S/N Elements Toatal Inventory M31 Central Pump Station 122,430.00 67,642.58
2 container 201,600.00 42,411.60
3 Base 100,170.00 4,257.23
4 Pump 111,300.00 5,453.70
5 Electric Motor 155,820.00 4,207.14
6 External Structure 200,340.00 10,017.00
7 Electronic Card 2,975,700.00 3,570.84
8 Small Mechanical components 99,036,000.00 3,565.30
9 Small Electrical Components 104,244,000.00 2,606.10
207,147,360.00 143,731.48
Total cubic Space an
-
7/31/2019 Facility Design, Whare House Design
2/16
unitaized area Weight pallet type8,745.00 180.00 14 level Pallet Rack, in 1 meter Span
2,409.75 50.00
8 level pallet rack, 1 level can cope 4 levels of containers (32
per pallet)
1,773.84 10.00
6 level Palet rack, and piled up to 8 level of bases (48 per
pallet)
15,582.00 45.00
14,023.80 25.00
20,034.00 10.00
318.83 3.00
1 Box 10 Pcs piled up to 4 level and 1 meter pallet rack of 14
levels
396.14 2.00
1 Box 50 Pcs unitized piled up containing 25 boxes in to 3level
racking
289.57 0.50 1 Box 10 Pcs Unitized to 60 levels in to 3 level racking storage
63,572.93
d Area allocation for each Units
-
7/31/2019 Facility Design, Whare House Design
3/16
Pumping
StationsS/N Elements Code Number of Pcs
1 Electrical Motor 2M 1.00
2 Hydraulic Pump 2P 1.00
3 Container 2S 1.004 Base 2B 1.00
5 External Structure 2SAE 1.00
21E 2.00
22E 3.00
23E 1.00
24E 1.00
21MM 60.00
22MM 60.00
23MM 80.00
24MM 40.00
21EE 40.00
22EE 60.00
23EE 40.00
24EE 30.00
Electrical Motor 4M 1.00
Hydraulic Pump 4P 1.00
Container 4S 1.00
Base 4B 1.00
External Structure 4SAE 1.00
41E 3.00
42E 2.0043E 3.00
44E 4.00
41MM 60.00
42MM 80.00
43MM 120.00
44MM 40.00
41EE 30.00
42EE 80.00
43EE 40.00
44EE 100.00
45EE 60.00
46EE 100.00
47EE 40.00
48EE 20.00
Electrical Motor 6M 1.00
Hydraulic Pump 6P 1.00
Container 6S 2.00
Base 6B 1.00
CentralStation2KW
Electronic Cards
Small Mechanical Units
Small Electrical Units
6 Electronic Cards
7 Small Mechanical Units
8 Small Electrical Units
CentralStation4KW
-
7/31/2019 Facility Design, Whare House Design
4/16
External Structure 6SAE 1.00
61E 2.00
62E 3.00
63E 2.00
64E 2.00
61MM 80.00
62MM 80.0063MM 100.00
64MM 20.00
61EE 50.00
62EE 80.00
63EE 40.00
64EE 100.00
65EE 60.00
66EE 120.00
67EE 60.00
68EE 40.00
Electrical Motor 10M 1.00
Hydraulic Pump 10P 1.00
Container 10S 2.00
Base 10B 1.00
External Structure 10SAE 1.00
101E 4.00
102E 3.00
103E 4.00
104E 2.00
101MM 100.00
102MM 80.00103MM 120.00
104MM 60.00
101EE 50.00
102EE 80.00
103EE 40.00
104EE 200.00
105EE 60.00
106EE 150.00
107EE 80.00
108EE 20.00
1
2
3
4
Total I
Electronic Cards
Central Pumping Station 2KW
Central Pumping Station 4KW
Central Pumping Station 6KW
Central Pumping Station 10KW
CentralStation6KW
Electronic Cards
Small Mechanical Units
Small Electrical Units
CentralSta
tion10KW
Small Mechanical Units
Small Electrical Units
-
7/31/2019 Facility Design, Whare House Design
5/16
Daily UsageSafty and Cycel
StockStock Balance
Total Volume of
Products/Cubic
Space
Total Area
2,940.00 38,220.00 38,220.00 1,111.32 3,704.40
2,940.00 26,460.00 26,460.00 1,440.60 4,116.00
2,940.00 32,340.00 32,340.00 7,422.03 24,740.102,940.00 23,520.00 23,520.00 1,124.55 22,491.00
