1 | Page of 5
To: James Tokar Montgomery County Public Schools (MCPS)
Division of Construction 45 West Gude Drive Room Suite 4300 Rockville, Maryland 20850
Issue: October 7, 2015
Project: Thomas A. Wootton High School Renovation/Expansion
Meeting: October 6, 2015
Purpose: Feasibility Study, Work Session Meeting #1
Present: Name Company Telephone EmailPaul Falkenbury, AIA Samaha Associates, P.C. 703‐691‐3311 phf@samaha‐arch.com Amy McCarty, AIA, LEED AP Samaha Associates, P.C. 703‐691‐3311 amccarty@samaha‐arch.com Jenny Alvarez, RA, LEED AP Samaha Associates, P.C. 703‐691‐3311 jalvarez@samaha‐arch.com James Tokar MCPS DOC 240‐314‐1008 [email protected] Debbie Szyfer MCPS DOLRP 240‐314‐4705 [email protected] Kimberly Boldon WHS ‐ Principal 301‐279‐8550 [email protected] Joe Mamana WHS ‐ Asst Principal 301‐279‐8550 [email protected] Joe Du Boyce WHS ‐ Asst Principal 301‐279‐8550 [email protected] Crystal Dovman WHS ‐ Asst Principal 301‐279‐8550 [email protected] Philip Hill WHS ‐ Business Manager 301‐279‐8559 [email protected] Maritsa Nicholas WHS ‐ Secretary 301‐279‐8550 [email protected] Cynthia Cunningham WHS ‐ Secretary 301‐279‐8550 [email protected] Antoinette Yanis WHS ‐ Registrar 301‐279‐8565 [email protected] Christopher Thompson WHS ‐ Athletic Director 301‐279‐8575 [email protected] Michael Thompson WHS ‐ Science R. Teacher 301‐279‐8595 [email protected] Maureen Knesel WHS ‐ Spec. Ed Teacher 301‐279‐8592 [email protected] Leslie Richardson WHS ‐ Spec. Ed Teacher 301‐279‐8592 [email protected] Malinda Pierce WHS ‐ Ceramics Teacher 301‐279‐8581 [email protected] Amy Pollin WHS ‐ Social Studies Teacher 301‐279‐8591 [email protected] Bryce Coon WHS ‐ Social Studies Teacher 301‐279‐8591 [email protected] Jennifer Bauer WHS ‐ Social Studies Teacher 301‐279‐8591 [email protected] Kraig Bauer WHS ‐ Social Studies Teacher 301‐279‐8591 [email protected] Sanford Herzon WHS ‐ Science Teacher 301‐279‐8595 [email protected] Catherine Boswell WHS ‐ English Teacher 301‐279‐8585 [email protected] Dominique Parker WHS ‐ English Teacher 301‐279‐8585 [email protected] Melanie Moomau WHS ‐ English Teacher 301‐279‐8585 [email protected] Paul Kirk WHS ‐ P.E. Dept. Chair 301‐279‐8573 [email protected] Sonia Olchyk WHS ‐ Spanish 301‐279‐8587 [email protected] Jillian Storms MSDE 410 ‐767‐0615 [email protected]
2 | Page of 5
Intro: The first Feasibility Study meeting was held at 2:45 p.m. at Wootton High School's auditorium. After a brief introduction by Jim Tokar, the design team presented an overview of the study process and the initial 3 concepts for the school. The following is a summary of the items discussed regarding the Renovation/Expansion: Debbie Szyfer briefly explained what the Capital Improvements Program is and how it
affects the school project. Once completed, the school will have a capacity of 2420 students with a core of 2400. The school will remain functional during construction. Construction will be phased. Paul Falkenbury explained the purpose of the feasibility study, how the main program
components will be located as per staff input, and the resultant options that will be refined moving forward. He explained the following steps after the study as well.
The school is planned to be open on August 2021, if construction starts by summer of 2018. Additionally, site renovations will continue through 2022.
Current Issues: When participants were asked about current school issues that may need to be addressed, they mentioned the following: HVAC systems need to be upgraded to current standards and checked for proper function. Classrooms need to have a phone system that communicates with the main office. The lower level is disconnected from dining room. Current circulation goes through lockers.
