Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into...
Transcript of Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into...
![Page 1: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/1.jpg)
Facilities UpdateApril 19, 2016
![Page 2: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/2.jpg)
Orange County Public Schools
Meeting Agenda
Chief Facilities Officer, John Morris• Introduction• Unitary Status• Public Requests • Facilities Web Page, Communications Manager, Lauren Roth• Site Acquisition/Surplus, Staff Attorney, Laura Kelly
Senior Director of Planning, Faz Ali• Real Estate• Advance Planning• 21st Century Learning – Furniture, Fixtures & Equipment• Plant Survey
Senior Executive Director Facilities, Jeff Hart• Market Assessment• Program Master Schedule
![Page 3: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/3.jpg)
Orange County Public SchoolsMeeting Agenda Continued
Program Director, Construction, Marc Clinch• Solar Energy Summary
Director of Capital Renewal and Portable Operations, Mike Winter• Capital Renewal• Digital Curriculum Program• Districtwide Program• Portables
Senior Director of Maintenance, Jim Surguine• Maintenance• Custodial Centralization, Kevin Ballinger • Curb Appeal, Paving & Landscaping
PM Team Program Manager, Basem Ghneim• Facilities Program Elements• Accelerated Capital Projects Update• Capital Program Timeline and Budget Update
![Page 4: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/4.jpg)
Unitary Status Schools
* Priority 95 to be funded as Relief School 133-K8-E-6** Priority 110 repurposed to Washington Shores ELC (Formerly Richmond Heights ES)*** Accelerated Project
CURRENT PRIORITY LIST2016
No. Name Planned Year Opening
87 Lockhart ES 201688 Riverside ES 201689 Dream Lake ES 201691 Tangelo Park ES 2016123 Ventura ES *** 2016
74 131-K8-SW-5 201790 Carver MS 201793 Cypress Park ES 2017102 Rock Lake ES 201794 Engelwood ES 2017114 Mollie Ray ES 201796 Oak Hill ES 2017117 Ivey Lane ES 2017122 Meadow Woods ES *** 2017
92 Dover Shores ES 2018127 Maxey ES 201895 Audubon Park ES * 2018129 Hungerford ES 201898 Lake Como/ Kaley K8 2018110 Washington Shores ELC **99 Hillcrest ES 2018100 Corner Lake MS 2019
4
![Page 5: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/5.jpg)
Community Requests
• Community questions to Board Members• Impacts to existing community• Traffic• Queuing/Stacking• Walkability
5
![Page 6: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/6.jpg)
Orange County Public Schools
Facilities Web Page
Presented byLauren Roth
Sr. Manager, Communications
![Page 7: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/7.jpg)
Orange County Public Schools
Site Acquisition/Surplus
• Accomplishments• Acquisition• Surplus
Presented byLaura Kelly
Staff Attorney
7
![Page 8: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/8.jpg)
Orange County Public SchoolsREM Accomplishments in 2014/2015
• Acquired over 130 acres of real property – 2 elementary school sites– 3 middle school sites– 1 PS8 site– 1 ancillary site
• Entered into a Property Exchange Agreement with the City of Orlando for Site 133-K8-N-6 and Site 205-K8-SW-6
• Entered into long-term use or easement agreements – Site 21-M-E-2 with Orange County– Site 131-PS8-SW-5 with Boys & Girls Clubs of Central Florida and Harris Rosen
Foundation, Inc., and working with University of Central Florida Board of Trustees, Orange Blossom Family Health and The Children’s Home Society of Florida
– Lake Nona HS with Blackfin Development• Entered into 3,240 short-term facility use agreements• Amended Policy DN: governing disposition of surplus property• Disposed of 2 acres of surplus property
8
![Page 9: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/9.jpg)
Orange County Public Schools
9
5 YR PURCHASE
ID NUM Year Acquired Acreage55-H-N-6 2010 15.386-E-E-2 2010 0.7
87-M-SE-3 2010 22.5430-E-SE-3 2011 12.1
200-E-W-7 2012 6.563-E-SE-2 2012 15
41-E-SE-2 2014 13.63Millennia Gardens ES 2014 12
131-PS8-SW-5 2015 12.921-M-E-2 2015 11.473-T-W-7 2015 37.5
Bay Lake ES 2015 15.837-M-SW-4 2015 25.652-M-SE-2 2016 26
44-E-SE-2 2016 13.1
![Page 10: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/10.jpg)
Orange County Public Schools
10
T
PS8
E
E E
E
M
M
M
![Page 11: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/11.jpg)
Orange County Public SchoolsSURPLUS SITES
