FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

20
FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray Spectrometer and SWIR Ground verification Exploration Program Of the Farleigh Lake Tenure (Mineral tenure # 507982) Event #4133904 Osoyoos Mining Division NTS 082E/05 UTM Zone 11 (NAD 83) Northing: 5482518 Easting: 300224 For Aldershot Resources Ltd 600 – 666 Burrard Street Vancouver, BC V6C 2X8 (Previous ARIS# 28174) Re: Minfile 082ESW154 By Auracle Geospatial Science Inc. January 2007 1

Transcript of FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

Page 1: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

FARLEIGH LAKE ASSESSMENT REPORT

Gamma-Ray Spectrometer and SWIR Ground verification

Exploration Program Of the

Farleigh Lake Tenure (Mineral tenure # 507982)

Event #4133904

Osoyoos Mining Division NTS 082E/05

UTM Zone 11 (NAD 83) Northing: 5482518

Easting: 300224

For Aldershot Resources Ltd 600 – 666 Burrard Street

Vancouver, BC V6C 2X8

(Previous ARIS# 28174) Re: Minfile 082ESW154

By

Auracle Geospatial Science Inc.

January 2007

1

Page 2: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

Table of Contents Executive Summary………………………………….……………3 Introduction………………………………………………..………4 Location and Access………………………………...…………….4 Mineral Tenure Status……………………..………………………5 Previous Work………………………………………………….....5 Regional Geography…………………………………………...….5 Mineralization Distribution Characteristics……………………….6 Local Geology of the Main Uranium Deposits in the Region…….7 2006 Work Program (Multi Instrument)………………………….8

• General Methodologies……………………………...………8 • Equipment and Instrumentation…………………………..…8 • Data…………………………………..………………..…….8 • Data Collection………………………………………..….....8 • Work Locations………………………………………..…….8 • Results……………………………………………...…….….8 • Conclusions………………...………………………...….…..9 • Statement of Work and Costs…………………………..…10

Figures 1. General location map………………………………………11

1A Tenure location……………………………………...…12 2. Geology and showings…………………………………….13 3. Locations of work………………………………………….14 4. Reference map of grid…………………………………...…15 5. Gamma ray distribution……………………………………16

Appendices • I Project Cost Report • II GR assays • III Statement of Qualification

2

Page 3: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

EXECUTIVE SUMMARY Auracle Geospatial Science Inc. was asked by Aldershot Resources Ltd. to carry out a ground verification reconnaissance and exploration work program on its several of its mineral tenures in British Columbia. These are primarily uranium prospects staked for their Uranium potential. In the preceding year spectral analysis was undertaken by the author on these tenures, together with an ongoing program of geoscience data compilation and image fusion. Geologically the West Okanagan area is underlain primarily by a granitic intrusive rock complex which has been overlain by a volcanic-sediment package of rocks. The volcanic sediment package has been eroded off over much of the claim area. Uranium mineralization of this area is predominantly hosted in young sedimentary bog-like basins. In the case of the Farleigh Lake and Brent Lake showings there is also reported to be the possibility of basal type uranium occurrence, and this became a matter of further exploration. Earlier Spectral analyses also needed ground based exploration in areas where spectral geology did not agree with current mapped geology. Gamma ray spectrometry does confirm previous findings and total counts per second exceed previous report. Recent data ranges as high as 7875cps (counts per second) and surface ROI assay mode values for Uranium up to 54 ppm with Thorium at 74.3ppm this seems to represent an anomaly. A high resolution ground based spectral and gamma ray spectrometry survey is recommended to develop drill target vectors. It is also believed that there may still be undisclosed company reports that may lead more directly to drill targets in this area. Auracle Geospatial Science Inc. January 2007

