    ROSEBURNPARKSHELTERFEASIBILITYSTUDY

    RevAUpgrade/refurbishdisusedpublictoiletandformcommunityshelter

    07December2012PreparedbyCraigProudfootForFriendsofRoseburnPark

    2012onefootsquare

    Thisreportisfinancedbygrantsfrom:

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    2/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    ContentsHISTORY..................................................................................................................................................3

    BACKGROUND.........................................................................................................................................6

    SCHEDULEOFWORKS.............................................................................................................................8

    CONDITION&DILAPIDATIONSURVEY..................................................................................................13

    CONSIDERATIONS.................................................................................................................................15

    CONCLUSION.........................................................................................................................................

    17

    PHOTOGRAPHS.....................................................................................................................................18

    DRAWINGS............................................................................................................................................38

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    3/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    HISTORYThe

    land

    now

    occupied

    by

    Roseburn

    Park

    used

    to

    be

    arather

    insalubrious,

    swampy

    area

    on

    the

    edge

    oftheWaterofLeith. ThiswasfilledinandleveledbytheCityCouncilin1891,butunfortunatelystill

    hasapropensityforseriousfloodingwhentheriver is inspate. Afterreclamation,thegroundwas

    leased for recreational purposes and the Edinburgh Polo Club (founded in 1880) moved there,

    stablingitsponiesatRussellRoad. In1898thecitypurchasedabouttenacresoflandadjoiningthe

    polo groundfrom the Balfourfamily of Balburnie and turned this into Roseburn Park. Sporting

    facilitiesweredevelopedincludinggolfwiththefoundingofRoseburnGolfClub in1901. Later,the

    game

    of

    rugby

    asserted

    its

    authority

    with

    the

    erection

    of

    Murrayfield

    Stadium

    in

    the

    1920s

    on

    the

    old

    pologroundandpartofthegolfcourse. Thestadiumopenedinablazeofgloryon21March1925

    withScotlandplayingEngland.

    FROMOLDMURRAYFIELDANDCORSTORPHINEROBINSHERMAN:PP7RoseburnParktakesitsnamefromaburndrainingintoCorstorphineLoch.Thelochwasoriginallya

    glaciallake,givingrisetoalargeareaofmarshland,whichwasfinallydrainedinthe17thcentury.

    Thestaff

    shelter

    and

    tool

    store

    was

    built

    circa.

    1903

    by

    the

    City

    Architects

    Department

    and

    used

    as

    a

    bothybytheparkkeepers. Thebuildingwaslaterconvertedforuseasapublictoiletin1936having

    theopenair lavatoriesroofedoverandreplacedwithWCcubiclecompartments. Thebuildinghas

    largelybeenunoccupiedinrecentyearsandhasbeenusedpredominantlyforstorage.

    Thereareanumberofcommunitydevelopmentandimprovementprojectsintheareawhichserve

    to strengthen the local connection with Roseburn Park whilst providing additional amenity for

    recreational groups. There were historically two cricket pitches formed in 1900 and the park

    continuesto

    be

    used

    extensively

    by

    sports

    groups

    including

    Murrayfield

    DAFS

    cricket

    club

    who

    use

    theadjacentRoseburnParkPavilion;keepingupthehistorictraditionofthesportinthepark.

    The Friends of Roseburn Park have recently commissioned and completed amural on the East

    elevationofthepavilionandthereareproposalsforanallweathertabletennistabletobelocated

    onthehardstanding. Thesesmall,butsignificant improvementworks inRoseburnParksuggesta

    feelingofpride intheareaandhelptocrystallisearealsenseofplace,capturingtheessenceand

    spiritofacommunitysidentitywithitssurroundingenvironment. Thistypeofinvestmentinlocus

    madebycommunitygroupssuchastheFriendsofRoseburnParkwillensuretheparkcontinuesto

    beenjoyedbylocalresidents,socialgroupsandvisitorstothearea.

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    4/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    EDWARDIANPHOTOGRAPHFROMOLDMURRAYFIELDANDCORSTORPHINEROBINSHERMAN:PP7

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    5/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PLANEXTRACTFROMORIGINAL1903DRAWING

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    6/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    BACKGROUNDIt

    is

    proposed

    that

    the

    existing

    disused

    public

    toilet

    is

    re

    furbished

    and

    over

    hauled

    to

    revive

    its

    use

    asboth a community shelter and toilet facilitywithwheelchair access. The shelterwillbeused

    occasionally foropendaysbyFRPandtheusewillbeextendedtoothercommunitygroups,sport

    groups,scoutsandschools.