ID NUM ACREAGE
59-S-W-4 Windy Ridge 3.020
60-S-N-7 Ponkan Road 81.960
70-S-SW-5 Archon 2.810
74-S-SE-3 GOAA 8.851 (2 tracts)
75-S-N-6 Kennedy Road 17.610
76-S-N-7 Union Street 0.850
77-S-E-2 Waterford N19 19.000
78-S-N-6 Eatonville 99.240
502-S-N-6 Edgewater Maury Road 1.000
503-S-E-1 Winter Park Tech ROW 2.469
504-S-N-7 Wekiva HS 12.000
511-S-SE-2 Avalon Tech Excess 1.450
520-S-W-4 Olympia HS Pond 1.170
11
![Page 12: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/12.jpg)
Orange County Public SchoolsAmendment to Policy DN Disposition of Real Property• Prior Policy DN required disposition by the following methods:
– Public Sale Through the Bid Process– Exchange with Governmental Entity– Lease or Lease Purchase Option
• Amended Policy DN; permits disposition by the following methods, as deemed in the best interest of the School Board:– Public Sale Through the Bid Process– Private Sale, Transfer or Exchange with Governmental Entity or
Private Entity– Lease or Lease Purchase Option
12
![Page 13: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/13.jpg)
Orange County Public SchoolsReal Estate Management
• LoopNet Data Service & Costar– LoopNet: A real estate marketing and listing platform for
commercial buyers and sellers. The service provides wide marketexposure for commercial properties. OCPS – REM will be able toexpose (13) surplus properties to the marketplace on anongoing basis.
– Costar: Supplements the LoopNet platform by providing real estatesale comparables in a searchable data base format. OCPS–REMwill be able to obtain sale comparables for site evaluation.
13
![Page 14: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/14.jpg)
Facilities Planning Update• Real Estate• Planning Tools Statutory Educational Facilities Planning Educational Specifications
• 21st Century FF&E Furniture, Fixtures and Equipment
Presented by
Faz AliSenior Director Planning
14
![Page 15: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/15.jpg)
15
![Page 16: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/16.jpg)
ACTIVE SITESSchool Type Number of Sites
Elementary 17Middle 1
K8 2High 2
Ancillary 1Total 23
16
![Page 17: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/17.jpg)
17
![Page 18: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/18.jpg)
POTENTIAL SITES
School Type Number of Sites
Elementary 14Middle 7High 2
Ancillary 2Total 25
18
![Page 19: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/19.jpg)
19
![Page 20: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/20.jpg)
Site Acquisition Activity
3 1 2 0 25 *2
33
3 4 6 6 813 15
48
0
10
20
30
40
50
60
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Num
ber o
f Site
s
Acquisition Years
Number of SitesCumulative
*Purchases as of March 2016
20
![Page 21: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/21.jpg)
Statutory Educational Facilities Planning: Florida Inventory of School Houses (FISH) Annual
Certification
• Chapter 1013.31(1)(d) of Florida Statutes• Basis of data for the Educational Facilities Planning• Due April 1 of each year• Certification indicates inventory is current and accurate• All new and renovation projects as well as portable
installations and removals
21
![Page 22: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/22.jpg)
Statutory Educational Facilities Planning:Five Year Plant Survey
• Chapter 1013.31 of Florida Statutes• Last approved June 2012, due June 2017• Required for the expenditure of capital millage funds,
PECO funds, and CO&DS funds• Utilizes the 16-17 COFTE projections• Includes Workforce Development information for
technical schools• Amended through Spot Survey• Basis for Policy FA
22
![Page 23: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/23.jpg)
Statutory Educational Facilities Planning: Five Year Work Plan
• Chapter 1013.35 of Florida Statutes• Due October 3 of each year• The first year of the work program is the districts capital
outlay budget• Reflects a balanced Capital Outlay plan that is
financially feasible based on Board approved budget
23
![Page 24: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/24.jpg)
Statutory Educational Facilities Planning: DOE Cost of Construction Report
• Chapter 1013.64 of Florida Statutes – Funds for comprehensive educational plant needs; construction cost maximums for school district capital projects.