This poses a security problem. Clear circulation and way‐finding is not clear. Gymnasium entry very hidden and seems like a back entry. The athletic department needs
a more identifiable entry. There are only 4 tennis courts. For tennis meets, the school shares courts with the adjacent
middle school. New design should help the school play a more cultural role in the community and have a
unique feature or identity that reaches out to parents and neighboring businesses. It may preferable to have classes looking into day‐lit courtyards, not covered commons
since passing students and noise may be distracting to students in classrooms. Current cafeteria is too small. Overflow makes it noisy in corridors. More capacity that
allows for one lunch with more spaces for students to eat at would be better. Music suite is currently too far from Auditorium. A new auditorium should have a higher fly loft and a higher cant than the current one for
better sightlines. Teachers need more workspaces separate from students and for small groups. Current science greenhouse is too small and not easily accessible.
3 | Page of 5
The special education department needs a small room for testing or individual/small group work.
After listening to concerns, Debbie Szyfer talked about the county standards, such as mechanical closets and auditorium capacity, and how these standards may be modified to suit Wootton HS' needs and for future projects. Paul Falkenbury proceeded to highlight some of the current site issues, such as: Temporary staff parking along bus loop has become permanent and quite restricting to bus
flow. Cars and buses do not flow out from Wootton Parkway quickly. Car entry needs to be separated from bus entry.
Entry does not have a secure vestibule. Concept Options: Three concept options for the design were presented. The following were the main features of each option: Option 1A:
∼ Reconfigured lockers with team rooms, larger locker areas, and better circulation. ∼ A larger entry to Athletics Department. ∼ Major components, current gymnasium, auditorium, and cafeteria would stay in place.
Cafeteria and auditorium storage would be expanded. ∼ Classrooms and labs are reconfigured for larger, up‐to‐standard spaces. ∼ Cutting roof opening on upper level eliminates windowless classrooms ∼ Science and technology suite are located in new addition on three levels. There may be
opportunities for a two levels space in hallway to accommodate physics experiments. ∼ Reconfigured administration and counseling suites will have a secure vestibule. ∼ Current relocatable classrooms will be eliminated.
Option 2A:
∼ Reconfigured lockers with team rooms, larger locker areas, and better circulation. ∼ A larger entry to Athletics Department. ∼ Current gymnasium stays in place. The auditorium, music and arts suites, and the
cafeteria would be relocated to the North end of the site over current tennis court location.
∼ New technology and science lab wing would be located where current cafeteria sits with technology labs on the lower level. College Institiute will be on site and a new courtyard provides labs with outdoor access and daylight.
∼ Reconfigured administration and counseling suites will have a secure vestibule which leads to two wide entry corridors.
4 | Page of 5
∼ Media center is relocated to second floor along front of school, providing higher ceilings and more visibility.
∼ Current relocatable classrooms will be eliminated.
Option 3A: ∼ Most transformative option. ∼ Main entry would be relocated to lower level which will make it more visible from
Wootton Parkway. ∼ Reconfigured administration will have a secure vestibule and a large inviting commons
space. ∼ Student activities, College Institute and Counseling Suite are relocated to lower level
along an outdoor space. ∼ Major components, the auditorium, music suite, cafeteria, and the athletics
department would be relocated to the North end of the site over current tennis court location.
∼ New technology and science lab wings would be on two levels with a small courtyard providing labs with daylight.
∼ Media center is relocated to second floor on southeast corner of school, providing higher ceilings and more visibility.
∼ A third level of classrooms with potential for future addition. ∼ Current relocatable classrooms will be eliminated.
All options involve a renovation of existing classrooms and finishes, and minor reconfigurations as necessary to provide up‐to‐standard spaces. After answering some general questions regarding cost estimates, the design and the proposed site circulation, the participants presented the feedback below: Regarding option 3A:
‐ It seems like a good idea to have the main entry on the lower level. ‐ The gymnasium is too far from the stadium. ‐ The site entries seem too tight. ‐ All noisy activities as located on north end may be an issue with neighboring residences.
