Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts...

5
Facility Upgrade Status at SSL, UCB Small Prototype Systems 33mm Demountable Detector Body Parts arrived, cleaned. 33mm Demountable Detector Test Flange at machining. Dual Test Chamber has hardware needed for above flange. Dual Test Chamber vacuum systems on order: • Scroll rough pump on order • Turbo pump controller on order (we have a TMP 150) • Turbo air cooling system to be designed and built 17 Nov 2009 1 Sharon R Jelinsky

Transcript of Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts...

Page 1: Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.

Facility Upgrade Status at SSL, UCB

• Small Prototype Systems– 33mm Demountable Detector Body Parts arrived, cleaned.– 33mm Demountable Detector Test Flange at machining.– Dual Test Chamber has hardware needed for above flange.– Dual Test Chamber vacuum systems on order:

• Scroll rough pump on order• Turbo pump controller on order (we have a TMP 150)• Turbo air cooling system to be designed and built• Convectron guages arrived and ready for installation• High Vacuum gauges on order

• Large Format Process Chamber– Design of vacuum chamber nearing completion.

17 Nov 2009 1

Sharon R Jelinsky

Page 2: Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.

Flexible 33mm MCP Photon CountingDemountable Detector Body

17 Nov 2009 S R Jelinsky – PSEC Tuesday Meeting 2

Top Clamp Plate

Compression Spacers

Compression Spring

Φ33mm MCPs

RT/Duroid Spacer

PEEK Body

Base Plate

Pressure Pad

All the body parts are complete, ultra-sonically cleaned and ready for fit test and assembly.

• All Stack parts now in house.

• MCP’s need to be identified and cleaned prior to use.

• Design of 4.5” CF flange for demountable detector mounting is complete.

• A total of three 4.5” CF flanges are in process at machine shop.

Page 3: Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.

Cross Section of Assembled Demountable

17 Nov 2009 J. McPhate – PSEC Collaboration Meeting 3

When complete, the 33mm MCP demountable detector assembly will mount within a machined 4.5” conflat flangewith a cross-delay anode mounted flush on the flange base.There are electrical feedthroughs for HV and anode signals, 4 SHV’s to control gap voltages and 4 SMA anode signals. PEEK parts (yellow) sandwich the base plate for rear field stand-off and hold down.

This style detector is very useful for rapid MCP restacking and optimizing.

Page 4: Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.

Demountable Photon Counting ImagingDetector Easily Tested

17 Nov 2009 J. McPhate – PSEC Collaboration Meeting 4

4.5” Conflat Flange Demountable System is easily mounted to any 4.5” Conflat port on our test chambers. Our Dual Chamber system will be outfitted with two 8” to 4.5” CF reducer flanges.

Page 5: Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.

Update on Dual Chamber Test Station

17 Nov 2009 5

• Each chamber has independent roughing and hivac valves uninterrupted testing of one detector while the other is swapped.

• Valves work and chambers hold vacuum.

• Already outfitted with UV transmissive windows.

• 8” to 4.5” CF reducer flanges and viton o-rings are ready for use.

• 4.5” CF flanges are ready for machining into three Demountable assembly flanges.

• Dry Scroll Pump for rough vacuum is due soon.

• Turbo Pump is in house, needs air cooling.

• Turbo Pump Controller is on order.

• High Vac gauges are on order, convectron gauges are here and ready to be installed.

Our Dual Chamber system is in several stages of completeness.