• Limits measured using Cost per Student Station
• Due March 1 of each year
School Type DOE Cost/ Student Station Limitation
2012 2013 2014 2015 DOE Cost/ Student Station Limitation
Elementary $20,857 $15,272.54(SunRidge ES)
$15,084.75(Sun Blaze ES)
$17,689.64(Dr. Phillips ES) $21,170
Middle/K8 $22,162 $20,264.66(SunRidge MS) - - $22,862
High $28,787 $24,998.71(Evans HS) - - $29,695
24
![Page 25: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/25.jpg)
Educational Specifications• Define the Educational Facilities model• Establish how facilities support programs and
curriculum• Baseline for equitable facilities districtwide• Include prototypical spaces, site, furnishing and
program requirements
25
![Page 26: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/26.jpg)
21st Century Learning: Furniture, Fixtures and Equipment
• High Performing Learning Environment– Integrated Technology– Learner Mobility– Multiple Modalities– Adaptability– Dynamic Ergonomics
26
![Page 27: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/27.jpg)
Proposed Collaborative Areas – K8 and Middle 27
![Page 28: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/28.jpg)
Proposed Media Center Areas – K8 and Middle 28
![Page 29: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/29.jpg)
Proposed High School Cafeteria – Cypress Creek High and Site 27-H-W-4 29
![Page 30: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/30.jpg)
Proposed Elementary School Classroom Configuration 30
![Page 31: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/31.jpg)
Proposed Elementary School Classroom Configuration 31
![Page 32: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/32.jpg)
Proposed Elementary School Media Center Layout 32
![Page 33: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/33.jpg)
Proposed Elementary School Media Center 33
![Page 34: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/34.jpg)
Proposed Middle School Media Center
Group Study
Genius Bar
Small GroupStudy
Computer Lab
Small GroupStudy
Circulation Desk
Media Specialist
TechCoordinator
InteractiveDisplay
MediaProjection
34
![Page 35: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/35.jpg)
Proposed Middle School Media Center – 3D Study
Group Study
Computer Lab
Small GroupStudy
InteractiveDisplay
Genius Bar
35
![Page 36: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/36.jpg)
Proposed Middle School Collaborative Space
PresentationStation
Small GroupStudy
Small GroupStudy
InteractiveDisplay
StudentDisplay
Wall
CollaborativeGroup Study
36
![Page 37: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/37.jpg)
Proposed Middle School Collaborative Space – 3D Study
PresentationStation
Small GroupStudy
Small GroupStudy
InteractiveDisplay
StudentDisplay
Wall
CollaborativeGroup Study
37
![Page 38: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/38.jpg)
Proposed High School Classroom /Collaboration 38
![Page 39: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/39.jpg)
Proposed High School Classroom /Collaboration 39
![Page 40: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/40.jpg)
Proposed High School Media Center 40
![Page 41: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/41.jpg)
Proposed High School Media Center 41
![Page 42: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/42.jpg)
Facilities Design & Construction
Update
• Market Assessment• Program Master Schedule
Presented ByJeff Hart
Senior Executive Director Facilities
42
![Page 43: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/43.jpg)
The Market43
![Page 44: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/44.jpg)
Planned (major) Construction Projects in Central Florida Area Market Trend Research
Sum of Construction Value ($) Project Type
Total
Accommodation 1,838,800,000
Aviation 3,411,000,000
Education (OCPS K-12) 3,250,000,000
Education (Colleges & Universities) 1,076,850,000
Education (K-12) 50,000,000
Healthcare 1,554,785,000
Mixed Use Development 10,959,000,000
Recreation 5,336,838,000
Residential 2,676,000,000
Retail 947,500,000
Transportation 8,857,000,000
Grand Total $39,957,773,000
44
![Page 45: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/45.jpg)
• These current and anticipated developments include:• Tourism, Transportation, and Tech• Airport South Terminal• I-4 Ultimate, Wekiva Parkway • Convention Center renovations• Performing Arts - Phase II• UCF – downtown UCF, I-Drive attractions/accommodations, Office buildings,
hotels/timeshares, assisted living, space coast, medical centers, mixed-use developments, town centers, plus numerous more!