    Theshelterwillbeusedtoprepareteas/coffeesandsandwicheswhenrequiredandwillbefuture

    proofed to allowprovision for a fridge andother small cooking appliances tomeet any growing

    demandsasthefunctionanduseoftheshelterdevelopsovertime. Thismay include lightsocial/

    commercialenterprise

    for

    fundraising

    during

    open

    days.

    It is thought that the shelter couldbeused formeetingsby FRP aswell asother resident social

    groupsandassuch,adequateseatingandatableshouldbeprovided. Tomaximiseontheefficiency

    of the small space, all furniture should be dismountable and storage should be carefully

    incorporated around the roomwith the internal space being as flexible as possible tomeet any

    futureuserequirements.

    TheWorksThefollowingsummaryoftheproposedworkswillformthebasisfortherefurbishment.

    1. The additional extension (circa. 1936) to the West elevation of the building is to becompletelyremoved,leavingonlytheoriginalbuiltprotrusion.

    2. Roof tobeoverhauled and timbers treated/ replaced asnecessary, surfacewaterproofedwith

    felt

    or

    similar

    and

    then

    finished

    with

    traditional

    tiles

    to

    match

    the

    original.

    3. All redundant gutters anddownpipes tobe removed and remaining tobemade in goodworkingorder.

    4. Allexistingdividingwallstoberemoved.5. Ceilingtobetakendowntoexposeexistingtimberraftersabovemainspace.6. Existing coldwater tank to be removed andwater to be taken directly from themains

    supply.

    7. Wheelchair accessible, unisex toilet to be installed to rear of shelterwith allowance forwheelchairaccess. Toilet to includeWC,washhandbasinandallnecessarygrab rails to

    meet current DDA requirements

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    7/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    12.Traditionaldetailstobepickedoutandaccentuatedwhereappropriate.13.Externaltimberandmasonrypaintfinishestomatchthosethoughttobeoriginalandofthetime. FromdiscussionswithaCECplanninghistorian, it is thought thatblackwouldbea

    suitable colour for the woodwork finish and perhaps a slightly offwhite colour for the

    renderedwalls. ThisitemisfordiscussionwithFRP.

    14.Further discussionswith LocalAuthority Building Standardsdepartment necessaryduringthe Building Warrant stage to determine the scope of works required tomeet current

    regulations. The extentsof thisupgradingworkwillbe at thediscretion of theBuilding

    Controlofficer.

    15.Theexistingconcreteslabisthoughttobesufficientforpurpose,thoughfurtherinspectionwillberequiredtoconfirmsuitabilityandwhetheranyremedialworkisrequired.

    16.OriginaltimberwindowstobereinstatedtoEastandWestelevationwithglazingbarsandastragalstomakeup3x3glazingpanes.

    17.Timbershutterstobefittedtoallwindows.18.Floor to be finishedwith hardwearing nonslipwater resistant surface and be coved at

    skirtingleveltoprovideadequateprotectiontothewallsfrompotentialflooding.

    19.Allelectrical sockets tobepositioned above flood levelwith suitableprovision for futureappliances.

    20.Asmallrefreshmentspreparationareaistobeformedwithinthemainspaceincorporatingakitchen sink, worktop space, storage space and future provision for additional small

    appliances.

    21.ABelfastsinkistobefittedwithinthemainareaforuseasacleanerssink.22.Storageandshelvingprovidedthroughoutatasuitablelevelabovethefloodline.23.Explorepotentialforperimeterbenchseatingwithintegratedstorage.24.Water and drainage to be overhauled to allow additional WC and sink outlets and all

    connectionstothemainsewermadegood.

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    8/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    SCHEDULEOFWORKSGENERALThe following Schedule of Works is provided purely for feasibility purposes and is subject tochanges determined by the Approved Building Warrant, developments to the proposal andamendmentsmadebytheclient.Anydiscrepanciesorinconsistenciestobereported.PREPARATIONS&PRELIMINARIESContractor to accept responsibilityfor coordination, supervision& administration of TheWorks,

    including

    all

    sub

    contracts,

    together

    with

    arranging

    a

    programme

    with

    Local

    Authority,

    statutory

    undertakers& subcontractors.Obtain& supply information as requiredfor coordination of The

    Work. Beforecommencingwork,prepareinanapprovedformaprogrammeforTheWorks,showing

    sequenceandtimingofprincipalactivities. Makeallowanceforsubcontractsincludingpreparation

    ofspecialists'drawings,andanyotherworkconcurrentwiththeContract.

