    FINAL

    Plot No. 19, Sector 33, Near Hero Ho

    Factory, Gurgaon, Haryana, India

    Tel (Fax): +91 124 4102980

    Email: lokesh@emergent ventures.c

    www.emergent ventures.com

    August 2008

    Feasibility Study ReportNational Bamboo Mission

    Emergent Ventures IndiaSustainable Solutions for Environmen

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    2/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    1

    E m e r g e n t V e n t u r e s

    Revision History of the Project Document

    Version

    Number Date Prepared by Description and reason for revision

    01 04/07/2008 Lokesh Chandra Dube

    Abhirup Sen

    Kumar Vishal

    Draft Report

    02 19/08/2008 Lokesh Chandra Dube

    Abhirup Sen

    Kumar Vishal

    Final Report

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    3/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    2

    E m e r g e n t V e n t u r e s

    EXECUTIVE SUMMARY Bamboo and bamboo based activities are promising means for climate change mitigation in developing

    countries like India. India has good bamboo resources. National Bamboo Mission assigned Emergent

    Ventures India for assessing feasibility of carbon credit generation under Clean Development

    Mechanism and voluntary carbon market in the Indian state of Nagaland. The EVI team visited CBTC

    office at Guwahati, NBDA office at Dimapur and collected data and information regarding the project

    activities being implemented/ planned. Plantation sites, gasifiers and charcoal units were also visited in

    and around Dimapur and Mokokchung. On the basis of detailed study from site visit and literature, EVI

    team prepared this report with following recommendations:

    SN Project Activities ERs

    Potential

    per annum

    Recomm

    ended

    Category

    Remarks

    1 Bamboo Plantation All

    sites 190,790 Green

    All sites have been assessed separately

    under section 3.1.1

    2 Harvested Bamboo

    Products Orange

    Eligible under VCS 2007 only, New Meth

    required which may include

    national/sectoral baseline. Success of

    project depends on successful approval of

    the proposed methodology. Detailed

    Baseline Assessment would be required

    through credible third party survey.

    Double Counting issues to be taken care

    of. Complex Monitoring.

    3 Bamboo Gasification for

    power (both, installed and

    planned) 1,191 Green

    Very small in quantum hence can be

    taken up as a bundled project activity

    involving whole of north east/country as

    a whole. It is advisable to launch it as a

    CDM Program of Activities.

    4 Bamboo

    Charcoal as a

    replacement

    In

    industries 4,460 Orange

    Needs to be established through credible

    third party surveys that baseline wood

    charcoal comes from a depleting source

    and is non renewable. Double counting of

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    4/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    3

    E m e r g e n t V e n t u r e s

    of Non

    renewable

    Wood

    Charcoal

    ERs should be avoided.

    In

    households 6,690 Orange

    Needs to be established through credible

    third party surveys that baseline wood

    charcoal comes from a depleting source

    and is non renewable. Double counting of

    ERs should be avoided. Complex

    monitoring.

    5 Bamboo

    Charcoal as

    a

    replacement

    of Coal

    In

    industrial

    application 3,827 Green

    Only in those industries that have coal as

    baseline. Can be taken up as a bundled

    project activity involving whole of north

    east/country as a whole. Can be

    developed as a CDM Program of Activities

    also. Double counting to be avoided.

    In

    households 5,741 Orange

    Baseline needs to be determined based

    on past data, credible third party survey

    of households. Double counting to be

    avoided. Complex monitoring.

    Green: Definite CDM/VCM opportunities, should be taken up

    Orange: Potential CDM/VCM project, wait and watch, a re-look on these opportunities needed after

    sometime (say 3 months)Red: Non-CDM/ VCM projects

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    5/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    4

    E m e r g e n t V e n t u r e s

    1. INTRODUCTION Bamboo is regarded as poor mans timber

    because of its versatility and usefulness in both

    socio cultural and industrial purposes. It

    belongs to Family Poaceae and is one of the

    fastest growing species in the world. There are

    nearly 75 genera and 1250 species of bamboo 1

    distributed across the world. It is an extremely

    strong, renewable and renowned for its

    strength. It adapts to diverse climatic

    conditions and soil type. It acts as a soil binder

    in marginal and degraded land. It is an ancient medicinal plant, an important food source and intricately

    related to indigenous art and culture 2. Its uses have grown over the centuries and the study of bamboo

    has currently identified over 1500 uses of bamboo 3. It is an excellent supplement to wood. Due to its

    high growth rate, it has the potential to be an effective carbon sink.

    India is endowed with a rich treasure trove of bamboo represented by about 24 species and 134 genera

    of which 18 genera and 90 species occur in North East India 4. India has over 9.5 million hectares of

    forests 2 which is about 40% of the world total bamboo forests and is next only to China with respect to

    abundance of bamboo. Bamboo occurs in well drained soils of deciduous and evergreen forests and

    extends from tropical alluvial plains to high mountains upto about 3500 m altitude 5.

    The world market for bamboo is valued at US $ 10 billion and is expected to reach about US $ 20 billion

    by 2015 3. The size of the domestic bamboo industry is estimated to be about Rs. 6,505 crores, which

    may grow to Rs.26,000 crores by 2015.

    1 Soderstrom, T.R. and R.P.Ellis (1988),The wood bamboo (Poaceae: Bambuceae) of Sri Lanka: a Morphological anatomical study. Simthsonian Contribution to Botany No. 72. P.175 2 Nath, V. Rajat S. Pal and S.K. Banerjee (2008) Bamboo: Its Distribution, Production, Habitat andagroforestry Potential. Indian Forester Vol 134(3):387 3 http://agricoop.nic.in/bamboo/bamboomission.htm 4 Tiwari, D.N. (1992). A Monograph on Bamboo. International Book Distributors, Dehra Dun, 498 pp. 5 Varmah, G.c. and K.N. bahadur (1980). Country Report and status of research on bamboos in India. India For. Rec. (n.s.), :28

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    6/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    5

    E m e r g e n t V e n t u r e s

    1.1 About National Bamboo Mission Despite such immense potential, the domestic bamboo sector is faced with constraints like lack of

    scientific methods for propagation and cultivation, lack of post harvest treatment and technology for

    product development, Inadequate trained manpower and inadequate infrastructure for large scale

    harvesting in the event of gregarious flowering. Keeping in view the potential of Bamboo, its present

    poor market linkage and sub optimal level technology application for manufacture of value added

    products in the industrial and cottage sector, the National Mission on Bamboo Technology & Trade

    development has been mooted by Planning Commission to accord Bamboo development a strategic role

    in rural economy, carbon sequestration and environmental integrity, poverty alleviation and bamboo

    based handicrafts & industrial development. The task for coordinating the National Mission on Bamboo

    Technology and Trade has been entrusted by the Prime Minister to the Ministry of Agriculture. The Mission document had a target of 2 million ha under bamboo during the Xth Plan involving an

    investment of Rs. 2,608 crores. The Mission document also envisages the integration different

    Ministries/ Departments for the holistic development of the sector, integrated programme expansion of

    plantations of bamboo species, its scientific management with the involvement of JFM committees,

    local initiatives and entrepreneurship for presenting this raw material for the Industries and assisting the

    Industry to access and apply modern technology for producing globally competitive new generation

    bamboo products. The other features of the Mission include Technology Development and Transfer for

    Planting, Technology intervention on process and products including standards and codes, Handicraft

    development including training, Trade and Market Development for bamboo products, and Technology

    development for building material.

