FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.
-
Upload
muriel-gibson -
Category
Documents
-
view
212 -
download
0
Transcript of FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.
![Page 1: FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.](https://reader035.fdocuments.us/reader035/viewer/2022072005/56649f3e5503460f94c5f490/html5/thumbnails/1.jpg)
FACILITY NEW BUILD/UPGRADE
LONG LEAD ITEMS
Craig Lavender - HMNII
![Page 2: FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.](https://reader035.fdocuments.us/reader035/viewer/2022072005/56649f3e5503460f94c5f490/html5/thumbnails/2.jpg)
TAG (T/AST/077)
Covers:
• CONSTRUCTION, MANUFACTURE, REPAIR, REPLACEMENT, MODIFICATIONS
• NEW BUILD
![Page 3: FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.](https://reader035.fdocuments.us/reader035/viewer/2022072005/56649f3e5503460f94c5f490/html5/thumbnails/3.jpg)
LC 17 REQUIRES ADEQUATE QA SYSTEMS WHICH INCLUDES
PROCUREMENT +
AUDIT OF ARRANGEMENTS
![Page 4: FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.](https://reader035.fdocuments.us/reader035/viewer/2022072005/56649f3e5503460f94c5f490/html5/thumbnails/4.jpg)
CUSTOMER - SUPPLIER
• WHERE LICENSEE IS IN PLACE
• WHERE THERE IS NO LICENSEE YET.
![Page 5: FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.](https://reader035.fdocuments.us/reader035/viewer/2022072005/56649f3e5503460f94c5f490/html5/thumbnails/5.jpg)
WHAT NII EXPECTS• ALL ORGANISATIONS IN SUPPLY CHAIN HAVE
ADEQUATE QA ARRANGEMENTS.
• SUPPLIER SELECTION
• TECHNICAL SPECIFICATIONS
• QUALITY PLANS
• CONTRACT VARIATION CONTROL
• COMPETENCE IN THE SUPPLY CHAIN
• DEVIATIONS (NON CONFORMANCE)
• RECORDS
• INSPECTION & SURVEILLANCE ACTIVITIES
![Page 6: FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.](https://reader035.fdocuments.us/reader035/viewer/2022072005/56649f3e5503460f94c5f490/html5/thumbnails/6.jpg)
DIFFICULT REQUIREMENTS FOR LONG LEAD ITEMS
• TECHNICAL SPECIFICATIONS
• COMPETENCE IN THE SUPPLY CHAIN
![Page 7: FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.](https://reader035.fdocuments.us/reader035/viewer/2022072005/56649f3e5503460f94c5f490/html5/thumbnails/7.jpg)
NII INVOLVEMENT
• ASSESSMENT OF TECHNICAL SPECIFICATION (DESIGN)
• ASSESSMENT OF CONTRACT ARRANGEMENTS• INSPECTION OF
CONSTRUCTION/MANUFACTURE• WITNESS TESTING• ENTRY ONTO Q PLANS