3

Page 4: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

INTRODUCTION In early January of 2005 an area of prospective uranium bearing terrain was acquired near the town of Grand Forks in southern BC. The Grand Forks area was identified as hosting a number of significant uranium showings during a review of BC uranium resources. This is a little known uranium bearing area that has had minimal exploration but has good potential for Pegmatite hosted uranium bearing deposits. The rising demand and price of Uranium on the world market was the incentive for these acquisitions. These claims were staked by Matthew Mason and subsequently optioned to Aldershot Resources Ltd who is funding this work program. In 2005 Aldershot Resources asked RM Resource Management Ltd to undertake an interdisciplinary technical exploration work program involving the use of Spectral Analysis to see if any uranium mineralization or other geologic features associated with the localization of uranium mineralization could be identified on the Aldershot properties. While the Spectral Analysis of the Okanagan West group was inconclusive it did provide an increase in the overall data available and a strong basis from which to proceed and some question of the location and accuracy of the mapped surface of the area.. In 2006 Aldershot Resources Ltd. asked Auracle Geospatial Science Inc. to undertake a field program of multi instrument uranium exploration at Farleigh Lake as a part of a BC Uranium exploration project. The purpose of the work is to better define the rock spectra of the area, and to correlate the Shortwave infrared and Gamma ray data by integration with existing and CDGPS spatial data in order to identify Uranium mineralization or its host geology. LOCATION AND ACCESS The Aldershot Farleigh Lake Tenure is only 8 kilometres north of the paved Green Lake road. (Figure 2). Access to the site is at the end of the Farleigh Lake road, by way of a gravel spur road which follows the west side of the Farleigh Lake Highlands. Access is somewhat difficult in some areas on the west side of the property and the road is not well used. Several of the old access roads are now on private land and are gated. There is electrical power to the private land at the south end of the tenure. PHYSIOGRAPHY The area consists of a manmade lake which has flooded a wetland, swampy lowland and steep bluffs to the East and west of the lake valley. Bedrock exposure coincides with the steepness of the topography providing good exposure at most elevations. Vegetation is

4

Page 5: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

sparse on the slopes and varied on the flats. This is a truly semi arid environment without running water (with the exception of the manmade drainages from the lake). MINERAL CLAIM STATUS This is a single tenure block of cells. This tenure was staked by Matthew Mason in January 2005 and subsequently optioned to Aldershot Resources Ltd. Aldershot has a 100% interest in this tenure, subject to terms of an option agreement. A description of the title may be found on the Titles Division cover confirmation letter of this document. PREVIOUS WORK Discovered by D.G. Leighton & Associates in 1979, the Surficial-type uranium occurrences of the Okanagan West area enjoyed only one year of attention prior to instatement of the 1980 provincial uranium exploration moratorium. Discovery of these uranium occurrences was a result of spin-off regional research generated by the uranium exploration activities east of Okanagan Lake in the mid 1970’s. Many of these occurrences were discovered as late as 1979 just prior to the implementation of the B.C. uranium exploration moratorium. Due to reclamation of old exploration sites, new logging and regeneration of forests in the area most of the old explorations areas and drill hole collars are impossible to locate. Sampling of uranium bearing springs and alkaline lakes was the primary exploration methodology. During this brief period at least 16 significant Surficial style uranium showings were found, some of which are included in the tenures which are the subject of this assessment report. Exploration work included regional and detailed stream sediment and soil sampling along with auger and some drill sampling of bogs and basins where uranium concentrations had been located. In this particular area there is further reference to basal style uranium and history of some drilling. With the amount of time that has passed since the last uranium exploration work on this claim, there seems to be no evidence left of it on the ground. REGIONAL GEOLOGY (extract from the authors preceding report) (Figures 2 and 3) The area is predominantly underlain by Middle Jurassic Okanagan Batholith granodiorite intrusive rocks which gradationally changes into the Osprey Lake quartz-monzonitic phase to the northwest. These intrusive rocks are unconformably overlain by a succession of Eocene epiclastic sediments, pyroclastic rocks, and alkaline lavas of the Penticton Group White Lake and Marron Formations. In the vicinity of the community of Summerland are a number of bodies of Eocene Penticton Group undifferentiated volcanic rocks including Marron, Springbrook, Maramara, and Skaha Formations. Also in this area and extending over to the shores of Okanagan Lake are several bodies of Eocene Penticton Group Kettle River and Springbrook Formation rocks including mudstones, siltstones, shales, and other fine clastic sedimentary rocks. An Eocene Coryelle syenitic