• And of course, OCPS
• Creative Village• Port Canaveral• All Aboard Florida/SunRail• Theme Park expansions
45
![Page 46: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/46.jpg)
Orlando International AirportNew South Terminal
I-4 Ultimate Improvement Project
Wekiva Parkway Hyatt House on I-Drive McDonald’s at Sand Lake/I-Drive
![Page 47: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/47.jpg)
Bay Lake Elementary school47
![Page 48: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/48.jpg)
Dream Lake Elementary School48
![Page 49: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/49.jpg)
Meadow Woods Elementary School49
![Page 50: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/50.jpg)
Riverside Elementary School50
![Page 51: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/51.jpg)
Tangelo Park Elementary School Replacement51
![Page 52: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/52.jpg)
Ventura Elementary School Replacement52
![Page 53: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/53.jpg)
Wedgefield Area K-8 School53
![Page 54: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/54.jpg)
Competition for limited resources
• Materials • Labor• Equipment
54
![Page 55: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/55.jpg)
908
799
896
959
500
550
600
650
700
750
800
850
900
950
1000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
INDE
X VA
LUE
YEAR
$75
$85
$95
$105Jan-14 Jul-14 Jan-15 Jul-15 Jan-16
Concrete
$12
$13
$14
$15
Drywall
$2
$3
$4
$5
Jan-14 Jul-14 Jan-15 Jul-15 Jan-16
Copper
55
![Page 56: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/56.jpg)
Our Capital Programin Design &
Construction
56
![Page 57: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/57.jpg)
2014 Openings 11 Elementary Schools = $161.4M 9 Replacement projects = $132.2M
(61) Spring Lake ES (79) Pineloch ES(63) Little River ES (81) John Young ES (66) Shingle Creek ES (86) Wheatley ES (72) Dr. Phillips ES (97) Washington Shores ES (73) Ocoee ES
2 Comprehensive Renovations = $29.2M(71) Lake Silver ES (77) Waterford ES
57
![Page 58: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/58.jpg)
2015 Openings 7 Elementary and 2 High Schools = $234.3M
2 Relief = $30.5M Eagle Creek ES Independence ES
3 Replacement projects = $51.1M(75) Lake Weston ES (84) Lovell ES(82) Clay Springs ES
4 Comprehensive Renovations = $152.7M(58) Dr. Phillips HS (80) Lake Whitney ES(78) Cypress Creek HS (85) Apopka ES
58
![Page 59: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/59.jpg)
2016 Openings 7 Elementary and 1 K-8 = $167.3M 3 Relief = $71.6M Millennia Gardens ES Bay Lake ES Site 2-K-8-E-1(Wedgefield area)
2 Replacement projects = $43.7M(91) Tangelo Park ES (123) Ventura ES
3 Comprehensive Renovations = $52M(87) Lockhart ES (89) Dream Lake ES(88) Riverside ES
59
![Page 60: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/60.jpg)
2017 Openings 9 Elementary, 1 PS8, 3 Middle, 1 High, and 1 Ancillary = $455.7M 6 Relief = $270.4M
Site 21-M-E-2 (Avalon Area) Site 131-PS8-SW-5 (Downtown Area) Site 52-M-SE-2 (Lake Nona Area) Site 27-H-W-4 (West Orange Area) Site 44-E-SE-2 (Lake Nona Area) Site 84-E-W-4 (MetroWest Area)
9 Replacement projects = $185.3M(90) Carver MS (102) Rock Lake ES(93) Cypress Park ES (114) Mollie Ray ES (94) Engelwood ES (117) Ivey Lane ES(96) Oak Hill ES (122) Meadow Woods ES
Pine Hills Transportation Center
60
![Page 61: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/61.jpg)
2018 Openings 9 Elementary and 2 K-8s = $210.6M 1 Relief = $42.7M Site 133-K-8-N-6 (Audubon Park Area)
9 Replacement projects = $146.7M(98) Lake Como/Kaley K-8 (124) Frangus ES(99) Hillcrest ES (127) Maxey ES(103) Durrance ES (129) Hungerford ES(105) Union Park ES (130) Hidden Oaks ES(106) Pine Hills ES
1 Comprehensive Renovation = $21.2M(92) Dover Shores ES
61
![Page 62: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/62.jpg)
Summer 2013 NTP Summer 2014 NTP Summer 2015 NTP
SCHOOL NAME Building Cost ($)/SQ FT Building Cost ($)/SQ FT Building Cost ($)/SQ FT
New/Replacement - CMDr. Phillips ES 98.42
Little River ES 103.61
Spring Lake ES 108.56
Washington Shores ES 103.47
Clay Springs ES 112.84
Lake Weston ES 100.21
Bay Lake ES 111.86
Tangelo Park ES 112.26
Ventura ES (Pkg 2) 116.26Average 103.52 106.53 113.46
