost of the project. Federal Aid refers

to the amount of Federal-aid the project has received. Regional FA (Federal-aid) refers to the amount

of Federal-aid received from the CIRTPA (i.e., STBG and TAP funds). SWAP refers to the amount of

swapped Federal-aid funding received by project.

31

Page 32: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

5/29/2021

2022 Statewide Transportation Improvement Program

32

Page 33: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

RPA 11CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36285

Dallas County

BROSCHBP-C025(115)--NC-25

On 250TH ST, Over Walnut Creek, On the south line of S2,T79, R26, Walnut Township

Bridge Replacement

Submitted

9/21/2021

TotalFederal Aid

RegionalSwap

$511,000$245,790

$245,790

$265,210

$511,000$245,790

$245,790$265,210

37403

Jasper County

BRS-CHBP-C050(128)--GB-50

On T38, Over SUGAR CREEK, S13 T80 R17

Bridge Replacement

Submitted

8/17/2021

TotalFederal Aid

RegionalSwap

$450,000$245,790

$204,210

$450,000$245,790

$204,21015532

Jasper County

BRS-CHBP-C050(129)--GB-50

On F-24, Over Clear Creek, S2 T80 R21

Bridge Replacement

Submitted

8/17/2021

TotalFederal Aid

RegionalSwap

$750,000$409,650

$340,350

$750,000$409,650

$340,350

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48551

Iowa Department ofTransportation

HSIPX-69()--3L-85

US69: CO RD E57 INTERSECTION

Pavement Widening

Submitted TotalFederal Aid

RegionalSwap

$400,000$360,000

$400,000$360,000

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48393

Jasper CountyConservation Board

ILL-C050()--94-50

From Commerce Drive in Prairie City to NE 116th Streetnear Mitchellville

Ped/Bike Grade & Pave

Submitted TotalFederal Aid

RegionalSwap

$1,800,000$300,000

$1,800,000$300,000

33

Page 34: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37885

Iowa Department ofTransportation

BRF-210()--38-8

IA210: DES MOINES RIVER 0.3 MI E OF CO RD E62

Bridge Rehabilitation

Submitted TotalFederal Aid

RegionalSwap

$3,500,000$2,800,000

$3,500,000$2,800,000

38066

Iowa Department ofTransportation

IM-80()--13-25

I-80: US 6/169 IN DE SOTO TO CO RD R16

Grade and Pave, Pave, Bridge Replacement

Submitted TotalFederal Aid

RegionalSwap

$18,037,000$16,233,300

$10,221,000$9,198,900

$24,445,000$22,000,500

$239,000$215,100

$52,942,000$47,647,800

38150

Iowa Department ofTransportation

IM-NHS-80()--03-50

I-80: NORTH SKUNK RIVER 2.1 MI E OF IA 224

Grade and Pave, Bridge Replacement, Erosion Control

Submitted TotalFederal Aid

RegionalSwap

$11,558,000$9,824,300

$377,000$320,450

$11,935,000$10,144,750

45390

Iowa Department ofTransportation

IMX-80()--02-50

I-80: 2.6 MI E OF CO RD S27 TO 0.8 MI E OF IA 14 (EB)

Submitted TotalFederal Aid

RegionalSwap

$1,700,000$1,530,000

$1,700,000$1,530,000

45388

Iowa Department ofTransportation

IMX-80()--02-50

I-80: 2.6 MI E OF CO RD S27 TO 1.3 MI E OF CO RD T14(WB)

Submitted TotalFederal Aid

RegionalSwap

$2,100,000$1,890,000

$2,100,000$1,890,000

48620

Iowa Department ofTransportation

NHSX-169()--3H-25

US169: S OF N RACCOON RIVER OVERFLOW TO IA 44

Pavement Widening, Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$3,753,000$3,002,400

$3,753,000$3,002,400

48501

Iowa Department ofTransportation

NHSX-30()--3H-8

US30: 0.5 MI E OF IA 17 TO 230TH ST

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$1,351,000$1,080,800

$1,351,000$1,080,800

39357

Iowa Department ofTransportation

NHSX-30()--3H-85

US30: CO RD S14 IN NEVADA

Grade and Pave, Bridge New, Traffic Signs

Submitted TotalFederal Aid

RegionalSwap

$6,000$4,800

$5,958,000$4,766,400

$5,964,000$4,771,200

48418

Iowa Department ofTransportation

BRF-5()--38-91

IA5: SOUTH RIVER 0.2 MI N OF CO RD S31 (NB)

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$10,000$8,000

$3,807,000$3,045,600

$3,817,000$3,053,600

34

Page 35: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39367

Iowa Department ofTransportation

IM-NHS-35()--03-91

I-35: N OF IA 92 TO S OF NORTH RIVER (SB)

Grade and Pave, Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$16,553,000$14,070,050

$16,553,000$14,070,050

38248

Iowa Department ofTransportation

NHSX-30()--3H-85

US30: 0.5 MI E OF I-35 TO E OF 590TH AVE

Pave, Grading, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$16,572,000$13,257,600

$11,412,000$9,129,600

$358,000$286,400

$28,342,000$22,673,600

45366

Iowa Department ofTransportation

BRF-14()--38-63

IA14: BRUSH CREEK 0.2 MI S OF CO RD G28

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$4,019,000$3,215,200

$4,019,000$3,215,200

45361

Iowa Department ofTransportation

BRF-65()--38-91

US65: OTTER CREEK 1.6 MI S OF CO RD G58

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$2,524,000$2,019,200

$2,524,000$2,019,200

45386

Iowa Department ofTransportation

BRF-69()--38-85

US69: WALNUT CREEK 0.2 MI N OF CO RD E57

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$2,110,000$1,688,000

$2,110,000$1,688,000

48604

Iowa Department ofTransportation

BRF-14()--38-63

IA14: DES MOINES RIVER 1.2 MI N OF CO RD G40

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$8,860,000$7,088,000

$8,860,000$7,088,000

48634

Iowa Department ofTransportation

BRF-30()--38-85

US30: SOUTH SKUNK RIVER 1.2 MI W OF I-35 (EB & WB)

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$13,025,000$10,420,000

$13,025,000$10,420,000

35

Page 36: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37957

Iowa Department ofTransportation

BRFN-117()--39-50

IA117: SQUAW CREEK 1.7 MI N OF CO RD S6G

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$469,000 $469,000

37975

Iowa Department ofTransportation

BRFN-169()--39-61

US169: NORTH RIVER 3.5 MI N OF N JCT IA 92

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$329,000 $329,000

37955

Iowa Department ofTransportation

BRFN-6()--39-50

US6: DITCH 0.2 MI E OF CO RD T12

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$614,000 $614,000

38006

Iowa Department ofTransportation

BRFN-65()--39-77

US65: SKUNK RIVER 7.6 MI N OF I-80 (NB)

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$427,000 $427,000

38141

Iowa Department ofTransportation

IMN-35()--0E-91

I-35: CO RD G64 INTERCHANGE

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$415,000 $415,000

38142

Iowa Department ofTransportation

IMN-35()--0E-91

I-35: CO RD G50 INTERCHANGE 4.7 MI S OF IA 92

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$383,000 $383,000

45392

Iowa Department ofTransportation

IMN-80()--0E-50

I-80: CO RD T14 AND IA 224 INTERCHANGE RAMPS

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$1,600,000 $1,600,000

48558

Iowa Department ofTransportation

NHSN-163()--2R-63

IA163: 198TH AVE INTERSECTION

Pave

Submitted TotalFederal Aid

RegionalSwap

$154,000 $154,000

38185

Iowa Department ofTransportation

NHSN-6()--2R-25

US6: S OF 302ND PL TO GREENWOOD HILLS DR INADEL (STATE SHARE)