    1.2 About Nagaland

    With a view to promote and develop Bamboo and its potentials as a major Economic activity in the State

    both as a resource and as enterprise the Government of Nagaland adopted the Nagaland Bamboo Policy

    in 2004 (vide notification No.APC/P1/2004). The policy envisions a planned, scientific and holistic

    approach to the cultivation and management of bamboos on a sustained basis can be an inexhaustible

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    7/44

    E m e r g e n t V e n t u r e s

    source of

    economy

    T

    natural b

    will als

    environm

    balance

    having gr

    life of t

    sequestr

    extensive

    as a pred

    the distri

    and Mok

    found mi

    in all oth

    growing

    estimatehectares

    Nagaland

    have bee

    Nagaland

    tulda ). Th

    to plains

    localities

    along the

    many ye

    Ph

    goods and s

    and the over

    he develo

    mboo resou

    o greatly

    ent and

    of the lan

    eat impact

    e people i

    tion. Bam

    ly all over N

    ominant pla

    cts of Dima

    okchung; w

    xed with oth

    er districts

    stock of

    to be aroin the coun

    which work

    identified

    are Kakoo

    ey occur alm

    along the b

    along the n

    roads, bam

    rs. The Dev

    ne: 91 124 435

    ervices and c

    all economic

    ment of rces of Naga

    add to

    the ecolo

    d consequ

    n the qualit

    ncluding ca

    oo is fo

    galand. It oc

    nt in portion

    ur, Peren,

    ile, it is re

    er forest sp

    f the state.

    bamboo

    nd 8.98 miry, out of w

    s out to be

    hich are spr

    (Dendrocala

    ost all along

    order with

    las and stre

    oos have be

    lopment of

    Emergent Vent3100, email: co

    an play a sig

    developmen

    the land

    the

    ical

    ntly

    y of

    bon

    und

    curs

    s of

    on

    dily

    cies

    The

    een

    llion hich about

    bout 0.448

    ead all over

    us hamilto

    the lower be

    ssam . Whil

    ms, Jati occ

    en over cut

    amboo in N

    res India Pvt. Lntact@emerge

    nificant role

    t of the stat

    % of the gr

    million Ha o

    Nagaland. Th

    nii ), Daloo (

    lts in contin

    e Kakoo an

    upies better

    hile, in oth

    agaland is t

    EmerSustaina

    d., Plot No. 19, tventures.com

    in the restor

    .

    owing stock

    4,48,000 H

    e predomin

    teinostachyu

    ous strips of

    Daloo clu

    drained site

    er areas the

    be approac

    gent Venturle Solutions

    Sector 33, Gurg, Web: www.e

    ation and rej

    is assessed

    a. Currently

    nt species o

    rn dulloa ) a

    some length

    ps are char

    s. In more a

    have been

    hed in a Mi

    s India Pvt. or Environm

    aon, Haryana 1ergent venture

    uvenation o

    to be availa

    round 22 s

    bamboo fo

    nd Jati (Ba

    descending

    cterized in

    ccessible loc

    left untouch

    sion mode,

    td. ent

    2 001s.com

    6

    rural

    le in

    ecies

    nd in

    busa

    down

    moist

    lities

    d for

    hich

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    8/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    7

    E m e r g e n t V e n t u r e s

    would have two approaches namely: Development of Bamboo as a Resource, Development of Bamboo

    as an Enterprise.

    1.3 About International Carbon Market

    Carbon is a tradable commodity as a result of the evolution of financial mechanisms of climate change

    mitigation. International carbon market can be categorized into two structures, first the Compliance

    market, also called regulatory market that may be of Kyoto type that allows transactions in terms of well

    defined market based flexibility mechanisms like CDM, JI and IET or of Non Kyoto type that have been

    developed as many state legislations in the USA and as New South Wales GHG Abatement Scheme in

    Australia. Second structure of the carbon market is Voluntary market; segments of Voluntary carbon

    market (VCM) are legally binding ones like Chicago Climate Exchange and the Over the Counter (OTC)

    market that includes the activities of companies and individuals who offset their emission footprints

    from activities, products or services.

    1.3.1 Clean Development Mechanism (CDM) CDM is a mechanism established and developed under Kyoto Protocol to reduce Green House Gas

    emissions.

    At the 1992 Rio Earth Summit, countries agreed to the United Nations Framework Convention on

    Climate Change (UNFCCC) in response to growing evidence that human activity was contributing to

    global warming. The UNFCCC contained a non binding commitment by industrialized countries (listed in

    Annex I of the Convention) that they would reduce their emissions of greenhouse gases to 1990 levels

    by the year 2000. But soon it became clear that this wasnt enough to avoid dangerous climate change.

    So in 1995, at the first Conference of Parties (COP) after the Convention entered into force, parties

    began to negotiate a Protocol that would set tighter and legally binding targets for reducing greenhouse

    gas emissions.

    Therefore, in 1997 at the 3rd COP to the Convention in Japan, Parties agreed on a Protocol that set

    binding targets for industrialized countries (Annex 1 countries) to reduce their emissions by an average

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    9/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    8

    E m e r g e n t V e n t u r e s

    of 5% below 1990 levels in the period 2008 2012, The Protocol was given the name of the city in which it

    was negotiated Kyoto .

    Now for assisting Annex 1 countries in reducing emissions up to specified level and helping them in

    reducing cost of such reduction a marketing mechanism was developed called Clean Development

    Mechanism (CDM) on the ground that emission reduction at any place across the globe will benefit the

    global environment equally. Under CDM, Certified Emission Reductions (CERs) are allotted to the

    projects in Non Annex 1 countries (developing countries) which result in reduction of green house gases

    emissions. Buyers in Annex 1 countries to meet their reduction targets can buy these credits from these

    developers.

    Various agencies have been authorized and specified for governing the whole procedure. As India is part

    of Non Annex 1 countries any project, which results in green house gas emission reduction can be, a

    potential CDM project.

    1.3.2 Voluntary Carbon Market (VCM) Voluntary Carbon Market has developed considerably in the past few years as an alternative to the

    Compliance Market. The Parties such as the USA, Canada and others have no legally binding targets as

    they have not ratified the Kyoto Protocol. Companies and individuals in these nations are realizing that

    they must take action to offset and reduce their emission footprints, as a sense of Corporate Social

    Responsibility or to gear up for possible future legislations.

    Potential for ERs under Voluntary Carbon Market: Climate, Community and Biodiversity Standards (CCBS)

    Background: The Climate, Community and Biodiversity Standards were launched by the Climate,

    Community, and Biodiversity Alliance (CCBA) in cooperation with independent experts and non

    governmental organisations. The CCBA is a unique partnership among research institutions,

    corporations and non governmental organizations (NGOs). The first version of the standards was

    released in May 2005. The standard is currently being reviewed and the second version is expected to

    be released by October 2008.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    10/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    9

    E m e r g e n t V e n t u r e s

    Goals: CCBAs main goal is to provide regulations and guidance to develop land use projects that

    mitigate climate change and deliver multiple benefits in an integrated sustainable manner. Hence, CCBA

    mainly concentrates on the generation of positive co benefits and restricts its carbon assessment to the

    acceptance of methodologies from other standards.