    AlldimensionstobeverifiedonsitebyContractorpriortocommencementofoperations,particularly

    where offsite component assembly is involved. Figured dimensions takeprecedence over those

    scaled. Contract administrator (C.A.) to be notified of any significant discrepancies or where

    uncertaintyexists.

    Components

    must

    only

    be

    manufactured

    from

    site

    verified

    sizes.

    PROVISIONALITEMSAllocationforinsurances,cleaning,skipsandremovalofsitewaste.Allstorageitemstobetemporarilyrelocatedtoallowsafe,unobstructedwork.

    ASBESTOSA

    full

    refurbishment

    and

    demolition

    asbestos

    survey

    is

    to

    be

    carried

    out

    prior

    to

    any

    works

    commencing.

    DOWNTAKINGS,SLAPPINGS,ETC.Beforestartingdemolitionwork,contractortoarrangedisconnectionofservicesasappropriate.

    All structuralworks tobecarriedout infullaccordancewithStructuralEngineer'sdetails,method

    statementsandspecifications.

    Alldowntakingworkindicatedbybrokenlinesonplans.

    1. Nonloadbearinginternalmasonrybrickwallstobetakendownasindicatedbybrokenlineonplan.

    2. Toiletpartitionwallsanddoorstobetakendownasindicatedbybrokenlineonplan.3. Extension from 1936 toilet block externalwalls and roof taken down as indicated by

    b k li l

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    9/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    DRAINAGEContractortoarrangeforinspectionanddraintest(s)tothesatisfactionoftheLocalAuthorityprior

    tocovering

    up

    any

    drainage

    works,

    and

    upon

    completion.

    ThisistoberecordedinwritingtotheCA.

    Air admittance valves (AAV) where installed to be positioned above the overflow level of any

    applianceandtobefullyaccessible.

    InternalsoilandwastepipeworkandfittingstobeUPVCorABSbyMarleyorequalandapproved.

    Anynewexternaldrainagebranchestobeincastirontoconnecttoexistingstacks/drainrun.

    1.Existing

    soil

    drainage

    to

    be

    reconfigured

    to

    accommodate

    new

    fixtures

    and

    fittings

    added

    to

    system.

    2. Existingdrainagetobeexposedwherenecessaryandrecordedinareaswherenewdrainagerunsaretobeconnectedtotheexistingsystem.

    3. Additional fixtures and fittings: accessibleWC, accessibleWHB, kitchen sink, Belfast sink,provisionfordishwasher.

    EXTERNALMASONRYWALLSANDFOUNDATIONS1. FoundationsfornewexternalwalltoSEspecification.2. New externalwalls are to be constructed using 9 brickwork tomatch existing coursing.

    Wallstobefinishedinternallywithdurable,waterproofmasonrypaint.

    3. BlockupreardoorwayonNorthelevationtoundersideofwindowcillleveltoformopeningforreinstatedwindowtobeconstructedusing9brickworktomatchexistingcoursing.

    INTERNALMASONRYWALLS,PARTITIONS1.

    All

    new

    internal

    walls

    are

    to

    be

    constructed

    in

    single

    leaf

    of

    4.5

    brickwork

    to

    match

    existing

    coursingasindicatedonplan.Wallstobefinishedindurable,waterproofmasonrypaint.

    2. DooropeningwithininternalwalltohaveconcretelintelovertoSEspecification.ROOF

    1. Rooftobeoverhauled. Roofrafters,joists,sarkingboardsandfasciatobetreatedand/orreplaced as necessary, surface waterproofed with tiling underfelt or similar and then

    finishedwithtraditionalrooftilestomatchoriginal.

    2. Areaofflatroof(includingcanopyonEastElevation)tobefinishedwithsuitablewaterproofmembrane (Green Bauder total roof system or similar) ensuring suitable gradient for

    rainwaterrunofftoroofmanufacturersguidelines;generally1:80with1:40designslope.

    WINDOWS&GLAZING

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    10/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    ELECTRICAL

    Fullappraisalofexistingserviceswithinworkareatobecarriedoutpriortocommencingwork. All

    servicesto

    be

    disconnected,

    removed

    and

    capped/

    made

    safe

    where

    redundant.

