Agenda
» eCall in Europe » HeERO Pre-deployment projects » eCall evolution » UK Status » Conclusions
!25/9/13
Andy Rooke
eCall History Europe
» eCall not new, third party systems existing for a number of years › Lacked market penetration
» European Commission looked at options to deploy eCall, as a mandated service › Based it on the 112 universal emergency number for
Europe › Free at point of use › Will operate throughout Europe and beyond
» eCall and TPS can co-exist
!35/9/13
Andy Rooke
eCall architecture
5/9/13 !4 444444
Andy Rooke
eCall regulatory measures
!5
Regulated under
amendment to type approval 2007/46/EC adoption by
2014
Recommendation to MS for MNO
implementation C(2011)6269 Final
8th September 2011
ITS Directive, common
specification issued
5/9/13
•••
EN 16072
Pan-European eCall Operating Requirements
EN 15722
MSD
-Public service 112-based only -Voice + MSD to relevant PSAP -112-based, with or without intermediation platform under Public delegation
eCall Flag
ETSI TS 124 008 Table 10.5.135d
ETSI TS 122 101 -Voice + MSD on 112
High Level Application Protocols
Data registry procedures - ISO/EN 24978:2009
Standardisation
In-band modem trx
“eCall Data Transfer - General Description
ETSI TS 126 267
“eCall Data Transfer. ANSI-C Reference Code
ETSI TS 126 268
“eCall Data Transfer. Conformance testing
ETSI TS 126 269
“eCall Data Transfer. Characterisation Report
ETSI TS & TR 126 969
ETSI-MSG & 3GPP. Chair: E. Barck
CEN TC 278 WG 15. Chair Bob Williams
EN 16062
eCall NAD conformance specs: ETSI TS 102 936-1 Protocol test specification
ETSI TS 102 936-2 Test Suites
CEN TS/prEN 16454
eCall end to end conformance testingSuccessfully Balloted
EN 16102
TPS-eCall Operating Requirements
25 amendments notified
Andy Rooke
eCall implementation in Europe
» Pre-deployment trial for Pan European eCall based on 112 = HeERO Projects
» Testing › Defined standards › In-vehicle systems › Readiness of Mobile Networks › PSAP upgrades › Continuity of service across all MS › Aftermarket devices
!75/9/13
Andy Rooke
HeERO project prospectus
» Pre-deployment projects » January 2011 to December 2014 » 15 Pilot Sites » €8m EC funding available » Total budget €16m » 82 Partners » 5 additional sites upgrading at their own
expense.
5/9/13 !8
Andy Rooke
HeERO Pilot Sites
!95/9/13
Andy Rooke
HeERO Technical Areas
» eCall new type approved vehicles M1 & N1 » Large Goods Vehicle eCall » Powered 2 Wheeled vehicles » Location technology
› Multiple Navigation Systems › Cross Border
» Aftermarket devices » Certification of vehicle and service
!10 5/9/13 11
Andy Rooke
!11
HeERO TimelineImplementation
Evaluation
Evaluationplanning
2011 2012 2013
Project progress to date
HeERO Phase 2
HeERO Phase 2
Deployment Enablers
1st Operation phase
Evaluation
Implementation
2nd operation phase
2014
Andy Rooke
eCall Possible evolution
!125/9/13
• eCall will evolve into a wider platform • Shared resources on the platform • Greater need for GNSS capability
1st GENERATION eCall
Dedicated systems
for location and communications
2nd GENERATION eCall
Shared location
Mobile connectivityMultiple
embedded applications
Andy Rooke
UK Status
» Technically UK › MNO Committed from 2014 › PSAP (BT) can upgrade but needs commission from
Government
» Rescue Services › Long association with eCall UK defined minimum set
of data › Little interest so far from emergency services but
waking up!
!135/9/13
Andy Rooke
UK Next Steps
» Get engaged! » Data (MSD) will soon arrive at PSAP 1 how will it
be transmited between PSAP 1 and 2? » Understanding what you can do with the data,
its not only just for the immediate rescue » Confidence levels for the different types of call
(KLPD experience) » Explore value added.
!145/9/13
Andy Rooke
Conclusions» eCall is coming to new vehicles from 2015 » After-market devices arriving much sooner » Legislative requirements moving forward
› Type approval › Networks › PSAP
» eCall in-vehicle system will evolve from a single unit
» eCall is understood but deployment opportunities yet to be fully understood
!155/9/13
After market eCall
!16
Andy Rooke
Coming to you very soon
!175/9/13
They are here now!
Andy Rooke !185/9/13
QUESTIONS?
• Andy Rooke – ERTICO ITS - Europe – Email:
[email protected] – Tel: +32 (0) 24000780 – Twitter andyrooke721