    CCBS is standard for climate, community and biodiversity co benefits generated from a land use land

    use change and forestry projects. It is not used on standalone basis and needs a carbon accounting

    standard for estimation of net removals of GHGs from atmosphere.

    Voluntary Carbon Standard (VCS)

    Background: The VCS is a standard for all greenhouse gas offset types with exception of new HFC project

    and was developed by non governmental organisations, industry associations, certification companies,

    project developers, and offset buyers. The first AFOLU version was released on 19th November 2007

    and is part of draft VCS second version.

    Goals: The standard is designed to validate and verify rigorous and trustworthy voluntary greenhouse

    gas offsets. In addition, the standard aims to generate permanent carbon credits called VCUs (Voluntary

    Carbon Units), keep validation and verification costs low, and ensure basic environmental and social

    benefits.

    1.4 About Emergent Ventures India

    EVI is a network of professionals with Expertise in Clean Development Mechanism, Voluntary Carbon

    Market, Forestry, Technology and Finance. EVI is currently working on a number of projects for GHG

    Emission Reduction under CDM.

    EVI has experts for CDM methodologies this helps us develop Project Design Documents (PDDs)

    with better articulation of baseline and Additionality logic. We design PDDs with reviews by high

    quality experts to maximize value for carbon assets for our clients.

    EVI is working with many big buyers for CERs/VERs. We deliver the best value for CERs to our

    clients owing to our strong buying selling network. The market is rapidly evolving with

    appearance of forward contracts, options, derivatives, and securitization. Our insights into CDM

    market help us structure the best deal for selling CERs.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    11/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    10

    E m e r g e n t V e n t u r e s

    We bring in associations with investors who would invest in the project (If required) based on

    the CERs/VERs revenue stream (based on project profile). This makes project finances more

    attractive.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    12/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    11

    E m e r g e n t V e n t u r e s

    2. METHODOLOGY OF FEASIBILITY ASSESSMENT

    For conducting this study the following methodology was been adopted by EVI:

    1. Field visit for detailed examination

    2. Data Collection & Analysis

    3. Estimation of potential Emission Reductions/ Net Removals

    4. Evaluation of Opportunities

    5. Recommendations

    Consultants from EVI visited different locations and had detailed discussions, and held meetings with

    NBDA and CBTC personnel. Data was collected from concerned officials, which are the basis for this

    report.

    After collecting data/information all opportunities were evaluated on various parameters

    Checking compliance with UNFCCC guidelines/ applicable Voluntary Standards

    - CERs/VERs generation potential

    - Possible Additionality

    - Applicability of Baseline and Monitoring Methodology

    - Complexity of new methodology development in case there is no approved methodology

    available for the project type

    - Monitoring requirements

    Based on above parameters all opportunities were categorized into three categories

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    13/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    12

    E m e r g e n t V e n t u r e s

    - Green: Definite CDM/VCM opportunities, should be taken up

    - Orange: Potential CDM/VCM project, wait and watch, a re look on these opportunities needed

    after sometime (say 3 months)

    - Red: Non CDM/ VCM projects

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    14/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    13

    E m e r g e n t V e n t u r e s

    3. OPPORTUNITY ANALYSIS

    1. Carbon sequestration Bamboo Plantations, Harvested Bamboo Products

    2. Energy components Bamboo Gasification for power and thermal use, charcoal making etc.

    3.1 Carbon Sequestration

    3.1.1 Bamboo plantations Promotion of bamboo plantations on individual land holdings as well as community lands which form

    89% of the total area of the state through the active participation of the Village Councils, (VDBs) and

    (VFCs) is one of the principle activity implemented under Bamboo Mission. This involves introduction of

    bamboos having commercially superior and desirable attributes for large scale cultivation to augment

    the existing local varieties of bamboos in the state. Priority is being given to synchronize bamboo

    cultivation to with existing farming practices, such as Jhum ing, horticulture etc. to maximize interim

    benefits. The details of the Bamboo plantations undertaken so far are provided in Table 6 below:

    S. No. District 2006 (ha.) 2007 (ha.) 2008 (ha.) 1 Kohima 180 300 550

    2 Mokokchung 180 1000 1091

    3 Tuensang 180 350 500 4 Mon 180 262 550 5 Zunheboto 180 250 450 6 Wokha 180 250 450 7 Phek 180 350 550 8 Dimapur 180 350 600 9 Peren 100 250 400 10 Kiphire 130 250 400 11 Longleng 100 280 400 12 Others 730 0 1559

    Total 2500 3892 7500

    Species planted 7 :

    6 As provided by Nagaland Bamboo Development Authority 7 Based on information from NBDA and CBTC

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    15/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    14

    E m e r g e n t V e n t u r e s

    Bambusa tulda, Bambusa nutans, Dendrocalamus hamiltonii, Dendrocalamus asper, Ochlandra

    travancorica, Teinostachyum dullooa.

    Pre project land use pattern 8:

    From above information we conclude that about 80% of total area planted is eligible. Plantations in

    degraded forest areas have provisionally been excluded.

    Site visits by EVI: Between 19 and 25 May 2008, EVI team visited several plantation sites accompanied by NBDA and CBTC

    officials in Dimapur and Mukokchung districts of Nagaland for preliminary assessment of existing

    bamboo plantations, understanding local socio economic issues and interactions with CBTC and NDBA

    resource persons. The list of sites visited during the tour is given in Table below.

    8 Based on information from NBDA and CBTC

    Pre project land use Year 1950 Year 1960 Year 1970 2006 Site 1 Dimapur Shifting cultivation Shifting cultivation Shifting cultivation Site 2 Peren Shifting cultivation Shifting cultivation Shifting cultivation Site 3 Mokokchung Shifting cultivation Shifting cultivation Shifting cultivation Site 4 Kohima Degraded Forest land Degraded Forest land Degraded Forest land Site 5 Wokha Shifting cultivation Shifting cultivation Shifting cultivation

    Site 6 Zunehebuto Degraded Forest land Degraded Forest land Degraded Forest land Site 7 Tuensang Shifting cultivation Shifting cultivation Shifting cultivation

    Site 8 Phek Degraded Forest land Degraded Forest land Degraded Forest land Site 9 Mon Shifting cultivation Shifting cultivation Shifting cultivation Site10 Longleng Shifting cultivation Shifting cultivation Shifting cultivation Site 11 Kepheri Shifting cultivation Shifting cultivation Shifting cultivation

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    16/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    15

    E m e r g e n t V e n t u r e s

    Sl. No

    District Plantation Site

    Area planted Spacing

    m x m

    Species Land use Status Eligibility for CDM / VCS 2006

    2007 2008

    1

    Dimapur

    Razhapa 20 50+ 5x5 B. tulda (75%)

    B. nutans (20%)

    B. balcooa (5%)

    Fallow grassland/ farmland

    2 Pushto 40 30 30 5x5 B.tulda (70%)

    B. nutans (20%)

    b. nutans ( 10%)

