FA - 1open_jicareport.jica.go.jp/pdf/11740495_066.pdf3 Robiyanto H Susanto Steering Committee...

25
ANNEX

Transcript of FA - 1open_jicareport.jica.go.jp/pdf/11740495_066.pdf3 Robiyanto H Susanto Steering Committee...

ANNEX

FA - 1

Annex F3.3.1 List of Attendants for Pre-PCM in Lower Area

No. Name Institution District/Municipality1 Ir. Rachmat Lubis Office of Fishery Banyuasin 2 Ir. Ali Imron Bamin,

MSi Office of Estate and Forestry Banyuasin

3 Robiyanto H Susanto Steering Committee Sriwidjaja Univ. 4 H. Fahmi Jana Office of Water Resource Banyuasin 5 Kuswari Marzah Drinking Water Company MUBA 6 Erawan Afrizal, SP Office of Agriculture and Animal Husbandry MUBA 7 M. Daud Office of Tourism MUBA 8 Armanuddin, SP Office of Agriculture and Animal Husbandry MUBA 9 Rismawati Gathmyr Office of Public Works MUBA 10 Aliyuddin Tjikmat District Planning Office Banyuasin 11 Desipial, S Sos NGO for Women Palembang 12 Mrs. Nurhayati NGO Puskokatara MUBA 13 Alisudin, SP NGO Kebersamaan Palembang 14 Rusjdi Usman Independent Committee for Regional Autonomy Palembang 15 Azhari Harun Office of Transportation MUBA 16 Sayuti Drinking Water Company 17 Bachrowi Office of Water Resource MUBA 18 Syahrin Office of Fishery MUBA 19 Ir. Nurfirman Office of Marine & Fishery OKI 20 Yusuf Senen NGO MPM MUBA 21 Zailani Environmental Control Agency Palembang 22 Suryadi Salam Office of Settlement and Regional

Infrastructures Palembang

23 Erminton S Office of Settlement and Regional Infrastructures

Palembang

24 Bachtiar Effendi Office of Settlement and Regional Infrastructures

Palembang

25 Taufik Harun District Planning Office OKI 26 Yeni NGO for Women OKI 27 Darul Asdi Community leader OKI 28 Rahmadi NGO OKI 29 Alfan Farmer OKI 30 Z. Effendi Office of Mining and Energy MUBA 31 Syamsul Bahri Office of Environment MUBA 32 Abu Yasir Fisherman OKI 33 Surya Dewanto Office of Water Resource Province 34 Rusdi W Office of Water Resource Province 35 Anton Budiono Office of Water Resource Province

FA - 2

Annex F3.3.2 List of Attendants for Pre-PCM in Middle Area

No. Name Institution District/Municipality 1 Gunaparti , AM Office of Mining and Energy Muaraenim 2 A. Zahedi City Planning Office Perabumulih 3 Irsan Matondang, SE NGO Soragama Perabumulih 4 Sumartha Edison, ST Office of Environment and Mining Perabumulih 5 A. Nadjib Office of Animal Husbandry and Fishery Muaraenim 6 Joni Ikob Office of Transportation Muaraenim 7 A. Jaya Office of Industry, Trade and Cooperative Muaraenim 8 Muhono Office of Forestry Muaraenim 9 Syarifuddin Drinking Water Company OKU 10 Bahawi Drinking Water Company OKU 11 Ibrahim Saleh Office of Water Resource OKU 12 Syam Hasan Legislative member Muaraenim 13 A. Pini Office of Tourism 14 Amaluddin Wazir Office of Estate 15 Mirza Jaya Drinking Water Company 16 Hermana LSM Muaraenim 17 Walamiah, SH NGO for WOmen Muaraenim 18 Ana Novianty,

