Facility: 8 Buildings:
Administration, Cargo, NII (2), Export Control, Maintenance Garage, Veterinary Services, POV Secondary Inspection
Tenants:CBP, ICE, FDA, USDA, GSA, Brokers
Gross Area: 98,300 SF Site Area: 35
AcresRock Removal: +/-100,000CY LEED: Silver (Goal of
Gold)
Cost: $120M to $140M
Schedule:Design: 2008 - 2009Construction: 2010 - 2013
Introduction
Land Port of Entry, Alexandria Bay, New York
Project TeamGSA
BIM Champions: Robert Granato
Ilana Hellmann
PM: Tom King
COR: Karin Reed
CO: Patricia Wright
Architect: Morphosis
CM: Gilbane Building Company
Project Challenges
Maintain Port Operations
Interstate CoordinationEnvironment
Rock
Preliminary Concepts
Concept 1
Concept 1
BIM Scope Development
OCA• Minimum Requirement: Spatial Validation• Scope Templates
Discussions with A/E• Typically uses 4D Modeling extensively in construction
coordination• Clash Detection: Goal of zero clashes
BIM Scope
A/E• Space Validation *• Energy Modeling *• Rock Quantities *• Daylight Modeling• 4D Circulation & Phasing Models• 3D Models Conflict Reports
CM • Rock Quantities• Schedule Information
* Submitted for Preliminary Concepts
Space Validation
Space Validation
Space Validation
Space Validation
Space Validation
Energy Modeling
Energy Modeling
A/E Analysis CM Analysis
Rock Quantities