MEMORANDUM State of Alaska
. ... . . . . .. -.... ; , ,"'
~ • .I · .. J ...... _ ...
Department of Transportation & Public Facilities Northern Region Preconstruction
TO: Distribution DATE: September 30, 2005
FILENO:
David T. Bloom, PE )lt-0 Preconstruction Engineer Northern Region
TELEPHONE NO: 451-2274 FAXNO: 451-5126
FROM:
\
SUBJECT: Design Designation Requests
The recent retirement ofBev Fantazzi as Traffic Data Supervisor, in Planning, and.the assumption of those duties, including Design Designations by Margaret Carpenter, presents an opportunity to briefly review how to consistently format Design Designation Requests and incorporate a couple of minor modifications.
Continue to submit the request memo from the project manager, through me, to Jerry Rafson. (Refer to attached example.) Include with the memo the Traffic Data Request Form(s) (example attached, also in Chapter 6 of the Alaska Flexible Pavement Design Manual) with the.project specific information filled out ori. the fonn(s). Attach a separate form for- each route as needed. ·
In the memo, request the following: • Current ADT • Design Year ADT (Year) • Mid-design Year ADT (Year) • Design Hourly Volume • Directional Split • Overall Percent Trucks (If available, give breakout for various truck categories on the Traffic Data Request
Form) • Special information (as needed), such as 85th percentile speed, or turning movements at specific intersections,
or special counts for special events.
DO NOT REQUEST ESALS; that is now calculated by the designers from the information that comes back in response to the Traffic Data request.
Planning will respond with their usual Design Designation sheet, sans the ESAL' s, and will fill out the appropriate data on the Traffic Data Request Fonn(s). The Materials Section is the source of contact for assistance in · calculating design loading, obtaining proper forms, in addition to pavement structure design assistance.
DTB/lmc
Attachments: As stated
Distribution: Colleen M~ Ackiss, P .E., Traffic & Safety Chief Ethan Birkholz, Planning Manager Margaret Carpenter, Traffic Data Supervisor Joseph H. Keeney, P.E., PD&E Chief Gerald J. Rafson, P .E., Planning & Support Services Chief Patricia D. Miller, P .E., Design Group Chief Gary C. Tyndall, P .E., Design Group Chief Leo Waster, P.E., Materials Engineer Preconstruction Engineering Managers
MEMORANDUM State of Alaska
.... .. f
TO: Gerald J. Rafson, P .E. Planning Chief Northern Region
1'Nrv ~ ~\~
FROM: David T. Bloot , P.E. Precons 1_on EngineeVvJU Nort rnRegion
Department ofTrnnsporration & Public Facilities Northern Region Prcconstruction
DATE: September 30, 2005
FILE NO: Q:\1-lwy\60434\clericai\Design Designationmmo.doc
TELEPHONE NO: 451-2274 FAX NO: 451-5126
SUB.JECT: Fairbanks Cowles Street Upgrade STP-0641 (2)/60434 Dcsig•~ Dcsigmttion
Please prepare a Design Designation for the Fairbanks Cowles Street Upgrade, project number STP-0641 (2)/60434. Include the following information:
.· Current AADT Design Year AADT (2026) Mid-design'Year AADT (2021) Design Hourly Volume Directional Split Percent Commercial Trucks
This project will upgrade Cowles Street between 19111 and 23 rd A venues, und 21st A venue between Lathrop and Cowles Street. Please provide turning movements for 21 s1/Lathrop Street, 19th Ave./Cowles, and 23rd Ave./Cowles Street intersections. Additionally, please complete the attached Traffic Data Request Forms. 15-year and 30-year numbers are required for the functional and fatigue failure analysis for pavement design.
Thank you for your assistance.
CMA/mat
Attachment: As stated
.-.
=·· ',., ~ .... _,.,.
