Agenda
• Rail project update
• Bus service
• Station and bus bay layout
• Station features
• Next steps
• Rail service disruptions
Department of Transportation
2
County of Fairfax, Virginia
Department of Transportation
3
Project Map
County of Fairfax, Virginia
Department of Transportation
4
Silver Line, Phase 1 Service Pattern
County of Fairfax, Virginia
Phase 1
Rail Project Update – Dec. 2012
• Guideway / trackway: 100%
• Utility relocation: 99%
• Track work: 94%
• Systems: 33%
• Stations:
Department of Transportation
5
– McLean: 67%
– Tysons Corner: 61%
– Greensboro: 49%
– Spring Hill: 48%
– Wiehle: 76%
Overall: 87%
County of Fairfax, Virginia
Department of Transportation
6
Phase 1 Rail Project Update
McLean kiss and ride. Photo courtesy Stephen Barna, Dulles Corridor Metrorail Project (DCMP).
County of Fairfax, Virginia
Department of Transportation
7
Phase 1 Rail Project Update
Outbound tunnel. Photo courtesy Stephen Barna, DCMP.
County of Fairfax, Virginia
Department of Transportation
8
Phase 1 Rail Project Update
East-looking view of Wiehle Station. Photo courtesy Stephen Barna, DCMP.
County of Fairfax, Virginia
Department of Transportation
9
Phase 1 Rail Project Update
WMATA clearance car at West Falls Church rail yard. Photo courtesy Stephen Barna, DCMP.
County of Fairfax, Virginia
Phase 1
Bus Service
• Service providers:
– Fairfax Connector
– Loudoun County (LCT & VRT)
– Metrobus
– PRTC
– MWAA-Washington Flyer
Department of Transportation
10
NOTE: Based on draft service plans except for Metrobus.
County of Fairfax, Virginia
Department of Transportation
11
Fairfax Connector in Tysons
NOTE: Map does not include routes 495F,G,J,M.
Routes
• 401/402
• 432
• 434
• 462
• 463
• 574
• 720/721
• 722
• 724
• SLC1,2,3,4
County of Fairfax, Virginia
Department of Transportation
12
Loudoun County in Tysons
Route
• Loudoun -
Tysons
Express
County of Fairfax, Virginia
Department of Transportation
13
Metrobus in Tysons
Routes
• 2T
• 3T
• 15M
• 23A,T
• 28A,X
County of Fairfax, Virginia
Department of Transportation
14
PRTC in Tysons
Routes
• Linton Hall Rd
• Manassas
• Woodbridge -
Tysons
Express
County of Fairfax, Virginia
Phase 1
Dulles Airport (IAD)
Wiehle IAD
Fairfax Connector 981
25/50 min. service with two
stops: Reston Town Center and
Herndon-Monroe Park & Ride
- - - - - - - -
MWAA-Washington Flyer
15-30/30 min. service non-stop
Department of Transportation
15
L’Enfant Pz/Rosslyn IAD
Metrobus 5A
30-40/60 min. service (existing
headways) with one stop:
Herndon-Monroe Park & Ride
County of Fairfax, Virginia
Phase 1
Existing Tysons Area Terminals
Tysons Corner Center
(rear / near Nordstrom) Fairfax Connector
462; 463; 495F,M
Loudoun County
Loudoun – Tysons Express
Metrobus
23A,T; 28A,X
PRTC
Woodbridge – Tysons Express
Department of Transportation
16
West Falls Church
(north side loop) Bay assignments: WMATA
Restructured service:
• 425/427 replaced by Silver Line
• 480 to Spring Hill Station (?)
• 500- and 900- series routes to
Wiehle Station
• LCT/VRT: some trips remain
to/from WFC; most to Wiehle
• MWAA-Washington Flyer to
Wiehle Station
County of Fairfax, Virginia
Department of Transportation
17
Tysons
West*Park
• Bay assignments:
FCDOT
• Connector Store
• 41 short-term spaces
• Restructured service: – 401/402 to Tysons Corner Sta.
– 574 to Spring Hill Station
– 981 to Wiehle Station
– 2T to Tysons Corner Station
– 23A to Tysons Corner Sta./Ctr.
– 24T (as Fairfax Connector
724) to Spring Hill Station
– 425/427 and 28T replaced by
Silver Line
Phase 1
Existing Tysons Area Terminals
No bus service planned after Phase 1;
layover terminal?