    Jhum cultivation + area of bamboo flowering

    3 Ghobovi 50 50 5x5 B.tulda (75%)

    B. nutans (25%)

    Jhum cultivation area +forests

    4 Homeland 100 50 5x5 B. tulda (80%)

    B. nutans (15%)

    B. balcooa (5%)

    Fallow farmland

    5 Peren

    Chaluki 100 (planned) area of bamboo flowering

    6

    Mokok chung

    Khatsung 130 70 7x7 B.tulda

    B. balcooa

    D. hamiltonii

    + paddy + banana

    Area under Jhum cultivation & fallow barren hill slopes

    7 Merangkung 100 25+ 5x5 B.tulda

    B. balcooa

    D. hamiltonii

    + paddy

    Area under Jhum

    cultivation &

    fallow barren hill

    slopes

    8 Chu Chuyimlang

    100 50 5x5 B.tulda

    B. balcooa

    D. hamiltonii

    + paddy

    Area under Jhum

    cultivation &

    fallow barren hill

    slopes

    9 Khensa 100 50+ 5x5 B.tuldaB. balcooa

    D. hamiltonii

    Area under Jhum cultivation & fallow barren hill slopes

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    17/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    16

    E m e r g e n t V e n t u r e s

    + paddy

    Total 40 630+ 475+

    Summary of observations:

    1. Total plantation area visited: 1100+ ha

    2. Species Composition 9: Bambusa tulda (70%), Bambusa nutans (10%), Bambusa

    balcooa (5%), Dendrocalamus hamiltonii (5%), other

    miscellaneous species (10%).

    3. Average spacing: 5 m x 5 m

    4. Propagation: By seedlings (80%), by rhizomes (20%)

    5. Percentage of eligible land confirmed: ~70% (in sampled area)

    Land use details from other districts:

    Information on pre project land use pattern for plantation sites in all districts were collected from NBDA

    and CBTC.

    21% of the land planted is degraded forest whereas the rest are areas under shifting cultivation.

    The plantations in degraded forest areas are provisionally being excluded from the eligible land

    area as their exact status around 1990 is not known. As per CDM AR (and VCS) guidelines, the

    land considered for CDM project should not have been a forest since 1 st January 1990.

    Hence, for calculation of potential carbon credits that can be generated, following plantation

    areas will be considered:

    Plantation area eligible for CDM/VCM benefits = 70 % * (80% * Total Plantation Area) 10

    9 This is as per the information provided by NBDA officials. 10 70% and 80% are the percentages of area eligible for CDM/VCM under sampled plantation area and the total plantation area.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    18/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    17

    E m e r g e n t V e n t u r e s

    Potential Emission Reductions and revenue generation:

    Assumptions for calculations:

    I) Number of clumps/ha: 400/ha (5m X 5 m spacing, as observed)

    II) Average recruitment rate of culms: 10 culms/yr/clump 11

    Thus, average number of culms per clump: 50 culms for a mature clump of 5 years age

    Average number of culms removed per clump from 5th year onwards: 10

    III) Average diameter and height of culm 12:

    SL No. Species Average

    Diameter (cm)

    Average Height (m)

    1 Bambusa tulda 5 16

    2 Bambusa nutans 5 15

    3 Dendrocalamus hamiltonii 10 10

    4 Bambusa balcooa 8 5

    IV) Specific Gravity of bamboo: 0.35 13

    V) Survival rate (after gap filling) = 90%14

    Eligible land for CDM/VCM benefits:

    S. No. Year of Plantation Total area under

    Plantation (ha)

    Area Eligible for

    CDM/VCS (ha)

    1 2006 2500 1400

    2 2007 3892 2180

    11 http://planning.up.nic.in/innovations/inno3/fw/bamboo.htm 12 Chowdhury, M.L. (ed) (2008), One Year of National Bamboo Mission, pp. 97 98, CBTC, Guwahati. 13 http://www.simetric.co.uk/si_wood.htm#top 14 Information from NBDA & CBTC

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    19/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    18

    E m e r g e n t V e n t u r e s

    3 2008 7500 4200

    4 2009 10000* 5600*

    5 2010 10000* 5600*

    Total 33892* 18980

    *Projected figures

    Please note that the emission reductions/ net removals given in the sections below are indicative, based

    on certain assumptions on past studies as available in literature. Actual ER generation may depend on a

    number of factors. The exact volume of credits would depend on more detailed assessment of

    technologies used, baseline scenarios, local conditions etc.

    The value of credits would also vary depending on the type (VER, CER), compliance with other standards

    (CCB, VCS), the year in which the credits accrue and many other factors which affect the delivery

    reliability of the credits.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    20/44

    Projection for VERs/CERs & Carbon Revenues from Bamboo Plantations Year Eligible

    Planted Area (ha)

    Cumulative eligible Area (ha)

    Total NRs

    t CO2

    Losses in t CO2 t CO2 Net NRst CO2

    NR Buffer

    ConsER ELeakage from

    land prep Loss from harvesting

    Total Leakage

    1 2 3 4 5 6 7 8 9

    5+6 (4 7) 40% of 8 (2006 1400 1400 0 15913 0 15913 15913 63652007 2180 3580 47167 24779 0 24779 22387 8955 2008 4200 7780 167779 47740 0 47740 120039 48015 2009 5600* 13380 429890 63653 0 63653 366237 146495 2010 5600* 18980 867755 63653 0 63653 804102 321641 2011 0 18980 1474611 0 233884 233884 1240726 496291 2012 0 18980 2024725 0 598075 598075 1426650 570660 2013 0 18980 2631226 0 1299728 1299728 1331498 532599 2014 0 18980 3008559 0 2235265 2235265 773294 309318

    2015 0 18980 3197226 0 3170802 3170802 26423 10569 2016 0 18980 3197226 0 3170802 3170802 26423 10569 2017 0 18980 3197226 0 3170802 3170802 26423 10569 2018 0 18980 3197226 0 3170802 3170802 26423 10569 2019 0 18980 3197226 0 3170802 3170802 26423 10569 2020 0 18980 3197226 0 3170802 3170802 26423 10569 2021 0 18980 3197226 0 3170802 3170802 26423 10569 2022 0 18980 3197226 0 3170802 3170802 26423 10569 2023 0 18980 3197226 0 3170802 3170802 26423 10569 2024 0 18980 3197226 0 3170802 3170802 26423 10569 2025 0 18980 3197226 0 3170802 3170802 26423 10569

    Total 6359676 2543870

    Annual ER generation & revenue 317984 127194

    Annual ER generation in t/ha & revenue in Rs. /ha 16.75 6.70 *Conservative projection; **Assumption: 1 ER= $5; 1$=Rs42

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    21/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    20

    E m e r g e n t V e n t u r e s

    3.1.2. Harvested bamboo products Bamboo can be used for almost all parts of houses, including posts, roofs, walls, floors, beams, and

    fences. People

    also

    use

    Bamboo

    to

    produce

    mats,

    baskets,

    tools,

    handles,

    hats,

    traditional

    toys,

    musical

    instruments and furniture.

