FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort...

88
FAA - Office of Airports Report Date: 11/30/2011 Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work AL AAL AK +01D Akutan (Proposed GA) 3 $ 11,000,000 $ 11,000,000 $ - $ - Construct New Airport [Phase 3] AL AAL AK +01F Alakanuk (Proposed CM) 4 $ 7,011,963 $ 4,511,963 $ 2,500,000 $ - Construct New Airport [Phase 4 (Surfacing)] AL AAL AK +07E Angoon (Proposed GA) 3 $ 1,000,000 $ 1,000,000 $ - $ - Construct New Airport [Construct New Airport EIS Phase III] AL AAL AK BET Bethel P 20 $ 9,135,827 $ 1,000,000 $ 8,135,827 $ - Rehabilitate Runway [Rehab Runway] - 01L/19R, Rehabilitate Taxiway [rehab taxiway] AL AAL AK CDB Cold Bay CS 10 $ 9,858,428 $ 3,078,559 $ 6,779,869 $ - Construct Runway Safety Area [Extend Runway Safety Area] - 14/32, Rehabilitate Apron [Rehabilitate North Apron], Rehabilitate Runway [Rehabilitate Rwy 14 Turn Around] - 14/32, Rehabilitate Taxiway [Rehabilitate Taxiway C] AL AAL AK SCC Deadhorse P 11 $ 3,831,982 $ 3,831,982 $ - $ - Rehabilitate Runway [Rehab Runway phase 1] - 05/23 AL AAL AK SCC Deadhorse P 13 $ 8,652,619 $ 700,441 $ 7,952,178 $ - Rehabilitate Apron [Phase 1], Rehabilitate Taxiway [Phase 1] AL AAL AK SCC Deadhorse P 12 $ 10,683,822 $ - $ 10,683,822 $ - Rehabilitate Runway [Rehab Runway phase 2] - 05/23 AL AAL AK FAI Fairbanks International P 40 $ 5,947,621 $ 5,947,621 $ - $ - Acquire Interactive Training System [Interactive Training System], Rehabilitate Apron [Rehabilitate Apron] AL AAL AK GST Gustavus CS 5 $ 10,010,274 $ 3,210,274 $ 6,800,000 $ - Improve Runway Safety Area - 11/29 AL AAL AK HOM Homer P 10 $ 321,100 $ 321,100 $ - $ - Improve Snow Removal Equipment Building [Aquire and improve snow removal equipment building] AL AAL AK HOM Homer P 11 $ 2,016,924 $ 2,016,924 $ - $ - Rehabilitate Apron, Rehabilitate Taxiway [Reconstruct Taxiway E & D (LOC)] AL AAL AK JNU Juneau International P 53 $ 2,000,000 $ - $ 2,000,000 $ - Construct Runway Safety Area [phase 5 (ATO RA)] - 08/26 AL AAL AK JNU Juneau International P 51 $ 1,441,744 $ 1,441,744 $ - $ - Construct Snow Removal Equipment Building [phase 2 (utilities) - Part A] AL AAL AK JNU Juneau International P 54 $ 6,301,428 $ 615,644 $ 5,685,784 $ - Construct Runway Safety Area [Phase 6 (construction)] - 08/26 AL AAL AK JNU Juneau International P 52 $ 4,509,960 $ 2,020,829 $ 2,489,131 $ - Construct Runway Safety Area [phase 4 (Design & construction)] - 08/26 AL AAL AK +08O Kaktovik (Proposed CS) 2 $ 1,834,450 $ 1,834,450 $ - $ - Construct New Airport [Construction Phase 1 (land acquis)] AL AAL AK ENA Kenai Municipal P 48 $ 789,347 $ 789,347 $ - $ - Acquire Snow Removal Equipment [Acquire SRE, FY 11 Phase 2: Tow Broom] AL AAL AK ENA Kenai Municipal P 46 $ 847,993 $ 666,476 $ 181,517 $ - Acquire Snow Removal Equipment [Acquire SRE, FY11 Phase 1: Grader/Loader] AL AAL AK ENA Kenai Municipal P 47 $ 118,037 $ 118,037 $ - $ - Wildlife Hazard Assessments AL AAL AK KTN Ketchikan International P 21 $ 647,248 $ - $ 647,248 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 3000 Gallon ARRF truck (Ketchikan)] AL AAL AK AKN King Salmon P 12 $ 7,677,323 $ 4,677,323 $ 3,000,000 $ - Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway Lighting AL AAL AK ADQ Kodiak P 14 $ 14,547,026 $ 579,055 $ 13,967,971 $ - Rehabilitate Runway [Reconstruct Runway, phase 1(LOC)] - 07/25, Rehabilitate Taxiway [Rehab taxiway B] AL AAL AK ADQ Kodiak P 13 $ 12,083,780 $ 9,083,780 $ 3,000,000 $ - Rehabilitate Runway [Rehabilitate Runway] - 18/36, Rehabilitate Runway Lighting [Edge lighting, regulators, regulator bldg] - 18/36 AL AAL AK GGV Kwigillingok CS 2 $ 1,488,031 $ 1,488,031 $ - $ - Rehabilitate Runway - 15/33 FY 2011 Grants Awarded Page 1 of 88

Transcript of FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort...

Page 1: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

AL AAL AK +01D Akutan (Proposed GA) 3 $ 11,000,000 $ 11,000,000 $ - $ - Construct New Airport [Phase 3]AL AAL AK +01F Alakanuk (Proposed CM) 4 $ 7,011,963 $ 4,511,963 $ 2,500,000 $ - Construct New Airport [Phase 4 (Surfacing)]AL AAL AK +07E Angoon (Proposed GA) 3 $ 1,000,000 $ 1,000,000 $ - $ - Construct New Airport [Construct New Airport EIS Phase III]

AL AAL AK BET Bethel P 20 $ 9,135,827 $ 1,000,000 $ 8,135,827 $ -

Rehabilitate Runway [Rehab Runway] - 01L/19R, Rehabilitate Taxiway [rehab

taxiway]

AL AAL AK CDB Cold Bay CS 10 $ 9,858,428 $ 3,078,559 $ 6,779,869 $ -

Construct Runway Safety Area [Extend Runway Safety Area] - 14/32, Rehabilitate

Apron [Rehabilitate North Apron], Rehabilitate Runway [Rehabilitate Rwy 14 Turn

Around] - 14/32, Rehabilitate Taxiway [Rehabilitate Taxiway C]AL AAL AK SCC Deadhorse P 11 $ 3,831,982 $ 3,831,982 $ - $ - Rehabilitate Runway [Rehab Runway phase 1] - 05/23AL AAL AK SCC Deadhorse P 13 $ 8,652,619 $ 700,441 $ 7,952,178 $ - Rehabilitate Apron [Phase 1], Rehabilitate Taxiway [Phase 1]AL AAL AK SCC Deadhorse P 12 $ 10,683,822 $ - $ 10,683,822 $ - Rehabilitate Runway [Rehab Runway phase 2] - 05/23

AL AAL AK FAI Fairbanks International P 40 $ 5,947,621 $ 5,947,621 $ - $ -

Acquire Interactive Training System [Interactive Training System], Rehabilitate

Apron [Rehabilitate Apron]AL AAL AK GST Gustavus CS 5 $ 10,010,274 $ 3,210,274 $ 6,800,000 $ - Improve Runway Safety Area - 11/29

AL AAL AK HOM Homer P 10 $ 321,100 $ 321,100 $ - $ -

Improve Snow Removal Equipment Building [Aquire and improve snow removal

equipment building]

AL AAL AK HOM Homer P 11 $ 2,016,924 $ 2,016,924 $ - $ - Rehabilitate Apron, Rehabilitate Taxiway [Reconstruct Taxiway E & D (LOC)]AL AAL AK JNU Juneau International P 53 $ 2,000,000 $ - $ 2,000,000 $ - Construct Runway Safety Area [phase 5 (ATO RA)] - 08/26AL AAL AK JNU Juneau International P 51 $ 1,441,744 $ 1,441,744 $ - $ - Construct Snow Removal Equipment Building [phase 2 (utilities) - Part A]AL AAL AK JNU Juneau International P 54 $ 6,301,428 $ 615,644 $ 5,685,784 $ - Construct Runway Safety Area [Phase 6 (construction)] - 08/26AL AAL AK JNU Juneau International P 52 $ 4,509,960 $ 2,020,829 $ 2,489,131 $ - Construct Runway Safety Area [phase 4 (Design & construction)] - 08/26AL AAL AK +08O Kaktovik (Proposed CS) 2 $ 1,834,450 $ 1,834,450 $ - $ - Construct New Airport [Construction Phase 1 (land acquis)]

AL AAL AK ENA Kenai Municipal P 48 $ 789,347 $ 789,347 $ - $ - Acquire Snow Removal Equipment [Acquire SRE, FY 11 Phase 2: Tow Broom]

AL AAL AK ENA Kenai Municipal P 46 $ 847,993 $ 666,476 $ 181,517 $ - Acquire Snow Removal Equipment [Acquire SRE, FY11 Phase 1: Grader/Loader]AL AAL AK ENA Kenai Municipal P 47 $ 118,037 $ 118,037 $ - $ - Wildlife Hazard Assessments

AL AAL AK KTN Ketchikan International P 21 $ 647,248 $ - $ 647,248 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 3000 Gallon ARRF truck

(Ketchikan)]AL AAL AK AKN King Salmon P 12 $ 7,677,323 $ 4,677,323 $ 3,000,000 $ - Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway Lighting

AL AAL AK ADQ Kodiak P 14 $ 14,547,026 $ 579,055 $ 13,967,971 $ -

Rehabilitate Runway [Reconstruct Runway, phase 1(LOC)] - 07/25, Rehabilitate

Taxiway [Rehab taxiway B]

AL AAL AK ADQ Kodiak P 13 $ 12,083,780 $ 9,083,780 $ 3,000,000 $ -

Rehabilitate Runway [Rehabilitate Runway] - 18/36, Rehabilitate Runway Lighting

[Edge lighting, regulators, regulator bldg] - 18/36AL AAL AK GGV Kwigillingok CS 2 $ 1,488,031 $ 1,488,031 $ - $ - Rehabilitate Runway - 15/33

FY 2011 Grants Awarded

Page 1 of 88

Page 2: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

AL AAL AK LHD Lake Hood P 17 $ 4,099,250 $ - $ 4,099,250 $ - Acquire Land For Approaches [Wendy's Way- RPZ phase 2]AL AAL AK LHD Lake Hood P 15 $ 1,841,672 $ 1,000,000 $ 841,672 $ - Improve Seaplane Base [Bank Stabilization, Phase 2]AL AAL AK LHD Lake Hood P 16 $ 760,812 $ - $ 760,812 $ - Install Guidance Signs [Install signage and lighting, Phase 2]

AL AAL AK MLY Manley Hot Springs GA 1 $ 8,356,380 $ 8,356,380 $ - $ -

Construct Apron [Construct apron phase 1], Construct Runway [Construct Runway

Phase 1] - Plan-1, Construct Taxiway [Phase 1]

AL AAL AK MRI Merrill Field P 53 $ 323,000 $ 323,000 $ - $ - Acquire Snow Removal Equipment [Acquire SRE - Replace Sweeper/Vacuum Truck]

AL AAL AK MRI Merrill Field P 56 $ 549,100 $ 392,000 $ 157,100 $ -

Acquire Safety Equipment and/or Fencing [Fencing, Signage, Lighting (VPD

reduction)]AL AAL AK MRI Merrill Field P 55 $ 2,253,400 $ 2,253,400 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxiway Quebec - Phase 2]AL AAL AK MRI Merrill Field P 54 $ 608,000 $ 608,000 $ - $ - Conduct Airport Master Plan Study [Conduct Airport Master Plan Phase I]

AL AAL AK +08L

Nanwalek / Port Graham Regional

(Proposed GA) 3 $ 948,563 $ 948,563 $ - $ - Conduct Miscellaneous StudyAL AAL AK +08M Ouzinkie (Proposed GA) 2 $ 2,433,682 $ 2,433,682 $ - $ - Construct New Airport [Construct new airport-ph2 Utilities, SREB, MIRL]AL AAL AK ORI Port Lions CS 4 $ 201,998 $ 201,998 $ - $ - Rehabilitate Runway Lighting [Regulator Bldg] - 07/25AL AAL AK OTZ Ralph Wien Memorial P 17 $ 2,958,362 $ 1,000,000 $ 1,958,362 $ - Rehabilitate TaxiwayAL AAL AK SIT Sitka Rocky Gutierrez P 28 $ 8,583,504 $ 1,000,000 $ 7,583,504 $ - Rehabilitate Runway [Rehab Runway] - 11/29AL AAL AK *AKS State of Alaska 16 $ 2,000,000 $ 2,000,000 $ - $ - Update State System Plan Study

AL AAL AK ANC Ted Stevens Anchorage International P 142 $ 7,429,050 $ 2,429,050 $ 5,000,000 $ - Widen Runway [LOI #2-01 DG VI Improvements] - 07R/25L

AL AAL AK ANC Ted Stevens Anchorage International P 148 $ 6,892,607 $ 2,415,456 $ 4,477,151 $ - Extend Runway [Extend 7R, Phase 4 (Part E)] - 07R/25L

AL AAL AK ANC Ted Stevens Anchorage International P 143 $ 320,848 $ 320,848 $ - $ - Modify Terminal Building [Phase 8 (including badging & communications center)]

AL AAL AK ANC Ted Stevens Anchorage International P 147 $ 1,427,372 $ 1,427,372 $ - $ -

Acquire Snow Removal Equipment [Acquire Snow Removal Equipment (SRE),

Phase 1 (Part D)]

AL AAL AK ANC Ted Stevens Anchorage International P 146 $ 2,389,520 $ - $ 2,389,520 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [RSIP (phase 10), 50

homes (est.)]

AL AAL AK ANC Ted Stevens Anchorage International P 140 $ 12,834,024 $ 3,334,024 $ 9,500,000 $ - Extend Runway [Extend 7R, Phase 2 (Part A)] - 07R/25L

AL AAL AK ANC Ted Stevens Anchorage International P 145 $ 5,341,612 $ 5,341,612 $ - $ - Extend Runway [Extend 7R, Phase 3 (Part B)] - 07R/25L

AL AAL AK ANC Ted Stevens Anchorage International P 141 $ 4,718,750 $ 1,518,750 $ 3,200,000 $ - Construct Apron [LOI #98-1 (grant 9): Conc A Apron Recon]

AL AAL AK ANC Ted Stevens Anchorage International P 144 $ 597,185 $ 597,185 $ - $ - Security Enhancements [Replace Gate Echo 21]

Page 2 of 88

Page 3: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

AL AAL AK ANC Ted Stevens Anchorage International P 149 $ 579,637 $ 579,637 $ - $ - Acquire Snow Removal Equipment [Acquire SRE, Phase 2 (Part F)]

AL AAL AK *AKV Various Locations in Alaska 82 $ 377,630 $ 377,630 $ - $ -

Remove Obstructions (Kwethluk; McCarthy; Merle K (Mudhole) Smith; Tatitlek;

Valdez Pioneer Field)

AL AAL AK *AKV Various Locations in Alaska 83 $ 1,347,899 $ 1,347,899 $ - $ -

Acquire Snow Removal Equipment (Akiachak (Proposed GA); Akutan (Proposed

GA); Tuluksak), Acquire Snow Removal Equipment (Akiachak (Proposed GA);

Akutan (Proposed GA); Tuluksak), Acquire Snow Removal Equipment (Akiachak

(Proposed GA); Akutan (Proposed GA); Tuluksak)

AL AAL AK *AKV Various Locations in Alaska 81 $ 1,500,000 $ - $ 1,500,000 $ -

Conduct aeronautical survey for WAAS approach (Ambler; Chalkyitsik; Golovin;

Holy Cross; Koyuk Alfred Adams)

AL AAL AK *AKV Various Locations in Alaska 79 $ 4,546,028 $ 4,546,028 $ - $ -

Rehabilitate Runway (Aniak - 10/28; Bethel - 12/30; Bob Baker Memorial - 06/24;

Chevak - 02/20; Cold Bay - 08/26; Emmonak - 16/34; Gambell - 16/34; Goose Bay -

08/26; Gustavus - 02/20; Healy River - 15/33; Homer - 03/21; Hope - 16/34;

Kalskag - 06/24; Ketchikan International - 11/29; King Salmon - 12/30; Kivalina -

12/30; Kodiak - 07/25; Marshall Don Hunter Sr - 07/25; McGrath - 16/34; Merle K

(Mudhole) Smith - 16/34; Nikolai - 04/22; Selawik - 09/27; Seldovia - 16/34; Sitka

Rocky Gutierrez - 11/29; Stony River 2 - 18/36; Unalakleet - 08/26; Unalaska -

12/30; Valdez Pioneer Field - 06/24; Wrangell - 10/28; Yakutat - 02/20)

AL AAL AK *AKV Various Locations in Alaska 80 $ 2,950,605 $ 2,950,605 $ - $ -

Acquire Snow Removal Equipment (Gulkana; Ralph M Calhoun Memorial; Ruby;

Savoonga; Shishmaref; Valdez Pioneer Field)

AL AAL AK *AKV Various Locations in Alaska 78 $ 1,002,654 $ 1,002,654 $ - $ -

Acquire Snow Removal Equipment (Gustavus; Haines; Hoonah; Petersburg James

A Johnson; Skagway)

AL AAL AK *AKV Various Locations in Alaska 77 $ 3,231,365 $ 3,231,365 $ - $ -

Acquire Snow Removal Equipment (Aniak; Atka; Homer; Nondalton; Port Heiden;

Sand Point)AL AAL AK IYS Wasilla GA 17 $ 770,850 $ 770,850 $ - $ - Acquire Snow Removal Equipment [Acquire SRE]AL AAL AK IYS Wasilla GA 18 $ 1,057,217 $ 1,057,217 $ - $ - Construct Apron [Construction, Apron D (Phase 2)]AL AAL AK IYS Wasilla GA 19 $ 190,000 $ 190,000 $ - $ - Conduct Environmental Study [Environmental phase 1]CE ACE IA AXA Algona Municipal GA 8 $ 161,500 $ 161,500 $ - $ - Rehabilitate TaxiwayCE ACE IA AMW Ames Municipal GA 20 $ 119,026 $ 119,026 $ - $ - Rehabilitate ApronCE ACE IA IKV Ankeny Regional R 16 $ 1,697,087 $ 457,081 $ 1,240,006 $ - Improve Runway Safety Area [LAND - Justice] - 04/22

CE ACE IA ADU Audubon County GA 6 $ 412,300 $ 412,300 $ - $ - Construct Parking Lot [construction], Rehabilitate Runway [Design] - 14/32CE ACE IA TZT Belle Plaine Municipal GA 7 $ 171,000 $ 171,000 $ - $ - Construct Snow Removal Equipment BuildingCE ACE IA 4K6 Bloomfield Municipal GA 6 $ 935,750 $ 508,451 $ 427,299 $ - Rehabilitate Runway [Construct] - 18/36CE ACE IA BNW Boone Municipal GA 12 $ 608,444 $ 150,000 $ 458,444 $ - Rehabilitate Apron [PHASE 2]CE ACE IA CNC Chariton Municipal GA 8 $ 82,162 $ 82,162 $ - $ - Construct Taxiway [Design Only]

Page 3 of 88

Page 4: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

CE ACE IA CKP Cherokee County Regional GA 8 $ 105,188 $ 105,188 $ - $ - Improve Airport DrainageCE ACE IA CAV Clarion Municipal GA 10 $ 38,507 $ 38,507 $ - $ - Construct Building [Design]CE ACE IA CBF Council Bluffs Municipal GA 18 $ 548,673 $ 164,092 $ 384,581 $ - Construct Runway [Phase 7] - 18/36CE ACE IA CSQ Creston Municipal GA 7 $ 218,500 $ 218,500 $ - $ - Construct Snow Removal Equipment BuildingCE ACE IA DEH Decorah Municipal GA 7 $ 157,700 $ 157,700 $ - $ - Construct Taxiway [Grade]CE ACE IA DSM Des Moines International P 53 $ 1,358,975 $ 1,358,975 $ - $ - Rehabilitate Taxiway [Design]

CE ACE IA DSM Des Moines International P 55 $ 2,303,272 $ 2,303,272 $ - $ -

Construct Runway [13R/31L (PH 7) Land - Wittern (General Manufacturing Tract),

for bike trail mitigation] - Plan-1CE ACE IA DBQ Dubuque Regional P 50 $ 387,677 $ 387,677 $ - $ - Rehabilitate Taxiway [taxilane around t-hangar]CE ACE IA DBQ Dubuque Regional P 49 $ 3,605,165 $ 612,323 $ 2,992,842 $ - Construct Terminal Building [Terminal Facility]CE ACE IA EGQ Emmetsburg Municipal GA 6 $ 187,481 $ 187,481 $ - $ - Install Runway Vertical/Visual Guidance System - 13/31CE ACE IA FFL Fairfield Municipal GA 13 $ 179,756 $ 179,756 $ - $ - Construct Snow Removal Equipment BuildingCE ACE IA FXY Forest City Municipal GA 11 $ 120,650 $ 120,650 $ - $ - Remove Obstructions [Construction]

CE ACE IA FOD Fort Dodge Regional CS 26 $ 4,842,851 $ 2,911,138 $ 1,931,713 $ - Rehabilitate Runway [Construction] - 12/30, Rehabilitate Runway Lighting - 12/30CE ACE IA FSW Fort Madison Municipal GA 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate TaxiwayCE ACE IA 3Y2 George L Scott Municipal GA 4 $ 152,198 $ 152,198 $ - $ - Acquire Snow Removal EquipmentCE ACE IA GFZ Greenfield Municipal GA 4 $ 68,400 $ 68,400 $ - $ - Update Airport Master Plan StudyCE ACE IA GGI Grinnell Regional GA 10 $ 188,100 $ 188,100 $ - $ - Expand ApronCE ACE IA HPT Hampton Municipal GA 7 $ 384,750 $ 384,750 $ - $ - Construct Building [Construct]CE ACE IA HNR Harlan Municipal GA 6 $ 42,750 $ 42,750 $ - $ - Rehabilitate Runway [design] - 15/33CE ACE IA HNR Harlan Municipal GA 7 $ 149,918 $ 149,918 $ - $ - Update Airport Master Plan StudyCE ACE IA 0K7 Humboldt Municipal GA 6 $ 364,800 $ 364,800 $ - $ - Construct Building [Construct Construct]CE ACE IA IIB Independence Municipal GA 10 $ 131,100 $ 131,100 $ - $ - Acquire Snow Removal EquipmentCE ACE IA IOW Iowa City Municipal GA 20 $ 1,472,025 $ 300,000 $ 1,172,025 $ - Construct Taxiway [Storm Sewer and Grading]

CE ACE IA IFA Iowa Falls Municipal GA 6 $ 931,897 $ 202,177 $ 729,720 $ -

Extend Runway [Extend R/W - Grading & Paving including turnaround] - 13/31,

Rehabilitate Runway Lighting - 13/31CE ACE IA EOK Keokuk Municipal GA 18 $ 357,545 $ 140,662 $ 216,883 $ - Rehabilitate Runway [design] - 08/26CE ACE IA OXV Knoxville Municipal GA 12 $ 298,998 $ 298,998 $ - $ - Rehabilitate Access RoadCE ACE IA LRJ Le Mars Municipal GA 8 $ 223,155 $ 223,155 $ - $ - Construct Snow Removal Equipment BuildingCE ACE IA OQW Maquoketa Municipal GA 6 $ 88,244 $ 88,244 $ - $ - Extend Runway [Land - Parcels B & O] - 15/33CE ACE IA MCW Mason City Municipal P 36 $ 1,744,742 $ 1,010,514 $ 734,228 $ - Construct Aircraft Rescue & Fire Fighting Building [construct building]CE ACE IA MXO Monticello Regional GA 6 $ 696,855 $ 696,855 $ - $ - Construct Terminal Building [Construction]CE ACE IA MUT Muscatine Municipal GA 15 $ 346,251 $ 346,251 $ - $ - Rehabilitate Runway Lighting - 06/24CE ACE IA +09B New 1 $ 1,067,455 $ 201,389 $ 866,066 $ - Construct New Airport [Land - Van Perseum Trust]CE ACE IA +09B New 2 $ 959,023 $ - $ 959,023 $ - Construct New Airport [Land - VP Pork]CE ACE IA CCY Northeast Iowa Regional GA 10 $ 228,950 $ 228,950 $ - $ - Rehabilitate Apron [Phase 1]

Page 4 of 88

Page 5: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

CE ACE IA OLZ Oelwein Municipal GA 5 $ 411,350 $ 411,350 $ - $ - Construct Snow Removal Equipment Building [construct]CE ACE IA ORC Orange City Municipal GA 6 $ 398,611 $ 398,611 $ - $ - Rehabilitate Runway - 16/34CE ACE IA OOA Oskaloosa Municipal GA 7 $ 369,053 $ 369,053 $ - $ - Rehabilitate Access RoadCE ACE IA OTM Ottumwa Regional GA 17 $ 468,343 $ 247,494 $ 220,849 $ - Improve Runway Safety Area [Construction] - 13/31CE ACE IA POH Pocahontas Municipal GA 7 $ 288,082 $ 288,082 $ - $ - Rehabilitate Runway Lighting [design and construction] - 11/29CE ACE IA RDK Red Oak Municipal GA 12 $ 258,649 $ 258,649 $ - $ - Rehabilitate Runway [Constrcut] - 17/35CE ACE IA 2Y4 Rockwell City Municipal GA 4 $ 325,079 $ 325,079 $ - $ - Rehabilitate ApronCE ACE IA SDA Shenandoah Municipal GA 10 $ 97,175 $ 97,175 $ - $ - Construct Taxiway [Grading - Partial from terminal to Rwy 30 end]CE ACE IA SUX Sioux Gateway/Col. Bud Day Field P 44 $ 376,642 $ 376,642 $ - $ - Update Airport Master Plan StudyCE ACE IA SUX Sioux Gateway/Col. Bud Day Field P 42 $ 539,213 $ 539,213 $ - $ - Acquire Snow Removal EquipmentCE ACE IA BRL Southeast Iowa Regional GA 30 $ 927,184 $ 278,048 $ 649,136 $ - Rehabilitate Apron [Terminal Apron], Rehabilitate Taxiway [Construct]CE ACE IA SPW Spencer Municipal GA 20 $ 234,611 $ 234,611 $ - $ - Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway LightingCE ACE IA *IAS State of Iowa 20 $ 74,205 $ - $ 74,205 $ - Conduct State System Plan StudyCE ACE IA CID The Eastern Iowa P 43 $ 663,831 $ 663,831 $ - $ - Update Airport Master Plan StudyCE ACE IA CID The Eastern Iowa P 42 $ 2,500,000 $ - $ 2,500,000 $ - Rehabilitate Runway [LOI - Reimbursement] - 09/27

CE ACE IA *IAV Various Locations in Iowa 5 $ 1,293,060 $ 1,293,060 $ - $ -

Install Weather Reporting Equipment (Algona Municipal; Arthur N Neu; Atlantic

Municipal; Council Bluffs Municipal; Decorah Municipal; Denison Municipal;

Newton Municipal; Sheldon Municipal; Storm Lake Municipal)CE ACE IA VTI Vinton Veterans Memorial Airpark GA 6 $ 267,710 $ 267,710 $ - $ - Rehabilitate ApronCE ACE IA AWG Washington Municipal GA 6 $ 1,096,704 $ 321,135 $ 775,569 $ - Rehabilitate Runway [Land] - 13/31CE ACE IA AWG Washington Municipal GA 5 $ 278,850 $ 278,850 $ - $ - Rehabilitate Runway [Design] - 13/31CE ACE IA ALO Waterloo Regional P 38 $ 546,725 $ 546,725 $ - $ - Rehabilitate Apron [Terminal Apron Rehab - Phase 3a]CE ACE IA ALO Waterloo Regional P 39 $ 684,950 $ 684,950 $ - $ - Acquire Snow Removal EquipmentCE ACE IA C25 Waverly Municipal GA 2 $ 283,778 $ 283,778 $ - $ - Rehabilitate Access RoadCE ACE IA EBS Webster City Municipal GA 11 $ 100,000 $ 100,000 $ - $ - Extend Runway [Relocate Threshold 14 end - Construct] - 14/32CE ACE IA 3Y3 Winterset Municipal GA 7 $ 53,342 $ 53,342 $ - $ - Construct Building [Design]CE ACE KS K78 Abilene Municipal GA 8 $ 304,000 $ 150,000 $ 154,000 $ - Construct Taxiway [Lighting - Phase 3]CE ACE KS K59 Amelia Earhart GA 7 $ 52,915 $ 52,915 $ - $ - Update Airport Master Plan StudyCE ACE KS ANY Anthony Municipal GA 8 $ 85,500 $ 85,500 $ - $ - Extend Runway [Aeronautical survey] - 17/35CE ACE KS PTS Atkinson Municipal GA 13 $ 65,652 $ 65,652 $ - $ - Conduct Environmental Study [EA]CE ACE KS ADT Atwood-Rawlins County City-County GA 9 $ 348,265 $ 348,265 $ - $ - Rehabilitate Runway Lighting [Design and construction] - 16/34CE ACE KS 3AU Augusta Municipal GA 15 $ 1,194,054 $ 600,000 $ 594,054 $ - Rehabilitate Taxiway [Construction - Phase 2]CE ACE KS RPB Belleville Municipal GA 10 $ 98,285 $ 98,285 $ - $ - Rehabilitate Runway - 18/36CE ACE KS CNK Blosser Municipal GA 8 $ 72,162 $ 72,162 $ - $ - Conduct Environmental StudyCE ACE KS EQA Captain Jack Thomas/El Dorado GA 9 $ 298,300 $ 242,327 $ 55,973 $ - Rehabilitate TaxiwayCE ACE KS CNU Chanute Martin Johnson GA 8 $ 61,845 $ 61,845 $ - $ - Rehabilitate Runway Lighting [Design] - 18/36

Page 5 of 88

Page 6: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

CE ACE KS SYF Cheyenne County Municipal GA 11 $ 1,786,000 $ 1,651,854 $ 134,146 $ - Extend Runway [Construction - grading/paving/MIRL] - 13R/31LCE ACE KS 8K8 Cimarron Municipal GA 5 $ 82,370 $ 82,370 $ - $ - Remove ObstructionsCE ACE KS UKL Coffey County GA 7 $ 109,820 $ 109,820 $ - $ - Update Airport Master Plan Study

CE ACE KS CFV Coffeyville Municipal GA 17 $ 348,876 $ 150,000 $ 198,876 $ -

Rehabilitate Runway [Crack seal] - 17/35, Rehabilitate Runway [crack seal] - 04/22,

Rehabilitate Taxiway [Crack seal and re-mark]

CE ACE KS AAO Colonel James Jabara R 20 $ 2,324,570 $ 302,112 $ 2,022,458 $ -

Rehabilitate Apron [Construction], Rehabilitate Runway [Construction] - 18/36,

Rehabilitate Taxiway [Construction]CE ACE KS DDC Dodge City Regional CS 27 $ 1,693,035 $ 150,000 $ 1,543,035 $ - Construct Apron [Construction]

CE ACE KS 13K Eureka Municipal GA 3 $ 315,400 $ 315,400 $ - $ -

Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate Runway

Lighting [Install MIRL to replace failing LIRL] - 18/36CE ACE KS FOE Forbes Field GA 28 $ 166,672 $ 166,672 $ - $ - Acquire Snow Removal EquipmentCE ACE KS FSK Fort Scott Municipal GA 14 $ 72,390 $ 72,390 $ - $ - Extend Runway [Environmental Assessment] - 18/36CE ACE KS GCK Garden City Regional P 32 $ 864,519 $ 445,524 $ 418,995 $ - Install Perimeter Fencing [Wildlife fence IAW WLHMP]CE ACE KS GCK Garden City Regional P 31 $ 554,476 $ 554,476 $ - $ - Update Airport Master Plan Study [Update Master Plan and ALP]CE ACE KS K34 Gardner Municipal GA 7 $ 49,020 $ 49,020 $ - $ - Improve Airport Drainage [Final design]CE ACE KS GBD Great Bend Municipal GA 20 $ 205,468 $ 205,468 $ - $ - Rehabilitate Apron [Design]CE ACE KS HYS Hays Regional CS 27 $ 53,471 $ - $ 53,471 $ - Wildlife Hazard Assessments [Perform 1 year study]CE ACE KS HYS Hays Regional CS 26 $ 350,706 $ 157,125 $ 193,581 $ - Rehabilitate Runway [Design] - 16/34CE ACE KS HRU Herington Regional GA 6 $ 701,175 $ 378,766 $ 322,409 $ - Rehabilitate Taxiway [Overlay parallel taxiway and apron connector]

CE ACE KS HLC Hill City Municipal GA 12 $ 136,096 $ 136,096 $ - $ -

Acquire Snow Removal Equipment [Vehicle with 10' blade], Install Miscellaneous

NAVAIDS [Install rotating beacon]CE ACE KS HUT Hutchinson Municipal GA 26 $ 242,060 $ 242,060 $ - $ - Improve Runway Safety Area [Final Design] - 13/31CE ACE KS IDP Independence Municipal GA 19 $ 1,160,601 $ 366,899 $ 793,702 $ - Construct Taxiway [Construct], Extend Runway [Construct] - 04/22CE ACE KS OJC Johnson County Executive R 25 $ 360,601 $ 150,000 $ 210,601 $ - Rehabilitate Runway [Panel repair/replacement]

CE ACE KS LQR Larned-Pawnee County GA 13 $ 1,789,800 $ 419,008 $ 1,370,792 $ -

Rehabilitate Runway [Panel replacement due to frost heave. Current estimate for

entire runway pending validation by Regional Pavement Engineer] - 17/35CE ACE KS LWC Lawrence Municipal GA 18 $ 51,830 $ 51,830 $ - $ - Wildlife Hazard AssessmentsCE ACE KS LBL Liberal Mid-America Regional CS 19 $ 337,463 $ 150,475 $ 186,988 $ - Rehabilitate Runway [Reconstruct Design - Phase 1] - 03/21CE ACE KS MHK Manhattan Regional P 41 $ 254,701 $ 254,701 $ - $ - Conduct Miscellaneous StudyCE ACE KS 3K7 Mark Hoard Memorial GA 2 $ 83,220 $ 83,220 $ - $ - Conduct Environmental Study [Environmental Assessment]CE ACE KS MPR McPherson GA 13 $ 44,987 $ 44,987 $ - $ - Rehabilitate Taxiway [Design]CE ACE KS MEJ Meade Municipal GA 10 $ 177,697 $ 177,697 $ - $ - Construct Fuel FarmCE ACE KS K51 Medicine Lodge GA 4 $ 86,092 $ 86,092 $ - $ - Rehabilitate Runway [Reseal and remark] - 16/34CE ACE KS K81 Miami County GA 14 $ 133,855 $ 133,855 $ - $ - Update Airport Master Plan Study [Update Airport Layout Plan]CE ACE KS K61 Moritz Memorial GA 8 $ 252,888 $ 252,888 $ - $ - Extend Runway [Acquire land - Phase 1] - 17/35CE ACE KS K61 Moritz Memorial GA 9 $ 300,282 $ 300,282 $ - $ - Extend Runway [Design - Phase 2] - 17/35

Page 6 of 88

Page 7: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

CE ACE KS 48K Ness City Municipal GA 4 $ 65,436 $ 65,436 $ - $ - Construct Runway [Land Acquisition - Phase 2] - Plan-1CE ACE KS IXD New Century Aircenter R 24 $ 190,995 $ 190,995 $ - $ - Rehabilitate Runway [Design] - 04/22CE ACE KS IXD New Century Aircenter R 23 $ 2,441,485 $ 261,184 $ 2,180,301 $ - Rehabilitate Taxiway [Construct]CE ACE KS EWK Newton-City-County R 28 $ 104,990 $ 104,990 $ - $ - Rehabilitate Runway [Design] - 17/35

CE ACE KS NRN Norton Municipal GA 4 $ 69,386 $ 69,386 $ - $ - Install Runway Vertical/Visual Guidance System [Install visual NAVAIDs] - 16/34CE ACE KS OEL Oakley Municipal GA 9 $ 62,087 $ 62,087 $ - $ - Acquire Land For Approaches [Land for RWY 16-34 RPZ & BRL]

CE ACE KS OIN Oberlin Municipal GA 9 $ 2,239,064 $ 420,003 $ 1,819,061 $ - Rehabilitate Runway [Reconstruction] - 17/35, Rehabilitate Taxiway [Construct]

CE ACE KS K67 Oswego Municipal GA 8 $ 135,314 $ 135,314 $ - $ - Rehabilitate Runway [Crack fill, slurry seal, and remark asphalt pavements] - 17/35CE ACE KS OWI Ottawa Municipal GA 10 $ 2,102,230 $ 600,000 $ 1,502,230 $ - Rehabilitate Runway [Construct] - 17/35CE ACE KS TOP Philip Billard Municipal GA 16 $ 133,213 $ 133,213 $ - $ - Acquire Snow Removal EquipmentCE ACE KS PHG Phillipsburg Municipal GA 9 $ 369,313 $ 369,313 $ - $ - Construct TaxiwayCE ACE KS RSL Russell Municipal GA 8 $ 117,187 $ 117,187 $ - $ - Acquire Snow Removal Equipment [Vehicle with 12' blade]CE ACE KS SLN Salina Municipal CS 34 $ 1,982,364 $ 1,982,364 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [Construct]CE ACE KS CBK Shalz Field GA 13 $ 75,811 $ 75,811 $ - $ - Extend Runway [Land] - 17/35CE ACE KS CBK Shalz Field GA 12 $ 104,332 $ 104,332 $ - $ - Extend Runway [Land] - 17/35CE ACE KS K82 Smith Center Municipal GA 11 $ 799,858 $ 150,000 $ 649,858 $ - Rehabilitate Apron [Construct]CE ACE KS 2K3 Stanton County Municipal GA 9 $ 622,029 $ 622,029 $ - $ - Construct Taxiway [Construct]CE ACE KS *KSS State of Kansas 13 $ 332,500 $ - $ 332,500 $ - Conduct State System Plan StudyCE ACE KS *KSS State of Kansas 14 $ 114,841 $ 114,841 $ - $ - Conduct aeronautical survey for WAAS approachCE ACE KS WLD Strother Field GA 18 $ 142,500 $ 142,500 $ - $ - Rehabilitate Taxiway [Design]

CE ACE KS 3K3 Syracuse-Hamilton County Municipal GA 9 $ 484,140 $ 484,140 $ - $ - Extend Runway [Move powerlines] - 18/36CE ACE KS PPF Tri-City GA 8 $ 46,930 $ 46,930 $ - $ - Rehabilitate Taxiway [Design]CE ACE KS ULS Ulysses GA 13 $ 286,641 $ 286,641 $ - $ - Rehabilitate Runway [Joint seal and remark] - 12/30CE ACE KS EGT Wellington Municipal GA 12 $ 59,375 $ 59,375 $ - $ - Conduct Environmental Study [EA]CE ACE KS ICT Wichita Mid-Continent P 62 $ 86,836 $ 86,836 $ - $ - Rehabilitate Taxiway Lighting [Design]CE ACE KS ICT Wichita Mid-Continent P 61 $ 254,977 $ 254,977 $ - $ - Construct Terminal Building [Phase 4 - Install trench drain]

CE ACE KS ICT Wichita Mid-Continent P 63 $ 956,290 $ 956,290 $ - $ - Construct Terminal Building [Phase 5 Utilities/Road Relocation - Lookback]CE ACE MO MKC Charles B. Wheeler Downtown R 22 $ 4,260,750 $ 150,000 $ 4,110,750 $ - Rehabilitate TaxiwayCE ACE MO COU Columbia Regional P 34 $ 7,645,077 $ 2,958,596 $ 4,686,481 $ - Rehabilitate TaxiwayCE ACE MO MCI Kansas City International P 66 $ 3,375,000 $ - $ 3,375,000 $ - Conduct Airport Master Plan StudyCE ACE MO MCI Kansas City International P 65 $ 11,500,000 $ 4,758,218 $ 6,741,782 $ - Rehabilitate Runway [Joint/FOD Repairs] - 01L/19R

Page 7 of 88

Page 8: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

CE ACE MO STL Lambert-St Louis International P 130 $ 7,318,112 $ 2,256,762 $ 5,061,350 $ -

Rehabilitate Taxiway [Phase 2 Construct], Rehabilitate Taxiway [Taxiway E from

Taxiway L to Taxiway J Phase 2 Construct]

CE ACE MO STL Lambert-St Louis International P 128 $ 423,000 $ 423,000 $ - $ -

Acquire Safety Equipment and/or Fencing [Part 139 Ground Vehicle Operations

Training Software]CE ACE MO *MOB Missouri State Block Grant Program 50 $ 861,349 $ - $ 861,349 $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 52 $ 932,835 $ - $ 932,835 $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 49 $ 2,039,991 $ - $ 2,039,991 $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 48 $ 14,579,159 $ 14,579,159 $ - $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 51 $ 599,070 $ - $ 599,070 $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 53 $ 1,386,523 $ - $ 1,386,523 $ - Non primary development projects in state block grant programCE ACE MO SGF Springfield-Branson National P 45 $ 1,398,260 $ 1,398,260 $ - $ - Construct Terminal BuildingCE ACE MO SGF Springfield-Branson National P 47 $ 1,654,614 $ 1,654,614 $ - $ - Construct Terminal Building [Phase 13]CE ACE MO SGF Springfield-Branson National P 46 $ 4,412,287 $ - $ 4,412,287 $ - Rehabilitate Runway [Reconstruct] - 14/32CE ACE MO *MOS State of Missouri 9 $ 1,580,800 $ - $ 1,580,800 $ - Acquire Mobile Aircraft Rescue & Fire Fighting Training FacilityCE ACE NE ANW Ainsworth Regional GA 9 $ 190,000 $ 190,000 $ - $ - Update Airport Master Plan StudyCE ACE NE BVN Albion Municipal GA 8 $ 78,840 $ 78,840 $ - $ - Construct Terminal Building [Phase I - Design]CE ACE NE AIA Alliance Municipal GA 15 $ 641,250 $ 641,250 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleCE ACE NE AIA Alliance Municipal GA 14 $ 697,480 $ 697,480 $ - $ - Construct Aircraft Rescue & Fire Fighting BuildingCE ACE NE FNB Brenner Field GA 8 $ 271,035 $ 271,035 $ - $ - Acquire Miscellaneous LandCE ACE NE CSB Cambridge Municipal GA 5 $ 850,000 $ 850,000 $ - $ - Rehabilitate Apron, Rehabilitate Taxiway

CE ACE NE 07K

Central City Municipal - Larry Reineke

Field GA 4 $ 1,309,085 $ 1,309,085 $ - $ - Construct Taxiway [Phase 2 Construct]CE ACE NE GRI Central Nebraska Regional P 34 $ 264,961 $ 264,961 $ - $ - Conduct Miscellaneous StudyCE ACE NE GRI Central Nebraska Regional P 35 $ 160,897 $ 160,897 $ - $ - Extend Runway [Phase I - EA/Prelim.] - 17/35CE ACE NE CDR Chadron Municipal GA 12 $ 516,000 $ 516,000 $ - $ - Rehabilitate Runway Lighting - 02/20, Rehabilitate Taxiway LightingCE ACE NE OLU Columbus Municipal GA 8 $ 170,050 $ 170,050 $ - $ - Acquire Snow Removal EquipmentCE ACE NE OLU Columbus Municipal GA 9 $ 810,000 $ 810,000 $ - $ - Acquire Land For Approaches [Phase I - Tract 44c - Gillet]CE ACE NE CZD Cozad Municipal GA 6 $ 300,000 $ 300,000 $ - $ - Construct Fuel FarmCE ACE NE BUB Cram Field GA 5 $ 2,560,000 $ 2,560,000 $ - $ - Rehabilitate Runway [Construct] - 15/33CE ACE NE 6K3 Creighton Municipal GA 7 $ 97,754 $ 97,754 $ - $ - Construct BuildingCE ACE NE 47V Curtis Municipal GA 3 $ 103,500 $ 103,500 $ - $ - Rehabilitate Runway [Phase I Design] - 12/30CE ACE NE 93Y David City Municipal GA 8 $ 314,069 $ 314,069 $ - $ - Construct Snow Removal Equipment BuildingCE ACE NE 93Y David City Municipal GA 9 $ 209,610 $ 209,610 $ - $ - Acquire Snow Removal EquipmentCE ACE NE OMA Eppley Airfield P 58 $ 13,443,750 $ 1,403,915 $ 12,039,835 $ - Rehabilitate Taxiway [Design and Construct Taxiways C, D, J, & E]CE ACE NE OMA Eppley Airfield P 57 $ 2,868,750 $ - $ 2,868,750 $ - Update Airport Master Plan StudyCE ACE NE OMA Eppley Airfield P 60 $ 4,076,670 $ 4,076,670 $ - $ - Expand ApronCE ACE NE OMA Eppley Airfield P 59 $ 984,000 $ - $ 984,000 $ - Rehabilitate Taxiway [Design Taxiways C, D, J, G, & E]

Page 8 of 88

Page 9: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

CE ACE NE ODX Evelyn Sharp Field GA 7 $ 267,000 $ 267,000 $ - $ - Install Taxiway LightingCE ACE NE K01 Farington Field GA 5 $ 160,000 $ 160,000 $ - $ - Construct Runway [Runway Construction (phase 1 - Land)] - 16/34CE ACE NE OKS Garden County GA 8 $ 59,070 $ 59,070 $ - $ - Construct BuildingCE ACE NE GRN Gordon Municipal GA 6 $ 283,000 $ 283,000 $ - $ - Construct Fuel FarmCE ACE NE GGF Grant Municipal GA 5 $ 206,500 $ 206,500 $ - $ - Rehabilitate TaxiwayCE ACE NE LXN Jim Kelly Field GA 11 $ 300,000 $ 300,000 $ - $ - Construct Fuel FarmCE ACE NE EAR Kearney Regional P 26 $ 166,888 $ 166,888 $ - $ - Update Airport Master Plan StudyCE ACE NE EAR Kearney Regional P 23 $ 844,119 $ 844,119 $ - $ - Construct Parking LotCE ACE NE LNK Lincoln P 45 $ 2,327,099 $ 2,327,099 $ - $ - Install Runway Sensors - 18/36, Rehabilitate Taxiway LightingCE ACE NE LNK Lincoln P 46 $ 106,875 $ 106,875 $ - $ - Rehabilitate Apron [Phase I - Design]CE ACE NE MCK McCook Ben Nelson Regional GA 12 $ 579,000 $ 579,000 $ - $ - Install Perimeter FencingCE ACE NE MCK McCook Ben Nelson Regional GA 13 $ 20,615 $ 20,615 $ - $ - Acquire Easement For ApproachesCE ACE NE 0C4 Pender Municipal GA 8 $ 120,000 $ 120,000 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate TaxiwayCE ACE NE PMV Plattsmouth Municipal GA 10 $ 201,498 $ 201,498 $ - $ - Acquire Snow Removal EquipmentCE ACE NE 7V7 Red Cloud Municipal GA 6 $ 182,000 $ 182,000 $ - $ - Rehabilitate Runway - 15/33CE ACE NE SWT Seward Municipal GA 9 $ 67,450 $ 67,450 $ - $ - Construct Snow Removal Equipment BuildingCE ACE NE *NES State of Nebraska 20 $ 50,104 $ 40,604 $ 9,500 $ - Update State System Plan StudyCE ACE NE AHQ Wahoo Municipal GA 10 $ 273,595 $ 273,595 $ - $ - Construct Fuel Farm

CE ACE NE BFF

Western Nebraska Regional/William B.