New/Replacement - GCJohn Young ES 92.63
Shingle Creek ES 91.62
Ocoee ES 96.99
Pineloch ES 95.89
Lovell ES 109.27
Eagle Creek ES 100.81
Independence ES 101.12
Millennia Gardens ES 109.04Average 94.28 103.73 109.04
62
![Page 63: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/63.jpg)
JobsFrom a Capital projects perspective alone, over 3 years, we will have the potential to have or will cause the need for some 19,700+ direct and indirect jobs:
• 2015 – 7 projects completed = 3,545• 2016 – 8 projects to be completed = 4,567• 2017 – 15 projects to be completed = 11,629
63
![Page 64: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/64.jpg)
Orange County Public Schools
Facilities Update
• Solar Energy Summary
Presented byMarc Clinch
Facilities Program Director, Construction
64
![Page 65: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/65.jpg)
Orange County Public Schools
Solar Energy SummarySolar Schools Interest
• Report called Brighter Future: A Study on Solar in U. S. Schools• Solar Foundation with Support from the Solar Energy Industries Association
(SEIA)• Claims a Rise of Solar in K-12 Schools• Claims that Solar is underutilized• Over 3,700 PV systems installed• Provides STEM opportunities• Could save $1M over 30-years
Future Board Workshop – May 12, 2016• Summary of previous presentations • Case Studies• Future Solar Options
![Page 66: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/66.jpg)
Orange County Public Schools
Facilities Update• Capital Renewal• Digital Curriculum• Districtwide Program• Portables
Presented byMike Winter
Director of Capital Renewal & Portables
66
![Page 67: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/67.jpg)
Orange County Public Schools
Capital Renewal Projects
Phase # Projects Budget(1)
• Planning 9 $ 7.6 M• Design/Pre-Con 22 21.1 M• Construction 4 8.8 M• Close-Out 9 9.5 M• Completed 61 11.1 M
105 $58.0 M(1) $200 M borrowing threshold maintained
67
![Page 68: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/68.jpg)
Orange County Public Schools
Digital Curriculum Projects
YearPhase # Schools Complete
• Cohort 1 (Pilot Program) 7 2013
• Cohort 2 11 2015
• Cohort 3 (Remaining HS) 13 2016
68
![Page 69: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/69.jpg)
Orange County Public Schools
Districtwide Project OverviewFY 2015 Completed ProjectsBusiness Cases 176
New Work Requests 524
Portable Requests 83
Safety/Health 95
Total 878
FY 2016 Completed To DateBusiness Cases 77
New Work Requests 623
Portable Requests 69
Safety/Health 258
Total 1,127
69
![Page 70: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/70.jpg)
Orange County Public Schools
70
2,441 2,376 2,1481,715 1,594 1,564 1,525 1,348 1,337 1,351
1,896 1,8491,772
1,6851,542 1,426 1,421
1,348 1,156 1,053
4,337 4,225 3,920
3,400 3,136
2,990 2,946 2,696
2,493 2,404
-
1,000
2,000
3,000
4,000
5,000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Num
ber o
f Por
tabl
es
Calendar Year
Portable Inventory History
Leased Owned Total
![Page 71: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/71.jpg)
Orange County Public Schools
Portable Operations Recycling Program
MoniesReceived for
Copper
Monies Received for Aluminum
Monies Received for
Steel
Total Monies Received
Total Tons Recycled
$519,094.60 $228,178.87 $32,204.80 $779,478.27 646.4 Tons
71
![Page 72: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/72.jpg)
Orange County Public Schools
Facilities Update• Maintenance• Custodial Centralization • Curb Appeal
Presented by
Jim SurguineSenior Director of Maintenance
72
![Page 73: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/73.jpg)
Orange County Public Schools
What We Measure
Goals:• Priority 1 Emergencies – respond with 2 hours and correct within 24 hours• Priority 2 Urgent – respond within 2 days and complete within 5 business days• Priority 3 Routine – complete within 30 days
Key Performance Indicators – Average Days to Complete Repairs
73
![Page 74: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/74.jpg)
Orange County Public Schools
What We Measure
Additional measures include the days to complete repair work orders for the different trades, the goal for all work orders is a timely completion based on the priorities and an overall completion average of 18 days.