There should be a traffic light at North entry. Paul Falkenbury explained that a traffic study will be performed and the final determination, based on study recommendations, would be done by the department of transportation.
Auxiliary gyms may be too noisy to be placed over the music suite. Access to gymnasium lobby should be at grade if possible. More computer access is necessary. Debbie Szyfer explained all classrooms are now
designed to provide computer access and promethean boards to reduce the need for computer labs and avoid scheduling conflicts.
Wireless network system needs to be designed for proper signal coverage throughout.
5 | Page of 5
Language arts teacher mentioned chrome books are not appropriate for all programs and teaching styles. Laptops or PCs are required.
Current lecture room with stepped seating is great; should be preserved if possible. Large conference rooms for staff meetings are necessary.
Main Gym should be on lower lever on south side for better proximity to stadium. An additional option could possibly be explored where only the cafeteria gets relocated. It would be preferable to not have staff parking within bus loop or entering at same
location. Although stadium has been resurfaced with new turf, there are no concessions or
restrooms.
This concluded the meeting. Please review these meeting minutes with the proper individuals and advise of any conflicts, additions, or modifications you may wish to incorporate. The presentation and attendance sheet has been included for reference. Cordially,
Jenny C. Alvarez, RA, LEED AP Samaha Associates, PC jalvarez@samaha‐arch.com
OCTOBER 6, 20151
1
THOMAS S. WOOTTONHIGH SCHOOL
FEASIBILITY STUDY Work Session #1October 6, 2015
OCTOBER 6, 20151
2
SAMAHA HISTORY* 60 Years of design, providing architectural, interior design, and planning services in the Washington metropolitan area.* 25 Years working with Montgomery County Public Schools.* Over 20 projects with Montgomery County Public Schools.* Over 20 School Phased Occupied Renovations
CHILD DEVELOPMENT CENTERSARLINGTON SERVICE CENTERBOLLINGFORT MEADEFORT MYERGOOD BEGINNINGSINDIAN HEADLORD OF LIFENAVEL SECURITY STATIONNNMC BETHESDAPATUXENTQUANTICOST. GEORGES DAYCARESYDENSTRICKER DAYCARETEDDY BEAR DAYCARE
ELEMENTARY SCHOOLSALEXANDRIA COUNTRY DAY ARTHUR MIDDLETON BAILEY’SBARRETTBURTONSVILLECRESTWOODCUNNINGHAM PARK DANIELS RUNDR. GUSTAVUS BROWNFORESTVILLEEVA TURNERFORT BELVOIRGREAT FALLSINDIAN HEAD JACKSON ROADJAMESTOWNMOUNT DANIELNOTTINGHAM TUCKAHOEVIRGINIA HILLSWEYANOKE
MIDDLE SCHOOLSAUBURNBETHESDA-CHEVY CHASE #2CABIN JOHNELKRIDGE LANDINGFRANKLINKILMERLIBERTYMACFARLANDMAYFIELD WOODSNORTH BETHESDANYSMITH SCHOOL (K-8)ORMOND STONERACHEL CARSONROCK TERRACETILDENWASHINGTON IRVING WESTMINSTER(K-8)
HIGH SCHOOLSANNANDALEBROAD RUNCHANTILLYGAITHERSBURG HAYFIELD SECONDARYHENRY E. LACKEYLAKE BRADDOCK SECONDARY LEELOUDOUN VALLEYMARSHALLMOUNT VERNONNORTHWESTNORTHWOODSHERWOODTHOMAS WOOTTON THOMAS STONEWALTER JOHNSONWATKINS MILL WELLNESS
Educational Experience
* PROJECTS LOCATED IN MONTGOMERY COUNTY
OCTOBER 6, 20151
3
SEVEN PRINCIPLES OF DESIGN1. Schools are centers of our communities.