Pavement Rehab/Widen

Submitted TotalFederal Aid

RegionalSwap

$1,092,000 $1,092,000

36

Page 37: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48542

Iowa Department ofTransportation

NHSN-6()--2R-50

US6: 0.5 MI N OF I-80 IN NEWTON

Grading

Submitted TotalFederal Aid

RegionalSwap

$55,000 $55,000

48560

Iowa Department ofTransportation

STPN-117()--2J-50

IA117: SOUTH SKUNK RIVER NORTH 1000 FT

Ditch Improvement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$452,000 $452,000

48544

Iowa Department ofTransportation

STPN-6()--2J-50

US6: 0.6 MI W OF POWESHIEK CO

Grading

Submitted TotalFederal Aid

RegionalSwap

$40,000 $40,000

48545

Iowa Department ofTransportation

STPN-6()--2J-50

US6: 0.7 MI W OF IA 224

Grading

Submitted TotalFederal Aid

RegionalSwap

$56,000 $56,000

39265

Iowa Department ofTransportation

BRFN-14()--39-50

IA14: ALLOWAY CREEK 1.6 MI S OF IA 224

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$2,468,000 $2,468,000

39294

Iowa Department ofTransportation

BRFN-5()--39-63

IA5: S JCT IA 92

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$1,674,000 $1,674,000

39368

Iowa Department ofTransportation

BRFN-5()--39-91

IA5: COAL CREEK 0.8 MI N OF IA 316 (NB)

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$670,000 $670,000

48476

Iowa Department ofTransportation

IMN-80()--0E-50

I-80: 0.5 MI E OF CO RD T14 (SPEEDWAY DR) TO 0.5 MIE OF IA 224

Submitted TotalFederal Aid

RegionalSwap

$1,500,000 $1,500,000

38180

Iowa Department ofTransportation

NHSN-30()--2R-8

US30: CO RD R18 INTERSECTION

Grade and Pave, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$2,013,000 $2,013,000

37

Page 38: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45431

Iowa Department ofTransportation

BRFN-92()--39-63

IA92: OLD HIGHWAY 92 3.9 MI E OF E JCT IA 5

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$1,111,000 $1,111,000

45309

Iowa Department ofTransportation

IMN-80()--0E-50

I-80: CHERRY CREEK 1.2 MI W OF IA 14 (EB & WB)

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$727,000 $727,000

45344

Iowa Department ofTransportation

NHSN-169()--2R-25

US169: S OF N RACCOON RIVER 1.4 MI N OF US 6

Culvert Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$46,000 $46,000

48466

Iowa Department ofTransportation

BRFN-316()--39-63

IA316: NS AND BNSF RR 2.5 MI N OF IA 5

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$640,000 $640,000

48411

Iowa Department ofTransportation

BRFN-5()--39-63

IA5: WALNUT CREEK 0.9 MI N OF CO RD G76

Bridge Replacement, Right of Way

Submitted TotalFederal Aid

RegionalSwap

$1,413,000 $1,413,000

48463

Iowa Department ofTransportation

BRFN-5()--39-63

IA5: WHITE BREAST CREEK 2.7 MI N OF IA 14 (NB)

Bridge Deck Overlay

Submitted TotalFederal Aid

RegionalSwap

$1,140,000 $1,140,000

38

Page 39: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36937

RPA 11

RGPL-PA11()--ST-00

HIRTA: Vehicle Purchase

Transit Investments

Submitted TotalFederal Aid

RegionalSwap

$144,775$115,820

$115,820

$124,795$99,836

$99,836

$269,570$215,656

$215,656

48479

Iowa Department ofTransportation

STP-117()--2C-50

IA117: N OF E 2ND ST IN PRAIRIE CITY TO CO RD F48IN COLFAX

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$2,500,000$2,000,000

$2,500,000$2,000,000

38272

Iowa Department ofTransportation

STP-17()--2C-8

IA17: 0.5 MI N OF US 30 TO 3.0 MI N (STATE SHARE)

Pave, Erosion Control, Traffic Signs

Submitted TotalFederal Aid

RegionalSwap

$4,955,000$3,964,000

$200,000$160,000

$5,155,000$4,124,000

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

32547

Dallas County

BROS-C025(113)--8J-25

On 170th St, Over Slough Creek, on the south line of S27T81 R27, Beaver Township

Bridge Replacement

Submitted

10/19/2021

TotalFederal Aid

RegionalSwap

$300,000$240,000

$300,000$240,000

39

Page 40: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39404

Boone CountyConservation Board

TAP-R-C008(086)--8T-08

High Trestle to City of Boone Trail - Phase 1

Ped/Bike Grade & Pave, Ped/Bike Miscellaneous

Submitted

9/20/2022

TotalFederal Aid

RegionalSwap

$418,000$100,000

$100,000

$418,000$100,000

$100,000

45520

Dallas CountyConservation Board

TAP-R-C025(123)--8T-25

RRVT Bridge Improvements Phase 2 - Bridge S OverMOSQUITO CREEK, S34 T79 R29

Ped/Bike Structures

Submitted

3/15/2022

TotalFederal Aid

RegionalSwap

$462,500$250,000

$250,000

$462,500$250,000

$250,000

39406

Milo

TAP-R-5087()--8T-91

In the city of Milo, Multi-use Path Project - From SoutheastWarren Elementary School to Centennial Park

Ped/Bike Grade & Pave

Submitted

11/15/2022

TotalFederal Aid

RegionalSwap

$370,000$230,000

$230,000

$370,000$230,000

$230,000

39399

Dallas CountyConservation Board

TAP-R-C025(117)--8T-25

RRVT Bridge Improvements Phase 3 - Bridge D

Ped/Bike Structures

Submitted

10/18/2022

TotalFederal Aid

RegionalSwap

$462,500$250,000

$250,000

$462,500$250,000

$250,000

39483

Adel

TAP-U-0035()--8I-25

In the city of Adel, Adel Recrational Trails

Ped/Bike Grade & Pave

Submitted TotalFederal Aid

RegionalSwap

$519,000$180,000

$180,000

$519,000$180,000

$180,000

45467

Adel

TAP-R-0035()--8T-25

Over S29 T79 R27

Ped/Bike Grade & Pave

Submitted TotalFederal Aid

RegionalSwap

$635,000$125,000

$125,000

$635,000$125,000

$125,000

45468

Pleasantville

TAP-R-6125()--8T-63

In the City of Pleasantville, Highway 5 Trail Project

Ped/Bike Grade & Pave

Submitted TotalFederal Aid

RegionalSwap

$320,000$150,000

$150,000

$320,000$150,000

$150,000

48677

Story CountyConservation Board

TAP-U-C085()--8I-85

HOINT: From the South Skunk River Scenic Bridge toCounty Road 610th Aveue

Ped/Bike Grade & Pave

Submitted TotalFederal Aid

RegionalSwap

$674,000$250,000

$250,000

$674,000$250,000

$250,000

40

Page 41: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

SWAP-CMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45465

Boone County

ICAAP-SWAP-C008()--FH-08

On R AVE, S23 T84 R26

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$2,578,000

$800,000

$2,578,000

$800,000PA Note: Letting in conjunction with an Iowa DOT project STP-17-2(24)�2C-08

41

Page 42: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35884

Boone County

BROS-SWAP-C008(78)--FE-08

On J AVE, OVER UP RR, S27 T84 R27

Bridge Replacement

TIP Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00036286

Dallas County

BROS-SWAP-C025(119)--SE-25

On 270th Street, Over Panther Creek, on the south line ofS15, T79N, R28W, Colfax Township