74
![Page 75: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/75.jpg)
Orange County Public Schools
Maintenance Work Orders62587 62395
6038658195
61945
0
10000
20000
30000
40000
50000
60000
70000
2011 2012 2013 2014 2015
Count of Maintenance Work Orders
75
![Page 76: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/76.jpg)
Orange County Public Schools
HVAC Work Order Trends
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
09/10 10/11 11/12 12/13 13/14 14/15
Aver
age
Days
to C
ompl
ete
Coun
t of H
VAC
Wor
k O
rder
s
Fiscal Year Count of HVAC Order
Average of days to complete
76
![Page 77: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/77.jpg)
Orange County Public Schools
Maintenance The Council of the Great City Schools surveys all 67 member districts during the annual Managing for Results data collection of Key Performance Indicators.
The results of the latest report issued in October of 2015:
• Building Maintenance Costs• Median Value from all districts = $1.17 per
SF• OCPS = $0.75 per SF
• Grounds Maintenance Costs• Median Value from all districts = $1,790 per
acre• OCPS = $928 per acre
77
![Page 78: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/78.jpg)
Orange County Public Schools
Custodial ProgramInitial Benefits / Efficiencies
• Employee/School recognition program is being established• Cleaning plans have improved efficiencies with equitable distribution of work• Redistribution of supplies, improved equipment, and changing of repair service
contract• Standardized restroom equipment contract
Improvements
• Developing process maps and standard operating procedures• Determining staffing by square footage/school• Tracking custodial vacancies and absenteeism rates• Reviewing physical screening program for new hires (IPCS)• Determining training program needs and establishing required certifications• Reviewing safety procedures and workplace injuries
78
![Page 79: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/79.jpg)
Orange County Public Schools
Custodial ProgramOngoing efforts
• Establish good communications with Schools• Establish long term goals for the program• Interviewing temp agency staffing prior to work• Developing temp agency expectations• Reviewing cleaning products and equipment• Evaluating vendor products currently in schools• Standardizing products & equipment• Clear scope of work for school & custodians • Establish work loading processes• Creating score cards and performance measures• Developing surveys for feedback from customers• Collaboration with other Florida school districts
79
![Page 80: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/80.jpg)
Orange County Public Schools
Curb Appeal
• $11.3M allocated for painting since 2013• The exteriors of 21 schools will be painted this year• Parking lot paving and restriping at 17 schools• Parking lot and site lighting repairs prioritized • Landscaping - tree trimming • Custodial cleanup of exteriors• Signage and marquees• Repairing and replacing sidewalks• Playgrounds – repairs and mulching• Attention to building entries• Fencing & gates - repairs/replacements
80
![Page 81: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/81.jpg)
Orange County Public Schools
Capital Program Update
• Facilities Program Elements• Accelerated Capital Projects Update• Capital Program Timeline and Budget Update
Presented byBasem Ghneim
Program Manager
81
![Page 82: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/82.jpg)
Orange County Public Schools
Program Elements
1. Balance of the 2003 Sales Tax “List of 136”2. Capital Renewal3. Digital Curriculum4. New Relief Schools5. Pre-2003 Sales Tax Schools6. Functional Equity7. Repurposing Facilities
82
![Page 83: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/83.jpg)
Orange County Public Schools
Accelerated Projects Update
Last year, a total of twenty (20) Capital Projects were recommended for acceleration. Of the twenty, ten (10) were selected.
