Facilities design

29
Facilities design

description

Facilities design. Main Topics. Discrete vs. Continuous Flow and Repetitive Manufacturing Process vs. Product-focused designs and the other currently used variations Designing Layouts Systematic Layout Planning (SLP) for Process-focused layouts Flow Patterns for Product-focused layouts - PowerPoint PPT Presentation

Transcript of Facilities design

Page 1: Facilities design

Facilities design

Page 2: Facilities design

Main Topics

• Discrete vs. Continuous Flow and Repetitive Manufacturing

• Process vs. Product-focused designs and the other currently used variations

• Designing Layouts– Systematic Layout Planning (SLP) for Process-focused layouts

– Flow Patterns for Product-focused layouts

• (Assembly) Line Balancing

• Cell Formation

• (Warehousing and its design issues – in a sequel presentation)

Page 3: Facilities design

Operation Process Chart Example for discrete part manufacturing(borrowed from Francis et. al.)

Page 4: Facilities design

Discrete vs. Continuous Flow and Repetitive Manufacturing Systems

(Figures borrowed from Heizer and Render)

Page 5: Facilities design

A typical (logical) Organization of the Production Activity in

Repetitive Manufacturing

RawMaterial& Comp.Inventory

FinishedItem

Inventory

S1,2S1,1 S1,n

S2,1 S2,2 S2,m

Assembly Line 1: Product Family 1

Assembly Line 2: Product Family 2

Fabrication (or Backend Operations)

Dept. 1 Dept. 2 Dept. k

S1,i

S2,i

Dept. j

Page 6: Facilities design

Synchronous Transfer Lines: Examples(Pictures borrowed from Heragu)

Page 7: Facilities design

Major Layout Types(borrowed from Francis et. al.)

Page 8: Facilities design

Advantages and Limitations of the various layout types (borrowed from Francis et. al.)

Page 9: Facilities design

Advantages and Limitations of the various layout types (cont. - borrowed from Francis et. al.)

Page 10: Facilities design

Selecting an appropriate layout(borrowed from Francis et. al.)

Page 11: Facilities design

The product-process matrix

Jumbledflow (jobShop)

Disconnectedline flow(batch)

Connectedline flow(assemblyLine)

Continuousflow (chemicalplants)

Processtype

Production volume & mix

Low volume,low standardi-zation

Multiple products,low volume

Few major products,high volume

High volume, highstandardization,commodities

Commercialprinter

HeavyEquipment

Autoassembly

Sugarrefinery

Void

Void

Page 12: Facilities design

Cell formation in group technology:A clustering problem

Partition the entire set of parts to be produced on the plant-floor intoa set of part families, with parts in each family characterized by similar processing requirements, and therefore, supported by the same cell.

M1 M2 M3 M4 M5 M6 M7P1 1 1 1P2 1 1 1P3 1 1P4 1 1P5 1 1P6 1 1 1

M1 M4 M6 M2 M3 M5 M7P1 1 1 1P3 1 1P2 1 1 1P4 1 1P5 1 1P6 1 1 1

Part-Machine Indicator Matrix

Page 13: Facilities design

Clustering Algorithms for Cellular ManufacturingRow & Column Masking

M1 M2 M3 M4 M5 M6 M7P1 1 1 1P2 1 1 1P3 1 1P4 1 1P5 1 1P6 1 1 1

M1 M4 M6 M2 M3 M5 M7P1 1 1 1P3 1 1P2 1 1 1P4 1 1P5 1 1P6 1 1 1

Page 14: Facilities design

Clustering Algorithms for Cellular Manufacturing:

Similarity Coefficients - Motivation

M1 M2 M3 M4 M5 M6 M7P1 1 1 1P2 1 1 1P3 1 1P4 1 1P5 1 1P6 1 1 1

M1 M4 M6 M2 M3 M5 M7P1 1 1 1P3 1 1P2 1 1 1P4 1 1P5 1 1P6 1 1 1

1

1

Page 15: Facilities design

Clustering Algorithms for Cellular Manufacturing:Similarity Coefficients - Definitions

• P(Mi) = set of parts supported by machine Mi• |P(Mi)| = cardinality of P(Mi), i.e., the number of elements

of this set• SC(Mi,Mj) = |P(Mi)P(Mj)| / |P(Mi)P(Mj)| =

|P(Mi)P(Mj)| / (|P(Mi)|+|P(Mj)|-|P(Mi)P(Mj)|)

• Notice that: 0 SC(Mi,Mj) 1.0, and the closer this value is to 1.0 the greater the similarity among the part sets supported by machines Mi and Mj.• By picking a desired threshold, one can cluster together all machines that have a similarity coefficient greater than or equal to this threshold.