    Thus Bamboo can be used as a replacement of building materials, and might reduce emissions

    associated with the production of baseline building material (e.g. concrete). Other products like

    furniture and household instruments/ composites can replace conventional energy intensive products.

    These options theoretically fall under the scope of Climate Change mitigation, but being complexities in

    monitoring and unavailability of methodology for estimation of Emission Reductions, it would be

    difficult to actually create carbon credit revenue out of these products.

    3.2 Energy Components Bamboo can be used as a source of bio energy. Bioenergy is considered to be GHG neutral and its use

    poses hardly any net radiative forcing to the atmosphere. Given the large amounts of biomass that

    Bamboo can produce it provides a very interesting source of bio energy in the tropics 15. When grown as

    an agricultural crop the biomass produced by Bamboo can be considered as a renewable source of

    energy. Like any other biomass Bamboo can also be directly burnt for heat and/or power generation. It

    can be used to replace carbon intensive fossil fuel or non renewable biomass.

    3.2.1 Direct Burning as a replacement of coal or non renewable wood: Bamboo biomass can replace coal in thermal applications. Such applications are eligible under CDM and

    VCM both. Small scale CDM methodology AMS I.E Switch from Non Renewable Biomass for Thermal

    Applications by the User can be used. This is a potential activity under programmatic CDM also. This is

    not a prime activity in the state. Replacing sub bituminous coal for bamboo biomass would result in

    emission reduction of 1.5 t CO2 per t of bamboo biomass. Similarly replacement of non renewable wood

    for thermal application would result in emission reduction of 1.7 t CO2 per t of bamboo biomass.

    3.2.2 Power Generation from bamboo biomass: Approved CDM methodologies AM0042 Gridconnected electricity generation using biomass from

    newly developed dedicated plantations, ACM 0006 Consolidated methodology for grid connected

    electricity generation from biomass residues and AMS ID Grid connected renewable electricity

    generation would be applicable for power generation project activities. Emission reductions achievable

    from per kW installed capacity in this case are 2.1 t CO2.

    15 Fielden, D, 1999. Energy farming with the big Bamboo. Renewable Energy World, March 1999, 23 27.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    22/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    21

    E m e r g e n t V e n t u r e s

    3.2.3 Bamboo Gasification for heat and power: Bamboo Gasification is one of the manufacturing methods which make Bamboo heated to form

    products under

    the

    condition

    of

    isolating

    air

    or

    in

    limited

    supply

    of

    air.

    Bamboo

    gas

    can

    be

    used

    for

    heat

    and power. Thermal application of bamboo producer gas is not prevalent in the state as of now. This is a

    potential project activity. Power generation activity would gain emission reductions in the following

    manner:

    Assumptions

    NER Grid emission factor 16 t CO2/MWh 0.46Run days per annum 330

    Run hours per day 20Auxiliary consumption rate 10%

    Installed Gasifiers Capacity

    kW Number of

    units Annually electricity generation (MWh)

    Auxiliary consumption (MWh)

    Net Generation (MWh)

    35 1 184.8 18.5 166

    100 1 528.0 52.8 475

    Gasifiers planned in near future Capacity

    (KW) No. of units

    Annually electricity generation MWh

    Auxiliary consumption MWh

    Net Generation MWh

    35 6 1108.0 110.8 998

    75 2 792.0 79.2 713

    25 2 264.0 26.4 238

    CER Estimations (t CO2 /year)

    Installed gasifiers 295.09Planned gasifiers 896.23

    Total 1191.33

    3.2.4 Bamboo Charcoal: Bamboo Charcoal is a product of Bamboo pyrolysis. It has a number of uses. Bamboo Charcoal can be

    used to replace coal for thermal applications.

    16 CO2 emission database 2007 08. Central electricity Authority.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    23/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    22

    E m e r g e n t V e n t u r e s

    Assumptions 17

    Capacity of Charcoal units under operation (tonnes per day) 12.5

    Running day per annum 270Annual Charcoal production (tonnes) 3375Calorific value of wood charcoal (TJ/Gg) 29.5Co2 Emission factor of Non renewable wood (tonne/TJ) 112Co2 Emission factor of Coal (tonne/TJ) 96.1Charcoal sold in the domestic market (tonnes) ~ 60% 2025Charcoal sold to ferro alloy industry (tonnes) ~ 40% 1350

    CER estimations

    Scenario 1 Non renewable Wood Charcoal as baseline Current

    For industrial application t CO2/year 4460.4For Domestic use t CO2/year 6690.6Total t CO2/year 11151

    Scenario 2 Coal as baseline Alternative

    For industrial application t CO2/year 12645.0For Domestic use t CO2/year 18967.5Total t CO2/year 31613

    17 Based on information from NBDA and IPCC default value.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    24/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    23

    E m e r g e n t V e n t u r e s

    4. PROJECT STRUCTURING

    4.1

    Plantation Project

    Bamboo plantations are eligible for carbon credit generation under CDM and VCM.

    In its 19 th meeting the A/R Working group of UNFCCC agreed that, the environmental integrity of the

    CDM activities is not affected by considering bamboos as being equivalent to trees in the context of A/R

    CDM project activities. Bamboos may be treated in the same way as trees in the context of A/R CDM

    project activities. Bamboo plantations are also eligible under VCS 2007 under Afforestation,

    Reforestation and Revegetation (ARR) activities and also under CCB Standards for VER generation.

    Applicable A/R Methodologies under CDM (also applicable for VCS 2007): Project Size: Large Scale

    Probable AR CDM Methodologies applicable for project type:

    i) ARAM0004 (Reforestation or afforestation of land currently under agricultural use)

    ii) ARAM0008 (Afforestation or reforestation on degraded land for sustainable wood production)

    Applicability Conditions in Methodology:

    S.N. Applicability Condition AR

    AM0004 AR

    AM0008

    1 Lands to be afforested or reforested are severely degraded.

    2 The project activity does not lead to a shift of pre project activities outside the project boundary

    X

    3 The project activity can lead to a shift of pre project activities outside the project boundary

    X

    4 The land would be expected to remain degraded in the absence of the project activity

    5 Environmental conditions and human induced degradation prevent

    the encroachment of natural forest vegetation.