5

Page 6: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

stock occurs to the north of the area near the headwaters of Eneas Creek. The central part of the main valley around Summerland and extending into some of the surrounding valleys are Quaternary alluvium deposits. These alluvium deposits consist primarily of sand and gravel and vary from sparse to many meters thick and locally occur in pockets on the hillsides. Most of the claim area has significant rock exposure and generally low levels of vegetation cover. The swamps and bogs which are associated with uranium concentrations vary from water filled bogs to dry basins. Some of these basins are overgrown with poplar trees. MINERALIZATION DISTRIBUTION AND CHARACTERISTICS (partial extract from the authors preceding report) Surficial-type uranium deposits are described as “young uranium in unconventional deposits”, which occur in post glacial alkaline troughs, within associated lakes and bog sediments. They occur as concentrations of uranium formed by interaction between uranium laden carbonate-alkalic groundwater carrying leached labile uranium infiltrating from the surrounding rock and precipitating upon reaction with humic acid produced by decaying organics in the small bog basin environments. This process is believed to still be taking place. At the Prairie Flats deposit, which is the largest deposit located so far in the area, it is estimated that uranium has accumulated at a rate of about 23 kilograms a year since glacial retreat. Uranium concentration also appears to be associated with clays as well as concentration by evaporation in closed basins. The uranium mineralization generally exists as an enriched uraniferous layer often strongly associated with molybdenum. This uraniferous layer is typically near surface in unconsolidated material. Enrichment exists at average depths of between 1 and 7 metres and with actual mineralized thicknesses of up to 3 meters. The source of this uranium mineralization has not yet been clearly identified although it is believed to be coming from the surrounding igneous rocks. Most of the known mineralized showings reported in the area are in the vicinity of, or directly underlain by Okanagan Batholith granodiorites. Regionally the Okanagan Batholith rocks are anomalous in uranium. In the vicinity of Farleigh and Brent Lakes, in addition to surficial occurrences, uranium mineralization described as basal style appears to be associated with some bedrock sources, primarily the Okanagan Batholithic complex of intrusive rocks with some outliers of Marron volcanics. Further to the west, uranium occurrences are reported to be associated with volcanic rocks of the Marron Formation and intrusive rocks of the Coryell Formation. Grades of some mineralized showings located on a number of the Aldershot claims in the area are as noted in the table following. These are only a few of the samples reported. Sample grades range from trace to the highest values shown in this table. Showing Sample Type Grades Brent Flats/Swamp Auger 0.040% U Farleigh Lake Drill Core 0.065% U Star Auger 500 ppm U Eneas Stream Sed Geochem 3.5 ppm U Stinkhole Auger 0.022% U

6

Page 7: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

Bald Auger 0.135% U Agur Lake Auger 0.152% U Agur Lake Soil Geochem .05 ppm U Clark Grab 1.5% U Powerline Soil Geochem 10 ppm U Some examples of other surficial style deposits with estimated Historic mineral reserves, which are located in the same general area and which represent examples of the potential for this style of deposit are listed below. Some of these deposits are held by other claim owners and some are in areas that are not accessible due to staking restrictions. Deposit Grade (avg) Resources (kg U) Prairie Flats 0.0334% U 178,000 Covert Basin 0.0180% U 23,000 North Wow Flat 0.0200% U 12,000 Sinking Pond 0.029%U 13,500 LOCAL GEOLOGY AND MINERALIZATION (Extracts taken from the authors reseeding assessment report) Most of the Uranium Mineralization located on the West Okanagan tenures is described as postglacial uranium concentrations in ponds and associated marsh sediments. The mineralization is typically classified as fresh water deposits resulting from the interaction between uranium-rich groundwater and unconsolidated material containing organics or clay. Some insitu uranium mineralization is also present, mostly near in the southern claim The Farleigh Lake (Minfile - 082ESW154) young uranium occurrence lies about 12.5 kilometres west of Penticton, British Columbia. This occurrence lies near the northwest end of a 2-kilometre northwest trending area of erratic uranium and thorium occurrences. Bedrock types at the Farleigh Lake uranium occurrence include the Kettle River Formation and Yellow Lake Member of the Marron Formation occurring as outliers within a stock of the Okanagan batholitic complex. The Kettle River formation is composed of granite boulder conglomerate, arkose, volcanic wacke and rhyolite breccia. The overlying Yellow Lake Member consists mostly of pyroxene-rich mafic phonolite lava and lesser purple-grey volcanic wacke, derived from erosion of the phonolite lava, a pink radioactive feldspathic trachytic ash flow, sandstone (grit) and conglomerate. Radioactivity in the Farleigh Lake area is associated with a pink grit unit, which occurs within wacke-shale lenses, intercalated in the lower part of the Yellow Lake Member alkaline volcanic assemblage. The well-layered grit unit is best exposed at the northwest end of Farleigh Lake, where it is 30 metres thick. The unit appears to be a channel deposit of reworked alkaline ash and ash flow material, as evidenced by a few examples of cross-bedding, grading and scour marks. The unit also contains small coal partings and wisps up to 7.6 centimetres thick. In 1978, Pacific Petroleum Ltd. drilled 200 metres west of the pink grit outcrop and intersected 3.8 metres of the grit unit (diamond-drill hole 78-5). A 2.3-metre sample assayed 0.003% uranium and 0.013% thorium, within which is a 0.6-metre coal seam which assayed 0.0065% uranium and 0.0185% thorium. The unit shows limonite-calcite alteration.