AMKL NGO for WOmen Muaraenim

19 A. Mun’im Farmer Muaraenim 20 Drs. H. Sulaiman

Basyar Community leader Muaraenim

21 M. Ardisupratman City Planning Office Perabumulih 22 Mustofa Farmer OKU 23 Surya Dewanto Office of Water Resource Province 24 Anton Budiono Office of Water Resource Province 25 Rusdi Wali Office of Water Resource Province 26 Yohannes Provincial Planning Office Province

FA - 3

Annex F3.3.3 List of Attendants for Pre-PCM in Upper Area

No. Name Institution District/Municipality1 Ir. Binsar Manurung,

MT Office of Water Resource Lahat

2 Ir. Wasis Budi Prasetyo, MT

Office of Water Resource Lahat

3 Zulkarnain, SE District Planning Office Lahat 4 Ir. Rias NT Office of Forestry and Estate Lahat 5 H. Marzuki Jemair NGO – Forum KP Masyarakat Lahat Lahat 6 Aminullah NGO – Farmers and fishermen group Pagaralam 7 Nopran Edwin NGO - Persada Pagaralam 8 Mismito Office of Industry and Trade Lubuklinggau 9 Ir. Nurli Izhar, Med.

Agr Office of Agriculture Lubuklinggau

10 Ir. Subandio Amin Office of Agriculture Lubuklinggau 11 Darnawati, SH NGO - HIPMI Lubuklinggau 12 Saparudin Yassa NGO – Simpul Walhi Musirawas 13 Haryanto Drinking Water Company Pagaralam 14 Syafei, SH Drinking Water Company Lahat 15 Ir. Hayatun Novrida,

MP Office of Animal Husbandry and Fishery Musirawas

16 Helmi Usi, SH District Planning Office Lubuklinggau 17 Ir. Syapriadi District Planning Office Lubuklinggau 18 Sri Oktavianti Women representative Lubuklinggau 19 Syahlan Musa Office of Transportation Lubuklinggau 20 Zulfikhar Provincial Forest Office Sumsel 21 Ir. Umar Dhani Office of Public Works Pagaralam 22 Drs. Fauzi Office of Touirism Pagaralam 23 Bambang Ekalaya NGO - LAKPP Musirawas 24 Agus Supriyo, S Sos Environmental Division Musirawas 25 Zainul Karsidi Office of Industry, Trade and Cooperative 26 Agustianto Legislative member Lahat 27 Murshal Husin Office of Tourism Lubuklinggau 28 Gustianto, SE Drinking Water Company Musirawas 29 Mefta Office of Tourism Musirawas 30 Darwin Office of Transportation Musirawas 31 Ir. Yita Arga Office of City Planning Lubuklinggau 32 Aliaman, SPd Public Relation Division 33 Suherman Saleh, SP Office of Agriculture Pagaralam 34 Riswan Sudariswan,

S Hut Office of Forestry Musirawas

35 Anton Budiono Office of Water Resource Province 36 Polly Aguscik Farmer Pagaralam 37 Eka Linggau Post News Agency Lubuklinggau 38 Hardianto Farmer Lubuklinggau 39 Kardiman Farmer Pagaralam 40 Suhartini Women representative Lahat 41 Rusdi Wahir Office of Water Resource Province 42 Surya Dewanto Office of Water Resource Province 43 Yohannes Provincial Planning Office Province

