Factory Requirements for System Design Quote #: Job · PDF fileFactory Requirements for System...
-
Upload
vuongtuong -
Category
Documents
-
view
222 -
download
5
Transcript of Factory Requirements for System Design Quote #: Job · PDF fileFactory Requirements for System...
Factory Requirements for System Design
www.hi-velocity.comFOR OFFICE USE ONLY
Quote #:
ESP 310.06 Factory Requirements 062211
Installing Contractor:
Requirements: Outdoor Design Temperature:
Y N
Y N
Heating
CoolingHeating:
Cooling:
Single Double TripleGlass:
Metal w/ FoamStandardDoors:
High Eff. Patio DoorStandardGlass Doors:
Other:
Skylights: Single Double Single w/ Storm
No Insulation Slab Edge Insulation
Edge and Perimeter
Perimeter:
Other:
Other:
Other:
Other:
R-22 R-410ACooling: Chilled Water
**If Glycol - Percent:
Water Temp**:
Date:
Job Name:
Contact Name: Address:
Address:
City/State:
Zip/Postal Code:
Phone Number:
Fax Number:
Email Address:
Distributor/Supplier:
Contact Name:
Phone Number:
Fax Number:
Elevation:
Water Temp**:
**If Glycol - Percent:
HWT Boiler
Water Source Heat Pump
Heating: Electrical Strip
Send this information along with your architectural drawings* to:
PH: 780-453-2093 FAX: 780-453-1932 Toll Free: 1-888-652-2219
12615 - 124 Street, Edmonton Alberta Canada T5L 0N8
or save form and email to: [email protected]
*All drawings must clearly show:
- Fancoil location- Preferred main plenum location (trunk line)- Orientation of drawing (N,S,E,W)- Ceiling Heights
- Windows, doors and skylight locations and sizes
- Room Dimensions
Other:
FloorCeilingWallInsulation:
Notes:
R-12 (3 1/2") Insulation:
R-30 (9") Insulation:
R-40 (12") Insulation:
R-3 No Insulation:
R-7 (2") Insulation:
R-20 (6") Insulation: