February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid...

139
February 28, 2008 TRAINING

Transcript of February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid...

Page 1: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

February 28, 2008

TRAINING

Page 2: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

               UDOT                

Contractor PC

USERTrust Vault

World Wide Web

UDOT Electronic Bid System Flow Chart

Page 3: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

BID OPENINGINFORMATION TABLE

WEBSITE

Page 4: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Follow“Download

Instructions”to install the EBS Program on your

Computer.

Page 5: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

After downloading the UDOT EBS Program the

UDOT EBS Icon is added to your desktop.

Click the icon to run the program.

Page 6: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Follow“Download

Instructions”to update DBE

Directory File on your Computer.

Date for last time

modified.

Must have current

DBE Directory File when bidding

Click to viewUDOT DBE

Directory

Page 7: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

UDOT DBE Directory Click “Table of Contents” for a list of

approved DBE subcontractors.

Page 8: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Follow“Digital

Certificate Instructions” to apply for a

digital certificate

and access to UserTrust

vault.

Page 9: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Enter the name of person signing the bid electronically.

Enter the e-mail address for the

person submitting the bid to the

UserTrust vault.

NOTE: The person responsible for signing the

bid and the person responsible for submitting the bid do not have to be

the same person.

Page 10: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 11: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 12: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 13: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 14: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 15: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 16: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 17: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 18: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

WHEN YOU SUBMIT BID

Page 19: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 20: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 21: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

ANNUALREGISTRATION

PROCESS

ANNUAL REGISTRATION

Page 22: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

IF YOU DO NOT HAVE

UDOT ‘USER ID’ AND

‘PASSWORD’.

DBE’S REGISTER WITH UDOT

CIVIL RIGHTS OFFICE.

Page 23: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

COMPLETE ALL REQUIRED

INFORMATION AND CLICK ‘SUBMIT’.

Page 24: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

3648

********

ENTER ‘USER ID’ AND ‘PASSWORD’.

Page 25: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

CONFIRM COMPANY PROFILE

INFORMATION AND CLICK ‘CONTINUE’ .

OPTIONS:“Change My Password”

&“Change Company Information”

Page 26: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

1999 ENTER ‘YEAR COMPANY WAS

ESTABLISHED’ AND ‘ANNUAL GROSS

RECEIPTS’.

CHECK ALL APPLICIABLE ‘WORK

CLASSIFICATIONS’ AND CLICK ‘SUBMIT’.

Page 27: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

SUPPORT PAGE

Page 28: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Recommended

Page 29: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Receive E-mail Notifications

for EBS.

Page 30: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

PROJECT BID INFORMATION

Page 31: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 32: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 33: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 34: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 35: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 36: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 37: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 38: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 39: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 40: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

“Bid Date” and “Project DBE Goal” can be edited when you receive an Addendum instructing you to make the change.

Page 41: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

BUILD DBECOMMITMENTFEDERAL PROJECTS

Page 42: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

1. Check the box for the committed DBE and then check the appliciable committed items.

Page 43: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

2. Indicate “Partial/Complete for each committed item and enter the total dollar amount committed for each item.

Page 44: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

3. View and Print the DBE Commitment Report.

Page 45: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

4. ONLY REQUIRED BY APPARENT LOW BIDDER AFTER BID OPENING.Prints DBE Confirmation letters for each committed DBE. Must be signed by the DBE and faxed to the UDOT Civil Rights Office before project is Awarded.

Page 46: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

GOOD FAITH EFFORTAND

INTEND TO SUBLETFEDERAL PROJECTS

Page 47: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Example: DBE Goal ‘>0’ & Unable to meet Goal.

Page 48: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Example: DBE Goal ‘0’ & Intend to Sublet Work.

Page 49: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 1. Select appropriate Group ID for items quoted.

Page 50: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 1a. After selecting to appropriate Group ID, highlight the items quoted for the group and click ‘Select’.

Selected Items are added to this window.

“Save” after selecting.

Page 51: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 2. Select DBE’s contacted for quotes, indicate how they were contacted, date contacted and the contact results by clicking on dropdowns. Comment is optional.

Page 52: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 3. Add NON-DBE subcontractors providing quotes if they are not listed in Step 4. Assign Items.

Page 53: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 4. Assign Group ID to DBE and Non-DBE subcontractors providing quotes.

1. Highlight applicable DBE/Non DBE subcontractor.

2. Highlight applicable Group Id/ and click “Select”

“Save” after each “Select’.