Heilig Field CS 33 $ 421,000 $ 421,000 $ - $ - Conduct Airport Master Plan StudyEA BEC WV 48I Braxton County GA 16 $ 78,740 $ 78,740 $ - $ - Rehabilitate Runway [Environmental Assessment] - 01/19

EA BEC WV MRB Eastern WV Regional/Shepherd Field R 29 $ 150,000 $ 150,000 $ - $ - Acquire Miscellaneous Land

EA BEC WV EKN

Elkins-Randolph County-Jennings

Randolph Field GA 20 $ 2,101,959 $ 150,000 $ 1,951,959 $ - Rehabilitate Runway - 05/23

EA BEC WV 4G7 Fairmont Municipal-Frankman Field GA 12 $ 2,451,000 $ - $ 2,451,000 $ - Construct Apron [Construct]

EA BEC WV LWB Greenbrier Valley CS 30 $ 3,962,000 $ 1,337,458 $ 2,624,542 $ - Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Rehabilitate TaxiwayEA BEC WV I18 Jackson County GA 18 $ 152,860 $ 152,860 $ - $ - Acquire Miscellaneous Land, Rehabilitate Runway Lighting - 04/22EA BEC WV I16 Kee Field GA 15 $ 87,049 $ 87,049 $ - $ - Remove Obstructions [EA]EA BEC WV 6L4 Logan County GA 11 $ 161,800 $ 161,800 $ - $ - Remove ObstructionsEA BEC WV 3I2 Mason County GA 18 $ 110,790 $ 110,790 $ - $ - Update Airport Master Plan StudyEA BEC WV BLF Mercer County GA 24 $ 1,650,673 $ 341,954 $ 1,308,719 $ - Rehabilitate Apron [Construct]EA BEC WV PKB Mid-Ohio Valley Regional CS 39 $ 598,168 $ 250,000 $ 348,168 $ - Install Perimeter Fencing [Construction]

Page 9 of 88

Page 10: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA BEC WV MGW

Morgantown Municipal-Walter L. Bill

Hart Field P 33 $ 525,597 $ 525,597 $ - $ -

Acquire Aircraft Deicing Equipment, Acquire Aircraft Rescue & Fire Fighting Safety

Equipment, Improve Airport Miscellaneous Improvements [Phase 1 - Design],

Rehabilitate Terminal Building [Phase 1 - Design]

EA BEC WV CKB North Central West Virginia P 34 $ 1,904,189 $ 1,904,189 $ - $ -

Acquire Snow Removal Equipment, Construct Taxiway, Rehabilitate Runway -

03/21EA BEC WV 79D Philippi/Barbour County Regional GA 12 $ 233,818 $ 233,818 $ - $ - Construct Building

EA BEC WV BKW Raleigh County Memorial CS 28 $ 36,741 $ 36,741 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Snow Removal

EquipmentEA BEC WV BKW Raleigh County Memorial CS 29 $ 274,869 $ 274,869 $ - $ - Remove ObstructionsEA BEC WV HTS Tri-State/Milton J. Ferguson Field P 46 $ 461,173 $ 461,173 $ - $ - Rehabilitate Taxiway [Design]

EA BEC WV HTS Tri-State/Milton J. Ferguson Field P 47 $ 8,174,668 $ 900,125 $ 7,274,543 $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Improve Aircraft Rescue

& Fire Fighting Building [Modify Door], Rehabilitate Runway - 12/30EA BEC WV W22 Upshur County Regional GA 25 $ 166,233 $ 166,233 $ - $ - Construct BuildingEA BEC WV HLG Wheeling Ohio County GA 28 $ 150,000 $ 150,000 $ - $ - Improve Terminal BuildingEA BEC WV CRW Yeager P 50 $ 904,779 $ 904,779 $ - $ - Remove Obstructions [Acquire Land]

EA BEC WV CRW Yeager P 49 $ 1,518,892 $ 1,518,892 $ - $ -

Acquire Snow Removal Equipment [Carrier Vehicle - Sweeper/Broom], Extend

Runway - 05/23, Improve Airport Erosion Control, Improve Runway Safety Area

[Modify ALSF] - 05/23EA HAR DE ILG New Castle R 32 $ 445,630 $ 445,630 $ - $ - Remove Obstructions [Off Airport - easements acquisition]EA HAR DE *DES State of Delaware 9 $ 190,190 $ - $ 190,190 $ - Conduct State System Plan StudyEA HAR DE GED Sussex County GA 26 $ 514,234 $ 66,573 $ 447,661 $ - Environmental Mitigation [Design of Wetland/Environmental, Phase II]EA HAR DE GED Sussex County GA 27 $ 723,900 $ 179,844 $ 544,056 $ - Extend Runway [Design] - 04/22EA HAR NJ ACY Atlantic City International P 81 $ 14,311,181 $ 9,506,326 $ 4,804,855 $ - Construct Aircraft Rescue & Fire Fighting Building [Design/Construct]

EA HAR NJ WWD Cape May County GA 31 $ 574,607 $ 574,607 $ - $ -

Improve Runway Safety Area [Environmental] - 01/19, Remove Obstructions

[Construction]

EA HAR NJ N12 Lakewood GA 13 $ 162,890 $ 162,890 $ - $ -

Acquire Land For Approaches [Runway 6 End], Remove Obstructions [RW 24 End

(Design/Permitting)]

EA HAR NJ N07 Lincoln Park R 9 $ 134,140 $ 134,140 $ - $ -

Rehabilitate Taxiway [T-Hangar Taxiway - Preliminary Design], Remove

Obstructions [Runway 1/19 - Preliminary Design/EA/Permitting]EA HAR NJ MIV Millville Municipal GA 33 $ 1,010,781 $ 1,010,781 $ - $ - Remove Obstructions [Phase V]EA HAR NJ MMU Morristown Municipal R 44 $ 792,300 $ 792,300 $ - $ - Conduct Miscellaneous Study [Feasibility Study]

EA HAR NJ MMU Morristown Municipal R 45 $ 190,475 $ 190,475 $ - $ -

Remove Obstructions [MALSR Line of Site (design/permitting)], Remove

Obstructions [Off Airport (EA)]

EA HAR NJ MJX Robert J. Miller Air Park GA 22 $ 299,250 $ 299,250 $ - $ -

Construct Runway [Crosswind Runway 14/32-Phase III(environmental mitigation

and prepare bid documents)] - Plan-1EA HAR NJ VAY South Jersey Regional R 10 $ 487,903 $ 487,903 $ - $ - Conduct Airport Master Plan Study

Page 10 of 88

Page 11: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA HAR NJ TTN Trenton Mercer GA 39 $ 973,750 $ 325,035 $ 648,715 $ - Rehabilitate Taxiway [Taxiways H, B & F, Design]EA HAR NJ TTN Trenton Mercer GA 38 $ 13,433,000 $ 704,190 $ 12,728,810 $ - Improve Runway Safety Area [EMAS, Construct] - 16/34EA HAR NJ OBI Woodbine Municipal GA 20 $ 965,475 $ 965,475 $ - $ - Expand Apron [Transient Apron (construct)]

EA HAR PA LBE Arnold Palmer Regional P 39 $ 861,768 $ 861,768 $ - $ -

Rehabilitate Access Road [Phase V], Rehabilitate Parking Lot [Rehab & Expand

Terminal Parking (non-revenue producing)]EA HAR PA LBE Arnold Palmer Regional P 40 $ 252,232 $ 252,232 $ - $ - Rehabilitate Terminal Building [Passenger Loading Bridge]

EA HAR PA BFD Bradford Regional CS 39 $ 75,858 $ 75,858 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment [Protective Gear],

Security Enhancements [Security Vehicle]EA HAR PA BFD Bradford Regional CS 38 $ 164,775 $ 164,775 $ - $ - Remove Obstructions [Runway 14/32, Phase II]EA HAR PA CXY Capital City R 24 $ 1,423,510 $ 456,575 $ 966,935 $ - Rehabilitate Runway - 08/26EA HAR PA *PAS Commonwealth of Pennsylvania 10 $ 45,600 $ - $ 45,600 $ - Conduct State System Plan StudyEA HAR PA @01N Delaware Valley Region 12 $ 176,187 $ - $ 176,187 $ - Conduct Metropolitan System Plan Study [CASP 29]EA HAR PA DUJ Dubois Regional CS 33 $ 100,929 $ 100,929 $ - $ - Wildlife Hazard Assessments

EA HAR PA DUJ Dubois Regional CS 32 $ 163,900 $ 163,900 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment [Gear], Rehabilitate

Terminal Building [(roof)]

EA HAR PA ERI Erie International/Tom Ridge Field P 56 $ 4,600,000 $ - $ 4,600,000 $ - Extend Runway [Phase X] - 06/24, Improve Runway Safety Area [Phase VII] - 06/24

EA HAR PA ERI Erie International/Tom Ridge Field P 55 $ 7,034,767 $ 1,415,198 $ 5,619,569 $ - Extend Runway [Phase IX] - 06/24, Improve Runway Safety Area [Phase VI] - 06/24

EA HAR PA N68 Franklin County Regional GA 12 $ 98,372 $ 98,372 $ - $ - Install Runway Vertical/Visual Guidance System [24 End PAPI (construct)] - 06/24EA HAR PA MDT Harrisburg International P 64 $ 310,906 $ 310,906 $ - $ - Rehabilitate Apron [Terminal Apron]EA HAR PA MDT Harrisburg International P 65 $ 85,010 $ 85,010 $ - $ - Improve Airport Drainage [(Stormwater Management Study/Permits)]

EA HAR PA JST

John Murtha Johnstown-Cambria

County CS 43 $ 47,500 $ 47,500 $ - $ -

Rehabilitate Taxiway [Environmental], Rehabilitate Taxiway Lighting [Taxiway B

(design)]EA HAR PA LNS Lancaster CS 35 $ 667,596 $ 667,596 $ - $ - Rehabilitate Apron [South East Apron (construct)]EA HAR PA ABE Lehigh Valley International P 88 $ 1,262,685 $ 1,262,685 $ - $ - Acquire Land for Development [WBF Inverse Condemnation-rebursement]EA HAR PA ABE Lehigh Valley International P 89 $ 1,390,250 $ 1,390,250 $ - $ - Improve Runway Safety Area [Design of EMAS, Phase III] - 13/31

EA HAR PA ABE Lehigh Valley International P 90 $ 3,137,531 $ - $ 3,137,531 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [100 Persons

Benefiting]EA HAR PA PNE Northeast Philadelphia R 18 $ 318,068 $ 318,068 $ - $ - Rehabilitate Runway [crack seal (design)] - 06/24

EA HAR PA *PAB Pennsylvania State Block Grant Program 55 $ 1,339,084 $ 1,339,084 $ - $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 57 $ 2,010,335 $ 2,010,335 $ - $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 62 $ 2,557,251 $ 707,083 $ 1,850,168 $ - Non primary development projects in state block grant program

Page 11 of 88

Page 12: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA HAR PA *PAB Pennsylvania State Block Grant Program 61 $ 1,176,331 $ - $ 1,176,331 $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 59 $ 1,647,457 $ 1,647,457 $ - $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 56 $ 4,560,000 $ 4,560,000 $ - $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 58 $ 1,140,000 $ 1,140,000 $ - $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 60 $ 367,850 $ - $ 367,850 $ - Non primary development projects in state block grant program

EA HAR PA PHL Philadelphia International P 97 $ 1,328,415 $ 1,328,415 $ - $ -

Construct Taxiway [High Speed Exit Taxiway (design)], Extend Taxiway [Taxiway K

(design)]EA HAR PA PHL Philadelphia International P 98 $ 15,077,043 $ 9,949,164 $ 5,127,879 $ - Rehabilitate Runway [(construction)] - 09L/27R

EA HAR PA PHL Philadelphia International P 99 $ 5,156,983 $ - $ 5,156,983 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [333 Persons

Benefiting, Phase VIII]

EA HAR PA PIT Pittsburgh International P 112 $ 7,057,622 $ 1,397,964 $ 5,659,658 $ - Rehabilitate Runway [(RIAT)] - 10C/28C, Rehabilitate Runway [(SMGCS)] - 10C/28CEA HAR PA PIT Pittsburgh International P 111 $ 703,933 $ 703,933 $ - $ - Rehabilitate Runway [Design, Phase V] - 14/32

EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 51 $ 3,335,052 $ 150,000 $ 3,185,052 $ -

Rehabilitate Runway [Construct] - 18/36, Rehabilitate Taxiway [Taxiways H and E

(construct)]

EA HAR PA FWQ Rostraver R 18 $ 169,115 $ 169,115 $ - $ -

Construct Taxiway [General Aviation Taxiways (Construction)], Install Runway

Lighting [(design)] - 08/26EA HAR PA UNV University Park P 52 $ 414,714 $ 414,714 $ - $ - Improve Terminal Building [Replace Baggage Carousel]

EA HAR PA UNV University Park P 51 $ 604,735 $ 604,735 $ - $ -

Install Runway Vertical/Visual Guidance System [MALSR-Runway 6 End (design)] -

06/24, Rehabilitate Runway - 06/24

EA HAR PA AVP Wilkes-Barre/Scranton International P 54 $ 1,842,069 $ 1,842,069 $ - $ - Construct Access RoadEA HAR PA IPT Williamsport Regional P 41 $ 108,748 $ 108,748 $ - $ - Wildlife Hazard AssessmentsEA HAR PA IPT Williamsport Regional P 42 $ 94,453 $ 94,453 $ - $ - Update Airport Master Plan Study [ALP Update]

EA HAR PA IPT Williamsport Regional P 40 $ 43,700 $ 43,700 $ - $ - Install Runway Vertical/Visual Guidance System [Feasibility Study] - 09/27

EA HAR PA IPT Williamsport Regional P 43 $ 926,250 $ 926,250 $ - $ - Rehabilitate Apron [General Aviation Apron], Rehabilitate Taxiway [Taxiway A]EA NYC NJ EWR Newark Liberty International P 129 $ 3,222,000 $ 3,222,000 $ - $ - Rehabilitate TaxiwayEA NYC NJ TEB Teterboro R 47 $ 6,928,495 $ 6,928,495 $ - $ - Rehabilitate Runway [Rehab. RW 1-19] - 01/19

EA NYC NJ TEB Teterboro R 49 $ 13,078,741 $ 2,466,241 $ 10,612,500 $ - Improve Runway Safety Area [EMAS, grading, drainage, retrofit MALSR] - 06/24

Page 12 of 88

Page 13: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA NYC NJ TEB Teterboro R 48 $ 11,964,708 $ - $ 11,964,708 $ -

Noise Mitigation Measures for Public Buildings [Soundproofing of H.P. Becton

Regional School-Construction Phase I]EA NYC NY SLK Adirondack Regional CS 52 $ 601,635 $ - $ 601,635 $ - Acquire Snow Removal Equipment [Runway Broom/Snowblower/Plow]

EA NYC NY SLK Adirondack Regional CS 51 $ 259,445 $ 259,445 $ - $ -

Update Airport Master Plan Study [Perform Airport Master Plan Update], Wildlife

Hazard Assessments [Perform Wildlife Hazard Management Study - Phase II]EA NYC NY ALB Albany International P 110 $ 435,155 $ 435,155 $ - $ - Improve Airport Drainage

EA NYC NY ALB Albany International P 109 $ 3,570,106 $ 3,570,106 $ - $ -

Rehabilitate Apron [Rehabilitate Cargo Apron - South 870' X 250'], Rehabilitate

Runway [Runway 10-28 Pavement and Lighting Rehabilitation (7,200 LF)] - 10/28,

Rehabilitate Taxiway [Taxiway C, K, H, I and J Pavement Rehabilitation (Approx.

7,300 LF)]EA NYC NY 23N Bayport Aerodrome GA 12 $ 151,271 $ 151,271 $ - $ - Install Perimeter Fencing [Update Airport Perimeter Fence Construction]

EA NYC NY 9G0 Buffalo Airfield R 22 $ 149,983 $ 149,983 $ - $ -

Acquire Land for Development [Acquire Land (0.44 Acres)], Install Perimeter

Fencing [Design and Construct Entry Fence Improvements - Phase II]EA NYC NY BUF Buffalo Niagara International P 76 $ 1,137,321 $ 1,137,321 $ - $ - Rehabilitate Access Road [Construction]EA NYC NY BUF Buffalo Niagara International P 78 $ 1,295,479 $ 1,295,479 $ - $ - Improve Terminal Building [Design and Construction]

EA NYC NY BUF Buffalo Niagara International P 77 $ 5,221,553 $ - $ 5,221,553 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Design 150 Homes

and Constuct 143 Homes], Noise Mitigation Measures for Residences within 70 -

74 DNL [Construct 6 Homes]EA NYC NY D38 Canandaigua R 27 $ 69,113 $ 69,113 $ - $ - Extend Runway [Land for extension and RPZ (Phase 3)] - 13/31

EA NYC NY D38 Canandaigua R 28 $ 603,250 $ 603,250 $ - $ - Extend Runway [Extend Runway 13-31 (Land Acquisition - Phase IV )] - 13/31

EA NYC NY OLE Cattaraugus County-Olean GA 15 $ 475,000 $ 475,000 $ - $ -

Install Airfield Guidance Signs [Install Airfield Guidance Signs and Pavement

Markings - Construction], Install Taxiway Lighting [Construction - Installation of

MITL for Parallel Taxiway], Install Weather Reporting Equipment [Construction -

AWOS system modifications]EA NYC NY DKK Chautauqua County/Dunkirk GA 44 $ 623,770 $ 623,770 $ - $ - Extend Runway [Relocate Newell Road - Construction] - 06/24EA NYC NY 1B1 Columbia County GA 30 $ 170,050 $ 170,050 $ - $ - Acquire Land For Approaches [Acquire Land for Easement R/W 21 RPZ]EA NYC NY 7N1 Corning-Painted Post GA 16 $ 192,064 $ 192,064 $ - $ - Acquire Snow Removal EquipmentEA NYC NY N03 Cortland County-Chase Field GA 19 $ 883,500 $ 883,500 $ - $ - Remove Obstructions [Construction for off-airport obstruction removal]

EA NYC NY N03 Cortland County-Chase Field GA 18 $ 66,500 $ 66,500 $ - $ -

Construct Snow Removal Equipment Building [SRE Building - Design], Install

Miscellaneous NAVAIDS [Replacement of Wind Cone, Segmented Circle and

Airport Beacon - Design]

Page 13 of 88

Page 14: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA NYC NY POU Dutchess County GA 36 $ 1,739,450 $ 1,739,450 $ - $ -

Rehabilitate Emergency Generator [Replace Airfield Lighting System Generator],

Rehabilitate Taxiway [Construction - Rehabilitation of Taxiway D and Associated

Taxiway Lighting]

EA NYC NY POU Dutchess County GA 37 $ 122,550 $ 122,550 $ - $ -

Extend Taxiway [Design Taxiway D Extension to Runway 24 End], Improve Airport

Drainage [SWPPP], Remove Obstructions [Study for Obstruction Removal-Phase 2

(GIS Survey)]

EA NYC NY ELM Elmira/Corning Regional P 56 $ 8,556,627 $ 1,413,499 $ 7,143,128 $ -

Extend Runway [Construct Extension (401Ft) of Runway 24 and Parallel Taxiway A

Including Purchase and Installation of EMAS Blocks for RSA] - 06/24

EA NYC NY 0G7 Finger Lakes Regional GA 21 $ 150,000 $ 150,000 $ - $ -

Conduct Environmental Study [Prepare Environmental Assessment For 1 - 5 Year

Development]

EA NYC NY GFL Floyd Bennett Memorial GA 47 $ 228,000 $ 228,000 $ - $ -

Acquire Easement For Approaches [Easement & Parcel Acquisition -

Survey/Prenegotiation Activities (3 Parcels in R/W 30 Approach)], Expand Aircraft

Rescue & Fire Fighting Building [Expand ARFF Building (Construction)]EA NYC NY GVQ Genesee County R 27 $ 1,021,250 $ 1,021,250 $ - $ - Expand Apron [Terminal Apron Construction PhI (80,000SF)]

EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 61 $ 12,312,938 $ 1,280,136 $ 11,032,802 $ -

Improve Runway Safety Area [Improvements to Runway 16-34 Runway Safety

Areas (Construction)] - 16/34

EA NYC NY ROC Greater Rochester International P 75 $ 3,307,553 $ 85,396 $ 3,222,157 $ - Rehabilitate Taxiway [Reconstruct and lower intersection of Taxiways D and E]

EA NYC NY ROC Greater Rochester International P 74 $ 854,731 $ 854,731 $ - $ -

Rehabilitate Runway [Rehabilitate Runway Intersection 10-28 and 4-22 Phase 6] -

10/28

EA NYC NY ROC Greater Rochester International P 72 $ 2,090,767 $ 2,090,767 $ - $ -

Rehabilitate Runway [Rehabilitate Runway Intersection 10-28 and 4-22 Phase 4] -

10/28

EA NYC NY ROC Greater Rochester International P 73 $ 1,539,013 $ 1,539,013 $ - $ -

Rehabilitate Runway [Rehabilitate Runway Intersection 10-28 and 4-22 Phase 5] -

10/28

EA NYC NY VGC Hamilton Municipal GA 19 $ 974,257 $ 974,257 $ - $ - Construct Taxiway [Construct Partial Parallel Taxiway - Phase II (2,800 ft. x 35 ft)]

EA NYC NY 4G6 Hornell Municipal GA 19 $ 132,601 $ 132,601 $ - $ -

Rehabilitate Runway [Rehabilitate Runway] - 18/36, Rehabilitate Taxiway

[Rehabilitate Taxiway]EA NYC NY ITH Ithaca Tompkins Regional P 58 $ 232,750 $ 232,750 $ - $ - Rehabilitate Apron [Rehabilitate Terminal Apron Design)]

EA NYC NY ITH Ithaca Tompkins Regional P 56 $ 28,500 $ 28,500 $ - $ -

Acquire Friction Measuring Equipment [Acquisition of friction measuring

equipment]

EA NYC NY ITH Ithaca Tompkins Regional P 55 $ 76,950 $ 76,950 $ - $ -

Update Airport Master Plan Study [Perform Airport Master Plan Update - Phase II

(GIS Component)]EA NYC NY ITH Ithaca Tompkins Regional P 57 $ 1,542,800 $ 1,542,800 $ - $ - Construct Sand and Chemical Storage Building [Construction]EA NYC NY ITH Ithaca Tompkins Regional P 59 $ 1,184,650 $ 349,066 $ 835,584 $ - Expand Apron [Construct Apron Expansion (Ph3)]

Page 14 of 88

Page 15: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA NYC NY JFK John F Kennedy International P 174 $ 1,877,220 $ 1,877,220 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxiway F (Approx. 2700 LF)]

EA NYC NY JFK John F Kennedy International P 173 $ 2,012,749 $ 2,012,749 $ - $ -

Rehabilitate Taxiway [Rehabilitate Taxiway Y from T/W J to T/W E and Portions of

T/W's F, G and H at Intersections T/W Y - Phase II]

EA NYC NY JFK John F Kennedy International P 172 $ - $ - $ - $ -

Construct Taxiway [DRP- High Speed Exit T/W PA, N & L Phase II], Construct

Taxiway [DRP- T/W PC, MB & M Fillet Improvements Phase II], Construct Taxiway

[DRP-V SW Quadrant T/W Imp. R/W 13R Phase III]EA NYC NY N89 Joseph Y Resnick GA 29 $ 336,844 $ 336,844 $ - $ - Acquire Land for Development, Construct TaxiwayEA NYC NY LGA La Guardia P 136 $ 2,949,367 $ 2,949,367 $ - $ - Rehabilitate Taxiway

EA NYC NY LGA La Guardia P 135 $ 21,134,896 $ - $ 21,134,896 $ -

Noise Mitigation Measures for Public Buildings [Soundproofing of Vaughn College

(Construction )]EA NYC NY LKP Lake Placid GA 33 $ 66,500 $ 66,500 $ - $ - Expand Apron [Apron Expansion (Design)]

EA NYC NY LKP Lake Placid GA 32 $ 201,400 $ 201,400 $ - $ -

Update Airport Master Plan Study [Perform Airport Master Plan Update (with GIS

component)]

EA NYC NY LKP Lake Placid GA 34 $ 41,800 $ 41,800 $ - $ -

Construct Apron [Runway 32 Holding Bay (Design)], Improve Runway Safety Area

[RSA Improvements (Design)] - 14/32

EA NYC NY ISP Long Island MacArthur P 87 $ 725,779 $ 725,779 $ - $ -

Construct Aircraft Rescue & Fire Fighting Building [Construct New ARFF Building -

Design]

EA NYC NY ISP Long Island MacArthur P 85 $ 5,391,982 $ 5,391,982 $ - $ -

Construct Taxiway [Construct T/W - Construct T/W "G" and T/W "W" Fillet

Widening - Phase I]

EA NYC NY ISP Long Island MacArthur P 86 $ 761,489 $ 761,489 $ - $ -

Construct Taxiway [Construct T/W - Construct T/W "G" and T/W "W" Fillet

Widening - Phase II]

EA NYC NY ISP Long Island MacArthur P 84 $ 3,323,273 $ 3,323,273 $ - $ - Construct Deicing Containment Facility [Construct Deicing Containment Facility]EA NYC NY OIC Lt Warren Eaton GA 30 $ 1,276,800 $ 150,000 $ 1,126,800 $ - Rehabilitate Runway [Rehabilitate Runway 1-19 Construction] - 01/19EA NYC NY MAL Malone-Dufort GA 26 $ 1,838,250 $ - $ 1,838,250 $ - Construct Taxiway [Parallel Taxiway "B" - Phase II (Construction)]

EA NYC NY MAL Malone-Dufort GA 25 $ 175,750 $ 175,750 $ - $ -

Update Airport Master Plan Study [Perform Airport Master Plan Update (w/GIS

Component)]

EA NYC NY MSS Massena International-Richards Field CS 53 $ 1,328,290 $ 214,700 $ 1,113,590 $ -

Acquire Emergency Generator [Emergency Generator for Airfield Lighting &

Security Improvements], Acquire Land For Approaches [Off-Airport Land

Acquisition & Relocation - Phase II (Trautman Property, Approx. 2.7 Acres)],

Modify Access Road [Realign Airport Access road (Design & Permitting)],

Rehabilitate Runway [Rehabilitation of R/W 9-27 & RSA Improvements (Final

Design)] - 09/27, Remove Obstructions [Remove Obstructions Phase II (On-Airport

Construction)]

EA NYC NY IAG Niagara Falls International R 38 $ 1,000,000 $ 1,000,000 $ - $ -

Construct Terminal Building [Reimbursement of Eligible Costs for Construction of

New Passenger Terminal (Phase 2)]

Page 15 of 88

Page 16: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA NYC NY OGS Ogdensburg International GA 40 $ 64,600 $ 64,600 $ - $ -

Remove Obstructions [Update Runway 9 & 27 Obstruction Study - Phase II (GIS

Component)]EA NYC NY OGS Ogdensburg International GA 42 $ 171,000 $ 171,000 $ - $ - Rehabilitate Runway [R/W 9-27 Rehabilitation (Design)] - 09/27

EA NYC NY OGS Ogdensburg International GA 41 $ 141,234 $ 141,234 $ - $ - Update Airport Master Plan Study [Perform Airport Layout Plan (ALP) Update]

EA NYC NY N66 Oneonta Municipal GA 13 $ 405,521 $ 405,521 $ - $ -

Remove Obstructions [Obstruction Removal in Approach to Runway 24 -

Construction]

EA NYC NY FZY Oswego County GA 36 $ 940,500 $ 940,500 $ - $ -

Remove Obstructions [Obstruction Removal and Lighting On-Airport - Phase I

(Construction)]

EA NYC NY FZY Oswego County GA 37 $ 934,800 $ 550,050 $ 384,750 $ - Rehabilitate Apron [Aircraft Tie Down Apron Rehabilitation (Construction)]EA NYC NY PEO Penn Yan GA 28 $ 393,243 $ 393,243 $ - $ - Modify Heliport/Helipad [Modify/Relocate Helipad]EA NYC NY 01G Perry-Warsaw GA 24 $ 831,679 $ 831,679 $ - $ - Rehabilitate Apron [Rehabilitate Apron - Construction]

EA NYC NY K09 Piseco GA 20 $ 1,038,920 $ 1,038,920 $ - $ -

Remove Obstructions [On-Airport Obstruction Removal -RW 22- Phase III

(Construction)]

EA NYC NY PBG Plattsburgh International P 40 $ 3,396,250 $ - $ 3,396,250 $ -

Improve Building [Nose Dock #1 & #2 Renovation-Phase III (Construction)],

Improve Fuel Farm [MAP] [Fuel Farm Relocation - EA], Improve Utilities [MAP]

[Water/Wastwater Improvements Study]EA NYC NY PBG Plattsburgh International P 38 $ 5,975,500 $ 226,831 $ 5,748,669 $ - Rehabilitate Taxiway [Taxiway A Rehabilitation - Phase I (Construction)]EA NYC NY PBG Plattsburgh International P 39 $ 685,723 $ 685,723 $ - $ - Improve Terminal Building [EA for Terminal Building Improvements]

EA NYC NY PBG Plattsburgh International P 37 $ 1,556,100 $ - $ 1,556,100 $ - Rehabilitate Taxiway Lighting [Replace Taxiway Lighting System (Construction)]

EA NYC NY PBG Plattsburgh International P 36 $ 108,300 $ 108,300 $ - $ -

Update Airport Master Plan Study [Perform Airport Master Plan Update - Phase II

(GIS Component)]

EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 27 $ 594,116 $ 594,116 $ - $ -

Acquire Miscellaneous Land [Increase Land Commitment Credit By 1.10 Acres +/-

(7.20 Acres +/- To 6.10 acres +/-) Out of a Total of 7.86 Acres], Rehabilitate

Taxiway [Reconstruct Taxiway "E" (Construction)]

EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 26 $ 87,400 $ 87,400 $ - $ -

Update Airport Master Plan Study [Perform Airport Master Plan Update - Phase II

(GIS Component)]

EA NYC NY FRG Republic R 44 $ 8,430,987 $ 150,000 $ 8,280,987 $ -

Construct Heliport/Helipad [Install Two (2) Helipad Markings - Construction],

Improve Runway Safety Area [Runway 14 RSA / EMAS blocks and construction.

Includes approach lights and MALSR relocation Phase II] - 14/32

EA NYC NY 5B2 Saratoga County GA 26 $ 199,493 $ 199,493 $ - $ -

Install Runway Vertical/Visual Guidance System [Design only] - 05/23, Rehabilitate

Apron [Reconstruct Based Aircraft Tie-Down Ramp - Design], Rehabilitate Taxiway

Lighting [Design only]

Page 16 of 88

Page 17: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA NYC NY SCH Schenectady County R 46 $ 235,293 $ 235,293 $ - $ -

Update Airport Master Plan Study [Airport Layout Plan Update, with A-GIS

component.]

EA NYC NY N23 Sidney Municipal GA 15 $ 55,575 $ 55,575 $ - $ -

Construct Taxiway [Design Taxilane], Install Perimeter Fencing [Design Wildlife

Control Incursion Fence], Light Obstructions [Design for Obstruction Lights for

Hangars and Hazard Beacons for Terrain]EA NYC NY 44N Sky Acres R 23 $ 78,420 $ 78,420 $ - $ - Improve Airport Drainage, Install Runway Lighting [DESIGN ONLY] - 17/35EA NYC NY SWF Stewart International P 68 $ 2,356,380 $ 2,356,380 $ - $ - Improve Service RoadEA NYC NY MSV Sullivan County International GA 29 $ 1,034,621 $ 242,459 $ 792,162 $ - Construct Aircraft Rescue & Fire Fighting Building [Construction]

EA NYC NY SYR Syracuse Hancock International P 118 $ 752,400 $ 752,400 $ - $ -

Conduct Miscellaneous Study [APMS], Construct Snow Removal Equipment

Building [Snow Removal Equipment Storage Building (Design Only)], Rehabilitate

Apron [Rehabilitate SRE Storage Building Access Road and Apron (Design)],

Rehabilitate Sand and Chemical Storage Building [Reconstruct Sand Storage Dome

(Design Only)]EA NYC NY SYR Syracuse Hancock International P 119 $ 502,903 $ 502,903 $ - $ - Remove Obstructions [On Airport Obstruction Removal (Construction)]

EA NYC NY 4B6 Ticonderoga Municipal GA 20 $ 320,298 $ 320,298 $ - $ -

Improve Airport Drainage [Improve Airport Drainage-Repair (Construction)], Install

Airfield Guidance Signs [Install Airfield Guidance Signs (Construction)]EA NYC NY CZG Tri-Cities GA 20 $ 39,900 $ 39,900 $ - $ - Rehabilitate Taxiway [Rehabilitation of North Taxilane-Design Only]

EA NYC NY ART Watertown International GA 37 $ 177,959 $ - $ 177,959 $ - Extend Runway [Acquire Land for Runway Extension 10-28 and RPZ] - 10/28EA NYC NY ART Watertown International GA 36 $ 193,800 $ 193,800 $ - $ - Rehabilitate Taxiway [Rehabilitate and Extend Taxiway "A" (Design)]EA NYC NY ART Watertown International GA 38 $ 2,146,687 $ - $ 2,146,687 $ - Rehabilitate Taxiway [Rehabilitate Taxiway "B" South (Construction)]

EA NYC NY ART Watertown International GA 35 $ 170,525 $ 170,525 $ - $ -

Update Airport Master Plan Study [ALP Update], Wildlife Hazard Assessments

[Wildlife Hazard Assessment]

EA NYC NY ELZ

Wellsville Municipal Airport,Tarantine

Field GA 25 $ 682,536 $ 682,536 $ - $ - Rehabilitate Apron [Rehabilitate West Apron Construction (7,120SY)]

EA NYC NY SDC Williamson-Sodus R 25 $ 185,612 $ 185,612 $ - $ -

Acquire Snow Removal Equipment [four wheel drive loader w/front mounted

snow plow and pusher w/bucket attachments]

EA NYC NY SDC Williamson-Sodus R 26 $ 38,950 $ 38,950 $ - $ -

Acquire Land For Approaches [Acquire Land for Runway 10-28 Primary Surface

and RPZ - Engineering (Phase1)]

EA WAS DC DCA Ronald Reagan Washington National P 27 $ 10,408,326 $ 144,349 $ 10,263,977 $ - Rehabilitate Runway [Construction] - 01/19EA WAS DC IAD Washington Dulles International P 45 $ 6,662,414 $ 6,662,414 $ - $ - Construct Runway [6/11] - Plan-1

EA WAS DC @008 Washington Metropolitan Area 8 $ 300,051 $ 300,051 $ - $ -

Conduct State System Plan Study [Update Ground Access Study Phase 2 /

Passenger Surveys Phase 2]

EA WAS MD BWI

Baltimore/Washington International

Thurgood Marshal P 85 $ 4,469,334 $ 4,469,334 $ - $ - Rehabilitate Apron [piers c & d apron construction phase]

Page 17 of 88

Page 18: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA WAS MD W29 Bay Bridge GA 21 $ 2,673,670 $ 150,000 $ 2,523,670 $ - Extend Taxiway [Construct Apron Ph 1]

EA WAS MD DMW

Carroll County Regional/Jack B Poage

Field R 26 $ 201,996 $ 201,996 $ - $ -

Construct Runway [reimburse bog turtle survey] - Plan-1, Construct Runway

[reimburse environmental assessment phase 2] - Plan-1, Construct Runway

[update property map] - Plan-1EA WAS MD ESN Easton/Newnam Field GA 38 $ 167,327 $ 167,327 $ - $ - Acquire Snow Removal Equipment [Dump Truck w/ Blade & Broom]

EA WAS MD FDK Frederick Municipal R 35 $ 135,236 $ 135,236 $ - $ -

Extend Runway [acquire land easement parcel a47 rw 5 approach] - 05/23, Extend

Runway [acquire land easement parcel a49 rw 23 approach] - 05/23, Extend

Runway [acquire land easement parcel a53 rw 5 approach] - 05/23

EA WAS MD CBE Greater Cumberland Regional GA 18 $ 390,395 $ 363,984 $ 26,411 $ -

Rehabilitate Runway [acquire land parcel 12 easement (nield)] - 05/23,

Rehabilitate Runway [acquire land parcel 18 (miltenberger)] - 05/23, Rehabilitate

Runway [acquire land parcel 20 (johnson)] - 05/23, Rehabilitate Runway [acquire

land parcel 20 easement (johnson)] - 05/23, Rehabilitate Runway [acquire land

parcel 33 (minke)] - 05/23, Rehabilitate Runway [acquire land parcel 33 easement

(minke)] - 05/23, Rehabilitate Runway [acquire land parcel 44 easement

(michaels)] - 05/23, Rehabilitate Runway [acquire land parcel 50 easement

(cuppett)] - 05/23, Rehabilitate Runway [acquire land parcel 56 easement (asher)] -

05/23, Rehabilitate Runway [acquire land parcel 5a (brant)] - 05/23, Rehabilitate

Runway [acquire land parcel 5b (brant)] - 05/23, Rehabilitate Runway [acquire

land parcel 5c (brant)] - 05/23, Rehabilitate Runway [acquire land parcel 66

easement (minke)] - 05/23, Rehabilitate Runway [acquire land parcel 70 easement

(vess)] - 05/23

EA WAS MD HGR

Hagerstown Regional-Richard A Henson

Field P 47 $ 538,445 $ 538,445 $ - $ - Extend Runway [construction phase - 9B] - 09/27

EA WAS MD HGR

Hagerstown Regional-Richard A Henson

Field P 46 $ 461,555 $ 461,555 $ - $ - Extend Runway [construction phase 9] - 09/27

EA WAS MD 2W5 Maryland R 11 $ 777,718 $ 777,718 $ - $ -

Construct Runway [acquire land (fee) armstrong parcel (0.99 acre)] - Plan-1,

Construct Runway [acquire land (fee) johnson parcel (0.74 acre)] - Plan-1,

Construct Runway [acquire land (fee) moose parcel (0.96 acre)] - Plan-1, Construct

Runway [update airport property map] - Plan-1EA WAS MD 2W5 Maryland R 12 $ 3,833,923 $ 984,809 $ 2,849,114 $ - Construct Runway [Construction, Phase 2] - Plan-1EA WAS MD GAI Montgomery County Airpark R 22 $ 3,021,286 $ 661,149 $ 2,360,137 $ - Remove Obstructions [acquire parcel 6 MVA]

EA WAS MD SBY Salisbury-Ocean City Wicomico Regional P 45 $ 1,082,724 $ 1,082,724 $ - $ - Acquire Snow Removal Equipment, Rehabilitate Taxiway [Design]

Page 18 of 88

Page 19: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA WAS MD 2W6 St. Mary's County Regional GA 16 $ 82,032 $ 82,032 $ - $ -

Extend Runway [acquire land airport drive relocation - parcels 13, 28, 29] - 11/29,

Extend Runway [acquire land for hayden road relocation - parcel 31] - 11/29EA WAS MD FME Tipton R 15 $ 609,171 $ 609,171 $ - $ - Remove Obstructions [on airport]

EA WAS VA MFV Accomack County GA 14 $ 166,250 $ 166,250 $ - $ - Remove Obstructions [Obstruction Study and Environmental Assessment Ph 2]EA WAS VA MTV Blue Ridge GA 17 $ 553,002 $ 553,002 $ - $ - Expand Apron [Acquire Land - FY08 House Referral]EA WAS VA 0V4 Brookneal/Campbell County GA 5 $ 276,260 $ 276,260 $ - $ - Construct Fuel Farm [Design/Construction]EA WAS VA CHO Charlottesville-Albemarle P 41 $ 2,118,411 $ 1,719,238 $ 399,173 $ - Extend Runway [RSA Embankment (Phase 1C), Land Acquisition] - 03/21EA WAS VA CPK Chesapeake Regional GA 17 $ 266,000 $ 266,000 $ - $ - Construct Apron [Wetland Mitigation]EA WAS VA EMV Emporia-Greensville Regional GA 10 $ 2,878,500 $ 430,592 $ 2,447,908 $ - Rehabilitate Runway [Rehabilitate Runway 15/33 (Construction)] - 15/33EA WAS VA FVX Farmville Regional GA 13 $ 283,765 $ 283,765 $ - $ - Remove Obstructions [(Design/Construction)]

EA WAS VA FKN Franklin Municipal-John Beverly Rose GA 14 $ 99,750 $ 99,750 $ - $ -

Acquire Land For Approaches [RPZ Land R/W 27 (Acquisition Ph 1 - Lesoine &

Thomas)]

EA WAS VA OFP Hanover County Municipal GA 22 $ 275,500 $ 275,500 $ - $ - Remove Obstructions [RW 34 Approach (Acquire Easements - Reimbursement)]EA WAS VA HSP Ingalls Field GA 10 $ 84,515 $ 84,515 $ - $ - Remove Obstructions [Terrain Clearing (Phase 1 - Design)]EA WAS VA 0VG Lee County GA 3 $ 421,800 $ 421,800 $ - $ - Install Perimeter Fencing [(Design / Construct)]EA WAS VA JYO Leesburg Executive R 34 $ 465,500 $ 465,500 $ - $ - Install Instrument Approach Aid [(Design/Construct)] - 17/35

EA WAS VA JYO Leesburg Executive R 35 $ 313,500 $ 313,500 $ - $ -

Improve Runway Safety Area [Acquire Land (Oaklawns)] - 17/35, Improve Runway

Safety Area [Design] - 17/35EA WAS VA LKU Louisa County/Freeman Field GA 16 $ 1,710,000 $ 1,710,000 $ - $ - Rehabilitate Runway [Phase II (Construction)] - 09/27EA WAS VA W45 Luray Caverns GA 12 $ 516,558 $ 516,558 $ - $ - Remove Obstructions [Land Acquisition (Parcels 44, 45)]EA WAS VA AVC Mecklenburg-Brunswick Regional GA 12 $ 756,863 $ 756,863 $ - $ - Extend Taxiway [Construction]EA WAS VA FYJ Middle Peninsula Regional GA 8 $ 813,200 $ 813,200 $ - $ - Rehabilitate Taxiway [to Runway 28 (Construction)]EA WAS VA MKJ Mountain Empire GA 20 $ 137,598 $ 137,598 $ - $ - Remove Obstructions [Environmental Assessment (Form 'C')]EA WAS VA W96 New Kent County GA 12 $ 78,518 $ 78,518 $ - $ - Remove Obstructions [(Design)]

EA WAS VA PHF

Newport News/Williamsburg

International P 44 $ 992,372 $ 992,372 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [(Replacement Vehicle)],

Rehabilitate Taxiway [Design]

EA WAS VA PHF

Newport News/Williamsburg

International P 45 $ 2,452,409 $ 2,452,409 $ - $ - Rehabilitate Runway Lighting [Construction] - 07/25

EA WAS VA ORF Norfolk International P 59 $ 865,540 $ 865,540 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 3,000 gallonn ARFF

replacement vehicle], Acquire Land for Noise Compatibility within 75 DNL [acquire

parcel 148 (Edwards)]EA WAS VA OMH Orange County GA 13 $ 493,620 $ 493,620 $ - $ - Remove Obstructions [Phase II (Acquire Land), Phase III (Design)]EA WAS VA RIC Richmond International P 59 $ 10,633,991 $ 10,633,991 $ - $ - Expand Apron [(Const.-Phase 1)]EA WAS VA ROA Roanoke Regional/Woodrum Field P 50 $ 5,309,287 $ 5,309,287 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [Construction]

Page 19 of 88

Page 20: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

EA WAS VA SHD Shenandoah Valley Regional CS 33 $ 113,621 $ 113,621 $ - $ - Install Runway Lighting [Construction] - 05/23EA WAS VA RMN Stafford Regional R 23 $ 95,000 $ 95,000 $ - $ - Remove Obstructions [Short Form EA]EA WAS VA RMN Stafford Regional R 22 $ 786,125 $ 786,125 $ - $ - Acquire Easement For Approaches [(Geslois, Fee & Easement)]EA WAS VA SFQ Suffolk Executive GA 18 $ 3,000,100 $ 28,875 $ 2,971,225 $ - Improve Runway Safety Area [Construction Ph 4 (Paving)] - 04/22EA WAS VA SFQ Suffolk Executive GA 19 $ 121,125 $ 121,125 $ - $ - Construct Taxiway [Environmental Assessment]EA WAS VA JFZ Tazewell County GA 15 $ 128,250 $ 128,250 $ - $ - Update Airport Master Plan Study [Update ALP]EA WAS VA HWY Warrenton-Fauquier R 17 $ 90,250 $ 90,250 $ - $ - Remove Obstructions [(Construction)]EA WAS VA W78 William M Tuck GA 13 $ 940,500 $ 940,500 $ - $ - Rehabilitate Apron [Construction Phase I]

EA WAS VA OKV Winchester Regional GA 27 $ 160,740 $ 160,740 $ - $ - Acquire Land for Development [Darr Property (Parcel 66; TM 64-A-65), 0.508 ac]EA WAS VA OKV Winchester Regional GA 26 $ 7,184,565 $ 854,565 $ 6,330,000 $ - Rehabilitate Runway [Phase II, Construction] - 14/32GL BIS ND BAC Barnes County Municipal GA 12 $ 150,000 $ 150,000 $ - $ - Rehabilitate Runway Lighting - 13/31

GL BIS ND BIS Bismarck Municipal P 47 $ 987,030 $ 987,030 $ - $ -

Conduct Environmental Study, Expand Apron [Construction], Rehabilitate Access

Road, Rehabilitate Apron [Design], Rehabilitate TaxiwayGL BIS ND BIS Bismarck Municipal P 48 $ 4,037,500 $ - $ 4,037,500 $ - Rehabilitate ApronGL BIS ND D09 Bottineau Municipal GA 10 $ 396,887 $ 396,887 $ - $ - Construct BuildingGL BIS ND 46D Carrington Municipal GA 8 $ 92,150 $ 92,150 $ - $ - Rehabilitate Runway - 13/31, Update Airport Master Plan StudyGL BIS ND 5N8 Casselton Robert Miller Regional GA 19 $ 267,523 $ 267,523 $ - $ - Construct Taxiway

GL BIS ND 2C8 Cavalier Municipal GA 10 $ 125,109 $ 125,109 $ - $ -

Construct Service Road [Construct Service Road-Phase 1 Design], Construct

Terminal Building [Construct GA Terminal-Phase 1 Design], Update Airport Master

Plan StudyGL BIS ND S32 Cooperstown Municipal GA 9 $ 41,021 $ 41,021 $ - $ - Conduct Environmental StudyGL BIS ND DVL Devils Lake Regional CS 29 $ 2,136,188 $ 296,188 $ 1,840,000 $ - Extend Runway - 13/31

GL BIS ND DIK Dickinson - Theodore Roosevelt Regional CS 27 $ 210,000 $ 210,000 $ - $ - Update Airport Master Plan StudyGL BIS ND D05 Garrison Municipal GA 9 $ 109,250 $ 109,250 $ - $ - Rehabilitate Runway - 13/31, Update Airport Master Plan StudyGL BIS ND D57 Glen Ullin Regional GA 9 $ 207,897 $ 207,897 $ - $ - Install Weather Reporting Equipment, Rehabilitate Runway - 11/29GL BIS ND GFK Grand Forks International P 43 $ 1,534,585 $ 134,585 $ 1,400,000 $ - Construct Access Road [Construction, south portion]GL BIS ND GFK Grand Forks International P 42 $ 1,290,883 $ 190,883 $ 1,100,000 $ - Construct Terminal Building [Construction Phase 6]GL BIS ND GFK Grand Forks International P 41 $ 1,081,671 $ 1,081,671 $ - $ - Construct Terminal Building [Construction Phase 5]GL BIS ND GWR Gwinner-Roger Melroe Field GA 11 $ 807,500 $ 807,500 $ - $ - Construct Apron

GL BIS ND K74 Hamry Field GA 12 $ 101,791 $ 101,791 $ - $ -

Improve Access Road, Install Airfield Guidance Signs, Update Airport Master Plan

StudyGL BIS ND BWP Harry Stern GA 16 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan Study

GL BIS ND 5H4 Harvey Municipal GA 9 $ 461,244 $ 461,244 $ - $ -

Construct Building [Construct Hangar Building-Phase 2 with Snow Removal

Equipment Building space], Construct Building [Construct Snow Removal Building-

Phase 2 within Hangar], Rehabilitate Runway - 11/29

Page 20 of 88

Page 21: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL BIS ND FAR Hector International P 39 $ 6,684,334 $ 3,684,334 $ 3,000,000 $ -

Rehabilitate Runway - 09/27, Rehabilitate Runway - 13/31, Rehabilitate Runway -

18/36

GL BIS ND JMS Jamestown Regional CS 34 $ 767,420 $ 567,420 $ 200,000 $ -

Acquire Snow Removal Equipment, Construct Access Road, Expand Terminal

BuildingGL BIS ND JMS Jamestown Regional CS 33 $ 85,500 $ 85,500 $ - $ - Rehabilitate Runway - 13/31GL BIS ND 6L3 Lisbon Municipal GA 10 $ 156,137 $ 156,137 $ - $ - Construct Fuel Farm, Construct Taxiway, Rehabilitate Runway - 14/32

GL BIS ND Y19 Mandan Municipal GA 17 $ 331,684 $ 331,684 $ - $ -

Conduct Environmental Study, Rehabilitate Runway [Rehabilitate Runway-Phase 1

Design Runway Reconstruction] - 13/31, Rehabilitate Runway - 13/31, Remove

ObstructionsGL BIS ND HZE Mercer County Regional GA 10 $ 113,050 $ 113,050 $ - $ - Install Airport Beacons, Rehabilitate Runway - 14/32