2,940.00 49,980.00 49,980.00 2,646.00 5,292.00
5,880.00 147,000.00 147,000.00 183.46 917.28
8,820.00 220,500.00 220,500.00 275.18 1,375.92
2,940.00 73,500.00 73,500.00 91.73 458.64
2,940.00 73,500.00 73,500.00 91.73 458.64
176,400.00 5,115,600.00 5,115,600.00 190.51 1,905.12
176,400.00 5,115,600.00 5,115,600.00 190.51 1,905.12
235,200.00 6,820,800.00 6,820,800.00 254.02 2,540.16
117,600.00 3,410,400.00 3,410,400.00 127.01 1,270.08
117,600.00 2,234,400.00 2,234,400.00 58.80 3,920.00
176,400.00 3,351,600.00 3,351,600.00 88.20 5,880.00
117,600.00 2,234,400.00 2,234,400.00 58.80 3,920.00
88,200.00 1,675,800.00 1,675,800.00 44.10 2,940.00
2,520.00 32,760.00 32,760.00 952.56 3,175.20
2,520.00 22,680.00 22,680.00 1,234.80 3,528.00
2,520.00 27,720.00 27,720.00 6,361.74 21,205.80
2,520.00 20,160.00 20,160.00 963.90 19,278.00
2,520.00 42,840.00 42,840.00 2,268.00 4,536.00
7,560.00 189,000.00 189,000.00 235.87 1,179.36
5,040.00 126,000.00 126,000.00 157.25 786.247,560.00 189,000.00 189,000.00 235.87 1,179.36
10,080.00 252,000.00 252,000.00 314.50 1,572.48
151,200.00 4,384,800.00 4,384,800.00 163.30 1,632.96
201,600.00 5,846,400.00 5,846,400.00 217.73 2,177.28
302,400.00 8,769,600.00 8,769,600.00 326.59 3,265.92
100,800.00 2,923,200.00 2,923,200.00 108.86 1,088.64
75,600.00 1,436,400.00 1,436,400.00 37.80 2,520.00
201,600.00 3,830,400.00 3,830,400.00 100.80 6,720.00
100,800.00 1,915,200.00 1,915,200.00 50.40 3,360.00
252,000.00 4,788,000.00 4,788,000.00 126.00 8,400.00
151,200.00 2,872,800.00 2,872,800.00 75.60 5,040.00
252,000.00 4,788,000.00 4,788,000.00 126.00 8,400.00
100,800.00 1,915,200.00 1,915,200.00 50.40 3,360.00
50,400.00 957,600.00 957,600.00 25.20 1,680.00
2,520.00 32,760.00 32,760.00 952.56 3,175.20
2,520.00 22,680.00 22,680.00 1,234.80 3,528.00
5,040.00 55,440.00 55,440.00 12,723.48 42,411.60
2,520.00 20,160.00 20,160.00 963.90 19,278.00
-
7/31/2019 Facility Design, Whare House Design
6/16
2,520.00 42,840.00 42,840.00 2,268.00 4,536.00
5,040.00 126,000.00 126,000.00 157.25 786.24
7,560.00 189,000.00 189,000.00 235.87 1,179.36
5,040.00 126,000.00 126,000.00 157.25 786.24
5,040.00 126,000.00 126,000.00 157.25 786.24
201,600.00 5,846,400.00 5,846,400.00 217.73 2,177.28
201,600.00 5,846,400.00 5,846,400.00 217.73 2,177.28252,000.00 7,308,000.00 7,308,000.00 272.16 2,721.60
50,400.00 1,461,600.00 1,461,600.00 54.43 544.32
126,000.00 2,394,000.00 2,394,000.00 63.00 4,200.00
201,600.00 3,830,400.00 3,830,400.00 100.80 6,720.00
100,800.00 1,915,200.00 1,915,200.00 50.40 3,360.00
252,000.00 4,788,000.00 4,788,000.00 126.00 8,400.00
151,200.00 2,872,800.00 2,872,800.00 75.60 5,040.00
302,400.00 5,745,600.00 5,745,600.00 151.20 10,080.00
151,200.00 2,872,800.00 2,872,800.00 75.60 5,040.00
100,800.00 1,915,200.00 1,915,200.00 50.40 3,360.00
3,150.00 40,950.00 40,950.00 1,190.70 3,969.00
3,150.00 28,350.00 28,350.00 1,543.50 4,410.00
6,300.00 69,300.00 69,300.00 15,904.35 53,014.50
3,150.00 25,200.00 25,200.00 1,204.88 24,097.50
3,150.00 53,550.00 53,550.00 2,835.00 5,670.00
12,600.00 315,000.00 315,000.00 393.12 1,965.60