Page 54: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 5. Enter dollar amounts for each item quoted by DBE/Non DBE subcontractors. Indicate if item was quoted as Partial or Complete by clicking on dropdown.

“Save” after entering quotes for each DBE/ Non-DBE.

250,000.00

Page 55: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 6. View and Print “Comparison” report for DBE/Non DBE quotes. Report will be submitted with your bid package.

Click on dropdown if you created multiple Group ID’s.

Page 56: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Step 6. View and Print “Contact List” for DBE/Non DBE contacted for quotes. Report will be submitted with your bid package.

Page 57: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

BIDDERSLIST

Page 58: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

FIRST TIME YOU CLICK ‘BIDDERS

LIST’

YOU MUST LOAD THE “SUBONTRACTORS”

Page 59: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

LOADINGSUBCONTRACTORS FILE

Page 60: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

CLICK “BID OPENING INFO”

ICON.

Page 61: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

RIGHT MOUSE CLICK “EBS

SUBCONTRACTOR FILE” AND SELECT

“SAVE TARGET AS….”

Page 62: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

SAVE IN C:\EBS/DOWNLOAD

FOLDER

Wait for “Download Complete” and click

“Close”.

Page 63: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

1. OPEN EBS, CLICK ‘BIDDERS LIST’ AND

SELECT “LOAD SUBCONTRACTORS”

2. SELECT “CMPNYDAT.TXT FILE FROM THE C:\EBS / DOWNLOAD” FOLDER AND CLICK “OPEN”.

Page 64: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

WAIT FOR MESSAGE AND

CLICK ‘OK’.

Page 65: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

ADDINGSUBCONTRACTORS

Page 66: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

CLICK ‘BIDDERS LIST’ AND SELECT ‘ADD

SUBCONTRACTOR’ .

Page 67: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

CLICK ‘ADD’, COMPLETE THE

REQUIRED INFORMATION AND

CLICK ‘SAVE’ .

Page 68: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

‘ADDED SUBCONTRACTORS’ NAME WILL APPEAR IN

‘SUBCONTRACTORS’ LIST .

Page 69: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

COMPLETINGBIDDERS LIST

Page 70: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

1. CLICK BOX RIGHT OF

“SUBCONTRACTORS” NAME WHO

SUBMITTED A BID/QUOTE.

2. CLICK BOX RIGHT OF APPLICABLE “PROJECT ITEM

DESCRIPTION(S)”

3. COMPILED “BIDDERS LIST”

REPORT

NOTE: “REG” “ANNUAL CONTRACTOR/SUBCONTRACTOR REGISTRATION” IS CURRENT.

4. CLICK DROPDOWN TO INDICATE “COMPLETE”, “ PARTIAL SERVICE” OR “PARTIAL SUPPLY”.

Page 71: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

OPTION: CLICK, ‘MOVE PROJECT’ TO MOVE ‘BIDDERS LIST’ FROM ONE PC TO ANOTHER.

x

Page 72: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

TIME ANDLANE RENTAL

Page 73: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

EXAMPLE

SPECIAL PROVISION FOR “LANE RENTAL”

COMPLETE LANE RENTAL

TABLE

Page 74: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

OPEN EBS

ENTER QUANTITIES

FROM SPECIAL

PROVISION TABLE.

CHECK SUBTOTAL

WITH SPECIAL

PROVISION TOTAL.

Page 75: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

MULTIPLE TIME SEGMENTS

TABLE

EXAMPLE

SPECIAL PROVISION FOR

“BIDDING CONTRACT

TIME”.

Page 76: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

EBS EXAMPLE

BIDDING CONTRACTOR

ENTERS NUMBER OF

CALENDAR DAYS

Page 77: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

EXAMPLE

BIDDING METHOD A+B

SPECIAL PROVISION

Page 78: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

NOTE“A” AND “B” ARE

SUBTOTALED SEPARATELY

EBS EXAMPLE

BIDDING CONTRACTOR

ENTERS NUMBER OF

CALENDAR DAYS

Page 79: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

PROGRAM VERSION #AND

BID ITEM VERSION #

Page 80: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

EBS PROGRAMVERSION #

BID ITEMVERSION #

NOTE: ‘BID ITEM VERSION #’ WILL BE CHANGED WITH AN ADDENDUM IF THE BID ITEMS ARE MODIFIED (i.e. deleted or added items, item quantity change, etc.)

