Feasibility Study for Stripping Test along L4T Line (Beam Dynamics) Veliko Dimov 23.04.2013 1

description

Feasibility Study for Stripping Test along L4 T L ine ( Beam Dynamics ). Veliko Dimov 23.04.2013. Outline. Summary of previous meeting (L4-BCC038) about stripping test along L4Z. Feasibility study for stripping test along L4T line (beam dynamics). Conclusion & suggestions. - PowerPoint PPT Presentation

Transcript of Feasibility Study for Stripping Test along L4 T L ine ( Beam Dynamics )

Page 1: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

1

Feasibility Study for Stripping Test along L4T Line

(Beam Dynamics)

Veliko Dimov23.04.2013

Page 2: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

2

Outline

• Summary of previous meeting (L4-BCC038) about stripping test along L4Z.

• Feasibility study for stripping test along L4T line (beam dynamics).

• Conclusion & suggestions.

Page 3: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

3

Injection Scheme L4PSB

Page 4: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

4

Option 1 : Installing Only Stripping Foil Unit

• Requires about 20 cm of free space along the beam line

Page 5: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

5

Option 1 : Installing Only Stripping Foil Unit

Page 6: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

6

• Requires about 1.3m of space along the beam line.

Option 2: Installing Stripping Foil Unit with two Chicane Magnets

Ref: L4-T-EP-0002 rev 1.0

Page 7: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

7

Option 2: Installing Stripping Foil Unit with two Chicane Magnets

Page 8: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

8

• Bending angle at PSB injection: 66mrad gives around 45 mm offset of the proton beam.

• Beam pipe radius is 50mm.

• Possibility of hitting the beam pipe and missing the dump!!!

Option 2: Installing Stripping Foil Unit with two Chicane Magnets

Page 9: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

9

L4T

Page 10: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

10

L4T• 10 quadrupole and 3 bending

magnets before the debuncher cavity. D

ebucher

Page 11: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

11

Advantage of having the test along the L4T line

• Along the L4T, a movable dump can be aligned according to the proton beam.

Along L4Z

Along L4T

Page 12: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

12

Objective of the simulations• H- beam from L4 should fit inside the stripping

foil.• H0 and H- beams after stripping should fit inside

the monitors in front of the internal dump.• Proton beam after stripping must be

transported to dump safely.

Page 13: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

13

Beam size along L4T• No loss along the L4T.• Parallel beam on the stripping foil (important for

transporting the beam to the dump after stripping).• Smaller size on horizontal plane (compatible with the foil

& screen sizes).

Page 14: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

14

Beam size along L4T• There is no significant growth in

beam size (even in 10m after the foil)Foil

Page 15: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

15

Spot size on the foil• The 99 per cent

beam size on the stripping foil is

x=±6mm, y = ±10mm• Because beam size

does not change rapidly, this is also the beam spot size on the H0&H- monitors.

Page 16: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

16

Spot size on the foil can be changed

Page 17: Feasibility  Study for Stripping Test along  L4 T L ine ( Beam Dynamics )

17

Conclusion and suggestions• From beam dynamics point of view, a

measurement bench can be installed at the position of debuncher cavity along the L4T.

• It may be a good idea to install two quadrupole magnets between the test bench and the movable dump. They may be necessary if the beam size is changed on the stripping foil.