    These

    drawings

    are

    basedonavisual,noninvasivesurveyofasfittedservices,andthereforeany indicationofthetype

    andlocationofservicesorservicerunsisonlyassumed.

    Afullinvasivetestandappraisalofservicesmustbecarriedoutbyaqualifiedmechanical/electrical

    consultanttothesatisfactionofthecontractororindividualpriortoanyworkscommencing.

    1. Determinewhetherexistingconsumerunit isadequate foradditionalelectricalsupplyandreplace accordingly if necessary. To bemounted in any case above 900mm (flood line)

    withinsuitablewallmountedcupboard.

    2. Conditionofexistingwiringtobeestablishedandifnecessary,buildingtoberewired.3. Supply, install and connect new surface mounted ceiling lights, switch points, double

    sockets,fusedspursocketsasindicatedonplan.

    4. Alldouble socketsand fused spur sockets tobewall surfacemountedatapprox.900mmabovefloorlevelandallassociatedwiringtobehousedwithinmetalconduit,fixedbackto

    walls. Cable runs tobe locatedwithin ceiling voidorwithinmetal conduit fixed to roof

    rafters.

    5. Fit all fused spur sockets to kitchen as necessary: Fridge, Freezer, Urn, Microwave,ThermostaticWaterHeater,SmallElectricOvenandElectricHob.

    6. SupplyandfitmechanicalextractfanstoAccessibleWCandKitchenasindicatedonplan. Allextractfanstobeprovidedwithanisolatorswitchandventedthroughexternalwall.

    7. Earth,bondandtestallnewandexistingelectrics.JOINERWORKS

    1. Existingceilingraftersandjoiststobereplacedorbridledinanyareasofwaterdamageorrot.

    2. Replaceanydamagedsarkingboards.3. FormnewceilingaboveaccessibleWCandparthallway. Tobestrappedwith50x25treated

    timberbattensandsheetedwith12.5mmt/eplasterboardwithvapourcontrollayerbehind.

    4. Formallnewshelvingandkitchenunitsasnecessary.DOORS

    All new doors to provideminimum clear opening width of 800mm to conform to current DDA

    requirements. DoorstomeetstandardssetoutinSecurebyDesign.

    1. ConditionofdoubledoorsettoSouthelevationtobeestablishedandreplacedifnecessary.D t b h t d i i di t d l t i i i t l d

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    11/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    5. Anyexisting ironmongerydamagedordefectivetobereplacedwithnew, includinghinges,keepers,latches,leversandlocks. Alltomatchoriginal.

    FLOORFINISHES1. SlipresistantwaterproofflooringfittedtoAccessibleToiletwithcovefilletedgetowalls.2. AllotherfloorareastoreceiveEpoxyConcretePaint. Colourtobeagreed.

    KITCHEN

    1. Formnewkitchenworktopwithintegratedsinkunitanddrainer.2. Fitstoragecupboardsasrequiredathighlevel. Lowlevelcarcassingtoaccommodatesmall

    fridgeunitandadditionalstorage.

    3. ThermostaticWaterHeater fitted toprovidehotwater tokitchensink tobe fittedwithantiscaldvalve.

    4. Future provision to bemade for potential installation of small appliances such as Urn,Microwave and small dishwasher. Drainage for future dishwasher to be provided and

    blankedoff.

    5. Mechanicalextractventfittedandventedthroughexternalwall.6. Tapstobefittedwithantiscaldvalves.

    ACCESSIBLEWC1. FitsuitableWHBandWC(tocomplywithDDAguidelines)2. Fit all fixtures, fittings and taps specification and positioning to comply with current

    DisabilityDiscriminationActguidelines.

    3. FitallnecessarygrabrailswithinaccessibleToilet.4.

    All

    silicone

    sealant

    to

    be

    mould

    resistant.

    5. FitThermostaticWaterHeater toprovidehotwatertoWHB tobe fittedwithantiscaldvalve.

    6. Fitshelfbelowwindow.7. Mechanicalextractventfittedandventedthroughexternalwall.8. FreshAirInletfittedandventedthroughexternalwall.