GL BIS ND MOT Minot International P 42 $ 4,514,962 $ 2,514,962 $ 2,000,000 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Aircraft Rescue & Fire

Fighting Building, Rehabilitate Taxiway, Security Enhancements

GL BIS ND HBC Mohall Municipal GA 8 $ 319,675 $ 319,675 $ - $ - Construct Taxiway, Install Runway Vertical/Visual Guidance System - 13/31GL BIS ND 3P3 Mott Municipal GA 10 $ 44,284 $ 44,284 $ - $ - Construct Building [Construct Building-Phase 1 Hangar design]GL BIS ND ISN Sloulin Field International P 33 $ 696,033 $ 696,033 $ - $ - Conduct Airport Master Plan Study [Master Plan / Site Selection]GL BIS ND ISN Sloulin Field International P 34 $ 1,540,900 $ 412,957 $ 1,127,943 $ - Rehabilitate Runway - 11/29GL BIS ND Y27 Standing Rock GA 8 $ 119,999 $ 119,999 $ - $ - Remove Obstructions, Update Airport Master Plan StudyGL BIS ND 08D Stanley Municipal GA 9 $ 431,000 $ 431,000 $ - $ - Construct Taxiway, Rehabilitate Runway - 09/27GL BIS ND S25 Watford City Municipal GA 13 $ 278,164 $ 278,164 $ - $ - Rehabilitate Apron

GL BIS ND S25 Watford City Municipal GA 12 $ 1,185,395 $ 1,185,395 $ - $ -

Construct Taxiway, Rehabilitate Apron [Rehabilitate Apron-Phase 2 of 3 phases on

apron project], Rehabilitate Runway - 12/30

GL BIS SD ABR Aberdeen Regional P 31 $ 1,000,000 $ 1,000,000 $ - $ -

Construct Access Road [Reimburse for construction], Construct Taxiway [Design &

Construction (Phase 1)], Rehabilitate Apron [Construction]GL BIS SD 6V5 Bison Municipal GA 7 $ 48,450 $ 48,450 $ - $ - Acquire Land For Approaches [EA for Land]GL BIS SD SPF Black Hills-Clyde Ice Field GA 19 $ 3,150,000 $ 150,000 $ 3,000,000 $ - Construct Taxiway [Construct Parallel Taxiway-Phase 3]GL BIS SD BTN Britton Municipal GA 10 $ 85,500 $ 85,500 $ - $ - Update Airport Master Plan Study

GL BIS SD BKX Brookings Regional GA 24 $ 237,500 $ 237,500 $ - $ -

Conduct Environmental Study [Administrative Record], Update Airport Master

Plan Study [Airport Layout Plan with Approach Surveys in AGIS]

GL BIS SD 7G9 Canton Municipal GA 4 $ 2,499,642 $ 2,499,642 $ - $ -

Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Runway

Vertical/Visual Guidance System - 18/36, Rehabilitate Apron, Rehabilitate Runway -

18/36, Rehabilitate Runway Lighting [Construction] - 18/36, Rehabilitate Taxiway

[Construction]GL BIS SD YKN Chan Gurney Municipal GA 23 $ 69,223 $ 69,223 $ - $ - Install Perimeter Fencing, Update Airport Master Plan StudyGL BIS SD 84D Cheyenne Eagle Butte GA 8 $ 499,130 $ 499,130 $ - $ - Install Miscellaneous NAVAIDS, Install Perimeter FencingGL BIS SD 6V0 Edgemont Municipal GA 4 $ 696,000 $ 696,000 $ - $ - Rehabilitate Runway [Construct] - 12/30GL BIS SD 0D8 Gettysburg Municipal GA 8 $ 66,349 $ 66,349 $ - $ - Update Airport Master Plan Study

Page 21 of 88

Page 22: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL BIS SD 9D1 Gregory Municipal - Flynn Field GA 9 $ 31,350 $ 31,350 $ - $ - Acquire Land For Approaches, Construct Building

GL BIS SD VMR Harold Davidson Field GA 8 $ 44,650 $ 44,650 $ - $ - Construct Taxiway [Construct Partial Parallel Taxiway to Rwy 12-Phase 1 Design]GL BIS SD 9D0 Highmore Municipal GA 4 $ 813,578 $ 813,578 $ - $ - Construct TaxiwayGL BIS SD HSR Hot Springs Municipal GA 8 $ 634,602 $ 634,602 $ - $ - Construct Building, Construct Terminal BuildingGL BIS SD 9F8 Hoven Municipal GA 7 $ 665,000 $ 665,000 $ - $ - Construct TaxiwayGL BIS SD HON Huron Regional GA 29 $ 817,950 $ 817,950 $ - $ - Acquire Snow Removal Equipment [Acquire]

GL BIS SD FSD Joe Foss Field P 43 $ 8,263,425 $ 4,263,425 $ 4,000,000 $ -

Install Runway Vertical/Visual Guidance System - 15/33, Rehabilitate Runway

[Construction] - 03/21, Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting -

03/21GL BIS SD 9V6 Martin Municipal GA 9 $ 34,000 $ 34,000 $ - $ - Acquire Land For Approaches [Environmental Assessment]GL BIS SD Y14 Marv Skie-Lincoln County GA 11 $ 99,027 $ 99,027 $ - $ - Update Airport Master Plan StudyGL BIS SD 5P2 Mc Laughlin Municipal GA 5 $ 881,600 $ 600,000 $ 281,600 $ - Rehabilitate Runway [Rehabilitate Runway (Overlay)] - 13/31GL BIS SD 5P2 Mc Laughlin Municipal GA 6 $ 152,000 $ 152,000 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayGL BIS SD 1D1 Milbank Municipal GA 13 $ 551,000 $ 551,000 $ - $ - Rehabilitate ApronGL BIS SD MBG Mobridge Municipal GA 9 $ 505,629 $ 505,629 $ - $ - Construct TaxiwayGL BIS SD 8F6 Murdo Municipal GA 8 $ 39,000 $ 39,000 $ - $ - Extend Runway [EA] - 14/32

GL BIS SD 8V3 Parkston Municipal GA 8 $ 47,500 $ 47,500 $ - $ -

Acquire Land For Approaches [Phase 1- EA for Land Acquistion], Construct Fuel

Farm

GL BIS SD PIR Pierre Regional P 31 $ 3,770,473 $ 1,000,000 $ 2,770,473 $ -

Construct Terminal Building [Phase 4 (Construct Terminal Apron, Access Road, and

Parking Lot)]

GL BIS SD 1D3 Platte Municipal GA 6 $ 291,945 $ 291,945 $ - $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System -

14/32, Rehabilitate Runway Lighting - 14/32

GL BIS SD RAP Rapid City Regional P 42 $ 2,950,500 $ 2,950,500 $ - $ - Expand Terminal Building, Improve Terminal Building [Rehabilitate Terminal]

GL BIS SD SUO Rosebud Sioux Tribal GA 8 $ 121,067 $ 121,067 $ - $ -

Conduct aeronautical survey for WAAS approach, Construct New Airport [move

SRE bldg]GL BIS SD 8D3 Sisseton Municipal GA 9 $ 582,120 $ 582,120 $ - $ - Improve Access Road, Install Perimeter Fencing, Rehabilitate ApronGL BIS SD 49B Sturgis Municipal GA 11 $ 385,700 $ 385,700 $ - $ - Install Perimeter FencingGL BIS SD 1D7 The Sigurd Anderson GA 6 $ 80,750 $ 80,750 $ - $ - Update Airport Master Plan Study

Page 22 of 88

Page 23: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL BIS SD *SDV Various Locations in South Dakota 16 $ 564,300 $ 564,300 $ - $ -

Rehabilitate Runway (Black Hills-Clyde Ice Field - 13/31; Chamberlain Municipal -

13/31; Cheyenne Eagle Butte - 13/31; Custer County - 08/26; Gettysburg

Municipal - 13/31; Highmore Municipal - 12/30; Hot Springs Municipal - 06/24;

Lemmon Municipal - 11/29; Milbank Municipal - 13/31; Miller Municipal - 15/33;

Onida Municipal - 13/31; Parkston Municipal - 15/33; Philip - 12/30; Platte

Municipal - 14/32; Redfield Municipal - 13/31; The Sigurd Anderson - 12/30;

Wessington Springs - 12/30; Wilder - 15/33)GL BIS SD AGZ Wagner Municipal GA 8 $ 61,750 $ 61,750 $ - $ - Acquire Land For ApproachesGL BIS SD ATY Watertown Regional CS 25 $ 7,713,000 $ 213,000 $ 7,500,000 $ - Rehabilitate Runway [Construction (Phase 1)] - 17/35GL CHI IL SPI Abraham Lincoln Capital P 58 $ 98,800 $ 98,800 $ - $ - Acquire Land For ApproachesGL CHI IL SPI Abraham Lincoln Capital P 60 $ 1,408,600 $ 244,647 $ 1,163,953 $ - Rehabilitate Apron [Phase 1]

GL CHI IL SPI Abraham Lincoln Capital P 59 $ 750,000 $ 750,000 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Taxiway [Design],

Construct Taxiway [Design], Improve Airport Drainage [Design - Phase 1], Install

Miscellaneous NAVAIDS, Modify Terminal Building [ADA Improvements + Freight

Door (Security)], Rehabilitate Access Road

GL CHI IL BMI

Central IL Regional Airport at

Bloomington-Normal P 58 $ 3,330,125 $ 3,330,125 $ - $ - Improve Terminal Building [Replacement Jet Bridges]

GL CHI IL BMI

Central IL Regional Airport at

Bloomington-Normal P 57 $ 187,291 $ 187,291 $ - $ - Update Airport Master Plan Study, Wildlife Hazard Assessments

GL CHI IL BMI

Central IL Regional Airport at

Bloomington-Normal P 56 $ 682,550 $ 682,550 $ - $ - Acquire Safety Equipment and/or FencingGL CHI IL MDW Chicago Midway International P 79 $ 1,870,316 $ 1,870,316 $ - $ - Rehabilitate Runway - 13L/31RGL CHI IL ORD Chicago O'Hare International P 117 $ 8,446,014 $ - $ 8,446,014 $ - Rehabilitate Taxiway [WQ]

GL CHI IL ORD Chicago O'Hare International P 121 $ 11,600,000 $ - $ 11,600,000 $ -

Noise Mitigation Measures for Public Buildings [Elk Grove High School -

Construction]

GL CHI IL ORD Chicago O'Hare International P 114 $ 26,500,000 $ 6,500,000 $ 20,000,000 $ - Extend Runway [Runway 10L Extension (Per FY09 LOI Application)] - 10/28GL CHI IL ORD Chicago O'Hare International P 119 $ 25,020 $ - $ 25,020 $ - VALE Vehicle [Hybrid Vehicles]

GL CHI IL ORD Chicago O'Hare International P 118 $ 20,900,000 $ - $ 20,900,000 $ -

Noise Mitigation Measures for Public Buildings [Ridgewood High School -

Construction]GL CHI IL ORD Chicago O'Hare International P 120 $ 50,000,000 $ - $ 50,000,000 $ - Construct Runway [Construct Runway 10R/28L] - Plan-2

GL CHI IL ORD Chicago O'Hare International P 116 $ 1,500,000 $ - $ 1,500,000 $ - Noise Mitigation Measures for Public Buildings [Ridgewood High School - Design]

GL CHI IL ORD Chicago O'Hare International P 115 $ 800,000 $ - $ 800,000 $ - Noise Mitigation Measures for Public Buildings [Elk Grove High School - Design]GL CHI IL RFD Chicago/Rockford International P 63 $ 6,910,885 $ 972,763 $ 5,938,122 $ - Rehabilitate Runway - 01/19

Page 23 of 88

Page 24: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL CHI IL RFD Chicago/Rockford International P 62 $ 1,350,110 $ 1,350,110 $ - $ - Construct Apron, Update Airport Master Plan Study

GL CHI IL PIA General Downing - Peoria International P 57 $ 5,734,900 $ 2,245,622 $ 3,489,278 $ -

Improve Aircraft Rescue & Fire Fighting Building [ARFF Building], Rehabilitate

Runway - 04/22, Rehabilitate Runway - 13/31, Rehabilitate TaxiwayGL CHI IL *ILB Illinois State Block Grant Program 95 $ 6,238,993 $ 6,238,993 $ - $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 97 $ 4,420,619 $ 3,769,097 $ 651,522 $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 94 $ 6,792,584 $ 6,792,584 $ - $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 98 $ 2,220,904 $ 754,404 $ 1,466,500 $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 96 $ 4,835,278 $ - $ 4,835,278 $ - Non primary development projects in state block grant programGL CHI IL MLI Quad City International P 69 $ 882,931 $ 882,931 $ - $ - Update Airport Master Plan Study [MP/eALP]GL CHI IL MLI Quad City International P 68 $ 1,607,929 $ 1,607,929 $ - $ - Rehabilitate Runway - 09/27GL CHI IL BLV Scott AFB/Midamerica GA 29 $ 2,339,000 $ 2,339,000 $ - $ - Expand Apron [Phase 2 Construction]GL CHI IL CMI University of Illinois-Willard P 27 $ 1,234,175 $ 1,234,175 $ - $ - Widen Taxiway [Taxiway A and B Intersection]

GL CHI IN AID Anderson Municipal-Darlington Field GA 25 $ 355,045 $ 355,045 $ - $ - Rehabilitate Runway Lighting - 18/36

GL CHI IN JVY Clark Regional R 24 $ 1,302,384 $ 202,384 $ 1,100,000 $ -

Extend Runway [Phase 4 Bean Road Relocation & Phase 5 Design and Obstruction

Survey] - 18/36GL CHI IN BAK Columbus Municipal GA 23 $ 73,308 $ 73,308 $ - $ - Rehabilitate Runway Lighting - 05/23GL CHI IN CFJ Crawfordsville Municipal GA 10 $ 69,233 $ 69,233 $ - $ - Conduct Environmental Study, Wildlife Hazard Assessments

GL CHI IN CFJ Crawfordsville Municipal GA 11 $ 147,554 $ 147,554 $ - $ - Extend Runway - 04/22, Install Perimeter Fencing [Design/Bid/Construction]GL CHI IN DCY Daviess County GA 12 $ 910,575 $ 910,575 $ - $ - Rehabilitate Runway [Construction - Phase 2] - 18/36

GL CHI IN GWB De Kalb County GA 20 $ 150,000 $ 150,000 $ - $ -

Extend Runway [Extend Runway Phase 3 Environmental Coordination, Survey,

Layout and Geometry] - 09/27, Remove ObstructionsGL CHI IN MIE Delaware County Regional GA 25 $ 80,812 $ 80,812 $ - $ - Rehabilitate Runway [Phase 1 - Design Continuation] - 02/20GL CHI IN MIE Delaware County Regional GA 24 $ 69,278 $ 69,278 $ - $ - Rehabilitate Runway [Phase 1 - Design] - 02/20

GL CHI IN 1I9 Delphi Municipal GA 10 $ 745,637 $ 745,637 $ - $ -

Extend Runway [Land and design for extension] - 18/36, Rehabilitate Apron

[Apron rehab]GL CHI IN EYE Eagle Creek Airpark R 18 $ 497,724 $ 497,724 $ - $ - Rehabilitate ApronGL CHI IN EYE Eagle Creek Airpark R 17 $ 154,499 $ 154,499 $ - $ - Rehabilitate Runway [Env/Design] - 03/21GL CHI IN EKM Elkhart Municipal GA 26 $ 924,739 $ 225,000 $ 699,739 $ - Rehabilitate Apron [Phase 3 Final]

GL CHI IN EVV Evansville Regional P 49 $ 6,571,013 $ - $ 6,571,013 $ -

Improve Runway Safety Area [Objects 20,22,23,24,25. Oak Hill Road Realignment

and SR57/Kansas Intersection Construction] - 04/22

GL CHI IN EVV Evansville Regional P 48 $ 5,143,775 $ 1,581,111 $ 3,562,664 $ -

Improve Runway Safety Area [Objects 20,22,23,24,25. Relocate roads -

construction. RGLs (RSAT).] - 04/22

GL CHI IN EVV Evansville Regional P 51 $ 4,465,000 $ - $ 4,465,000 $ -

Improve Runway Safety Area [Railroad Relocation - Phase 2 (Construction)] -

04/22

Page 24 of 88

Page 25: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL CHI IN EVV Evansville Regional P 50 $ 1,839,770 $ - $ 1,839,770 $ -

Improve Runway Safety Area [Objects 20,22,23,24,25. SR 57 Realignment

Construction] - 04/22

GL CHI IN FWA Fort Wayne International P 58 $ 1,684,025 $ 1,684,025 $ - $ -

Rehabilitate Runway [Design and Construct Runway 5-23 Shoulders] - 05/23,

Security Enhancements [Perimeter Fence Phase 2]

GL CHI IN FWA Fort Wayne International P 59 $ 170,107 $ 170,107 $ - $ -

Acquire Friction Measuring Equipment [Continuous Friction Measuring

Equipment]

GL CHI IN FKR Frankfort Municipal GA 15 $ 2,276,577 $ 181,223 $ 2,095,354 $ - Construct Taxiway [Construction], Rehabilitate Runway Lighting [Design] - 04/22

GL CHI IN SER Freeman Municipal GA 13 $ 1,896,749 $ 150,000 $ 1,746,749 $ -

Rehabilitate Runway [Design completed in 2010 (shown as strengthening, which

has been modified down to rehab).] - 05/23

GL CHI IN FRH French Lick Municipal GA 11 $ 1,691,537 $ 150,000 $ 1,541,537 $ -

Extend Taxiway [Extend Taxiway - Phase 5 (Paving and Construction)], Install

Perimeter Fencing, Wildlife Hazard AssessmentsGL CHI IN RCR Fulton County GA 10 $ 173,375 $ 173,375 $ - $ - Rehabilitate TaxiwayGL CHI IN GYY Gary/Chicago International GA 26 $ 5,150,000 $ 150,000 $ 5,000,000 $ - Extend Runway - 12/30GL CHI IN GYY Gary/Chicago International GA 27 $ 266,000 $ - $ 266,000 $ - Improve Airport DrainageGL CHI IN GSH Goshen Municipal GA 12 $ 230,052 $ 230,052 $ - $ - Acquire Easement For ApproachesGL CHI IN I34 Greensburg Municipal GA 8 $ 501,166 $ 501,166 $ - $ - Acquire Existing Airport, Acquire Snow Removal Equipment

GL CHI IN HFY Greenwood Municipal GA 25 $ 150,000 $ 150,000 $ - $ -

Rehabilitate Airport Beacons, Rehabilitate Apron, Rehabilitate Runway [Full Depth

Crack Repair - Phase 2] - 01/19, Update Airport Master Plan Study [Phase 2]GL CHI IN 05C Griffith-Merrillville R 10 $ 137,275 $ 137,275 $ - $ - Environmental Mitigation

GL CHI IN 2R2 Hendricks County-Gordon Graham Field R 12 $ 390,588 $ 390,588 $ - $ - Install Perimeter FencingGL CHI IN HNB Huntingburg GA 13 $ 180,215 $ 180,215 $ - $ - Conduct Environmental Study [Environmental Assessment - Phase II]GL CHI IN HHG Huntington Municipal GA 11 $ 90,725 $ 90,725 $ - $ - Acquire Land for DevelopmentGL CHI IN 8A4 Indianapolis Downtown GA 10 $ 112,648 $ 112,648 $ - $ - Rehabilitate Apron [Phase 1 Construction]GL CHI IN TYQ Indianapolis Executive R 22 $ 353,623 $ 353,623 $ - $ - Install Taxiway Lighting

GL CHI IN IND Indianapolis International P 118 $ 7,458,437 $ 2,458,437 $ 5,000,000 $ -

Construct Apron, Construct Service Road, Construct Taxiway, Improve Airport

Drainage, Remove Obstructions [Relocate ATCT]GL CHI IN IND Indianapolis International P 119 $ 2,541,563 $ 2,541,563 $ - $ - Construct ApronGL CHI IN IND Indianapolis International P 122 $ 42,000 $ 42,000 $ - $ - Security EnhancementsGL CHI IN IND Indianapolis International P 123 $ 128,834 $ 128,834 $ - $ - Conduct Airport Master Plan Study [Phase 1B]GL CHI IN IND Indianapolis International P 120 $ 400,500 $ 400,500 $ - $ - Security Enhancements

GL CHI IN IND Indianapolis International P 121 $ 399,716 $ 399,716 $ - $ -

Conduct Airport Master Plan Study [Phase 1], Conduct Miscellaneous Study,

Rehabilitate TaxiwayGL CHI IN UMP Indianapolis Metropolitan R 18 $ 190,105 $ 190,105 $ - $ - Install Perimeter FencingGL CHI IN MQJ Indianapolis Regional R 13 $ 252,985 $ 252,985 $ - $ - Extend Runway [Localizer Relocation Ph. 1] - 07/25

Page 25 of 88

Page 26: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL CHI IN RZL Jasper County GA 8 $ 257,915 $ 257,915 $ - $ - Improve Airport Drainage [Construct - Phase 1]

GL CHI IN C62 Kendallville Municipal GA 18 $ 1,092,500 $ 285,453 $ 807,047 $ -

Rehabilitate Runway [Rehab runway pavement] - 10/28, Rehabilitate Taxiway

[Rehab Part parallel, 2-connectors and T-hgr TW]GL CHI IN OKK Kokomo Municipal GA 19 $ 1,763,959 $ 150,000 $ 1,613,959 $ - Extend Runway [Relocate Road Construct] - 05/23GL CHI IN PPO La Porte Municipal GA 18 $ 69,233 $ 69,233 $ - $ - Update Airport Master Plan Study [Phase 3]

GL CHI IN PPO La Porte Municipal GA 19 $ 80,829 $ 80,829 $ - $ -

Install Runway Lighting [Design] - 14/32, Install Taxiway Lighting [Phase 1 -

Design], Update Airport Master Plan Study [Phase 4]GL CHI IN GGP Logansport/Cass County GA 17 $ 300,000 $ 300,000 $ - $ - Construct Taxiway, Rehabilitate Taxiway

GL CHI IN IMS Madison Municipal GA 15 $ 157,667 $ 157,667 $ - $ -

Update Airport Master Plan Study [Update ALP and Survey; Land Acquisition;

Wildlife Study]GL CHI IN MZZ Marion Municipal GA 19 $ 579,783 $ 150,000 $ 429,783 $ - Rehabilitate Runway [2nd Phase - the 4 end of the runway] - 04/22GL CHI IN MZZ Marion Municipal GA 20 $ 406,449 $ 406,449 $ - $ - Strengthen Taxiway [Rehabilitation of Taxiways A, A2 & A3 Second Phase]GL CHI IN CEV Mettel Field GA 18 $ 318,295 $ 318,295 $ - $ - Construct Apron [Design], Construct Terminal Building

GL CHI IN MGC Michigan City Municipal GA 15 $ 125,979 $ 125,979 $ - $ -

Install Miscellaneous NAVAIDS [Replace Beacon], Install Perimeter Fencing [Phase

1 - Design/Bid Terminal Area Fence], Rehabilitate Taxiway [Phase 1 - Design],

Update Airport Master Plan Study [Update Terminal Area], Wildlife Hazard

AssessmentsGL CHI IN BMG Monroe County GA 28 $ 300,000 $ 300,000 $ - $ - Conduct Environmental Study, Construct Apron [Phase 1 Design]GL CHI IN OVO North Vernon GA 14 $ 2,130,963 $ - $ 2,130,963 $ - Rehabilitate Runway [Phase 2, Bid/Construct] - 05/23

GL CHI IN I42 Paoli Municipal GA 9 $ 497,325 $ 497,325 $ - $ - Improve Runway Safety Area - 02/20, Remove Obstructions [Tree Trimming]GL CHI IN TEL Perry County Municipal GA 8 $ 306,850 $ 306,850 $ - $ - Expand Apron [Expand Apron - Phase 2 Construction]GL CHI IN I76 Peru Municipal GA 15 $ 85,314 $ 85,314 $ - $ - Acquire Snow Removal Equipment [Carrier vehicle with plow and broom]

GL CHI IN C65 Plymouth Municipal GA 15 $ 162,240 $ 162,240 $ - $ -

Acquire Land For Approaches [Last of Stockberger Land], Rehabilitate Runway

[Design] - 10/28, Remove Obstructions [Preliminary Study]

GL CHI IN VPZ Porter County Regional GA 23 $ 150,000 $ 150,000 $ - $ -

Improve Airport Miscellaneous Improvements, Update Airport Master Plan Study

[Reimburse - Phase 2]GL CHI IN PLD Portland Municipal GA 8 $ 422,250 $ 422,250 $ - $ - Construct Fuel Farm [Relocate Aging Fuel System]GL CHI IN 4I7 Putnam County GA 13 $ 765,101 $ 765,101 $ - $ - Expand Apron [Phase 2]

GL CHI IN I22 Randolph County GA 13 $ 2,189,583 $ 150,001 $ 2,039,582 $ -

Construct Runway [This phase, # 5 will construct the taxiway and associated

lighting] - 08/26GL CHI IN RID Richmond Municipal GA 14 $ 150,000 $ 150,000 $ - $ - Rehabilitate TaxiwayGL CHI IN I83 Salem Municipal GA 11 $ 150,000 $ 150,000 $ - $ - Construct Runway [Design: Utilities, Grading, and Fence] - Plan-1GL CHI IN GEZ Shelbyville Municipal GA 23 $ 399,000 $ 399,000 $ - $ - Rehabilitate TaxiwayGL CHI IN SMD Smith Field GA 12 $ 150,000 $ 150,000 $ - $ - Construct Apron [Design & Construct Common Use Ramp Phase 1 & 2]GL CHI IN SBN South Bend Regional P 42 $ 1,125,579 $ 1,125,579 $ - $ - Expand Terminal Building [Phase 4 (Part A)]

Page 26 of 88

Page 27: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL CHI IN SBN South Bend Regional P 43 $ 1,313,086 $ 1,313,086 $ - $ -

Expand Terminal Building [Phase 5 (Part B)], Groove Runway - 18/36, Improve

Runway Safety Area - 18/36, Rehabilitate Taxiway, Update Airport Master Plan

Study [Phase 1], Wildlife Hazard AssessmentsGL CHI IN SBN South Bend Regional P 44 $ 1,500,000 $ - $ 1,500,000 $ - Expand Terminal Building [Phase 6 (Part C)]GL CHI IN OXI Starke County GA 11 $ 259,787 $ 259,787 $ - $ - Construct TaxiwayGL CHI IN *INS State of Indiana 9 $ 146,870 $ 146,870 $ - $ - Update State System Plan StudyGL CHI IN SIV Sullivan County GA 13 $ 214,205 $ 214,205 $ - $ - Rehabilitate Apron [Construction - Phase II]GL CHI IN SIV Sullivan County GA 12 $ 26,600 $ 26,600 $ - $ - Rehabilitate Apron [Phase 1 (Design)]GL CHI IN SIV Sullivan County GA 14 $ 45,151 $ 45,151 $ - $ - Rehabilitate Apron [Construction - Phase III]

GL CHI IN HUF Terre Haute International-Hulman Field GA 39 $ 386,000 $ 386,000 $ - $ -

Update Airport Master Plan Study [Update ALP and Master Plan, Study for Co-

located Runway Ends (14/18)]GL CHI IN ANQ Tri-State Steuben County GA 12 $ 27,550 $ 27,550 $ - $ - Rehabilitate Runway [Replace Non-Standard Runway Markings] - 05/23

GL CHI IN BFR Virgil I Grissom Municipal GA 10 $ 150,000 $ 150,000 $ - $ -

Acquire Easement For Approaches, Install Runway Lighting [MIRLS] - 06/24,

Remove ObstructionsGL CHI IN IWH Wabash Municipal GA 12 $ 70,439 $ 70,439 $ - $ - Acquire Snow Removal Equipment [Carrier vehicle and broom]

GL CHI IN ASW Warsaw Municipal GA 10 $ 141,075 $ 141,075 $ - $ -

Conduct Environmental Study [Lower Powerline EA (Phase 1 of powerline

relocation)], Update Airport Master Plan Study [Extend Runway 9/27 feasibility

study - Phase 2]

GL CHI IN MCX White County GA 12 $ 471,400 $ 471,400 $ - $ -

Extend Runway [Extend RW 18/36 w/parallel TW: 50% Design for RW & TW

extensions and final design/bid for phase 1 apron relocation. Includes land

reimbursement as local share.] - 18/36GL DET MI FNT Bishop International P 50 $ 3,324,818 $ 3,324,818 $ - $ - Expand Terminal BuildingGL DET MI LAN Capital Region International P 49 $ 693,897 $ 693,897 $ - $ - Improve Terminal BuildingGL DET MI LAN Capital Region International P 50 $ 856,934 $ 856,934 $ - $ - Improve Terminal Building, Rehabilitate Runway Lighting - 10R/28LGL DET MI CVX Charlevoix Municipal P 15 $ 950,000 $ 950,000 $ - $ - Acquire Snow Removal Equipment [Acquisition]GL DET MI TVC Cherry Capital P 36 $ 1,415,500 $ 1,415,500 $ - $ - Rehabilitate Taxiway LightingGL DET MI ESC Delta County CS 35 $ 195,700 $ 195,700 $ - $ - Acquire Safety Equipment and/or FencingGL DET MI DTW Detroit Metropolitan Wayne County P 104 $ 1,849,866 $ - $ 1,849,866 $ - VALE Infrastructure

GL DET MI DTW Detroit Metropolitan Wayne County P 103 $ 13,198,322 $ 3,198,322 $ 10,000,000 $ -

Rehabilitate Runway [Phase 1 - Infrastructure modification to meet standards -

Taxiway Z relocation] - 04R/22L

GL DET MI DTW Detroit Metropolitan Wayne County P 102 $ 3,037,434 $ 3,037,434 $ - $ - Extend Taxiway [Final phase], Rehabilitate Runway [Final Phase] - 09L/27R

GL DET MI GRR Gerald R. Ford International P 47 $ 1,100,491 $ 1,100,491 $ - $ -

Acquire Snow Removal Equipment, Conduct Miscellaneous Study, Rehabilitate

Runway Lighting [Design] - 08R/26LGL DET MI CMX Houghton County Memorial P 36 $ 611,934 $ 611,934 $ - $ - Improve Airport Drainage, Modify Terminal BuildingGL DET MI CMX Houghton County Memorial P 35 $ 415,238 $ 415,238 $ - $ - Modify Access Road [Construction Phase 2]

Page 27 of 88

Page 28: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL DET MI AZO Kalamazoo/Battle Creek International P 38 $ 887,656 $ 887,656 $ - $ -

Acquire Interactive Training System, Construct Aircraft Rescue & Fire Fighting

Building, Construct Terminal Building, Install Airport Beacons, Rehabilitate Runway

- 05/23GL DET MI MBS MBS International P 46 $ 6,952,943 $ - $ 6,952,943 $ - Construct Apron

GL DET MI MBS MBS International P 45 $ 6,036,379 $ 1,533,678 $ 4,502,701 $ -

Construct Terminal Building [Portion of building system], Improve Utilities [extend

water main as part of construct terminal building phase 8]

GL DET MI *MIB Michigan State Block Grant Program 81 $ 10,877,311 $ 10,877,311 $ - $ - Non primary development projects in state block grant program

GL DET MI *MIB Michigan State Block Grant Program 82 $ 764,874 $ 764,874 $ - $ - Non primary development projects in state block grant program

GL DET MI *MIB Michigan State Block Grant Program 80 $ 300,000 $ - $ 300,000 $ - Non primary development projects in state block grant program

GL DET MI *MIB Michigan State Block Grant Program 78 $ 200,000 $ - $ 200,000 $ - Non primary development projects in state block grant program

GL DET MI *MIB Michigan State Block Grant Program 79 $ 3,396,000 $ - $ 3,396,000 $ - Non primary development projects in state block grant program

GL DET MI *MIB Michigan State Block Grant Program 77 $ 7,512,885 $ 7,512,885 $ - $ - Non primary development projects in state block grant program

GL DET MI MKG Muskegon County P 35 $ 1,079,086 $ 1,079,086 $ - $ -

Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS, Rehabilitate

ApronGL DET MI SAW Sawyer International P 34 $ 354,350 $ 354,350 $ - $ - Rehabilitate Runway [Construction] - 01/19GL DET MI SAW Sawyer International P 35 $ 796,100 $ 796,100 $ - $ - Acquire Snow Removal Equipment [Equipment Purchase]GL DET OH AKR Akron Fulton International GA 17 $ 284,461 $ 284,461 $ - $ - Update Airport Master Plan Study

GL DET OH CAK Akron-Canton Regional P 55 $ 8,976,092 $ 2,900,165 $ 6,075,927 $ -

Construct Aircraft Rescue & Fire Fighting Building, Modify Terminal Building,

Rehabilitate Apron, Rehabilitate TaxiwayGL DET OH CAK Akron-Canton Regional P 56 $ 1,667,772 $ 1,667,772 $ - $ - Update Airport Master Plan StudyGL DET OH AMT Alexander Salamon GA 8 $ 412,618 $ 412,618 $ - $ - Rehabilitate Runway Lighting - 05/23GL DET OH 6G5 Barnesville-Bradfield GA 9 $ 268,038 $ 268,038 $ - $ - Improve Airport Drainage, Rehabilitate Runway Lighting - 09/27GL DET OH 5G7 Bluffton GA 12 $ 61,892 $ 61,892 $ - $ - Rehabilitate ApronGL DET OH GEO Brown County GA 9 $ 348,835 $ 348,835 $ - $ - Remove ObstructionsGL DET OH BKL Burke Lakefront R 8 $ 511,752 $ 511,752 $ - $ - Rehabilitate Apron

GL DET OH HAO Butler County Regional R 22 $ 150,000 $ 150,000 $ - $ -

Rehabilitate Runway - 11/29, Remove Obstructions, Update Airport Master Plan

Study

GL DET OH CDI Cambridge Municipal GA 11 $ 204,846 $ 204,846 $ - $ -

Acquire Snow Removal Equipment, Conduct aeronautical survey for WAAS

approach

Page 28 of 88

Page 29: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL DET OH PCW Carl R Keller Field GA 30 $ 150,000 $ 150,000 $ - $ -

Rehabilitate Apron, Rehabilitate Runway [Design for R/W North of 9/27] - 18/36,

Rehabilitate Taxiway [design], Rehabilitate TaxiwayGL DET OH TSO Carroll County-Tolson GA 9 $ 637,053 $ 637,053 $ - $ - Improve Airport Drainage, Improve Runway Safety Area - 07/25GL DET OH I67 Cincinnati West GA 11 $ 87,195 $ 87,195 $ - $ - Rehabilitate Runway - 01/19GL DET OH CLE Cleveland-Hopkins International P 98 $ 4,160,000 $ - $ 4,160,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLGL DET OH CLE Cleveland-Hopkins International P 97 $ 19,972,196 $ - $ 19,972,196 $ - Improve Runway Safety Area [Rwy 10 end and EMAS] - 10/28GL DET OH CLE Cleveland-Hopkins International P 99 $ 2,002,040 $ 2,002,040 $ - $ - Construct Runway - 06L/24RGL DET OH 02G Columbiana County GA 15 $ 170,499 $ 170,499 $ - $ - Improve Airport DrainageGL DET OH CGF Cuyahoga County R 23 $ 1,300,119 $ 1,300,119 $ - $ - Rehabilitate Apron [Aprons A1, A2, B, C, and D1]

GL DET OH VES Darke County GA 8 $ 178,180 $ 178,180 $ - $ -

Acquire Land for Development [PARCELS 5,7,13], Acquire Snow Removal

Equipment [tractor w/attachments]GL DET OH MGY Dayton-Wright Brothers R 13 $ 164,162 $ 164,162 $ - $ - Rehabilitate Runway - 02/20

GL DET OH DFI Defiance Memorial GA 10 $ 114,079 $ 114,079 $ - $ -

Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway - 12/30,

Rehabilitate Taxiway

GL DET OH LHQ Fairfield County GA 21 $ 150,000 $ 150,000 $ - $ -

Acquire Land For Approaches, Acquire Land for Development, Conduct

Miscellaneous Study, Rehabilitate Runway - 10/28GL DET OH I23 Fayette County GA 8 $ 99,286 $ 99,286 $ - $ - Rehabilitate Runway - 05/23GL DET OH FDY Findlay GA 22 $ 165,467 $ 165,467 $ - $ - Conduct Airport Master Plan StudyGL DET OH FZI Fostoria Metropolitan GA 12 $ 100,605 $ 100,605 $ - $ - Extend Taxiway [Design], Install Perimeter FencingGL DET OH USE Fulton County GA 10 $ 37,672 $ 37,672 $ - $ - Rehabilitate Runway - 09/27, Rehabilitate Taxiway [design]GL DET OH GAS Gallia-Meigs Regional GA 10 $ 364,853 $ 364,853 $ - $ - Improve Fuel Farm [Construction]

GL DET OH PMH Greater Portsmouth Regional GA 15 $ 111,796 $ 111,796 $ - $ -

Improve Airport Drainage, Improve Airport Miscellaneous Improvements, Install

Miscellaneous NAVAIDS, Rehabilitate Runway - 18/36

GL DET OH I19

Greene County-Lewis A. Jackson

Regional GA 17 $ 1,100,538 $ 1,100,538 $ - $ - Construct Taxiway, Rehabilitate TaxiwayGL DET OH I74 Grimes Field GA 17 $ 363,652 $ 363,652 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayGL DET OH PHD Harry Clever Field GA 11 $ 367,707 $ 367,707 $ - $ - Rehabilitate ApronGL DET OH PHD Harry Clever Field GA 10 $ 91,809 $ 91,809 $ - $ - Rehabilitate ApronGL DET OH HOC Highland County GA 9 $ 223,705 $ 223,705 $ - $ - Light Obstructions, Remove ObstructionsGL DET OH 10G Holmes County GA 9 $ 233,546 $ 233,546 $ - $ - Extend Runway - 09/27, Rehabilitate Airport Beacons

GL DET OH I43 James A Rhodes GA 9 $ 501,503 $ 501,503 $ - $ - Improve Airport Drainage, Rehabilitate Runway - 01/19, Remove ObstructionsGL DET OH DAY James M Cox Dayton International P 74 $ 4,310,159 $ 4,310,159 $ - $ - Rehabilitate Apron

GL DET OH 89D Kelleys Island Land Field GA 8 $ 98,230 $ 98,230 $ - $ -

Acquire Land For Approaches [Boker Parcel 0.123 acres], Remove Obstructions,

Update Airport Master Plan StudyGL DET OH CQA Lakefield GA 14 $ 484,424 $ 484,424 $ - $ - Acquire Land for Development, Expand Apron

Page 29 of 88

Page 30: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL DET OH I68 Lebanon-Warren County GA 13 $ 182,956 $ 182,956 $ - $ -

Acquire Land For Approaches, Environmental Mitigation, Install Perimeter

Fencing, Rehabilitate Runway - 01/19, Remove Obstructions

GL DET OH AOH Lima Allen County GA 14 $ 150,000 $ 150,000 $ - $ -

Acquire Snow Removal Equipment, Construct Utilities [Phase 1], Update Airport

Master Plan StudyGL DET OH LPR Lorain County Regional R 19 $ 58,900 $ 58,900 $ - $ - Rehabilitate TaxiwayGL DET OH LPR Lorain County Regional R 20 $ 477,218 $ 477,218 $ - $ - Rehabilitate Runway - 07/25, Rehabilitate TaxiwayGL DET OH UYF Madison County GA 15 $ 260,895 $ 260,895 $ - $ - Acquire Land For ApproachesGL DET OH MFD Mansfield Lahm Regional GA 26 $ 1,094,564 $ 299,622 $ 794,942 $ - Acquire Safety Equipment and/or Fencing [Part 139 Airport]GL DET OH MNN Marion Municipal GA 20 $ 300,044 $ 300,044 $ - $ - Construct TaxiwayGL DET OH 4G5 Monroe County GA 11 $ 233,386 $ 233,386 $ - $ - Construct Snow Removal Equipment BuildingGL DET OH 4I9 Morrow County GA 9 $ 516,161 $ 516,161 $ - $ - Rehabilitate Runway - 10/28, Rehabilitate TaxiwayGL DET OH AXV Neil Armstrong GA 15 $ 99,750 $ 99,750 $ - $ - Improve Airport Drainage, Improve Utilities [Design]GL DET OH VTA Newark-Heath GA 25 $ 1,019,513 $ 1,019,513 $ - $ - Improve Runway Safety Area - 09/27, Rehabilitate Runway - 09/27

GL DET OH I86 Perry County GA 10 $ 782,672 $ 782,672 $ - $ - Acquire Miscellaneous Land, Construct Taxiway, Rehabilitate Runway - 08/26

GL DET OH CYO Pickaway County Memorial GA 11 $ 396,337 $ 396,337 $ - $ -

Acquire Snow Removal Equipment, Expand Apron, Light Obstructions, Rehabilitate

Runway - 01/19, Remove Obstructions

GL DET OH EOP Pike County GA 9 $ 62,246 $ 62,246 $ - $ - Improve Runway Safety Area - 07/25, Rehabilitate Runway [Design] - 07/25GL DET OH CMH Port Columbus International P 77 $ 2,967,547 $ - $ 2,967,547 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLGL DET OH CMH Port Columbus International P 76 $ 1,654,698 $ 1,654,698 $ - $ - Construct Runway [AGL 10-01] - 10R/28LGL DET OH CMH Port Columbus International P 75 $ 10,706,931 $ 706,931 $ 10,000,000 $ - Construct Runway [AGL 10-01] - 10R/28LGL DET OH POV Portage County GA 25 $ 171,150 $ 171,150 $ - $ - Improve Airport Drainage, Rehabilitate Runway - 09/27

GL DET OH 3W2 Put-in-Bay GA 18 $ 412,855 $ 412,855 $ - $ -

Improve Airport Drainage, Rehabilitate Runway - 03/21, Update Airport Master

Plan StudyGL DET OH OWX Putnam County GA 8 $ 61,788 $ 61,788 $ - $ - Widen Runway [Design] - 09/27GL DET OH I40 Richard Downing GA 17 $ 145,350 $ 145,350 $ - $ - Acquire Snow Removal EquipmentGL DET OH LCK Rickenbacker International CS 39 $ 4,525,474 $ 1,614,909 $ 2,910,565 $ - Rehabilitate Runway - 05R/23LGL DET OH 16G Seneca County GA 9 $ 227,865 $ 227,865 $ - $ - Acquire Land For Approaches

GL DET OH I12 Sidney Municipal GA 15 $ 185,718 $ 185,718 $ - $ -

Acquire Land For Approaches, Acquire Land for Development, Conduct

Environmental Study, Improve UtilitiesGL DET OH SGH Springfield-Beckley Municipal GA 21 $ 13,038 $ 13,038 $ - $ - Improve Runway Safety Area - 06/24

GL DET OH TDZ Toledo Executive R 22 $ 92,615 $ 92,615 $ - $ -

Install Runway Vertical/Visual Guidance System [design] - 14/32, Update Airport

Master Plan Study [reimbursement]

GL DET OH TOL Toledo Express P 73 $ 4,502,077 $ 2,687,979 $ 1,814,098 $ -

Conduct Miscellaneous Study, Construct Taxiway, Rehabilitate Runway - 07/25,

Rehabilitate Taxiway

Page 30 of 88

Page 31: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL DET OH MRT Union County GA 19 $ 179,741 $ 179,741 $ - $ - Improve Airport Drainage, Rehabilitate Apron [crack repair], Rehabilitate TaxiwayGL DET OH VNW Van Wert County GA 13 $ 56,335 $ 56,335 $ - $ - Remove ObstructionsGL DET OH 3G3 Wadsworth Municipal GA 15 $ 29,094 $ 29,094 $ - $ - Acquire Land For ApproachesGL DET OH 1G0 Wood County GA 23 $ 136,662 $ 136,662 $ - $ - Rehabilitate Runway - 10/28, Rehabilitate Taxiway

GL DET OH YNG Youngstown-Warren Regional P 40 $ 1,456,438 $ 1,456,438 $ - $ -

Construct Taxiway, Construct Taxiway, Improve Airport Miscellaneous

Improvements, Rehabilitate Runway - 14/32, Update Airport Master Plan Study

GL DET OH ZZV Zanesville Municipal GA 11 $ 1,496,698 $ 1,496,698 $ - $ - Install Airfield Guidance Signs, Rehabilitate Taxiway, Rehabilitate Taxiway LightingGL MSP MN AEL Albert Lea Municipal GA 13 $ 1,554,265 $ 150,000 $ 1,404,265 $ - Construct Runway [paving, lighting, land, obstructions] - 16/34

GL MSP MN ANE Anoka County-Blaine Airport(Janes Field) R 10 $ 231,445 $ 231,445 $ - $ - Rehabilitate TaxiwayGL MSP MN BDE Baudette International GA 10 $ 1,552,158 $ 268,562 $ 1,283,596 $ - Extend Taxiway

GL MSP MN BJI Bemidji Regional P 27 $ 535,090 $ 535,090 $ - $ -

Improve Terminal Building [Install aircraft boarding bridge], Install Airport Beacons

[Install airport beacon (sponsor reimbursement)]

GL MSP MN BJI Bemidji Regional P 26 $ 213,556 $ 213,556 $ - $ -

Expand Aircraft Rescue & Fire Fighting Building [Aircraft Rescue and Firefighting

Building Improvement (Project Formulation)]GL MSP MN SBU Blue Earth Municipal GA 10 $ 2,301,751 $ 156,324 $ 2,145,427 $ - Rehabilitate Runway - 16/34GL MSP MN BRD Brainerd Lakes Regional P 36 $ 313,485 $ 313,485 $ - $ - Construct TaxiwayGL MSP MN CFE Buffalo Municipal GA 8 $ 69,350 $ 69,350 $ - $ - Acquire Land For Approaches

GL MSP MN COQ Cloquet Carlton County GA 9 $ 97,717 $ 97,717 $ - $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System -

17/35GL MSP MN CQM Cook Municipal GA 6 $ 65,645 $ 65,645 $ - $ - Rehabilitate Runway - 13/31GL MSP MN MIC Crystal R 7 $ 300,000 $ 300,000 $ - $ - Rehabilitate Taxiway

GL MSP MN DTL Detroit Lakes-Wething Field GA 7 $ 138,219 $ 138,219 $ - $ -

Construct Taxiway, Install Miscellaneous NAVAIDS, Wildlife Hazard Assessments

[EA Phase 3]GL MSP MN TOB Dodge Center GA 7 $ 39,900 $ 39,900 $ - $ - Construct BuildingGL MSP MN DLH Duluth International P 51 $ 5,935,428 $ 286,469 $ 5,648,959 $ - Construct Terminal Building [1st phase disc proposed in 2011]GL MSP MN DLH Duluth International P 53 $ 4,950,189 $ - $ 4,950,189 $ - Construct Terminal Building [2nd phase disc proposed in 2011]

GL MSP MN DLH Duluth International P 52 $ 3,868,418 $ - $ 3,868,418 $ - VALE Infrastructure [Geothermal, Gate Electrification, Solar Panels/Solar Thermal]GL MSP MN DLH Duluth International P 50 $ 1,295,876 $ 1,295,876 $ - $ - Construct Terminal Building

GL MSP MN ELO Ely Municipal GA 12 $ 278,867 $ 278,867 $ - $ -

Rehabilitate Apron, Rehabilitate Building, Rehabilitate Runway - 12/30,

Rehabilitate TaxiwayGL MSP MN FRM Fairmont Municipal GA 12 $ 75,988 $ 75,988 $ - $ - Rehabilitate ApronGL MSP MN INL Falls International P 24 $ 268,933 $ 268,933 $ - $ - Rehabilitate Runway - 04/22, Update Airport Master Plan Study

Page 31 of 88

Page 32: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL MSP MN FBL Faribault Municipal GA 9 $ 1,271,151 $ 1,271,151 $ - $ - Construct Runway - Plan-1

GL MSP MN FSE Fosston Municipal GA 6 $ 132,207 $ 132,207 $ - $ -

Construct Taxiway [Phase 1 - Design & bidding, wetland mitigation & permitting,

purchase wetland credits], Rehabilitate Apron, Rehabilitate Runway - 16/34,

Rehabilitate TaxiwayGL MSP MN GYL Glencoe Municipal GA 1 $ 47,500 $ 47,500 $ - $ - Remove Obstructions, Update Airport Master Plan StudyGL MSP MN CKC Grand Marais/Cook County GA 12 $ 309,510 $ 309,510 $ - $ - Conduct Miscellaneous Study, Rehabilitate Runway - 09/27