2. The design of schools evolves through a community based design process.
3. The design of schools should be student centered.
4. Learning spaces should be fl exible and adaptable.
5. The learning environment should be secure and healthy.
6. Technology should infuse learning.
7. The historic and urban character of the school must be respected.
OCTOBER 6, 20151
4
FEASIBILITY STUDY PROCESS* SPACE SUMMARY AND EDUCATIONAL SPECIFICATIONS ARE DEVELOPED * MCPS SELECTS ARCHITECT AND ENGINEERS* MCPS HIRES CONSULTANTS TO CONDUCT AN NRIFSD PLAN, GEOTECHNICAL REPORT, AND SITE SURVEY* KICK-OFF MEETING HELD TO SET UP MEETING DATES* ARCHITECT AND ENGINEERS CONDUCT A PRELIMINARY EXISTING CONDITIONS SURVEY* NOTIFICATIONS ARE SENT TO THE SCHOOL AND COMMUNITY INVITING THEM TO PARTICIPATE IN THE FEASIBILITY STUDY WORK SESSIONS* EASEMENTS OR RIGHT-OF-WAY ARE IDENTIFIED ON SITE* ARCHITECT PRESENTS POSSIBLE DESIGN SOLUTIONS FOR THE PROJECT AT EACH WORK SESSION. THE DESIGNS WILL BE REVISED PER STAFF, STUDENT, AND COMMUNITY INPUT. * PRELIMINARY CODE ANALYSIS IS COMPLETED* PRELIMINARY PROJECT PHASING WILL BE DEVELOPED* COST ESTIMATES FOR EACH OF THE FINAL THREE OPTIONS WILL BE PROVIDED FOR BUDGETING PURPOSES* FINAL OPTIONS WILL BE PRESENTED TO THE MCPS DOC DIRECTOR FOR REVIEW AND APPROVAL* ARCHITECT PREPARES DRAFT FEASIBILITY STUDY REPORT FOR MCPS REVIEW* FINAL FEASIBILITY STUDY REPORT WILL BE DISTRIBUTED TO THE SCHOOL AND COMMUNITY STAKEHOLDERS* FEASIBILITY STUDY WILL BE SUBMITTED TO MSDE FOR REVIEW* PROJECT WILL BE INCLUDED IN THE NEXT CIP FOR CONSIDERATION
OCTOBER 6, 20151
5
SITE ISSUES
BUILDING ISSUES* EXISTING WINDOWLESS SPACES* EXISTING AUDITORIUM SEATS 1,200 * EXISTING SPACES DO NOT MEET CURRENT EDUCATION SPECIFICATIONS* EXISTING GYM ENTRY HAS A LOW PROFILE
* EXISTING STADIUM TO REMAIN* BUS LOADING * STUDENT DROP OFF* VIEW TO SERVICE AREA/RECEIVING* LIMITED SPACE FOR ADDITION* GRADE CHANGES
CONSTRUCTION ISSUES* PHASED OCCUPIED CONSTRUCTION
OCTOBER 6, 20151
6
PROGRAM
NET SQUARE FOOTAGE: 249,820 SFGROSS SQUARE FOOTAGE: 384,338 SF(65% EFFICIENCY)
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
ART
ADMIN
HEALTH
COUNSELING
SPECIALEDUCATION
CCDCCD
ESOLESOL
CCRDCCRD
TECH
AOITAOITMEDIAMEDIACENTERCENTER
PHYSICALEDUCATIONEDUCATION
AUDITORIUMAUDITORIUM
CLASSROOMS
BUILDINGBUILDINGSERVICESSERVICES
SCIENCE
PROGRAM
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATION
ART ARTART
ADMINADMADMININ
HEALTHHEAHEALTHLTH
COUNSELINGCOUCOUNSENSELINLINGG
SSSEE
CLASSROOMCLACLASSRSSROOMOOMSS
SC NCSCISCIENCENCEE
STUDENT STUDENT DININGDINING
OCTOBER 6, 20151
7
EXISTING SITE PLAN
EXISTING SCHOOLEXISTING SCHOOL
STAFF PARKINGSTAFF PARKING
STUDENT PARKINGSTUDENT PARKING
TENNIS COURTSTENNIS COURTSBASEBALL FIELDBASEBALL FIELD
