Fabrication Time Estimation

2
7/23/2019 Fabrication Time Estimation http://slidepdf.com/reader/full/fabrication-time-estimation 1/2 Deposition rate of electrode and weight Electrode dimensions Depositon rate Inch mm Wt/mtr (g) lbs/hr kg/hr  3/32 2.38 34.9! ".3# !."  "/ 8 3."8 2."#" ".8# !.84  #/32 3.9$ 9$.""" 2.$ ".2"  3/" 4.$ "39.839 4.22 ".9"  $/32 #.# "9!.33$ .2# 2.83 Weight o% &eld per metre 'illet ie 'illet * +,tt -ap/r Inch mm g/mtr g/mtr g/mtr  "/ 8 3."8 39. 8.# $9."  3/" 4.$ 89.! "#4.2 "$8.!  "/ 4 .3# "#8.3 2$4." 3".#  #/" $.94 24$.3 428.3 494.  3/ 8 9.#3 3#." ".8 $"2.2  "/ 2 "2.$! 33." "!9.# "2."  #/ 8 "#.88 989.2 "$"3.2 "9$8.3  3/ 4 "9.!# "424.4 24$.! 2848.8 " 2#.4! 2#32.3 438#.9 #!4.#

Transcript of Fabrication Time Estimation

Page 1: Fabrication Time Estimation

7/23/2019 Fabrication Time Estimation

http://slidepdf.com/reader/full/fabrication-time-estimation 1/2

Deposition rate of electrode and weight

Electrode dimensions Depositon rate

Inch mm Wt/mtr (g) lbs/hr kg/hr

  3/32 2.38 34.9! ".3# !."

  "/ 8 3."8 2."#" ".8# !.84

  #/32 3.9$ 9$.""" 2.$ ".2"

  3/" 4.$ "39.839 4.22 ".9"

  $/32 #.# "9!.33$ .2# 2.83

Weight o% &eld per metre

'illet ie 'illet * +,tt -ap/r

Inch mm g/mtr g/mtr g/mtr

  "/ 8 3."8 39. 8.# $9."

  3/" 4.$ 89.! "#4.2 "$8.!

  "/ 4 .3# "#8.3 2$4." 3".#  #/" $.94 24$.3 428.3 494.

  3/ 8 9.#3 3#." ".8 $"2.2

  "/ 2 "2.$! 33." "!9.# "2."

  #/ 8 "#.88 989.2 "$"3.2 "9$8.3

  3/ 4 "9.!# "424.4 24$.! 2848.8

" 2#.4! 2#32.3 438#.9 #!4.#

Page 2: Fabrication Time Estimation

7/23/2019 Fabrication Time Estimation

http://slidepdf.com/reader/full/fabrication-time-estimation 2/2

Weight of weld

Electrode diameter !."2# Inch

-ength o% &eld " mtr

,mber o% passes " os

Deposition e0cienc1 "

Weight per metre 2."#" grams

Weight o% electrode .2"#"kilograms