GL MSP MN GPZ

Grand Rapids/Itasca County Airport-

Gordon Newstrom Field GA 16 $ 244,410 $ 244,410 $ - $ - Improve Airport Drainage, Rehabilitate Apron, Rehabilitate Runway - 16/34GL MSP MN HCO Hallock Municipal GA 6 $ 333,062 $ 333,062 $ - $ - Construct Fuel Farm

GL MSP MN 04Y Hawley Municipal GA 7 $ 129,333 $ 129,333 $ - $ -

Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 16/34,

Rehabilitate TaxiwayGL MSP MN 1D6 Hector Municipal GA 7 $ 521,550 $ 150,239 $ 371,311 $ - Improve Runway Safety Area - 05/23GL MSP MN HCD Hutchinson Municipal-Butler Field GA 12 $ 109,183 $ 109,183 $ - $ - Rehabilitate Runway - 15/33GL MSP MN MJQ Jackson Municipal GA 10 $ 366,656 $ 366,656 $ - $ - Expand ApronGL MSP MN 12Y Le Sueur Municipal GA 8 $ 97,341 $ 97,341 $ - $ - Acquire Land For Approaches

GL MSP MN LJF Litchfield Municipal GA 8 $ 158,481 $ 158,481 $ - $ -

Rehabilitate Access Road [mill and overlay], Rehabilitate Parking Lot [mill and

overlay], Rehabilitate Runway - 13/31

GL MSP MN LXL

Little Falls/Morrison County-Lindbergh

Field GA 12 $ 49,455 $ 49,455 $ - $ - Update Airport Master Plan Study

GL MSP MN MSP

Minneapolis-St Paul International/Wold-

Chamberlain P 104 $ 5,496,843 $ 5,496,843 $ - $ - Extend Taxiway, Modify Service Road, Rehabilitate Apron, Security EnhancementsGL MSP MN MVE Montevideo-Chippewa County GA 11 $ 164,374 $ 164,374 $ - $ - Construct Snow Removal Equipment Building

GL MSP MN JKJ Moorhead Municipal GA 7 $ 489,999 $ 489,999 $ - $ -

Construct Building [Construct Revenue Generating Hangar (Phase 2 -

Construction)]GL MSP MN MZH Moose Lake Carlton County GA 4 $ 329,099 $ 329,099 $ - $ - Construct Building

GL MSP MN MOX Morris Municipal - Charlie Schmidt Field GA 5 $ 128,250 $ 128,250 $ - $ - Construct Taxiway [Phase 1, Design]GL MSP MN CNB Myers Field GA 9 $ 219,450 $ 219,450 $ - $ - Acquire Snow Removal Equipment, Update Airport Master Plan StudyGL MSP MN ULM New Ulm Municipal GA 9 $ 3,738,625 $ 2,736,948 $ 1,001,677 $ - Extend Runway - 15/33GL MSP MN ORB Orr Regional GA 8 $ 222,623 $ 222,623 $ - $ - Rehabilitate Access Road, Rehabilitate Parking Lot

GL MSP MN VVV Ortonville Municipal-Martinson Field GA 8 $ 119,097 $ 119,097 $ - $ - Construct Fuel Farm [Construction]GL MSP MN OWA Owatonna Degner Regional GA 15 $ 331,876 $ 331,876 $ - $ - Rehabilitate Runway - 12/30

GL MSP MN PKD Park Rapids Municipal-Konshok Field GA 11 $ 561,316 $ 561,316 $ - $ -

Construct Utilities [Construction], Improve Access Road, Improve Airport Drainage

[Construction], Install Perimeter Fencing, Update Airport Master Plan Study

Page 32 of 88

Page 33: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL MSP MN PEX Paynesville Municipal GA 6 $ 141,292 $ 141,292 $ - $ -

Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate Taxiway, Update

Miscellaneous StudyGL MSP MN PQN Pipestone Municipal GA 7 $ 47,643 $ 47,643 $ - $ - Install Airport Beacons, Install Miscellaneous NAVAIDSGL MSP MN HIB Range Regional CS 31 $ 45,600 $ 45,600 $ - $ - Improve Terminal BuildingGL MSP MN HIB Range Regional CS 30 $ 44,860 $ 44,860 $ - $ - Improve Terminal Building [Terminal passenger hold room expansion]GL MSP MN RGK Red Wing Regional GA 10 $ 335,844 $ 335,844 $ - $ - Rehabilitate Apron, Remove ObstructionsGL MSP MN RWF Redwood Falls Municipal GA 11 $ 129,931 $ 129,931 $ - $ - Acquire Land For ApproachesGL MSP MN TWM Richard B Helgeson GA 8 $ 1,334,139 $ 1,334,139 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate TaxiwayGL MSP MN RST Rochester International P 30 $ 416,510 $ 416,510 $ - $ - Construct Deicing Containment Facility

GL MSP MN RST Rochester International P 31 $ 122,091 $ 122,091 $ - $ -

Conduct Miscellaneous Study, Improve Runway Safety Area [Object 13] - 13/31,

Improve Runway Safety Area [Object 7] - 02/20, Install Airfield Guidance Signs

GL MSP MN ROX Roseau Municipal/Rudy Billberg Field GA 7 $ 488,679 $ 488,679 $ - $ -

Rehabilitate Apron [Rehabilitate Apron], Rehabilitate Taxiway [Rehabilitate hangar

area taxiway and taxilanes]GL MSP MN 55Y Rushford Municipal GA 4 $ 71,250 $ 71,250 $ - $ - Conduct Miscellaneous Study, Construct Building

GL MSP MN SGS

South St Paul Municipal-Richard E

Fleming Field R 13 $ 59,432 $ 59,432 $ - $ - Remove Obstructions

GL MSP MN MML

Southwest Minnesota Regional

Marshall/Ryan Field GA 10 $ 276,450 $ 276,450 $ - $ - Acquire Snow Removal Equipment, Construct ApronGL MSP MN STP St Paul Downtown Holman Field R 20 $ 913,758 $ 913,758 $ - $ - Rehabilitate Taxiway [Segment South of Rwy 9/27]

GL MSP MN STC St. Cloud Regional P 23 $ 526,350 $ 526,350 $ - $ -

Acquire Snow Removal Equipment, Install Runway Lighting - 13/31, Update

Airport Master Plan StudyGL MSP MN SAZ Staples Municipal GA 7 $ 25,000 $ 25,000 $ - $ - Rehabilitate Apron [Rehabilitate apron - Phase 1 (Design)]GL MSP MN TVF Thief River Falls Regional CS 14 $ 4,630,056 $ - $ 4,630,056 $ - Rehabilitate Runway [Phase 2 Reconstruct Runway] - 13/31

GL MSP MN TVF Thief River Falls Regional CS 13 $ 1,593,073 $ 150,159 $ 1,442,914 $ -

Improve Runway Safety Area [ALP/EA (includes 139 recommended obstruction

survey), Phase 1 RSA Correction. Object 17,Object 18] - 13/31, Rehabilitate

Runway [Phase 1 Taxiway grading and prep for conversion to temp runway] -

13/31GL MSP MN 12D Tower Municipal GA 8 $ 34,010 $ 34,010 $ - $ - Remove Obstructions

GL MSP MN ADC Wadena Municipal GA 7 $ 343,003 $ 343,003 $ - $ -

Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate Runway

[Rehabilitate (Crack Seal) Runway 16/34] - 16/34GL MSP MN Y49 Walker Municipal GA 7 $ 140,391 $ 140,391 $ - $ - Acquire Snow Removal EquipmentGL MSP MN ACQ Waseca Municipal GA 8 $ 62,130 $ 62,130 $ - $ - Construct Taxiway, Rehabilitate Apron [design]GL MSP MN MWM Windom Municipal GA 8 $ 47,500 $ 47,500 $ - $ - Update Airport Master Plan Study

GL MSP MN ONA Winona Municipal-Max Conrad Field GA 7 $ 335,461 $ 335,461 $ - $ - Improve Runway Safety Area - 12/30, Update Airport Master Plan Study

Page 33 of 88

Page 34: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL MSP MN 10D Winsted Municipal GA 5 $ 394,773 $ 394,773 $ - $ -

Construct Terminal Building, Rehabilitate Access Road, Rehabilitate Apron,

Rehabilitate Parking Lot, Rehabilitate Taxiway

GL MSP WI GRB Austin Straubel International P 42 $ 7,910,925 $ 2,906,379 $ 5,004,546 $ - Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Building]

GL MSP WI EAU Chippewa Valley Regional P 33 $ 598,500 $ 598,500 $ - $ -

Conduct Miscellaneous Study [Drainage Study], Construct Taxiway [Reconfigure

and construct TWY D (Phase 1 - preliminary design)], Improve Terminal Building

[Phase 6 - Reimbursement for Preliminary Planning (Categorical Exclusion

Document, ALP Update, Hazardous Material Assesment)], Rehabilitate Apron

[Rehabilitate north GA apron (Phase 1 - design)], Rehabilitate Apron [Terminal

apron (Phase 1 - Design)], Rehabilitate Service Road, Rehabilitate Taxiway [Phase 1

- Design], Update Airport Master Plan Study, Update Miscellaneous Study [Update

Storm Water Pollution Prevention Plan]GL MSP WI MSN Dane County Regional-Truax Field P 47 $ 1,300,000 $ 1,300,000 $ - $ - Construct Snow Removal Equipment Building [Design]

GL MSP WI MKE General Mitchell International P 65 $ 3,732,000 $ - $ 3,732,000 $ -

Install Noise Monitoring System, Noise Mitigation Measures for Residences within

65 - 69 DNL [52 Homes]GL MSP WI MKE General Mitchell International P 63 $ 3,187,500 $ 1,718,636 $ 1,468,864 $ - Rehabilitate Runway - 07R/25L

GL MSP WI MKE General Mitchell International P 64 $ 1,041,048 $ 1,041,048 $ - $ -

Acquire Safety Equipment and/or Fencing, Construct Service Road, Install Runway

Lighting - 01L/19R, Rehabilitate Runway - 07R/25L

GL MSP WI MKE General Mitchell International P 68 $ 7,265,000 $ - $ 7,265,000 $ -

Noise Mitigation Measures [study], Noise Mitigation Measures for Residences

within 65 - 69 DNL [104 homes]GL MSP WI MKE General Mitchell International P 66 $ 8,202,636 $ 1,002,636 $ 7,200,000 $ - Construct Runway Safety Area - 01L/19RGL MSP WI MKE General Mitchell International P 67 $ 1,258,545 $ - $ 1,258,545 $ - VALE Infrastructure [Concourse E ground power]GL MSP WI LSE La Crosse Municipal P 35 $ 171,601 $ 171,601 $ - $ - Construct Taxiway

GL MSP WI ATW Outagamie County Regional P 42 $ 999,745 $ 999,745 $ - $ -

Install Guidance Signs [Install taxiway guidance signs], Install Runway Incursion

Caution Bars [Install runway guard lights and appropriate signage]

GL MSP WI ATW Outagamie County Regional P 43 $ 416,994 $ 416,994 $ - $ -

Rehabilitate Apron [Rehab terminal apron panels], Rehabilitate Runway [Rehab

RWY 12/30 Panel Replacement (Phase 1-Design)] - 12/30

GL MSP WI RHI Rhinelander-Oneida County P 32 $ 95,000 $ 95,000 $ - $ -

Improve Airport Miscellaneous Improvements [Remark Pavement (Phase I-

Design)], Remove Obstructions [Remove Obstructions (Phase I - Design)]

GL MSP WI RHI Rhinelander-Oneida County P 33 $ 1,044,280 $ 1,044,280 $ - $ -

Construct Aircraft Rescue & Fire Fighting Building [Construct replacement ARFF

building (Phase II - construction)]

GL MSP WI *WIB Wisconsin State Block Grant Program 52 $ 1,688,425 $ - $ 1,688,425 $ - Non primary development projects in state block grant program

Page 34 of 88

Page 35: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

GL MSP WI *WIB Wisconsin State Block Grant Program 51 $ 15,460,152 $ 15,460,152 $ - $ - Non primary development projects in state block grant program

GL MSP WI *WIB Wisconsin State Block Grant Program 53 $ 300,000 $ 300,000 $ - $ - Non primary development projects in state block grant programNE ANE CT BDL Bradley International P 52 $ 2,105,679 $ 2,105,679 $ - $ - Environmental MitigationNE ANE CT BDL Bradley International P 53 $ 3,360,000 $ - $ 3,360,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLNE ANE CT DXR Danbury Municipal R 36 $ 989,643 $ 650,000 $ 339,643 $ - Rehabilitate Taxiway ["B"]

NE ANE CT GON Groton-New London GA 27 $ 2,954,340 $ 886,849 $ 2,067,491 $ -

Construct Runway Safety Area [Phase II Construction] - 05/23, Rehabilitate

Taxiway ["D"]NE ANE CT HFD Hartford-Brainard R 14 $ 470,250 $ 470,250 $ - $ - Acquire Snow Removal EquipmentNE ANE CT HFD Hartford-Brainard R 15 $ 628,520 $ 628,520 $ - $ - Update Airport Master Plan StudyNE ANE CT 4B8 Robertson Field R 5 $ 216,980 $ 216,980 $ - $ - Rehabilitate Runway [PH I - Design] - 02/20

NE ANE CT *CTV Various Locations in Connecticut 8 $ 37,759 $ 37,759 $ - $ - Install Airfield Guidance Signs (Bradley International; Groton-New London)NE ANE CT OXC Waterbury-Oxford GA 16 $ 426,550 $ 426,550 $ - $ - Acquire Snow Removal EquipmentNE ANE CT OXC Waterbury-Oxford GA 17 $ 5,000,000 $ - $ 5,000,000 $ - Acquire Land for Noise Compatibility within 65 - 69 DNLNE ANE MA BAF Barnes Municipal GA 37 $ 1,502,038 $ - $ 1,502,038 $ - Noise Mitigation Measures for Residences within 70 - 74 DNLNE ANE MA BAF Barnes Municipal GA 36 $ 89,965 $ 89,965 $ - $ - Acquire Land for DevelopmentNE ANE MA BAF Barnes Municipal GA 35 $ 991,522 $ 60,985 $ 930,537 $ - Acquire Land for Noise Compatibility within 70 - 74 DNL

NE ANE MA HYA

Barnstable Municipal-

Boardman/Polando Field P 51 $ 2,707,500 $ 2,707,500 $ - $ - Construct Terminal Building [Phase II - Access Road]

NE ANE MA HYA

Barnstable Municipal-

Boardman/Polando Field P 53 $ 1,777,450 $ 1,179,365 $ 598,085 $ - Rehabilitate Apron

NE ANE MA HYA

Barnstable Municipal-

Boardman/Polando Field P 52 $ 87,300 $ 87,300 $ - $ - Conduct Environmental Study [EA for Future Development]NE ANE MA BVY Beverly Municipal R 31 $ 236,550 $ 236,550 $ - $ - Conduct aeronautical survey for WAAS approachNE ANE MA BVY Beverly Municipal R 30 $ 130,150 $ 130,150 $ - $ - Rehabilitate Taxiway [Pavement Maintenance]NE ANE MA FIT Fitchburg Municipal GA 19 $ 320,625 $ 320,625 $ - $ - Conduct Environmental Study [Phase III]

NE ANE MA BOS

General Edward Lawrence Logan

International P 110 $ 9,245,431 $ - $ 9,245,431 $ - Construct Runway Safety Area [Phase III (Construction)] - 15R/33L

NE ANE MA BOS

General Edward Lawrence Logan

International P 107 $ 750,000 $ 101,256 $ 648,744 $ -

Construct Runway Safety Area [Phase Ia Runway 33L (environmental permitting

applications and supporting design work)] - 15R/33L

NE ANE MA BOS

General Edward Lawrence Logan

International P 106 $ 7,256,297 $ 1,356,297 $ 5,900,000 $ - Construct Runway [Phase I] - 14/32

NE ANE MA BOS

General Edward Lawrence Logan

International P 113 $ 15,492,680 $ - $ 15,492,680 $ - Construct Runway Safety Area [Phase VI (Construction)] - 15R/33L

Page 35 of 88

Page 36: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NE ANE MA BOS

General Edward Lawrence Logan

International P 109 $ 5,933,080 $ - $ 5,933,080 $ -

Construct Runway Safety Area [Phase II (Includes Design Completion, Mitigation

and Begin Construction)] - 15R/33L

NE ANE MA BOS

General Edward Lawrence Logan

International P 112 $ 2,785,875 $ - $ 2,785,875 $ - Construct Runway Safety Area [Phase V (Construction)] - 15R/33L

NE ANE MA BOS

General Edward Lawrence Logan

International P 111 $ 5,610,180 $ 718,788 $ 4,891,392 $ - Construct Runway Safety Area [Phase IV (Construction)] - 15R/33L

NE ANE MA BOS

General Edward Lawrence Logan

International P 108 $ 2,473,703 $ 2,473,703 $ - $ - Construct Runway [Phase II] - 14/32

NE ANE MA AQW Harriman-And-West GA 22 $ 322,050 $ 150,000 $ 172,050 $ -

Acquire Snow Removal Equipment, Update Airport Master Plan Study

[SWPP/SPCC]NE ANE MA 1B9 Mansfield Municipal GA 25 $ 97,850 $ 97,850 $ - $ - Acquire Snow Removal Equipment [rotary plow]NE ANE MA 1B9 Mansfield Municipal GA 24 $ 102,600 $ 102,600 $ - $ - Acquire Land for Development [Fruit Street]

NE ANE MA GHG

Marshfield Municipal - George Harlow

Field GA 19 $ 47,025 $ 47,025 $ - $ - Rehabilitate Runway [Phase I - Reimburseable Agreement] - 06/24

NE ANE MA GHG

Marshfield Municipal - George Harlow

Field GA 20 $ 626,240 $ 626,240 $ - $ -

Acquire Land for Development [Land Swap], Conduct Environmental Study

[Invasive Species]NE ANE MA MVY Marthas Vineyard P 37 $ 63,650 $ 63,650 $ - $ - Wildlife Hazard AssessmentsNE ANE MA MVY Marthas Vineyard P 39 $ 862,125 $ 862,125 $ - $ - Construct Aircraft Rescue & Fire Fighting BuildingNE ANE MA ACK Nantucket Memorial P 53 $ 289,991 $ 289,991 $ - $ - Construct Terminal Building [Phase VII - B]NE ANE MA ACK Nantucket Memorial P 54 $ 382,758 $ 382,758 $ - $ - Conduct Environmental Study [South Apron]NE ANE MA ACK Nantucket Memorial P 55 $ 4,217,525 $ 321,166 $ 3,896,359 $ - Extend Runway [Phase I] - 15/33, Rehabilitate Runway [1500'] - 06/24NE ANE MA ACK Nantucket Memorial P 52 $ 851,986 $ 851,986 $ - $ - Construct Terminal Building [Phase VII]NE ANE MA EWB New Bedford Regional P 43 $ 213,750 $ 213,750 $ - $ - Extend Runway Safety Area [Survey Data] - 05/23NE ANE MA EWB New Bedford Regional P 42 $ 301,625 $ 301,625 $ - $ - Remove Obstructions [Land Acquisition]NE ANE MA EWB New Bedford Regional P 41 $ 4,928,600 $ 1,967,574 $ 2,961,026 $ - Extend Runway Safety Area [Mitigation - Replication] - 05/23NE ANE MA EWB New Bedford Regional P 44 $ 391,400 $ 391,400 $ - $ - Update Airport Master Plan StudyNE ANE MA OWD Norwood Memorial R 31 $ 763,800 $ 763,800 $ - $ - Rehabilitate Taxiway

NE ANE MA ORE Orange Municipal GA 20 $ 412,300 $ 175,500 $ 236,800 $ - Rehabilitate Apron [Phase I GA (Design)], Rehabilitate Taxiway [Phase I Design]NE ANE MA PSF Pittsfield Municipal GA 27 $ 2,000,000 $ 1,593,415 $ 406,585 $ - Extend Runway [(Phase VI)] - 08/26NE ANE MA PSF Pittsfield Municipal GA 26 $ 137,750 $ 137,750 $ - $ - Extend Runway [VII (Aeronautical Study for New Approach)] - 08/26NE ANE MA PYM Plymouth Municipal GA 38 $ 1,724,250 $ 192,273 $ 1,531,977 $ - Rehabilitate Taxiway [Relocate "E"]

NE ANE MA PVC Provincetown Municipal P 30 $ 1,254,000 $ 1,254,000 $ - $ -

Expand Terminal Building [Phase I - Design and Permitting], Rehabilitate Taxiway

[Phase I - Design and Permitting], Wildlife Hazard AssessmentsNE ANE MA TAN Taunton Municipal - King Field GA 21 $ 166,250 $ 166,250 $ - $ - Remove Obstructions [obstruction analysis]NE ANE MA 0B5 Turners Falls GA 15 $ 150,000 $ 150,000 $ - $ - Conduct Environmental Study [Tribal Investigation - Koch Property]NE ANE MA CEF Westover ARB/Metropolitan GA 23 $ 2,500,000 $ 150,000 $ 2,350,000 $ - Acquire Land for Noise Compatibility within 70 - 74 DNL

Page 36 of 88

Page 37: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NE ANE MA ORH Worcester Regional GA 43 $ 790,564 $ 790,564 $ - $ - Security EnhancementsNE ANE ME LEW Auburn/Lewiston Municipal R 20 $ 204,706 $ 204,706 $ - $ - Conduct Environmental Study [RSA]

NE ANE ME AUG Augusta State CS 24 $ 5,177,706 $ 1,516,480 $ 3,661,226 $ -

Rehabilitate Runway [Obstruction Removal] - 17/35, Rehabilitate Runway [Pase VI -

Reimburseable Agreement] - 17/35, Rehabilitate Runway [Phase IV] - 17/35,

Rehabilitate Runway [Phase V EMAS] - 17/35NE ANE ME BGR Bangor International P 53 $ 451,538 $ 451,538 $ - $ - Rehabilitate Apron [Trench]NE ANE ME BGR Bangor International P 54 $ 398,372 $ 398,372 $ - $ - Install Guidance Signs, Wildlife Hazard AssessmentsNE ANE ME BST Belfast Municipal GA 10 $ 499,090 $ 499,090 $ - $ - Construct Apron [Phase II - GA]NE ANE ME B19 Biddeford Municipal GA 8 $ 58,546 $ 58,546 $ - $ - Environmental Mitigation [Removal of old crosswind runway]

NE ANE ME BXM Brunswick Executive GA 1 $ 140,410 $ 127,500 $ 12,910 $ -

Construct Building [Design Only (10 T-Hangars)], Install Airfield Guidance Signs

[Remark Airfield Markings From Military to FAA Standards - Phase I (Design)],

Install Perimeter Fencing [Design (Includes Gates)]

NE ANE ME BXM Brunswick Executive GA 3 $ 4,609,556 $ 22,500 $ 4,587,056 $ -

Acquire Snow Removal Equipment, Improve Utilities [MAP] [Vault, Airfield Lighting

Control System and Rotating Beacon], Install Perimeter Fencing [Phase II -

Installation], Rehabilitate Runway Lighting - 01L/19R, Remove Obstructions,

Runway Incursion Markings [Runway and Taxiway Markings]NE ANE ME BXM Brunswick Executive GA 2 $ 341,459 $ - $ 341,459 $ - Update Airport Master Plan Study, Wildlife Hazard AssessmentsNE ANE ME CAR Caribou Municipal GA 13 $ 275,500 $ 275,500 $ - $ - Remove Obstructions [Phase I On Airport obstruction removal]

NE ANE ME OWK Central Maine Airport of Norridgewock GA 15 $ 224,200 $ 224,200 $ - $ - Install Perimeter Fencing, Remove Obstructions

NE ANE ME OWK Central Maine Airport of Norridgewock GA 14 $ 136,759 $ 136,759 $ - $ - Remove Obstructions [Easements]

NE ANE ME OWK Central Maine Airport of Norridgewock GA 16 $ 200,450 $ 200,450 $ - $ - Rehabilitate Runway [Phase I (Design)] - 15/33NE ANE ME OLD Dewitt Field,Old Town Municipal GA 9 $ 80,750 $ 80,750 $ - $ - Rehabilitate Runway - 12/30NE ANE ME OLD Dewitt Field,Old Town Municipal GA 10 $ 137,750 $ 137,750 $ - $ - Update Airport Master Plan StudyNE ANE ME IZG Eastern Slopes Regional GA 16 $ 273,600 $ 273,600 $ - $ - Construct Fuel Farm [Jet "A"]NE ANE ME EPM Eastport Municipal GA 10 $ 347,810 $ 347,810 $ - $ - Expand Apron, Rehabilitate Runway [Crack Repair] - 15/33NE ANE ME 3B1 Greenville Municipal GA 14 $ 85,500 $ 85,500 $ - $ - Conduct Environmental Study [EA]NE ANE ME 3B1 Greenville Municipal GA 15 $ 118,750 $ 118,750 $ - $ - Acquire Land for Development [Hangar Development]NE ANE ME BHB Hancock County-Bar Harbor P 32 $ 461,392 $ 461,392 $ - $ - Acquire Snow Removal Equipment [Blower], Runway Incursion Markings

NE ANE ME BHB Hancock County-Bar Harbor P 33 $ 707,750 $ 707,750 $ - $ -

Construct Taxiway [Phase I - Design and Permitting for Parallel for 17-35], Install

Perimeter FencingNE ANE ME RKD Knox County Regional P 37 $ 137,750 $ 137,750 $ - $ - Rehabilitate Apron [crack seal and repair]NE ANE ME RKD Knox County Regional P 36 $ 223,250 $ 223,250 $ - $ - Acquire Snow Removal Equipment [Plow]

Page 37 of 88

Page 38: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NE ANE ME LRG Lincoln Regional GA 8 $ 81,110 $ 81,110 $ - $ -

Rehabilitate Runway [RSA, obstruction, runway treshold and profile analysis] -

17/35NE ANE ME MVM Machias Valley GA 8 $ 179,182 $ 179,182 $ - $ - Update Airport Master Plan StudyNE ANE ME MLT Millinocket Municipal GA 15 $ 89,775 $ 89,775 $ - $ - Rehabilitate Apron [Design]

NE ANE ME MLT Millinocket Municipal GA 14 $ 80,136 $ 80,136 $ - $ -

Acquire Easement For Approaches [aviagation easments], Acquire Land For

Approaches

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 36 $ 155,621 $ 155,621 $ - $ - Acquire Snow Removal Equipment

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 37 $ 571,387 $ 571,387 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 34 $ 20,235 $ 20,235 $ - $ - Rehabilitate Apron [Crack Repair]

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 35 $ 43,075 $ 43,075 $ - $ - Install Guidance SignsNE ANE ME 81B Oxford County Regional GA 9 $ 242,397 $ 242,397 $ - $ - Remove Obstructions [Phase II]NE ANE ME 2B7 Pittsfield Municipal GA 12 $ 111,150 $ 111,150 $ - $ - Expand Apron [Phase I - Environmental Study]

NE ANE ME PWM Portland International Jetport P 72 $ 12,735,479 $ 4,897,644 $ 7,837,835 $ -

Construct Runway Safety Area [Phase III - Construction] - 18/36, Rehabilitate

Runway - 18/36, Rehabilitate Taxiway ["C"]NE ANE ME 8B0 Steven A. Bean Municipal GA 12 $ 632,200 $ 632,200 $ - $ - Construct Building [SRE]

NE ANE ME B21 Sugarloaf Regional GA 5 $ 43,700 $ 43,700 $ - $ -

Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway [Crack

Repair]

NE ANE ME IWI Wiscasset GA 16 $ 147,250 $ 147,250 $ - $ -

Acquire Snow Removal Equipment, Install Perimeter Fencing, Update Airport

Master Plan Study [SWPP]NE ANE NH LEB Lebanon Municipal CS 45 $ 86,888 $ 86,888 $ - $ - Conduct Environmental Study [final EA]NE ANE NH LEB Lebanon Municipal CS 46 $ 45,557 $ 45,557 $ - $ - Rehabilitate Taxiway

NE ANE NH MHT Manchester P 85 $ 2,301,428 $ 2,301,428 $ - $ -

Acquire Land For Approaches [Part A - Runway 6 End RPZ], Acquire Snow Removal

Equipment, Improve Terminal Building [Public Annoucement System Upgrades]NE ANE NH MHT Manchester P 89 $ 3,341,589 $ - $ 3,341,589 $ - VALE Infrastructure [Solar Photovoltaic (PV) Facility]NE ANE NH MHT Manchester P 87 $ 274,872 $ 274,872 $ - $ - Acquire Interactive Training SystemNE ANE NH MHT Manchester P 88 $ 2,139,451 $ 1,694,154 $ 445,297 $ - Acquire Land For Approaches [Phase 2]NE ANE NH MHT Manchester P 86 $ 791,236 $ 791,236 $ - $ - Security Enhancements [CCTV System]

NE ANE NH *NHB

New Hampshire State Block Grant

Program 15 $ 7,147,623 $ 89,423 $ 7,058,200 $ -

Non primary development projects in state block grant program, Non primary

development projects in state block grant program

NE ANE NH *NHB

New Hampshire State Block Grant

Program 11 $ 792,769 $ 792,769 $ - $ - Non primary development projects in state block grant program

Page 38 of 88

Page 39: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NE ANE NH *NHB

New Hampshire State Block Grant

Program 13 $ 541,512 $ 541,512 $ - $ - Non primary development projects in state block grant program

NE ANE NH *NHB

New Hampshire State Block Grant

Program 14 $ 11,015,750 $ - $ 11,015,750 $ - Non primary development projects in state block grant program

NE ANE NH *NHB

New Hampshire State Block Grant

Program 12 $ 630,340 $ 630,340 $ - $ - Non primary development projects in state block grant programNE ANE NH PSM Portsmouth International at Pease GA 49 $ 301,625 $ 301,625 $ - $ - Remove Obstructions [PH I - Design]NE ANE NH PSM Portsmouth International at Pease GA 50 $ 59,828 $ 59,828 $ - $ - Acquire Friction Measuring EquipmentNE ANE NH PSM Portsmouth International at Pease GA 51 $ 580,573 $ 580,573 $ - $ - Acquire Snow Removal EquipmentNE ANE RI BID Block Island State CS 16 $ 91,653 $ 91,653 $ - $ - Install Instrument Approach Aid [REIL] - 10/28NE ANE RI BID Block Island State CS 15 $ 1,463,114 $ 1,463,114 $ - $ - Construct Terminal BuildingNE ANE RI SFZ North Central State R 23 $ 339,407 $ 339,407 $ - $ - Rehabilitate Taxiway [Phase I - Design]NE ANE RI OQU Quonset State R 16 $ 149,530 $ 149,530 $ - $ - Install Perimeter FencingNE ANE RI *RIS State of Rhode Island 2 $ 638,871 $ - $ 638,871 $ - Conduct State System Plan StudyNE ANE RI PVD Theodore Francis Green State P 97 $ 1,210,598 $ 1,210,598 $ - $ - Acquire Snow Removal EquipmentNE ANE RI PVD Theodore Francis Green State P 95 $ 335,547 $ 335,547 $ - $ - Construct Deicing Containment Facility [Part A - Conceptual Study]NE ANE RI PVD Theodore Francis Green State P 96 $ 1,684,174 $ 1,684,174 $ - $ - Construct Deicing Containment Facility [Part B - Design]NE ANE VT BTV Burlington International P 88 $ 2,935,025 $ 778,369 $ 2,156,656 $ - Acquire Land for Noise Compatibility within 65 - 69 DNL [Phase II]NE ANE VT BTV Burlington International P 87 $ 3,168,250 $ - $ 3,168,250 $ - Acquire Land for Noise Compatibility within 65 - 69 DNL [Phase I]NE ANE VT BTV Burlington International P 86 $ 104,999 $ 104,999 $ - $ - Wildlife Hazard AssessmentsNE ANE VT VSF Hartness State (Springfield) GA 7 $ 376,803 $ 376,803 $ - $ - Light Obstructions [Hazard Beacons - Phase II]NE ANE VT MVL Morrisville-Stowe State GA 10 $ 260,383 $ 260,383 $ - $ - Remove Obstructions [Phase I - Easements]

NE ANE VT RUT Rutland - Southern Vermont Regional CS 32 $ 377,736 $ 377,736 $ - $ -

Acquire Snow Removal Equipment, Extend Runway Safety Area [Phase III -

Reimburseable Agreement] - 01/19, Light Obstructions [PH I - Hazard Beacons],

Wildlife Hazard Assessments

NE ANE VT RUT Rutland - Southern Vermont Regional CS 33 $ 237,215 $ 237,215 $ - $ - Extend Runway Safety Area [Phase II - Design] - 01/19NE ANE VT *VTS State of Vermont 11 $ 94,592 $ 94,592 $ - $ - Update State System Plan Study

NE ANE VT *VTV Various Locations in Vermont 7 $ 1,083,342 $ 1,083,342 $ - $ -

Acquire Snow Removal Equipment (William H. Morse State), Construct Building

(Franklin County State), Construct Snow Removal Equipment Building (Franklin

County State), Install Weather Reporting Equipment (Middlebury State)NE ANE VT *VTV Various Locations in Vermont 8 $ 407,645 $ 407,645 $ - $ - Install Perimeter Fencing (Edward F Knapp State), Rehabilitate RunwayNM DEN CO ASE Aspen-Pitkin County/Sardy Field P 45 $ 10,454,773 $ 2,454,773 $ 8,000,000 $ - Extend Runway - 15/33NM DEN CO ASE Aspen-Pitkin County/Sardy Field P 46 $ 1,902,398 $ - $ 1,902,398 $ - Construct Taxiway [Design/Construct], Construct TaxiwayNM DEN CO AJZ Blake Field GA 10 $ 600,000 $ 600,000 $ - $ - Expand ApronNM DEN CO BDU Boulder Municipal GA 12 $ 1,080,054 $ 1,080,054 $ - $ - Rehabilitate Apron

Page 39 of 88

Page 40: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM DEN CO APA Centennial R 44 $ 4,690,849 $ 920,849 $ 3,770,000 $ - Rehabilitate Runway - 17L/35R, Rehabilitate TaxiwayNM DEN CO COS City of Colorado Springs Municipal P 53 $ 9,848,647 $ 3,941,591 $ 5,907,056 $ - Rehabilitate TaxiwayNM DEN CO CEZ Cortez Municipal CS 29 $ 150,000 $ 150,000 $ - $ - Acquire Snow Removal EquipmentNM DEN CO DEN Denver International P 70 $ 7,000,000 $ - $ 7,000,000 $ - Expand ApronNM DEN CO DEN Denver International P 73 $ 8,773,303 $ 46,603 $ 8,726,700 $ - Rehabilitate Runway - 16L/34RNM DEN CO DEN Denver International P 72 $ 1,760,561 $ 1,760,561 $ - $ - Rehabilitate TaxiwayNM DEN CO DEN Denver International P 71 $ 11,660,530 $ 5,860,530 $ 5,800,000 $ - Rehabilitate Runway - 08/26NM DEN CO DRO Durango-La Plata County P 41 $ 70,000 $ - $ 70,000 $ - Wildlife Hazard AssessmentsNM DEN CO DRO Durango-La Plata County P 40 $ 2,274,807 $ 2,274,807 $ - $ - Rehabilitate TaxiwayNM DEN CO EGE Eagle County Regional P 49 $ 565,467 $ 565,467 $ - $ - Conduct Airport Master Plan StudyNM DEN CO EGE Eagle County Regional P 48 $ 852,834 $ 852,834 $ - $ - Rehabilitate Apron [design]NM DEN CO EGE Eagle County Regional P 47 $ 599,500 $ 599,500 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM DEN CO EIK Erie Municipal GA 12 $ 231,808 $ 231,808 $ - $ - Construct Taxiway, Rehabilitate ApronNM DEN CO FNL Fort Collins-Loveland Municipal P 29 $ 6,661,218 $ 1,038,652 $ 5,622,566 $ - Rehabilitate Runway - 15/33NM DEN CO 1V6 Fremont County GA 13 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan StudyNM DEN CO FTG Front Range R 38 $ 3,859,380 $ 224,380 $ 3,635,000 $ - Rehabilitate Runway - 08/26NM DEN CO RIL Garfield County Regional GA 21 $ 1,102,000 $ 98,073 $ 1,003,927 $ - Improve Runway Safety Area [land reimbursement] - 08/26NM DEN CO GJT Grand Junction Regional P 47 $ 458,521 $ 458,521 $ - $ - Acquire Snow Removal EquipmentNM DEN CO GJT Grand Junction Regional P 49 $ 1,186,014 $ 1,186,014 $ - $ - Conduct Environmental StudyNM DEN CO GJT Grand Junction Regional P 48 $ 382,958 $ 382,958 $ - $ - Update Airport Master Plan StudyNM DEN CO GXY Greeley-Weld County GA 23 $ 600,000 $ 600,000 $ - $ - Rehabilitate TaxiwayNM DEN CO GUC Gunnison-Crested Butte Regional P 44 $ 1,879,665 $ 1,879,665 $ - $ - Rehabilitate Apron

NM DEN CO ANK Harriet Alexander Field GA 13 $ 2,700,000 $ 2,700,000 $ - $ -

Install Runway Lighting - 06/24, Install Runway Vertical/Visual Guidance System -

06/24, Rehabilitate Runway - 06/24NM DEN CO ANK Harriet Alexander Field GA 14 $ 1,986,400 $ 1,986,400 $ - $ - Construct Taxiway, Rehabilitate Apron, Rehabilitate TaxiwayNM DEN CO AIB Hopkins Field GA 8 $ 150,000 $ 150,000 $ - $ - Improve Runway Safety Area [design] - 05/23NM DEN CO LXV Lake County GA 10 $ 500,855 $ 500,855 $ - $ - Construct Snow Removal Equipment BuildingNM DEN CO FLY Meadow Lake R 20 $ 120,000 $ 120,000 $ - $ - Acquire Land For ApproachesNM DEN CO EEO Meeker GA 9 $ 875,549 $ 875,549 $ - $ - Construct Runway - 03/21NM DEN CO MTJ Montrose Regional P 40 $ 3,658,328 $ 1,179,828 $ 2,478,500 $ - Extend TaxiwayNM DEN CO 4V0 Rangely GA 9 $ 109,000 $ 109,000 $ - $ - Rehabilitate Runway - 06/24, Rehabilitate TaxiwayNM DEN CO BJC Rocky Mountain Metropolitan R 51 $ 1,287,250 $ 154,165 $ 1,133,085 $ - Improve Runway Safety Area - 11L/29RNM DEN CO *COS State of Colorado 11 $ 250,000 $ 250,000 $ - $ - Update State System Plan StudyNM DEN CO SBS Steamboat Springs/Bob Adams Field GA 21 $ 300,000 $ 300,000 $ - $ - Acquire Easement For Approaches, Rehabilitate ApronNM DEN CO HDN Yampa Valley P 38 $ 1,712,781 $ 1,712,781 $ - $ - Modify Terminal BuildingNM DEN CO 2V6 Yuma Municipal GA 8 $ 150,000 $ 150,000 $ - $ - Rehabilitate Runway - 16/34NM DEN UT BDG Blanding Municipal GA 14 $ 575,000 $ 575,000 $ - $ - Rehabilitate Apron

Page 40 of 88

Page 41: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM DEN UT BMC Brigham City GA 23 $ 32,865 $ 32,865 $ - $ - Update Airport Master Plan StudyNM DEN UT U96 Cal Black Memorial GA 13 $ 420,742 $ 420,742 $ - $ - Conduct Environmental Study [Phase III]NM DEN UT CNY Canyonlands Field CS 22 $ 600,000 $ 600,000 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate TaxiwayNM DEN UT CNY Canyonlands Field CS 23 $ 325,000 $ 325,000 $ - $ - Construct Aircraft Rescue & Fire Fighting BuildingNM DEN UT DTA Delta Municipal GA 11 $ 132,500 $ 132,500 $ - $ - Acquire Snow Removal EquipmentNM DEN UT U69 Duchesne Municipal GA 7 $ 975,000 $ 975,000 $ - $ - Rehabilitate Runway - 17/35NM DEN UT U34 Green River Municipal GA 9 $ 150,000 $ 150,000 $ - $ - Construct Taxiway

NM DEN UT 36U

Heber City Municipal - Russ McDonald

Field GA 23 $ 70,533 $ 70,533 $ - $ - Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting - 03/21NM DEN UT LGU Logan-Cache GA 22 $ 159,893 $ 159,893 $ - $ - Construct TaxiwayNM DEN UT U14 Nephi Municipal GA 14 $ 173,660 $ 173,660 $ - $ - Rehabilitate Runway - 16/34NM DEN UT U14 Nephi Municipal GA 15 $ 230,627 $ 230,627 $ - $ - Acquire Snow Removal EquipmentNM DEN UT +06V New 15 $ 16,000,000 $ 1,000,000 $ 15,000,000 $ - Construct New AirportNM DEN UT OGD Ogden-Hinckley R 36 $ 4,447,607 $ 47,607 $ 4,400,000 $ - Rehabilitate Runway - 16/34NM DEN UT OGD Ogden-Hinckley R 35 $ 102,393 $ 102,393 $ - $ - Rehabilitate Runway - 16/34

NM DEN UT U55 Panguitch Municipal GA 10 $ 348,836 $ 348,836 $ - $ - Acquire Snow Removal Equipment, Construct Snow Removal Equipment BuildingNM DEN UT 1L9 Parowan GA 14 $ 249,547 $ 249,547 $ - $ - Improve Runway Safety Area - 04/22, Install Perimeter FencingNM DEN UT PVU Provo Municipal GA 32 $ 182,933 $ 182,933 $ - $ - Construct Terminal Building, Install Perimeter FencingNM DEN UT PVU Provo Municipal GA 33 $ 289,654 $ 289,654 $ - $ - Construct Terminal Building, Install Perimeter FencingNM DEN UT RIF Richfield Municipal GA 13 $ 7,915,030 $ 1,915,030 $ 6,000,000 $ - Construct Runway - 01/19NM DEN UT 74V Roosevelt Municipal GA 10 $ 103,170 $ 103,170 $ - $ - Expand Apron, Rehabilitate ApronNM DEN UT SLC Salt Lake City International P 96 $ 8,697,207 $ 3,378,889 $ 5,318,318 $ - Construct ApronNM DEN UT SLC Salt Lake City International P 97 $ 6,161,619 $ 661,619 $ 5,500,000 $ - Construct ApronNM DEN UT SLC Salt Lake City International P 98 $ 9,005,892 $ 33,549 $ 8,972,343 $ - Construct ApronNM DEN UT U77 Spanish Fork-Springville GA 19 $ 1,172,096 $ 1,172,096 $ - $ - Extend Runway - 12/30

NM DEN UT 38U Wayne Wonderland GA 7 $ 407,908 $ 407,908 $ - $ -

Improve Runway Safety Area - 13/31, Install Perimeter Fencing, Rehabilitate

Runway Lighting - 13/31NM DEN UT ENV Wendover GA 23 $ 4,964,179 $ 1,864,179 $ 3,100,000 $ - Construct Taxiway, Extend Runway [Environmental Assessment] - 08/26NM DEN WY AFO Afton Municipal GA 20 $ 124,051 $ 124,051 $ - $ - Construct Taxiway [EA]

NM DEN WY CPR Casper/Natrona County International P 50 $ 250,000 $ 250,000 $ - $ - Update Airport Master Plan StudyNM DEN WY DWX Dixon GA 13 $ 150,000 $ 150,000 $ - $ - Install Perimeter Fencing, Rehabilitate Runway Lighting - 06/24NM DEN WY FBR Fort Bridger GA 10 $ 150,000 $ 150,000 $ - $ - Construct Snow Removal Equipment Building, Install Perimeter FencingNM DEN WY GCC Gillette-Campbell County P 36 $ 1,207,574 $ 1,207,574 $ - $ - Expand ApronNM DEN WY W43 Hulett Municipal GA 16 $ 358,550 $ 358,550 $ - $ - Improve Runway Safety Area - 13/31NM DEN WY LND Hunt Field GA 11 $ 600,000 $ 600,000 $ - $ - Construct Taxiway

Page 41 of 88

Page 42: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM DEN WY JAC Jackson Hole P 46 $ 8,883,899 $ 1,000,000 $ 7,883,899 $ - Construct Deicing Containment Facility, Install Runway Lighting - 01/19NM DEN WY JAC Jackson Hole P 45 $ 1,344,910 $ 1,344,910 $ - $ - Expand Terminal BuildingNM DEN WY BYG Johnson County GA 15 $ 125,000 $ 125,000 $ - $ - Improve Runway Safety Area - 13/31NM DEN WY EMM Kemmerer Municipal GA 17 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan StudyNM DEN WY LAR Laramie Regional CS 28 $ 100,000 $ 100,000 $ - $ - Rehabilitate Runway - 12/30NM DEN WY LSK Lusk Municipal GA 10 $ 300,000 $ 300,000 $ - $ - Rehabilitate Runway - 10/28NM DEN WY BPI Miley Memorial Field GA 12 $ 444,274 $ 444,274 $ - $ - Expand ApronNM DEN WY ECS Mondell Field GA 13 $ 385,250 $ 385,250 $ - $ - Extend Runway - 13/31NM DEN WY +09F New (Replacement Airport) 2 $ 3,675,241 $ 3,675,241 $ - $ - Construct New AirportNM DEN WY U68 North Big Horn County GA 11 $ 150,000 $ 150,000 $ - $ - Conduct Airport Master Plan StudyNM DEN WY EAN Phifer Airfield GA 6 $ 450,000 $ 450,000 $ - $ - Acquire Land For ApproachesNM DEN WY POY Powell Municipal GA 12 $ 524,775 $ 524,775 $ - $ - Construct TaxiwayNM DEN WY RIW Riverton Regional P 33 $ 468,927 $ 468,927 $ - $ - Remove ObstructionsNM DEN WY RKS Rock Springs-Sweetwater County P 27 $ 427,500 $ 427,500 $ - $ - Update Airport Master Plan StudyNM DEN WY RKS Rock Springs-Sweetwater County P 28 $ 250,000 $ 250,000 $ - $ - Construct TaxiwayNM DEN WY SHR Sheridan County P 42 $ 2,907,061 $ 907,061 $ 2,000,000 $ - Rehabilitate TaxiwayNM DEN WY SHR Sheridan County P 40 $ 142,324 $ 142,324 $ - $ - Rehabilitate Taxiway, Rehabilitate Taxiway LightingNM DEN WY SHR Sheridan County P 41 $ 536,331 $ 536,331 $ - $ - Rehabilitate Taxiway LightingNM DEN WY GEY South Big Horn County GA 18 $ 300,000 $ 300,000 $ - $ - Acquire Snow Removal EquipmentNM DEN WY COD Yellowstone Regional P 28 $ 344,020 $ 344,020 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM HLN MT BHK Baker Municipal GA 14 $ 786,751 $ 786,751 $ - $ - Extend Runway [Phase IV] - 13/31, Extend Taxiway [Phase I]NM HLN MT BHK Baker Municipal GA 13 $ 968,973 $ 968,973 $ - $ - Extend Runway [Phase III] - 13/31NM HLN MT BTM Bert Mooney P 45 $ 3,095,767 $ 983,521 $ 2,112,246 $ - Rehabilitate Runway - 11/29, Rehabilitate TaxiwayNM HLN MT BIL Billings Logan International P 41 $ 910,646 $ 910,646 $ - $ - Rehabilitate Runway [Phase II] - 10L/28R

NM HLN MT BIL Billings Logan International P 40 $ 1,724,709 $ 1,724,709 $ - $ -

Construct Taxiway [Phase II], Rehabilitate Runway [Phase I] - 10L/28R, Runway

Incursion MarkingsNM HLN MT BIL Billings Logan International P 42 $ 313,500 $ 313,500 $ - $ - Rehabilitate Runway [Phase III] - 10L/28RNM HLN MT 3U3 Bowman Field GA 14 $ 1,144,499 $ 1,144,499 $ - $ - Construct Taxiway, Rehabilitate Runway [Phase III] - 04/22NM HLN MT 00F Broadus GA 5 $ 321,900 $ 321,900 $ - $ - Install Perimeter Fencing, Rehabilitate Runway - 10/28NM HLN MT 4U6 Circle Town County GA 5 $ 281,571 $ 281,571 $ - $ - Install Perimeter FencingNM HLN MT CTB Cut Bank Municipal GA 9 $ 91,000 $ 91,000 $ - $ - Rehabilitate Runway [Phase I] - 13/31NM HLN MT GDV Dawson Community GA 10 $ 445,251 $ 445,251 $ - $ - Conduct Environmental Study, Construct Taxiway [Phase I]