    PAINTING

    1. All walls to receive 2 coats of mould resistant masonry paint applied directly to thebrickwork.

    2. All woodwork including doors (new and existing), skirtings, door frames, facings, sills,aprons,pelmets,boxedoutbulkheadsorpipeenclosurestoreceive3no.coatsofEggshell

    Paint. Externaltimberworktobepaintedincolourappropriatetothetimethebuildingwas

    b ilt It h b t d b th L l A th it l i hi t i th t bl k ld b

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    12/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    7. Anyredundantguttersordownpipestoberemoved.8. Traditional details in stone lintel above East elevation door to be cleaned up and

    accentuatedwhere

    appropriate.

    FURNITURE&DECORATIONFinal choice of finishes, materials, colours, light fittings, fixed or unfixed furniture etc. to be

    confirmed by client. This includes demountablemeeting room table and chairs, sanitaryware,

    kitchenunits/worktopsandironmongery.

    Thebudgetconstructioncostfortherefurbishmentworkshasbeentenderedandisestimatedtobe

    intheregionof27,310+VAT

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    13/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    CONDITION&DILAPIDATIONSURVEYThe

    inspection

    of

    the

    shelter

    was

    carried

    out

    on

    20

    October

    2012.

    Thisappraisalhasbeenpreparedforfeasibilitypurposesonlytoassesstheconditionofthebuilding

    withaviewtoitsrefurbishmentandusebyFRPasashelterandaccessibleWC.

    Pleasenotethatthisreportisbasedonaninspectionmadewithouttheremovalofanyfinishesand

    isbasedonavisualcheckoftheelementswherereadilyaccessible. Problemsofstructuralintegrity,

    timber infestation,fungaldecay,dampandasbestosareoutwiththescopeofthissurveyandhave

    onlybeen identified incaseswheretheyarevisuallyapparent. Afurther invasiveappraisalofthe

    buildingconditionisrequiredpriortoanyworkscommencing.

    Thebuildingisasinglestoreystructuredatingfrom1903. Itwasformerlyusedasapublictoilet,but

    isnowdisusedotherthanforstoragepurposes. Thebuildingiscurrentlysplitintotwoareasandcan

    beaccessedviadoorsontheSouth,EastandNorthelevations.

    Thebuildingisasolidbrickworkconstructionandiscladwitharoughcastrender. Thereareseveral

    areasof

    cracking

    and

    spalling

    to

    the

    render

    with

    some

    significant

    cracking

    to

    the

    brickwork

    on

    the

    Northelevation(seePhotograph4).

    Allwindowopeningshavebeenboardedupandinmostcasesrenderedoverexternally. Allexternal

    timberdoorsare inreasonableworkingconditionandcurrentlysuitable forsecuring thebuilding,

    thoughall ironmongery is inneedofupgradingand replacing. It isexpected that ifnewexternal

    doorsareinstalledthenthetimberstandardsandframingwillrequirereplacingtoensuretheyare

    plumb.

    Allexternaland internalbrickwallswerereasonablyplumbgiventheageofthestructureandfree

    fromnoticeablesettlementotherthanthecrackingtothebrickworkontheNorthelevation. This

    cracking may be as a result of inadequate propping or lintel bearing when the window was

    reconfiguredandreplacedwithadoorinthe1930s.

    Thebuilding floorconsistsofacast insituconcreteslabwhichshowssomesignsofcracking,but

    generallyappearstobeofsoundbearing(seePhotograph30).

    The roof raftersand timberceilingjoistsweregenerallydryand free fromwarping,but localised

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    14/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    Mostoftheguttersanddownpipesaremissingordamagedwhichhasexacerbatedtheproblemof

    wateringress.

    All

    cast

    iron

    SVPs

    and

    downpipes

    remaining

    will

    require

    testing

    to

    ensure

    they

    are

    running free, but are generally in a reasonable condition for painting. All gutters will require

    replacing.

    Inconclusion,thebuildingisinagoodconditionstructurallyandexhibitsnosignofseveredefects.

    Anyminordefectshavebeenreferredtoabove.

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    15/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    CONSIDERATIONSAlthough

    it

    may

    not

    be

    required,

    it

    is

    recommended

    that

    aformal

    planning

    application

    is

    submitted

    totheLocalAuthoritytoobtainofficialrecognitionofthebuildingschangeofuse.

    DEMOLITIONPartof the feasibility studyhasbeen to consider the implicationsof completelydemolishing the

    buildingandleavingthesitevacant. Althoughthiswouldservetopreventthebuildingfromfalling

    intofurtherdisrepairandbecomingaforgottenandpotentiallyunsaferelic inthepark, it isbyno

    meansasustainablesolutiontothematter.

