Facility Planning Project - Tefal Pot Production

28
TEFAL POT Group (4) Facility Planning Micro Project Alexandria University Faculty of Engineering Production Engineering Department Third Year Facilities Planning and Material Handling (PE313)

Transcript of Facility Planning Project - Tefal Pot Production

Page 1: Facility Planning Project - Tefal Pot Production

TEFAL POT

Group (4)

Facility Planning Micro Project

Alexandria University

Faculty of Engineering

Production Engineering Department

Third Year

Facilities Planning and Material Handling (PE313)

Page 2: Facility Planning Project - Tefal Pot Production

Table of Contents 1. Introduction ........................................................................................................................ 1

2. Product .............................................................................................................................. 1

2.1. Name of the product .................................................................................................... 1

2.2. Function of the product................................................................................................ 1

3. Product design .................................................................................................................. 1

3.1. Drawing of product in isometric view & exploded view ............................................... 1

3.1.1. Isometric view (using solid works 2013)................................................................ 1

3.1.2. Exploded view (using solid works 2013) ............................................................... 2

3.2. Drawing of each component (using solid works 2013)................................................ 2

3.2.1. Pot body drawing .................................................................................................. 2

3.2.2. Pot body handle drawing ....................................................................................... 2

3.2.3. Pot cover drawing ................................................................................................. 3

3.2.4. Pot cover handle drawing ...................................................................................... 3

3.2.5. Pot body handle installation screw drawing .......................................................... 3

3.2.6. Pot body handle installation nut drawing............................................................... 4

3.2.7. Rubber seal ring drawing ...................................................................................... 4

3.2.8. Pot Cover handle installation pin........................................................................... 4

4. Process design .................................................................................................................. 5

4.1. Parts list ....................................................................................................................... 5

4.2. Bill of material (using X-mind 6) .................................................................................. 5

4.3. Route sheet ................................................................................................................. 6

4.4. Assembly chart (using X-mind 6) ................................................................................ 7

4.5. Operation process chart .............................................................................................. 8

5. Schedule design ................................................................................................................ 8

5.1. Machine ....................................................................................................................... 8

5.1.1. List of the required Machines ................................................................................ 8

5.1.2. Annual demand for the product ............................................................................. 9

5.1.3. Number of required machines for each type ....................................................... 10

5.2. Operators .................................................................................................................. 12

5.2.1. Approximate number of needed operators in the production area...................... 12

5.2.2. Number of operators for each machine type ....................................................... 12

6. Facility Areas design ....................................................................................................... 12

Page 3: Facility Planning Project - Tefal Pot Production

TEFAL POT

Group (4)

Facility Planning Micro Project

Alexandria University

Faculty of Engineering

Production Engineering Department

Third Year

Facilities Planning and Material Handling (PE313)

Page 4: Facility Planning Project - Tefal Pot Production

6.1. Production Area ......................................................................................................... 12

6.1.1. List of departments in the production area .......................................................... 12

6.1.2. Name of layout for the production area ............................................................... 13

6.1.3. Schematic drawing showing flow of material from stores to warehouse (using edraw max 7.8) ................................................................................................................ 13

6.1.4. The production area drawing (using edraw max 7.8) .......................................... 14

6.1.5. The required production area .............................................................................. 15

6.2. Personal requirements areas .................................................................................... 15

6.2.1. Parking area ........................................................................................................ 15

18 employees in manufacturing section ................................................................................ 16

6.2.2. Food service area ............................................................................................... 17

6.2.3. Other areas (Locker room, rest room and health room) ..................................... 18

7. Material handling ............................................................................................................. 20

7.1. Fork lift ....................................................................................................................... 20

7.2. Conveyor ................................................................................................................... 22

8. Conclusion ....................................................................................................................... 23