Bridge Replacement

TIP Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$600,000

$590,000

$600,000

$590,00032498

Madison County

BROS-SWAP-C061()--FE-61

On R21, Over BRANCH TO CLANTON CREEK, at S1 T74R27

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00044730

Marion County

BROS-SWAP-C063()--SE-63

On STORY DR, Over ENGLISH CREEK, from 103rd to94th S16 T74 R20

Bridge Replacement

TIP Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00037566

Madison County

BRS-SWAP-2215(601)--FF-61

On R21 (PERU RD), Over CLANTON CREEK, S12 T74R27

Bridge Replacement

TIP Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$1,800,000

$360,000

$1,800,000

$360,00037567

Madison County

BRS-SWAP-C061(115)--FF-61

On R35 (BEV. PARK RD.), Over CLANTON CREEK, S12T75 R26

Bridge Replacement

TIP Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$2,200,000

$700,000

$2,200,000

$700,00032218

Jasper County

BHS-SWAP-C050()--FC-50

On County Road F48, Over Small Stream, along WLINES10 T79 R21

Bridge Rehabilitation

TIP Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00047106

Dallas County

BROS-SWAP-C025(B-67)--SE-25

On IVY PL, Over FROG CREEK, S16 T81 R28

Bridge New

TIP Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00032516

Dallas County

BROS-SWAP-C025(E-44)--SE-25

On B Avenue, Over Mosquito Creek, on the east line of S6,T80, R29, Lincoln Township

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$620,000

$600,000

$620,000

$600,000

42

Page 43: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

16565

Jasper County

BROS-SWAP-C050( )--SE-50

N 75th Ave W: Over Clear Creek

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,00037408

Jasper County

BROS-SWAP-C050()--FE-50

On S 44th Ave, Over SMALL STREAM, on NLINE S16 T79R19

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00038753

Jasper County

BROS-SWAP-C050()--SE-50

On Eagle St, Over INDIAN CREEK, in SW Corner of S27TT81N RR21W

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00038606

Polk County

BROS-SWAP-C077(BR9150)--SE-77

ON SE 48TH AVE, IN THE NW 1/4 SEC 28-78-22, 0.98 MI.EAST OF SE POWERS DRIVE

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00032507

Story County

BROS-SWAP-C085(162)--FE-85

On 150th St., Over Skunk River, NLINE S31 T85 R23

Bridge Replacement

TIP Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00027021

Jasper County

BRS-SWAP-C050(116)--FF-50

On County Road F48, Over Squaw Creek, on the west sideof W 116th St S S11 T79 R21

Bridge Replacement

TIP Approved

9/21/2021

TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,00032336

Marion County

BRS-SWAP-C063(T15)--FF-63

On T15, Over BNSF RR AND STREAM, from 165th toLisbon Dr.

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$2,750,000

$2,750,000

$2,750,000

$2,750,00047104

Dallas County

BROS-SWAP-C025(N-61)--SE-25

On 365TH ST, Over BEAR CREEK, S32 T78 R28

Culvert New

TIP Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00037298

Story County

BROS-SWAP-C085()--FE-85

On 530th Ave., Over Ballard Creek, on WLINE S15 T82R24

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

43

Page 44: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

32791

Warren County

BROS-SWAP-C091(M2009)--SE-91

On 20TH AVE, Over PAINTER CREEK, S20 T75 R25

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00020595

Madison County

BRS-SWAP-C061()--FF-61

On P53, Over NORTH RIVER, S10 T76 R29

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,00047114

Dallas County

BHS-SWAP-C025(N-60)--FC-25

On F 60, Over PANTHER CREEK, S5 T78 R28

Bridge Rehabilitation

TIP Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00040161

Boone County

BROS-SWAP-C008(xx)--SE-08

On 310TH ST, Over LITTLE BEAVER CREEK, S18 T82R27

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00040162

Boone County

BROS-SWAP-C008(xx)--SE-8

On 140TH ST, Over MONTGOMERY CREEK, S25 T85R26

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00044737

Marion County

BROS-SWAP-C063(168th)--SE-63

On 168TH PL, Over Cedar Creek, from Vermont to MonroeCo. Line S27 T74 R19

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00037572

Madison County

BRS-SWAP-C061()--FF-61

On R35 (BEV. PARK RD.), Over MIDDLE RIVER, at SWS25 T76 R26

Bridge Replacement

TIP Approved TotalFederal Aid

RegionalSwap

$2,500,000

$2,500,000

$2,500,000

$2,500,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

8948

Dallas County

HSIP-SWAP-C025(A-31)--FJ-25

On P-46, from Highway 141 N 2.0 miles to Greene Co.,Dallas Township

Pavement Rehab/Widen

Submitted TotalFederal Aid

RegionalSwap

$2,000,000

$240,000

$676,000

$2,000,000

$240,000

$676,000

44

Page 45: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48675

Boone

STBG-SWAP-0750()--SG-08

In the city of Boone, On W Park Ave approx. 750 ft W ofWestwood Blvd to S Marion St approx. 1,000 ft S ofMadison St

Grade and Pave

Submitted TotalFederal Aid

RegionalSwap

$1,500,000

$725,000

$725,000

$1,500,000

$725,000

$725,000

45451

Indianola

STBG-SWAP-3680()--SG-91

In the city of Indianola, East Hillcrest Avenue from NorthJefferson Way to North 14th Street

Grade and Pave, Traffic Signals

Submitted TotalFederal Aid

RegionalSwap

$4,522,600

$3,105,000

$3,105,000

$4,522,600

$3,105,000

$3,105,00029505

Newton

STBG-SWAP-5482(622)--SG-50

In the city of Newton, Union Drive Reconstruction, fromaprox 520ft S of N 4th Avenue to aprox 80ft N of N 19thAvenue

Pavement Rehab

Submitted

11/16/2021

TotalFederal Aid

RegionalSwap

$2,800,000

$2,800,000

$2,800,000

$2,800,000

$2,800,000

$2,800,000

48644

Pella

STBG-SWAP-5947()--SG-63

In the city of Pella, - Washington Street and Fifield RoadIntersection

Pavement Rehab/Widen

Submitted TotalFederal Aid

RegionalSwap

$500,000

$450,000

$450,000

$500,000

$450,000

$450,00035889

Boone County

STBG-SWAP-C008()--FG-8

On E26, approximately .58 miles west and .50 miles east ofthe Des Moines River

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,000

$600,000

$600,00045720

Boone County

STBG-SWAP-C008()--SK-08

On X AVE, Over ONION CREEK, S25 T84 R25

Submitted TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

$400,000

$400,00036033

Jasper County

STBG-SWAP-C050(125)--FG-50

On F62, from State Highway 163 East 4.3 Miles to StateHighway 14

Pavement Rehab/Widen

Submitted

9/21/2021

TotalFederal Aid

RegionalSwap

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,00010913

Madison County

STBG-SWAP-C061()--FG-61

On G61 (MACKSBURG RD), from ADAIR/MADISONCOUNTY LINE EAST 6 Miles to FIELDSTONE AVE.