    The followingworkswith theirassociatedcostswouldbe required inorder for thebuilding tobe

    demolishedandthesurroundinggroundmadegood:

    1. TherewouldbearequirementforLocalAuthorityconsent.2. Theareawouldhave tobecordonedoffandmadesafewhilst thedemolitionworks take

    place.

    3. Afulldemolitionasbestossurveywouldhavetobeundertakenandanyhazardousmaterialsdisposed

    of

    according

    to

    current

    legislation.

    4. A contractorwould require formal appointment toundertake theworks andprovide thenecessarymethodstatements.

    5. Deleteriousmaterialswouldhavetobeseparated from inertmaterials,removedfromsiteand disposed of in accordance with the current legislation for waste management

    monitoringanddisposal.

    6. Given theageof thebuilding, theLocalAuthorityArchaeologydepartmentmay requireawatchingbriefduringthedemolitionprocess.

    7. Agroundcontaminationsurveywouldhavetobeundertakenandthegroundwouldhavetobereinstatedwithsuitablemeasuresinaccordancewithcurrent legislationtomitigateany

    futureissueswithcontaminatedground.

    Theassociatedcostswiththeaboveoutlinescopeofworkswouldnotbesubstantiallylessthanthe

    cost to carryout the refurbishmentworks and theenvironmental footprint leftbehindwouldbe

    significant.

    Withthe

    removal

    of

    the

    structure,

    the

    park

    would

    lose

    the

    use

    of

    the

    building

    indefinitely;

    it

    is

    unlikelythatanytypeofsustainabledevelopmentwouldobtainfundingforanewbuildproject in

    thispartofthepark. Thetriangulationofthethreestructuresinthiscornerofthepark(Roseburn

    ParkPavilion,theChangingPavilionandthePublicToilet/Shelter)definethephysicalboundariesof

    thisinformalandpartlyshelteredmeetingplaceinthiscornerofRoseburnPark. Theremovalofany

    of these built forms would dilute this sense of place

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    16/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    Whilstthestructure inquestion isof limitedarchitectural interest, largelydueto itstinyscale, it is

    nonethelessofsomehistoric interestbeingararesurvivorofsuchaveryutilitarianobjectfromthe

    early20th

    century.

    GivenitsuseandlocationitisalmostcertainlybytheCityArchitectsdept.possiblybyCETweedieor

    EJMacRae.

    Itsmost interestingfeature isprobably thepair ofmotif carvings over the entrance which are

    indistinctbutseemtobeofanopenfigorpomegranate.

    The

    building

    is

    unlikely

    to

    ever

    be

    listed

    but

    is

    an

    interesting

    feature

    in

    its

    context.

    Thebudgetcostforthedemolitionworkshasbeentenderedandisestimatedtobeintheregionof

    9,000+VATNEWBUILDAproposal to demolish the existingbuilding and replace itwith a newbuild structure hasbeen

    explored,butsubsequentlyruledoutforanumberofreasons. Fundamentally,thesizeandnature

    ofthe

    space

    required

    by

    Friends

    of

    Roseburn

    Park

    is

    adequately

    met

    within

    the

    footprint

    of

    the

    existingstructure. FRPhavenorequirement,noworinthefuture,foradditionalspacethatwould

    justifythesubstantialcostindevelopinganewbuilding.

    Notwithstanding the above, itwould be difficult tomake a case to the LocalAuthority Planning

    Department for demolishing the historic structure and replacing it with a building of a similar

    armature.

    Thebudget

    construction

    cost

    for

    the

    anew

    build

    project

    of

    asimilar

    scale

    to

    the

    existing

    building

    is

    estimatedtobeintheregionof50,000+VAT

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    17/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    CONCLUSIONGiven

    the

    current

    state

    of

    the

    building,

    the

    new

    use

    will

    help

    to

    generate

    an

    activity

    stream,

    slowly

    breathinglifebackintothebuildingwhichwillindirectlysustainitsupkeepandlongevity. Itiswell

    knownthatifabuildinghasaviablepurposewithasustainableuse,thebuildingismorelikelytobe

    properlymaintainedinthefuture. Withoutthisrefurbishmentwork,thebuildingislikelytofallinto

    afurtherstateofderelictionandbecomehazardoustoparkusers. ItwouldseemprudentthatFRP

    applyforaleaseonthebuildingandobtainfundingtoundertaketherequiredworks.