List of figures

Figure 1 : Tefal Pot isometric view .......................................................................................... 1 Figure 2 : Tefal pot exploded view .......................................................................................... 2 Figure 3 : Pot body .................................................................................................................. 2 Figure 4 : Pot body handle ...................................................................................................... 2 Figure 5 : Pot cover ................................................................................................................. 3 Figure 6 : Pot cover handle ..................................................................................................... 3 Figure 7 : Pot body handle installation screw .......................................................................... 3 Figure 8 : Pot body handle installation nut .............................................................................. 4 Figure 9 : Rubber seal ring ...................................................................................................... 4 Figure 10 : Pot cover handle installation pin ........................................................................... 4 Figure 11 : Bill of material ........................................................................................................ 5 Figure 12 : Assembly chart ...................................................................................................... 7 Figure 13 : Opertaion process chart ........................................................................................ 8 Figure 14 : Material flow ........................................................................................................ 13 Figure 15 : Production area ................................................................................................... 14 Figure 16 : Parking layout...................................................................................................... 15 Figure 17 : Food service layout ............................................................................................. 17 Figure 18: Men's rest and locker room layout ....................................................................... 18 Figure 19 : Women's rest and locker room............................................................................ 19 Figure 20 : Health service...................................................................................................... 19 Figure 21 : Fork truck ............................................................................................................ 20

Page 5: Facility Planning Project - Tefal Pot Production

Figure 22 : Fork truck 1 flow .................................................................................................. 21 Figure 23 : Fork truck 2 flow .................................................................................................. 21 Figure 24 : Fork truck 3 motion.............................................................................................. 21 Figure 25 : Conveyor ............................................................................................................. 22

List of tables

Table 1 : Parts list .................................................................................................................... 5 Table 2 : Pot body Route sheet ............................................................................................... 6 Table 3 : Pot cover Route sheet .............................................................................................. 7 Table 4 : List of required machines ......................................................................................... 8 Table 5 : Number of required machines ................................................................................ 10 Table 6 : Operators distribution ............................................................................................. 12 Table 7 : Parking calculations................................................................................................ 16 Table 8 : Food service calculations ....................................................................................... 18 Table 9 : Material handling .................................................................................................... 20

Page 6: Facility Planning Project - Tefal Pot Production

1 | P a g e

Tefal Pot

1. Introduction Our Product was Tefal Cooking Pot The Product is The Base™ 2 Pot Set provides essential non stick performance

for people who love to cook but hate to clean up. It’s the perfect size and weight for use on any backcountry excursion. Its compact design is pack friendly, and there’s room inside for adding mugs and plates to customize your kitchen without taking up more space

Material Used: Stainless Steel Alloy with PTC Non-Stick Coating that also can resist thermal shocks

So we can control the manufacturing process of the pot with maximum efficiency we needed to achieve near optimum results for 2 main parameters in our project:

Facility Design & Planning for the entire process of production Product Design & Evaluation Process (Design & Manufacturing Process)