7

Page 8: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

FIELD WORK 2006 Field work was carried out in the late fall (October28th to 30th) with 14 to 16 hour work days to take advantage of the seasonal temperatures. Work locations delineated figure 3. This work was comprised of field sample collection and gamma ray spectrometry with 27 sites examined at approximate 100 metre intervals. This was however quite difficult due to steep terrain along the lower grid line. EQUIPMENT and INSTRUMENTATION 1 Exploranium GR320 spectrometer 1 21in.³ NaI detector 1 ePING CDGPS 1 Unimog 4X4 Gamma Ray Spectrometry was conducted using An Exploranium GR-320 and spatial control was established with an e-ping CDGPS receiver. Gamma Ray Spectrometry was undertaken with Regions of Interest (ROIs) set to: Potassium (K) 1324 to 1500 KeV; Uranium (U) 1663 to1833 KeV and Thorium (Th) 2330 to2842 KeV. DATA Gamma Ray Spectra were saved as proprietary Explore4 files. CDGPS data saved as NMEA files Where it has been converted, all supplied data with this report is provided as both raw and metadata appended conversion, in MS Access, ESRI, IDRISI, ENVI formats. DATA COLLECTION Gamma Ray Spectral data were collected at 100 metre interval accessible ground control points. RESULTS 27 points were examined as a part of this exploration. The grid was planned to intersect the reported uraniferous pink grit rock unit. After some exploration the grit unit was identified. The results show that the layer is anomalous in radiation and that emits relatively high Uranium and Thorium signals. Rock samples were also collected for later analysis Gamma ray spectral statistics of the delineated Farleigh Lake site are as follows: Uranium by ROI assay: Count: 27 Minimum: 2.2 Maximum: 54 Sum: 202.9 Mean: 7.514815 Standard Deviation: 9.361375

8

Page 9: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

Thorium by ROI assay: Count: 27 Minimum: 4.5 Maximum: 74.3 Sum: 926.9 Mean: 34.32963 Standard Deviation: 16.518358 Total Counts per second: Count: 27 Minimum: 2546 Maximum: 7875 Sum: 131345 Mean: 4864.62963 Standard Deviation: 1312.304028 Gamma Ray spectrometer results are shown in Appendix II The purpose of this work was to explore for uranium and its indicators. Of added importance to the development of this exploration work was the significance of data collocation. Questions of spatial accuracy in the mapping of the geology were addressed to a degree, and it was noted that many of the mapped contacts were imprecise. This lack of spatial accuracy has a serious affect on correlation analysis. The results of the radiometric survey of the Farleigh Lake grid are insufficient in size to provide a suitable basis for conclusion beyond their scale. These results do however confirm that the ‘pink grit unit” as described above is anomalous. This has been delineated for analysis using inversion weighting parameters and is displayed as a convolution diagram in figure 5. CONCLUSIONS This is an area of considerable potential which is supported by this work and analyses. The area, while quite rugged is amenable to further work. This work cannot be considered to be conclusive due to its small sample size. There is a strong indication that further work is appropriate to define the size and nature of the anomaly. It is recommended that a program of high resolution ground based gamma ray spectrometry over a larger area be undertaken in concert with a PIMA Short wave InfraRed spectrometry data collection with the purpose of further development.