Page 81: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

EBS WEB LINKS

Page 82: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

OPENS ‘BID OPENING INFORMATION

TABLE’

Page 83: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 84: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

OPENS ‘UNOFFICIAL BID RESULTS’

Page 85: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 86: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

OPENS ‘UserTrust VAULT’

NOTE: NEED UserTrust CERTIFICATE TO ACCESS THE VAULT.

Page 87: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

‘UserTrust VAULT’ FOR CERTIFICATE.

Page 88: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

EBSHELP

Page 89: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 90: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 91: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

EBSPOWERPOINT

TRAINING

Page 92: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

DOWNLOADEBS VERSION 5.01

POWERPOINTPRESENTATION

Page 93: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

ADDENDUMS

Page 94: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

UDOT Addendums must be acknowledged and documented or your bid will be declared Non-Responsive.

Click ‘Add Addendum’ enter initials and click

‘Save’.

Page 95: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

CONTRACTORPROFILE

Page 96: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Required before you can prepare and submit bids.

Contact UDOT for ‘Contractor ID’.

Page 97: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

STATUS OF

WORK

Page 98: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Required for projects >$500,000 and bidder is not prequalified by UDOT as ‘Unlimited’.

Click ‘Insert Row’ and document all uncompleted work for your company. Information is saved from bid to bid and can be updated.

Page 99: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

TRANSMITBID

Page 100: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Click to transmit bid. Also, can be use to view/edit required bid documents.

Required documents will be highlighted depending on type of project (Federal or State).

Click “View” to view the selected document.

Page 101: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 102: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Click “Edit” to edit the selected document.

Page 103: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Complete edit and return to ‘Transmit Bid’.

Page 104: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Enter ‘Bond Authorization Code’

Page 105: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Bond Authorization Code is submit with bid package.

Page 106: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

‘Proposal Guaranty’ can be submitted in lieu of a Bid Bond.

Page 107: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Enter ‘Certified Check #’ or ‘Cashier’s Check #’.NOTE: Check must be equal to 5% of the total amount of your bid.

Page 108: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Check ‘Alternate #1”

or‘Alternate #2

Page 109: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

X

Click“Proposal Guaranty”

Page 110: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Click “Print Forms” and review bid submittal documents before transmitting bid.

Page 111: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Click“Transmit Bid”

to submit bid to UserTrust Vault.

Page 112: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Enter‘Bond Authorization Code’

or‘Proposal Guaranty’.

Click‘Transmit Bid’

Page 113: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Click “Save” to save bid package to diskette.

Possible warning messages after clicking ‘Save’.

Page 114: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

‘Blaine Bailey Construction Company’

Vault opens for certificate holder.

Page 115: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 116: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 117: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 118: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

E-mail notification for bid submitted prior to bid opening date and time.

Page 119: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

E-mail notification for bid submitted after bid opening date and time.

Page 120: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

‘View History’ enables you to view the number bids you submitted to the vault for the selected project.

NOTE:Last bid submitted prior to bid opening date and time is the bid UDOT will receive from the UserTrust Vault for bid opening.

Page 121: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

MOVEBID

INFORMATION

Page 122: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

‘Move Project’ allows multiple users to work different parts of the bid package and then move all the parts

to the target PC used to submit the bid.

Check what you want to move and click ‘Save’

SAVE TO DISKETTE

Page 123: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Click, “Load New Project/Addendum’

Changes are loaded into target

bid package.

Page 124: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

BIDOPENINGPROCESS

Page 125: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Downloaded2:00 P.M.

UDOT downloads bids form the UserTrust Vault at the time specified for opening of bids.

Page 126: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Bids Opened2:30 P.M.

Page 127: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Bids are listed in order of the lowest bid first.

If lowest bid is not 10% over the Engineer’s Estimate, bid

results are published to UDOT’s ‘Unofficial Bid

Results’ website.

Page 128: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 129: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

View unofficial bid results.

Page 130: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 131: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

View unit prices submitted by apparent low bidder.

Page 132: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Web message for bids 10% over Engineer’s Estimate.

Page 133: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Web message if you try to view bids before they opened. Click ‘Refresh’ and try again later.

Page 134: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

All submitted bids are uploaded to an abstract.

Page 135: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

When the Bid Abstract is reviewed and approved by UDOT, the abstract is published to UDOT’s website.

Page 136: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 137: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Used to view and compare all submitted bid prices with the Engineer’s Estimate.

Page 138: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Page 139: February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.

Thank you.

Training