FA - 4

Annex F3.4.1 List of Attendants for PCM (1) in Lower Area

No. Name Institution District/Municipality 1 Aliyuddin Tjikmat District Planning Board Banyuasin 2 Yenny Ali OKI 3 Hanafiah, BA Office of Mining and Energy Banyuasin 4 Eliana Office of Mining and Energy Banyuasin 5 Zuher Effendi Office of Mining and Energy MUBA 6 Tabrani Noer Office of Public Work Banyuasin 7 Syaiful Office of Agriculture Banyuasin 8 Soegiyono Office of Agriculture Banyuasin 9 Taufik Harun Office of Public Work OKI 10 Ir. Rachmat Lubis Office of Fishery &Coastal Area Development Banyuasin 11 H M Anhar Zulkifli Drinking Water Company MUBA 12 Suratinah Office of Fishery MUBA 13 Effendi W Office of Forestry OKI 14 Rahmadi NGO Ingo’s OKI 15 Abuyasier NGO Ingo’s OKI 16 Fahruddin Diah Legislative member OKI 17 Syafriyulis Office of Marine & Fishery OKI 18 M. Tohir Community leader OKI 19 Alfan Suri Farmer OKI 20 Suryadi S Office of Settlement & Regional Infrastructure Palembang 21 Ifna Nur District Planning Board OKI 22 Iskandar Port Administration Palembang 23 Juni Alpansuri Rural resident OKI 24 Syahnan Port Administration Palembang 25 A. Yudha, ST Palembang 26 Kms. Abubakar Office of Environment Palembang

FA - 5

Annex F3.4.2 List of Attendants for PCM (1) in Middle Area

No. Name Institution District/Municipality1 Mirza Yahya Drinking Water Company Muara Enim 2 Hermada R NGO Gerakan Sriwijaya Muara Enim 3 Walama, SH Teacher Muara Enim 4 Ana NGO Muara Enim 5 Said Ali District Planning Board Muara Enim 6 Maizar Office of Fishery & Animal Husbandry Muara Enim 7 Irsan Matondang, SE NGO Soragama Prabumulih 8 Yeye Dencik Tokoh wanita Prabumulih 9 Nusa Jaya, SP Office of Fishery Prabumulih 10 Zulkifli, ST Prabumulih 11 M. Ardi Supratman District Planning Board Prabumulih 12 Gunaparti , AM Office of Mining and Energy Muara Enim 13 Novian As Office of Public Work Prabumulih 14 Andi NGO Prabumulih

Annex F3.4.3 List of Attendants for PCM (1) in Upper Area

No. Name Institution District/Municipality1 H. Burhan Djamil Drinking Water Company Pagar Alam 2 Haryanto Pagar Alam 3 H. Bahani Office of Forestry 4 Umar Dhani Office of Public Work Pagar Alam 5 Winaryo Office of Forestry and Estate Pagar Alam 6 Khoiruddin Nasution Office of Fishery Muara Enim 7 H. Fadhil Taufik Office of Water Resources Musi Rawas 8 Suharsa Farmer

THE STUDY ON COMPREHENSIVE WATER MANAGEMENT OF MUSI RIVER BASIN

CTI Engineering International Co., Ltd.

NIKKEN Consultants, Inc.

High population

growthLow discipline in human resource

Many settlements are located at sides

of riversSlash & burn land-

opening

River is used not only for washing and bathing but

also garbage disposal and toilet

Water source has been depleted Drought

Lack of education

Illegal logging

Sedimentation

Drinking water distribution facilities

are insufficient

Water transportation is

difficult

Illegal fish catch with poisonous substance

Saline water intrusion increaseWater quality is lowIncrease in water

run-off

Water flora and fauna have decreased

Quantity of drinking water is limited.

Limited coverage of drinking water

service

Incidence of digestive disease

increased

People's perception has been changed from food crops to

fish production with regard to the use of water in irrigation

canals

Floods in wet season

Erosion of river bank

Damage of irrigation infrastructure

Damage of public facilities and deaths

Spatial plan is not followed

EIA documents are not followed

Encroachment/shifting cultivation

Erosion of land Industrial and oil exploitation waste

Poor drainage system

Small rivers contracted/confined

Limited tourism events on river

Business chance of tourism is limited

Water supply for paddy field is

insufficient

Annex F3.4.4 Cause-Effect Tree of Lower Area Group

FA - 6

THE STUDY ON COMPREHENSIVE WATER MANAGEMENT OF MUSI RIVER BASIN

CTI Engineering International Co., Ltd.

NIKKEN Consultants, Inc.