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,00044729

Marion County

STBG-SWAP-C063()--FG-63

On G 76, from IA 5 to Van Buren Dr. S11 T74 R19

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

$350,000

$350,000

45

Page 46: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36012

Story County

STBG-SWAP-C085(164)--FG-85

On R38, from Slater City Limits north 8.0 Miles

Pavement Rehab

Submitted

12/21/2021

TotalFederal Aid

RegionalSwap

$2,400,000

$2,400,000

$2,400,000

$2,400,000

$2,400,000

$2,400,00039163

Perry

STBG-SWAP-5970()--SG-25

In the city of Perry, Willis Avenue Overlay from 3rd to 16thStreet

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$539,000

$539,000

$539,000

$539,000

$539,000

$539,00038624

Boone County

STBG-SWAP-C008(xx)--FG-08

On E 18, Over BLUFF CREEK, on NLINE S20 T85N R27W

Bridge Replacement

Submitted TotalFederal Aid

RegionalSwap

$620,000

$620,000

$620,000

$620,000

$620,000

$620,00038825

Marion County

STBG-SWAP-C063()--FG-63

On McKimber and on S. Attica Rd. both from IA 5/92 toKnoxville Corp. Limit, and on 110th from IA 5/92 toMcKimber

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,000

$600,000

$600,000

40160

Boone County

STBG-SWAP-C008()--SK-08

On L RD, Over TRIB. OF DES MOINES RIVER, S14 T85R27

Submitted TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

$350,000

$350,00037454

Dallas County

STBG-SWAP-C025(H-43)--FG-25

On R22, from Highway 44 N 5 miles to F31, GrantTownship

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$2,750,000

$800,000

$800,000

$2,750,000

$800,000

$800,00044747

Polk County

STBG-SWAP-C077(NE 42 St)--SG-77

On NE 42 St, from NE 150th Ave N 2 miles to NE 166th Ave

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

$350,000

$350,00041362

Story County

STBG-SWAP-C085(E29)--FG-85

On E29, from 700' west of 570th Ave. E 9.2 miles to 660thAve.

Submitted TotalFederal Aid

RegionalSwap

$1,800,000

$1,800,000

$1,800,000

$1,800,000

$1,800,000

$1,800,00036930

Pella

STBG-SWAP-5947()--SG-63

In the city of Pella, Oskaloosa St, from SE 16 to 240 St(Eagle Lane) including the intersection approx. 300 ft

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$1,650,000

$1,650,000

$1,650,000

$1,650,000

$1,650,000

$1,650,000

46

Page 47: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44738

Marion County

STBG-SWAP-C063(OL)--FG-63

On G28 from IA 14 to Pella CL, T14 from Jasper Co. toPella CL, T17 from Old Hwy 92 to IA 5, S45 from G76 toLucas Co.

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$5,500,000

$2,000,000

$2,000,000

$5,500,000

$2,000,000

$2,000,000

40174

Polk County

STBG-SWAP-C077()--FG-77

On SE 6TH AVE, from SE 92 St to SE Camp Dr, 2.70 miles

Pavement Rehab

Submitted TotalFederal Aid

RegionalSwap

$459,000

$459,000

$459,000

$459,000

$459,000

$459,000

47

Page 48: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

CHAPTER SIX

Federal Transit Administrations Projects

A portion of Federal fuel tax revenue is placed in the Mass Transit Account of the Federal Highway

Trust Fund. These funds, along with General Fund appropriations, are reserved for transit purposes

and are administered by the FTA.

Program Format

The project listing is organized by TIP funding program. The sponsor name, project number, project

location, project description, project funding, programmed amounts by year, and Transit Number are

shown for each project within the different TIP funding categories. The Transit Number is a unique

number given to each project included in the CIRTPA’s Transit Program.

Project Total refers to the total cost of the project. Federal-Aid refers to the amount of Federal-Aid

(FA) the project has received. State-Aid (SA) refers to the amount of funding the transit provider has

received from the State.

48

Page 49: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Draft 2022 Transit Program(Filtered)

 

 

49

Page 50: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

RPA-11 (40 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 11 / HIRTA 4452 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3326 SA

5339 Region 11 / HIRTA 4460 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3325 SA

5339 Region 11 / HIRTA 4463 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 8727 SA

STP Region 11 / HIRTA 5157 Conversion Van Total 60,420 Capital VSS, Hybrid FA 51,357 Expansion SA

5339 Region 11 / HIRTA 5977 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 1143 SA

5339 Region 11 / HIRTA 6209 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1141 SA

STA, 5311 Region 11 / HIRTA 6210 Day to Day Operations/Adm Total 1,412,919 Operations FA 835,879 Other SA 577,040

5339 Region 11 / HIRTA 6212 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1142 SA

5339 Region 11 / HIRTA 6213 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 3323 SA

5339 Region 11 / HIRTA 6214 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5516 SA

5339 Region 11 / HIRTA 6215 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 5519 SA

5339 Region 11 / HIRTA 5992 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 6526 SA

Region 11 / HIRTA 6223 New Project Total Operations FA Other SA

STP Region 11 / HIRTA 6061 Conversion Van Total 58,727 Capital UFRC, VSS FA 49,918 Expansion SA

STP Region 11 / HIRTA 6062 Conversion Van Total 58,727 Capital UFRC, VSS FA 49,918 Expansion SA

 

 

50

Page 51: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

RPA-11 (40 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 11 / HIRTA 6216 Light Duty Bus (158" wb) Total 90,280 Capital FA 76,738 Replacement Unit #: 3329 SA

5339 Region 11 / HIRTA 6217 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1144 SA

5339 Region 11 / HIRTA 6218 Light Duty Bus (176" wb) Total 96,040 Capital FA 81,600 Replacement Unit #: 2227 SA

5339 Region 11 / HIRTA 3242 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2228 SA

5339 Region 11 / HIRTA 4442 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1146 SA

5339 Region 11 / HIRTA 4445 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1149 SA

5339 Region 11 / HIRTA 5980 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1147 SA

5339 Region 11 / HIRTA 5983 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3328 SA

5339 Region 11 / HIRTA 5986 Minivan Total 56,564 Capital VSS FA 48,080 Replacement Unit #: 3330 SA

5339 Region 11 / HIRTA 5987 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 4420 SA

5339 Region 11 / HIRTA 4448 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2229 SA

5339 Region 11 / HIRTA 5989 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5521 SA

5339 Region 11 / HIRTA 5990 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5523 SA

5339 Region 11 / HIRTA 5991 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5522 SA

5339 Region 11 / HIRTA 4450 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2231 SA

 

 

51

Page 52: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

RPA-11 (40 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 11 / HIRTA 5988 Light Duty Bus (176" wb) Total 131,120 Capital VSS, Low Floor FA 111,452 Replacement Unit #: 4422 SA

5339 Region 11 / HIRTA 4446 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1150 SA

5339 Region 11 / HIRTA 4444 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1148 SA

5339 Region 11 / HIRTA 5979 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 1145 SA

5339 Region 11 / HIRTA 6219 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 2230 SA

5339 Region 11 / HIRTA 6220 Minivan Total 55,689Capital FA 47,336Replacement Unit #: 4419 SA

5339 Region 11 / HIRTA 6063 Non-ADA LD bus (176" wb) Total 156,000Capital UFRC, VSS, Low Floor FA 124,800Expansion SA

5339 Region 11 / HIRTA 5993 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 8725 SA

5339 Region 11 / HIRTA 5994 Light Duty Bus (138" wb) Total 94,050Capital VSS FA 79,943Replacement Unit #: 8728 SA

5339 Region 11 / HIRTA 5995 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 8729 SA

 

 

52

Page 53: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

CHAPTER SEVEN

Financial Plan

The FAST Act states that the TIP shall include a financial plan that demonstrates how the approved

TIP can be implemented, identification of public and private resources that are reasonably expected

to be made available to carry out the TIP, and recommend any additional financing strategies for

needed projects and programs.