9,450.00 236,250.00 236,250.00 294.84 1,474.20
12,600.00 315,000.00 315,000.00 393.12 1,965.60
6,300.00 157,500.00 157,500.00 196.56 982.80
315,000.00 9,135,000.00 9,135,000.00 340.20 3,402.00
252,000.00 7,308,000.00 7,308,000.00 272.16 2,721.60378,000.00 10,962,000.00 10,962,000.00 408.24 4,082.40
189,000.00 5,481,000.00 5,481,000.00 204.12 2,041.20
157,500.00 2,992,500.00 2,992,500.00 78.75 5,250.00
252,000.00 4,788,000.00 4,788,000.00 126.00 8,400.00
126,000.00 2,394,000.00 2,394,000.00 63.00 4,200.00
630,000.00 11,970,000.00 11,970,000.00 315.00 21,000.00
189,000.00 3,591,000.00 3,591,000.00 94.50 6,300.00
472,500.00 8,977,500.00 8,977,500.00 236.25 15,750.00
252,000.00 4,788,000.00 4,788,000.00 126.00 8,400.00
63,000.00 1,197,000.00 1,197,000.00 31.50 2,100.00
2,940.00 29,400.00 29,400.00 17,867.85 27,489.00
2,520.00 25,200.00 25,200.00 15,315.30 23,562.00
2,520.00 25,200.00 25,200.00 15,315.30 23,562.00
3,150.00 31,500.00 31,500.00 19,144.13 29,452.50
8,700,300.00 198,447,060.00 143,731.48 607,468.96
207,147,360.00nventory
-
7/31/2019 Facility Design, Whare House Design
7/16
Property of
element/Package
Can not be piled Up.
-
7/31/2019 Facility Design, Whare House Design
8/16
Day 1 Day 2
1 Electrical Motor 2M 1
2 Hydraulic Pump 2P 1
3 Container 2S 1
4 Base 2B 1
5 External Structure 2SAE 1
21E 2
22E 3
23E 1
24E 1
21MM 60
22MM 60
23MM 8024MM 40
21EE 40
22EE 60
23EE 40
24EE 30
Electrical Motor 4M 1
Hydraulic Pump 4P 1
Container 4S 1
Base 4B 1
External Structure 4SAE 1
41E 3
42E 2
43E 3
44E 4
41MM 60
42MM 80
43MM 120
44MM 40
41EE 30
42EE 80
43EE 4044EE 100
45EE 60
46EE 100
47EE 40
48EE 20
Electrical Motor 6M 1
Hydraulic Pump 6P 1
Container 6S 2
Sub Assemblies
S/N Elements Code Number of PcsStations
CentralStation4KW
Electronic Cards
Small Mechanical Units
Small Electrical Units
CentralStation2KW
6 Electronic Cards
7 Small Mechanical Units
8 Small Electrical Units
-
7/31/2019 Facility Design, Whare House Design
9/16
Base 6B 1
External Structure 6SAE 1
61E 2
62E 3
63E 2
64E 2
61MM 8062MM 80
63MM 100
64MM 20
61EE 50
62EE 80
63EE 40
64EE 100
65EE 60
66EE 120
67EE 60
68EE 40
Electrical Motor 10M 1
Hydraulic Pump 10P 1
Container 10S 2
Base 10B 1
External Structure 10SAE 1
101E 4
102E 3
103E 4
104E 2
101MM 100102MM 80
103MM 120
104MM 60
101EE 50
102EE 80
103EE 40
104EE 200
105EE 60
106EE 150
107EE 80
108EE 20
1
2
3
4
CentralStation6KW
Electronic Cards
Small Mechanical Units
Small Electrical Units
Central Pumping Station 10KW
CentralStatio
n10KW Electronic Cards
Small Mechanical Units
Small Electrical Units
Assembled Complet Central pump Station
Central Pumping Station 2KW
Central Pumping Station 4KW
Central Pumping Station 6KW
-
7/31/2019 Facility Design, Whare House Design
10/16
Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9
Amount of Items withdrawen
-
7/31/2019 Facility Design, Whare House Design
11/16
-
7/31/2019 Facility Design, Whare House Design
12/16
S/N Elements Toatal Inventory M3 unitaized area Weight
1 Central Pump Station 122,430.00 67,642.58 8,745.00 180.00
2 container 201,600.00 42,411.60 2,409.75 50.00
3 Base 100,170.00 4,257.23 1,773.84 10.00