I rattle Data Request Form TOR Form-1-1 0/20/03
Alaska Department of Transportation & Public Facilities
Requested By: Design Project Number: Date 'quested: ( ~\\@~"' A c. t;s._~ Sr1-? -e>G,i4l (.~~ ~~~ 3"i II '2JP I c "(
Base Year: lcoL( Common Route Name: CDS Route Name:
Base Year Total AADT: Functional Class:
AADT Growth Rate Urban/Rural Forward (%/yr): End Year: -z.o z. ~ Historic M.P. Interval: CDS M.P. Interval: Back Cast (%/yr): Begin Year: AI J~r-~
Lana Configuration Sketch: (D•Igner: Provide sketch of lan•layout. Number each lane and
Truck · Load Factor %of Total .tlow dl,.ctlona.) .
Category . (ESALs par AADT t .. Truck) In Truck
Category -& I LJ
2-axla 2 t ~-t- Av-e.. I f; - ~
3-axla 4 c j . .
t l tf 4-axla rr .¥t
5-axle
;t 6-axta· M~c- j'..._l- .... - h ~1M'" sh~w...J ..... Percent.of Base Year Total AADT for Each Comments:
NUmbered Lane In Configuration S~etch: .
Lane# · %
Lane# %
Lane# %
Lana# %
Lana# %
Lana# %
Data Provided By: Provider's Signature: Data Provided:
Figure 6·1. Traffic Data Request (TOR) Form
Effective -4101/04 Alaska Flexible Pavement Design Manual
1ratt1c Data Request Form TOR Form-1-10/20/03
Alaska Department of Transportation & Public Facilities
Requested By: Design Project Number: Date Requested: r.~\\-_._ <'- A,.'£. ·~c.... ~- oc..•·-\\ (.~\ I l.o_'-t~'i \\ - Z.Ct - 0 '-(
Base Year: -z.oo~ Common Route Name: CDS Route Name:
Base Year Total AADT: Functional Class:
AADT Growth Rate Urban/Rural Forward (%/yr): End Year: 2.t:JZ..t, Historic M.P. Interval: CDS M.P. Interval: Back Cast (%/yr): Begin Year:N /A~
.. Lane Configuration Sketch: (Dalgn•r: Provide sketctl of lane layout. Number each lane and
Truck Load Factor %of Total 8how direction•.)
Category . (ESALs per AADT - - \~"-Aut-::::= -Truck) In Truck r--
t category ~ 2-axle
!11 r 3-axle . .
~ ....... 4-axle
5-axJe - - '2..~-=-=' A., .. iit.&-axta· JLI~, ,,..1 • J..~ '.. ..cJ-"t ·~c-.otJ •
Percent of Base Year Total AADT for Each Comments:
Numbered Lane In Configuration Sketch:
Lane# %
Lane# %
Lane# %
Lane# %
Lane# %
Lane# %
Data Provided By: Pro.vlder's Signature: Date Provided:
Figure 6·1. Traffic Data Request (TOR) Fonn
· ~~- .. ~·
Effective 4101/04 Alaska Flexible Pavement Design Manual
1raff1c Data Request Form TOR Form-1-10/20/03
Alaska Department of Transportation & Public Facilities
Requested By: Design Project Nul!l.ber: Date Requested: c :::::> * ( * ~ c . JC. ~ BaseYear: ~ Common Route Name: CDS Route Name:
Base Year Total AADT: Functional Class:
AADT Growth Rate Urban/Rural Forward (%/yr): --End Year: C -X-~
Historic M.P. Interval: CDS M.P. Interval: Back Cast (%/yr): Begin Year:~
Lane Configuration Sketch: (Designer: Provide sketch of lane layout. Number each lane and
Truck Load Factor %of Total show directions.)
Category (ESALs per AADT Truck) in Truck
Category 2-axle r-3-axle
f ('II \J \ O.e, s\L&ch
4-axle
5-axle \ ~ 6-axle
'
Percent of Base Year Total AADT for Each ·Comments:
Numbered Lane in Ccmfiguration Sketch:
¥::-Lane# .%
Lane# %
Lane# %
Lane# %
Lane# %
Lane# %
Data Provided By: Provider's Signature: Date Provided:
. i
Figure 6-1. Traffic Data Request (TOR) Form
·- ·-,
Effective 4/01/04 6·3 Alaska Flexible Pavement Oaslgn Manual