NM HLN MT DLN Dillon GA 10 $ 355,000 $ 355,000 $ - $ - Acquire Snow Removal Equipment, Construct Snow Removal Equipment BuildingNM HLN MT S71 Edgar G Obie GA 11 $ 186,447 $ 186,447 $ - $ - Rehabilitate Runway Lighting - 08/26NM HLN MT 97M Ekalaka GA 8 $ 85,500 $ 85,500 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway

Page 42 of 88

Page 43: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM HLN MT MLS Frank Wiley Field GA 13 $ 210,287 $ 210,287 $ - $ -

Improve Access Road, Rehabilitate Apron, Rehabilitate Runway - 04/22,

Rehabilitate Runway - 12/30, Rehabilitate TaxiwayNM HLN MT BZN Gallatin Field P 39 $ 2,263,608 $ 263,608 $ 2,000,000 $ - Expand Terminal Building [Phase IV]NM HLN MT BZN Gallatin Field P 37 $ 1,185,053 $ 1,185,053 $ - $ - Security Enhancements [Phase II]NM HLN MT BZN Gallatin Field P 38 $ 125,000 $ - $ 125,000 $ - Wildlife Hazard AssessmentsNM HLN MT GPI Glacier Park International P 42 $ 6,483,541 $ 1,383,541 $ 5,100,000 $ - Rehabilitate TaxiwayNM HLN MT GPI Glacier Park International P 44 $ 2,349,000 $ - $ 2,349,000 $ - Rehabilitate Apron

NM HLN MT GTF Great Falls International P 52 $ 1,500,000 $ - $ 1,500,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase V (assumes

30 homes)]

NM HLN MT GTF Great Falls International P 51 $ 500,000 $ - $ 500,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase IV (design)]

NM HLN MT GTF Great Falls International P 50 $ 853,870 $ 226,348 $ 627,522 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle, Update Airport Master Plan StudyNM HLN MT GTF Great Falls International P 49 $ 1,307,121 $ 1,307,121 $ - $ - Modify Terminal Building [Phase I], Rehabilitate ApronNM HLN MT GTF Great Falls International P 53 $ 605,709 $ 5,709 $ 600,000 $ - Improve Airport DrainageNM HLN MT HLN Helena Regional P 43 $ 1,569,288 $ 1,569,288 $ - $ - Acquire Snow Removal EquipmentNM HLN MT LWT Lewistown Municipal GA 15 $ 132,435 $ 132,435 $ - $ - Extend Taxiway

NM HLN MT S59 Libby GA 10 $ 336,541 $ 336,541 $ - $ -

Install Runway Vertical/Visual Guidance System - 15/33, Rehabilitate Runway

Lighting - 15/33NM HLN MT M75 Malta GA 9 $ 336,021 $ 336,021 $ - $ - Install Perimeter FencingNM HLN MT 9S4 Mineral County GA 8 $ 259,587 $ 259,587 $ - $ - Construct Building

NM HLN MT LVM Mission Field GA 6 $ 2,401,000 $ 2,401,000 $ - $ -

Construct Taxiway, Rehabilitate Runway [Phase II] - 04/22, Rehabilitate Runway

Lighting [Phase II] - 04/22, Rehabilitate Taxiway [Phase II], Rehabilitate TaxiwayNM HLN MT LVM Mission Field GA 7 $ 810,039 $ 810,039 $ - $ - Expand Apron, Rehabilitate Apron

NM HLN MT MSO Missoula International P 54 $ 4,206,760 $ 2,206,760 $ 2,000,000 $ -

Rehabilitate Runway - 07/25, Rehabilitate Runway - 11/29, Rehabilitate Taxiway,

Security EnhancementsNM HLN MT +00U New 5 $ 313,750 $ 313,750 $ - $ - Construct New Airport [Phase II]NM HLN MT S34 Plains GA 8 $ 188,850 $ 188,850 $ - $ - Rehabilitate Access Road, Rehabilitate Runway - 13/31NM HLN MT 6S5 Ravalli County GA 11 $ 40,000 $ 40,000 $ - $ - Conduct Environmental Study [Phase III]

NM HLN MT RPX Roundup GA 9 $ 296,399 $ 296,399 $ - $ -

Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Taxiway, Remove

Obstructions

NM HLN MT 9S2 Scobey GA 7 $ 536,088 $ 536,088 $ - $ -

Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building,

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System -

12/30

Page 43 of 88

Page 44: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM HLN MT SBX Shelby GA 10 $ 168,000 $ 168,000 $ - $ -

Construct Taxiway [Phase I], Rehabilitate Apron, Rehabilitate Runway - 05/23,

Rehabilitate Runway - 11/29, Rehabilitate Taxiway [Phase I], Rehabilitate TaxiwayNM HLN MT *MTS State of Montana 9 $ 95,634 $ 95,634 $ - $ - Conduct State System Plan StudyNM HLN MT 32S Stevensville GA 9 $ 127,617 $ 127,617 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate Taxiway

NM HLN MT 9S5 Three Forks GA 7 $ 266,351 $ 266,351 $ - $ -

Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate Runway -

02/20, Rehabilitate Taxiway

NM HLN MT 7S1 Twin Bridges GA 9 $ 59,194 $ 59,194 $ - $ -

Rehabilitate Apron [Phase I], Rehabilitate Runway [Phase I] - 17/35, Rehabilitate

Taxiway [Phase I]NM HLN MT 7S6 White Sulphur Springs GA 7 $ 28,325 $ 28,325 $ - $ - Acquire Land For Approaches, Acquire Land for Development

NM HLN MT GGW Wokal Field/Glasgow International GA 16 $ 560,968 $ 560,968 $ - $ -

Rehabilitate Runway [Phase III] - 12/30, Rehabilitate Runway Lighting [Phase III] -

12/30

NM HLN MT GGW Wokal Field/Glasgow International GA 15 $ 4,254,902 $ 654,902 $ 3,600,000 $ -

Rehabilitate Runway [Phase II] - 12/30, Rehabilitate Runway Lighting [Phase II] -

12/30, Rehabilitate TaxiwayNM HLN MT 6S3 Woltermann Memorial GA 10 $ 208,964 $ 208,964 $ - $ - Construct Snow Removal Equipment Building

NM HLN MT WYS Yellowstone CS 10 $ 163,709 $ 163,709 $ - $ -

Construct Aircraft Rescue & Fire Fighting Building [Phase I], Improve Airport

Miscellaneous Improvements, Install Guidance SignsNM HLN MT WYS Yellowstone CS 11 $ 188,978 $ 188,978 $ - $ - Conduct Airport Master Plan Study

NM SEA ID U36 Aberdeen Municipal GA 5 $ 201,979 $ 201,979 $ - $ - Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building

NM SEA ID BOI Boise Air Terminal/Gowen Field P 56 $ 4,812,750 $ 4,812,750 $ - $ -

Acquire Snow Removal Equipment, Rehabilitate Access Road, Rehabilitate Apron,

Rehabilitate TaxiwayNM SEA ID 65S Boundary County GA 11 $ 63,183 $ 63,183 $ - $ - Acquire Land For ApproachesNM SEA ID U03 Buhl Municipal GA 11 $ 20,900 $ 20,900 $ - $ - Rehabilitate Runway Lighting - 09/27NM SEA ID EUL Caldwell Industrial R 23 $ 77,000 $ 77,000 $ - $ - Construct Taxiway, Construct TaxiwayNM SEA ID LLJ Challis GA 7 $ 83,200 $ 83,200 $ - $ - Update Airport Master Plan Study

NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 35 $ 200,000 $ 200,000 $ - $ - Rehabilitate Runway - 01/19, Rehabilitate Taxiway

NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 34 $ 1,228,532 $ 1,228,532 $ - $ - Construct Aircraft Rescue & Fire Fighting Building

NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 36 $ 361,926 $ 361,926 $ - $ - Rehabilitate Runway - 01/19, Rehabilitate TaxiwayNM SEA ID DIJ Driggs-Reed Memorial GA 11 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan StudyNM SEA ID GNG Gooding Municipal GA 8 $ 128,470 $ 128,470 $ - $ - Rehabilitate Taxiway

NM SEA ID IDA Idaho Falls Regional P 36 $ 1,766,524 $ 1,766,524 $ - $ -

Improve Runway Safety Area - 02/20, Install Perimeter Fencing, Rehabilitate

ApronNM SEA ID TWF Joslin Field - Magic Valley Regional P 32 $ 153,308 $ 153,308 $ - $ - Construct Snow Removal Equipment Building

Page 44 of 88

Page 45: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM SEA ID LWS Lewiston-Nez Perce County P 32 $ 200,000 $ 200,000 $ - $ - Construct Apron, Construct TaxiwayNM SEA ID MYL McCall Municipal GA 20 $ 445,803 $ 445,803 $ - $ - Construct Snow Removal Equipment BuildingNM SEA ID MAN Nampa Municipal GA 23 $ 1,026,000 $ 411,595 $ 614,405 $ - Rehabilitate Runway - 11/29

NM SEA ID PIH Pocatello Regional P 34 $ 926,503 $ 890,000 $ 36,503 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Miscellaneous NAVAIDS,

Rehabilitate Runway - 17/35, Runway Incursion MarkingsNM SEA ID 1S6 Priest River Municipal GA 3 $ 186,266 $ 186,266 $ - $ - Construct TaxiwayNM SEA ID S83 Shoshone County GA 7 $ 790,010 $ 790,010 $ - $ - Rehabilitate ApronNM SEA ID *IDS State of Idaho 7 $ 350,000 $ 350,000 $ - $ - Update State System Plan StudyNM SEA ID S87 Weiser Municipal GA 9 $ 1,138,776 $ 1,138,776 $ - $ - Rehabilitate Runway - 12/30

NM SEA OR AST Astoria Regional GA 19 $ 1,782,000 $ 150,000 $ 1,632,000 $ -

Install Airfield Guidance Signs, Rehabilitate Runway Lighting - 08/26, Rehabilitate

Runway Lighting - 13/31, Rehabilitate Taxiway LightingNM SEA OR BKE Baker City Municipal GA 11 $ 120,000 $ 120,000 $ - $ - Construct Taxiway, Rehabilitate TaxiwayNM SEA OR S05 Bandon State GA 6 $ 257,000 $ 257,000 $ - $ - Improve Runway Safety Area - 16/34, Rehabilitate Runway - 16/34NM SEA OR BDN Bend Municipal GA 21 $ 3,425,000 $ 555,321 $ 2,869,679 $ - Rehabilitate TaxiwayNM SEA OR BOK Brookings GA 11 $ 469,732 $ 469,732 $ - $ - Rehabilitate Apron

NM SEA OR 2S7 Chiloquin State GA 4 $ 200,000 $ 200,000 $ - $ -

Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Runway - 17/35,

Remove Obstructions

NM SEA OR DLS

Columbia Gorge Regional/The Dalles

Municipal GA 9 $ 2,372,009 $ 2,372,009 $ - $ - Rehabilitate Runway - 12/30NM SEA OR CVO Corvallis Municipal GA 16 $ 237,500 $ 237,500 $ - $ - Update Airport Master Plan Study

NM SEA OR PDT Eastern Oregon Regional at Pendleton CS 21 $ 690,893 $ 150,000 $ 540,893 $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM SEA OR 6S2 Florence Municipal GA 11 $ 797,628 $ 797,628 $ - $ - Expand Apron, Install Perimeter Fencing, Rehabilitate ApronNM SEA OR 6S2 Florence Municipal GA 12 $ 227,843 $ 227,843 $ - $ - Expand Apron, Install Perimeter Fencing, Rehabilitate ApronNM SEA OR 4S1 Gold Beach Municipal GA 9 $ 143,735 $ 143,735 $ - $ - Rehabilitate TaxiwayNM SEA OR JSY Joseph State GA 8 $ 1,472,500 $ 1,472,500 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate Taxiway

NM SEA OR LMT Klamath Falls P 32 $ 360,555 $ 360,555 $ - $ -

Acquire Snow Removal Equipment, Install Runway Sensors - 14/32, Rehabilitate

Service RoadNM SEA OR LGD La Grande/Union County GA 18 $ 2,327,500 $ 127,500 $ 2,200,000 $ - Improve Runway Safety Area - 12/30NM SEA OR LKV Lake County GA 6 $ 131,000 $ 131,000 $ - $ - Update Airport Master Plan Study

NM SEA OR 9S9 Lexington GA 6 $ 1,978,805 $ 1,978,805 $ - $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System -

08/26, Rehabilitate Runway - 08/26NM SEA OR S33 Madras Municipal GA 7 $ 321,000 $ 321,000 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 16/34

NM SEA OR EUG Mahlon Sweet Field P 47 $ 2,397,048 $ 2,397,048 $ - $ -

Acquire Snow Removal Equipment, Construct Deicing Containment Facility,

Rehabilitate Apron, Rehabilitate Taxiway

NM SEA OR ONP Newport Municipal GA 18 $ 76,142 $ 76,142 $ - $ - Acquire Emergency Generator, Install Guidance Signs, Rehabilitate Runway - 02/20

Page 45 of 88

Page 46: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM SEA OR ONO Ontario Municipal GA 10 $ 553,168 $ 553,168 $ - $ -

Expand Apron, Install Runway Lighting - 14/32, Rehabilitate Apron, Rehabilitate

Runway - 14/32, Rehabilitate TaxiwayNM SEA OR PDX Portland International P 65 $ 10,606,765 $ 1,283,471 $ 9,323,294 $ - Rehabilitate Runway - 10R/28LNM SEA OR PDX Portland International P 66 $ 4,427,161 $ 609,525 $ 3,817,636 $ - Rehabilitate Runway - 10R/28LNM SEA OR PDX Portland International P 67 $ 10,600,000 $ - $ 10,600,000 $ - Rehabilitate TaxiwayNM SEA OR PDX Portland International P 64 $ 8,350,188 $ 1,491,118 $ 6,859,070 $ - Rehabilitate Runway - 10R/28LNM SEA OR HIO Portland-Hillsboro R 24 $ 511,000 $ 150,000 $ 361,000 $ - Rehabilitate Runway - 12/30NM SEA OR RDM Roberts Field P 34 $ 600,000 $ 600,000 $ - $ - Extend Taxiway, Rehabilitate Apron

NM SEA OR MFR Rogue Valley International - Medford P 37 $ 1,985,000 $ 1,985,000 $ - $ - Acquire Snow Removal Equipment, Rehabilitate Taxiway, Rehabilitate TaxiwayNM SEA OR RBG Roseburg Regional GA 18 $ 262,324 $ 262,324 $ - $ - Rehabilitate TaxiwayNM SEA OR RBG Roseburg Regional GA 19 $ 511,215 $ 511,215 $ - $ - Remove ObstructionsNM SEA OR S45 Siletz Bay State GA 5 $ 150,000 $ 150,000 $ - $ - Remove ObstructionsNM SEA OR OTH Southwest Oregon Regional P 35 $ 727,070 $ 727,070 $ - $ - Construct Terminal BuildingNM SEA OR OTH Southwest Oregon Regional P 34 $ 272,930 $ 272,930 $ - $ - Update Airport Master Plan StudyNM SEA OR *ORS State of Oregon 10 $ 182,000 $ 182,000 $ - $ - Update State System Plan StudyNM SEA OR TMK Tillamook GA 12 $ 241,723 $ 241,723 $ - $ - Rehabilitate Runway - 13/31NM SEA OR TMK Tillamook GA 13 $ 2,697,929 $ 60,431 $ 2,637,498 $ - Rehabilitate Runway - 13/31

NM SEA OR *ORV Various Locations in Oregon 25 $ 79,696 $ 79,696 $ - $ -

Rehabilitate Apron (Ashland Municipal-Sumner Parker Field; Gold Beach

Municipal; Grants Pass), Rehabilitate Runway (Bandon State - 16/34; Christmas

Valley - 07/25; Illinois Valley - 18/36; Lake County - 16/34; Roseburg Regional -

16/34), Rehabilitate Taxiway (Cottage Grove State; Florence Municipal; Hobby

Field)NM SEA WA AWO Arlington Municipal GA 22 $ 1,245,925 $ 1,245,925 $ - $ - Acquire Land For Approaches

NM SEA WA BLI Bellingham International P 47 $ 1,863,731 $ 1,620,636 $ 243,095 $ -

Acquire Interactive Training System, Acquire Snow Removal Equipment, Improve

Airport Drainage

NM SEA WA BLI Bellingham International P 48 $ 371,943 $ 371,943 $ - $ -

Acquire Aircraft Deicing Equipment, Construct Apron [Design], Expand Terminal

Building, Improve Access RoadNM SEA WA BLI Bellingham International P 46 $ 487,041 $ 487,041 $ - $ - Update Airport Master Plan Study

NM SEA WA BFI Boeing Field/King County International P 45 $ 3,000,000 $ - $ 3,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

NM SEA WA BFI Boeing Field/King County International P 44 $ 5,000,000 $ - $ 5,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLNM SEA WA PWT Bremerton National GA 25 $ 152,431 $ 152,431 $ - $ - Install Perimeter FencingNM SEA WA @00K Central Puget Sound Region 4 $ 190,000 $ 190,000 $ - $ - Conduct Metropolitan System Plan StudyNM SEA WA CLS Chehalis-Centralia GA 13 $ 170,000 $ 170,000 $ - $ - Acquire Snow Removal Equipment, Install Perimeter Fencing

Page 46 of 88

Page 47: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM SEA WA DEW Deer Park GA 19 $ 2,561,588 $ 2,561,588 $ - $ - Construct Apron, Rehabilitate Apron, Rehabilitate Runway Lighting - 16/34

NM SEA WA TDO

Ed Carlson Memorial Field - South Lewis

County GA 6 $ 445,327 $ 445,327 $ - $ -

Rehabilitate Runway [(Fog/Crack Seal)] - 06/24, Remove Obstructions [Remove

Obstructions (Trees)]NM SEA WA EPH Ephrata Municipal GA 12 $ 135,125 $ 135,125 $ - $ - Rehabilitate Runway - 11/29NM SEA WA EPH Ephrata Municipal GA 13 $ 282,257 $ 282,257 $ - $ - Install Miscellaneous NAVAIDS, Rehabilitate Taxiway [Design]NM SEA WA SFF Felts Field R 25 $ 191,264 $ 191,264 $ - $ - Construct Service Road

NM SEA WA FHR Friday Harbor P 27 $ 1,387,772 $ 1,387,772 $ - $ -

Improve Airport Drainage [Phase 3], Install Emergency Generator, Install

Perimeter Fencing, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting, Remove

ObstructionsNM SEA WA FHR Friday Harbor P 26 $ 146,167 $ 146,167 $ - $ - Update Airport Master Plan StudyNM SEA WA MWH Grant County International CS 37 $ 2,500,000 $ - $ 2,500,000 $ - Rehabilitate ApronNM SEA WA S23 Ione Municipal GA 4 $ 79,025 $ 79,025 $ - $ - Install Miscellaneous NAVAIDS [Construction Ph2]

NM SEA WA S31 Lopez Island GA 11 $ 2,056,172 $ - $ 2,056,172 $ -

Construct Taxiway [Construction], Rehabilitate Apron [Construction], Rehabilitate

Taxiway [Construction]

NM SEA WA S52 Methow Valley State GA 6 $ 725,419 $ 725,419 $ - $ -

Improve Airport Miscellaneous Improvements, Install Airfield Guidance Signs,

Install Perimeter Fencing, Install Runway Lighting - 13/31, Install Runway

Vertical/Visual Guidance System - 13/31, Install Taxiway Lighting

NM SEA WA 43D Odessa Municipal GA 4 $ 150,000 $ 150,000 $ - $ -

Improve Airport Miscellaneous Improvements [Phase 1], Rehabilitate Runway -

02/20NM SEA WA OLM Olympia Regional GA 22 $ 225,000 $ - $ 225,000 $ - Install Airfield Guidance SignsNM SEA WA OLM Olympia Regional GA 21 $ 150,000 $ 150,000 $ - $ - Rehabilitate Taxiway [C & D]NM SEA WA ORS Orcas Island CS 10 $ 142,500 $ 142,500 $ - $ - Rehabilitate ApronNM SEA WA ORS Orcas Island CS 9 $ 400,666 $ 400,666 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate TaxiwayNM SEA WA S70 Othello Municipal GA 7 $ 1,558,043 $ 1,558,043 $ - $ - Construct Runway - 07/25NM SEA WA EAT Pangborn Memorial P 33 $ 207,661 $ 207,661 $ - $ - Extend Runway - 12/30NM SEA WA EAT Pangborn Memorial P 34 $ 1,634,354 $ 1,086,354 $ 548,000 $ - Rehabilitate Taxiway LightingNM SEA WA VUO Pearson Field GA 8 $ 93,708 $ 93,708 $ - $ - Update Airport Master Plan Study

NM SEA WA S94 Port of Whitman Business Air Center GA 5 $ 77,425 $ 77,425 $ - $ - Construct Apron

NM SEA WA PUW Pullman/Moscow Regional P 37 $ 4,107,458 $ 1,107,458 $ 3,000,000 $ -

Acquire Snow Removal Equipment, Expand Aircraft Rescue & Fire Fighting

Building, Rehabilitate Runway - 05/23, Security EnhancementsNM SEA WA RNT Renton Municipal R 22 $ 150,000 $ 150,000 $ - $ - Rehabilitate TaxiwayNM SEA WA RLD Richland GA 23 $ 94,995 $ 94,995 $ - $ - Construct Taxiway, Rehabilitate TaxiwayNM SEA WA 72S Rosalia Municipal GA 7 $ 235,978 $ 235,978 $ - $ - Rehabilitate ApronNM SEA WA SEA Seattle-Tacoma International P 126 $ 3,317,632 $ 3,317,632 $ - $ - Construct Runway - Plan-1

Page 47 of 88

Page 48: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

NM SEA WA SEA Seattle-Tacoma International P 124 $ 10,901,258 $ 2,701,258 $ 8,200,000 $ - Construct Runway - Plan-1NM SEA WA SEA Seattle-Tacoma International P 125 $ 3,612,679 $ - $ 3,612,679 $ - VALE InfrastructureNM SEA WA BVS Skagit Regional GA 19 $ 8,975,000 $ - $ 8,975,000 $ - Install Perimeter Fencing, Rehabilitate Runway - 10/28NM SEA WA BVS Skagit Regional GA 18 $ 300,000 $ 300,000 $ - $ - Install Perimeter Fencing, Rehabilitate Runway - 10/28NM SEA WA PAE Snohomish County (Paine Field) R 50 $ 8,200,000 $ 150,000 $ 8,050,000 $ - Rehabilitate Runway - 16R/34LNM SEA WA KLS Southwest Washington Regional GA 14 $ 489,863 $ 489,863 $ - $ - Construct TaxiwayNM SEA WA GEG Spokane International P 47 $ 3,145,996 $ 3,145,996 $ - $ - Rehabilitate Runway - 03/21NM SEA WA GEG Spokane International P 46 $ 18,868,658 $ 2,709,757 $ 16,158,901 $ - Rehabilitate Runway - 03/21NM SEA WA *WAS State of Washington 12 $ 125,000 $ 125,000 $ - $ - Conduct State System Plan StudyNM SEA WA 1S5 Sunnyside Municipal GA 5 $ 114,123 $ 114,123 $ - $ - Install Weather Reporting EquipmentNM SEA WA TIW Tacoma Narrows GA 14 $ 172,500 $ 172,500 $ - $ - Rehabilitate Runway - 17/35NM SEA WA PSC Tri-Cities P 38 $ 1,897,630 $ 1,897,630 $ - $ - Rehabilitate Runway - 12/30, Rehabilitate TaxiwayNM SEA WA PSC Tri-Cities P 37 $ 945,000 $ 945,000 $ - $ - Rehabilitate Access Road

NM SEA WA 2S8 Wilbur GA 10 $ 150,000 $ 150,000 $ - $ - Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building

NM SEA WA CLM William R Fairchild International P 30 $ 456,706 $ 456,706 $ - $ -

Acquire Snow Removal Equipment, Install Airfield Guidance Signs, Rehabilitate

Taxiway LightingNM SEA WA CLM William R Fairchild International P 29 $ 138,237 $ 138,237 $ - $ - Conduct Miscellaneous Study

NM SEA WA YKM Yakima Air Terminal/McAllister Field P 32 $ 477,642 $ 477,642 $ - $ - Update Airport Master Plan Study

NM SEA WA YKM Yakima Air Terminal/McAllister Field P 33 $ 418,950 $ 418,950 $ - $ -

Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate Taxiway [Ph1

(design)]SO ATL GA AGS Augusta Regional at Bush Field P 34 $ 480,349 $ 480,349 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleSO ATL GA BQK Brunswick Golden Isles P 32 $ 1,350,000 $ 1,000,000 $ 350,000 $ - Acquire Equipment, Construct Taxiway [(design done, construct ph I)]SO ATL GA 4A7 Clayton County - Tara Field GA 17 $ 8,685,000 $ 85,000 $ 8,600,000 $ - Acquire Land for Development [Acquire 90.5 Acres For Development]

SO ATL GA CSG Columbus Metropolitan P 36 $ 345,155 $ 345,155 $ - $ -

Acquire Safety Equipment and/or Fencing, Construct Taxiway [phase i - Ty C (west)

relocation design], Rehabilitate Runway Lighting [design ph I] - 06/24, Security

EnhancementsSO ATL GA *GAB Georgia State Block Grant Program 7 $ 27,416,870 $ 20,166,870 $ 7,250,000 $ - Non primary development projects in state block grant programSO ATL GA *GAB Georgia State Block Grant Program 8 $ 5,000,000 $ - $ 5,000,000 $ - Non primary development projects in state block grant program

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 101 $ 3,076,639 $ - $ 3,076,639 $ - Acquire Land For Approaches

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 103 $ 1,000,000 $ - $ 1,000,000 $ - Improve Runway Safety Area [Install 10/28 Bridge Railing] - 10/28

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 102 $ 11,795,086 $ 8,795,086 $ 3,000,000 $ - Construct Taxiway [extend TYs SC & SJ (now Ty U) to the North]

Page 48 of 88

Page 49: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 100 $ 10,000,000 $ - $ 10,000,000 $ - Extend Runway - 10/28

SO ATL GA SAV Savannah/Hilton Head International P 52 $ 7,889,145 $ 3,889,145 $ 4,000,000 $ -

Construct Taxiway [North Airfield Development - Ph I EA], Construct Taxiway

[North Airfield Development - Ph II Storm Water Management Plan], Construct

Taxiway [North Airfield Development - Ph IV Relocate Rd/ Tunnel Construction],

Construct Taxiway [North Airfield Development - Ph V-A Extend Ty A (total

$14,168,543)], Construct Taxiway [North airfield development - Ph III project

design (road reloc & tunnel, Ty A ext, Ty H const, vault & traffic study)]

SO ATL GA ABY Southwest Georgia Regional P 38 $ 3,242,848 $ 1,196,887 $ 2,045,961 $ - Construct Terminal Building [construct terminal building area (phase III)]

SO ATL GA VLD Valdosta Regional P 28 $ 1,000,000 $ 1,000,000 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [limited to Index A truck],

Construct Aircraft Rescue & Fire Fighting Building [phase I - design], Improve

Airport Drainage [phase II - drainage impr]

SO ATL NC OAJ Albert J Ellis P 32 $ 1,306,250 $ 1,306,250 $ - $ -

Construct Terminal Building [PHASE 2 - TERM BLDG DESIGN], Improve Airport

DrainageSO ATL NC OAJ Albert J Ellis P 33 $ 9,829,975 $ 1,829,975 $ 8,000,000 $ - Construct Terminal Building [PHASE 3 CONSTRUCTION]

SO ATL NC AVL Asheville Regional P 40 $ 1,669,030 $ 1,669,030 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct Airport Master Plan

Study, Construct Aircraft Rescue & Fire Fighting Building [DESIGN]SO ATL NC AVL Asheville Regional P 39 $ 514,139 $ 514,139 $ - $ - Expand Terminal BuildingSO ATL NC CLT Charlotte/Douglas International P 65 $ 3,695,893 $ 3,695,893 $ - $ - Construct Runway [LOI Payment 5 (Part B Entitlemtns)] - 18R/36LSO ATL NC CLT Charlotte/Douglas International P 64 $ 16,804,107 $ 4,804,107 $ 12,000,000 $ - Construct Runway [LOI Payment 5] - 18R/36L

SO ATL NC EWN Coastal Carolina Regional P 33 $ 180,489 $ 180,489 $ - $ -

Improve Runway Safety Area [FAA REIMBURSABLE AGREEMENT FOR THE

LOCALIZER RELOCATION] - 04/22

SO ATL NC EWN Coastal Carolina Regional P 34 $ 1,123,097 $ 1,123,097 $ - $ -

Improve Runway Safety Area [RUNWAY 4/22 EXTENSION - LOC RELOCATE - RWY

22 EXTENSION] - 04/22, Rehabilitate Taxiway [DESIGN], Remove Obstructions

SO ATL NC FAY Fayetteville Regional/Grannis Field P 38 $ 4,981,210 $ 1,981,210 $ 3,000,000 $ -

Improve Runway Safety Area [DESIGN] - 04/22, Rehabilitate Apron

[CONSTRUCTION]

SO ATL NC *NCB

North Carolina State Block Grant

Program 41 $ 3,350,000 $ - $ 3,350,000 $ - Non primary development projects in state block grant program

SO ATL NC *NCB

North Carolina State Block Grant

Program 42 $ 23,356,970 $ 15,356,970 $ 8,000,000 $ -

Non primary development projects in state block grant program, Non primary

development projects in state block grant program

SO ATL NC GSO Piedmont Triad International P 65 $ 1,766,099 $ - $ 1,766,099 $ -

Acquire Land for Noise Compatibility within 70 - 74 DNL, Install Noise Monitoring

System [Purchase and install noise monitoring system]

Page 49 of 88

Page 50: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ATL NC GSO Piedmont Triad International P 63 $ 1,982,384 $ 1,982,384 $ - $ -

Construct Runway [Construct Runway 5L-23R and associated taxiways; Construct

connector taxiway "F"; Extend taxiway "K"; Acquire Land, Phase X] - Plan-1

SO ATL NC GSO Piedmont Triad International P 64 $ 2,370,421 $ 2,370,421 $ - $ -

Construct Runway [FY11 BALANCE OF SCHEDULED PAYMENT 10 FOR LOI L02-

2013] - Plan-1SO ATL NC PGV Pitt-Greenville P 36 $ 1,020,288 $ 1,020,288 $ - $ - Rehabilitate Apron, Update Airport Master Plan StudySO ATL NC RDU Raleigh-Durham International P 41 $ 3,419,134 $ 3,419,134 $ - $ - Rehabilitate Runway Lighting - 05R/23L, Rehabilitate Taxiway

SO ATL NC ILM Wilmington International P 44 $ 7,711,503 $ 2,862,735 $ 4,848,768 $ - Rehabilitate Taxiway [CONSTRUCTION], Rehabilitate Taxiway [CONSTRUCTION]

SO ATL SC AIK Aiken Municipal GA 14 $ 1,120,140 $ 343,383 $ 776,757 $ -

Install Runway Vertical/Visual Guidance System [Install 2 Box PAPIs on Runway 7

and Runway 25 - Phase II Construction] - 07/25, Rehabilitate Runway Lighting

[Phase II - Construction] - 07/25, Rehabilitate Taxiway Lighting [Phase II -

Construction]

SO ATL SC BNL Barnwell Regional GA 9 $ 22,825 $ 22,825 $ - $ -

Conduct Environmental Study [Complete Groundwater Site Assessment and

Installation of Fuel Farm Monitoring Wells], Conduct Environmental Study

[Prepare Stormwater Pollution Prevention Plan (SWPPP) and Spill Prevention

Control and Countermeasures Plan (SPCC)]

SO ATL SC CHS Charleston AFB/International P 35 $ 6,249,630 $ 6,249,630 $ - $ - Expand Terminal Building [Terminal Annex Facility Improvements Construction]

SO ATL SC CHS Charleston AFB/International P 34 $ 2,845,485 $ 2,845,485 $ - $ -

Expand Apron [Apron C - Design & Construction], Expand Terminal Building [EA

Reimbursement and BCA], Improve Terminal Building [Handicap Access

Improvements - Reimbursement], Rehabilitate Taxiway [Taxiway F - Design &

Construction]SO ATL SC JZI Charleston Executive GA 17 $ 216,321 $ 216,321 $ - $ - Acquire Land For Approaches [Runway 9 Approach]

SO ATL SC CQW Cheraw Municipal/Lynch Bellinger Field GA 9 $ 75,000 $ 75,000 $ - $ - Construct Taxiway [Parallel (design)]

SO ATL SC CAE Columbia Metropolitan P 40 $ 2,368,751 $ 2,368,751 $ - $ -

Conduct Miscellaneous Study [Pavement Management Survey and System

Implementation], Improve Airport Drainage [Storm Water Detention Pond (Pitts

Lake)], Improve Runway Safety Area [Phase I - DESIGN] - 05/23, Improve Terminal

Building [Terminal Improvements (Phase I) - Restrooms/Elevators Renovation

Project], Install Airfield Guidance Signs [Airfield Signage and SMGCS Project -

Phase I (Design Only)], Rehabilitate Service Road [West Side Perimeter Road -

Phase I (Design Only)]SO ATL SC UDG Darlington County Jetport GA 11 $ 150,001 $ 150,001 $ - $ - Remove Obstructions [Remove Obstructions - Phase 1]SO ATL SC GYH Donaldson Center GA 18 $ 1,500,000 $ 150,000 $ 1,350,000 $ - Extend Taxiway [Phase 3 - pave & light]

SO ATL SC FDW Fairfield County GA 11 $ 2,703,130 $ 346,990 $ 2,356,140 $ -

Rehabilitate Runway - 04/22, Remove Obstructions [Obstruction Removal -

Reimbursement]

Page 50 of 88

Page 51: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ATL SC FLO Florence Regional P 29 $ 844,630 $ 844,630 $ - $ - Improve Terminal Building

SO ATL SC GGE Georgetown County GA 13 $ 1,065,859 $ 1,065,859 $ - $ -

Rehabilitate Runway Lighting [Rehabilitate Runway 5/23 Lighting - Design and

Construction] - 05/23, Rehabilitate Taxiway Lighting [Taxiway Lighting Rehab -

Design and Construction]

SO ATL SC GMU Greenville Downtown GA 19 $ 150,000 $ 150,000 $ - $ -

Acquire Land for Development [reimburse ph 1], Construct Taxiway [final

reimbursement (grant 15)]

SO ATL SC GSP Greenville Spartanburg International P 46 $ 3,770,082 $ 3,770,082 $ - $ - Rehabilitate Terminal Building [design ($4,206,228 total eligible)]

SO ATL SC GRD Greenwood County GA 12 $ 438,532 $ 438,532 $ - $ -

Improve Fuel Farm [construct], Remove Obstructions [Obstruction Clearing and

Approach Survey]SO ATL SC HVS Hartsville Regional GA 12 $ 279,086 $ 279,086 $ - $ - Acquire Land For Approaches [Land Acquisition]

SO ATL SC HXD Hilton Head P 32 $ 813,591 $ 813,591 $ - $ -

Extend Runway [Environmental Assessment] - 03/21, Update Airport Master Plan

Study [Phase II - Reimbursement]

SO ATL SC HXD Hilton Head P 31 $ 1,724,154 $ 186,409 $ 1,537,745 $ -

Rehabilitate Apron [Joint Replacement - Construction], Remove Obstructions [Off-

Airport Obstruction Removal - Rwy 21]SO ATL SC CUB Jim Hamilton L.B. Owens R 17 $ 380,447 $ 150,000 $ 230,447 $ - Construct Taxiway [Acquire Land], Remove Obstructions [Construction]SO ATL SC LKR Lancaster County-Mc Whirter Field GA 15 $ 334,762 $ 260,981 $ 73,781 $ - Rehabilitate Taxiway [Taxilane - construction]

SO ATL SC LUX Laurens County GA 11 $ 115,884 $ 115,884 $ - $ -

Construct Fuel Farm [reimburse - credit card pay at pump], Rehabilitate Runway

[design only] - 08/26SO ATL SC 52J Lee County-Butters Field GA 8 $ 51,000 $ 51,000 $ - $ - Construct Fuel Farm [Construct Fuel Farm - Phase 1 (design only)]

SO ATL SC 6J0 Lexington County at Pelion GA 13 $ 150,000 $ 150,000 $ - $ - Construct Building [Design & Bid], Update Airport Master Plan Study [ALP Update]SO ATL SC RBW Lowcountry Regional GA 12 $ 150,000 $ 150,000 $ - $ - Construct Building [Construction]

SO ATL SC BBP

Marlboro County Jetport - H.E. Avent

Field GA 11 $ 39,076 $ 39,076 $ - $ -

Acquire Land For Approaches [Acquire Land - Admin, Appraisals, Review

Appraisals, surveys, phase 1 environmental]SO ATL SC LRO Mt Pleasant Regional-Faison Field GA 15 $ 299,631 $ 299,631 $ - $ - Construct Terminal Building [Reimbursement - Ph IV]SO ATL SC MYR Myrtle Beach International P 47 $ 3,178,387 $ - $ 3,178,387 $ - Construct Access Road [Terminal Loop Road to new terminal]SO ATL SC MYR Myrtle Beach International P 48 $ 3,646,202 $ 3,646,202 $ - $ - Expand Terminal Building [Phase II]

SO ATL SC EOE Newberry County GA 10 $ 29,485 $ 29,485 $ - $ - Update Airport Master Plan Study [ALP Update (including Terminal Layout Plan)]

SO ATL SC PYG Pageland GA 8 $ 40,841 $ 40,841 $ - $ -

Conduct Environmental Study [Planning project includes documented CATEX EA

and SWPP-SPCC plan], Remove Obstructions

SO ATL SC LQK Pickens County GA 18 $ 136,025 $ 136,025 $ - $ -

Acquire Land for Development [survey, appraisals & environmental], Update

Airport Master Plan StudySO ATL SC PHH Robert F Swinnie GA 5 $ 172,278 $ 172,278 $ - $ - Construct Fuel Farm [Design and Construction]

SO ATL SC UZA Rock Hill/York County/Bryant Field R 22 $ 97,140 $ 97,140 $ - $ -

Rehabilitate Runway [design] - 02/20, Remove Obstructions [clearing for LPV

approaches]

Page 51 of 88

Page 52: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ATL SC 6J4 Saluda County GA 9 $ 92,596 $ 92,596 $ - $ - Construct Building [design only], Construct Fuel Farm [design only]SO ATL SC SPA Spartanburg Downtown Memorial GA 15 $ 3,283,200 $ 150,000 $ 3,133,200 $ - Rehabilitate Apron [construct]

SO ATL SC *SCS State of South Carolina 11 $ 346,927 $ 38,761 $ 308,166 $ -

Acquire Land for Development (Allendale County), Update State System Plan

StudySO ATL SC DYB Summerville GA 15 $ 4,886,779 $ 1,172,585 $ 3,714,194 $ - Extend Runway [Wetland Mitigation and Construction] - 06/24

SO ATL SC SMS Sumter GA 16 $ 150,000 $ 150,000 $ - $ -

Acquire Land For Approaches [Ph 1: Reimburse for Land Acquisition of ~34ac in

Rwy 5 Approach], Improve Runway Safety Area - 05/23

SO ATL SC 35A Union County, Troy Shelton Field GA 6 $ 276,164 $ 276,164 $ - $ -

Acquire Easement For Approaches [Fulbright, Fulbright & Harrison properties],

Acquire Land For Approaches [Wade property 5.5ac]SO ATL SC *SCV Various Locations in South Carolina 15 $ 413,302 $ 413,302 $ - $ - Install Perimeter Fencing (Woodward Field)

SO ATL SC CKI Williamsburg Regional GA 12 $ 1,408,746 $ 351,869 $ 1,056,877 $ -

Construct Taxiway [Construct Parallel Taxiway - Phase II (Construction)], Remove

Obstructions [Remove Obstructions to Runway 14/32 Approaches - Design and

Constructions]SO ATL SC CDN Woodward Field GA 17 $ 484,500 $ 484,500 $ - $ - Rehabilitate TaxiwaySO ATL SC CDN Woodward Field GA 18 $ 428,760 $ 428,760 $ - $ - Improve Runway Safety Area [Land Acquisition] - 06/24

SO JAN AL 0J0 Abbeville Municipal GA 6 $ 267,003 $ 267,003 $ - $ -

Install Miscellaneous NAVAIDS [Beacon and Windcone], Rehabilitate Runway -

17/35, Rehabilitate Runway Lighting - 17/35

SO JAN AL 8A0

Albertville Regional-Thomas J Brumlik

Field GA 21 $ 165,426 $ 165,426 $ - $ - Acquire Land for DevelopmentSO JAN AL ANB Anniston Metropolitan GA 27 $ 562,400 $ 562,400 $ - $ - Improve Runway Safety Area - 05/23, Rehabilitate Runway - 05/23SO JAN AL 0R1 Atmore Municipal GA 8 $ 65,353 $ 65,353 $ - $ - Improve Runway Safety Area [Phase 1 - Design Only]

SO JAN AL AUO Auburn University Regional GA 26 $ 3,040,000 $ 80,767 $ 2,959,233 $ -

Construct Taxiway [Construct parallel taxiway C extension to end of main

RW18/36.]

SO JAN AL 1R8 Bay Minette Municipal GA 9 $ 1,310,115 $ 524,317 $ 785,798 $ -

Construct Taxiway [Construct east portion of parallel taxiway and design west

portion of parallel taxiway.]

SO JAN AL EKY Bessemer R 11 $ 345,402 $ 345,402 $ - $ - Install Runway Vertical/Visual Guidance System - 05/23, Remove Obstructions

SO JAN AL 0A8 Bibb County GA 9 $ 112,299 $ 112,299 $ - $ -

Conduct Miscellaneous Study [Runway Extension Justification Report],

Rehabilitate ApronSO JAN AL M22 Bill Pugh Field GA 10 $ 121,600 $ 121,600 $ - $ - Construct Apron, Install Perimeter Fencing

SO JAN AL BHM Birmingham-Shuttlesworth International P 85 $ 3,683,436 $ - $ 3,683,436 $ - VALE Infrastructure

SO JAN AL BHM Birmingham-Shuttlesworth International P 83 $ 5,717,000 $ 4,592,354 $ 1,124,646 $ - Construct Apron [Phase 1 (Construct Apron)]

SO JAN AL BHM Birmingham-Shuttlesworth International P 86 $ 5,239,571 $ - $ 5,239,571 $ - Rehabilitate Taxiway [Phase 1 (Rehabilitate Taxiways B and F)]

Page 52 of 88

Page 53: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO JAN AL BHM Birmingham-Shuttlesworth International P 84 $ 3,483,190 $ - $ 3,483,190 $ - Rehabilitate Taxiway [Phase 2 (Taxiway Rehabilitation)]

SO JAN AL 71J Blackwell Field GA 12 $ 433,825 $ 433,825 $ - $ -

Acquire Land For Approaches, Acquire Land for Development [Land for New

Terminal Development], Remove obstructions to permit WAAS approach [Remove

Trees]SO JAN AL 12J Brewton Municipal GA 9 $ 90,681 $ 90,681 $ - $ - Construct BuildingSO JAN AL 09A Butler-Choctaw County GA 4 $ 162,421 $ 162,421 $ - $ - Acquire Land For ApproachesSO JAN AL 61A Camden Municipal GA 7 $ 39,230 $ 39,230 $ - $ - Update Airport Master Plan Study

SO JAN AL 14J Carl Folsom GA 8 $ 64,570 $ 64,570 $ - $ -

Construct Taxiway [Design Only (Phase 1)], Rehabilitate Taxiway [Design Only

(Phase 1)]

SO JAN AL PYP

Centre-Piedmont-Cherokee County

Regional GA 8 $ 150,000 $ 150,000 $ - $ - Construct Fuel Farm [Construct Fuel Farm Phase 1]SO JAN AL 02A Chilton County GA 8 $ 567,863 $ 567,863 $ - $ - Acquire Land for Development

SO JAN AL 11A Clayton Municipal GA 2 $ 150,871 $ 150,871 $ - $ -

Install Miscellaneous NAVAIDS [Lighted Wind Cone], Rehabilitate Runway [Runway

Marking and Crack Sealing] - 09/27

SO JAN AL SEM Craig Field GA 11 $ 256,718 $ 256,718 $ - $ - Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Building

SO JAN AL 4R9 Dauphin Island GA 9 $ 313,254 $ 313,254 $ - $ - Acquire Land For Approaches [Acquire runway protection zone land, phase 4]

SO JAN AL DYA Demopolis Municipal GA 9 $ 205,200 $ 205,200 $ - $ -

Improve Runway Safety Area [Relocate Road from RSA (Design Only)] - 04/22,

Rehabilitate Runway [Rehabilitate Runway 4/22 (Design Only)] - 04/22, Remove

Obstructions [Obstruction Removal (Design Only)]SO JAN AL DHN Dothan Regional P 34 $ 93,100 $ 93,100 $ - $ - Wildlife Hazard AssessmentsSO JAN AL EDN Enterprise Municipal GA 17 $ 2,890,145 $ 919,102 $ 1,971,043 $ - Rehabilitate Runway - 05/23SO JAN AL 0J4 Florala Municipal GA 1 $ 42,068 $ 42,068 $ - $ - Conduct Airport Master Plan Study [New ALP and Exhibit A]

SO JAN AL 5R4 Foley Municipal GA 9 $ 113,517 $ 113,517 $ - $ -

Conduct Miscellaneous Study [Conduct study of Runway 36 approach violations

and mitigation options], Rehabilitate Access Road [Rehabilitate airport access

road]SO JAN AL 3A1 Folsom Field GA 18 $ 391,808 $ 391,808 $ - $ - Acquire Land For ApproachesSO JAN AL 33J Geneva Municipal GA 9 $ 152,858 $ 152,858 $ - $ - Install Perimeter Fencing [Phase 2 - South Side]

SO JAN AL 7A0 Greensboro Municipal GA 2 $ 305,682 $ 305,682 $ - $ -

Rehabilitate Runway [Ph I - Design Only] - 18/36, Rehabilitate Taxiway, Update

Airport Master Plan Study

SO JAN AL CQF H. L. (Sonny) Callahan GA 13 $ 586,276 $ 586,276 $ - $ -

Rehabilitate Airport Beacons [Replace existing airport beacon and beacon tower.],

Rehabilitate Apron [Rehabilitate apron in front of existing T-Hangars.]