Socialization of law

and regulation

Consistency in law, spatial plan, and other regulation

application

Increase family planning

Implementation of 9 year school obligation

Reforestation, soil and water

conservation

Improvement of drainage and water management system

Improvement of river banks Resettlement

Increase of water resource availability

Provision of waste water treatment facilities and

application of environmental monitoring and management

plan

Dredging of river channel

Increase drinking water production

Optimization of irrigation system

Provision of bathing-washing-toilet facilities and

garbage disposing facilities

Water quality increases Land reclamation Water retention

Increase of drinking water distribution

facilities

Increase of river tourism

infrastructureRiver bank

improvement

Provision of water for agriculture and

fishery

Sustainability of water flora and

faunaProvision of drinking

water Flooding controlled Sufficient irrigation system

Water transportation is not

disturbedRiver tourism activity

increases

Water use optimization

Annex F3.4.5 Objective Tree of Lower Area Group

FA - 7

THE STUDY ON COMPREHENSIVE WATER MANAGEMENT OF MUSI RIVER BASIN

CTI Engineering International Co., Ltd.

NIKKEN Consultants, Inc.

Limited water flow

(50l/sec)

Quantity of drinking water is limited

Drinking water service coverage is

only 15%

Drinking water intake facilities are

insufficient

Upper Komering project

Drought

Water source has been depleted

Decrease in agricultural productivity

Decrease in people's economy/

welfare

Increase in insecurity

EIA documents are not followed

Industrial and oil exploitation waste

Water quality is low

Incidence of digestive diseases

increased

Lack of education

River is used not only for washing and bathing but also

garbage disposal and toilet

People's awareness on conservation is

low

DeforestationLand use planning

has difficulty in implementation

Erosion of land

Illegal logging

Damage of public facilities and deaths

High risk for land slidingFloodErosion of river

banksSedimentation

Low discipline in human resources

Poor drainage system

Damaged roads

Poor drainage facilities

Floods in wet season

Paddy field are limited

Rice self-sufficient has not achieved

Price of rice is relatively high

Annex F3.4.6 Cause-Effect Tree of Middle Area Group

FA - 8

THE STUDY ON COMPREHENSIVE WATER MANAGEMENT OF MUSI RIVER BASIN

CTI Engineering International Co., Ltd.

NIKKEN Consultants, Inc.

Socialization and sanction

Enforcement of Perda and its

sanction

Water quality increases

Community health increases

Increase the role of NGOs in empowerment

of women and supervisor of Perda and

environment

Proper plan of city drainage

Proper development of city drainage

Development of Dagku Kiri and

Kanan to develop potential field

Development of paddy field

Development of proper irrigation

management

Ground water utilization

sufficient quality of water supply

Periodic water quality monitoring

Provision of bathing-washing-

toilet facilities

Increase of water flow to 200 l/sec

Extension on sanitation

Conservation and reforestation

Dredging of Komering

Improvement of river transportation

Increase of people's income

Annex F3.4.7 Objective Tree of Middle Area Group

FA - 9

THE STUDY ON COMPREHENSIVE WATER MANAGEMENT OF MUSI RIVER BASIN

CTI Engineering International Co., Ltd.

NIKKEN Consultants, Inc.