Select Acceleration Summary– Modular Elementary Schools (4) - Selected– Future Relief Schools (6) - Selected– Functional Equity Middle Schools (8)– Pre-Sales Tax List High Schools (2)
83
![Page 84: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/84.jpg)
Orange County Public Schools
• Advance Group 2 Modular ES• (122) Meadow Woods ES • (123) Ventura ES• (124) William Frangus ES• (130) Hidden Oaks ES
• Advance Future Relief Schools• Bay Lake ES• 44-E-SE-2• 84-E-W-4• 133-K-8-N-6• (98) Lake Como/(104)Kaley K8• (120) Pershing/(102)Pine Castle K8
2017201720182018
201620162017201720182019
2014 Projected Opening Year
2017201620182018
201620172017201820182019
2020202020202020
201720202021201920192020
Original Planned
Opening Year
Accelerated Projects UpdateCurrent Projected
Opening Year
84
![Page 85: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/85.jpg)
Orange County Public Schools
• Current Market Conditions– Higher Profit Margins– Resources/ Local Labor Shortage & Materials
• Project Scope– Enrollment Projections (Student Count)– Updated Design Guidelines – New Building Code
Impacts to the Capital Program
85
![Page 86: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/86.jpg)
Orange County Public Schools
2003 Sales Tax “List of 136”• Committed $ 109 M $ 397 M
• Balance of “the List of 136” $ 932 M $ 672 M
Total $1,041 M $1,069 M
Capital Program Update
2014Update
2016Update
Explanation of Variance• Market Conditions $ 25 M• Scope Adjustments $ 3 M
(Through 12/31/25)
86
![Page 87: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/87.jpg)
Orange County Public Schools
87
Relief (16 Schools)FY 2014-2024
Eagle Creek ES 133-K- 8-E-6 Audubon Park Area *Independence ES 37-M-W-4 Bridgewater Area
21-M-E-2 Avalon Park Area 44-E-SE-2 Southern Lake Nona *2-K8-E-1 Wedgefield Area 84-E-W-4 MetroWest ES *27-H-W-4 Beck Property 85-E-W-4 Sunset Park ES Area
Millennia Gardens ES 26-E-N-7 Arden Park 52-M-SE-2 Lake Nona Middle Area 80-H-SW-4 Dr. Phillips
Bay Lake ES* 20-E-SW-5 Tangelo Park
Accelerated*
![Page 88: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/88.jpg)
Orange County Public Schools
Capital Program Update
New Relief Schools• Committed $ 5 M $ 281 M
• New Additional Schools $ 584 M $ 458 M
Total $ 589 M $ 739 M
• Additional Schools $150 M (Impact fees & Sales Tax)
114-E-W-4 65-M-W-4 102-E-W-7
90-E-N-7 43-E-SE-2 56-M-SE-2
(Through 12/31/25)
2014Update
2016Update
88
![Page 89: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/89.jpg)
Orange County Public Schools
Capital Program Update
Digital Curriculum
• District Wide $ 229 M $ 229 + TBD
(Through 12/31/25)
2014Update
2016Update
89
![Page 90: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/90.jpg)
Orange County Public Schools
Repurposing FacilitiesPriority
No. Facility Current Use Potential Future Use
99 Hillcrest ES Elementary School Districtwide Magnet
101 Fern Creek ES Elementary School Magnet Program (Gifted ES)
104 Kaley ES Elementary School Audiology Program, Testing Center, OCVS
109 Pine Castle ES Elementary School Pre-K Center
112 Cherokee School Exceptional Student Education Magnet Program (Gifted MS)
115 Silver Star Center Orange County Virtual School (OCVS) Alternative Education (MS)
N/A Howard MS Middle School Districtwide Magnet
90
![Page 91: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/91.jpg)
Orange County Public Schools
• 2003 Sales Tax “List” $1,041 M $1,069 M• Capital Renewal $ 950 M $ 950 M
• Digital Curriculum $ 229 M $ 229 M +TBD• New Relief Schools $ 589 M $ 739 M• Pre-2003 Sales Tax Schools* $ 285 M $ 285 M• Functional Equity* $ 152 M $ 152 M• Repurposing Facilities $ TBDTotal $3,246 M $3,424 M
Capital Program Projected Need2014
Update2016
Update
(Through 12/31/25)
“As per the OCPS Office of Management & Budget, the Projected Funding Sources through Fiscal Year 2026 will adequately offset the overall Capital Need.”
* Beyond the 10 year budget
91
![Page 92: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/92.jpg)
Orange County Public Schools
Next Steps• Complete Unitary Status Agreement Projects – August 2018• Complete “Sales Tax List” Projects through 136 – August 2022• Relief School Projects• Digital Curriculum Program• Accelerate Real Estate Acquisitions• Capital Renewal Program• Management of Portable Inventory• Curb Appeal Initiative• Research 21st Century Learning• Energy Research
92
![Page 93: Facilities Update April 19, 2016 · – Lake Nona HS with Blackfin Development • Entered into 3,240 short-term facility use agreements ... – Costar: Supplements the LoopNet platform](https://reader033.fdocuments.us/reader033/viewer/2022051907/5ffa7d81faf2fd726c2278b7/html5/thumbnails/93.jpg)
Orange County Public Schools
Superintendent’s Comments
School Board Questions and Discussion
93