Transcript of FAD-1 ACCEPTANCE PPT

PowerPoint Presentation

FAD-1 AcceptanceA Quick Overview of Optical Fiber and FAD(Fixed Asset Development)Prepared By : Mohammed Shoeb

FAD-1 AcceptanceTRANSMIT LIGHTS IN THE CORELIGHTS TRAPPED IN THE CORE BY THE OPTICAL CLADDINGBuffer or primary coating protects fiber from moisture or damageMost fibers are all glass, but some fibers have a glass core with plastic cladding (PCS/HCS) or are all plastic (POF)CABLE PROTECT fibers in the application environmentCONNECTORS: join fibers or connect to active devices so they can be disconnected for rerouting, testing, etc.SPLICE: join two fibers permanentlyHARDWARE: provides the mounting, protection, etc. for connectors or splicesTEST EQUIPMENT: checks performance

AN OVERVIEW OF FIBER OPTICS

2

FAD-1 AcceptanceSPLICING: METHOD OF JOINING A FIBER CABLE IS KNOWN AS SPLICING. TWO METHOD OF SPLICINGWE ARE USING (FUSION,MECHANICAL)OTDR(optical time domain reflectometer):OTDR WORK FROM ONE END CREATSNAPSHOT OF CABLESend out high power signal Gather backscatter lightAverages signalDisplay backscatter signal over timePOWER METER AND LASER: TRANSMITTER OUTPUR, RECIVER INPUT, REFRENCES FOR LOSS MEASURMENT

PARAMETERS OF FIBER OPTICS

3

FAD-1 AcceptanceFAD ARCHITECTURE FTTC FTTEFTTMROADFTTX TopologyGPON(Gigabit Passive Optical Network)Data rates up to 2.5 Gb/sWavelength:1- Upstream 1310 nm(Voice and Data)2- Downstream 1490 nm(Voice and Data)3- 1550 nm (TV)

4

FAD-1 AcceptanceTHERE ARE TWO TYPES OF WORK CIVILJOINT BOXES(joint reinforce concrete)JRC 4/ JRC 10 with 1-COVER (1.2m*0.78m*1.02m)JRC12 with 4-COVER (1.73m*1.24m*1.34m)JRC14 with 6-COVER (2.58m*1.28m*1.4m)MRTMR-1,MR-2,MR-4 and MR-86. EB(ENTRY BOX)

TYPES OF WORK

5

FAD-1 Acceptance

JRC 4/ JRC 10 with 1-COVER (1.2m*0.78m*1.02m)

JRC12 with 4-COVER (1.73m*1.24m*1.34m)

JRC14 With 6-COVER (2.58m*1.28m*1.4m)

MRT

6

FAD-1 AcceptanceBTMG(Brake through and make good)

TRENCH

7

FAD-1 AcceptanceDUCTS(D54-D56)

FDH O/D(FIBER DISTRIBUTION HUB

8

FAD-1 AcceptanceCABLE

EXPRESS CABLE: THIS TYPES OF CABLE ARE USING FOR LONG DISTANCE SUCH AS IN BETWEEN TWO EXCHANGES (200F)

DISTRIBUTION CABLE: THIS TYPES OF CABLE ARE USING FOR SHORT DISTANCE SUCH AS IN BETWEEN TWO JOINTS (24F)

9

FAD-1 Acceptance

DROP FIBER CABLE: SINGLE FIBER /THIS TYPES OF CABLE ARE USED AT CUSTOMER END OR PREMISESJOINT ENCLOSURE: THIS TECHNIQUE ARE USING TO PROTECT TWO FIBRE JOINTS THERE ARE DIFFERENT TYPES OF JOINTS SUCH AS (100F,200F AND DROP FIBER JEC

10

FAD-1 Acceptance

FDH(FIBER DISTRIBUTION HUB): UNDER GROUND FDH: THIS TECHNIQUE IS VERY POPULAR AND LATEST,KEEPING THE FDH INSIDE JRC

INDOOR OR WALL MOUNT FDH: I/D FDH CAN INSTALL INSIDE BUILDING OR CUSTOMER END TO PROVIDE CONNECTIVITY

11

FAD-1 Acceptance

NECESSITY DOCUMENT RELATED TO ACCEPTANCEUJ/UC As-Built diagramScheme Plan As-Built for Civil Work ProjectsDSR As-Built (ONLY FOR CABLE)Circulation mail to R&R CPN by R&R in case of SplitterPM/LS Test resultOTDR Test Result in excelOTDR Test Results in .sor formatStore Check ListSIV/MRN OR Material Transaction Report if applicable.LOI/Work Order from PCCRFS

CCC (Cable Completion Certificate)PCC ( Project Completion Certificate) FAC (Final Acceptance Certificate)Signed Diary SheetSummary of Diary SheetInvoicePartner's Letter for InvoiceCertificate of Contract Completion Covering letter for Certificate of Contract Completion to Director/Payable(Projects)Certificate of Invoice for Payment/GIS UPLAODED

12

FAD-1 AcceptanceFOLLOWING ACCEPTACE DOCUMENTS:

FOR CABLE:UC/UJ DIAGRAMOTDR TESTINSERTION LOSS TEST FOR CIVIL :LAB TEST AND MUNCIPALITY CERTIFICATEAS BUILD DIAGRAM TOTAL SITESCIVILCABLE701159

13

FAD-1 Acceptance THANK YOU

14