FOOTBALL FIELDFOOTBALL FIELD
SOFTBALL SOFTBALL FIELDFIELD
BU
SES
BU
SES
WO
OTT
ON
PA
RK
WAY
WO
OTT
ON
PA
RK
WAY
PRACTICEPRACTICEFIELDFIELD
DROP OFFDROP OFF
MAIN ENTRYMAIN ENTRY
AUDITORIUM ENTRYAUDITORIUM ENTRY
GYMGYMENTRYENTRY
ROBERT FROST MIDDLE SCHOOLROBERT FROST MIDDLE SCHOOL
OCTOBER 6, 20151
8
EXISTING GROUND FLOOR
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
SECOND GYMSECOND GYMCCDCCD
LOCKER LOCKER ROOMSROOMS
WEIGHT WEIGHT GYMGYM
DININGDINING
KITCHENKITCHEN
BUILDINGBUILDINGSERVICESSERVICES
BUILDINGBUILDINGABOVEABOVE
AUXAUXGYMGYM
AUXAUXGYMGYM
BOILERBOILER
TECHNOLOGYTECHNOLOGY
-16’-10”
-13’-4”
-13’-4”
OCTOBER 6, 20151
9
EXISTING FIRST FLOOR
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
AUDITORIUMAUDITORIUM
STAGESTAGE
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
MAIN GYMMAIN GYM
GYM BELOWGYM BELOW
MUSIC MUSIC SUITESUITE
ARTARTSUITESUITE
MEDIA MEDIA CENTERCENTER
HEATLHHEATLHSUITESUITE
ADMIN ADMIN OFFICESOFFICES
COUNSCOUNSSUITESUITE
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
COURTYARDCOURTYARD
COURTYARDCOURTYARD
COURT-COURT-YARDYARD
COURT-COURT-YARDYARD
COMMONSCOMMONS
3’-8”
0’
0’
OCTOBER 6, 20151
10
EXISTING SECOND FLOOR
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
GYM BELOWGYM BELOW
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
SCIENCE SCIENCE SUITESUITE
CLASSROOMSCLASSROOMS13’-4”
OCTOBER 6, 20151
11
SITE PLAN - OPTION 1A
EXISTING SCHOOLEXISTING SCHOOLTO BE RENOVATEDTO BE RENOVATED
STAFF PARKINGSTAFF PARKING
STUDENT PARKINGSTUDENT PARKING
NEW ADDITIONNEW ADDITIONBASEBALL FIELDBASEBALL FIELD
FOOTBALL FIELDFOOTBALL FIELD
SOFTBALL SOFTBALL FIELDFIELD
BUSESBUSES
WO
OTT
ON
PA
RK
WAY
WO
OTT
ON
PA
RK
WAY
TENNIS TENNIS COURTSCOURTS
DROP OFFDROP OFF
MAIN ENTRYMAIN ENTRY
AUDITORIUM ENTRYAUDITORIUM ENTRY
GYMGYMENTRYENTRY
BUS STACKING - 22CAR STACKING - 40STAFF PARKING - 180STUDENT PARKING - 150
OCTOBER 6, 20151
12
GROUND FLOOR - OPTION 1A
SECOND GYMSECOND GYMCCDCCD
LOCKER LOCKER ROOMSROOMS
WEIGHT WEIGHT GYMGYM
DININGDINING
KITCHENKITCHEN
BUILDINGBUILDINGSERVICESSERVICES
TEAMTEAMROOMSROOMS
BUILDINGBUILDINGABOVEABOVE
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
HEALTHHEALTH
-16’-10”
-13’-4”
LOBBYLOBBY
COMMONSCOMMONS
-13’-4”
-13’-4”
-13’-4”
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
13
FIRST FLOOR - OPTION 1A
AUDITORIUMAUDITORIUM
STAGESTAGE
TECHNOLOGYTECHNOLOGYLABSLABS
ENGINEERINGENGINEERINGLABSLABS
CLASSROOMSCLASSROOMS
LFILFI
SCBSCB
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
MAIN GYMMAIN GYM
GYM BELOWGYM BELOW
MUSIC MUSIC SUITESUITE
ARTARTSUITESUITE
MEDIA MEDIA CENTERCENTERAUX GYMSAUX GYMS HEATLHHEATLH
SUITESUITE
ADMIN ADMIN OFFICESOFFICES
COUNSCOUNSSUITESUITE
AOITAOIT
COLLEGECOLLEGEINSTITUTEINSTITUTE
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