People's awareness on conservation is

low

EIA documents are not followed

Encroachment/shifting cultivation

Water source has been depleted

High risk for land sliding

Drought

High population growth

Quantity of drinking water is limited

Limited coverage of drinking water

service

Incidence of digestive diseases

increased

Drinking water distribution facilities

are insufficient

Water transportation is

difficult

Limited tourism events on river

Business chance of tourism is limited

Water supply for paddy field is

insufficient

Water flora and fauna have been

decreased

Extensive coffee plantation

Lack of data and information

Land use planning has difficulty in implementation

Deforestation

Sedimentation

Erosion of land

Floods in wet season

Poor drainage system

Increase in water run-off

Damage of irrigation infrastructure

Industrial and oil exploitation waste

Damage of public facilities and deaths

People's participation in

forest planning is limited

Illegal logging

Stone quarrying

Erosion of river banks

many settlements are located at sides

of rivers

River is used not only for washing and bathing but also

garbage disposal and toilet

Waste of aquaculture

Water quality is low

No clear regulations for irrigation water

use

WUAS are not optimally functioning

Irrigation canals are diverted to

fishponds for aquaculture

Water use conflicts occur between irrigation and aquaculture

Lack of education

National park boundaries are not

clear

Low discipline in human resources

Customary law sanction/Perda

Poor socialization

Men and women's role for proper use of water is limited

Annex F3.4.8 Cause-Effect Tree of Upper Area Group

FA - 10

THE STUDY ON COMPREHENSIVE WATER MANAGEMENT OF MUSI RIVER BASIN

CTI Engineering International Co., Ltd.

NIKKEN Consultants, Inc.

Improvement of

formal and nonformal education

Revitalization of customary law regarding sanction on deforestation, irrigation

misconduct, etc.

Socialization of national park

borders

People do not practice illegal

logging

Land use plan is properly followed

Sanction is given to improper land use

EIA document is followed

Empowerment of WUAS which gather farmers and pond

owners

conflicts are solved through the

principle of peace

Limitation in area and number of fishponds to meet available water

allocation

Provision of definite regulation on

irrigation water use

Enforcement of Perda regarding fast flow

fishpond permission and sanction

Provision of criteria water intake for

fishpond

Agreement on irrigation water

distribution

Application of cropping pattern based on irrigation water

distribution agreement

Provision of data and information

regarding natural resources

Development of erosion prevention

structures

Land and water conservation

Planning for water allocation

Planning for drinking water

distribution

Extension for efficient water use

Planning for city drainage system

Involvement of people in

development planning

Reforestation on critical land

Coffee plantation involves inter-sector

coordination

Proper treatment of oil exploitation and

industrial waste

Improvement of damage irrigation

facilities

Provision of Perda for stone quarrying and stone mining

Resettlement of people living in the

side of rivers

Assignment of teams for flood and

drought

Improvement of proper garbage

disposal

Improvement of public facilities

Annex F3.4.9 Objective Tree of Upper Area Group

FA - 11

FA - 12

Annex F3.5.1 List of Attendants for PCM (2) (1/2)

No Name Institution 1 Alvian Ando Bappeda BA 2 Mirdayani, Amd. Enterpreneur 3 Thamrin Amak Public Work Office 4 H. Burlian PDAM 5 Arlan Public Work Office 6 Alisudin, SP. NGO (Kebersamaan) 7 Ari Ralim Public Work Office 8 Gunawan F. Forestry Office of Lahat 9 Toni K. Panggarbesi Bappeda 10 Novian Aswardani, ST Public Work Office 11 Zunddi Amir Local Government 12 Syawal Rizal Bapedalda Office of Palembang 13 Tri Hadi Public Work Office of Palembang 14 Hanafiah AB – 15 Hs Ansyori Local Government (OKI) 16 Darkum Fishery Office of Mura 17 Diponegoro Bappeda Prabumulih 18 Triseptember B Bappeda Prabumulih 19 Hidayat Dinas Tata Kota Lb. Linggau 20 Soekrasno Directorate PSDA Jakarta 21 Kowaruddin Public Work Office 22 Idris Erman Najib Mining Office (Lahat) 23 Setiyono Plantation Office 24 Lego Rahmad PDAM of Prabumulih 25 Edison NGO (FPPSS Palembang) 26 Aktorian, ST. Local Government (OKI) 27 Wahyu H. State Owned Enterprise (Pelindo II) 28 Insani State Owned Enterprise (OKI) 29 Misnan Hartono, SH. NGO (KBR Pagar Alam) 30 Rislani Gafar Public Work of BanyuAsin 31 Rusman Syafriadi Mining Office of banyuasin 32 Hanafiah AB Local Government of Banyuasin 33 Djustap Mining Office of OKU 34 Hanafi – 35 Syahnan Port Office of Palembang 36 Herry Fishery Office 37 Alibudin Forestry Office of OKI 38 Madlan Agriculture Office of MUBA 39 Iskandar Tarmijaya PDAM 40 Yose Rizal PDAM 41 Azimi Asnawi Enterpreneur (Prabumulih) 42 M. Yani NGO (KPP Prabumulih) 43 Nurfirman Local Government OKI 44 Bandi Hermawan Bengkulu University 45 Hermen Malik Bappeda Bengkulu 46 Denny Hayatuddin NGO (Cahaya Bintang Banyuasin) 47 Asman Asri Tourism Office Palembang 48 Syafei, SH PDAM of Lahat 49 Mawardi Public Work Office 50 Muh. Subiyono Farmer Association of Mura

