S a n J o s e C i t y C o l l e g e
F a c i l i t i e s M a s t e r P l a nD e c e m b e r 8 , 2 0 1 5
A F A C I L I T I E S M A S T E R P L A N
Creating a framework of systems to supportcurrent & future growth & campus
improvement: a roadmap bringing all projects together to serve one vision.
Board Review12.08.2015
2
A F A C I L I T I E S M A S T E R P L A N
Place-making is a multi-faceted approach to planning,design and management of a campus to create asense of “belonging” by strengthening the connectionbetween people and the places they share.
Board Review12.08.2015
3
2014 November
2015 February
March
April
May - June
September -November
December
Education / Facility Master Plan kick-off
Review existing buildings with Maintenance & Operations StaffSurvey Students, Faculty, Staff
Review SWOT findings & solicit input
Updated District Board
President’s Cabinet UpdateCommittee Reviews of Draft
Review FMP Draft 2 with Campus Constituents / Open Forums
Presentation to Board
T I M E L I N EBoard Review
12.08.2015
4
O B J E C T I V E S
Supporting student access to learning
Balancing & supporting socialization & formal learning.
Maintaining student safety.
Fostering environmental responsibility.
Highest & Best Use of Existing Facilities
Building Upon your current planning documents
Creating unique “places”.
Board Review12.08.2015
5
S A N J O S E C I T Y C O L L E G EF a c i l i t i e s M a s t e r P l a n
Board Review12.08.2015
6
F M P O b j e c t i v e s / G o a l s
• Improved Vehicular Access
• Balance / Increase parking
• Create a Campus Core with purposeful open space
• Improve Pedestrian Circulation
• Support the Educational Master Plan / Program of Work
• Create a place for students that is uniquely San Jose City College
Board Review12.08.2015
7
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n : p r o g r a m o f w o r k
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH5
1b
C
CT
L
SC4
AWAW
2a
6
Kingman Ave
2b
1a
1a 1b2a2b
3.i3.ii456
M&O / ReprographicsCosmetology Expansion / Adaptive PECTE BuildingTechnology Center Renovation –Expansion of Dental and medical officesGeneral Education Building Phase IGeneral Education Building Phase IIJaguar CenterDrama / Theater LobbyParking Structure
Program of Work
Board Review12.08.2015
3.ii
3.i
Existing Building
New Construction
Repurpose
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center
P
8
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH
C
CT
L
SC
AWAW
1a
Kingman Ave
1a. M & O / ReprographicsPrograms:
• Building Maintenance• Vehicle Storage• Grounds• Reprographics
ASF / GSF / Mass:• 9,850 ASF• 15,154 GSF (@65% Efficiency)• 1 story
Vacates:• Reprographics• Boiler Plant• 300
Project Sequence:• Project start not effected by other
projects
1b. Cosmetology / Adaptive PEPrograms:
• Esthetician Program• Adaptive PE
ASF / GSF / Mass:• 5,643 ASF• 1 story
Project Sequence:• After M&O
1a
1b
Board Review12.08.2015
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center
P
9
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH
C
CT
L
SC
AWAW
2a
Kingman Ave
2a. CTE BuildingPrograms:
• Air Conditioning • Facilities & Maintenance • Machine Technology• Emergency Medical• Solar Lab• Laser Lab• Computer Lab• Other (growth)• Food Service
Site Work:• Expanded Service
ASF / GSF / Mass:• 60,000 ASF (CTE) / 3,700 ASF (Food Service)• 98,000 GSF • 3 Stories
Vacates:• 200• 100• Emergency Medical @ Technology Center
Project Sequence:• After M&O Re-locates• After Athletics / Wellness Opens
2b. 5th Floor of Technology BuildingPrograms Phase:
• Medical & Dental Assistant Lecture / Lab / Offices
ASF / GSF / Mass:• 2,207 ASF
2b
Board Review12.08.2015
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center
P
10
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH
C
CT
L
SC
AWAW
3.i
Kingman Ave
3. General Education BuildingPrograms Phase I:
• Business Lecture• Large Lecture• Reading / Study Room• Office• Administrative Offices• Campus IT
Programs Phase II:• Lecture / Large Lecture• Foreign Language Lab• English Lab• 4930 English Lab• Science Labs• Faculty Offices
Site Work:• Removal of Business & GE Complex• Improve circulation @Leland / Moorpark• Expand / Improve Parking & Drop Off• SJCC Quad
ASF / GSF / Mass:• I: 27,000 ASF / 41,538 GSF / 3 Stories• II: 40,640 ASF / 62,523 GSF / 4 Stories• Project: 67,640 ASF / 104,061 GSF /
3-4 Stories
Vacates:• Business Building• General Education Complex
Project Sequence:• Phased project: Phase 1 is on an open
pad. Phase 1 replaces uses in Business Building, allowing Phase 2 to begin
3.ii
Board Review12.08.2015
P
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center 11
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH
C
CT
L
SC
AWAW
4
Kingman Ave
4. Jaguar Center: Student Development & Multi Cultural CenterPrograms Phase:
• Lounge• Recreation Room• Offices• Leadership Office• Meeting Room
Site Work:• Connection to Quad
ASF / GSF :• 10,200 ASF• 15,692 GSF (potential mezzanine)
Project Sequence:• Begin after Athletics / Wellness is
completed
Board Review12.08.2015
P
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center 12