2. Product

2.1. Name of the product Tefal pot

2.2. Function of the product Cook and distribute heat in the whole pot body equally so it can cook your meals in

most delightful and tasty way possible

3. Product design

3.1. Drawing of product in isometric view & exploded view

3.1.1. Isometric view (using solid works 2013)

Figure 1 : Tefal Pot isometric view

Page 7: Facility Planning Project - Tefal Pot Production

2 | P a g e

3.1.2. Exploded view (using solid works 2013)

3.2. Drawing of each component (using solid works 2013)

3.2.1. Pot body drawing

3.2.2. Pot body handle drawing

Figure 2 : Tefal pot exploded view

Figure 3 : Pot body

Figure 4 : Pot body handle

Page 8: Facility Planning Project - Tefal Pot Production

3 | P a g e

3.2.3. Pot cover drawing

3.2.4. Pot cover handle drawing

3.2.5. Pot body handle installation screw drawing

Figure 5 : Pot cover

Figure 6 : Pot cover handle

Figure 7 : Pot body handle installation screw

Page 9: Facility Planning Project - Tefal Pot Production

4 | P a g e

3.2.6. Pot body handle installation nut drawing

3.2.7. Rubber seal ring drawing

3.2.8. Pot Cover handle installation pin

Figure 8 : Pot body handle installation nut

Figure 9 : Rubber seal ring

Figure 10 : Pot cover handle installation pin

Page 10: Facility Planning Project - Tefal Pot Production

5 | P a g e

4. Process design

4.1. Parts list Table 1 : Parts list

Make / buy

Size Quantity Per unit

Name Number

Make Base 220X10 mm Rest of body 240X145 mm

1 Body 01

Buy 55 X 55 mm 2 Body Handle 02 Buy 230 mm Diameter 1 Cover 03 Buy 60 mm Dia. X 40

mm height 1 Cover Handle 04

Buy 20 mm Dia. X 30 mm height

2 Screws 05

Buy 8 mm Dia. X 7 mm long

2 Nuts 06

Buy 236 mm Diameter

1 Rubber seal ring 07

Buy 20 mm Dia. X 30 mm height

1 Pin 08

4.2. Bill of material (using X-mind 6)

Figure 11 : Bill of material

Page 11: Facility Planning Project - Tefal Pot Production

6 | P a g e

4.3. Route sheet Table 2 : Pot body Route sheet

Product: Tefal pot Part number: 01 Part name: Pot body Raw material: Stainless steel

Operation time

Setup time

Dept. Tool M/C type Operation Description

Operation Number

8 sec.s 6 min.s Tefal Pot Production

Line

Designed for

variable sizes

HACO 200 Ton Hydraulic Press Semi Automatic

Machine

Deep drawing for blanks

0101

6 sec.s 4 min.s Tefal Pot Production

Line

Single point

cutting tool

MT 22 FR Lathe Tearing 0102

38 sec.s 12 min.s Tefal Pot Production

Line

Twist drill, Spot

welding contact point

Semi Robotic Machine

Drilling and spot welding for nuts

0103

7 sec.s ------ Tefal Pot Production

Line

Pneumatic driver

Pneumatic Screw Driver

Handling installation

0104

22 sec.s ------ Tefal Pot Production

Line

-------- RC Thermal Packaging Oven

Packaging oven 0105

Page 12: Facility Planning Project - Tefal Pot Production

7 | P a g e

Table 3 : Pot cover Route sheet

Product: Tefal pot Part number: 03 Part name: Pot Cover Raw material: Stainless steel

Operation time

Setup time Dept. Tooling M/C type Operation Description

Operation Number

7 sec.s -------- Tefal Pot Production

Line

Pneumatic Screw Driver

Plunger (Handle) installation

0201

6 sec.s Manual Packaging 0202

4.4. Assembly chart (using X-mind 6)

Figure 12 : Assembly chart

Page 13: Facility Planning Project - Tefal Pot Production

8 | P a g e

4.5. Operation process chart

Figure 13 : Opertaion process chart

5. Schedule design

5.1. Machine

5.1.1. List of the required Machines

Table 4 : List of required machines

Machine

Name

Machine Picture

Operation

Name

Operation picture

HACO 200 Ton hydraulic Press

Deep drawing

Page 14: Facility Planning Project - Tefal Pot Production

9 | P a g e

MT 22 FR lathe

Tearing

Semi Robotic Machine

Drilling and spot

welding for nuts

Pneumatic screw driver

Handling installation

Thermal packaging

oven

Packaging oven

5.1.2. Annual demand for the product 16,000 Parts

Page 15: Facility Planning Project - Tefal Pot Production

10 | P a g e

5.1.3. Number of required machines for each type Table 5 : Number of required machines

Machine Name Operation Name

Scrap estimate

S Q (units/year)

H E R Setup time

F

HACO 200 Ton hydraulic press (A)