FA - 13

Annex F3.5.1 List of Attendants for PCM (2) (2/2)

No Name Institution 51 Kusnadi B. Public Work Office of Muba 52 A. Bakri L. Informal Leader in Muba 53 A. Wahab Omar Public Work Office 54 K. Silalahi Extension Worker 55 Rusdi Wahyu Public Work Office 56 B. Manurung Public Work Office 57 Malhasan Adebar Bapedalda Muba 58 A. Roihan Chief of Irrigation Division of South Sumatera 59 A. Yassir R. Community (OKU) 60 Ilyas Panji Alam Parliament of OKI 61 Epy Hermanto M. PDAM 62 Nandang Ks. Forestry Office 63 Sarlan S. Bappeda Jambi 64 Kgs. Cekmat Bappeda Jambi 65 Helda Merlianti, SP Public Prosperity of Municipality Office 66 Drs. H. Barmawi NGO (FPPSS Muara Enim) 67 Andi Murbayu Bappeda Kab. Lahat 68 M. Henry E, SH. NGO (Muara Enim) 69 Arwanda Arya Foundation (PE Prabumulih) 70 R. Anil Jonson NGO (Faksi Prabumulih) 71 Iskandar Junaidi Farmer Leader 72 Umar Dhani Public Work 73 Winaryo Forestry Office of Pagar Alam 74 Drs. H. Burmawi HNS Informal Leader 75 Suhaidah Sofey AN Woman Organization (GOW Lahat) 76 Rita Septiana NGO (Sugih Rahayu Palembang) 77 Tizu Local Government of Palembang 78 Apandi Agriculture Office of South Sumatera Province 79 Yuwono Aries Bappeda MUBA 80 Tatsuhi Yasuhara MLIT (JICA Jakarta) 81 Haviludin Firm (Sinar Tani) 82 Zainal Arifin Bappeda Muara Enim 83 Herman Informal Leader 84 Junaidi, ST Informal Leader 85 Hermada Rambang NGO (GSI Muara Enim) 86 M. Kaef, Bsc NGO (GSI Muara Enim) 87 Ambrul NGO (GSI Muara Enim) 88 Ana Novianty Women Empowerment (Muara Enim) 89 Walamah Women Empowerment (Muara Enim) 90 R. Lubis Fishery Office of Banyuasin 91 Mirza PDAM of Muara Enim 92 Rahmadi Djakfar NGO (BP3O) 93 Yud Vianto NGO (OKI) 94 Manawinardi Bappeda OKI 95 A. Lagan Parliament of Palembang 96 Zulfikhar Forestry Office 97 Mustofakamil Bappeda Pagar Alam 98 Syaifulawan Kimpraswil of Municipality

Annex F3.5.2 Discussion on Priority Programs (1/11)

Component: Water Use Alternative Program

Proposed Priority Program Alternative Program 1 Alternative Program 2

Program Title Sustainable water Supply Management

Program Description

- Provision of additional water treatment

- Additional Piping Network

- Increasing of row water quality, specially in Ogan Komering Ilir Regency

- Decreasing water leakage level

- Woman Empowerment towards efficient water use

- Increasing the service

Constraints High cost of piping system - High cost of brackish water installation construction