    6 Site preparation involving slash and burn practices shall be restricted to non tree vegetation

    X

    7 Grazing shall not occur within the project boundary.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    25/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    24

    E m e r g e n t V e n t u r e s

    8 Biomass of non tree vegetation is in a steady state or decreasing for all baseline land uses

    9 No biomass burning for site preparation X X

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    26/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    25

    E m e r g e n t V e n t u r e s

    Baseline Scenarios to be considered:

    ARAM0004 ARAM0008

    I. No growing trees or woody perennials exist

    II. No trees or other woody perennials will start to grow at any time during the crediting period

    III. No trees or other woody perennials will reach the threshold for the national definition of forest due to ongoing cutting and burning cycles that are part of shifting cultivation systems;

    I. Plantation forestry for commercial woothe proposed project;

    II. Plantation forestry for other than commconservation forest);

    III. Permanent agricultural cropping activit

    IV. Remaining as the existing land use, namland.

    Data requirement for the methodologies needed to be supplied by NBM:

    S.N. Data Parameters Description Possible Data Source Timeline of Data

    1 Historical land use/cover data

    Determining baseline approach, demonstrating

    eligibility of land Local Publications, government, interview

    Earliest possible up tnow

    2 Land use/cover map Demonstrating eligibility of land, stratifying land

    area Landsat Before 1990

    and most recent date

    3 Landform map Stratifying land area most recent date Local government

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    27/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    26

    E m e r g e n t V e n t u r e s

    4 Soil map Stratifying land area most recent Local government and institutional agencies

    5 Regional, local forestry inventory

    Demonstrating eligibility of land, stratifying land

    area Local government

    and institutional

    agencies

    Satellite imaof 1989/1990and most recent date

    6 Digital Elevation Model (DEM)

    Demonstrating eligibility of land, stratifying land

    area e.g. SRTM, ASTER Most recent

    7 National and sectoral policies: National and sectoral

    Additionality consideration Local government Before 11 N2001

    8 IRR, NPV (if any, depends on the way of additionality analysis)

    cost benefit ratio, or unit cost of serviceIndicators of investment analysis

    Local government Most recentdate Local

    Calculation

    9 Investment costs (if any, depends on the way of additionality analysis)

    Including land purchase or rental, machinery, equipments, buildings, fences, site and soil preparation, seedling, planting, weeding, pesticides, fertilization, supervision, training, technical consultation, etc. that occur in the establishment period.

    Local Local statistics, published data and/or survey (if any, depends on the way of additionality analysis)

    Most recentdate,

    10 Operations and maintenance costs

    Including costs of thinning, pruning, harvesting, replanting, fuel, transportation, repairs, fire and disease control, patrolling, administration, etc.

    Local Local statistics, published data and/or survey (if any, depends on the way of additionality analysis)

    Most recentdate

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    28/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    27

    E m e r g e n t V e n t u r e s

    11 Transaction costs Including costs of project preparation, validation,

    registration, monitoring, etc. National and International DOE

    Most recentdate

    12 Revenues Those from timber, fuel wood, non wood

    products, with and without CER revenues, etc Local Local statistics, published data and/or survey (if any, depends on the way of additionality analysis)

    Most recentdate

    13 Local yield/volume tables

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    29/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Baseline and additionality criteria to be considered:

    The baseline for a CDM project activity is the scenario that reasonably represents the anthropogenic

    emissions by sources of greenhouse gases (GHG) that would occur in the absence of the proposed

    project activity. A baseline shall cover emissions from all gases, sectors and source categories listed in

    Annex A (of the Kyoto Protocol) within the project boundary. A baseline shall be deemed to reasonably

    represent the anthropogenic emissions by sources that would occur in the absence of the proposed

    project activity if it is derived using a baseline methodology referred to in paragraphs 37 and 38 of the

    CDM modalities and procedures.

    A methodology 18 is an application of an approach as defined in paragraph 22 of the CDM A/R modalities

    and procedures, to an individual A/R CDM project activity, for the determination of the baseline

    scenario. A baseline methodology should reflect aspects such as environmental conditions and past land

    uses and land use changes. No methodology is excluded a priori so that project participants have the

    opportunity to propose a methodology.

    In this case, shifting cultivation is the most probable scenario that can be adopted as baseline.

    Additionality of a CDM programme of activities (PoA All types)

    A PoA19 is additional if it can be demonstrated that in the absence of the CDM the proposed voluntary

    measure would not be implemented, or the mandatory policy/regulation would be systematically not

    enforced and that noncompliance with those requirements is widespread in the country/region, or that

    the PoA will lead to a greater level of enforcement of the existing mandatory polic/regulation. This shall

    constitute the demonstration of additionality of the PoA as a whole.

    Aspects of National Bamboo Mission that has to be highlighted along with the documentary

    evidences to establish Additionality of the project.

    Consideration for Carbon credits and CDM/VCM benefits during project conceptualization

    Uniqueness of NBM as the pioneer project for systematic and scientific bamboo cultivation and

    utilization in India

    18 , 18: UNFCC Glossary of CDM Terms (http://cdm.unfccc.int/EB/036/eb36_repan32.pdf)

    E m e r g e n t V e n t u r e s

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    30/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    29

    E m e r g e n t V e n t u r e s

    The technological, financial, operational and other constraints faced by NBM and how the

    project would not be feasible without the additional financial means from the sale of Carbon

    credits

    Additional Value for projects with cobenefits in Voluntary Carbon Market

    Social and environmental responsibility has become an increasingly important part of the marketing

    strategies of large companies. Cobenefits in the Voluntary Carbon Markets progressively capture a

    great value. Hence a high level of co benefits can attract investment in Forestry based Climate Change

    Mitigation Projects. Well managed and sustainable projects are closely associated with a variety of co

    benefits, such as increased employment and income generation, biodiversity and watershed

    conservation, and the provision of wood products and recreational services. These are likely to be

    greatly appreciated by carbon credit buyers and compose a significant value proposition to carbon

    offsets.

    The CCBS has developed a set of basic compulsory regulations that must be met prior to a project

    achieving certification. The compulsory basic requirements include net positive community impacts,

    mitigation of negative offsite community impacts, net positive biodiversity impacts, and mitigation of

    negative offsite biodiversity impacts.

    According to AFOLU VCS (2007), projects have the potential to improve socio economic and

    environmental impacts, but may also have negative impacts. Hence, prior to certification, the VCS

    requires projects to identify negative environmental and socio economic impacts and undertake steps

    to mitigate these.

    Both VCS 2007 and CCB accept approved A/R methodologies.

    4.1.2.

    Harvested bamboo

    products

    HWP is eligible for carbon credit generation under VCS 2007. Studies are required to benchmark the

    baseline and project activity emissions in this sector by using actual sectoral data of emissions in

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    31/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    30

    E m e r g e n t V e n t u r e s

    manufacturing of products. As of now no such studies are available. A number of methodological issues

    including monitoring may constrain such projects.

    4.2 Energy components:

    4.2.1 Bamboo Gasification for power/thermal use: CDM Methodology available for biomass gasification are AM0042 Gridconnected electricity generation

    using biomass from newly developed dedicated plantations, ACM 0006 Consolidated methodology for

    grid connected electricity generation from biomass residues and AMS ID Grid connected renewable

    electricity generation. Prima facie it seems a potential CDM POA activity. This is also eligible in VCS 2007

    and other VCM standards. Bamboo gasification for thermal use is an eligible activity under the CDM

    category AMS I E Switch from Non Renewable Biomass for Thermal Applications by the User . Also

    eligible for VERs.

    4.2.2 Charcoal Preparation and thermal use: CDM Methodology available for this sector are AMS I E Switch from Non Renewable Biomass for

    Thermal Applications by the User and AMS III K Avoidance of methane release from charcoal production

    by shifting from pit method to mechanized charcoaling process. This is a potential CDM POA activity,

    also eligible for VERs when NBM can prove that it charcoal produced is replacing non renewable wood

    biomass/ coal or charcoal made from non renewable biomass.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    32/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    31

    E m e r g e n t V e n t u r e s

    5. Sequence of Activities for Carbon Credit project document development

    5.1 CDM project Cycle

    Step1 -Preparing a CDM project for validation Before submission of a project for validation, the developers need to do the following:

    Methodology Selection There are two categories for each of the sectors i.e. large scale project and small scale projects. The

    basket of small scale projects comprised of following.

    o Renewable

    energy

    projects

    up

    to

    15MW

    installed

    capacity.

    o Energy savings of 60 GWhe.

    o CO2 abatement of 60 kt/year.

    o A&R sequestration of 16 kt CO2; developed or implemented by low income

    communities.