Federal Highway Administration Projects

For purposes of transportation operations and maintenance, the financial plan shall contain system-

level estimates of costs and revenue sources that are reasonably expected to be available to

adequately operate and maintain Federal-aid highways (as defined by 23 U.S.C. 101(a)(5)) and public

transportation (as defined by title 49 U.S.C. Chapter 53). In addition, revenue and cost estimates for

the TIP must use an inflation rate(s) to reflect ‘‘year of expenditure dollars,’’ based on reasonable

financial principles and information, developed cooperatively by the CIRTPA, State(s), and public

transportation operator(s). The CIRTPA staff utilized an inflation rate of 4% to determine ‘‘year of

expenditure dollars.’’

The FFY 2022-2025 TIP is fiscally constrained by funding sources. Funding sources include Federal,

State, and local financial resources. The CIRTPA recognizes that in the event of Federal, State, and

local funding changes, amendments, or revisions, it will need to reflect the change in project funds

within the FFY 2022-2025 TIP.

CIRTPA Federal-aid Funding Sources

The total Federal share of projects included in the first year (annual element) of the TIP shall not

exceed levels of funding committed to the CIRTPA. Additionally, the total Federal share of projects

included in the second, third, fourth, and/or subsequent years of the TIP may not exceed levels of

funding committed, or reasonably expected to be available, to the CIRTPA.

Table 7.1 displays a listing of all Federal-Aid funding sources in the TIP and the amount of Federal

funds committed by source and the total project cost of all projects utilizing Federal fund by funding

53

Page 54: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

source for FFYs 2022-2025. Table 7.2 displays a listing of all SWAP funding sources in the TIP and

the amount of SWAP funds committed by source and the total project cost of all projects utilizing

SWAP fund by funding source for FFYs 2019-2022. Tables 7.3 and 7.4 displays the financial

constraint of the STBG and TAP funding sources for Federal Fiscal Years 2022-2025, breaking down

all revenues, expenditures, programmed funds, adjustments, and returns.

TABLE 7.1 CIRTPA Federal-Aid Funding Sources

Federal-Aid Funding Sources

2022 2023 2024 2025

Total Cost Federal Aid Total Cost Federal Aid Total Cost Federal Aid Total Cost Federal Aid

CHBP $1,711,000 $901,230 ($809,230

SWAP) $0 $0 $0 $0 $0 $0

HSIP $400,000 $360,000 $0 $0 $0 $0 $0 $0

ILL $1,800,000 $300,000 $0 $0 $0 $0 $0 $0

NHPP $42,005,000 $36,365,600 $49,314,000 $41,300,950 $44,887,000 $38,372,950 $21,055,100 $26,289,000

RTP $7,599,775 $6,079,820 $324,765 $259,836 $0 $0 $0 $0

STBG $14,788,795 $11,831,036 $6,206,820 $4,965,420 $259,836 $324,795 $0 $0

STBG-HBP $300,000 $240,000 $0 $0 $0 $0 $0 $0

STBG-TAP $880,500 $350,000 $1,351,000 $660,000 $955,000 $275,000 $674,000 $250,000

Totals $69,485,070 $55,526,456 $57,196,585 $47,186,206 $46,101,836 $38,972,745 $21,729,100 $26,539,000

TABLE 7.2 CIRTPA SWAP Funding Sources

SWAP Funding Sources

2021 2022 2023 2024

Total Cost SWAP Total Cost SWAP Total Cost SWAP Total Cost SWAP

SWAP-CMAQ $2,578,000 $800,000 $0 $0 $0 $0 $0 $0

SWAP-HBP $6,900,000 $3,950,000 $8,145,000 $8,125,000 $2,300,000 $2,300,000 $4,800,000 $4,800,000

SWAP-HSIP $2,000,000 $676,000

SWAP-STBG $18,072,600 $15,830,000 $1,759,000 $1,759,000 $5,525,000 $3,300,000 $7,609,000 $4,109,000

Totals $29,550,600 $21,256,000 $9,904,000 $9,884,000 $7,825,000 $5,600,000 $12,409,000 $8,909,000

54

Page 55: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.3 CIRTPA Surface Transportation Program Financial Constraint

2022 2023 2024 2025

Unobligated Balance (Carryover) $8,243,752 $1,490,722 $4,255,156 $7,358,376

STBG Target $8,385,718 $5,283,000 $5,283,000 $5,283,000

Flex Funds $212,122 $212,000 $212,000 $211,000

Subtotal $13,841,592 $6,985,772 $9,750,156 $12,853,376

Transfer Out $0 $0 $0 $0

Programmed STBG Funds $12,350,820 $2,730,616 $2,391,780 $2,350,780

Balance $1,490,772 $4,255,156 $7,358,376 $10,502,596 Based on Iowa Department of Transportation’s Fiscal Year 2021 2nd Quarter Status Report.

TABLE 7.4 CIRTPA Transportation Alternatives Program Financial Constraint

2022 2023 2024 2025

Unobligated Balance (Carryover) $466,302 $394,781 $12,781 $17,781

TAP Target $278,479 $278,000 $278,000 $278,000

Subtotal $744,781 $672,781 $290,781 $293,781

Transfer Out $0 $0 $0 $0

Programmed TAP Funds $350,000 $660,000 $275,000 $250,000

Balance $394,781 $12,781 $15,781 $43,781 Based on Iowa Department of Transportation’s Fiscal Year 2021 2nd Quarter Status Report.

Operations and Maintenance Costs and Projections

The following tables demonstrate the costs of operations and maintenance to the Federal-aid System.

Table 7.5 contains the operation and maintenance costs on Federal-aid city streets within each city in the

CIRTPA. Tables 7.6 and 7.7 contain the projected operation and maintenance costs on Federal-aid city

streets within each city in the CIRTPA based on data in Table 7.5.

55

Page 56: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.5 2019 CIRTPA City Street Operations and Maintenance Expenditures on Federal-Aid Routes

City/County Name

On-System Miles

Total Miles

Percentage Federal-Aid

Routes

Total Roadway

Maintenance

Total Operations

Maintenance on Federal-Aid Routes

Operations on Federal-Aid Routes

Boone County 2.25 38.00 0.06 $627,666 $141,085 $58,103 $14,042

Boone 28.33 96.90 0.29 $1,073,489 $593,216 $313,849 $173,434

Dallas County 11.86 75.55 0.16 $933,080 $462,774 $151,265 $72,982

Adel 2.61 22.82 0.11 $493,690 $287,996 $56,390 $32,895

Perry 11.79 45.24 0.26 $713,141 $350,037 $185,880 $91,237

Jasper County 8.63 86.36 0.10 $859,796 $426,105 $90,525 $42,257

Newton 24.76 91.28 0.27 $1,138,509 $399,531 $308,752 $108,349

Madison County 3.83 37.74 0.10 $656,521 $156,553 $48,436 $11,714

Winterset 6.73 38.0 0.18 $646,843 $182,453 $114,648 $32,338

Marion County 6.97 39.15 0.18 $317,174 $133,494 $54,043 $34,289

Knoxville 11.18 43.84 0.25 $806,717 $530,558 $205,709 $135,290

Pella 15.90 60.94 0.26 $855,533 $83,520 $223,120 $21,782

Polk County 2.34 13.94 0.17 $171,138 $47,946 $8,744 $4,759

Story County 7.86 62.70 0.13 $764,968 $288,372 $118,867 $28,389

Huxley 1.85 16.61 0.11 $122,079 $246,432 $13,608 $27,470

Nevada 14.90 44.94 0.33 $645,608 $126,656 $214,010 $41,985

Story City 3.16 22.50 0.14 $343,431 $87,397 $48,266 $12,283

Warren County 1.04 23.48 0.04 $334,093 $103,853 $21,314 $6,414

Indianola 15.36 70.22 0.22 $1,610,171 $318,523 $352,284 $69,689

Totals 181.33 930.19 0.19 $13,113,642 $4,966,496 $2,587,813 $961,598

Source: 2019 City Street Finance Reports

56

Page 57: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.6 CIRTPA Forecasted City Street Maintenance Expenditures on Federal-Aid Routes

