FEATURED COMPANIES THAT ARE PART OF GBT...FEATURED COMPANIES THAT ARE PART OFGBT Global Business...
Transcript of FEATURED COMPANIES THAT ARE PART OF GBT...FEATURED COMPANIES THAT ARE PART OFGBT Global Business...
FEATURED COMPANIES THAT ARE PART OF GBT
Global Business Terminal ( GBT ) is the new corporate campus consisting of eight office towers, builton world class construction standard, highlighted by its functionality, design and green architecture.This business center is intended for companies with national and international reach, that wish topromote their products and businesses.
NEW CONCEPT IN THE REGION
EMPRESAS DESTACADAS QUE SON PARTE DE GBT
Global Business Terminal (GBT), es nuevo campus corporativo que constara de 8 torres de oficinas,creado sobre una base de calidad, destacado por su funcionalidad, diseño y arquitectura verde.Esta central de negocios está destinada para aquellas empresas con alcance nacional comointernacional que desean promover sus productos y negocios.
NUEVO CONCEPTO EN LA REGIÓN TOWER AREADY FOR OCUPATION
TOCUMEN INTERNATIONALAIRPORT
LOCATION
GBT offers the advantage of the best services and facilities in a pleasant and appropriate environment.
FACILITIES AND SERVICES
• Nova Deli Café ®• Hotel Crowne Plaza ® Panama Airport• Transport to Tocumen International Airport
ADMINISTRATION
is a global leader in asset management and professionalservices company ; currently they manage more than 167million m2 worldwide.
They will be responsible for :• Preventive and corrective maintenance of the complex• Safety management systems• Service management of common areas :
Cleaning, gardening, spraying , recycling and parking operation
CORPORATE CAMPUS8 Towers of 6 levels each in a boulevard
With up to 1,547 m2 spaces availableBasic improvements at Level 400
• Spacious common areas• Column-free spaces design• Total electric plant• High speed elevators• Double glazing for energy savings and acoustic• Sprinklers• Pressurized emergency stairs• 24 hour security
FLOOR PLANTLOW LEVEL
AVAILABILITY | TOWER A ( READY FOR OCCUPY ) AND TOWER B ( CONSTRUCTION ) | ASK FOR AVAILABILITY
FLOOR PLANTLOW LEVEL
AVAILABILITY | TOWER A ( READY FOR OCCUPY ) AND TOWER B ( CONSTRUCTION ) | ASK FOR AVAILABILITY
FLOOR PLANTLOW LEVEL
AVAILABILITY | TOWER A ( READY FOR OCCUPY ) AND TOWER B ( CONSTRUCTION ) | ASK FOR AVAILABILITY
FLOOR PLANTCOMPLETE FLOOR
COMPLETE FLOOR1,574 m2
AVAILABILITY | TOWER A ( READY FOR OCCUPY ) AND TOWER B ( CONSTRUCTION ) | ASK FOR AVAILABILITY
FLOOR PLANTDIVIDED LEVEL
AVAILABILITY | TOWER A ( READY FOR OCCUPY ) AND TOWER B ( CONSTRUCTION ) | ASK FOR AVAILABILITY
FLOOR PLANTDIVIDED LEVEL
AVAILABILITY | TOWER A ( READY FOR OCCUPY ) AND TOWER B ( CONSTRUCTION ) | ASK FOR AVAILABILITY
FLOOR PLANTDIVIDED LEVEL
AVAILABILITY | TOWER A ( READY FOR OCCUPY ) AND TOWER B ( CONSTRUCTION ) | ASK FOR AVAILABILITY
TOWER AEl U.S Green Building Council (USGBC)awarded our first LEED Silver certificationtower.
LEED LEADERSHIP IN ENERGYAND ENVIRONMENTAL DESIGN
TOWER BHas been Pre- Certified LEED,in construction cycle.
PROGRESSTOWER B
Tel. (507) 204-5637Cel. (507) 6997-8938Mail. [email protected]