County of Fairfax, Virginia
Phase 1
Station and Bus Bay Layout
• Bus bay dimensions – Taper: 60’ at rear, 40’ at front of bus bay array
– Tangent: 10’ x 45’ + array taper (McLean, Tysons Corner,
Spring Hill)
• Operations consideration: tangent bays as one fluid bus lane
– Sawtooth: 66’ (Wiehle)
Department of Transportation
18
66’
18’ 48’
Sawtooth Indent
• Wiehle north: 3’
• Wiehle south: 6’
County of Fairfax, Virginia
McLean Station 1824 Dolley Madison Blvd, McLean
Bay assignments: FCDOT / WMATA
North side (WMATA)
• 2 tangent revenue bays with shelters along SB Route 123 (Dolley
Madison Blvd)
South side (FCDOT)
• 3 tangent revenue bays with shelters along EB Colshire Dr
• 1 tangent layover bay along EB Colshire Dr (verify operation)
• Kiss & Ride
– short-term parking, taxi, and shuttle spaces
• Fairfax County to retain ownership of the bus bays and kiss & ride
Department of Transportation
19
County of Fairfax, Virginia McLean Station
Department of Transportation
20
McLean Station
North and South
County of Fairfax, Virginia
Department of Transportation
21
McLean North
County of Fairfax, Virginia
Department of Transportation
22
McLean North – Illustrative Bus Svc.
23A,T
Tysons
Cnr Ctr
County of Fairfax, Virginia
Department of Transportation
23
McLean South
NO
RT
HB
OU
ND
RO
UT
E 1
23
County of Fairfax, Virginia
Department of Transportation
24
McLean South – Illustrative Bus Svc.
NO
RT
HB
OU
ND
RO
UT
E 1
23
23A,T
Ballston-
Crystal Cty
SLC1 (?)
County of Fairfax, Virginia
Department of Transportation
25
Colshire Drive Realignment Proposal
NO
RT
HB
OU
ND
RO
UT
E 1
23
Proposed realigned Colshire Drive
Pro
po
sed
Co
lsh
ire M
ead
ow
Ro
ad
exte
nd
ed
to
An
ders
on
Ro
ad
County of Fairfax, Virginia
Tysons Corner Station 1943 Chain Bridge Rd, Tysons Corner
Bay assignments: WMATA
North side (Tysons II)
• 3 tangent revenue bays with shelters
in the bus lane along SB Tysons
Blvd
South side (Tysons I)
• 3 tangent revenue bays with shelters
in the bus lane along NB Route 123
(Chain Bridge Rd)
Department of Transportation
26
County of Fairfax, Virginia
Department of Transportation
27
Tysons Corner North (Tysons II)
NOTE: buses exiting the bus lane must proceed
south/turn right on to SB Route 123 in the direction
of International Dr.
Tangent bay lane + bus lane width: 22’
County of Fairfax, Virginia
Department of Transportation
28
Tysons Corner North (Tysons II)
County of Fairfax, Virginia
Department of Transportation
29
Tysons Cnr. N – Illustrative Bus Svc.
NOTE: buses exiting the bus lane must proceed
south/turn right on to SB Route 123 in the direction
of International Dr.
County of Fairfax, Virginia
Department of Transportation
30
Tysons Corner South (Tysons I)
NOTE: buses exiting the bus lane must proceed
east/turn right toward the Tysons Corner Center ring
road. There is no left turn to return to Route 123.
Bus lane width: 20’ min.
County of Fairfax, Virginia
Department of Transportation
31
Tysons Cnr. S – Illustrative Bus Svc.
NOTE: buses exiting the bus lane must proceed
east/turn right toward the Tysons Corner Center ring
road. There is no left turn to return to Route 123.
County of Fairfax, Virginia
Greensboro Station 8305 Leesburg Pike, Tysons Corner
North entrance
• No bus bays
South entrance
• No bus bays
Department of Transportation
32
County of Fairfax, Virginia
Department of Transportation
33
Greensboro North
WESTBOUND ROUTE 7
County of Fairfax, Virginia
Department of Transportation
34
Greensboro N – Illustrative Bus Svc.
SLC3 Proposed: site redevelopment; 2 bus bays, closure of
service road access at WB Route 7 requested in proffer.