9

Page 10: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

STATEMENT OF WORK The field work was carried out between October 5 and October 12 and was conducted by Auracle Geospatial Science Inc. with David McLelland (Project Manager) and a field technician. Post collection analyses was carried out as a part of a provincial uranium exploration program and ended January 5 2006. While the actual cost of the work exceeds the amount (please see appendix II) applied to this assessment report, it agrees with the budget allowed to complete the work and is reduced from $2439.50 to an applied total of $1343.90 with filing fees totalling $100.88

10

Page 11: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

11

Page 12: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …
Page 13: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …
Page 14: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …
Page 15: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …
Page 16: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …
Page 17: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

BC Uranium Project, Nettwerk Uranium PropertiesAssessment Work Cost ReportProperty/Claim Farleigh Lake

Cost Categories description Units Rate Qty No Units CostLabour Costs

Manager (Spectral Analysis) Spectral $/Day (8 hr) $550.00 1 1.5 $825.00Technician Spectral/ prospect/DGPS $/Day (8 hr) $350.00 1 1.5 $525.00

TravelLodging R&B Ass. Rates Cost $100.00 2 2 $400.00Meals include in R&B Cost incFerry Fares People $22.00Ferry Fares Vehicles $121.75Vehicle UNIMOG and Trailer $/Km $0.51 2 640

CommunicationsSatellite $/Week $100.00 1 1Internet in field ( room based) $/Mo $30.00 1 0.5

Field Equipment RentalChain saw N/C4X4 Truck $/Day $200.00 1 1.5 $300.00Vehicle Fuel Vehicle Fuel $/Day $25.00 1 $42.00ATV $/Day $100.00 2 7ATV Fuel ATV Fuel $12.00 2 7Generator $/Week $300.00 1 1

Generator fuel $/Day $10.00 1 7Boat $/Month $500.00 1 0.25 $0.00

Technical Equipment RentalSWIR Photospectrometer PIMA II U model $/week $1,035.00Scintillometer/ Gamma ray Spectrometer $/week $835.00 $42.00Base Computer $/Day $50.00Portable Computer Laptop link $/Day $25.00 1DGPS $/Day $33.00 1 1.5 $49.50Printer $/Day $10.00GPS $/Day $20.00 N/C

Freight Pima freight apportioned $100.00Sample Analyses

Rock Sample Preparation $/Sample $5.86Sample Bags 8x13Poly and tyvek Tag $/Bag $0.30 $6.00Rock Samples Analyses Group1EX-U $/Sample $11.35

Technical Work CostsSpectral Analysis PreparationSpectral Data Acquistion Costs 75 sites included aboveSoftware Purchase Cost +10%Computer Processing $/Hr

Map & Report Preparation Mapping Contractor 1/2 in trap sandrift Cost +10% $150.00Printing & Copying Cost +10%

Total Assessment Work Applicable Costs $2,439.50

Assessment Work Filing FeesAssessment Filing Fees $/Unit $0.40 1yr $76.21Grouping Fees $/Group

Page 18: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

S CWP PO X Y GRTOTGRK GRU GRT GRTOT GRKCOGRUC GRTCOUNT534 599 300237 5482335 57.2 5.9 2.2 74.3 6917 1495 291 611535 600 300228 5482357 36.1 3.9 4.3 25.5 4368 972 198 215536 601 300225 5482376 22.1 2.5 3.2 12.3 2678 608 117 105537 602 300227 5482400 31.9 3.1 54.0 20.0 3854 806 195 171538 603 300222 5482413 53.7 4.0 7.8 50.8 6499 1197 379 428539 604 300216 5482422 36.2 2.9 5.7 28.1 4375 825 237 234540 605 300211 5482435 46.8 3.0 7.5 4.5 5659 939 332 351541 606 300195 5482449 39.5 2.3 6.0 38.4 4779 771 288 323542 607 300179 5482463 42.5 3.3 6.1 40.2 5145 970 298 339543 608 300173 5482476 39.0 82.7 3.9 43.6 4812 838 272 364545 609 300166 5482501 41.8 2.6 5.6 42.6 5058 843 300 358546 610 300161 5482516 42.6 2.6 5.1 41.5 5152 828 286 348547 611 300154 5482534 37.8 2.3 4.1 39.2 4577 736 255 328548 612 300134 5482557 21.0 2.5 3.5 8.8 2546 597 107 77548 613 300121 5482567 22.8 3.0 4.8 7.9 2755 718 129 71550 614 300141 5482575 35.6 3.2 4.9 28.3 4311 857 222 239551 616 300155 5482568 24.9 2.8 3.4 13.4 3017 690 126 115552 617 300166 5482558 48.9 3.4 6.3 47.5 5911 1035 336 399553 618 300175 5482559 40.4 2.6 5.5 41.3 4892 834 292 347554 620 300192 5482531 38.3 2.4 4.5 39.8 4637 759 266 333555 621 300196 5482516 51.0 3.7 8.1 47.8 6166 1132 371 403556 622 300207 5482508 47.3 3.1 9.2 41.8 5725 990 365 355557 623 300215 5482495 65.1 5.0 12.6 55.3 7875 1509 491 470558 624 300232 5482428 44.3 3.1 6.4 39.8 5355 930 303 336559 625 300275 5482375 41.5 3.1 5.3 37.7 5021 901 271 317560 629 300266 5482311 24.1 2.8 4.6 10.2 2922 686 135 89561 627 300258 5482290 52.4 3.8 8.3 46.3 6339 1134 369 391