Deep drawing

6% 8 sec.s 22385 8 hrs 81% 90% 6 min.s 1

MT 22 FR Lathe (B) Tearing 8 % 6 sec.s 21042 8 hrs 86% 85% 4 min.s 1 Semi Robotic machine (C)

Drilling and spot welding

for nuts

5 % 38 sec.s 19358 8 hrs 90% 95% 12 min.s 1

Pneumatic screw driver (D)

Handling installation

No scrap in pots but scrap in

threads may reach 13%

14 sec.s 18390 8 hrs 78% 90% ---------- 1

RC Thermal Packaging oven (E)

Packaging No scrap 22 sec.s 16000 8 hrs 80% 60% ---------- 1

5.1.3.1. Calculations of Q and F

Annual production for the product (Output) = 16,000 units Number of working days = 5 days / week

For machine (A)

Q = /

( )( )( )( )( ) =

( . )( . )( . )( . )( )= 22385.22396 units/year

Page 16: Facility Planning Project - Tefal Pot Production

11 | P a g e

F = +

=∗ .

. ∗ . ∗ ∗ ∗ ∗ ∗ ∗ + ∗ ∗ ∗ ∗

∗ ∗ ∗ ∗=

0.296 m/c = 1 Machine

For Machine (B)

Q = /

( )( )( )( ) =

( . )( . )( . )( )=

21042.11052 units/year

F= +

=∗ .

. ∗ . ∗ ∗ ∗ ∗ ∗ ∗ + ∗ ∗ ∗ ∗

∗ ∗ ∗ ∗ =

0.033 m/c = 1 Machine

For Machine (C)

Q = /

( )( )( ) =

( . )( . )( )=

19358.74168 units/year

F= +

=∗ .

. ∗ . ∗ ∗ ∗ ∗ ∗ ∗ + ∗ ∗ ∗ ∗

∗ ∗ ∗ ∗ =

0.149 m/c = 1 Machine

For Machine (D)

Q = /

( )( ) =

( . )( )= 18390.8046 units/year

F= +

=∗ .

. ∗ . ∗ ∗ ∗ ∗ ∗ ∗ + 0 = 0.053 m/c = 1 Machine

For Machine (E)

Q = /

( ) =

( )= 16,000 units/year

F= +

=∗

. ∗ . ∗ ∗ ∗ ∗ ∗ ∗ + 0 = 0.106 m/c = 1 Machine

Page 17: Facility Planning Project - Tefal Pot Production

12 | P a g e

5.2. Operators

5.2.1. Approximate number of needed operators in the production area 15 operators

5.2.2. Number of operators for each machine type This approach for selection the proper number of workers in the production line (no services is included) based on the aggregate planning of the production line

Note: The production line has 3 Engineers to Maintain, monitor & control the production line

The Handle Installation Workstation consist from two sub branches handle installation

1) Handle installation for Pot body 2) Handle Installation for Cover

The Distribution of workers on the main production line is as following:

Table 6 : Operators distribution

Number of Workers Workstation M/C Used

1 Deep drawing for blanks HACO 200 Ton Hydraulic Press

Semi Automatic Machine

1 Tearing MT 22 FR Lathe

1 Drilling and spot welding for nuts Semi Robotic Machine 5 Handling installation Pneumatic Screw Driver 3 Cleaning Manual 4 Packaging RC Thermal Packaging Oven

6. Facility Areas design

6.1. Production Area

6.1.1. List of departments in the production area 1. Manufacturing (Body making + Handle Assembly + Inspection + Packaging)

2. Design Office 3. Management

4. Cafeteria 5. Health Office

6. Rest rooms / Locker Room

Page 18: Facility Planning Project - Tefal Pot Production

13 | P a g e

6.1.2. Name of layout for the production area Product Layout

And that for the following reasons:

Product layouts are found in flow shops (repetitive assembly and process or continuous flow industries).