4 Pump 111,300.00 5,453.70 15,582.00 45.00
5 Electric Motor 155,820.00 4,207.14 14,023.80 25.00
6 External Structure 200,340.00 10,017.00 20,034.00 10.00
7 Electronic Card 2,975,700.00 3,570.84 318.83 3.00
8 Small Mechanical compon 99,036,000.00 3,565.30 396.14 2.00
9 Small Electrical Compone 104,244,000.00 2,606.10 289.57 0.50
207,147,360.00 143,731.48 63,572.93
Total cubic Space and Area allocation for each Units
-
7/31/2019 Facility Design, Whare House Design
13/16
Rack type Method
pallet typeLxWxHxLe
vel
14 level Pallet Rack, in 1
meter Span AS/RS
8 level pallet rack, 1 level
can cope 4 levels of
containers (32 per pallet) AS/RS
6 level Palet rack, and
piled up to 8 level of
bases (48 per pallet)
AS/RS
1 Box 10 Pcs piled up to 4
level and 1 meter pallet
rack of 14 levels
1 Box 50 Pcs unitized
piled up containing 25
boxes in to 3level racking
1 Box 10 Pcs Unitized to60 levels in to 3 level
racking storage
-
7/31/2019 Facility Design, Whare House Design
14/16
S/N Elements Toatal Inventory M3 unitaized area Weight
1 Central Pump Station 122,430.00 67,642.58 8,745.00 180.00
2 container 201,600.00 42,411.60 2,409.75 50.00
3 Base 100,170.00 4,257.23 1,773.84 10.00
4 Pump 111,300.00 5,453.70 15,582.00 45.00
5 Electric Motor 155,820.00 4,207.14 14,023.80 25.00
6 External Structure 200,340.00 10,017.00 20,034.00 10.00
7 Electronic Card 2,975,700.00 3,570.84 318.83 3.00
8
Small Mechanical
components 99,036,000.00 3,565.30 396.14 2.00
9
Small Electrical
Components 104,244,000.00 2,606.10 289.57 0.50
207,147,360.00 143,731.48 63,572.93
T
-
7/31/2019 Facility Design, Whare House Design
15/16
Daily Material
Movement in KG pallet type
22,037,400.00 14 level Pallet Rack, in 1 meter Span
10,080,000.00
8 level pallet rack, 1 level can cope 4 levels of containers (32
per pallet)
1,001,700.00
6 level Palet rack, and piled up to 8 level of bases (48 per
pallet)
5,008,500.00
3,895,500.00
2,003,400.00
8,927,100.00
1 Box 10 Pcs piled up to 4 level and 1 meter pallet rack of 14
levels
198,072,000.00
1 Box 50 Pcs unitized piled up containing 25 boxes in to 3level
racking
52,122,000.00 1 Box 10 Pcs Unitized to 60 levels in to 3 level racking storage
4.4
400
tal cubic Space and Area allocation for each Units
-
7/31/2019 Facility Design, Whare House Design
16/16
m kg
Recommended Material Handling Type
total
height
total
weighttotal height of
AS RS/Rack
level of
Rack
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car. 0.85 360
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car. 4.4 800
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car. 4 800
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car.
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car. Trolly forinside
material movement facilitetor.
15 meter AS/RS for Loading and Unloading from the rack andFork lift 1.5 to 5 ton for loading to car.
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car.
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car. Conveyor for
movement from the receiving to buffer storage.
15 meter AS/RS for Loading and Unloading from the rack and
Fork lift 1.5 to 5 ton for loading to car.