Page 19: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

Statement of Qualification

I, David J. McLelland, do hereby certify that: 1. I am a Principal in: Auracle Geospatial Science Inc, 325 Dorset Road Qualicum Beach, British Columbia, Canada V9K 1H5 2. I am a post graduate student of Earth and Environmental Science and have completed the postgraduate certificate in applied and theoretical GI Science at Simon Fraser University, and completed the academic component of the MSc. program requirement. This work is also in partial fulfillment and serves as base data for a thesis. 3. I have completed the B.C.I.T. B.C.Y.C.M. Mineral Exploration program, and Completed the B.C.I.T.1 B.C.Y.C.M. Advanced field School. 4. I am the Project Manager and I am responsible for the collection and management of data and execution of analysis. 5. This report was prepared on behalf of Auracle Geospatial Science who has been engaged by Aldershot resources Ltd. to complete a work program on these properties. 6. I have no material or financial interest in the subject properties or the companies that own them. 7. This report has been prepared in accordance with generally accepted Scientific Principles and is based upon the best information available at the time of preparation. I am not aware of any material fact or material change with respect to the subject matter of the report that is not reflected in the report and therefore the omission of Date: January 5, 2007 Qualicum Beach, British Columbia ________________________________________ David McLelland

Page 20: FARLEIGH LAKE ASSESSMENT REPORT Gamma-Ray …

-'-. - Mineral Titles Online 1.6.3~ -.0

BRITISHCOLUMBIA

- IJ - I!IIE

B.C. HOME

Mineral Titles

BIi

Mineral ClaimExploration andDevelopmentWork/Expiry DateChange

~ Select Input MethodM Se!ect/Input Tenuresr;a Input LotsM Data Input FormQ Review Form Data

[;a Process Payment~ Confirmation

I: Main Menu

11 Search for Mineral /. . Placer / Coal Titles

11View Mineral Tenures

!I View Placer Tenures

!I View Coal Tenures

!I MI9 Hel/LI!m>

Page 1 of 1

C.:mtilct U$ .. HelP.II!iI

Mineral Titles Online

Mineral Claim Exploration and Development Work/Expiry DateCbange

Confirmation

Recorder: MCLELLAND,DAVIDJ. (143204)Recorded: 2007 jFEBj21

D/E Date: 2007jFEBj21

Submitter: MCLELLAND, DAVID J. (143204)

Effective: 2007jFEBj21

Your report is due in 90 days. Please attach a copy of this confirmation page to the front ofyour report.

Event Number: 4133904

Work Start Date: 2006jSEPj02Work Stop Date: 2007jJANj05

Total Value of Work: $ 3800.00Mine Permit No:

Work Type: Technical and Physical WorkPhysical Items: Labour, Supply costs, Transportation j travel expensesTechnical Items: Geophysical, Prospecting

Summary of the work value:

Total required work value: $ 3358.62

PAC name:Debited PAC amount:Credited PAC amount:

Aldershot Resources Ltd.$ 0.00$ 441.38

Total Submission Fees: $

$

252.13

Total Paid: 252.13

The event was successfully saved.

Please use Back button to !;I°back to event confirmation index.

COPYR!GlH ! OtSCLA!MER I !>RHI~'f ! ACCESSIBILITY

~

http://www.rntonline.gov.bc.ca/rnto/jsp/sow_rn_c/sowEventConfirrnation.jsp?ca.bc.gov.e.. . 21/02/2007

Good New # of Area Work Sub-Tenure # Claim Issue To Good Days in Value mission

Name/Propert't' Date Date To For- Ha Due FeeDate ward507982 Fa rleia h Lake 2005jfebj26 2007 jfebj26 2010jfebj26 1096 83.99 J$ 1343.90 l<t100.88507983 Brent lake 2005jfebj26 2007jfebj26 2010jfebj26 1096 125.92 $ 2014.72 $ 151.24