1
9 10 11 12 H G F E D C B A 7 8 4 5 6 1 2 3 7a Hi 8a 12b 13 14 14a Di Bi 12a Tekla Structures 200*6.3SHS BRISE SOLIEL BEAM ADDED C3 15/7/13 PS STEELWORK AMENDED. REFER TO MAIN GA's C2 26/6/13 TJM ISSUED FOR CONSTRUCTION C1 31/5/13 TJM ISSUED FOR APPROVAL P1 23/5/13 TJM Rev Mk Revision Description Rev Date Initials E-mail: [email protected] Telephone:(01300) 345588 Facsimile:(01300) 345533 Pulham Business Park Pulham Dorchester Dorset. DT2 7DX C3 15/7/13 TJM YANNONS FARM, PAIGNTON COWLINS BT G [17] 3D VIEW 2228 REVISION CLIENT DRAWING TITLE DRAWN BY DATE REVIEWED PROJECT DRAWING. No. CONTRACT No. PHARMACEUTICAL MANUFACTURING UNIT SCALE CONSTRUCTION STATUS
Transcript of FABRICATIONS - Snashall Steel
9
10
11
12
H
G
F
E
DC
B
A
7
8
4
5
6
1
2
3
7a
Hi
8a
12b
13
14
14a Di
Bi
12a
Tek
la S
truc
ture
s
200*6.3SHS BRISE SOLIEL BEAM ADDEDC3 15/7/13PS
STEELWORK AMENDED. REFER TO MAIN GA'sC2 26/6/13TJM
ISSUED FOR CONSTRUCTIONC1 31/5/13TJM
ISSUED FOR APPROVALP1 23/5/13TJM
Rev Mk Revision Description Rev DateInitials
E-mail: [email protected]
Telephone:(01300) 345588 Facsimile:(01300) 345533
Pulham Business Park Pulham Dorchester Dorset. DT2 7DX
C3 15/7/13
TJM
YANNONS FARM, PAIGNTON
COWLINS
BT
G [17]
3D VIEW
2228
REVISION
CLIENT
DRAWING TITLE
DRAWN BY
DATE
REVIEWED
PROJECT
DRAWING. No.
CONTRACT No.
PHARMACEUTICAL MANUFACTURING UNIT
SCALE
CONSTRUCTIONSTATUS