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH
C
CT
L
SC
AWAW
Kingman Ave
5. Theater ArtsPrograms Phase:
• Expanded Lobby / Ticketing • Theater / Drama Labs• Dance Labs• Lecture• Black Box Theater• Workshop / Storage• Costume / Prep• Dressing Rooms
Site Work:• North Access Road• East Parking Expansion
ASF / GSF / Mass:• New: 16,660 ASF / 25,631 GSF• Renovation: 21,784 GSF
Vacates:• Dance rooms in Art• GE
Project Sequence:• Use 100 or 200 as temporary housing
5
Board Review12.08.2015
P
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center 13
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH
C
CT
L
SC
AWAW
Kingman Ave
6. Parking StructureSite Work:
• South Kingman Ave / Traffic Light @ Leigh / Kingman
• Loop road along Leigh (East of Football)
Size / Mass:• 180 Stalls / Plate• 5 Plates = 900 Cars
Project Sequence:• After CTE Building• After Theater Arts
6
Board Review12.08.2015
P
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center 14
V i s i o n 2 0 3 0 : p r o j e c t c o s t
Project Scope Square Footage Total Project Program With State Funding
ASF GSF Cost College $ State $
General Education Building - Phase I New Construction 27,000 41,538 $24,467,858 $24,467,858 $0
General Education Building - Phase II New Construction 40,640 62,523 $39,045,661 $22,689,917 $16,355,743
Maintenance, Operations and Repro New Construction 9,850 15,154 $6,930,442 $6,930,442 $0
Cosmetology & Adaptive PE Repurpose 5,643 8,682 $5,557,013 $5,557,013 $0
CTE New Construction 63,700 98,000 $63,650,785 $37,057,701 $26,593,084
Technology / Dental / Health Repurpose 2,207 3,395 $1,987,916 $1,987,916 $0
Theatre Arts New Construction/ Renovation 30,820 47,415 $26,613,128 $26,613,128 $0
Jaguar Center Repurpose 10,200 15,692 $9,728,190 $9,728,190 $0
Parking Structure New Construction $30,898,811 $30,898,811
sub-total 190,060 292,400 $208,879,802 $165,930,975 $42,948,827
Infrastructure & Core Site Amenities $29,453,307 $29,453,307
Total $ 238,333,109* $ 195,384,282 * $ 42,948,827*
Board Review12.08.2015
* The total project cost is provided in 2015 / 2016 cost dollars. This includes state supportable cost, soft cost, program management cost, and 17% geographic adjustment
15
Years Projects
2018 SJCC M&O / Grounds / Reprographics
2019 Adaptive PE / Cosmetology Expansion
2020 GE / Business / Admin Building Phase 1
Jaguar CenterStudent Development /
Multi-Cultural Center
2022 CTE Building w/ Food Service
2023 Medical & Dental Assistant Program
2024 Theater Arts GE / Business / Admin Building Phase 2
2025Demolition of (E) GE
ComplexNew Campus Drop Off
2026 South Parking Structure / On-Campus Road: Kingman
Board Review12.08.2015V i s i o n 2 0 3 0 : p r o g r a m s e q u e n c e
This program of work assumes future consideration of GO Bonds by the District and a State GO Bond November 2016.This program of work will shift 2 additional years dependent on when the District pursues a GO Bond.
16
V i s i o n 2 0 3 0 : t o t a l c o s t o f o w n e r s h i p
Project Name New GSF Existing GSF Net GSF Project Cost Operating Yearly Capital Renewal First Cost Total Cost of w/o Equipments Cost $ 6.29 Cost 0.015 75 Years Ownership
& Prog. Mgmt
M & O/Reprographics 15,154 15,154 - $ 6,149,036 $ - $ 92,236 $ 81,987 $ 174,223
GE/ Business Phase I 41,538 25,272 16,266 $ 22,120,774 $ 102,313 $ 331,812 $ 294,944 $ 729,068
GE/ Business Phase II 62,523 43,668 18,855 $ 34,183,504 $ 118,598 $ 512,753 $ 455,780 $ 1,087,131
CTE 98,000 98,000 - $ 56,474,178 $ - $ 847,113 $ 752,989 $ 1,600,102
Student Development 15,692 15,692 - $ 8,788,023 $ -
$ 131,820 $ 117,174 $ 248,994
Theater Arts 47,415 21,784 25,631 $ 22,889,384 $ 161,219 $ 343,341 $ 305,192 $ 809,752
Total 280,322 219,570 60,752 $ 127,003,504 $ 382,130 $ 2,259,073 $ 2,008,065 $ 4,649,269
Board Review12.08.2015
17
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n : p r o g r a m o f w o r k
Lela
nd A
ve
Parkmoor Ave
S
T
M
A
TH5
1b
C
CT
L
SC4
AWAW
2a
6
Kingman Ave
2b
1a
1a 1b2a2b
3.i3.ii456
M&O / ReprographicsCosmetology Expansion / Adaptive PECTE BuildingTechnology Center Renovation –Expansion of Dental and medical officesGeneral Education Building Phase IGeneral Education Building Phase IIJaguar CenterDrama / Theater LobbyParking Structure
Program of Work
Board Review12.08.2015
3.ii
3.i
Existing Building
New Construction
Repurpose
AAW CCTLMPSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyLibrary / Learning Resource CenterMulti-Disciplinary BuildingParking StructureScience ComplexTechnology CenterTheaterStudent Center
P
18
San Jose City College
Moorpark Ave
S Ba
scom
Ave
Leig
h A
ve
N
b e y o n d v i s i o n 2 0 3 0
Lela
nd A
ve
Parkmoor Ave
Kingman Ave
Board Review12.08.2015
Existing Building
New Construction
Repurpose
Leig
h A
ve
1
2
Future Facilities
1. Future Classroom / Lab Building• +/- 60,000 GSF
2. Future Child Development Center
3. Future Classroom / Lab Building• +/- 100,000 GSF
4. Future Program / Building to be determined• Beach Volley Ball?• Pool Complex?
5. Future Classroom / Lab Building
3
4
5
19
Board Review12.08.2015
20