City/County Name 2020 2021 2022 2023 2024 2025

Boone County $62,844 $65,358 $67,972 $70,691 $73,519 $76,460

Boone $339,459 $353,037 $367,159 $381,845 $397,119 $413,004

Dallas County $163,608 $170,153 $176,959 $184,037 $191,398 $199,054

Adel $60,991 $63,431 $65,968 $68,607 $71,351 $74,205

Perry $201,048 $209,090 $217,453 $226,151 $235,197 $244,605

Jasper County $97,912 $101,828 $105,901 $110,138 $114,543 $119,125

Newton $333,946 $347,304 $361,196 $375,644 $390,670 $406,297

Madison County $52,388 $54,484 $56,663 $58,930 $61,287 $63,738

Winterset $124,003 $128,963 $134,122 $139,487 $145,066 $150,869

Marion County $58,453 $60,791 $63,223 $65,752 $68,382 $71,117

Knoxville $222,495 $231,395 $240,650 $250,276 $260,288 $270,699

Pella $241,327 $250,980 $261,019 $271,460 $282,318 $293,611

Polk County $9,458 $9,836 $10,229 $10,638 $11,064 $11,507

Story County $128,567 $133,709 $139,058 $144,620 $150,405 $156,421

Huxley $14,718 $15,307 $15,919 $16,556 $17,218 $17,907

Nevada $231,473 $240,732 $250,361 $260,376 $270,791 $281,623

Story City $52,205 $54,293 $56,464 $58,723 $61,072 $63,515

Warren County $23,053 $23,975 $24,934 $25,932 $26,969 $28,048

Indianola $381,030 $396,272 $412,122 $428,607 $445,752 $463,582

Totals $2,798,979 $2,910,938 $3,027,375 $3,148,470 $3,274,409 $3,405,385

Source: 2019 City Street Finance Reports

57

Page 58: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.7 CIRTPA Forecasted City Street Operation Expenditures on Federal-Aid Routes

City/County Name 2020 2021 2022 2023 2024 2025

Boone County $15,188 $15,795 $16,427 $17,084 $17,768 $18,478

Boone $187,586 $195,090 $202,893 $211,009 $219,449 $228,227

Dallas County $78,937 $82,095 $85,379 $88,794 $92,346 $96,039

Adel $35,579 $37,002 $38,482 $40,022 $41,623 $43,288

Perry $98,682 $102,629 $106,734 $111,004 $115,444 $120,062

Jasper County $45,705 $47,533 $49,435 $51,412 $53,469 $55,607

Newton $117,190 $121,878 $126,753 $131,823 $137,096 $142,580

Madison County $12,670 $13,177 $13,704 $14,252 $14,822 $15,415

Winterset $34,977 $36,376 $37,831 $39,344 $40,918 $42,555

Marion County $37,087 $38,570 $40,113 $41,718 $43,387 $45,122

Knoxville $146,330 $152,183 $158,270 $164,601 $171,185 $178,032

Pella $23,559 $24,502 $25,482 $26,501 $27,561 $28,664

Polk County $5,147 $5,353 $5,567 $5,790 $6,022 $6,263

Story County $30,706 $31,934 $33,211 $34,540 $35,921 $37,358

Huxley $29,712 $30,900 $32,136 $33,421 $34,758 $36,149

Nevada $45,411 $47,227 $49,117 $51,081 $53,124 $55,249

Story City $13,285 $13,817 $14,369 $14,944 $15,542 $16,164

Warren County $6,937 $7,215 $7,503 $7,804 $8,116 $8,440

Indianola $75,376 $78,391 $81,526 $84,787 $88,179 $91,706

Totals $1,040,064 $1,081,667 $1,124,934 $1,169,931 $1,216,728 $1,265,397 Source: 2019 City Street Finance Reports

Table 7.8 contains the operation and maintenance costs on Federal-aid county roads within each county

in the CIRTPA. Tables 7.9 and 7.10 contain the projected maintenance and operation costs on Federal-

aid county roads within each county in the CIRTPA based on data in Table 7.8.

58

Page 59: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.8 2019 CIRTPA County Road Operations and Maintenance Costs on Federal-Aid Routes

County Name On-System

Miles Total Miles

Percentage Federal-Aid

Routes

Total Maintenance

Cost

Total Operations

Cost

Maintenance Cost on

Federal-Aid Routes

Operations Cost on

Federal-Aid Routes

Boone County 300.715 969.840 0.31 $4,014,479 $2,289,180 $1,272,662 $709,798

Dallas County 283.284 851.438 0.33 $6,589,183 $3,308,263 $2,192,303 $1,100,700

Jasper County 408.692 1212.513 0.34 $5,740,607 $2,455,574 $1,934,940 $827,681

Madison County 334.988 906.586 0.37 $4,103,936 $1,615,199 $1,516,425 $596,824

Marion County 315.120 850.953 0.37 $4,132,657 $1,661,162 $1,530,382 $615,152

Polk County 324.804 721.883 0.45 $6,619,143 $2,933,411 $2,978,217 $1,319,859

Story County 364.112 925.463 0.39 $4,111,630 $2,373,758 $1,617,670 $933,926

Warren County 323.597 862.092 0.38 $5,312,903 $2,800,188 $1,994,264 $1,051,086

Totals 2,655.312 7,300.768 0.36 $40,714,539 $19,678,636 $15,036,863 $7,155,025

Source: 2020 County Engineers Annual Report TABLE 7.9 CIRTPA Forecasted County Road Maintenance Costs on Federal-Aid Routes

County Name 2020 2021 2022 2023 2024 2025

Boone County $1,272,662 $1,323,568 $1,376,511 $1,431,572 $1,488,835 $1,548,388

Dallas County $2,192,303 $2,279,995 $2,371,195 $2,466,043 $2,564,685 $2,667,272

Jasper County $1,934,940 $2,012,338 $2,092,831 $2,176,545 $2,263,606 $2,354,151

Madison County $1,516,425 $1,577,082 $1,640,165 $1,705,772 $1,774,002 $1,844,963

Marion County $1,530,382 $1,591,597 $1,655,261 $1,721,471 $1,790,330 $1,861,943

Polk County $2,978,217 $3,097,345 $3,221,239 $3,350,089 $3,484,092 $3,623,456

Story County $1,617,670 $1,682,377 $1,749,672 $1,819,659 $1,892,445 $1,968,143

Warren County $1,994,264 $2,074,035 $2,156,996 $2,243,276 $2,333,007 $2,426,328

Totals $15,036,863 $15,638,338 $16,263,871 $16,914,426 $17,591,003 $18,294,643

Source: 2020 County Engineers Annual Report TABLE 7.10 CIRTPA Forecasted County Road Operations Costs on Federal-Aid Routes

County Name 2020 2021 2022 2023 2024 2025

Boone County $709,798 $738,190 $767,718 $798,427 $830,364 $863,578

Dallas County $1,100,700 $1,144,728 $1,190,517 $1,238,138 $1,287,663 $1,339,170

Jasper County $827,681 $860,788 $895,219 $931,028 $968,269 $1,007,000

Madison County $596,824 $620,697 $645,525 $671,346 $698,200 $726,128

Marion County $615,152 $639,758 $665,348 $691,962 $719,641 $748,426

Polk County $1,319,859 $1,372,653 $1,427,559 $1,484,661 $1,544,048 $1,605,810

Story County $933,926 $971,283 $1,010,134 $1,050,539 $1,092,561 $1,136,263

Warren County $1,051,086 $1,093,129 $1,136,854 $1,182,328 $1,229,621 $1,278,806

Totals $7,155,025 $7,441,226 $7,738,875 $8,048,430 $8,370,367 $8,705,182

Source: 2020 County Engineers Annual Report

59

Page 60: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Non-Federal-aid Revenue Sources and Projections

In addition to operations and maintenance costs are Non Federal-aid revenue sources. Non Federal-

aid revenue sources and projections are included to demonstrate the revenue sources and amounts

available for operation and maintenance of the system in the CIRTPA planning area.