Page 16: Facilities design

Flow Patterns for Product-focused Layouts(borrowed from Francis et. al.)

Page 17: Facilities design

Design of Process-based layouts

Arrange spatially the facility departments in a way that• facilitates the flow of parts through the facility by minimizing the material handling / traveling effort;• observes additional practical constraints arising from, e.g.,

• processing/operational requirements• safety/health considerations• aesthetics• building features• etc.

Page 18: Facilities design

Prevailing Methodology:Systematic Layout Planning (SLP)

Departments Activities

1. Material Flows

2. ActivityRelationships

3. REL Chart

4. REL Diagram

5. SpaceRequirements

6. Space REL Diagram

7. SpaceAvailability

8. LayoutAlternatives

Page 19: Facilities design

Example on SLP

Developed in class – c.f. your class notes!

Page 20: Facilities design

Synchronous Transfer Lines: Examples(Pictures borrowed from Heragu)

Page 21: Facilities design

Balancing Synchronous Transfer Lines• Given:

– a set of m tasks, each requiring a certain (nominal) processing time t_i, and

– a set of precedence constraints regarding the execution of these m tasks,• assign these tasks to a sequence of k workstations, in a way that

– the total amount of work assigned to each workstation does not exceed a pre-defined cycle time c, (constraint I)

– the precedence constraints are observed, (constraint II)– while the number of the employed workstations k is minimized.

(objective)

• Remark: The problem is hard to solve optimally, and quite often it is addressed through heuristics.

Page 22: Facilities design

Heuristics for Assembly Line Balancing

Developed in class – c.f. your class notes!

Page 23: Facilities design

Asynchronous Production Lines

• Each part moves to the next station upon finishing processing at its current station, provided that there is available buffering capacity at the next station, without coordinating its movement with other parts in the system.

• Some reasons for adopting an asynchronous operational mode:– Lack / High cost of synchronizing material handling

equipment– (Highly) variable processing times at or among the different

stations– Frequent equipment failures

Page 24: Facilities design

Buffers, WIP and Congestion

Typical quantities of interest:• Times spent at different part of the system (“cycle” times)• Material accumulated at different parts of the system (WIP)

Estimates for these quantities can be obtained either through• Queueing theory (G/G/1 models), or• Simulation

Page 25: Facilities design

The G/G/1 model

TH TH

Station Parameters: (m: number of machines)• Production rate / Throughput: TH• Mean effective processing time: te

• St. deviation of effective processing time: e

• Coefficient of variation (CV) of effective processing time: ce = e / te

• Machine utilization u = TH * te (TH*te / m)• Coefficient of variation of inter-arrival times: ca

• Coefficient of variation of inter-departure times: cd

Evaluating the key performance measures:• CTq = [(ca2 + ce2) / 2]*[u / (1-u)] * te [(ca2 + ce2) / 2]*[u(2(m+1))-1 /(m (1-u))] * te

• CT = CTq + te

• WIPq = TH * CTq • WIP = TH * CT = WIPq + u WIPq + m*u• cd

2 = u2 * ce2 + (1-u2) * ca

2 1+(1-u2)(ca2-1)+u2(ce

2-1)/m

Page 26: Facilities design

Evaluating an entire Production Line

TH

Key observations:• For a stable system, the average production rate of every station will be equal to TH.• For every pair of stations, the inter-departure times of the first constitute the inter-arrival times of the second.• Then, the entire line can be evaluated on a station by station basis, working from the first station to the last, and using the equations for the basic G/G/1 model.

Page 27: Facilities design

Taking into consideration machine failuresDefinitions:• Base machine processing time: t0

• Coefficient of variation for base processing time: c0 = 0 / t0

• Mean time to failure: mf

• Mean time to repair: mr

• Coefficient of variation of repair times: cr = r / mr

• Machine Availability A = mf / (mf + mr)

Then,• te = t0 / A (or equivalently 1/te = A * (1/t0) )• e

2 = (0/A)2 + (mr2+ r

2)(1-A)(t0/A)• ce

2 = e2 / te

2 = c02 + (1+cr

2)A(1-A)mr/t0

Page 28: Facilities design

Example on the Analysis and Design of Asynchronous Production Lines through

the presented G/G/m model

Developed in class – c.f. your class notes!

Page 29: Facilities design

Reading Assignment

• From your textbook:– Chapter 1: Section 1.9

– Chapter 10: Sections 10.1-10.3, 10.6

– Chapter 8: Section 8.10

– (for those of you interested to see something more, read also Sections 10.4, 10.5 and 10.7)