    Any other project which is outside the above areas will fall into large scale project activities.

    There are different methodologies for each of the sectors and projects. One needs to choose a particular

    methodology which is suitable for that case. If approved methodology is not available then one needs to

    develop new methodology. The new methodology will include identification of baseline scenarios,

    formulae to estimate emission reduction and monitoring mechanism for CDM project activity.

    A UNFCCC approved Validator (known as Designated Operating Entity or DOE) will review the New

    Methodology and submit to the Executive Board (EB). A Methodology Panel appointed by EB reviews

    the New Methodology for issues such as Transparency, Accuracy and Implementability to make a

    recommendation about whether it should be approved.

    This process may take 6 months or more.

    Project Design Document (PDD) It is the document that outlines

    The Project Concept

    How the project reduces emissions and estimates of emission reductions

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    33/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    32

    E m e r g e n t V e n t u r e s

    How the project is Additional (is not business as usual; the project overcomes a number of

    barriers, is not a common practice and without CDM benefits is unlikely to be implemented)

    Monitoring methodology for monitoring future emission reductions.

    PDD has to be consistent with Approved or proposed New Methodology.

    DOE makes an assessment of whether the PDD is consistent with approved methodology or not.

    Approval of Host Country PDD would be submitted to Ministry of Environment and Forest (MOEF) for host country approval.

    MOEF would ask developers to present the case in front of government officials to show that the project

    is in line with sustainable development priorities of India and doesnt create any negative impact on

    environment, local community or the national resources.

    Approval from MOEF takes around 6 weeks.

    Step -2: Validation Validation is an audit of the project conducted by UNFCCC approved validator. There are a number of

    well known Validators such as SGS, DNV, TUV, BVQI and JQA etc.

    Validation is essentially the point at which a project is approved or rejected. While in a formal sense

    registration by the Executive Board constitutes final approval, evaluation of Validator plays a significant

    role in EB approval and a Validator may refuse to submit the document to EB unless he/she is satisfied

    with the PDD.

    During validation process the following factors are checked:

    Alignment of PDD with approved/ proposed Methodology

    Correctness of additionality arguments, appropriateness of choice of baseline scenarios, client

    preparedness for monitoring the emission reductions etc.

    Stakeholder acceptance of the Project. Stakeholders are all those entities that are likely to be

    affected by the Project and include local community, local regulatory bodies etc. The validation

    process includes a 30 day public comment period during which stakeholders; the public and

    NGOs can make submissions to the validator about why the project shouldnt be accepted.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    34/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    33

    E m e r g e n t V e n t u r e s

    If the validator believes that the project qualifies as per CDM guidelines, they submit a Validation Report

    to the Executive Board, which makes a recommendation that the project be registered.

    The Validation Report is made public when it is sent to the Board and must include an explanation of

    how the comments received by the Validator have been taken into account.

    Step 3: Registration by the Executive Board Registration by the Executive Board is given automatically, unless one of the countries involved in the

    project, or at least 3 members of the Executive Board requests a review. A small scale project takes 4

    weeks for automatic approval; a large project takes 8 weeks for such approval if there is no request for

    review.

    Step 4: Verification, certification and issuance of emission reduction credits Once a project is registered the developer begins to monitor the reduction of emissions according to the

    plan they presented in the PDD and compiles a monitoring report.

    Periodically the client appoints a DOE as a Verification Agency (which has to be different from the one

    that did the validation) that verifies the actual emission reductions according to the Monitoring Plan

    submitted in PDD and compiles a Verification Report and submits to EB. This report is made public.

    After EB approves, Certificates of Emission Reductions (known as Certified Emission Reductions or CER)

    are issued.

    Verification can be done for any length of time; however for this particular project it is suggested to go

    for annual verification to reduce cost of verification.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    35/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    34

    E m e r g e n t V e n t u r e s

    NBM

    Advisors:EVI

    DOE DNA

    Validationreport

    Host countryapproval

    BuyerCERs

    DOE

    Verificationreport

    LocalStakeholders

    Stakeholders consultationreport

    Globalstakeholders

    Feasibility & PCN

    EngagementEngagement

    30 days comment period

    8 week appeal process

    ERPACDM project cycle

    5.2 VCM project cycle:

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    36/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    35

    E m e r g e n t V e n t u r e s

    Carbon Market Dynamics Buyers: Currently there are two types of buyers in the market:

    Government fund (Belgium, Canada, Japan, World Bank etc)

    Private funds.

    Government funds are the biggest buyers in the market, but the rate provided by them is much lower

    than as compared to private players.

    Pricing: Key drivers of price

    Risk of CER delivery

    o Methodology approval risk

    o Project registration risk

    o Project Implementation Risk

    o Operational risk (under/over performance)

    o Creditworthiness the project sponsor and the viability of the Project

    o Country risk (includes Kyoto Protocol risks) Confidence in the quality of the ongoing

    carbon asset management by the Counter Party (Host Countries) and hence expectation

    of delivery of CERs over the life of the project

    Demand supply balance of ERs

    o Demand ability of Annex 1 participant to meet the reduction targets by improvements

    in their own countries.

    o Demand affected by factors such as availability of gas, weather changes.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    37/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    36

    E m e r g e n t V e n t u r e s

    o Supply of ERs from other sources such as JI20 (projects in other Annex 1 countries), Hot

    Air21 (from CIS countries, Russia etc)

    o Supply of CERs (India, China, Brazil etc are building a huge pipeline which will come in

    the market by 2008)

    o CERs from areas such as afforestation/reforestation activities, which can be very big.

    Additional environmental and social benefits coming due to project (buyers tend to pay a

    premium for projects with big positive socio economic impact).

    Demand supply balance is likely to vary significantly with time. Accordingly there is a huge uncertainty

    about prices.

    Structure of the Emission Reduction Purchase Agreement (ERPA) is crucial. Prices will vary depending on

    Whether it is a spot contract or forward contract

    Amount of upfront payment required, and applied discount rates in case of upfront payment,

    Guarantee the seller is willing to undertake in case it fails to deliver upon contract

    commitments, penalties for non delivery, and sellers capacity to pay the penalties;

    Current Market Scenario: While government buyers seem to aim for CER prices at 67 Euros for projects with a balanced risk distribution, private buyers seem willing to accept 10 12 Euros.

    Possible Sale Structures: There are various CERs sale structures used in the market based on the project

    profile, and risk appetite of project promoter.