Table 7.11 contains the receipts for the Road Use Tax Fund and other road monies on Federal-aid

routes within each city in the CIRTPA. Table 7.12 contains the projected revenues on Federal-aid

routes within each city in the CIRTPA based on data in Table 7.11.

Table 7.13 contains the receipts for Farm-to-Market Federal-aid routes within each county in the

CIRTPA. Table 7.14 contains the projected revenues for Farm-to-Market Federal-aid routes within

each county in the CIRTPA based on data in Table 7.13.

Table 7.15 contains the receipts for the Secondary Road Fund Federal-aid routes within each

county in the CIRTPA. Table 7.16 contains the projected revenues for the Secondary Road Fund

Federal-aid routes within each county in the CIRTPA based on data in Table 7.15.

60

Page 61: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.11 2019 CIRTPA City Street Fund Receipts

City/County Name Road Use Tax

Fund Federal-Aid

Receipts Miscellaneous

Receipts Total Receipts

Boone County $654,381 $5,211,236 $5,211,236 $2,148,353

Boone $1,635,620 $3,062,883 $159,016 $4,857,519

Dallas County $1,083,105 $1,253,881 $1,253,881 $465,204

Adel $475,662 $573,536 $555,047 $1,604,245

Perry $994,988 $215,141 $891,833 $2,101,962

Jasper County $1,170,349 $562,156 $562,156 $366,682

Newton $1,970,599 $195,474 $309,724 $2,475,797

Madison County $349,239 $547,790 $547,790 $149,315

Winterset $670,474 $398,475 $900,652 $1,969,601

Marion County $481,149 $3,222,349 $81,887 $3,785,385

Knoxville $944,735 $983,062 $39,120 $1,966,917

Pella $1,337,331 $282,682 $0 $1,620,013

Polk County $168,064 $105,379 $0 $273,443

Story County $1,024,216 $329,280 $482,108 $1,835,604

Huxley $428,509 $68,997 $330,443 $827,949

Nevada $878,205 $155,617 $3,824,705 $4,858,527

Story City $443,236 $15,733 $657,209 $1,116,178

Warren County $403,078 $242,985 $7,404 $653,467

Indianola $1,909,623 $737,460 $341,802 $2,988,885

Totals $17,022,563 $18,164,116 $16,156,013 $36,065,046 Source: 2019 City Street Finance Reports

61

Page 62: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.12 CIRTPA Forecasted City Street Fund Revenue

City/County Name 2020 2021 2022 2023 2024 2025

Boone County $2,234,287 $2,323,659 $2,416,605 $2,513,269 $2,613,800 $2,718,352

Boone $5,051,820 $5,253,893 $5,464,048 $5,682,610 $5,909,915 $6,146,311

Dallas County $483,812 $503,165 $523,291 $544,223 $565,992 $588,631

Adel $1,668,415 $1,735,151 $1,804,557 $1,876,740 $1,951,809 $2,029,882

Perry $2,186,040 $2,273,482 $2,364,421 $2,458,998 $2,557,358 $2,659,652

Jasper County $381,349 $396,603 $412,467 $428,966 $446,125 $463,970

Newton $2,574,829 $2,677,822 $2,784,935 $2,896,332 $3,012,186 $3,132,673

Madison County $155,288 $161,499 $167,959 $174,677 $181,665 $188,931

Winterset $2,048,385 $2,130,320 $2,215,533 $2,304,155 $2,396,321 $2,492,174

Marion County $3,936,800 $4,094,272 $4,258,043 $4,428,365 $4,605,500 $4,789,720

Knoxville $2,045,594 $2,127,417 $2,212,514 $2,301,015 $2,393,055 $2,488,777

Pella $1,684,814 $1,752,206 $1,822,294 $1,895,186 $1,970,994 $2,049,833

Polk County $284,381 $295,756 $307,586 $319,890 $332,685 $345,993

Story County $1,909,028 $1,985,389 $2,064,805 $2,147,397 $2,233,293 $2,322,625

Huxley $861,067 $895,510 $931,330 $968,583 $1,007,327 $1,047,620

Nevada $5,052,868 $5,254,983 $5,465,182 $5,683,789 $5,911,141 $6,147,587

Story City $1,160,825 $1,207,258 $1,255,548 $1,305,770 $1,358,001 $1,412,321

Warren County $679,606 $706,790 $735,062 $764,464 $795,043 $826,844

Indianola $3,108,440 $3,232,778 $3,362,089 $3,496,573 $3,636,436 $3,781,893

Totals $37,507,648 $39,007,954 $40,568,272 $42,191,003 $43,878,643 $45,633,789 Source: 2019 City Street Finance Reports

62

Page 63: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.13 State Fiscal Year 2020 CIRTPA Farm-to-Market Receipts

County Name 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Total

Boone County $341,649 $317,492 $313,833 $163,842 $1,136,817

Dallas County $379,716 $352,868 $348,801 $182,098 $1,263,482

Jasper County $463,498 $430,726 $425,762 $222,277 $1,542,264

Madison County $327,120 $303,991 $300,487 $156,875 $1,088,472

Marion County $390,011 $362,435 $358,258 $187,035 $1,297,740

Polk County $623,381 $579,305 $572,628 $298,951 $2,074,265

Story County $380,940 $354,006 $349,926 $182,685 $1,267,557

Warren County $421,341 $391,550 $387,037 $202,060 $1,401,987

Totals $3,327,656 $3,092,373 $3,056,733 $1,595,823 $11,072,584 Source: Iowa Department of Transportation

TABLE 7.14 CIRTPA Forecasted Farm-to-Market Revenue

County Name 2020 2021 2022 2023 2024 2025

Boone County $1,136,817 $1,182,290 $1,229,581 $1,278,765 $1,329,915 $1,383,112

Dallas County $1,263,482 $1,314,022 $1,366,582 $1,421,246 $1,478,096 $1,537,219

Jasper County $1,542,264 $1,603,955 $1,668,113 $1,734,837 $1,804,231 $1,876,400

Madison County $1,088,472 $1,132,011 $1,177,292 $1,224,383 $1,273,359 $1,324,293

Marion County $1,297,740 $1,349,650 $1,403,636 $1,459,782 $1,518,173 $1,578,900

Polk County $2,074,265 $2,157,235 $2,243,524 $2,333,265 $2,426,596 $2,523,660

Story County $1,267,557 $1,318,259 $1,370,989 $1,425,829 $1,482,862 $1,542,176

Warren County $1,401,987 $1,458,066 $1,516,389 $1,577,045 $1,640,126 $1,705,731

Totals $11,072,584 $11,515,488 $11,976,107 $12,455,151 $12,953,357 $13,471,492 Source: Iowa Department of Transportation

63

Page 64: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

TABLE 7.15 Fiscal Year 2020 CIRTPA Secondary Road Fund Receipts

County Name Property Tax L.O.S.T. Road Use Tax

Fund

Farm-to- Market

Extension Revenue

Time-21 Bridge Funds

Transfer Credits

Misc Receipts

Total Receipts

Boone County $2,375,880 $263,713 $3,686,460 $27,179 $473,462 $0 $180,456 $11,742 $7,018,892