- Ground water contains sand that may damage pump

Implementation of renovation block

Positive Impact Low operational cost in level B gravitation system

Negative impact

Prerequisite Fulfilling drinking water requirement for the community

Rank

FA - 14

Annex F3.5.2 Discussion on Priority Programs (2/11)

Component: Water Use Alternative Program

Proposed Priority Program Alternative Program 1 Alternative Program 2

Program Title Irrigation Development Program

Program Description

Construction/Development Rehabilitation and upgrading Pump Installation Land clearing Land Development Rainfed paddy field, fishery

New construction

Constraint Basin Sedimentation in up, middle and downstream area

Positive Impact Increasing the Production Optimum water utilization Water availability at the sources

Negative impact Industrial waste water (?)

Prerequisite Comprehensive and detailed study for regional regulation on irrigation

Rank

FA - 15

Annex F3.5.2 Discussion on Priority Programs (3/11)

Component: Water Use Alternative Program

Proposed Priority Program Alternative Program 1 Alternative Program 2

Program Title Swamp Development Program

Program Description

- Review in detail on tidal swamp spatial plan

- Optimization of tidal swamp area - Optimization of inland swamp - Construction of irrigation infrastructures

for shrimp/fishpond

Constraints - Limited fund at province/regency/municipality level

- Limited human resources at operational level

Positive Impact - Increasing of production and productivity of fish cultivation

- Increasing water discharge and efficiency - Land and water utilization

Negative impact

Prerequisite - Comprehensive study/ review in detail on tidal swamp spatial plan

- Regional regulation on swamp area

Rank

FA - 16

Annex F3.5.2 Discussion on Priority Programs (4/11)

Component: Water Use Alternative Program Proposed Priority Program Alternative Program 1 Alternative Program 2 Program Title Water supply program in tidal swamp area

Program Description

- Feasibility study of brackish water treatment

- Water treatment construction based on appropriate technology

Constraints - Water treatment requires high cost - Purchasing power is low

Positive Impact Increasing of public health

Negative impact

Prerequisite Standardized quality of water supply

Rank

FA - 17

Annex F3.5.2 Discussion on Priority Programs (5/11)

Component: Water Use (Irrigation) Alternative Program

Proposed Priority Program Alternative Program 1 Alternative Program 2

Program Title Rehabilitation Program and Upgrading

Program Description

Improvement of infrastructures and operation & maintenance of irrigation system

Constraints - Functional decrease of irrigation system - Excessive water use

Positive Impact - Revitalization of irrigation system - To increase the function of irrigation

system - To increase the production

Negative impact

Prerequisite - Detail design - Participatory implementation - Certainty period, example 5-10 years (?)

Rank

FA - 18

Annex F3.5.2 Discussion on Priority Programs (6/11)

Component: Water Use Alternative Program Proposed Priority Program Alternative Program 1 Alternative Program 2 Program Title Water management for transportation

Program Description - Dredging of river canal along the year- Survey, investigation and design for

long-term river dredging

Constraints Expensive cost for dredging

Positive Impact - Safety of vessels - Increase of regional economy

Negative impact - Dredging location is too long and location of removal is too close to the river, so dredged material return back

Environmental pollution during dredging

Prerequisite Maintenance cost of Musi River canal is accommodated in regional budget

Rank

FA - 19

Annex F3.5.2 Discussion on Priority Programs (7/11)

Component: Water Use Alternative Program Proposed Priority Program Alternative Program 1 Alternative Program 2 Program Title Raw water (river) development Program Description - Construction of power plant

- Provision of water treatment in tidal swamp area

- Development of industrial and housing area

- Raw water quality preservation - Water quality control

Constraints - Water requirement data are not available

- Large covering area

Positive Impact - Electrical requirement is fulfilled. - Water requirement in tidal swamp area

is fulfilled. - Well-planned utilization zoning in

swamp area

Keep to be filled of the resources, such as: 1. Animal (?) 2. Concerning vegetable (?)