    Fixed + Float

    o In large contracts it is possible to link CERs prices to the European Union Allowance 22 (EUA)

    prices (with some discount) to help clients maximize CERs value if market prices go up in

    20 JI: Joint Implementation- Similar to CDM, but implemented by Developed countries in developed countries21 Hot Air is a colloquial term used to describe emission reduction traded by CIS countries. CIS countries are already

    emitting less than their targets as their economy is witnessing slump, these emissions are thus traded in the market.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    38/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    37

    E m e r g e n t V e n t u r e s

    future. Discounts of Euro 810 prevail and therefore for clients willing to accept price decline

    risks current price could be ~ Euro 15 (EUA prices ~ 23 Euro).

    o The structures have a price floor to ensure protection against steep price fall.

    Fixed

    o In case investment is brought in by CERs buyer, CERs are sold at a fixed price for the

    crediting period (range from Euro 4 Euro 8) depending on quality of CERs, risks etc.

    Fixed till 2007 the start of first target period for Annex 1 countries, and then Floating price structure

    for future CERs.

    In comparison with compliance markets, voluntary markets are less mature and trade in lower volumes.

    There is no umbrella regulator in the voluntary carbon market. Voluntary market considers less complex

    and lest costly ways to handle the issue of non permanence than the current approach of temporary

    credits under the CDM. In Voluntary Carbon Standard 2007 (AFOLU) and CarbonFix Standard, two major

    voluntary standards for forestry it is done by setting a buffer reserve based on its assessment of

    potential risks of carbon loss.

    Observations from voluntary carbon market suggest that forestry accounted for the highest 36% of the

    transaction volume in the year 2006 as compared to mere 1% of expiring credits from CDM. Growing

    45%, in the year 2007 Agriculture and forestry projects contributed to 18% of total OTC market

    transaction 23.

    Voluntary market is also to promote innovative means of emission reductions. Harvested wood should

    be used as durable wood products such as furniture and construction. Maximum benefits from the

    terrestrial carbon sinks can be obtained by making progressive farmer a project holder for growing trees

    22

    EUA: European Union Allowances, allowances given to EU which are traded among themselves to deal with theiremission reduction targets. EUAs are traded at a premium as they are traded among countries with high credit

    rating, and have no delivery risk. Currently EUAs are traded around 21-23 Euros. CERs on the other hand are traded

    at discount due to delivery risk, project performance risk, project promoters risks etc.23 State and Trend of the Voluntary Carbon Market Reports 2007 and 2008, Ecosystem Marketplace.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    39/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    38

    E m e r g e n t V e n t u r e s

    in agro ecosystems and for Bioenergy options in them. In order to minimize the transaction costs it is

    important to maximize the flow of financial benefits to the farmers from the sale of good quality VERs/

    VCUs. This will lead to the deduction in costs to the project developer and /or promoter and make

    attractive to them as well as local stakeholders.

    Emergent Ventures is involved in developing some interesting forestry projects and is in process of

    proposing new methodologies for accounting emission reductions in forestry and agriculture sector.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    40/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    39

    E m e r g e n t V e n t u r e s

    RECOMMENDATIONS:

    EVI comes out with following recommendations based on the study:

    SN Project Activities ERs

    Potential

    per annum

    Recomm

    ended

    Category Remarks

    1 Bamboo Plantation All

    sites 190,790 Green

    All sites have been assessed separately

    under section 3.1.1

    2 Harvested Bamboo

    Products Orange

    Eligible under VCS 2007 only, New Meth

    required which may include

    national/sectoral baseline. Success of

    project depends on successful approval of

    the proposed methodology. Detailed

    Baseline Assessment would be required

    through credible third party survey.

    Double Counting issues to be taken care

    of. Complex Monitoring.

    3 Bamboo Gasification for

    power (both, installed and

    planned) 1,191 Green

    Very small in quantum hence can be

    taken up as a bundled project activity

    involving whole of north east/country as

    a whole. It is advisable to launch it as a

    CDM Program of Activities.

    4

    Bamboo

    Charcoal as a

    replacement

    of Non

    renewable

    Wood

    Charcoal

    In

    industries 4,460 Orange

    Needs to be established through credible

    third party surveys that baseline wood

    charcoal comes from a depleting source

    and is non renewable. Double counting of

    ERs should be avoided.

    In

    households 6,690 Orange

    Needs to be established through credible

    third party surveys that baseline wood

    charcoal comes from a depleting source

    and is non renewable. Double counting of

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    41/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    40

    E m e r g e n t V e n t u r e s

    ERs should be avoided. Complex

    monitoring.

    5 Bamboo

    Charcoal as a

    replacement

    of Coal

    In

    industrial

    application 3,827 Green

    Only in those industries that have coal as baseline. Can be taken up as a bundled

    project activity involving whole of north

    east/country as a whole. Can be

    developed as a CDM Program of Activities

    also. Double counting to be avoided.

    In

    households 5,741 Orange

    Baseline needs to be determined based

    on past data, credible third party survey

    of households. Double counting to be

    avoided. Complex monitoring.

    Green: Definite CDM/VCM opportunities, should be taken up

    Orange: Potential CDM/VCM project, wait and watch, a re-look on these opportunities needed after

    sometime (say 3 months)

    Red: Non-CDM/ VCM projects

    The Way Forward Following will be the plan of action to move forward with bamboo based carbon credit projects:

    1. EVI shall send proposal of advisory services for Green projects. The proposal will include

    detailed timelines and points of action.

    2. Model of roles/responsibility shall be adapted by NBM as appropriate. An indicative model could

    be:

    a. NBM Project Finance

    b. CBTC Project management and co ordination

    c. NBDA Technical back up, project monitoring and implementation

    d. EVI Project advisory for CDM/VCM

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    42/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    41

    E m e r g e n t V e n t u r e s

    3. Similar feasibility studies can be performed by EVI for other states also. EVI shall send services

    offering for this.

    4. Required third party assessments/ surveys to be done for Orange projects.

    5. After analysis based on assessment/ surveys as per remarks on Orange projects, projects moved

    to Green would be taken up for carbon credits.

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    43/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    Emergent Ventures India Pvt. Ltd., Plot No. 19, Sector 33, Gurgaon, Haryana 122 001Phone: 91 124 4353100, email: contact@emergent ventures.com , Web: www.emergent ventures.com

    42

    E m e r g e n t V e n t u r e s

    Glossary of Terms

    % Percentage

    AR, A&R, A/R Afforestation and/ or Reforestation

    CDM Clean Development Mechanism

    CER Carbon Emission Reduction

    DNA Designated National Authority

    DOE Designated Operational Entity

    GHG Green House Gases

    IPCC Intergovernmental Panel on Climate Change IRR Internal Rate of Return

    KP Kyoto Protocol

    kWh Kilo Watt Hour

    MWh Mega Watt Hour

    MNES Ministry of Non Conventional Energy Sources

    MoEF Ministry of Environment and Forests

    NBM National Bamboo Mission

    PCN Project Concept Note

    PDD Project Design Document

    UNFCCC United Nations Framework Convention on Climate Change

    VCM Voluntary Carbon Market

    VCS Voluntary Carbon Standard

    VCU Voluntary Carbon Unit

  • 8/8/2019 Feasibility NBM Nagaland Finl LCD 260808

    44/44

    Emergent Ventures India Pvt. Ltd. Sustainable Solutions for Environment

    E m e r g e n t V e n t u r e s