Dallas County $3,161,491 $1,642,571 $3,906,866 $36,877 $502,658 $0 $0 $5,153 $9,255,616

Jasper County $3,088,734 $0 $5,033,764 $36,321 $646,241 $2,641 $0 $0 $8,807,700

Madison County $1,892,354 $0 $3,528,278 $40,334 $456,176 $381,002 $0 $0 $6,298,144

Marion County $2,224,216 $0 $4,004,171 $22,939 $535,111 $0 $0 $4,748 $6,791,185

Polk County $7,050,208 $0 $6,297,514 $0 $805,327 $0 $0 $12,820 $14,165,868

Story County $2,740,000 $0 $3,977,591 $35,682 $510,029 $0 $0 $45,525 $7,308,827

Warren County $3,181,213 $0 $4,317,651 $0 $551,396 $548,733 $0 $0 $8,598,993

Totals $25,714,096 $1,906,284 $34,752,295 $199,332 $4,480,399 $932,376 $180,456 $79,989 $68,245,226

Source: Iowa Department of Transportation

TABLE 7.16 CIRTPA Forecasted Secondary Road Fund Revenue

County Name 2020 2021 2022 2023 2024 2025

Boone County $7,018,892 $7,299,648 $7,591,634 $7,895,299 $8,211,111 $8,539,555

Dallas County $9,255,616 $9,625,841 $10,010,874 $10,411,309 $10,827,762 $11,260,872

Jasper County $8,807,700 $9,160,008 $9,526,408 $9,907,465 $10,303,763 $10,715,914

Madison County $6,298,144 $6,550,070 $6,812,073 $7,084,555 $7,367,938 $7,662,655

Marion County $6,791,185 $7,062,832 $7,345,346 $7,639,160 $7,944,726 $8,262,515

Polk County $14,165,868 $14,732,503 $15,321,803 $15,934,675 $16,572,062 $17,234,944

Story County $7,308,827 $7,601,180 $7,905,227 $8,221,436 $8,550,294 $8,892,306

Warren County $8,598,993 $8,942,953 $9,300,671 $9,672,698 $10,059,606 $10,461,990

Totals $68,245,226 $70,975,035 $73,814,036 $76,766,598 $79,837,262 $83,030,752

Source: Iowa Department of Transportation

64

Page 65: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Federal Transit Administration Projects

As with highway projects, legislation requires that all Federal and State transit projects be included

in a fiscally constrained TIP. As the 5307 annual apportionment is the only guaranteed source of

grant funds, CIRTPA actively seeks discretionary funding from a variety of sources, including the state

Public Transit Equipment and Facilities Management System (PTMS) process and earmarks (State

and Federal). Because these funds are the hardest to obtain, there is always uncertainty whether the

projects will be implemented in the current year. Therefore, the TIP will periodically be revised if

project funding is reduced or delayed. Table 7.15 lists all federal funding sources for HIRTA projects

by FFY 2021. Table 7.16 lists all state funding sources for HIRTA projects by FFY 2025.

Funding Sources

Federal and State funding account for the majority of all capital purchases and as a result, is critical

to success. The following section outlines the general funding sources available to HIRTA for FFY

2022-2025.

TABLE 7.17 HIRTA’s Federal Funding Sources for FY 2022 - 2025

Federal-Aid Funding Sources

2022 2023 2024 2025

Total Cost Federal Aid Total Cost Federal Aid Total Cost Federal Aid Total Cost Federal Aid

5311/STA $1,412,919

$835,879 ($577,040 State Aid) $0 $0 $0 $0 $0 $0

5339 $877,127 $745,559 $1,327,080 $1,127,986 $591,309 $502,613 $504,019 $420,617

STP $60,420 $51,357 $117,454 $99,836 $0, $0 $0 $0

Totals $2,350,466 $1,632,795 $1,444,534 $1,227,822 $591,309 $502,613 $504,019 $420,617

TABLE 7.18 HIRTA’s State Funding Sources for FY 2022 - 2025

State-Aid Funding Sources

2022 2023 2024 2025

Total Cost State Aid Total Cost State Aid Total Cost State Aid Total Cost State Aid

STA See Above See Above $0 $0 $0 $0 $0 $0

Totals N/A $577,040 $0 $0 $0 $0 $0 $0

65

Page 66: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

C H A P T E R E I G H T Public Participation

The CIRTPA’s Public Participation Plan outlines the CIRTPA’s public outreach requirements and efforts

through three primary components: public meetings, publications, and maintenance of the CIRTPA’s

website, www.cirtpa.org.

The CIRTPA holds a standard of a minimum public comment period of 45 calendar days and a minimum

4-week advance public notice before an initial, amended, or revised TIP is adopted by the CIRTPA. This

standard also applies when holding public meetings for any TIP amendments. The CIRTPA will approve the

TIP, and/or amendments to the TIP, following the completion of the public comment period. The CIRTPA

works to hold public meetings at convenient and accessible locations and times. If a person is not able to

attend a public meeting, information regarding the TIP and/or amendments to the TIP is available on the

CIRTPA’s website. In addition, all meetings of the CIRTPA committees are open to the public. Members of

the public may request time on the CIRTPA’s agendas to comment on specific subjects of interest to the

representatives.

Legal notices and meeting announcements regarding the adoption of the TIP and/or amendments to the

TIP are published in The Des Moines Register and sent to the various news agencies within central Iowa a

week before the scheduled public meeting.

The CIRTPA website contains CIRTPA news and information about upcoming events, CIRTPA members,

staff, the organization of the CIRTPA, and employment opportunities. Meeting agendas and minutes are

available, as is a listing of committee representatives. The website features a library containing

documents, maps, newsletters, and press releases. Additionally, educational opportunities related to

CIRTPA activities are listed on the website. CIRTPA staff regularly updates the website in order to engage

citizens.

The CIRTPA accepts input and comments from the public through a variety of means. Members of the

public may express their views, share their opinions, and ask questions regarding proposed amendments

in three ways: 1) orally at a meeting; 2) in writing via forms available at a meeting; or, 3) by submitting

66

Page 67: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

written comments to the CIRTPA prior to the close of the given comment period. The CIRTPA will make a

summary, analysis, or report on the disposition of comments made as part of the review of the TIP and/or

amendments to the TIP and will notify the CIRTPA TTC and TPC representatives of all TIP comments as

part of the approved TIP. Immediately following is a summary of the comments made June 23, 2021 and

any subsequent written comments submitted to the CIRTPA before July 15, 2021.

Public Comment Summary

The CIRTPA staff held a public meeting on June 23, 2021, to receive comments and questions on the TIP

draft. If there would have been participants, they would have been given a copy of the TIP (also, available

on the CIRTPA website) and staff would have guided the participants through the document, chapter by

chapter, explaining in detail each chapter’s significance within the TIP. Once staff would have finished

explaining the information in the TIP, the meeting would have been open for discussion. The participants

did not have any comments about the TIP draft or any particular surface transportation improvements

listed.

67

Page 68: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Appendix A Federal regulations require documentation in addition to the project list prior to approval of the

Central Iowa Regional Transportation Planning Alliance’s Federal Fiscal Years 2018-2021

Transportation Improvement Program. All regional planning affiliation transportation improvement

programs must be accompanied by:

1. A resolution of adoption by the planning organization.

This resolution can be found on the following page.

68

Page 69: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

RESOLUTION PLACEHOLDER

69

Page 70: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Appendix B

70

Page 71: FEDERAL FISCAL YEAR 202-2025 TRANSPORTATION …

Appendix C

71