Flow shops produce high-volume, highly standardized products that require highly standardized, repetitive processes. In a product layout, resources are arranged sequentially, based on the routing of the products. In theory, this sequential layout allows the entire process to be laid out in a straight line, which at times may be totally dedicated to the production of only one product or product version. The flow of the line can then be subdivided so that labour and equipment are utilized smoothly throughout the operation. So that will be the most suitable layout for us.

6.1.3. Schematic drawing showing flow of material from stores to warehouse (using edraw max 7.8)

Figure 14 : Material flow

Page 19: Facility Planning Project - Tefal Pot Production

14 | P a g e

6.1.4. The production area drawing (using edraw max 7.8)

Figure 15 : Production area

Page 20: Facility Planning Project - Tefal Pot Production

15 | P a g e

6.1.5. The required production area Total machine length = 1.5+1.5+4+12+1.5 = 20.5 m Total length = 1.5+1.5+4+12+1.5+1.5 = 22 m Machine area = 22 × 1.8 = 40 m2 Cover assembly machine area = 22 × 1.5 = 33 m2 Total layout area = 13.8 × 22 = 305 m2

Required production area = 13.8 m X 22 m

6.2. Personal requirements areas

6.2.1. Parking area

6.2.1.1. Parking layout drawing

Figure 16 : Parking layout

Page 21: Facility Planning Project - Tefal Pot Production

16 | P a g e

6.2.1.2. Calculation of the required area of parking + Number of employees in the firm= 65 employees distributed as the following:

18 employees in manufacturing section

12 employees in workshop (Maintenance)

3 employees for material handling

8 employees in inventory section

7 employees for service (Cafeteria-cleaning- Security)

17 employees for management

+ As the firm is neither centralized nor served by public transportation so 1 parking place is provided for every 1.25 employees

∴ The number of spaces in firm = 50 spaces

+Types of cars:

45% of all cars driven to work are compact cars. 50% of all cars driven to work are standard cars. 5% of the spaces allocated for handicapped cars PW=SW = 12 feet

Estimated parking area:

90 feet width 200 feet depth Cross aisle width = 15 feet

Notes:

No walls and no walking edge Parking angle of 90 degrees

“Module used is module 4”

Table 7 : Parking calculations

Type of car PW=SW W Number of spaces per module

Compact 8 57’2’’ (90/8)*2= 23 Standard 8’6’’ 66’ (90/8.5)*2= 23

Page 22: Facility Planning Project - Tefal Pot Production

17 | P a g e

Required spaces for compact cars: 45% × 50 = 22 spaces Required spaces for standard cars: 50% × 50 = 25 spaces Required spaces for handicapped cars: 5% × 50 = 3 spaces Therefore parking layout includes 1 module for compact cars and 2 modules for

standard cars.

Assume handicapped cars will park in Row 1 with standard cars:

Therefore, remaining space in row (1) = 60 – (12×3) = 54 feet. Calculating number of spaces in each row:

Row (1): Number of spaces = 54/8.5 = 6 spaces Row (2, 3, 4): Number of spaces = (60-30)/8.5 = 7 spaces Row (5): Number of spaces = 60/8 = 8 spaces Row (6): Number of spaces = 90/8 = 12 spaces

NOTE:

“Row (4) will include 5 standard cars and 2 compact cars”

6.2.2. Food service area

6.2.2.1. Food service layout drawing

Figure 17 : Food service layout

Page 23: Facility Planning Project - Tefal Pot Production

18 | P a g e

6.2.2.2. Calculation of the required area of the food service As number of employees is less than 200 employees so we use a vending

machine + Cafeteria 1 hour (from 11.00 am to 12.00 am) is provided daily for meals divided into 2

sections as the following

Table 8 : Food service calculations

Begin of meal Time sat down in chair End of lunch break 11.00 11.10 11.30 11.20 11.30 11.50

So the Vending machine area and the cafeteria area is provided for 33 employees in the shift