0’
10’-8”
3’-8”
3’-8”0’
0’
3’-8”
BUILDING BUILDING ABOVEABOVE
COURTYARDCOURTYARD
COURTYARDCOURTYARD
COURT-COURT-YARDYARD
COURT-COURT-YARDYARD
COURT-COURT-YARDYARD
COURT-COURT-YARDYARD
MECHMECH
COMMONSCOMMONSEXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
14
SECOND FLOOR - OPTION 1A
GYM BELOWGYM BELOW
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
SCIENCE SCIENCE SUITESUITE
CLASSROOMSCLASSROOMSCLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
STUDENT STUDENT ACTIVITIESACTIVITIES
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
18’-4”
13’-4”
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
15
THIRD FLOOR - OPTION 1A
SCIENCE SCIENCE SUITESUITE
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
33’
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
16
SITE PLAN - OPTION 2A
EXISTING SCHOOLEXISTING SCHOOLTO BE RENOVATEDTO BE RENOVATED
STAFF PARKINGSTAFF PARKING
STUDENT PARKINGSTUDENT PARKING
NEW ADDITIONNEW ADDITIONBASEBALL FIELDBASEBALL FIELD
FOOTBALL FIELDFOOTBALL FIELD
SOFTBALL SOFTBALL FIELDFIELD
BUSESBUSES
WO
OTT
ON
PA
RK
WAY
WO
OTT
ON
PA
RK
WAY
PRACTICEPRACTICEFIELDFIELD
DROP OFFDROP OFF
MAIN ENTRYMAIN ENTRY
AUDITORIUM ENTRYAUDITORIUM ENTRY
GYMGYMENTRYENTRY
TENNIS TENNIS COURTSCOURTS
BUS STACKING - 22CAR STACKING - 40STAFF PARKING - 180STUDENT PARKING - 150
OCTOBER 6, 20151
17
GROUND FLOOR - OPTION 2A
SECOND GYMSECOND GYMCCDCCD
LOCKER LOCKER ROOMSROOMS
WEIGHT WEIGHT GYMGYM
BUILDINGBUILDINGSERVICESSERVICES
TEAMTEAMROOMSROOMS
COURTYARDCOURTYARD
TECHNOLOGYTECHNOLOGYLABSLABS
ENGINEERENGINEERLABLAB
BUILDINGBUILDINGABOVEABOVE
MP MP LABLAB
AOITAOIT
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
-16’-10”
-13’-4”
LOBBYLOBBY
-13’-4”
-13’-4”
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
18
FIRST FLOOR - OPTION 2A
DININGDINING
KITCHENKITCHEN
AUDITORIUMAUDITORIUM
STAGESTAGE
CLASSROOMSCLASSROOMS
LFILFI
SCBSCB
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
MAIN GYMMAIN GYM
GYM BELOWGYM BELOW
MUSIC MUSIC SUITESUITE
ARTARTSUITESUITE
AUX GYMSAUX GYMS HEATLHHEATLHSUITESUITE
ADMIN ADMIN OFFICESOFFICES
COUNSCOUNSSUITESUITE
COLLEGECOLLEGEINSTITUTEINSTITUTE
CLA
SSR
OO
MS
CLA
SSR
OO
MS
SCIENCE SCIENCE SUITESUITE
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
CO
UR
TYA
RD
CO
UR
TYA
RD
COURTYARDCOURTYARD
COURTYARDCOURTYARD
COURTYARDCOURTYARD
COURT-COURT-YARDYARD
COURT-COURT-YARDYARD
MECHMECH
0’
3’-8”LOBBYLOBBY
COMMONSCOMMONSEXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
19
SECOND FLOOR - OPTION 2A
MEDIA MEDIA CENTERCENTER
SCIENCE SCIENCE SUITESUITE
GYM BELOWGYM BELOW
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
SPECIAL EDSPECIAL ED
CLA
SSR
OO
MS
CLA
SSR
OO
MS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