Negative impact Construction may cause environmental impacts.

Prerequisite - Sufficient water discharge - Large amount of funds

Standard parameter for row water quality - pH - Turbidity - Discharge, BOD and COD

Rank

FA - 20

Annex F3.5.2 Discussion on Priority Programs (8/11)

Component: Environment Alternative Program

Proposed Priority Program Alternative Program 1 Alternative Program 2

Program Title Enforcement of law regarding environment Supervision and control of River Pollution

Program Description

- Implementation of environment Impact assessment (AMDAL)

- Environmental pollution prevention - Increase of public health

- Law extension - Monitoring & supervision - Law enforcement

- Sanction reinforcement

Constraints - Lack of human resources - Environmental law is not properly

socialized.

- Lack of human resources - Law is not properly socialized.

Positive Impact River is well managed

Negative impact - Social restlessness

Prerequisite - Guarantee of society secure condition - People’s participation

Rank

FA - 21

Annex F3.5.2 Discussion on Priority Programs (9/11)

Component: Environment (Improvement and rehabilitation of water catchment area) Alternative Program

Proposed priority Program Alternative Program 1 Alternative Program 2

Program Title River Environment management Supervision & Control of River pollution

Program Description

- Erosion Prevention - Riverbank re-greening - River water quality improvement

- Riverbank re-greening program - Consruction of river revetment.

Constraints - Deforestation around the river - River sedimentation

- Reforestation (?) - City Forest Program (?) - Dredging (?)

Positive Impact - To preserve river environment - To preserve river ecosystem

- Clean River

Negative impact Area surrounding the river can not be utilized freely.

Prerequisite People perception supports the implementation of the project

Rank

FA - 22

Annex F3.5.2 Discussion on Priority Programs (10/11)

Component: Flood (Flood Plain management) Alternative Program

Proposed priority Program Alternative Program 1 Alternative Program 2

Program Title Optimization/Flood warning System Reforestation of the upstream areas Drainage System Improvement

Program Description

1. To balance the distribution of AWLR (Automatic Water Level Recorder)

2. To develop regional communication system3. To prepare well-trained personnel

1. Government and JICA as facilitators 2. Reforestation of water catchment area 3. Limitation of land for new settlement

1. Increasing of canal volume 2. Construction of dikes 3. Routine maintenance

Constraints 1. Lack of facility 2. Flood points zoning 3. Limited budget for operation

1. Spend much time 2. Need maintenance

1. High cost in land acquisition

Positive Impact 1. Flood controlling can be more effective. 2. Flood damage can be minimized.

1. Increase of water absorption 2. Make the environment greener 3. Prevention from erosion

1. Decrease of flood inundation 2. Better environment 3. Water can be utilized; irrigation, fishpond,

etc

Negative impact

Prerequisite 1. Well-programmed inter-flood points area 2. Routine funding 3. Improvement of community 4. Government/ community coordination

1. Provision of management authority 2. Availability of funds 3. Government and community control

1. Availability of funds 2. Well-prepared technical planning. 3. Long-term program. 4. Establishment of coordination.

Rank 1 2 3

FA - 23

Annex F3.5.2 Discussion on Priority Programs (11/11)

Component: Institution Alternative Program

Proposed priority Program Alternative Program 1 Alternative Program 2

Program Title Establishment of PTPA/PPTPA Conservation Compensation Data Processing

Program Description

- Establishment of non-structural organization

- Coordination of structural organization

Compensation from downstream to upstream Establishment of data and information unit

Constraints - Difference background - Sectoral Egoism

Difficulty to determine compensation - Weakness of information sources - Weak of information network - Limited human resources

Positive Impact Provision of Integrated management People will keep maintaining upstream area for conservation

Availability of accurate and fast-access data

Negative impact

Prerequisite Availability of public concern to achieve the target

Availability of public commitment - Availability of hardware and software - Supporting human resources.

Rank

FA - 24