SO JAN AL 5M0 Hartselle-Morgan County Regional GA 11 $ 84,550 $ 84,550 $ - $ -

Conduct Miscellaneous Study, Rehabilitate Airport Beacons, Update Airport

Master Plan Study

Page 53 of 88

Page 54: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO JAN AL 0J6 Headland Municipal GA 11 $ 66,380 $ 66,380 $ - $ -

Expand Apron [Expand Apron (Design Only)], Remove obstructions to permit

WAAS approach

SO JAN AL HSV

Huntsville International-Carl T Jones

Field P 65 $ 2,140,100 $ 2,140,100 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Apron, Modify Access

Road

SO JAN AL HSV

Huntsville International-Carl T Jones

Field P 64 $ 1,603,719 $ 1,603,719 $ - $ - Rehabilitate Terminal Building

SO JAN AL HSV

Huntsville International-Carl T Jones

Field P 66 $ 6,426,256 $ 5,417 $ 6,420,839 $ - Acquire Land for Development

SO JAN AL HSV

Huntsville International-Carl T Jones

Field P 67 $ 5,900,000 $ - $ 5,900,000 $ - Rehabilitate Runway [Widen RW and install blast pads-design] - 18R/36L

SO JAN AL 4A9 Isbell Field GA 18 $ 137,549 $ 137,549 $ - $ -

Rehabilitate Apron, Rehabilitate Runway [Sealcoat and fill cracks] - 04/22,

Rehabilitate Taxiway

SO JAN AL JKA Jack Edwards GA 25 $ 112,124 $ 112,124 $ - $ -

Conduct Miscellaneous Study [Conduct airfield pavement evaluation.], Install

Runway Vertical/Visual Guidance System [Install vertical/visual guidance system

for Runway 17] - 17/35, Install Taxiway Lighting [Install medium intensity taxiway

edge lighting on apron access taxiway.], Remove Obstructions [Remove trees

north of Runway 27 and adjacent to Taxiways A and E.], Update Airport Master

Plan Study [Conduct airfield boundary survey.]SO JAN AL 4R3 Jackson Municipal GA 8 $ 49,670 $ 49,670 $ - $ - Improve Runway Safety Area [Improve RW 19 RSA (Design Only)] - 01/19SO JAN AL 7A3 Lanett Municipal GA 8 $ 123,752 $ 123,752 $ - $ - Conduct Airport Master Plan Study [Develop Airport Master Plan]SO JAN AL PRN MacCrenshaw Memorial GA 9 $ 645,069 $ 645,069 $ - $ - Extend Taxiway, Improve Airport Drainage

SO JAN AL MDQ

Madison County Executive/Tom Sharp Jr

Field GA 22 $ 892,810 $ 892,810 $ - $ -

Extend Runway [Runway Extension (Acquire Land)] - 18/36, Extend Runway -

18/36, Install Instrument Approach Aid - 18/36, Install Runway Lighting - 18/36,

Modify Service RoadSO JAN AL HAB Marion County-Rankin Fite GA 9 $ 252,207 $ 252,207 $ - $ - Construct Fuel Farm, Remove Obstructions

SO JAN AL BFM Mobile Downtown GA 25 $ 320,000 $ 320,000 $ - $ -

Acquire Safety Equipment and/or Fencing [Airport emergency crash phone

system.], Install Airfield Guidance Signs [Replace airfield guidance signs (design

only)], Install Perimeter Fencing [Phase 2 of install security fence.], Rehabilitate

Apron [Air cargo ramp repairs (design only)]

Page 54 of 88

Page 55: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO JAN AL MOB Mobile Regional P 49 $ 2,282,210 $ 2,282,210 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire quick response vehicle],

Improve Airport Drainage [Phase 2 of repair storm drainage (construction)], Install

Guidance Signs [Replace airfield signage (design only)], Rehabilitate Aircraft

Rescue & Fire Fighting Building [Rehabilitate Aircraft Rescue & Fire Fighting

Building], Rehabilitate Terminal Building [Rehabilitate and expand terminal canopy

(phase 1) [Includes design for Rehab of air handlers 9&10 plus lighting

improvements]]

SO JAN AL MGM Montgomery Regional (Dannelly Field) P 42 $ 2,269,347 $ 2,269,347 $ - $ - Expand Apron, Improve Airport Drainage, Rehabilitate TaxiwaySO JAN AL 06A Moton Field Municipal GA 15 $ 120,000 $ 120,000 $ - $ - Install Perimeter Fencing, Remove ObstructionsSO JAN AL GAD Northeast Alabama Regional GA 12 $ 135,850 $ 135,850 $ - $ - Rehabilitate Taxiway LightingSO JAN AL MSL Northwest Alabama Regional CS 28 $ 1,226,545 $ 151,552 $ 1,074,993 $ - Construct Apron [Design and site preparation]SO JAN AL 1M4 Posey Field GA 7 $ 178,502 $ 178,502 $ - $ - Construct Apron, Expand Access Road, Install Perimeter Fencing

SO JAN AL 1A9 Prattville - Grouby Field GA 13 $ 80,647 $ 80,647 $ - $ -

Install Weather Reporting Equipment [AWOS (Design Only)], Rehabilitate Runway

[Pavement Marking] - 09/27SO JAN AL DCU Pryor Field Regional GA 20 $ 150,000 $ 150,000 $ - $ - Construct Fuel Farm, Rehabilitate Runway - 18/36

SO JAN AL 7A5 Roanoke Municipal GA 6 $ 208,929 $ 208,929 $ - $ -

Improve Airport Drainage, Install Runway Vertical/Visual Guidance System - 11/29,

Remove ObstructionsSO JAN AL 20A Robbins Field GA 8 $ 36,828 $ 36,828 $ - $ - Update Airport Master Plan Study

SO JAN AL 4A6 Scottsboro Municipal-Word Field GA 15 $ 116,134 $ 116,134 $ - $ -

Acquire Land For Approaches, Rehabilitate Apron, Rehabilitate Runway [Seal

cracks] - 04/22, Remove ObstructionsSO JAN AL EET Shelby County GA 15 $ 207,200 $ 207,200 $ - $ - Construct Building

SO JAN AL 79J

South Alabama Regional at Bill Benton

Field GA 16 $ 170,764 $ 170,764 $ - $ - Install Perimeter Fencing [Phase 1 - Construct perimeter fence.]SO JAN AL PLR St Clair County R 13 $ 513,000 $ 513,000 $ - $ - Rehabilitate Runway Lighting - 03/21, Rehabilitate Taxiway LightingSO JAN AL 2R5 St Elmo GA 7 $ 457,160 $ 457,160 $ - $ - Construct Building [Construct T-hangars]SO JAN AL ASN Talladega Municipal GA 21 $ 505,244 $ 130,154 $ 375,090 $ - Construct Apron [Phase 1 Construct cargo apron]SO JAN AL ALX Thomas C Russell Field GA 13 $ 529,267 $ 175,500 $ 353,767 $ - Rehabilitate Apron, Rehabilitate TaxiwaySO JAN AL TOI Troy Municipal GA 13 $ 1,994,209 $ 150,000 $ 1,844,209 $ - Extend Runway [Construction Phase 3] - 07/25SO JAN AL TCL Tuscaloosa Regional GA 27 $ 2,702,213 $ 154,976 $ 2,547,237 $ - Construct Taxiway [Construct Parallel Taxiway (Paving)]

SO JAN AL A08 Vaiden Field GA 6 $ 113,686 $ 113,686 $ - $ - Construct Taxiway [Partial Parallel Taxiway - Ph 1, 3200 feet (Design Only)]SO JAN AL JFX Walker County-Bevill Field GA 14 $ 80,000 $ 80,000 $ - $ - Rehabilitate ApronSO JAN AL EUF Weedon Field GA 16 $ 535,455 $ 535,455 $ - $ - Construct Building [Construct 100' x 100' Hangar (Ph 1)]SO JAN MS 9M4 Ackerman Choctaw County GA 7 $ 43,001 $ 43,001 $ - $ - Remove ObstructionsSO JAN MS 1M2 Belzoni Municipal GA 12 $ 187,958 $ 187,958 $ - $ - Construct Building [Hangar]SO JAN MS 19M C. A. Moore GA 12 $ 147,740 $ 147,740 $ - $ - Construct Building, Improve Building, Widen Taxiway

Page 55 of 88

Page 56: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO JAN MS 08M Carthage-Leake County GA 7 $ 210,997 $ 210,997 $ - $ - Rehabilitate Apron

SO JAN MS 23M Clarke County GA 11 $ 95,685 $ 95,685 $ - $ -

Rehabilitate Airport Beacons [Refurbish rotating beacon.], Rehabilitate Runway

Lighting [Rehabilitate runway edge lighting.] - 16/34SO JAN MS RNV Cleveland Municipal GA 17 $ 1,045,677 $ 171,206 $ 874,471 $ - Extend Runway [Sitework for Runway and Taxiway Extension] - 17/35

SO JAN MS UBS Columbus-Lowndes County GA 13 $ 221,368 $ 221,368 $ - $ - Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate TaxiwaySO JAN MS M11 Copiah County GA 10 $ 285,664 $ 285,664 $ - $ - Construct Runway [Acquire Land] - 17/35

SO JAN MS M24 Dean Griffin Memorial GA 11 $ 174,882 $ 174,882 $ - $ -

Improve Runway Safety Area [Improve safety area, shift runway south, widen

runway to meet standards and elimenate line of sight issue. (design only - design

of project and design of environmental mitigation)] - 17/35SO JAN MS CKM Fletcher Field GA 17 $ 538,596 $ 538,596 $ - $ - Construct ApronSO JAN MS 2M4 G. V. Montgomery GA 8 $ 244,895 $ 244,895 $ - $ - Install Perimeter Fencing [Install perimeter fence (phase 1)]SO JAN MS STF George M Bryan GA 16 $ 69,065 $ 69,065 $ - $ - Update Airport Master Plan Study

SO JAN MS GTR Golden Triangle Regional P 46 $ 849,944 $ 849,944 $ - $ -

Acquire Land for Development [Land Reimbursement], Improve Access Road,

Security EnhancementsSO JAN MS GTR Golden Triangle Regional P 47 $ 565,329 $ - $ 565,329 $ - Acquire Land for DevelopmentSO JAN MS GWO Greenwood-Leflore GA 14 $ 173,223 $ 173,223 $ - $ - Improve Airport DrainageSO JAN MS GNF Grenada Municipal GA 8 $ 347,024 $ 347,024 $ - $ - Improve Airport Drainage

SO JAN MS GPT Gulfport-Biloxi International P 76 $ 14,604,260 $ 2,922,286 $ 11,681,974 $ -

Expand Terminal Building [Terminal expansion], Extend Taxiway [Construct

Taxiway J extension (phase 3 - complete taxiway extension)], Install Runway

Lighting [Install airfield lighting controls in the new air traffic control tower.] -

14/32, Rehabilitate Access Road [Rehabilitate access road to new general aviation

area and new air traffic control tower], Rehabilitate Runway Lighting [Rehabilitate

Runway 18/36 lighting (construction)] - 18/36

SO JAN MS GPT Gulfport-Biloxi International P 77 $ 4,987,500 $ - $ 4,987,500 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Sound insulation

Phase 6]

SO JAN MS HEZ

Hardy-Anders Field Natchez-Adams

County GA 23 $ 109,012 $ 109,012 $ - $ - Install Airfield Guidance Signs

SO JAN MS HBG Hattiesburg Bobby L Chain Municipal GA 18 $ 521,572 $ 521,572 $ - $ -

Improve Airport Drainage [Design only for rehabilitation of drainage], Install

Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System [Install

Precision Approach Path Indcators on Runway 13 / 31] - 13/31, Rehabilitate

Taxiway Lighting

Page 56 of 88

Page 57: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO JAN MS PIB Hattiesburg-Laurel Regional P 32 $ 681,897 $ 681,897 $ - $ -

Improve Terminal Building [Improve terminal building entrance to meet ADA

requirements], Rehabilitate Parking Lot [Restripe parking lot], Rehabilitate

Runway [Remark runway] - 18/36, Rehabilitate Taxiway [Remark taxiways and

install enhanced hold markings on taxiways.], Security Enhancements [Enhance

security]SO JAN MS HKS Hawkins Field GA 13 $ 240,764 $ 240,764 $ - $ - Improve Airport Drainage

SO JAN MS LUL Hesler-Noble Field GA 6 $ 346,179 $ 346,179 $ - $ -

Install Runway Vertical/Visual Guidance System [Install 4-box PAPI and REILs on

RW 13 and RW 31.] - 13/31, Rehabilitate Runway Lighting [Rehabilitate Runway

13/31 edge lights.] - 13/31, Rehabilitate Taxiway Lighting [Rehabilitate remaining

portion of taxiway lights.]

SO JAN MS 14M Hollandale Municipal GA 8 $ 101,318 $ 101,318 $ - $ - Construct Terminal Building, Install Perimeter Fencing, Rehabilitate TaxiwaySO JAN MS M41 Holly Springs-Marshall County GA 14 $ 121,125 $ 121,125 $ - $ - Acquire Land for DevelopmentSO JAN MS M44 Houston Municipal GA 11 $ 159,161 $ 159,161 $ - $ - Construct Taxiway

SO JAN MS 4R1 I H Bass Jr Memorial GA 9 $ 166,716 $ 166,716 $ - $ - Rehabilitate Apron [Seal coat apron (100' x 200')], Rehabilitate Runway - 14/32SO JAN MS IDL Indianola Municipal GA 14 $ 174,611 $ 174,611 $ - $ - Construct BuildingSO JAN MS 15M Iuka GA 7 $ 39,254 $ 39,254 $ - $ - Acquire Land For Approaches, Improve Runway Safety Area - 18/36

SO JAN MS JAN Jackson-Evers International P 45 $ 2,008,664 $ 2,008,664 $ - $ -

Improve Airport Drainage, Rehabilitate Apron [NE Apron Assessment],

Rehabilitate Apron [Repairs Near Atlantic Aviation], Rehabilitate Runway [Phase 1 -

Pavement Assessment and Design] - 16R/34L, Rehabilitate Taxiway [Phase 1 -

Pavement Assessment and Design]SO JAN MS JVW John Bell Williams GA 16 $ 1,452,000 $ 203,575 $ 1,248,425 $ - Construct Apron [Phase 2 - Construction]SO JAN MS M16 John Bell Williams GA 15 $ 96,425 $ 96,425 $ - $ - Construct Apron [Phase 1 - Design Only]SO JAN MS MEI Key Field P 29 $ 850,900 $ 850,900 $ - $ - Construct TaxiwaySO JAN MS MEI Key Field P 30 $ 2,434,295 $ - $ 2,434,295 $ - Construct TaxiwaySO JAN MS LMS Louisville Winston County GA 11 $ 107,401 $ 107,401 $ - $ - Improve Terminal BuildingSO JAN MS 20M Macon Municipal GA 10 $ 487,174 $ 487,174 $ - $ - Construct Building, Construct Taxiway

SO JAN MS 17M Magee Municipal GA 7 $ 235,315 $ 235,315 $ - $ -

Construct Terminal Building [Construct terminal building], Rehabilitate Runway

[Seal and Mark] - 18/36SO JAN MS M83 McCharen Field GA 10 $ 339,273 $ 339,273 $ - $ - Expand Apron

SO JAN MS MCB McComb/Pike County/John E Lewis Field GA 20 $ 25,552 $ 25,552 $ - $ - Install Perimeter FencingSO JAN MS GLH Mid Delta Regional CS 29 $ 178,790 $ 178,790 $ - $ - Rehabilitate Apron [Phase 1]SO JAN MS M40 Monroe County GA 13 $ 488,760 $ 488,760 $ - $ - Construct Apron, Construct Building, Construct Taxiway

SO JAN MS 5A4 Okolona Municipal-Richard Stovall Field GA 13 $ 159,932 $ 159,932 $ - $ - Construct Taxiway, Install Perimeter Fencing, Rehabilitate Apron

Page 57 of 88

Page 58: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO JAN MS PMU Panola County GA 8 $ 57,542 $ 57,542 $ - $ - Construct Taxiway [Phase 1 - Design Only], Remove ObstructionsSO JAN MS T36 Paul Pittman Memorial GA 13 $ 316,763 $ 316,763 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate TaxiwaySO JAN MS MPE Philadelphia Municipal GA 12 $ 62,910 $ 62,910 $ - $ - Rehabilitate Airport BeaconsSO JAN MS CRX Roscoe Turner GA 20 $ 1,197,556 $ 198,103 $ 999,453 $ - Rehabilitate TaxiwaySO JAN MS M37 Ruleville-Drew GA 11 $ 280,884 $ 280,884 $ - $ - Construct Building, Construct Taxiway

SO JAN MS *MSS State of Mississippi 6 $ 26,593 $ 26,593 $ - $ -

Construct Apron, Construct Building, Construct Taxiway, Construct Terminal

Building, Expand Apron, Extend Runway, Improve Airport Drainage, Improve

Runway Safety Area, Install Airfield Guidance Signs, Install Runway Lighting,

Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway, Rehabilitate

Taxiway Lighting, Update State System Plan StudySO JAN MS HSA Stennis International GA 25 $ 1,200,000 $ 1,200,000 $ - $ - Expand Apron

SO JAN MS 01M Tishomingo County GA 13 $ 61,362 $ 61,362 $ - $ -

Improve Runway Safety Area - 17/35, Install Perimeter Fencing, Rehabilitate

Airport Beacons

SO JAN MS PQL Trent Lott International GA 27 $ 205,683 $ 205,683 $ - $ -

Remove Obstructions [Clear and grub Runway 36 protection zone and automated

surface observation system critical area.]SO JAN MS UTA Tunica Municipal GA 17 $ 1,262,734 $ 1,262,734 $ - $ - Construct Terminal Building [Phase 1B]SO JAN MS UTA Tunica Municipal GA 18 $ 405,555 $ - $ 405,555 $ - Rehabilitate Runway [Seal Coat] - 17/35SO JAN MS TUP Tupelo Regional P 35 $ 544,079 $ 544,079 $ - $ - Extend Runway - 18/36, Wildlife Hazard Assessments

SO JAN MS TUP Tupelo Regional P 36 $ 5,830,700 $ 1,184,105 $ 4,646,595 $ -

Acquire Safety Equipment and/or Fencing, Extend Runway - 18/36, Install

Guidance Signs, Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway

SO JAN MS UOX University-Oxford GA 25 $ 1,133,415 $ 1,133,415 $ - $ -

Acquire Land for Development, Construct Parking Lot, Wildlife Hazard

AssessmentsSO JAN MS VKS Vicksburg Municipal GA 4 $ 115,900 $ 115,900 $ - $ - Install Weather Reporting Equipment [Phase 2 - Construction]SO JAN MS 5A6 Winona-Montgomery County GA 11 $ 238,494 $ 238,494 $ - $ - Construct Building, Improve Access RoadSO JAN MS 87I Yazoo County GA 12 $ 289,773 $ 289,773 $ - $ - Rehabilitate Apron, Rehabilitate BuildingSO MEM KY EKX Addington Field GA 16 $ 5,080,477 $ 150,000 $ 4,930,477 $ - Rehabilitate Runway - 05/23

SO MEM KY DWU Ashland Regional GA 15 $ 123,481 $ 123,481 $ - $ -

Construct Taxiway [Phase 1 EA Cumulative, Phase II Archeological and Relocation

Calcs for Taxiway Relocation]

SO MEM KY PAH Barkley Regional P 39 $ 410,549 $ 410,549 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Terminal Building, Install

Perimeter Fencing, Security Enhancements

SO MEM KY PAH Barkley Regional P 40 $ 606,660 $ 606,660 $ - $ -

Construct Apron [Phase B Construction], Construct Terminal Building

[Environmental Assessment], Rehabilitate Terminal Building [Construction],

Security Enhancements [Replace three existing security gates.]

Page 58 of 88

Page 59: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO MEM KY LEX Blue Grass P 59 $ 962,772 $ 962,772 $ - $ -

Acquire Snow Removal Equipment, Improve Terminal Building [Phase II

(Construction)], Rehabilitate Apron [Phase I (Design)], Rehabilitate Terminal

Building [Phase II (Construction)]

SO MEM KY LEX Blue Grass P 58 $ 246,671 $ 246,671 $ - $ -

Update Airport Master Plan Study, Update Miscellaneous Study, Update

Miscellaneous Study

SO MEM KY BWG Bowling Green-Warren County Regional GA 23 $ 87,687 $ 87,687 $ - $ - Rehabilitate Runway [Phase 1, Conceptual Design] - 03/21SO MEM KY LOU Bowman Field R 21 $ 50,000 $ 50,000 $ - $ - Acquire Easement For Approaches [Phase IA Environmental Assessment]SO MEM KY I93 Breckinridge County GA 6 $ 104,480 $ 104,480 $ - $ - Improve Runway Safety Area - 09/27, Remove Obstructions

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 78 $ 2,311,566 $ 2,311,566 $ - $ - Rehabilitate Runway - 18C/36C

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 79 $ 8,307,162 $ 2,017,070 $ 6,290,092 $ - Rehabilitate Runway - 18C/36C

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 80 $ 838,457 $ 838,457 $ - $ - Rehabilitate Runway - 18C/36C

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 77 $ 6,000,000 $ - $ 6,000,000 $ - Construct Runway [FY 2011 Scheduled Payment]

SO MEM KY 0I8 Cynthiana-Harrison County GA 9 $ 99,750 $ 99,750 $ - $ -

Install Perimeter Fencing [Phase II (Construction)], Update Airport Master Plan

StudySO MEM KY FGX Fleming-Mason GA 14 $ 80,572 $ 80,572 $ - $ - Conduct Environmental StudySO MEM KY 1M7 Fulton GA 10 $ 1,743,154 $ 1,743,154 $ - $ - Extend Runway [Phase VI Extend Runway 9-27] - 09/27SO MEM KY 1M7 Fulton GA 11 $ 328,572 $ 328,572 $ - $ - Extend Runway [Phase V, Extend Runway 9-27] - 09/27SO MEM KY K62 Gene Snyder GA 11 $ 360,050 $ 360,050 $ - $ - Improve Runway Safety Area [Phase II (Construction)] - 03/21

SO MEM KY 27K

Georgetown Scott County - Marshall

Field GA 18 $ 150,000 $ 150,000 $ - $ - Construct Terminal BuildingSO MEM KY GLW Glasgow Municipal GA 22 $ 225,000 $ 225,000 $ - $ - Rehabilitate Runway - 07/25SO MEM KY EHR Henderson City-County GA 23 $ 192,000 $ 151,560 $ 40,440 $ - Rehabilitate Runway - 09/27

SO MEM KY HVC Hopkinsville-Christian County GA 17 $ 300,000 $ 300,000 $ - $ - Rehabilitate Runway [Includes strength study, crack repair & seal coat] - 08/26

SO MEM KY CEY Kyle-Oakley Field GA 22 $ 230,439 $ 230,439 $ - $ -

Remove Obstructions [Avigation easements], Remove Obstructions

[Environmental Assessment]SO MEM KY 1M9 Lake Barkley State Park GA 3 $ 71,250 $ 71,250 $ - $ - Rehabilitate Runway [Phase 1, Design Only] - 02/20SO MEM KY SME Lake Cumberland Regional GA 19 $ 283,962 $ 283,962 $ - $ - Construct Fuel Farm [Phase II (Construction)]SO MEM KY 6I2 Lebanon-Springfield GA 11 $ 194,275 $ 194,275 $ - $ - Construct Taxiway [Phase I (Design)]SO MEM KY LOZ London-Corbin Airport-Magee Field GA 18 $ 66,500 $ 66,500 $ - $ - Install Airfield Guidance Signs

SO MEM KY SDF Louisville International-Standiford Field P 91 $ 6,628,193 $ 6,628,193 $ - $ - Construct Taxiway

Page 59 of 88

Page 60: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO MEM KY SDF Louisville International-Standiford Field P 90 $ 13,101,152 $ 13,101,152 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Land for Development,

Acquire Safety Equipment and/or Fencing, Acquire Snow Removal Equipment,

Conduct Miscellaneous Study, Construct Taxiway [Relocation of FEDEX due to TW

Construction], Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway

Lighting - Plan-1SO MEM KY 2I0 Madisonville Municipal GA 21 $ 131,999 $ 131,999 $ - $ - Install Weather Reporting Equipment

SO MEM KY 2I0 Madisonville Municipal GA 22 $ 34,390 $ 34,390 $ - $ - Improve Runway Safety Area [Phase 1 Design] - 05/23, Remove ObstructionsSO MEM KY M25 Mayfield Graves County GA 12 $ 300,000 $ 300,000 $ - $ - Install Airfield Guidance Signs, Install Taxiway Lighting

SO MEM KY 18I McCreary County GA 9 $ 426,187 $ 426,187 $ - $ -

Construct Fuel Farm [Phaase II (Construction)], Install Perimeter Fencing [Phase II

(Construction)], Remove Obstructions [Phase I]SO MEM KY M21 Muhlenberg County GA 12 $ 30,624 $ 30,624 $ - $ - Rehabilitate Runway [phase 3] - 05/23SO MEM KY M21 Muhlenberg County GA 11 $ 840,578 $ 840,578 $ - $ - Rehabilitate Runway - 05/23SO MEM KY 7K4 Ohio County GA 13 $ 30,000 $ 30,000 $ - $ - Rehabilitate Runway [Phase 2] - 03/21SO MEM KY 7K4 Ohio County GA 12 $ 694,531 $ 694,531 $ - $ - Rehabilitate Runway [Construction Phase] - 03/21

SO MEM KY OWB Owensboro-Daviess County P 44 $ 485,555 $ 461,805 $ 23,750 $ -

Extend Runway [AGIS Survey] - 18/36, Extend Runway [Property Acquisition

Reimbursement] - 18/36, Rehabilitate ApronSO MEM KY OWB Owensboro-Daviess County P 46 $ 149,999 $ 149,999 $ - $ - Extend Runway [ILS Phase - Phase 2] - 18/36

SO MEM KY OWB Owensboro-Daviess County P 45 $ 2,390,253 $ 390,253 $ 2,000,000 $ -

Acquire Aircraft Deicing Equipment [Deice truck Part A], Acquire Easement For

Approaches [Wilson Farm 2.044 acres; Fischer Property 13.531 acres], Acquire

Land For Approaches [Wilson Farm Agency Property 4.157 acres], Extend Runway

[ILS Phase] - 18/36SO MEM KY PBX Pike County-Hatcher Field GA 13 $ 32,012 $ 32,012 $ - $ - Improve Runway Safety Area - 09/27SO MEM KY 2M0 Princeton-Caldwell County GA 9 $ 235,391 $ 235,391 $ - $ - Rehabilitate Runway - 05/23, Remove ObstructionsSO MEM KY 4M7 Russellville-Logan County GA 13 $ 184,913 $ 184,913 $ - $ - Rehabilitate Airport Beacons, Rehabilitate Runway Lighting - 06/24

SO MEM KY I50 Stanton GA 5 $ 574,155 $ 574,155 $ - $ -

Construct Taxiway [Phase 1 construction from RW 24 threshold to connector

taxiway.]

SO MEM KY TWT Sturgis Municipal GA 12 $ 25,000 $ 25,000 $ - $ -

Rehabilitate Runway [Pavement evaluation study and temporary markings.] -

18/36SO MEM KY AAS Taylor County GA 14 $ 100,000 $ 100,000 $ - $ - Rehabilitate TaxiwaySO MEM KY TZV Tompkinsville-Monroe County GA 9 $ 320,832 $ 320,832 $ - $ - Expand Apron, Install Runway Vertical/Visual Guidance System - 04/22SO MEM KY I35 Tucker-Guthrie Memorial GA 10 $ 71,250 $ 71,250 $ - $ - Update Airport Master Plan StudySO MEM KY EKQ Wayne County GA 7 $ 65,000 $ 65,000 $ - $ - Construct Fuel Farm [Phase I (Design)], Update Airport Master Plan StudySO MEM KY K20 Wendell H Ford GA 16 $ 261,185 $ 261,185 $ - $ - Rehabilitate Runway - 14/32, Rehabilitate TaxiwaySO MEM KY 9I3 West Liberty GA 8 $ 76,000 $ 76,000 $ - $ - Improve Airport Drainage, Install Perimeter FencingSO MEM KY W38 Williamsburg-Whitley County GA 13 $ 1,122,011 $ 150,000 $ 972,011 $ - Improve Runway Safety Area [Phase I] - 02/20SO MEM TN JWN John C Tune R 15 $ 1,092,500 $ 1,092,500 $ - $ - Construct Runway Safety Area [Phase 2, Environmental] - 02/20

Page 60 of 88

Page 61: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO MEM TN CHA Lovell Field P 54 $ 4,722,789 $ 2,156,943 $ 2,565,846 $ - Acquire Land For ApproachesSO MEM TN CHA Lovell Field P 53 $ 4,124,082 $ - $ 4,124,082 $ - VALE Infrastructure [Phase 1 - Construct a 1 megawatt solar farm]SO MEM TN TYS McGhee Tyson P 64 $ 251,323 $ 251,323 $ - $ - Rehabilitate Runway [Phase 1 - Design] - 05L/23RSO MEM TN MEM Memphis International P 83 $ 637,500 $ - $ 637,500 $ - Improve Runway Safety Area - 18R/36L

SO MEM TN MEM Memphis International P 82 $ 16,710,850 $ 10,673,752 $ 6,037,098 $ -

Acquire Snow Removal Equipment [Two snow broom attachments and up to 5

towable snow brooms.], Improve Terminal Building [Public Access Improvements

(Moving Walkway)], Rehabilitate Apron [Design & Phase 1 construction],

Rehabilitate Taxiway [Taxiway Victor Reconstruction Phase 2], Rehabilitate

Terminal Building [Terminal Elevator Replacement], Security Enhancements

SO MEM TN MEM Memphis International P 84 $ 17,018,731 $ 15,118,731 $ 1,900,000 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment

[Deice truck; dump truck with plow], Construct Apron [West Cargo Apron Design],

Expand Terminal Building [Expand FIS], Improve Access Road, Improve Terminal

Building [Family Restrooms], Rehabilitate Taxiway [Taxiway Victor Reconstruction

Phase 2B], Rehabilitate Terminal Building [Terminal Escalator Replacement],

Security Enhancements, Strengthen Runway [3 Taxiways seismic retrofit] -

18C/36C

SO MEM TN BNA Nashville International P 91 $ 787,245 $ 787,245 $ - $ -

Conduct Miscellaneous Study [This will be a PCI Airfield Inspection as part of the

Pavement Maintenance Program], Rehabilitate Taxiway [Phase 1, Disign Only]SO MEM TN BNA Nashville International P 90 $ 1,111,388 $ 1,111,388 $ - $ - Security Enhancements

SO MEM TN *TNB Tennessee State Block Grant Program 42 $ 13,318,306 $ 13,318,306 $ - $ - Non primary development projects in state block grant program

SO MEM TN *TNB Tennessee State Block Grant Program 43 $ 3,500,000 $ - $ 3,500,000 $ - Non primary development projects in state block grant programSO MEM TN TRI Tri-Cities Regional TN/VA P 62 $ 9,723,452 $ 1,550,740 $ 8,172,712 $ - Construct Taxiway [TW R and Hamilton Road Construction]

SO MEM TN TRI Tri-Cities Regional TN/VA P 61 $ 363,309 $ 363,309 $ - $ -

Acquire Safety Equipment and/or Fencing, Acquire Snow Removal Equipment,

Improve Runway Safety Area - 05/23, Security EnhancementsSO ORL FL AAF Apalachicola Regional GA 6 $ 313,950 $ 313,950 $ - $ - Rehabilitate Runway [Re-mark Runway 13/31] - 13/31SO ORL FL AVO Avon Park Executive GA 17 $ 153,725 $ 153,725 $ - $ - Update Airport Master Plan Study [Airport Master Plan Update]

SO ORL FL BOW Bartow Municipal GA 28 $ 837,900 $ 173,458 $ 664,442 $ -

Rehabilitate Taxiway [Rehab Taxiway A, H and Apron Edge (Phase 2 -

Construction)]

SO ORL FL BCT Boca Raton R 17 $ 169,692 $ 169,692 $ - $ - Construct Runway Safety Area [Runway Safety Area (Ph.1 � Planning)] - 05/23SO ORL FL F95 Calhoun County GA 4 $ 158,757 $ 158,757 $ - $ - Install Weather Reporting Equipment [Installation of AWOS Equipment]

Page 61 of 88

Page 62: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ORL FL VQQ Cecil GA 15 $ 379,994 $ 379,994 $ - $ -

Improve Airport Drainage [Improve Airport Drainage - Phase 1], Rehabilitate

Taxiway [Rehab Taxiway D]SO ORL FL CRG Craig Municipal R 20 $ 199,697 $ 199,697 $ - $ - Improve Airport Drainage [Airfield Drainage Improvements]

SO ORL FL CTY Cross City GA 7 $ 604,584 $ 604,584 $ - $ -

Install Miscellaneous NAVAIDS [Install Wind Cone and Beacon], Install Runway

Lighting [Install Runway Lights MIRL on 13/31] - 13/31, Install Runway

Vertical/Visual Guidance System [Installation of REILs and PAPIs] - 13/31

SO ORL FL DAB Daytona Beach International P 60 $ 6,997,936 $ - $ 6,997,936 $ -

Rehabilitate Runway [Rehab Runway 07L/25R including lighting system

(Construction - Phase 2)] - 07L/25RSO ORL FL DAB Daytona Beach International P 62 $ 130,536 $ - $ 130,536 $ - Construct Taxiway [RSAT Cutover Taxiway - Design]SO ORL FL DAB Daytona Beach International P 61 $ 1,832,568 $ 1,832,568 $ - $ - Improve Terminal Building [Bond Repayment for Renovations]

SO ORL FL 54J Defuniak Springs GA 5 $ 307,511 $ 307,511 $ - $ -

Install Miscellaneous NAVAIDS [Install Roatating Beacon], Install Weather

Reporting Equipment [Install AWOS Equipment]

SO ORL FL DED DeLand Municipal-Sidney H Taylor Field R 18 $ 141,916 $ 141,916 $ - $ - Update Airport Master Plan Study [Update Airport Master Plan Study]

SO ORL FL ORL Executive R 27 $ 19,054 $ 19,054 $ - $ -

Install Runway Distance-To-Go Signs [Runway 25 ILS Signage and Markings] -

07/25SO ORL FL FHB Fernandina Beach Municipal GA 21 $ 176,745 $ 176,745 $ - $ - Rehabilitate Runway [Rehab R/W 4/22 (shoulder erosion)] - 04/22SO ORL FL XFL Flagler County GA 13 $ 598,500 $ 598,500 $ - $ - Construct Runway [Construct New Runway 11/29 (Relocate)] - 11/29

SO ORL FL FLL

Fort Lauderdale/Hollywood

International P 66 $ 23,772,248 $ 3,772,248 $ 20,000,000 $ - Extend Runway [Extend Runway 9R/27L (Phase 1)] - 09R/27L

SO ORL FL FLL

Fort Lauderdale/Hollywood

International P 67 $ 20,000,000 $ - $ 20,000,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation

Measures (Phase 2)]SO ORL FL GNV Gainesville Regional P 32 $ 761,248 $ - $ 761,248 $ - Rehabilitate Taxiway [Rehab Taxiway A]SO ORL FL GNV Gainesville Regional P 33 $ 1,456,863 $ 1,456,863 $ - $ - Security Enhancements [Rehabilitate Perimeter Fencing]SO ORL FL HEG Herlong R 14 $ 372,608 $ 372,608 $ - $ - Rehabilitate Apron [Rehab Northeast Apron]

SO ORL FL JAX Jacksonville International P 49 $ 7,417,929 $ 2,025,032 $ 5,392,897 $ -

Construct Taxiway [Construct Concourse B Apron Bypass Taxiway], Rehabilitate

Taxiway [Rehab Taxiway T & H]SO ORL FL EYW Key West International P 44 $ 1,998,474 $ 1,998,474 $ - $ - Construct Terminal BuildingSO ORL FL EYW Key West International P 45 $ 412,000 $ - $ 412,000 $ - Conduct Noise Compatibility Plan Study [Update Part 150 Noise Study]SO ORL FL 42J Keystone Airpark GA 20 $ 236,275 $ 236,275 $ - $ - Install Taxiway Lighting [Install MITL TW A]SO ORL FL ISM Kissimmee Gateway R 32 $ 855,610 $ 855,610 $ - $ - Construct Taxiway [Construct RWY 24 Hold Position]SO ORL FL X07 Lake Wales Municipal GA 14 $ 126,768 $ 126,768 $ - $ - Update Airport Master Plan Study [Update Airport Master Plan Study]

SO ORL FL LAL Lakeland Linder Regional R 33 $ 692,550 $ 150,000 $ 542,550 $ -

Improve Runway Safety Area [Runway and Taxiway Safety Area Drainage - Surge

Basin] - 09/27

SO ORL FL LEE Leesburg International GA 21 $ 238,769 $ 238,769 $ - $ -

Install Airfield Guidance Signs [Install Guidance Signs (Design)], Wildlife Hazard

Assessments [Wildlife Hazard Assessment]

Page 62 of 88

Page 63: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ORL FL MAI Marianna Municipal GA 14 $ 80,420 $ 80,420 $ - $ -

Install Miscellaneous NAVAIDS [Install Wind Cone], Rehabilitate Taxiway [Rehab

Taxiway (Partial Parallel to 18-36) - Design]

SO ORL FL X35 Marion County GA 2 $ 1,359,619 $ 333,150 $ 1,026,469 $ -

Install Runway Lighting [Install MIRLs on RW 5/23] - 05/23, Rehabilitate Runway

[Rehab Runway 05/23 (Phase 2 - Construction)] - 05/23

SO ORL FL MLB Melbourne International P 37 $ 387,600 $ 387,600 $ - $ -

Rehabilitate Taxiway [Rehabilitate Taxiway V and S T-Hangar Taxilanes], Wildlife

Hazard Assessments [Conduct Wildlife Hazard Assessment]SO ORL FL COI Merritt Island GA 17 $ 369,363 $ 369,363 $ - $ - Improve Runway Safety Area [RSA Improvements (EA)] - 11/29SO ORL FL MIA Miami International P 64 $ 3,462,000 $ 3,462,000 $ - $ - Improve Terminal Building [Construct Roof Rehabilitation]

SO ORL FL F45

North Palm Beach County General

Aviation R 15 $ 186,482 $ 186,482 $ - $ -

Construct Taxiway [North Parel Taxiway Design], Wildlife Hazard Assessments

[Wildlife Hazard Assessments]

SO ORL FL HWO North Perry R 7 $ 53,418 $ 53,418 $ - $ -

Install Airfield Guidance Signs [Install airfield guidance signs.], Rehabilitate Runway

[Rehabilitate Runway 18R-36L (marking).] - 18R/36L, Rehabilitate Runway

[Rehabilitate Runway 9L-27R (marking).] - 09R/27L

SO ORL FL ECP Northwest Florida Beaches International P 5 $ 475,000 $ 475,000 $ - $ - Update Airport Master Plan Study [Airport Master Plan and Airport Layout Plan]

SO ORL FL ECP Northwest Florida Beaches International P 4 $ 2,705,512 $ 2,705,512 $ - $ -

Construct New Airport [Tenant Relocation Assistance], Environmental Mitigation

[Environmental Mitigation], Improve Terminal Building [Installation of Passenger

Loading Bridge]

SO ORL FL MCO Orlando International P 112 $ 6,774,262 $ 3,624,038 $ 3,150,224 $ -

Construct Taxiway [Construct Taxiway B2], Rehabilitate Taxiway [Rehabilitate

Taxiway B1]SO ORL FL MCO Orlando International P 111 $ 2,225,000 $ 2,225,000 $ - $ - Update Airport Master Plan Study [Update Airport Master Plan Study]

SO ORL FL SFB Orlando Sanford International P 68 $ 10,555,573 $ 3,689,968 $ 6,865,605 $ -

Extend Runway [Extend Runway 09L/27R (+/- 11,000 LF) - Construction (Including

NAVAIDS relocation)] - 09L/27RSO ORL FL SFB Orlando Sanford International P 67 $ 1,917,864 $ - $ 1,917,864 $ - Construct Service Road [Construct Perimeter Service Road]SO ORL FL SFB Orlando Sanford International P 66 $ 127,122 $ 127,122 $ - $ - Acquire Equipment

SO ORL FL FMY Page Field R 17 $ 268,455 $ 268,455 $ - $ -

Acquire Land For Approaches [Acquire land for approaches], Construct Service

Road [Construct Service Road - Design]

SO ORL FL 28J Palatka Municipal - Lt. Kay Larkin Field GA 21 $ 4,123,121 $ 3,650,276 $ 472,845 $ - Rehabilitate Runway [Rehab Runway 09/27] - 09/27

SO ORL FL PHK Palm Beach County Glades GA 3 $ 274,280 $ 274,280 $ - $ -

Rehabilitate Apron [Rehabilitate Apron - Design], Rehabilitate Runway Lighting

[Airfield Runway Lighting and Electrical Upgrade] - 17/35SO ORL FL LNA Palm Beach County Park R 11 $ 94,966 $ 94,966 $ - $ - Wildlife Hazard Assessments [Wildlife Hazard Assessment]SO ORL FL PBI Palm Beach International P 55 $ 1,375,660 $ 1,375,660 $ - $ - Improve Terminal Building [Terminal Roof Improvements]

SO ORL FL PBI Palm Beach International P 54 $ 299,998 $ - $ 299,998 $ - Conduct Environmental Study [Conduct Environmental Study (EIS) - Phase III]

SO ORL FL PNS Pensacola Gulf Coast Regional P 38 $ 2,940,935 $ 2,940,935 $ - $ -

Improve Access Road [Improve Access Road], Rehabilitate Apron [Rehabilitate

Terminal Apron]

Page 63 of 88

Page 64: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ORL FL 40J Perry-Foley GA 11 $ 829,680 $ 201,389 $ 628,291 $ - Rehabilitate Runway [Rehab Runway 18/36 (Phase 2)] - 18/36SO ORL FL PCM Plant City GA 7 $ 567,167 $ 567,167 $ - $ - Construct Taxiway [Construct Taxiway to new T-Hangar Area]

SO ORL FL PGD Punta Gorda P 31 $ 978,382 $ 978,382 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [ARFF Truck Reimbursement],

Acquire Handicap Passenger Lift Device [Acquire Passenger Ramps], Extend

Runway [Convert Taxiway H to Runway 04 Extension] - 04/22, Extend Runway

[Extend Runway - Reimbursement (Phase 6)] - 04/22, Runway Incursion Markings

[Install Surface Painted Hold Position Markings]SO ORL FL 2J9 Quincy Municipal GA 9 $ 471,207 $ 471,207 $ - $ - Construct Taxiway [Construct Taxilanes]

SO ORL FL SRQ Sarasota/Bradenton International P 48 $ 3,206,718 $ 3,206,718 $ - $ -

Construct Taxiway [Construct Taxiway J], Improve Terminal Building [Terminal roof

Replacement]SO ORL FL SEF Sebring Regional GA 22 $ 4,237,317 $ 1,188,851 $ 3,048,466 $ - Rehabilitate Runway [Rehabilitate Runway 18/36 - Construction] - 18/36

SO ORL FL TIX Space Coast Regional GA 23 $ 413,915 $ 413,915 $ - $ -

Install Perimeter Fencing [Install Perimeter Fence], Rehabilitate Taxiway [Install

Surface-Painted Hold Position Signs], Wildlife Hazard Assessments [Wildlife Hazard

Assessment]

SO ORL FL SGJ St Augustine GA 31 $ 6,353,692 $ 162,780 $ 6,190,912 $ -

Improve Runway Safety Area [Relocate parallel Taxiway B to meet ADG RSA

Standards for Runway 13/31] - 13/31

SO ORL FL FPR St Lucie County International GA 32 $ 3,522,824 $ 1,568,037 $ 1,954,787 $ -

Improve Airport Drainage [Improve Airfield Drainage], Rehabilitate Taxiway

[Rehab Taxiway A & B]

SO ORL FL PIE St Petersburg-Clearwater International P 37 $ 5,761,935 $ 5,723,833 $ 38,102 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Vehicle],

Rehabilitate Runway [Rehab Runway 17L/35R] - 17L/35R, Rehabilitate Runway

[Rehabilitate Runway 04/22] - 04/22SO ORL FL *FLS State of Florida 7 $ 1,695,770 $ 1,695,770 $ - $ - Conduct State System Plan Study

SO ORL FL 24J Suwannee County GA 9 $ 299,875 $ 299,875 $ - $ -

Install Airfield Guidance Signs [Install Airfield Signage (5)], Rehabilitate Runway

Lighting [Rehabilitate MIRL Runway Lights] - 07/25, Rehabilitate Taxiway Lighting

[Reabilitate poritions of TW A MITL (60 lights)]SO ORL FL TLH Tallahassee Regional P 36 $ 12,798,468 $ 2,861,272 $ 9,937,196 $ - Rehabilitate Runway [Rehabilitate Runway (Construction Ph1)] - 09/27

SO ORL FL TPA Tampa International P 56 $ 2,571,379 $ 2,571,379 $ - $ -

Expand Apron [Expand Cargo Apron], Rehabilitate Terminal Building [Rehabilitate

Terminal Building]SO ORL FL TPA Tampa International P 55 $ 1,315,500 $ 1,315,500 $ - $ - Update Airport Master Plan Study [Update Airport Master Plan Study]

SO ORL FL MTH The Florida Keys Marathon GA 29 $ 150,000 $ 150,000 $ - $ -

Acquire Emergency Generator [Acquire Emergency Generator Switch Gear],

Remove Obstructions [Remove Obstruction (RPZ RWY25)]

SO ORL FL 1J0 Tri-County GA 7 $ 126,226 $ 126,226 $ - $ -

Install Perimeter Fencing [Install Perimeter Fencing], Rehabilitate Runway

[Runway 01/19 Markings] - 01/19

SO ORL FL X23 Umatilla Municipal GA 7 $ 411,929 $ 411,929 $ - $ -

Construct Apron [Aircraft Parking Apron (Phase 2)], Construct Taxiway [Construct

Partial Parallel Taxiway A (Construction)]

Page 64 of 88

Page 65: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SO ORL FL X59 Valkaria GA 3 $ 109,315 $ 109,315 $ - $ -

Rehabilitate Apron [Rehab main apron (remarking and tie-downs) - Design Part B],

Rehabilitate Taxiway [Rehab Taxiway B - Design Part B]

SO ORL FL X59 Valkaria GA 4 $ 2,831,413 $ 162,780 $ 2,668,633 $ -

Construct Taxiway [Construct Parallel Taxiway A - Design], Rehabilitate Apron

[Rehab main apron (remarking and tie-downs) - Construction Part C], Rehabilitate

Taxiway [Rehab Taxiway B - Construction]SO ORL FL VRB Vero Beach Municipal GA 35 $ 401,105 $ 401,105 $ - $ - Remove Obstructions [Remove Obstructions]

SO ORL FL CHN Wauchula Municipal GA 10 $ 133,713 $ 133,713 $ - $ -

Acquire Land For Approaches [Acquire Land For Approaches], Construct Taxiway

[Construct Taxiway and Taxilanes - Design]SO ORL FL X60 Williston Municipal GA 12 $ 1,622,333 $ 1,622,333 $ - $ - Extend Taxiway, Rehabilitate TaxiwaySO ORL FL GIF Winter Haven's Gilbert GA 22 $ 242,209 $ 242,209 $ - $ - Extend Taxiway [Extend Taxiway F - Design Reimbursement]

SO ORL FL ZPH Zephyrhills Municipal GA 10 $ 100,700 $ 100,700 $ - $ -

Update Airport Master Plan Study [Airport Layout Plan, Exhibit A and Capital

Improvement Program Updates]

SO ORL PR SIG Fernando Luis Ribas Dominicci P 7 $ 667,916 $ 667,916 $ - $ -

Conduct Airport Master Plan Study [Conduct Airport Master Plan Study and

Airport Layout Plan]

SO ORL PR RVR Jose Aponte De La Torre GA 7 $ 4,304,166 $ - $ 4,304,166 $ -

Construct Access Road [Reconstruct Access Road], Construct Utilities [MAP]

[Construct Primary Electrical Switch and Distribution System (Phase 1 - Design)]SO ORL PR SJU Luis Munoz Marin International P 47 $ 7,820,469 $ 2,740,727 $ 5,079,742 $ - Rehabilitate Taxiway [Rehab Taxiway S (Phase 1 - Construction)]

SO ORL PR PSE Mercedita P 19 $ 2,645,001 $ 2,645,001 $ - $ -

Rehabilitate Apron [Rehab GA Apron (Design)], Security Enhancements [Security

Enhancements], Update Airport Master Plan Study [Update ALP and MP], Wildlife

Hazard Assessments [Conduct Wildlife Hazard Assessment]

SO ORL PR BQN Rafael Hernandez P 24 $ 4,450,028 $ 4,450,028 $ - $ -

Rehabilitate Taxiway [Rehabilitate a Portion of Taxiway A and Connectors C & D

(Construction)], Wildlife Hazard Assessments [Conduct Wildlife Hazard

Assessment]

SO ORL VI STT Cyril E King P 30 $ 340,457 $ 340,457 $ - $ -

Improve Runway Safety Area [Runway Safety Area Determination Study] - 10/28,

Rehabilitate Apron [Rehab GA Apron (Design)], Rehabilitate Taxiway [Rehab

Taxiway A (Design)]SO ORL VI STX Henry E Rohlsen P 32 $ 2,661,167 $ 2,661,167 $ - $ - Rehabilitate Runway [Rehab Runway 10/28 - Construction] - 10/28SW AROK AR LIT Adams Field P 78 $ 3,614,206 $ 3,614,206 $ - $ - Rehabilitate Taxiway Lighting [Phase 2 Construction]SW AROK AR LIT Adams Field P 77 $ 761,859 $ 667,572 $ 94,287 $ - Improve Runway Safety Area [Phase 2 - Construction] - 04R/22LSW AROK AR M73 Almyra Municipal GA 5 $ 540,000 $ 540,000 $ - $ - Widen Runway [Construction] - 18/36

SW AROK AR BVX Batesville Regional GA 11 $ 126,402 $ 126,402 $ - $ -

Extend Runway Safety Area [Phase I - Design Only for RSA Grading] - 08/26, Install

Perimeter Fencing [Install Perimeter Fence - Design Only]