    It ismybeliefthat ifappropriatecareandattention isgiventotherefurbishmentofthishistorical

    shelteranditisreinstatedtoitsformerglory,thenitwillstandtorepresenttheaspirations,thecare

    andtheenergythathasbeen invested intheareabytheFRPcommunitygroup. Thebuildingwill

    holdthepotentialtoaccommodateanddevelopwiththegrowingneedsofthevariousgroupswho

    usetheparknowandinyearstocome.

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    18/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPHS

    PHOTOGRAPH1

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    19/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH3

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    20/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH5

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    21/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH7

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    22/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH9

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    23/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH11

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    24/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH13

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    25/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH15

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    26/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH17

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    27/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH19

    R b P k Sh lt F ibilit R t 07 12 12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    28/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH21

    Roseburn Park Shelter Feasibility Report 07 12 12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    29/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH23

    Roseburn Park Shelter Feasibility Report 07 12 12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    30/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH25

    Roseburn Park Shelter Feasibility Report 07 12 12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    31/43

    RoseburnParkShelter FeasibilityReport 07.12.12

    PHOTOGRAPH27

    RoseburnParkShelter FeasibilityReport 07.12.12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    32/43

    y p

    PHOTOGRAPH29

    RoseburnParkShelter FeasibilityReport 07.12.12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    33/43

    PHOTOGRAPH31

    RoseburnParkShelter FeasibilityReport 07.12.12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    34/43

    PHOTOGRAPH33

    RoseburnParkShelter FeasibilityReport 07.12.12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    35/43

    PHOTOGRAPH35

    RoseburnParkShelter FeasibilityReport 07.12.12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    36/43

    PHOTOGRAPH37

    RoseburnParkShelter FeasibilityReport 07.12.12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    37/43

    PHOTOGRAPH39

    RoseburnParkShelter FeasibilityReport 07.12.12

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    38/43

    DRAWINGS

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    39/43

    ROSEBURN PARKSHELTER

    CORSTORPH

    INEROAD

    ROSEBURNPARK

    ABINGERGA

    RDENS

    ORMIDALETERRACE

    37

    21

    WATEROFLEITH

    (SK)0011037-RPP

    CPAs Shown

    Job No.

    Scale

    Drawing No.

    Date

    Rev.

    By

    Client

    Friends of Roseburn Park

    Existing Floor Plan and Site Location Plan

    09 NOV 2012

    A

    Project

    Roseburn Park ShelterRefurbishment Proposal

    Craig Proudfoot

    102/7 Crewe Road North

    Edinburgh, EH5 2NE

    07968 071 510

    [email protected]

    REV DATE

    onefootsquare

    c/o Don Wilkie

    THIS DRAWING IS FOR DISCUSSION PURPOSES ONLY. DO NOT SCALE FROM THISDRAWING - ALL LEVELS & DIMENSIONS TO BE CHECKED ON SITE PRIOR TO

    CONSTRUCTION/ FABRICATION AND ANY DISCREPANCIES IMMEDIATELY REPORTED

    N

    NOTES

    Existing Floor Plan1:50 @ A3

    FEASIBILITY

    NSite Location Plan1:1,250 @ A3

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    40/43

    (SK)0021037-RPP

    CP1:50 @ A3

    Job No.

    Scale

    Drawing No.

    Date

    Rev.

    By

    Client

    Friends of Roseburn Park

    Existing Elevations

    09 NOV 2012

    -

    Project

    Roseburn Park ShelterRefurbishment Proposal

    Craig Proudfoot

    102/7 Crewe Road North

    Edinburgh, EH5 2NE

    07968 071 510

    [email protected]

    REV DATE

    onefootsquare

    c/o Don Wilkie

    THIS DRAWING IS FOR DISCUSSION PURPOSES ONLY. DO NOT SCALE FROM THISDRAWING - ALL LEVELS & DIMENSIONS TO BE CHECKED ON SITE PRIOR TO

    CONSTRUCTION/ FABRICATION AND ANY DISCREPANCIES IMMEDIATELY REPORTED

    NOTES

    FEASIBILITY

    Existing East Elevation1:50 @ A3

    Existing West Elevation1:50 @ A3

    Existing South Elevation1:50 @ A3

    Existing North Elevation1:50 @ A3

    A

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    41/43

    Perimeter seating with integrated storage

    Accessible Uni-sex

    WC. Suitable forwheelchair users.