WESTBOUND ROUTE 7
County of Fairfax, Virginia
Department of Transportation
35
Greensboro South
EASTBOUND ROUTE 7
County of Fairfax, Virginia
Spring Hill Station 1576 Spring Hill Rd, Vienna
Bay assignments: WMATA
North entrance
• 5 tangent revenue bays with 4 shelters
along WB Leesburg Pike
• Kiss & Ride
– short-term parking and taxi spaces
South entrance
• No bus bays
Department of Transportation
36
County of Fairfax, Virginia
Department of Transportation
37
Spring Hill North
County of Fairfax, Virginia
Department of Transportation
38
Spring Hill N – Illustrative Bus Svc.
SLC4
432
574
724
480 Wolf Trap (?)
SLC4
County of Fairfax, Virginia
Department of Transportation
39
Spring Hill South
County of Fairfax, Virginia
Wiehle Station 1862 Wiehle Ave, Reston
Bay assignments: FCDOT
North entrance (bus plaza)
• 10 sawtooth revenue bays; 2 sawtooth layover bays
• Connector Store
• Kiss & Ride
– Short-term parking and taxi spaces
• Park & Ride
– 2,300 commuter spaces
– Garage project update – Dec. 2012; construction is 80% complete; expected
completion in July 2013
South entrance (Wiehle Ave ramp)
• 5 sawtooth bays
Department of Transportation
40
County of Fairfax, Virginia
Department of Transportation
41
Wiehle North (Bus Plaza)
County of Fairfax, Virginia
Department of Transportation
42
Wiehle North – Illustrative Bus Svc.
County of Fairfax, Virginia
Department of Transportation
43
Wiehle South (Eastbound Off-Ramp)
NOTE: buses exiting the off-ramp bus lane must
turn right onto SB Wiehle Ave in the direction of
Sunrise Valley Dr.
Sawtooth bay + bus lane width: 29’
County of Fairfax, Virginia
Department of Transportation
44
66’
18’
48’
Wiehle South (Eastbound Off-Ramp)
29’
BUS LANE
GENERAL TRAFFIC + BUSES EXITING THE BUS LANE
GENERAL TRAFFIC
GENERAL TRAFFIC
GENERAL TRAFFIC
WIE
HL
E A
VE
NU
E
ON
LY
BU
SE
S
County of Fairfax, Virginia
Department of Transportation
45
Wiehle South – Illustrative Bus Svc.
NOTE: buses exiting the off-ramp bus lane must
turn right onto SB Wiehle Ave in the direction of
Sunrise Valley Dr.
County of Fairfax, Virginia
Phase 1
Bus Bay Assignment Contacts
FCDOT
McLean Station (south)
Wiehle-Reston East Station
- - - - - - - -
Heather Diez
Department of Transportation
46
WMATA
McLean Station (north)
Spring Hill Station
Tysons Corner Station
- - - - - - - -
Bryant McClary
Walter Daniels
County of Fairfax, Virginia
Phase 1
Station Features
• Bus shelters
• Pedestrian / bike hardware
• Art
Department of Transportation
47
County of Fairfax, Virginia
Bus Shelters
• All Phase 1 stations except Greensboro;
different design at Wiehle north in garage
• 6’ x 24’
• Stainless steel structure and bench
• Display cabinet (not illuminated)
• Light fixture
Department of Transportation
48
County of Fairfax, Virginia
Bus Shelters
Silver Line shelters will be similar to new shelters installed at Vienna (south).
Department of Transportation
49
County of Fairfax, Virginia
Department of Transportation
50
Pedestrian / Bike Hardware
County of Fairfax, Virginia
Department of Transportation
51
Art
McLean
Tysons Corner
Wiehle Greensboro
Spring Hill
County of Fairfax, Virginia
Phase 1
Next Steps
• Next coordination meeting, Mar./Apr. 2013 – Connector staff to coordinate and host
• Station facility group tour, Aug./Sep. 2013 – Bus bays, lanes, shelters, etc… should be complete
– Nick can coordinate with rail office staff
– Possible use of a Connector or Metro bus for the
group tour
• Rail service disruption discussion
Department of Transportation
52
County of Fairfax, Virginia
Phase 1
Rail Service Disruptions
• How will your agency react to bridge gaps
if rail service is suspended?
• Tentative topic of discussion at the next
coordination meeting
• Jim Hughes (WMATA) is continuing the bus
bridge/mutual aid agreement effort
between Fairfax County and WMATA
Department of Transportation
53
County of Fairfax, Virginia
Questions / Comments?
Nick Perfili
FCDOT – Dulles Rail
703-877-5685
Department of Transportation