SW AROK AR 7M3 Bearce GA 9 $ 315,709 $ 315,709 $ - $ -

Rehabilitate Apron [Rehabilitate Apron - Phase 2 (construction)], Rehabilitate

Taxiway [Rehabilitation Taxiway - Phase 2 (Construction)]SW AROK AR 0M0 Billy Free Municipal GA 7 $ 17,765 $ 17,765 $ - $ - Rehabilitate Runway [Design-only] - 18/36

Page 65 of 88

Page 66: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW AROK AR HKA Blytheville Municipal GA 12 $ 431,802 $ 431,802 $ - $ -

Rehabilitate Runway - 18/36, Rehabilitate Runway Lighting - 18/36, Rehabilitate

TaxiwaySW AROK AR HRO Boone County GA 19 $ 222,273 $ 145,125 $ 77,148 $ - Rehabilitate ApronSW AROK AR 37T Calico Rock-Izard County GA 8 $ 135,317 $ 135,317 $ - $ - Install Perimeter FencingSW AROK AR 4M3 Carlisle Municipal GA 10 $ 218,669 $ 218,669 $ - $ - Rehabilitate Runway - 18/36SW AROK AR 4M1 Carroll County GA 11 $ 112,841 $ 112,841 $ - $ - Rehabilitate ApronSW AROK AR 4M8 Clarendon Municipal GA 6 $ 142,412 $ 142,412 $ - $ - Construct Runway [Phase 5 - Runway Lighting] - Plan-1SW AROK AR H35 Clarksville Municipal GA 9 $ 46,930 $ 46,930 $ - $ - Construct Taxiway [Design Only]SW AROK AR CCA Clinton Municipal GA 9 $ 131,195 $ 131,195 $ - $ - Acquire Land for DevelopmentSW AROK AR 86 Conway Replacement Airport 4 $ 3,720,105 $ 1,050,000 $ 2,670,105 $ - Construct New Airport [Phase 4]SW AROK AR 4M9 Corning Municipal GA 15 $ 166,351 $ 166,351 $ - $ - Rehabilitate Taxiway [Phase 3 - Construction]

SW AROK AR 32A Danville Municipal GA 3 $ 417,202 $ 417,202 $ - $ -

Acquire Land for Development [Land Acquisition], Remove Obstructions [Electric

Utility Line Relocation]SW AROK AR 5M1 De Witt Municipal GA 5 $ 59,375 $ 59,375 $ - $ - Construct Taxiway [Design-only]

SW AROK AR +08B Delta Regional Airport 7 $ 4,329,247 $ 1,087,500 $ 3,241,747 $ -

Collect airport data for Airports Geographic Information System, Construct New

Airport [Construct New Airport - Phase 7 (Construct Stage 2B - Final HMAC Lift on

Apron and TW Paving and Install Lighting; and Design Stage 3 - Access Road,

Utilities & Terminal Area Facilities - Ph A]

SW AROK AR M89 Dexter B Florence Memorial Field GA 12 $ 157,244 $ 157,244 $ - $ -

Install Miscellaneous NAVAIDS [Replace existing wind cone and install

supplemental wind cones], Install Runway Vertical/Visual Guidance System

[Replace PAPI system] - 04/22SW AROK AR FYV Drake Field GA 40 $ 239,497 $ 239,497 $ - $ - Rehabilitate Runway - 16/34SW AROK AR 5M4 Fordyce Municipal GA 8 $ 86,343 $ 86,343 $ - $ - Rehabilitate Runway - 05/23SW AROK AR FSM Fort Smith Regional P 40 $ 1,055,193 $ 1,055,193 $ - $ - Rehabilitate Taxiway [Phase 1b - Realignment Taxiway A West]SW AROK AR PBF Grider Field GA 10 $ 400,831 $ 400,831 $ - $ - Rehabilitate Runway - 18/36SW AROK AR CDH Harrell Field GA 12 $ 159,941 $ 159,941 $ - $ - Rehabilitate Runway - 18/36SW AROK AR HBZ Heber Springs Municipal GA 10 $ 152,190 $ 152,190 $ - $ - Acquire Land For Approaches [Acquire Runway 23 RPZ (Phase 5 - Tract 4)]SW AROK AR M18 Hope Municipal GA 7 $ 369,903 $ 369,903 $ - $ - Rehabilitate Runway [Phase 2 - Construction] - 16/34SW AROK AR 6M2 Horseshoe Bend GA 4 $ 269,449 $ 269,449 $ - $ - Rehabilitate Runway Lighting - 13/31

SW AROK AR M77 Howard County GA 6 $ 319,334 $ 319,334 $ - $ -

Expand Apron [Expand Apron], Install Runway Vertical/Visual Guidance System

[Install New PAPIs on both runway ends] - 01/19, Rehabilitate Apron [Overlay

Apron]SW AROK AR PGR Kirk Field GA 9 $ 235,414 $ 235,414 $ - $ - Construct Taxiway [Partial Parallel Taxiway]SW AROK AR M32 Lake Village Municipal GA 7 $ 148,093 $ 148,093 $ - $ - Construct Taxiway [Partial Parallel Taxiway - Phase 4 (Lighting)]SW AROK AR AGO Magnolia Municipal GA 9 $ 598,500 $ 598,500 $ - $ - Construct Apron [Phase 1]

SW AROK AR M78 Malvern Municipal GA 4 $ 174,332 $ 174,332 $ - $ -

Improve Runway Safety Area [Design and Construct RSA Improvements (Tree

Removal and Regrading)] - 04/22

Page 66 of 88

Page 67: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW AROK AR MXA Manila Municipal GA 8 $ 74,100 $ 74,100 $ - $ - Install Runway Vertical/Visual Guidance System - 18/36

SW AROK AR 6M7

Marianna/Lee County-Steve Edwards

Field GA 4 $ 319,539 $ 319,539 $ - $ - Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 18/36SW AROK AR FLP Marion County Regional GA 8 $ 244,755 $ 244,755 $ - $ - Rehabilitate Apron [Phase 2 - Initial Construction]SW AROK AR 7M1 McGehee Municipal GA 8 $ 495,065 $ 495,065 $ - $ - Expand Apron [Apron Expansion - Phase I]

SW AROK AR 42A

Melbourne Municipal - John E Miller

Field GA 12 $ 21,850 $ 21,850 $ - $ - Improve Airport Drainage [Design-only]

SW AROK AR HOT Memorial Field GA 19 $ 1,433,028 $ 247,344 $ 1,185,684 $ -

Expand Apron [Phase 2- construction], Install Airfield Guidance Signs [Install

Surface-Painted Hold Position Signs]SW AROK AR LLQ Monticello Municipal/Ellis Field GA 12 $ 73,220 $ 73,220 $ - $ - Rehabilitate Taxiway [Taxiway/Ramp Sealcoat]SW AROK AR BDQ Morrilton Municipal GA 7 $ 526,284 $ 526,284 $ - $ - Construct Taxiway [Construct Parallel Taxiway - Phase II]SW AROK AR M19 Newport Municipal GA 8 $ 291,446 $ 291,446 $ - $ - Rehabilitate Runway - 18/36SW AROK AR ORK North Little Rock Municipal R 21 $ 434,734 $ 434,734 $ - $ - Rehabilitate Runway Lighting [Phase 2 - Construction] - 05/23SW AROK AR ORK North Little Rock Municipal R 22 $ 312,568 $ 312,568 $ - $ - Rehabilitate Runway Lighting [Phase 3 - Construction] - 05/23SW AROK AR XNA Northwest Arkansas Regional P 42 $ 10,000,000 $ - $ 10,000,000 $ - Rehabilitate Runway - 16/34SW AROK AR XNA Northwest Arkansas Regional P 40 $ 1,578,110 $ 1,578,110 $ - $ - Expand Terminal Building [Phase 4 (Part A-2011)]SW AROK AR XNA Northwest Arkansas Regional P 41 $ 1,841,003 $ 1,841,003 $ - $ - Expand Terminal Building [Phase 5 (Part B-2011)]SW AROK AR 7M4 Osceola Municipal GA 5 $ 237,932 $ 237,932 $ - $ - Improve Runway Safety Area - 01/19SW AROK AR 7M5 Ozark-Franklin County GA 4 $ 88,864 $ 88,864 $ - $ - Install Taxiway Lighting [Design and Installation of Taxiway Lighting]SW AROK AR 7M7 Piggott Municipal GA 7 $ 145,482 $ 145,482 $ - $ - Rehabilitate Runway Lighting [Construction] - 18/36SW AROK AR ROG Rogers Municipal-Carter Field GA 29 $ 1,010,246 $ 538,646 $ 471,600 $ - Rehabilitate Apron [Phase II: Construct mid-section east side apron]SW AROK AR RUE Russellville Regional GA 10 $ 690,969 $ 690,969 $ - $ - Expand Apron [Expand Apron], Rehabilitate Apron [Rehabilitate Apron]SW AROK AR SUZ Saline County Regional GA 5 $ 32,088 $ 32,088 $ - $ - Acquire Snow Removal Equipment

SW AROK AR SRC Searcy Municipal GA 19 $ 287,818 $ 287,818 $ - $ - Construct Taxiway [480' Taxiway in Hangar Development Area (Not Fully Funded)]SW AROK AR 9M8 Sheridan Municipal GA 5 $ 312,607 $ 312,607 $ - $ - Install Perimeter Fencing [Install Perimeter Fencing]SW AROK AR SGT Stuttgart Municipal GA 18 $ 211,673 $ 211,673 $ - $ - Rehabilitate Runway [Rehab Runway 9/27] - 09/27SW AROK AR TXK Texarkana Regional-Webb Field P 34 $ 31,590 $ 31,590 $ - $ - Install Airfield Guidance SignsSW AROK AR TXK Texarkana Regional-Webb Field P 36 $ 484,170 $ 484,170 $ - $ - Conduct Environmental Study [Environmental Assessment]SW AROK AR TXK Texarkana Regional-Webb Field P 35 $ 330,986 $ 330,986 $ - $ - Install Airfield Guidance Signs, Rehabilitate Airport BeaconsSW AROK AR HEE Thompson-Robbins GA 9 $ 480,580 $ 480,580 $ - $ - Rehabilitate Runway Lighting [Runways 17/35 and 8/26] - 17/35SW AROK AR M27 Waldron Municipal GA 6 $ 481,750 $ 481,750 $ - $ - Construct Taxiway [Phase I - Parallel Taxiway Construction]SW AROK AR ARG Walnut Ridge Regional GA 11 $ 78,723 $ 78,723 $ - $ - Improve Airport Drainage, Rehabilitate Apron

SW AROK AR 3M9 Warren Municipal GA 3 $ 123,206 $ 123,206 $ - $ -

Acquire Land for Development [Acquire Land - 15 acres for completion of parallel

taxiway], Construct Taxiway [Parallel Taxiway - Phase I (design)]SW AROK AR AWM West Memphis Municipal R 23 $ 1,316,887 $ 166,844 $ 1,150,043 $ - Rehabilitate TaxiwaySW AROK AR CRT Z M Jack Stell Field GA 8 $ 191,842 $ 191,842 $ - $ - Install Perimeter Fencing [Install Perimeter Fencing]

Page 67 of 88

Page 68: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW AROK OK AVK Alva Regional GA 9 $ 106,782 $ 106,782 $ - $ - Rehabilitate Taxiway [Crack repair] - -SW AROK OK 1F0 Ardmore Downtown Executive GA 11 $ 509,000 $ 509,000 $ - $ - Rehabilitate Apron [Phase 2: Construction]

SW AROK OK ADM Ardmore Municipal GA 13 $ 272,222 $ 272,222 $ - $ -

Improve Airport Drainage [Design only grant], Rehabilitate Taxiway [Phae I -

Geometric Study], Update Airport Master Plan StudySW AROK OK AQR Atoka Municipal GA 8 $ 435,955 $ 435,955 $ - $ - Construct Apron, Install Miscellaneous NAVAIDS [Install airport beacon]SW AROK OK BVO Bartlesville Municipal GA 9 $ 473,328 $ 473,328 $ - $ - Construct Apron

SW AROK OK K44 Beaver Municipal GA 4 $ 192,423 $ 192,423 $ - $ -

Extend Runway [Partial reimbursement for expenses - Phase 3] - 17/35, Install

Runway Lighting [Partial reimbursement for expenses - Phase 3] - 17/35,

Rehabilitate Runway [Partial reimbursement for expenses - Phase 3] - 17/35

SW AROK OK BKN Blackwell-Tonkawa Municipal GA 9 $ 199,425 $ 199,425 $ - $ -

Install Runway Lighting - 17/35, Install Runway Vertical/Visual Guidance System -

17/35, Rehabilitate Airport BeaconsSW AROK OK 17K Boise City GA 4 $ 710,441 $ 710,441 $ - $ - Rehabilitate Runway [Overlay and remarking] - 04/22

SW AROK OK BFK Buffalo Municipal GA 6 $ 215,792 $ 215,792 $ - $ -

Install Miscellaneous NAVAIDS [Installing Rotating Beacon], Rehabilitate Runway

[Crack Seal] - 17/35SW AROK OK 86F Carnegie Municipal GA 3 $ 196,842 $ 196,842 $ - $ - Rehabilitate Runway Lighting - 17/35

SW AROK OK CHK Chickasha Municipal GA 10 $ 163,150 $ 163,150 $ - $ -

Improve Airport Drainage [Design Only], Install Runway Vertical/Visual Guidance

System [Install PAPIs]SW AROK OK O65 Christman Airfield GA 7 $ 41,705 $ 41,705 $ - $ - Construct Taxiway [Design Partial Parallel Twy]

SW AROK OK GCM Claremore Regional GA 14 $ 486,210 $ 486,210 $ - $ -

Remove Obstructions [Constuction-only Grant. OAC-funded design in 2009] -

17/35SW AROK OK 95F Cleveland Municipal GA 7 $ 103,256 $ 103,256 $ - $ - Rehabilitate Runway [Rehabilitate Runway (PhaseII)] - 18/36SW AROK OK CLK Clinton Regional GA 10 $ 46,075 $ 46,075 $ - $ - Rehabilitate Apron [Phase 1 (design)]

SW AROK OK CSM Clinton-Sherman GA 5 $ 600,000 $ 600,000 $ - $ -

Install Airfield Guidance Signs [Install Taxiway Guidance Signs], Install Runway

Vertical/Visual Guidance System [Install REILS] - 17R/35L, Install Runway

Vertical/Visual Guidance System [Runway Holding Position Signs & RW Exit Signs] -

17L/35RSW AROK OK F36 Cordell Municipal GA 4 $ 319,141 $ 319,141 $ - $ - Install Runway Lighting [Runway lighting and electrical upgrade] - 17/35

SW AROK OK CUH Cushing Municipal GA 12 $ 52,250 $ 52,250 $ - $ -

Construct Taxiway [design-only], Rehabilitate Access Road [Entrance Rd],

Rehabilitate Taxiway

SW AROK OK ELK Elk City Regional Business GA 12 $ 236,346 $ 236,346 $ - $ -

Install Perimeter Fencing [Install perimeter fencing], Install Runway Vertical/Visual

Guidance System [Install REILS] - 17/35SW AROK OK WDG Enid Woodring Regional GA 24 $ 141,740 $ 141,740 $ - $ - Rehabilitate Runway [Remove rubber & remark]

SW AROK OK GMJ Grove Municipal GA 14 $ 145,730 $ 145,730 $ - $ -

Rehabilitate Taxiway [East side T-hangar taxilane construction] - -, Rehabilitate

Taxiway [West side T-hangar taxilane construction] - -

SW AROK OK GOK Guthrie-Edmond Regional GA 12 $ 140,410 $ 140,410 $ - $ -

Construct Taxiway [design], Install Taxiway Lighting [design], Rehabilitate Runway

Lighting - 16/34, Rehabilitate Taxiway [design]

Page 68 of 88

Page 69: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW AROK OK DUC Halliburton Field GA 12 $ 538,394 $ 538,394 $ - $ - Construct Terminal Building [Phase 5]SW AROK OK F32 Healdton Municipal GA 5 $ 600,000 $ 600,000 $ - $ - Construct Runway [Phase 3- pave portion of new runway] - 17/35

SW AROK OK H68 Hefner-Easley GA 1 $ 282,411 $ 282,411 $ - $ -

Improve Runway Safety Area [Design-only] - 18/36, Rehabilitate Runway [design &

construction] - 18/36SW AROK OK F10 Henryetta Municipal GA 2 $ - $ - $ - $ - No projects assigned.SW AROK OK HBR Hobart Regional GA 3 $ 52,250 $ 52,250 $ - $ - Rehabilitate Runway [Overlay 12/30 - Design] - 12/30

SW AROK OK O35 Hollis Municipal GA 2 $ 64,315 $ 64,315 $ - $ -

Collect airport data for Airports Geographic Information System [Aeronautical

survey]SW AROK OK H92 Hominy Municipal GA 7 $ 266,000 $ 266,000 $ - $ - Install Perimeter Fencing

SW AROK OK LAW Lawton-Fort Sill Regional P 28 $ 50,008 $ 50,008 $ - $ -

Rehabilitate Apron [Rehabilitate Apron - Phase 1 (design)], Rehabilitate Taxiway

[Rehabilitate - Phase 1 (design)]

SW AROK OK LAW Lawton-Fort Sill Regional P 29 $ 476,595 $ 476,595 $ - $ -

Rehabilitate Apron [Rehabilitation Apron - Phase 2 (construction)], Rehabilitate

Taxiway [Rehabilitation Taxiway - Phase 2 (construction)]

SW AROK OK MLC McAlester Regional GA 11 $ 1,420,815 $ 920,815 $ 500,000 $ -

Improve Runway Safety Area [Phase One construction Phase I Construction] -

02/20SW AROK OK MLC McAlester Regional GA 12 $ 407,351 $ 407,351 $ - $ - Improve Runway Safety Area [Phase II Construction] - 02/20SW AROK OK 4O4 McCurtain County Regional GA 9 $ 236,600 $ 236,600 $ - $ - Construct Taxiway [Design-only] - -

SW AROK OK O53 Medford Municipal GA 6 $ 253,731 $ 253,731 $ - $ -

Improve Access Road, Install Miscellaneous NAVAIDS [Miscellaneous NAVAIDS

construction], Rehabilitate Runway [Rehabilitate Runway Construction] - 17/35,

Rehabilitate Taxiway [Rehabilitate Taxiway]

SW AROK OK MIO Miami Municipal GA 15 $ 59,470 $ 59,470 $ - $ -

Extend Taxiway [Prelim Engr Report] - -, Rehabilitate Runway [Prelim Engr Report] -

17/35SW AROK OK H71 Mid-America Industrial GA 9 $ 315,400 $ 315,400 $ - $ - Extend TaxiwaySW AROK OK OKM Okmulgee Regional GA 17 $ 64,220 $ 64,220 $ - $ - Install Miscellaneous NAVAIDS, Install Perimeter Fencing

SW AROK OK PVJ Pauls Valley Municipal GA 10 $ 386,684 $ 386,684 $ - $ - Rehabilitate Runway Lighting [Replace Rwy 17/35 runway edge lighting.] - 17/35

SW AROK OK F22 Perry Municipal GA 9 $ 102,852 $ 102,852 $ - $ -

Rehabilitate Runway [Runway 17/35 - Design] - 17/35, Rehabilitate Taxiway

[Design] - -

SW AROK OK RVS Richard Lloyd Jones Jr R 24 $ 74,298 $ 74,298 $ - $ -

Rehabilitate Service Road [Construction - Phase 5 (Northern Perimeter Road STA

10+00 to STA 38+60 and Southwestern Perimeter Road between Gates 1 & 2 and

Gates 7 & 8)]

SW AROK OK RVS Richard Lloyd Jones Jr R 25 $ 192,565 $ 192,565 $ - $ -

Install Airfield Guidance Signs [design-only], Install Miscellaneous NAVAIDS [design-

only], Install Runway Vertical/Visual Guidance System [design-only] - 01L/19R,

Install Runway Vertical/Visual Guidance System [design-only] - 01R/19L,

Rehabilitate Runway Lighting [design-only] - 01R/19LSW AROK OK JSV Sallisaw Municipal GA 9 $ 51,490 $ 51,490 $ - $ - Improve Runway Safety Area - 17/35

Page 69 of 88

Page 70: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW AROK OK 3O4 Sayre Municipal GA 5 $ 60,015 $ 60,015 $ - $ -

Construct Service Road, Install Perimeter Fencing [Design] - -, Rehabilitate Runway

[Design] - 17/35, Rehabilitate Runway Lighting [Runway Lighting Design Only] -

17/35

SW AROK OK SNL Shawnee Regional GA 15 $ 3,524,477 $ 1,224,477 $ 2,300,000 $ -

Rehabilitate Runway [Construct-Rehab rwy (OAC to supplement $280,000)] -

17/35, Rehabilitate Runway [RSA Component] - 17/35SW AROK OK 1K8 South Grand Lake Regional GA 3 $ 128,242 $ 128,242 $ - $ - Expand Apron [Fueling Area on GA Apron]SW AROK OK HHW Stan Stamper Municipal GA 9 $ 123,462 $ 123,462 $ - $ - Install Miscellaneous NAVAIDSSW AROK OK *OKS State of Oklahoma 11 $ 198,392 $ 198,392 $ - $ - Update State System Plan StudySW AROK OK GZL Stigler Regional GA 7 $ 473,981 $ 473,981 $ - $ - Install Perimeter Fencing

SW AROK OK SWO Stillwater Regional GA 20 $ 3,497,520 $ 1,897,520 $ 1,600,000 $ -

Construct Taxiway [Construct reconfiguration of south portion of parallel twy and

around terminal apron(OAC to supplement $285,00).]SW AROK OK SUD Stroud Municipal GA 7 $ 66,500 $ 66,500 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

SW AROK OK F30 Sulphur Municipal GA 5 $ 140,508 $ 140,508 $ - $ -

Improve Runway Safety Area [Improve Runway 17 RSA, remove vegetation from

ROFA] - 17/35, Install Miscellaneous NAVAIDSSW AROK OK TQH Tahlequah Municipal GA 9 $ 95,712 $ 95,712 $ - $ - Acquire Land for Development - -SW AROK OK OJA Thomas P Stafford GA 9 $ 173,522 $ 173,522 $ - $ - Acquire Land For Approaches [Acquire land]SW AROK OK 0F9 Tishomingo Airpark GA 2 $ 74,005 $ 74,005 $ - $ - Rehabilitate Runway [Phase 1 - design] - 17/35

SW AROK OK TUL Tulsa International P 82 $ 8,539,844 $ 3,081,216 $ 5,458,628 $ -

Construct Utilities [DESIGN, BIDDING, CM & INSPECTION of work originally

programmed on TUL80-2011], Rehabilitate Runway [Rehab RW 18L/36R - Phase 4

(construction of DP2 and design of DP3). Note: $207,000 of Match to be paid with

PFC)] - 18L/36RSW AROK OK TUL Tulsa International P 80 $ 450,469 $ - $ 450,469 $ - Improve Airport Drainage

SW AROK OK TUL Tulsa International P 79 $ 342,633 $ 342,633 $ - $ -

Remove Obstructions [Demolition of Hangar #8 & #10 in RW 8 RPZ], Security

Enhancements [PRELIM Design-Only]

SW AROK OK TUL Tulsa International P 81 $ 1,329,238 $ 1,329,238 $ - $ -

Install Runway Vertical/Visual Guidance System [Match to be pd with PFC funds] -

08/26

SW AROK OK OUN University of Oklahoma Westheimer R 23 $ 2,040,606 $ 1,240,606 $ 800,000 $ -

Rehabilitate Apron [Reconstruct south terminal apron (OAC supplementing

$200,000)]SW AROK OK WWR West Woodward GA 9 $ 44,650 $ 44,650 $ - $ - Rehabilitate Taxiway [Phase 1 - design]SW AROK OK H05 Wilburton Municipal GA 4 $ 243,685 $ 243,685 $ - $ - Install Runway Lighting - 17/35SW AROK OK OKC Will Rogers World P 60 $ 6,600,000 $ 6,600,000 $ - $ - Rehabilitate Taxiway

SW AROK OK OWP William R. Pogue Municipal GA 15 $ 135,992 $ 135,992 $ - $ -

Extend Taxiway [Design-Extend West T/L], Rehabilitate Apron [Design-Crack Seal &

Seal Coat West Apron], Rehabilitate Runway [Design-Overlay RW] - 17/35,

Rehabilitate Taxiway [Design-Vrack Seal & Seal Coat TWs A, B & Connectors]SW LANM LA ARA Acadiana Regional GA 16 $ 300,000 $ 300,000 $ - $ - Update Airport Master Plan StudySW LANM LA AEX Alexandria International P 53 $ 3,000,000 $ - $ 3,000,000 $ - Noise Mitigation Measures for Residences within 70 - 74 DNL

Page 70 of 88

Page 71: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW LANM LA AEX Alexandria International P 52 $ 2,315,354 $ - $ 2,315,354 $ - Rehabilitate Apron [Phase I - Rehabilitate south west apron]SW LANM LA AEX Alexandria International P 50 $ 1,844,261 $ 1,317,405 $ 526,856 $ - Rehabilitate Runway [Rehab RW 18/36 Midfield] - 18/36SW LANM LA AEX Alexandria International P 51 $ 212,415 $ 212,415 $ - $ - Rehabilitate Runway - 14/32SW LANM LA AEX Alexandria International P 48 $ 6,000,000 $ - $ 6,000,000 $ - Noise Mitigation Measures for Residences within 70 - 74 DNL

SW LANM LA AEX Alexandria International P 49 $ 2,400,000 $ - $ 2,400,000 $ -

Construct Fuel Farm [Relocate Fuel Farm - Demolition of Old Fuel Farm], Construct

Fuel Farm [Relocate fuel Farm- Construct Access Road]

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 93 $ 3,694,800 $ 1,194,800 $ 2,500,000 $ -

Rehabilitate Runway [Phase IV Construction: Rehabilitation of Runway 13/31,

Reconstruction of Taxiway B, Extend and Reconstruction of Taxiway L,

Reconstruction of Taxiway A and assocated SMGS lighting, Reconstruction of

Taxiways E and G] - 13/31

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 94 $ 1,393,838 $ 1,393,838 $ - $ -

Rehabilitate Runway [Phase IV-B Construction:Rehabilitation of Runway 13/31,

Reconstruction of Taxiway B, Extend and Reconstruction of Taxiway L,

Reconstruction of Taxiway A and assocated SMGS lighting, Reconstruction of

Taxiways E and G] - 13/31

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 92 $ 2,289,500 $ - $ 2,289,500 $ -

Acquire Land for Noise Compatibility outside 65 DNL [To acquire noise parcel

inholdings identified in previous Part 150 update-Liberty Farms, Pryce place, Lot Z]

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 95 $ 3,178,354 $ - $ 3,178,354 $ - Construct Taxiway [Extend Taxiway L]SW LANM LA 0M8 Byerley GA 2 $ 375,577 $ 375,577 $ - $ - Remove Obstructions [Acquire Land or Easements]SW LANM LA 0R4 Concordia Parish GA 9 $ 72,438 $ 72,438 $ - $ - Update Airport Master Plan StudySW LANM LA 5R8 DeQuincy Industrial Airpark GA 14 $ 1,746,052 $ 1,746,052 $ - $ - Construct Taxiway [Phase II (Construction)]SW LANM LA PTN Harry P Williams Memorial GA 14 $ 476,544 $ 476,544 $ - $ - Rehabilitate Taxiway Lighting [Rehab Taxiway A Electrical]SW LANM LA HUM Houma-Terrebonne GA 25 $ 1,206,686 $ 706,686 $ 500,000 $ - Rehabilitate Taxiway [Design and Construction]SW LANM LA 1R1 Jena GA 6 $ 193,663 $ 193,663 $ - $ - Install Perimeter Fencing

SW LANM LA M79 John H Hooks Jr Memorial GA 11 $ 408,276 $ 408,276 $ - $ -

Acquire Land for Development, Remove Obstructions [Acquire Land/Easements

for Approaches]

SW LANM LA LFT Lafayette Regional P 42 $ 5,506,968 $ 996,525 $ 4,510,443 $ -

Improve Runway Safety Area [Phase III Construction on Runway 22L (north end)] -

04R/22L

SW LANM LA LFT Lafayette Regional P 41 $ 5,749,539 $ 854,223 $ 4,895,316 $ -

Improve Runway Safety Area [Phase II Construction: including installation of EMAS

and relocation of the NAVAIDS (glide slope, PAPI, and REIL)] - 04R/22LSW LANM LA LCH Lake Charles Regional P 40 $ 1,594,622 $ 1,594,622 $ - $ - Expand Aircraft Rescue & Fire Fighting BuildingSW LANM LA LCH Lake Charles Regional P 41 $ 617,500 $ 617,500 $ - $ - Update Airport Master Plan StudySW LANM LA 3R2 Le Gros Memorial GA 8 $ 675,520 $ 675,520 $ - $ - Improve Airport Drainage [Phase 1 - Drainage Improvement]

SW LANM LA L39 Leesville GA 8 $ 469,526 $ 469,526 $ - $ - Improve Runway Safety Area [Construction Phase II South Side of Apron] - 18/36

Page 71 of 88

Page 72: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW LANM LA MSY

Louis Armstrong New Orleans

International P 91 $ 578,980 $ 578,980 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

SW LANM LA MSY

Louis Armstrong New Orleans

International P 92 $ 1,130,000 $ 1,130,000 $ - $ - Construct Taxiway [Ph I: Design Taxiway G]SW LANM LA MLU Monroe Regional P 29 $ 5,717,523 $ 1,147,266 $ 4,570,257 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway [TW A,C,D,E,F,H,J]SW LANM LA BQP Morehouse Memorial GA 13 $ 56,531 $ 56,531 $ - $ - Rehabilitate Taxiway Lighting [Prepare Plans & Specs]SW LANM LA IER Natchitoches Regional GA 17 $ 48,925 $ 48,925 $ - $ - Rehabilitate Apron [Rehabilitate apron (south portion)-Phase 3 design]SW LANM LA DTN Shreveport Downtown R 18 $ 905,333 $ 905,333 $ - $ - Rehabilitate Runway - 05/23SW LANM LA SHV Shreveport Regional P 54 $ 305,000 $ 305,000 $ - $ - Rehabilitate Runway [Design] - 05/23SW LANM LA SHV Shreveport Regional P 55 $ 2,140,000 $ 1,964,192 $ 175,808 $ - Security Enhancements [Construction Ph I]SW LANM LA ASD Slidell R 17 $ 71,607 $ 71,607 $ - $ - Install Perimeter Fencing [Airfield Fencing]

SW LANM LA GAO South Lafourche Leonard Miller Jr GA 12 $ 4,294,460 $ 2,075,183 $ 2,219,277 $ -

Extend Runway [Phase V of Construction - Remaining Parallel Taxiway Paving and

Lighting] - 18/36SW LANM LA UXL Southland Field GA 14 $ 141,884 $ 141,884 $ - $ - Install Perimeter Fencing [Install Airfield Fencing]

SW LANM LA 0R7 The Red River GA 5 $ 100,000 $ 100,000 $ - $ -

Expand Apron [Complete Design and EA], Install Perimeter Fencing [Complete

Design and EA]SW LANM LA F87 Union Parish GA 10 $ 463,587 $ 463,587 $ - $ - Rehabilitate Runway Lighting [Construction] - 16/34SW LANM LA F89 Winnsboro Municipal GA 5 $ 137,750 $ 137,750 $ - $ - Rehabilitate Runway - 18/36SW LANM NM ALM Alamogordo-White Sands Regional GA 19 $ 237,522 $ 237,522 $ - $ - Improve Airport DrainageSW LANM NM ABQ Albuquerque International Sunport P 39 $ 8,275,767 $ 8,275,767 $ - $ - Construct ApronSW LANM NM ABQ Albuquerque International Sunport P 38 $ 1,765,424 $ - $ 1,765,424 $ - VALE InfrastructureSW LANM NM F37 Carrizozo Municipal GA 4 $ 217,296 $ 217,296 $ - $ - Rehabilitate Apron

SW LANM NM CAO Clayton Municipal Airpark GA 14 $ 65,185 $ 65,185 $ - $ -

Construct Snow Removal Equipment Building [Construct SRE Building - Phase 1

(Design-Only)]

SW LANM NM CVN Clovis Municipal GA 27 $ 392,784 $ 392,784 $ - $ - Extend Runway [COMPLETE MOVEMENT OF NAVAIDS FOR EXTENSION] - 04/22SW LANM NM CVN Clovis Municipal GA 28 $ 307,747 $ 307,747 $ - $ - Extend Runway - 04/22

SW LANM NM AEG Double Eagle II R 17 $ 325,374 $ 150,000 $ 175,374 $ -

Collect airport data for Airports Geographic Information System [e-ALP GIS IAW

16, 17 18]SW LANM NM FSU Fort Sumner Municipal GA 9 $ 315,682 $ 315,682 $ - $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway [TWY C]SW LANM NM FMN Four Corners Regional P 33 $ 230,684 $ 230,684 $ - $ - Acquire Snow Removal Equipment [Acquire Snow Removal Equipment]

SW LANM NM FMN Four Corners Regional P 34 $ 632,923 $ 632,923 $ - $ -

Construct Building [Snow Removal Equipment Building - Phase II (Construction)],

Rehabilitate Apron [Reconstruct Apron - Phase I (Design-Only)]SW LANM NM SVC Grant County GA 12 $ 73,298 $ 73,298 $ - $ - Rehabilitate Apron [TERMINAL AREA DESIGN ONLY]SW LANM NM E05 Hatch Municipal GA 7 $ 164,579 $ 164,579 $ - $ - Improve Runway Safety Area - 11/29SW LANM NM 24N Jicarilla Apache Nation GA 13 $ 101,140 $ 101,140 $ - $ - Update Airport Master Plan Study [Update Airport Master Plan]

Page 72 of 88

Page 73: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW LANM NM LRU Las Cruces International GA 26 $ 5,483,879 $ 150,000 $ 5,333,879 $ - Rehabilitate Taxiway [Recon Twy A]SW LANM NM LRU Las Cruces International GA 27 $ 418,589 $ - $ 418,589 $ - Collect airport data for Airports Geographic Information System

SW LANM NM LVS Las Vegas Municipal GA 12 $ 381,691 $ 381,691 $ - $ -

Construct Snow Removal Equipment Building [Snow Removal Equipment - Phase II

(Construction)]

SW LANM NM LVS Las Vegas Municipal GA 13 $ 155,384 $ 155,384 $ - $ -

Construct Snow Removal Equipment Building [Snow Removal Equipment - Phase II

(Construction - Part 2)]SW LANM NM HOB Lea County Regional GA 19 $ 348,076 $ 348,076 $ - $ - Conduct Miscellaneous Study, Update Airport Master Plan StudySW LANM NM LSB Lordsburg Municipal GA 12 $ 40,261 $ 40,261 $ - $ - Rehabilitate ApronSW LANM NM LAM Los Alamos GA 9 $ 205,642 $ 205,642 $ - $ - Conduct Airport Master Plan Study [Prepare Airport Master Plan]

SW LANM NM 0.00E+00 Moriarty GA 11 $ 268,328 $ 268,328 $ - $ - Construct Runway [Construct Runway 18/36 - Phase 1 (Design-Only)] - Plan-1

SW LANM NM 83 New Airport 3 $ 95,864 $ 95,864 $ - $ -

Construct New Airport [Construct New Replacement Airport - Phase III (Data

Recovery - Part 2)]

SW LANM NM 83 New Airport 4 $ 282,571 $ 282,571 $ - $ -

Construct New Airport [Construct New Replacement Airport - Phase IV (Design-

Only)]

SW LANM NM E14 Ohkay Owingeh GA 7 $ 279,515 $ 279,515 $ - $ -

Improve Runway Safety Area [Improve Runway Safety Area - Phase II

(Construction)] - 16/34SW LANM NM PRZ Portales Municipal GA 15 $ 144,558 $ 144,558 $ - $ - Rehabilitate ApronSW LANM NM RTN Raton Municipal/Crews Field GA 14 $ 1,754,536 $ 1,754,536 $ - $ - Strengthen Runway [Strengthen Runway 02/20] - 02/20

SW LANM NM RTN Raton Municipal/Crews Field GA 15 $ 1,538,007 $ 1,538,007 $ - $ -

Rehabilitate Runway [Rehabilitate Runway 07/25.] - 07/25, Rehabilitate Runway

Lighting [Rehabilitate Runway 02/20 Lighting.] - 02/20SW LANM NM ROW Roswell International Air Center P 25 $ 639,888 $ 639,888 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Taxiway

SW LANM NM SAF Santa Fe Municipal CS 36 $ 2,701,187 $ 650,742 $ 2,050,445 $ -

Rehabilitate Taxiway [Reconstruct Taxiway A, Phase I, including MITL, signage and

markings], Rehabilitate Taxiway [Reconstruct Taxiway C including MITL, signage

and markings]

SW LANM NM SXU Santa Rosa Route 66 GA 10 $ 163,171 $ 163,171 $ - $ -

Install Airfield Guidance Signs [Replace Airfield Guidance Signs - Phase I (Design-

Only)], Rehabilitate Runway [Reconstruct Runway 8-26 - Phase I (Design-Only)] -

08/26

SW LANM NM SRR Sierra Blanca Regional GA 22 $ 607,141 $ 607,141 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Rehabilitate Apron,

Rehabilitate Runway - 06/24SW LANM NM ONM Socorro Municipal GA 11 $ 67,941 $ 67,941 $ - $ - Rehabilitate Airport Beacons, Rehabilitate Apron

SW LANM NM S42 Springer Municipal GA 5 $ 299,838 $ 299,838 $ - $ -

Install Runway Vertical/Visual Guidance System [Install Runway Vertical/Visual

Guidance System] - 01/19

SW LANM NM SKX Taos Regional GA 23 $ 168,420 $ 168,420 $ - $ -

Rehabilitate Runway [Crack Seal, Pavement Rejuvenator and Remark of Runway

04/22.] - 04/22SW LANM NM SKX Taos Regional GA 24 $ 52,060 $ 52,060 $ - $ - Acquire Equipment [Replace Airport Beacon.]

Page 73 of 88

Page 74: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW LANM NM TCC Tucumcari Municipal GA 12 $ 257,528 $ 257,528 $ - $ -

Rehabilitate Taxiway [Pavement Maintenance of Runway 8-26, Taxiways, Taxilanes

and Aprons - Seal Coating & Markings] - 08/26SW LANM NM TCC Tucumcari Municipal GA 13 $ 156,302 $ 156,302 $ - $ - Conduct Airport Master Plan StudySW LANM NM N17 Vaughn Municipal GA 6 $ 250,714 $ 250,714 $ - $ - Construct Snow Removal Equipment Building [PHASE 2]

SW TEX TX ABI Abilene Regional P 41 $ 6,562,967 $ 1,104,189 $ 5,458,778 $ -

Rehabilitate Taxiway [Rehabilitate Taxiways EASI and C with South Connectors,

Phase II (Construction)], Rehabilitate Taxiway [Rehabilitate Taxiways M, N and P,

Phase I (Design)]

SW TEX TX AUS Austin-Bergstrom International P 56 $ 975,000 $ 975,000 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 3000 Gallon ARFF Vehicle.]

SW TEX TX BRO

Brownsville/South Padre Island

International P 39 $ 914,000 $ 914,000 $ - $ -

Conduct Miscellaneous Study [Terminal Plan Study], Improve Airport Drainage

[Environmental Assessment], Improve Terminal Building [Design only: HVAC,

Cameras, and Ticket Counters], Install Airport Beacons [Site selection study],

Rehabilitate Taxiway [Engineering/Design-Only], Remove Obstructions

[Environmental Assessment]

SW TEX TX CRP Corpus Christi International P 47 $ 2,596,792 $ 2,596,792 $ - $ -

Extend Runway [Runway 13 Extension, Phase I (Design)] - 13/31, Extend Runway

[Runway 17 Extension, Phase I (Design)] - 17/35

SW TEX TX CRP Corpus Christi International P 48 $ 3,250,000 $ - $ 3,250,000 $ - Security Enhancements [Install Perimeter Road Security System, Section 1]SW TEX TX DAL Dallas Love Field P 39 $ 1,603,020 $ 1,603,020 $ - $ - Construct Runway Safety Area - 13L/31RSW TEX TX DAL Dallas Love Field P 38 $ 7,900,000 $ 900,000 $ 7,000,000 $ - Rehabilitate ApronSW TEX TX DAL Dallas Love Field P 40 $ 1,978,179 $ - $ 1,978,179 $ - VALE Infrastructure

SW TEX TX DFW Dallas/Fort Worth International P 101 $ 5,133,913 $ 5,133,913 $ - $ -

Rehabilitate Runway [Phase 1 - Design] - 13R/31L, Rehabilitate Runway Lighting

[Phase 1 - Design] - 17C/35CSW TEX TX DFW Dallas/Fort Worth International P 100 $ 4,053,823 $ 4,053,823 $ - $ - Rehabilitate Runway - 18L/36R, Rehabilitate Taxiway

SW TEX TX DRT Del Rio International P 13 $ 2,263,729 $ 925,843 $ 1,337,886 $ -

Construct Taxiway [Construct Taxiway G, Phase II (Construction)], Rehabilitate

Apron [Rehabilitate GA/Air Carrier Aprons, Phase II (Construction)], Rehabilitate

Taxiway [Reconstruct Taxiways H and GA, Phase I (Design)]

SW TEX TX GGG East Texas Regional P 37 $ 538,445 $ 538,445 $ - $ -

Expand Terminal Building [Improve Terminal Building (Design Only).], Improve

Airport Miscellaneous Improvements [Rehabilitate terminal entrance road and

parking lot Phase 4.]

SW TEX TX GGG East Texas Regional P 36 $ 461,555 $ 461,555 $ - $ -

Improve Airport Miscellaneous Improvements [Rehabilitate terminal entrance

road and parking lot.]SW TEX TX CLL Easterwood Field P 33 $ 333,450 $ 333,450 $ - $ - Update Airport Master Plan Study [Phase II Master Plan Update]SW TEX TX CLL Easterwood Field P 34 $ 4,221,800 $ 525,810 $ 3,695,990 $ - Construct Taxiway [Taxiway G]SW TEX TX CLL Easterwood Field P 32 $ 162,925 $ 162,925 $ - $ - Update Airport Master Plan Study [Phase I Master Plan Update]

Page 74 of 88

Page 75: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW TEX TX ELP El Paso International P 31 $ 3,413,825 $ 3,413,825 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Aircraft Rescue

& Fire Fighting Vehicle [Acquired ARFF Vehicle.], Improve Service Road,

Rehabilitate Taxiway [Reconstruct Twy A (design only).], Safety Management

System (SMS) Program

SW TEX TX AFW Fort Worth Alliance R 43 $ 10,915,469 $ 709,392 $ 10,206,077 $ -

Extend Runway [Extend Runway - Phase 7] - 16L/34R, Rehabilitate Apron,

Rehabilitate Runway - 16L/34R, Rehabilitate TaxiwaySW TEX TX AFW Fort Worth Alliance R 44 $ - $ - $ - $ - No projects assigned.

SW TEX TX IAH George Bush Intercontinental/Houston P 95 $ 2,200,000 $ - $ 2,200,000 $ - Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 90 $ 2,524,164 $ 2,524,164 $ - $ - Rehabilitate Runway - 15L/33R

SW TEX TX IAH George Bush Intercontinental/Houston P 91 $ 2,134,685 $ - $ 2,134,685 $ -

Acquire Land for Noise Compatibility within 65 - 69 DNL, Noise Mitigation

Measures for Residences within 65 - 69 DNL

SW TEX TX IAH George Bush Intercontinental/Houston P 94 $ 7,975,000 $ - $ 7,975,000 $ - Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 93 $ 6,517,491 $ - $ 6,517,491 $ - Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 89 $ 10,349,425 $ 10,349,425 $ - $ - Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 92 $ 4,709,524 $ 4,709,524 $ - $ - Rehabilitate Taxiway

SW TEX TX BPT Jack Brooks Regional P 28 $ 2,005,401 $ 2,005,401 $ - $ -

Conduct Environmental Study, Conduct Miscellaneous Study [Pavement analysis

and topographic surveying/aerial photography], Modify Access Road

[Construction]

SW TEX TX LRD Laredo International P 66 $ 1,000,000 $ - $ 1,000,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation in

65 DNL.]

SW TEX TX LRD Laredo International P 67 $ 285,000 $ - $ 285,000 $ - Conduct Noise Compatibility Plan Study [Update Noise Compatibility Study.]

SW TEX TX LRD Laredo International P 68 $ 6,356,977 $ 1,656,977 $ 4,700,000 $ -

Construct Taxiway, Improve Runway Safety Area [Upgrade EMAS.] - 17R/35L,

Rehabilitate Apron [Rehabilitate GA Apron (Phase 6).]