    Prep. Area

    Perimeter seating with integrated storage

    Demountable

    table and chairs

    Belfastsink

    Doors changed tooutward opening to

    maximise internal spaceand improve security

    Door changed to outwardopening to maximiseinternal space andimprove security

    Windowreinstated

    (obscure glass)

    RWP/SVP

    RWP/SVP

    RWP/SVP

    RWP

    Ceilingexposedtoroofraftersoverthisarea

    EXISTINGMANHOLE,DISCONNECTINGTRAP & FAI

    FAI

    SPdw

    2

    2

    SP

    2

    SP

    2

    SP 2 SP

    SP

    2

    2

    2

    SP

    A

    2

    2 2

    Pitch roof to be overhauled. Roof

    rafters, joists, sarking boards andfascia to be treated and/ or replaced

    as necessary, surface waterproofedwith tiling under-felt or similar and

    then finished with traditional rooftiles to match existing.

    Area of flat roof to be finished withsuitable waterproof membrane (Green

    Bauder total roof system or similar)ensuring suitable gradient for rainwater

    run-off - to roof manufacturer'sguidelines; generally 1:80 with 1:40design slope.

    Area of flat roof above entrance to be

    finished with suitable waterproofmembrane (Green Bauder total roofsystem or similar) ensuring suitablegradient for rainwater run-off.

    (SK)0031037-RPP

    CP1:50 @ A3

    Job No.

    Scale

    Drawing No.

    Date

    Rev.

    By

    Client

    Friends of Roseburn Park

    Proposed Floor Plan & Section A-A

    09 NOV 2012

    B

    ProjectRoseburn Park ShelterRefurbishment Proposal

    Craig Proudfoot

    102/7 Crewe Road North

    Edinburgh, EH5 2NE

    07968 071 510

    [email protected]

    REV DATE

    onefootsquare

    c/o Don Wilkie

    THIS DRAWING IS FOR DISCUSSION PURPOSES ONLY. DO NOT SCALE FROM THISDRAWING - ALL LEVELS & DIMENSIONS TO BE CHECKED ON SITE PRIOR TO

    CONSTRUCTION/ FABRICATION AND ANY DISCREPANCIES IMMEDIATELY REPORTED

    N

    NOTES

    Proposed Floor Plan

    1:50 @ A3

    FEASIBILITY

    Proposed Section Through A-A

    1:50 @ A3

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    42/43

    (SK)0041037-RPP

    CP1:50 @ A3

    Job No.

    Scale

    Drawing No.

    Date

    Rev.

    By

    Client

    Friends of Roseburn Park

    Proposed Elevations

    09 NOV 2012

    -

    ProjectRoseburn Park ShelterRefurbishment Proposal

    Craig Proudfoot

    102/7 Crewe Road North

    Edinburgh, EH5 2NE

    07968 071 510

    [email protected]

    REV DATE

    onefootsquare

    c/o Don Wilkie

    THIS DRAWING IS FOR DISCUSSION PURPOSES ONLY. DO NOT SCALE FROM THISDRAWING - ALL LEVELS & DIMENSIONS TO BE CHECKED ON SITE PRIOR TO

    CONSTRUCTION/ FABRICATION AND ANY DISCREPANCIES IMMEDIATELY REPORTED

    NOTES

    FEASIBILITY

    Proposed East Elevation1:50 @ A3

    Proposed West Elevation1:50 @ A3

    Proposed South Elevation1:50 @ A3

    Proposed North Elevation1:50 @ A3

    FEASIBILITY

  • 7/29/2019 Feasibility Report a EMAIL VERSION

    43/43

    PhotographofExisting PhotoMontageofProposed

    REV DATE NOTES THIS DRAWING IS FOR FEASIBILITY PURPOSES ONLY. DO NOT SCALE FROM THISDRAWING ALL LEVELS & DIMENSIONS TO BE CHECKED ON SITE PRIOR TO

    CONSTRUCTION/ FABRICATION ANDANY DISCREPANCIES IMMEDIATELY REPORTED

    2012ONE FOOT SQUARE

    CraigProudfoot

    102/7CreweRoadNorth

    onefootsquare

    Project

    RoseburnParkShelter

    Edinburgh,EH52NE

    07968071510

    [email protected]

    Proposal to form community shelter and upgrade/ refurbish publicClient

    Friends of Roseburn Park

    Scale Date ByNTS 18DEC2012 CP

    toilet

    c/oDonWilkie . . .

    1037RPP B(SK)005