Vending machine requires 1 ft2 per person Cafeteria requires 15 ft2 per person using 36-in square tables

6.2.3. Other areas (Locker room, rest room and health room)

6.2.3.1. Men’s rest and locker room

Figure 18: Men's rest and locker room layout

Area = 29.26 m2

Page 24: Facility Planning Project - Tefal Pot Production

19 | P a g e

6.2.3.2. Women’s rest and locker room

Figure 19 : Women's rest and locker room

Area = 29.26 m2

6.2.3.3. Health service room

Figure 20 : Health service

Area= 132 m2

Page 25: Facility Planning Project - Tefal Pot Production

20 | P a g e

7. Material handling

7.1. Fork lift Flexible motion Variety of load capacity ( can handle up to one ton load of material) Load is one carton which is low quantity material moved Distance moved from warehouse to production line which is long distance And according to Material Handling Equipment diagram which help us choose

optimum type of material handling equipment

Powered trucks are best solution for long distance and small quantity (carton)

We choose one ton fork truck as load handled is less than load capacity of it and decrease costs .One ton fork truck needs 9 aisle widths

Table 9 : Material handling

Equipment usage Fork truck 1 Blanks to deep drawing

Nuts for spot welding Screw & Handle for pot body

Fork truck 2 Pins , Seals , Cover , Handle (for covers)

Thermal packages , Cartons Fork truck 3 Cover to final packaging

Products to warehouse

Figure 21 : Fork truck

Page 26: Facility Planning Project - Tefal Pot Production

21 | P a g e

Fork truck 1 First one moves from storage to deep drawing machine holding 1000 Blank and back to storage holding zero material then go to spot welding machine holding 2000 nuts , 1000 handle for cover then go back to storage to begin new cycle

Figure 22 : Fork truck 1 flow Fork truck 2 Moves from storage holding body handles, Packages and cartons to pneumatic screw driver then to oven then to packaging and go back to storage to begin a new cycle

Figure 23 : Fork truck 2 flow Fork truck 3 Moves from Cover packaging holding 1000 Cover Packaged to final packaging area to be packed with body in cartons then holding cartons from final packaging area to Warehouse and the go back to cover packaging to begin new cycle

Figure 24 : Fork truck 3 mo on

Storage Deep drawing Storage

Handle installition

of cover

Nuts for spot

welding machine

Storage

Storagepnematic

screw driver

Thermal packaging

oven

final Packaging Storage

Cover Packaging

Final packaging

areaWarehouse Cover

packaging

Page 27: Facility Planning Project - Tefal Pot Production

22 | P a g e

7.2. Conveyor

Second Material handling equipment in production line

In Line production case:

Load is unity and high quantity material moved Need accumulation of loads at Packaging Linear motion between machines which is short distance Don’t need any inclination motion And according to Material Handling Equipment diagram which help us choose

optimum type of material handling equipment

Conveyors are best solution for short distance and large quantities handled

Usage (Specific): Tefal body handling from deep drawing machine to the end of the process

Figure 25 : Conveyor

Page 28: Facility Planning Project - Tefal Pot Production

23 | P a g e

8. Conclusion In this report we have discussed our design approach & its implementation in terms of design, manufacturing & process, and then we discussed the major elements effecting the production of that product (Machines, Tools, Materials & work force).

After that we took a look on the facility strategic planning in respect to 3 major points

Production Line Personnel Requirement Logistics

Then we introduce a solution based on real data acquired from Zahran Co. Egypt we used the Six Sigma implementation for trying to improve productivity and lower the waste

In this report we used many tools that helped us in collecting, processing & analysis the data to get the required information that we need for the discussion of this project like:

MS Office Package CAD using Solidworks FEA using JMAG Designer Plant Simulation using Siemens Plant Simulation Layout Drawing using Edraw Max Charts Design & Drawing using Xmind

In the end we hope we could have managed to give a basic foundation of the effect of facility planning on the production quality based on our case study.