SW TEX TX LRD Laredo International P 69 $ 3,000,000 $ - $ 3,000,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation in

65 DNL]

SW TEX TX LBB Lubbock Preston Smith International P 35 $ 100,000 $ - $ 100,000 $ - Wildlife Hazard Assessments

SW TEX TX LBB Lubbock Preston Smith International P 36 $ 26,078,786 $ 3,649,712 $ 22,429,074 $ -

Rehabilitate Runway [Conduct Preliminary Engineering study for 17R/35L

Pavement.] - 17R/35L, Rehabilitate Runway [Phase 3 of construction.] - 08/26

Page 75 of 88

Page 76: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

SW TEX TX MFE McAllen Miller International P 42 $ 4,318,852 $ 4,318,852 $ - $ - Expand Terminal BuildingSW TEX TX MFE McAllen Miller International P 41 $ 87,122 $ 87,122 $ - $ - Update Miscellaneous Study [Phase 2], Wildlife Hazard Assessments

SW TEX TX MAF Midland International P 52 $ 7,543,382 $ 2,983,765 $ 4,559,617 $ -

Rehabilitate Apron [Rehabilitate Executive Apron, Area 1, Phase II (Construction)],

Rehabilitate Taxiway [Rehabilitate Taxiway Systems, Phase III (Construction)]SW TEX TX SJT San Angelo Regional/Mathis Field P 32 $ 1,034,814 $ 1,034,814 $ - $ - Improve Building [Improve Terminal Building, Phase II (Construction)]SW TEX TX SAT San Antonio International P 68 $ 3,197,427 $ - $ 3,197,427 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLSW TEX TX SAT San Antonio International P 71 $ 1,602,573 $ - $ 1,602,573 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLSW TEX TX SAT San Antonio International P 70 $ 4,200,000 $ - $ 4,200,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLSW TEX TX SAT San Antonio International P 69 $ 9,333,837 $ 2,333,837 $ 7,000,000 $ - Extend Runway [Paving, Phase 2] - 03/21

SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 9 $ 6,000,000 $ 1,000,000 $ 5,000,000 $ - Rehabilitate Runway [Construction (Phase 2).] - 17/35SW TEX TX *TXS State of Texas 8 $ 500,000 $ - $ 500,000 $ - Update State System Plan StudySW TEX TX *TXB Texas State Block Grant Program 79 $ 2,025,378 $ 2,025,378 $ - $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 77 $ 2,000,000 $ - $ 2,000,000 $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 78 $ 3,500,000 $ - $ 3,500,000 $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 75 $ 12,128,063 $ 12,128,063 $ - $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 72 $ 17,639,791 $ 17,639,791 $ - $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 76 $ 400,000 $ - $ 400,000 $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 74 $ 5,000,000 $ - $ 5,000,000 $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 73 $ 14,045,135 $ 14,045,135 $ - $ - Non primary development projects in state block grant program

SW TEX TX TYR Tyler Pounds Regional P 32 $ 5,869,573 $ 1,041,930 $ 4,827,643 $ -

Improve Runway Safety Area [Phase 4 to Extend Twy F and realign Twys H & C;

relocate Rwy 4/22 VASI.] - 04/22

SW TEX TX HRL Valley International P 52 $ 1,562,448 $ 1,562,448 $ - $ -

Expand Apron, Rehabilitate Apron [Joint Seal], Rehabilitate Taxiway [Seal Coat Twy

L & M], Rehabilitate Taxiway Lighting

SW TEX TX ACT Waco Regional P 32 $ 3,300,000 $ 1,000,000 $ 2,300,000 $ -

Rehabilitate Apron [Rehabilitate Apron (Phase 1).], Rehabilitate Taxiway

[Construction (Phase I).]WP HNL AS FAQ Fitiuta GA 26 $ 300,000 $ 300,000 $ - $ - Install Perimeter Fencing

WP HNL AS FAQ Fitiuta GA 25 $ 600,000 $ 600,000 $ - $ - Conduct Airport Master Plan Study [Phase I], Wildlife Hazard AssessmentsWP HNL AS PPG Pago Pago International P 50 $ 1,000,000 $ 1,000,000 $ - $ - Improve Aircraft Rescue & Fire Fighting Building [Ph. I]WP HNL FM *FMS Federated States of Micronesia 2 $ 1,400,000 $ - $ 1,400,000 $ - Collect airport data for Airports Geographic Information SystemWP HNL FM TTK Kosrae GA 12 $ 8,980,000 $ - $ 8,980,000 $ - Rehabilitate Runway [Phase III] - 05/23WP HNL FM PNI Pohnpei International GA 14 $ 8,980,000 $ - $ 8,980,000 $ - Rehabilitate Runway [Phase VII] - 09/27WP HNL GU GUM Guam International P 80 $ 1,975,678 $ 1,975,678 $ - $ - Extend Runway [Phase IX] - 06L/24R

WP HNL GU GUM Guam International P 82 $ 1,400,000 $ - $ 1,400,000 $ - Improve Airport Miscellaneous Improvements [Demolish Naval Housing - Ph. IV]

Page 76 of 88

Page 77: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP HNL GU GUM Guam International P 81 $ 2,304,801 $ 2,304,801 $ - $ - Improve Airport Miscellaneous Improvements [Demolish Naval Housing - Ph. III]WP HNL HI HNM Hana GA 8 $ 139,896 $ 139,896 $ - $ - Wildlife Hazard AssessmentsWP HNL HI HNM Hana GA 7 $ 150,000 $ 150,000 $ - $ - Improve Terminal Building [Design only]WP HNL HI ITO Hilo International P 41 $ 2,195,743 $ 2,195,743 $ - $ - Rehabilitate Apron [GA apron - Ph II], Rehabilitate Taxiway [Ph II]

WP HNL HI ITO Hilo International P 40 $ 190,000 $ 190,000 $ - $ - Rehabilitate Apron [GA apron - Design only], Rehabilitate Taxiway [Design - Ph I]WP HNL HI ITO Hilo International P 43 $ 190,000 $ 190,000 $ - $ - Rehabilitate Taxiway [CM costs only]WP HNL HI ITO Hilo International P 42 $ 10,615,395 $ 6,798,382 $ 3,817,013 $ - Rehabilitate Runway [RWY 3/21 - Ph II] - 03/21WP HNL HI ITO Hilo International P 39 $ 570,000 $ 570,000 $ - $ - Rehabilitate Runway [RWY 3/21 - Design only] - 03/21WP HNL HI HNL Honolulu International P 101 $ 240,000 $ 240,000 $ - $ - Rehabilitate Taxiway [Txwy RA]WP HNL HI HNL Honolulu International P 105 $ 99,375 $ 99,375 $ - $ - Acquire Friction Measuring EquipmentWP HNL HI HNL Honolulu International P 108 $ 1,034,255 $ 1,034,255 $ - $ - Improve Terminal Building [Phase IV]WP HNL HI HNL Honolulu International P 102 $ 802,000 $ 802,000 $ - $ - Rehabilitate Runway [RWY 26L - Design] - 08R/26LWP HNL HI HNL Honolulu International P 103 $ 1,250,000 $ - $ 1,250,000 $ - Improve Runway Safety Area [RWY 22 culvert design] - 04R/22LWP HNL HI HNL Honolulu International P 107 $ 821,025 $ 821,025 $ - $ - Improve Terminal BuildingWP HNL HI HNL Honolulu International P 104 $ 1,000,000 $ 1,000,000 $ - $ - Rehabilitate Runway [RWY 4R - Ph I Design] - 04R/22LWP HNL HI HNL Honolulu International P 106 $ 275,000 $ 275,000 $ - $ - Rehabilitate Runway Lighting [8L & 4L (Design only)] - 08L/26RWP HNL HI JRF Kalaeloa (John Rodgers Field) R 12 $ 789,655 $ 789,655 $ - $ - Rehabilitate Building [Design only]WP HNL HI LUP Kalaupapa GA 7 $ 150,000 $ 150,000 $ - $ - Improve Terminal Building [Design only]WP HNL HI LUP Kalaupapa GA 6 $ 77,870 $ 77,870 $ - $ - Acquire Equipment [Aircraft Passenger Lift]WP HNL HI KOA Kona International at Keahole P 34 $ 2,136,844 $ 2,136,844 $ - $ - Improve Terminal Building [Baggage Claim]WP HNL HI KOA Kona International at Keahole P 35 $ 2,276,385 $ 2,276,385 $ - $ - Rehabilitate Runway - 17/35WP HNL HI KOA Kona International at Keahole P 33 $ 117,640 $ 117,640 $ - $ - Acquire Friction Measuring EquipmentWP HNL HI LNY Lanai P 13 $ 238,957 $ 238,957 $ - $ - Construct Apron [Phase III]WP HNL HI LNY Lanai P 14 $ 950,000 $ 950,000 $ - $ - Improve Runway Safety Area [Phase I, Design only] - 03/21WP HNL HI LIH Lihue P 43 $ 226,480 $ 226,480 $ - $ - Improve Airport Drainage [Relocate Drainage Swale]WP HNL HI LIH Lihue P 42 $ 934,800 $ - $ 934,800 $ - Install Guidance SignsWP HNL HI MKK Molokai P 17 $ 5,353,165 $ 2,323,410 $ 3,029,755 $ - Rehabilitate Taxiway [Txwy A & B]WP HNL HI MKK Molokai P 16 $ 76,000 $ 76,000 $ - $ - Improve Airport Drainage [Design only]WP HNL HI MUE Waimea-Kohala GA 7 $ 134,572 $ 134,572 $ - $ - Wildlife Hazard AssessmentsWP HNL MH MAJ Marshall Islands International GA 12 $ 200,000 $ - $ 200,000 $ - Install Perimeter Fencing [Seawall - Design only]WP HNL MH MAJ Marshall Islands International GA 11 $ 500,000 $ - $ 500,000 $ - Collect airport data for Airports Geographic Information SystemWP HNL MH MAJ Marshall Islands International GA 10 $ 3,000,000 $ - $ 3,000,000 $ - Improve Runway Safety Area [Relocate service road - Ph. II] - 07/25

WP HNL MP GSN Francisco C. Ada/Saipan International P 72 $ 6,000,000 $ - $ 6,000,000 $ - Construct Aircraft Rescue & Fire Fighting Training Facility [Ph. III]

Page 77 of 88

Page 78: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP HNL MP GSN Francisco C. Ada/Saipan International P 71 $ 2,574,512 $ 2,574,512 $ - $ - Rehabilitate Runway [Phase X] - 07/25

WP HNL MP GSN Francisco C. Ada/Saipan International P 70 $ 2,206,874 $ 2,206,874 $ - $ - Rehabilitate Runway [Phase IX] - 07/25WP HNL PW ROR Babelthuap/Koror GA 16 $ 500,000 $ - $ 500,000 $ - Collect airport data for Airports Geographic Information SystemWP HNL PW ROR Babelthuap/Koror GA 15 $ 6,750,000 $ - $ 6,750,000 $ - Construct Apron [Phase IV]WP LAX AZ P20 Avi Suquilla GA 18 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan StudyWP LAX AZ E51 Bagdad GA 7 $ 211,861 $ 211,861 $ - $ - Improve Runway Safety Area [Phase I] - 05/23WP LAX AZ E95 Benson Municipal GA 15 $ 150,000 $ 150,000 $ - $ - Rehabilitate Runway [Phase III] - 10/28

WP LAX AZ P04 Bisbee Municipal GA 11 $ 303,407 $ 303,407 $ - $ -

Construct Taxiway [Taxiway A, Design Only Phase I], Install Miscellaneous

NAVAIDS [Install Beacon, Design Only, Phase I], Install Runway Vertical/Visual

Guidance System [Install PAPI - Design only] - 17/35, Rehabilitate Apron

[(Approximately 17,300 Square Yards) Design Only, Phase I]

WP LAX AZ BXK Buckeye Municipal GA 16 $ 477,109 $ 459,562 $ 17,547 $ -

Construct Apron, Construct Runway Safety Area [Blast pad at both ends, Phase 2] -

17/35

WP LAX AZ CGZ Casa Grande Municipal GA 14 $ 806,651 $ 806,651 $ - $ -

Install Runway Lighting [Phase II] - 05/23, Install Taxiway Lighting [Install Parallel

Taxiway B Lighting (Approximately 5,200 Linear Feet by 40 Linear Feet)],

Rehabilitate Runway Lighting [Construct Runway Lighting Electrical Vault] - 05/23WP LAX AZ CHD Chandler Municipal R 21 $ 75,000 $ 75,000 $ - $ - Install Weather Reporting Equipment [AWOS]WP LAX AZ AZC Colorado City Municipal GA 17 $ 1,854,187 $ 1,854,187 $ - $ - Rehabilitate Runway [Phase II] - 11/29WP LAX AZ P08 Coolidge Municipal GA 8 $ 123,475 $ 123,475 $ - $ - Extend Taxiway [Design Only]WP LAX AZ E60 Eloy Municipal GA 10 $ 112,220 $ 112,220 $ - $ - Remove ObstructionsWP LAX AZ PRC Ernest A. Love Field P 32 $ 2,571,365 $ 505,881 $ 2,065,484 $ - Improve Runway Safety Area - 03R/21LWP LAX AZ PRC Ernest A. Love Field P 33 $ 6,769,559 $ 631,464 $ 6,138,095 $ - Improve Runway Safety Area - 03R/21LWP LAX AZ FFZ Falcon Field R 21 $ 1,567,500 $ 150,000 $ 1,417,500 $ - Construct Taxiway [Construct Taxiway B, Phase II]

WP LAX AZ FLG Flagstaff Pulliam P 35 $ 3,512,782 $ 1,776,387 $ 1,736,395 $ -

Improve Airport Miscellaneous Improvements [Airfield Electrical Upgrade to

include installation of airfield lighting conduit, cables, isolation transformers, and

replacing existing Density Altitude Display Signs.], Rehabilitate Taxiway

WP LAX AZ @00B Ganado 1 $ 600,000 $ 600,000 $ - $ - Conduct Miscellaneous Study [Conduct Navajo Nation Airports Master Plan Study]WP LAX AZ GEU Glendale Municipal R 21 $ - $ - $ - $ - No projects assigned.WP LAX AZ GCN Grand Canyon National Park P 23 $ 227,384 $ 227,384 $ - $ - Improve Runway Safety Area - 03/21WP LAX AZ 1G4 Grand Canyon West P 13 $ 665,642 $ 665,642 $ - $ - Update Airport Master Plan StudyWP LAX AZ CFT Greenlee County GA 11 $ 160,236 $ 160,236 $ - $ - Rehabilitate Apron [Approximately 9400 Square Yards, Phase II]

Page 78 of 88

Page 79: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP LAX AZ IGM Kingman GA 25 $ 1,599,556 $ 300,000 $ 1,299,556 $ -

Install Guidance Signs [for Rwy 3/21 & Rwy 17/35], Rehabilitate Runway [Phase IV-

overlay Runway 03/21 and cracjk seal Runway 17/35] - 03/21, Rehabilitate

Runway Lighting - 17/35, Rehabilitate Taxiway Lighting [for Rwy 3/21 & Rwy

17/35]

WP LAX AZ HII Lake Havasu City GA 23 $ 204,077 $ 204,077 $ - $ -

Install Miscellaneous NAVAIDS [Relocate airport rotating beacon], Rehabilitate

Runway Lighting - 14/32

WP LAX AZ IFP Laughlin/Bullhead International P 38 $ 7,611,360 $ 1,896,355 $ 5,715,005 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire

Fighting Building [Phase II]WP LAX AZ IFP Laughlin/Bullhead International P 39 $ 313,500 $ - $ 313,500 $ - Conduct Noise Compatibility Plan StudyWP LAX AZ OLS Nogales International GA 15 $ 150,000 $ 150,000 $ - $ - Acquire Equipment [Acquire Sweeper], Install Perimeter FencingWP LAX AZ PGA Page Municipal P 25 $ 1,347,580 $ 1,347,580 $ - $ - Construct Apron, Rehabilitate Runway - 07/25

WP LAX AZ PAN Payson GA 17 $ 112,261 $ 112,261 $ - $ -

Improve Runway Safety Area [Install runway blast pads on each end of Runway

6/24, Phase II] - 06/24, Install Airfield Guidance Signs [Install airfield signage,

Phase II]WP LAX AZ DVT Phoenix Deer Valley R 28 $ 5,540,800 $ 836,251 $ 4,704,549 $ - Improve Airport Drainage [Drainage and Erosion control]WP LAX AZ DVT Phoenix Deer Valley R 29 $ 748,600 $ - $ 748,600 $ - Collect airport data for Airports Geographic Information SystemWP LAX AZ GYR Phoenix Goodyear R 18 $ 3,800,950 $ 150,000 $ 3,650,950 $ - Construct Taxiway [Construct Taxiway A Connector, Phase II]WP LAX AZ PHX Phoenix Sky Harbor International P 70 $ 4,083,000 $ 3,289,639 $ 793,361 $ - Improve Runway Safety Area - 07R/25L, Rehabilitate TaxiwayWP LAX AZ PHX Phoenix Sky Harbor International P 72 $ 372,600 $ - $ 372,600 $ - Conduct Noise Compatibility Plan Study [Update NEM]WP LAX AZ PHX Phoenix Sky Harbor International P 71 $ 3,462,750 $ 3,462,750 $ - $ - Rehabilitate Apron [West hold bay]WP LAX AZ IWA Phoenix-Mesa Gateway P 29 $ 9,975,000 $ 1,055,487 $ 8,919,513 $ - Expand Terminal Building [Phase II]WP LAX AZ IWA Phoenix-Mesa Gateway P 31 $ 4,803,600 $ - $ 4,803,600 $ - Expand Terminal BuildingWP LAX AZ IWA Phoenix-Mesa Gateway P 32 $ 1,231,317 $ 1,231,317 $ - $ - Expand Terminal BuildingWP LAX AZ IWA Phoenix-Mesa Gateway P 30 $ 1,983,229 $ - $ 1,983,229 $ - Construct Fuel Farm [MAP]WP LAX AZ RYN Ryan Field R 23 $ 252,078 $ 252,078 $ - $ - Install Emergency GeneratorWP LAX AZ SAD Safford Regional GA 21 $ 83,017 $ 83,017 $ - $ - Update Airport Master Plan Study

WP LAX AZ E77 San Manuel GA 4 $ 59,497 $ 59,497 $ - $ -

Install Airfield Guidance Signs [Install airfield guidance signs], Install Miscellaneous

NAVAIDS [Install Segmented circle, Beacon and Windcone], Install Runway

Lighting [Including Taxiway, Design Only] - 11/29

WP LAX AZ SDL Scottsdale R 28 $ 1,915,847 $ 1,892,097 $ 23,750 $ -

Rehabilitate Apron [Reconstruction of Landmark North apron (approximately

32,680 square yards), Phase IV]WP LAX AZ SDL Scottsdale R 27 $ 654,096 $ 69,233 $ 584,863 $ - Rehabilitate ApronWP LAX AZ SEZ Sedona GA 20 $ 1,290,453 $ 1,290,453 $ - $ - Expand Apron [Expand A Apron (approximately 300 feet by 580 feet)]WP LAX AZ SOW Show Low Regional CS 21 $ 392,850 $ 368,073 $ 24,777 $ - Acquire Snow Removal EquipmentWP LAX AZ FHU Sierra Vista Municipal-Libby AAF GA 25 $ 211,850 $ 211,850 $ - $ - Update Airport Master Plan Study

Page 79 of 88

Page 80: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP LAX AZ FHU Sierra Vista Municipal-Libby AAF GA 26 $ 635,991 $ 635,991 $ - $ - Extend Taxiway [Extend Taxiway G, Approximately 600 Feet x 50 Feet, Phase 2]WP LAX AZ D68 Springerville Municipal GA 22 $ 1,350,000 $ 150,000 $ 1,200,000 $ - Remove Obstructions [Remove Obstructions From RVZ]WP LAX AZ *AZS State of Arizona 5 $ 750,000 $ - $ 750,000 $ - Conduct aeronautical survey for WAAS approachWP LAX AZ TUS Tucson International P 63 $ 2,277,431 $ 736,018 $ 1,541,413 $ - Rehabilitate Runway [Phase III] - 03/21WP LAX AZ TUS Tucson International P 62 $ 6,876,043 $ 616,474 $ 6,259,569 $ - Rehabilitate Runway - 03/21WP LAX AZ E24 Whiteriver GA 12 $ 410,801 $ 410,801 $ - $ - Acquire Snow Removal Equipment, Install Weather Reporting Equipment

WP LAX AZ E25 Wickenburg Municipal GA 20 $ 173,000 $ 173,000 $ - $ -

Construct Access Road [Extend access road to new apron (approximately 1,200

Linear Feet x 24 Linear Feet), design only], Construct Apron [Construct apron

(approximately 30,000 Square Yards), design only.], Rehabilitate Apron,

Rehabilitate Runway [Including blast pads and marking (approximately 57,000

Square Yards), design only.] - 05/23, Rehabilitate Taxiway [Rehabilitate parallel

taxiway including marking (approximately 31,000 Square Yards), design only.]

WP LAX AZ RQE Window Rock GA 12 $ 841,700 $ 841,700 $ - $ -

Install Runway Lighting - 02/20, Rehabilitate Runway [Approximately 7,000' x 75',

Design and Site Preparation, Phase 1] - 02/20WP LAX CA BNG Banning Municipal GA 11 $ 193,922 $ 150,000 $ 43,922 $ - Construct Taxiway [Relocate Twy A]

WP LAX CA DAG Barstow-Daggett GA 7 $ 1,900,000 $ 1,900,000 $ - $ -

Install Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System

[Rwy 8/26 & 4/22 (PAPIs and windcones)] - 08/26, Rehabilitate Runway Lighting

[Rwy 4/22 & 8/26] - 04/22

WP LAX CA L35 Big Bear City GA 18 $ 1,581,750 $ 1,581,750 $ - $ -

Improve Airport Drainage, Rehabilitate Runway - 08/26, Rehabilitate Taxiway [Twy

A- West End]

WP LAX CA BUR Bob Hope P 54 $ 1,211,670 $ 1,066,631 $ 145,039 $ -

Improve Runway Safety Area - 15/33, Rehabilitate Aircraft Rescue & Fire Fighting

BuildingWP LAX CA BUR Bob Hope P 53 $ 964,270 $ 964,270 $ - $ - Improve Runway Safety Area - 15/33WP LAX CA BUR Bob Hope P 55 $ 805,900 $ - $ 805,900 $ - Conduct Noise Compatibility Plan Study

WP LAX CA POC Brackett Field R 15 $ 427,991 $ 427,991 $ - $ -

Rehabilitate Runway [slurry seal north rwy] - 08L/26R, Rehabilitate Taxiway [North

Taxiway and connectors with Rubberized Emulsion Aggregate Slurry Seal including

markings.]WP LAX CA BWC Brawley Municipal GA 14 $ 1,709,793 $ 1,709,793 $ - $ - Rehabilitate TaxiwayWP LAX CA CMA Camarillo R 31 $ 4,085,493 $ 2,941,407 $ 1,144,086 $ - Construct Taxiway [Parallel Twys]WP LAX CA L18 Fallbrook Community Airpark GA 4 $ 119,735 $ 119,735 $ - $ - Conduct Environmental StudyWP LAX CA F70 French Valley GA 25 $ 254,664 $ 206,938 $ 47,726 $ - Rehabilitate ApronWP LAX CA SEE Gillespie Field R 20 $ 173,540 $ 173,540 $ - $ - Conduct Environmental StudyWP LAX CA HMT Hemet-Ryan GA 12 $ 95,000 $ 95,000 $ - $ - Conduct Environmental Study

WP LAX CA IPL Imperial County CS 28 $ 603,145 $ 603,145 $ - $ -

Install Miscellaneous NAVAIDS [Relocate Seg. Circle/Wind Cone], Rehabilitate

Runway Lighting [Rwy 8/26 & Twy Bravo] - 08/26

Page 80 of 88

Page 81: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP LAX CA 2O7 Independence GA 6 $ 33,250 $ 33,250 $ - $ - Install Miscellaneous NAVAIDS [Segmented Circle]WP LAX CA IYK Inyokern P 27 $ 1,193,675 $ 1,000,000 $ 193,675 $ - Rehabilitate Runway - 02/20

WP LAX CA HHR

Jack Northrop Field/Hawthorne

Municipal R 13 $ 169,727 $ 169,727 $ - $ - Install Emergency Generator

WP LAX CA HHR

Jack Northrop Field/Hawthorne

Municipal R 12 $ 347,700 $ 347,700 $ - $ - Conduct Noise Compatibility Plan StudyWP LAX CA TRM Jacqueline Cochran Regional GA 20 $ 237,500 $ 237,500 $ - $ - Conduct Environmental StudyWP LAX CA LPC Lompoc GA 14 $ 316,863 $ 316,863 $ - $ - Rehabilitate Access RoadWP LAX CA O26 Lone Pine GA 8 $ 38,760 $ 38,760 $ - $ - Rehabilitate Runway - 16/34WP LAX CA LGB Long Beach /Daugherty Field/ P 38 $ 1,113,315 $ - $ 1,113,315 $ - Conduct Airport Master Plan Study [Conduct Airside Study]

WP LAX CA LGB Long Beach /Daugherty Field/ P 37 $ 5,079,431 $ 2,386,334 $ 2,693,097 $ -

Rehabilitate Apron [Air Carrier/Terminal Apron, Phase 3B], Rehabilitate Taxiway

[Twy E & F Access Pavements, Phase II]

WP LAX CA LGB Long Beach /Daugherty Field/ P 36 $ 2,045,569 $ 2,045,569 $ - $ -

Rehabilitate Apron [Air Carrier/Terminal Apron, Phase III], Rehabilitate Taxiway

[Twy E & F Access Pavements, Phase I]

WP LAX CA LAX Los Angeles International P 67 $ 7,000,000 $ - $ 7,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [City of Inglewood]

WP LAX CA LAX Los Angeles International P 66 $ 5,000,000 $ - $ 5,000,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [County of Los

Angeles]

WP LAX CA LAX Los Angeles International P 64 $ 12,382,407 $ 4,382,407 $ 8,000,000 $ -

Construct Apron [Bradley East and West Aprons], Construct Taxiway [Taxiway T

and associated projects]

WP LAX CA LAX Los Angeles International P 68 $ 5,502,740 $ 5,502,740 $ - $ -

Construct Apron [Bradley East and West Aprons], Construct Taxiway [Taxiway T

and associated projects]

WP LAX CA LAX Los Angeles International P 65 $ 5,000,000 $ - $ 5,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [City of El Segundo]

WP LAX CA LAX Los Angeles International P 69 $ 3,000,000 $ - $ 3,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [City of Inglewood]WP LAX CA RIV March ARB R 8 $ 172,528 $ 172,528 $ - $ - Conduct Airport Master Plan StudyWP LAX CA CRQ McClellan-Palomar P 29 $ 321,730 $ 321,730 $ - $ - Update Airport Master Plan StudyWP LAX CA BFL Meadows Field P 38 $ 1,315,900 $ 1,315,900 $ - $ - Improve Terminal BuildingWP LAX CA MHV Mojave GA 26 $ 2,088,911 $ 2,088,911 $ - $ - Rehabilitate Runway [Phase II] - 12/30

WP LAX CA MYF Montgomery Field R 14 $ 475,000 $ 475,000 $ - $ - Security Enhancements [Install access control for approximately 10 airfield gates]WP LAX CA OKB Oceanside Municipal GA 8 $ 236,645 $ 236,645 $ - $ - Install Perimeter Fencing, Rehabilitate Apron

WP LAX CA ONT Ontario International P 37 $ 6,000,000 $ - $ 6,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [City of Ontario]WP LAX CA PSP Palm Springs International P 48 $ 2,649,415 $ 2,649,415 $ - $ - Security Enhancements [replace security fencing]WP LAX CA REI Redlands Municipal GA 12 $ 448,875 $ 448,875 $ - $ - Rehabilitate Apron

Page 81 of 88

Page 82: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP LAX CA RAL Riverside Municipal R 25 $ 250,696 $ 250,696 $ - $ - Conduct Environmental StudyWP LAX CA SAN San Diego International P 66 $ 9,000,000 $ - $ 9,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLWP LAX CA SAN San Diego International P 65 $ 8,425,360 $ 3,443,368 $ 4,981,992 $ - Improve Airport Drainage, Improve Runway Safety Area - 09/27WP LAX CA SAN San Diego International P 64 $ 2,018,789 $ - $ 2,018,789 $ - VALE InfrastructureWP LAX CA SBA Santa Barbara Municipal P 44 $ 791,420 $ 712,500 $ 78,920 $ - Conduct Airport Master Plan StudyWP LAX CA SBA Santa Barbara Municipal P 43 $ 2,042,340 $ 2,042,340 $ - $ - Construct Terminal Building

WP LAX CA SMX

Santa Maria Public/Capt G Allan

Hancock Field P 31 $ 7,460,986 $ 1,000,000 $ 6,460,986 $ - Extend Runway [phase II] - 12/30WP LAX CA MIT Shafter-Minter Field GA 18 $ 191,335 $ 191,335 $ - $ - Acquire EquipmentWP LAX CA VCV Southern California Logistics R 19 $ 745,023 $ 745,023 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleWP LAX CA TSP Tehachapi Municipal GA 11 $ 140,890 $ 140,890 $ - $ - Rehabilitate Taxiway [Twy A]WP LAX CA VNY Van Nuys R 12 $ 2,576,731 $ 2,576,731 $ - $ - Rehabilitate Taxiway [Rehab Twy A2, Phase II]WP LAX CA WHP Whiteman R 14 $ 526,271 $ 526,271 $ - $ - Rehabilitate Apron [north aircraft ramp]

WP SFO CA ACV Arcata P 39 $ 1,895,326 $ 1,312,688 $ 582,638 $ - Improve Runway Safety Area [Soil Stablization @ Runway 14 End, Phase II] - 14/32

WP SFO CA O85 Benton Field GA 12 $ 2,783,916 $ 150,000 $ 2,633,916 $ -

Improve Runway Safety Area [Improve Runway 15/33 Safety Area - Phase II

(Construct)] - 15/33

WP SFO CA O85 Benton Field GA 13 $ 764,862 $ 764,861 $ 1 $ -

Rehabilitate Runway [Rehabilitate Runway 15/33 (approximately 75' by 2,420')] -

15/33

WP SFO CA CCR Buchanan Field R 18 $ 3,258,337 $ 3,258,337 $ - $ -

Rehabilitate Runway [Rehabilitate Runway 1L/19R (including marking) -

Design/Construct] - 01L/19RWP SFO CA MER Castle GA 13 $ 117,800 $ 117,800 $ - $ - Construct Taxiway [Design]

WP SFO CA O59 Cedarville GA 7 $ 409,084 $ 409,084 $ - $ -

Rehabilitate Apron, Rehabilitate Runway [Reseal joints, slurry seal runway,] -

01/19, Rehabilitate Taxiway [Reseal Joints for taxiways "A" and "B"]

WP SFO CA STS Charles M. Schulz - Sonoma County P 43 $ 432,488 $ 432,488 $ - $ -

Acquire Land For Approaches [Land Acquisition for Approaches approximately

0.42 acre]WP SFO CA STS Charles M. Schulz - Sonoma County P 42 $ 719,767 $ 719,767 $ - $ - Acquire Land For Approaches

WP SFO CA CIC Chico Municipal P 31 $ 307,800 $ 307,800 $ - $ -

Acquire Equipment [Acquire sweeper], Rehabilitate Taxiway [Reconsruct Taxiway

H (940' x 75'), including Holding Apron (530' x 150') - Design]WP SFO CA O60 Cloverdale Municipal GA 6 $ 75,000 $ 75,000 $ - $ - Update Airport Master Plan Study

WP SFO CA O08 Colusa County GA 13 $ 394,968 $ 394,968 $ - $ -

Install Miscellaneous NAVAIDS [Rehabilitate rotating beacon and pole - Construct],

Install Perimeter Fencing [Install Perimeter Fencing and Gates (Phase 2, Highway

Side) - Construct], Install Runway Vertical/Visual Guidance System [Install PAPI for

Runway 13/31 - Construct] - 13/31WP SFO CA O28 Ells Field-Willits Municipal GA 5 $ 58,000 $ 58,000 $ - $ - Rehabilitate Runway [Rehabilitate Runway 16/34 (Crack seal)] - 16/34

Page 82 of 88

Page 83: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP SFO CA O89 Fall River Mills GA 12 $ 389,490 $ 389,490 $ - $ - Rehabilitate Taxiway [Reconstruct Taxiway Connector/Apron (including marking)]WP SFO CA F34 Firebaugh GA 5 $ 37,700 $ 37,700 $ - $ - Rehabilitate TaxiwayWP SFO CA FCH Fresno Chandler Executive R 18 $ 401,079 $ 401,079 $ - $ - Rehabilitate Apron

WP SFO CA FAT Fresno Yosemite International P 64 $ 3,468,422 $ 1,901,667 $ 1,566,755 $ -

Rehabilitate Apron [Rehabilitate Commercial Aviation Eastside Apron], Update

Miscellaneous StudyWP SFO CA FAT Fresno Yosemite International P 67 $ 1,000,000 $ - $ 1,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLWP SFO CA FAT Fresno Yosemite International P 65 $ 21,248,896 $ 1,258,896 $ 19,990,000 $ - Extend Runway - 11R/29L, Rehabilitate ApronWP SFO CA FAT Fresno Yosemite International P 63 $ 272,978 $ 272,978 $ - $ - Improve Runway Safety Area [EA] - 11L/29RWP SFO CA FAT Fresno Yosemite International P 66 $ 141,171 $ 141,171 $ - $ - Wildlife Hazard Assessments

WP SFO CA 2O1 Gansner Field GA 9 $ 367,686 $ 367,686 $ - $ -

Install Runway Vertical/Visual Guidance System [Install PAPI for RWY 24] - 06/24,

Install Weather Reporting Equipment [Install AWOS AV], Rehabilitate Runway

[Rehabilitate Runway (Including resealing joints for runway, and associated

taxiway and apron)] - 06/24, Rehabilitate Runway Lighting [Relocate threshold

lights and mark new threshold marking for RWY 6] - 06/24

WP SFO CA DVO Gnoss Field R 15 $ 150,000 $ 150,000 $ - $ -

Conduct Environmental Study [Environment Impact Statement for Runway

Extension Phase IV]WP SFO CA 3O1 Gustine GA 11 $ 38,900 $ 38,900 $ - $ - Rehabilitate TaxiwayWP SFO CA HAF Half Moon Bay R 13 $ 231,800 $ 231,800 $ - $ - Update Airport Master Plan StudyWP SFO CA HJO Hanford Municipal GA 19 $ 71,250 $ 71,250 $ - $ - Install Miscellaneous NAVAIDS, Rehabilitate Runway [design] - 14/32

WP SFO CA HWD Hayward Executive R 18 $ 205,000 $ 205,000 $ - $ -

Improve Runway Safety Area [Culvert Sulphur Creek within Object Free Area - EA,

Phase 1B] - 10L/28R

WP SFO CA HES Healdsburg Municipal GA 7 $ 136,800 $ 136,800 $ - $ -

Conduct Miscellaneous Study, Construct Taxiway [Reimburse for realign and

construct taxiway A]WP SFO CA CVH Hollister Municipal GA 14 $ 199,285 $ 199,285 $ - $ - Improve Runway Safety Area [Drainage ditch removal - Design] - 13/31

WP SFO CA CEC Jack McNamara Field P 25 $ 1,654,694 $ 1,654,694 $ - $ -

Construct Terminal Building [Construct replacement terminal building - Phase I

Design], Install Miscellaneous NAVAIDS [Relocate lighted windcone], Rehabilitate

Airport Beacons [Replace existing beacon], Rehabilitate Runway [Pavement

strength evaluation for Runways 11/29 & 17/39, associated taxiways and aprons,

and engineering design for minor pavement repair and numerals and runway

marking changes due to change in magnetic inclination.] - 11/29

WP SFO CA 1O2 Lampson Field GA 12 $ 60,800 $ 60,800 $ - $ -

Conduct Miscellaneous Study [Pavement Condition Index - Supplement to AIP 11],

Install Miscellaneous NAVAIDS [Replace Rotating Beacon - Design], Rehabilitate

Runway Lighting [Rehabilitate Runway 10/28 Lighting - Phase 1 (assessment)] -

10/28

Page 83 of 88

Page 84: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP SFO CA LVK Livermore Municipal R 22 $ 100,000 $ 100,000 $ - $ - Wildlife Hazard Assessments [Wildlife Hazard Assessment]

WP SFO CA LVK Livermore Municipal R 21 $ 2,003,727 $ 2,003,727 $ - $ -

Modify Service Road [Northside perimeter road (emergency service) realignment

to meet POFZ clearance standards (including overlay) - Design/Construct],

Rehabilitate Runway [Runway 7L/25R Overlay (Including Remarking) - Construct] -

07L/25R

WP SFO CA MAE Madera Municipal GA 23 $ 519,674 $ 519,674 $ - $ - Install Runway Vertical/Visual Guidance System - 12/30, Install Taxiway LightingWP SFO CA MMH Mammoth Yosemite CS 24 $ 150,000 $ 150,000 $ - $ - Rehabilitate Terminal BuildingWP SFO CA OAR Marina Municipal GA 10 $ 1,029,186 $ 1,029,186 $ - $ - Rehabilitate TaxiwayWP SFO CA MPI Mariposa-Yosemite GA 10 $ 197,563 $ 197,563 $ - $ - Rehabilitate Runway - 08/26WP SFO CA TLR Mefford Field GA 13 $ 1,416,394 $ 1,416,394 $ - $ - Improve Airport DrainageWP SFO CA MCE Merced Regional//Macready Field GA 19 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan Study

WP SFO CA OAK Metropolitan Oakland International P 58 $ 713,222 $ 713,222 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

WP SFO CA OAK Metropolitan Oakland International P 60 $ 788,410 $ - $ 788,410 $ - Conduct Environmental Study

WP SFO CA OAK Metropolitan Oakland International P 59 $ 6,547,045 $ 3,605,607 $ 2,941,438 $ - Rehabilitate Taxiway [Phase 1 Taxiway W and U], Update Miscellaneous Study

WP SFO CA MOD Modesto City County-Harry Sham Field P 35 $ 1,144,792 $ 1,144,792 $ - $ -

Acquire Equipment [Acquire ADA compliant passenger loading ramp], Improve

Airport Drainage [Airfield drainage study], Rehabilitate Apron [NW Terminal Apron

pavement rehabilitation], Rehabilitate Runway Lighting [Conduct airfield lighting

and electrical utilities study including airport signage and marking plan] - 10L/28RWP SFO CA MRY Monterey Peninsula P 57 $ 1,752,548 $ 819,834 $ 932,714 $ - Improve Runway Safety Area [design phase II] - 10R/28LWP SFO CA MRY Monterey Peninsula P 58 $ 27,956,408 $ 956,408 $ 27,000,000 $ - Improve Runway Safety Area [RSA (Construct Phase I)] - 10R/28L

WP SFO CA APC Napa County R 28 $ 2,116,301 $ 150,000 $ 1,966,301 $ -

Rehabilitate Apron [Rehabilitate General Aviation Apron (Phase 2A) -

Construction]

WP SFO CA O02 Nervino GA 9 $ 321,396 $ 321,396 $ - $ -

Install Miscellaneous NAVAIDS [Replace existing airport beacon], Install Weather

Reporting Equipment [Install AWOS AV], Rehabilitate Apron [Reseal pavement

joints as a part of Pavement Maintenance and Management Program

requirements], Rehabilitate Runway [Reseal pavement joints as a part of

Pavement Maintenance and Management Program requirements] - 07/25,

Rehabilitate Taxiway [Reseal pavement joints as a part of Pavement Maintenance

and Management Program requirements]

Page 84 of 88

Page 85: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP SFO CA GOO Nevada County Air Park GA 15 $ 2,281,450 $ 2,281,450 $ - $ -

Improve Runway Safety Area [Construction] - 07/25, Rehabilitate Runway

[Touchdown area pavement repair and runway pavement rehabilitation] - 07/25

WP SFO CA SJC Norman Y. Mineta San Jose International P 80 $ 7,496,370 $ 2,117,698 $ 5,378,672 $ - Construct Taxiway [Phase IV]WP SFO CA O27 Oakdale GA 11 $ 75,000 $ 75,000 $ - $ - Update Airport Master Plan Study

WP SFO CA OVE Oroville Municipal GA 15 $ 511,936 $ 511,936 $ - $ -

Rehabilitate Apron [Rehabilitate Apron (crack seal and remarking) - Construction],

Rehabilitate Runway [Rehabilitate Runway 1/19 (crack seal, remarking, and

signage) - Construction] - 01/19, Rehabilitate Runway [Rehabilitate Runway 12/30

(crack seal, remarking, and signage) - Construction] - 12/30, Rehabilitate Taxiway

[Rehabilitate Taxiways (crack seal, remarking, and signage) - Construction]

WP SFO CA PAO Palo Alto Airport of Santa Clara County R 8 $ 57,000 $ 57,000 $ - $ -

Rehabilitate Runway [Rehabilitate Runway 13/31 (crack/slurry seal including

marking/signage) - Design] - 13/31, Rehabilitate Taxiway [Rehabilitate taxiways

(crack/slurry seal including marking/signage) - Design]WP SFO CA PRB Paso Robles Municipal GA 21 $ 551,000 $ 551,000 $ - $ - Rehabilitate Runway - 01/19

WP SFO CA O69 Petaluma Municipal R 22 $ 118,750 $ 118,750 $ - $ -

Rehabilitate Apron [Rehabilitate Parking Apron (approximately 190,000 sq

ft)Design], Rehabilitate Taxiway [Rehabilitate Southwest Taxiway (approximately

20,000 sq ft) Design]WP SFO CA PTV Porterville Municipal GA 12 $ 133,000 $ 133,000 $ - $ - Rehabilitate Taxiway [design]

WP SFO CA RDD Redding Municipal P 41 $ 5,800,000 $ 1,781,467 $ 4,018,533 $ - Expand Terminal Building [Expand Terminal Building (Phase I) - Construction]WP SFO CA O32 Reedley Municipal GA 12 $ 694,278 $ 694,278 $ - $ - Install Miscellaneous NAVAIDS, Rehabilitate Apron

WP SFO CA RHV Reid-Hillview of Santa Clara County R 14 $ 50,350 $ 50,350 $ - $ -

Rehabilitate Runway [Rehabilitate Runway 13L/31R (crack/slurry seal including

marking/signage) - Design] - 13L/31R, Rehabilitate Taxiway [Rehabilitate Taxiways

Y, Z, A, B, C, D, and E (crack/slurry seal including marking/signage) - Design]

WP SFO CA O88 Rio Vista Municipal GA 13 $ 100,000 $ 100,000 $ - $ -

Improve Airport Miscellaneous Improvements [Electrical system improvements -

Design], Rehabilitate Apron [Rehabilitate apron (crack/slurry seal including

marking) - Design], Rehabilitate Runway [Rehabilitate Runway 14/32 (crack/slurry

seal including marking) - Design] - 14/32, Rehabilitate Runway [Rehabilitate

Runway 7/25 (crack/slurry seal including marking) - Design] - 07/25, Rehabilitate

Taxiway [Rehabilitate Taxiways (crack/slurry seal including marking) - Design]WP SFO CA O88 Rio Vista Municipal GA 14 $ 100,000 $ 100,000 $ - $ - Update Airport Master Plan Study

Page 85 of 88

Page 86: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP SFO CA O05 Rogers Field GA 14 $ 235,374 $ 235,374 $ - $ - Rehabilitate Taxiway [Reconstruct taxilanes (approximately 3 @ 25' X 450')]

WP SFO CA SMF Sacramento International P 48 $ 8,678,808 $ 1,678,808 $ 7,000,000 $ -

Construct Apron [Terminal Modernization Program - Construct terminal apron and

associated taxiways, Remain Over Night (RON) Pad, and partial crossfield taxiway

(Taxiway W)]

WP SFO CA SMF Sacramento International P 49 $ 441,046 $ 441,046 $ - $ -

Construct Apron [Terminal Modernization Program - Construct terminal apron and

associated taxiways, Remain Over Night (RON) Pad, and partial crossfield taxiway

(Taxiway W)]

WP SFO CA MHR Sacramento Mather R 17 $ 999,131 $ 686,460 $ 312,671 $ - Modify Building [Miscellaneous building abatement and demolition - Phase I]

WP SFO CA SFO San Francisco International P 56 $ 7,145,935 $ 6,716,515 $ 429,420 $ -

Rehabilitate Apron [Rehabilitate Boarding Area C and E Apron (reconstruction &

drainage) Phase II], Rehabilitate Taxiway [Rehabilitate Taxiway S, C, & F1

(reconstruction & drainage) Phase II]WP SFO CA SBP San Luis County Regional P 39 $ 224,575 $ 224,575 $ - $ - Acquire Equipment

WP SFO CA E16

South County Airport of Santa Clara

County R 9 $ 52,250 $ 52,250 $ - $ -

Rehabilitate Runway [Rehabilitate Runway 14/32 (crack/slurry seal including

marking/signage) - Design] - 14/32, Rehabilitate Taxiway [Rehabilitate taxiways

(crack/slurry seal including marking/signage) - Design]

WP SFO CA SCK Stockton Metropolitan P 30 $ 717,383 $ 717,383 $ - $ -

Rehabilitate Apron [Reconstruct terminal apron (from AC to PCC) - Design],

Rehabilitate Runway [Rehabilitate runway including slurry seal and restripe

pavement markings] - 11L/29R, Rehabilitate Taxiway [Reimbursement for

enhanced runway hold position, taxiway centerline markings and taxiway

movement area markings]

WP SFO CA SVE Susanville Municipal GA 12 $ 145,643 $ 145,643 $ - $ -

Acquire Snow Removal Equipment, Install Runway Lighting [Install Runway

Lighting Radio Control for Runway 11/29] - 11/29WP SFO CA TRK Truckee-Tahoe GA 26 $ 695,400 $ 695,400 $ - $ - Rehabilitate TaxiwayWP SFO CA O81 Tulelake Municipal GA 7 $ 1,120,552 $ 1,120,552 $ - $ - Rehabilitate Apron [Approximately 154,500 Square Feet]

WP SFO CA *CAV Various Locations in California 1 $ 1,300,000 $ - $ 1,300,000 $ -

Wildlife Hazard Assessments (Brackett Field; Cable; Chino; El Monte; Fullerton

Municipal; General Wm J Fox Airfield; Jack Northrop Field/Hawthorne Municipal;

Santa Monica Municipal; Whiteman; Zamperini Field)

WP SFO CA WVI Watsonville Municipal GA 12 $ 194,940 $ 194,940 $ - $ - Conduct Environmental Study [Conduct an environmental assessment study]WP SFO NV L92 Alamo Landing Field GA 5 $ 2,597,845 $ 946,681 $ 1,651,164 $ - Construct Runway - 14/32WP SFO NV TMT Austin GA 13 $ 126,970 $ 126,970 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate TaxiwayWP SFO NV BAM Battle Mountain GA 21 $ 1,529,795 $ 1,529,795 $ - $ - Rehabilitate Apron [Phase I]

Page 86 of 88

Page 87: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP SFO NV BVU Boulder City Municipal P 18 $ 2,688,292 $ 2,688,292 $ - $ - Rehabilitate Runway [Phase 2] - 15/33, Rehabilitate Taxiway [Construction]WP SFO NV CXP Carson R 21 $ 1,270,429 $ 1,270,429 $ - $ - Construct Taxiway [phase II]WP SFO NV LOL Derby Field GA 12 $ 150,000 $ 150,000 $ - $ - Improve Airport Drainage

WP SFO NV EKO Elko Regional P 40 $ 550,582 $ 550,582 $ - $ -

Rehabilitate Apron [General Aviation Apron (approx. 980' x 300')], Rehabilitate

Apron [North Tie-Down Apron (approx. 1209' x 300')], Rehabilitate Runway

[(approx 8912' x 150')] - 05/23, Rehabilitate Runway [(approx. 3015' x 60')] -

12/30, Rehabilitate Taxiway [Taxiway "A" (approx. 6,959' x 60')], Rehabilitate

Taxiway [Taxiway "B" (approx. 2245' X 35')]

WP SFO NV 05U Eureka GA 9 $ 2,632,351 $ 1,932,351 $ 700,000 $ -

Rehabilitate Runway [Reconstruct Runway 17/35 - Construct] - 17/35, Rehabilitate

Taxiway [Phase 1 - Rehabilitate parallel taxiway (exit. taxiways) - Construct]WP SFO NV GAB Gabbs GA 7 $ 177,650 $ 177,650 $ - $ - Rehabilitate Runway - 16/34

WP SFO NV HTH Hawthorne Industrial GA 9 $ 118,750 $ 118,750 $ - $ -

Rehabilitate Apron [Rehabilitate apron (overlay) - Design], Rehabilitate Runway

[Rehabilitate Runway 10/28 (crack seal/seal coat) - Design] - 10/28

WP SFO NV 06U Jackpot/Hayden Field GA 8 $ 318,250 $ 318,250 $ - $ -

Install Weather Reporting Equipment [AWOS A-V], Rehabilitate Apron,

Rehabilitate Runway - 15/33, Rehabilitate Taxiway [Seal Coat Taxiway]WP SFO NV 1L1 Lincoln County GA 7 $ 78,850 $ 78,850 $ - $ - Conduct Environmental StudyWP SFO NV LAS McCarran International P 76 $ 8,464,336 $ - $ 8,464,336 $ - Acquire Land for Noise Compatibility within 65 - 69 DNL

WP SFO NV LAS McCarran International P 77 $ 10,489,054 $ 5,056,805 $ 5,432,249 $ -

Rehabilitate Apron [Construct D Gate Apron, Base Bid], Rehabilitate Taxiway

[Construct Taxiway C, Base Bid]

WP SFO NV LAS McCarran International P 78 $ 8,371,313 $ 921,468 $ 7,449,845 $ -

Rehabilitate Apron [Construct D Gate Apron, Additive Alternate 1], Rehabilitate

Taxiway [Construct Taxiway C, Additive Alternate 1]

WP SFO NV MEV Minden-Tahoe GA 21 $ 266,475 $ 266,475 $ - $ -

Conduct Miscellaneous Study [Drainage Study], Rehabilitate Taxiway [Phase I

design Taxiwy "A"], Rehabilitate Taxiway [Phase I design taxiway "D"]WP SFO NV 0 Pahrump (New) 5 $ 600,000 $ - $ 600,000 $ - Conduct Environmental Study [Phase II of EIS]WP SFO NV RTS Reno/Stead R 30 $ 350,000 $ 150,000 $ 200,000 $ - Construct Terminal BuildingWP SFO NV RNO Reno/Tahoe International P 91 $ 4,600,831 $ - $ 4,600,831 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLWP SFO NV RNO Reno/Tahoe International P 90 $ 2,975,774 $ 1,191,853 $ 1,783,921 $ - Rehabilitate Apron [Phase 15]WP SFO NV RNO Reno/Tahoe International P 92 $ 3,227,511 $ 323,962 $ 2,903,549 $ - Extend TaxiwayWP SFO NV RNO Reno/Tahoe International P 89 $ 2,399,169 $ - $ 2,399,169 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

WP SFO NV LWL Wells Municipal/Harriet Field GA 8 $ 273,053 $ 273,053 $ - $ -

Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate Taxiway [Connector

Taxiway]WP SFO NV WMC Winnemucca Municipal GA 17 $ 83,445 $ 83,445 $ - $ - Rehabilitate Runway - 14/32

Page 87 of 88

Page 88: FAA - Office of Airports Report Date: 11/30/2011 · CSQ; Creston Municipal. GA; 7 ... FSW; Fort Madison Municipal. GA; 7 $ 565,449 $ 565,449 $ - $ - Rehabilitate Taxiway; CE. ACE;

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2011 Grants Awarded

WP SFO NV WMC Winnemucca Municipal GA 16 $ 502,803 $ 502,803 $ - $ -

Rehabilitate Access Road [slurry sesal access road], Rehabilitate Apron [Slurry Seal

Tie down Aprons including misc. improvements], Rehabilitate Runway - 02/20,

Rehabilitate Runway - 14/32, Rehabilitate Taxiway [Slurry Seal Taxiways A, B, C, D,

A1, A2, A3, A4]WP SFO NV O43 Yerington Municipal GA 14 $ 386,000 $ 386,000 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate Taxiway

Page 88 of 88