COURTYARDCOURTYARD13’-4”
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
20
SITE PLAN - OPTION 3A
EXISTING SCHOOLEXISTING SCHOOLTO BE RENOVATEDTO BE RENOVATED
STUDENT PARKINGSTUDENT PARKING
STAFF PARKINGSTAFF PARKING
NEW ADDITIONNEW ADDITION
BASEBALL FIELDBASEBALL FIELD
FOOTBALL FIELDFOOTBALL FIELD
SOFTBALL SOFTBALL FIELDFIELD
DROP OFFDROP OFF
WO
OTT
ON
PA
RK
WAY
WO
OTT
ON
PA
RK
WAY
PRACTICEPRACTICEFIELDFIELD
BUSESBUSES MAIN ENTRYMAIN ENTRY
ACTIVITY ENTRYACTIVITY ENTRY
NEW ADDITIONNEW ADDITION
ACTIVITY ENTRYACTIVITY ENTRY
STUDENT STUDENT PARKINGPARKING
TENNIS TENNIS COURTSCOURTS
BUS STACKING - 18CAR STACKING - 55STAFF PARKING - 150STUDENT PARKING - 200
OCTOBER 6, 20151
21
GROUND FLOOR - OPTION 3A
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
-13’-4”-16’-10”
COURTYARDCOURTYARDCCDCCD
HEALTHHEALTH
ADMINADMINSUITESUITE
STUDENTSTUDENTACTIVITIESACTIVITIES
HEATLHHEATLHSUITESUITE
AOITAOIT
COUNSCOUNSSUITESUITE
COLLEGE COLLEGE INSTITUTEINSTITUTE
LOBBYLOBBY
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
22
FIRST FLOOR - OPTION 3A
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
COURTYARDCOURTYARD
COURTYARDCOURTYARD
COURTYARDCOURTYARD
COURT-COURT-YARDYARD
COURT-COURT-YARDYARD
COURT-COURT-YARDYARD
0’
0’
0’
3’-8”
3’-8”
0’
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
ENGINEERING ENGINEERING LABLAB
TECHNOLOGY TECHNOLOGY LABLAB
MP LABMP LAB
MEDIA MEDIA CENTERCENTER
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
ART ART SUITESUITE
MUSIC MUSIC SUITESUITE
LOCKER LOCKER ROOMSROOMSTEAMTEAM
ROOMSROOMS
LFILFI
SCBSCB
CLASSROOMSCLASSROOMS
ART ART SUITESUITE
AUDITORIUMAUDITORIUM
STAGESTAGE
KITCHENKITCHEN
DININGDINING
LOBBYLOBBY
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
COMMONSCOMMONS
COMMONSCOMMONS
OCTOBER 6, 20151
23
SECOND FLOOR - OPTION 3A
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
13’-4”
13’-4”
16’
0’8’
SCIENCE SCIENCE SUITESUITE
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
SPEC EDSPEC ED
SECOND GYMSECOND GYM
MAIN GYMMAIN GYM
AUX GYMSAUX GYMS
SPEC EDSPEC ED
SCIENCE SCIENCE SUITESUITE
CLASSROOMSCLASSROOMS
LOBBYLOBBY
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
24
THIRD FLOOR - OPTION 3A
CLASSROOMSCLASSROOM SUPPORTSCIENCE AND TECHNOLOGYSCIENCE AND TECH SUPPORTARTS AND MUSICARTS AND MUSIC SUPPORTACTIVITIESACTIVITIES SUPPORTADMINISTRATIONSERVICESCIRCULATION
28’
CLASSROOMSCLASSROOMS
CLASSROOMSCLASSROOMS
EXISTING BUILDING OUTLINENEW BUILDING OUTLINEEXISTING TO BE RENOVATED
OCTOBER 6, 20151
25
QUESTIONS?Feasibility Study Work Session Schedule
Work Session #1
Work Session #2
Work Session #3
Work Session #4
Community Presentation
2:45 pm
7:00 pm
2:45 pm
7:00 pm
7:00 pm
October 6, 2015
October 22, 2015
November 4, 2015
December 2, 2015
December 15, 2015