f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the...
7
Transcript of f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the...
![Page 1: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not](https://reader036.fdocuments.us/reader036/viewer/2022071022/5fd63edad1002b59a3501bdb/html5/thumbnails/1.jpg)
![Page 2: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not](https://reader036.fdocuments.us/reader036/viewer/2022071022/5fd63edad1002b59a3501bdb/html5/thumbnails/2.jpg)
![Page 3: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not](https://reader036.fdocuments.us/reader036/viewer/2022071022/5fd63edad1002b59a3501bdb/html5/thumbnails/3.jpg)
![Page 4: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not](https://reader036.fdocuments.us/reader036/viewer/2022071022/5fd63edad1002b59a3501bdb/html5/thumbnails/4.jpg)
![Page 5: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not](https://reader036.fdocuments.us/reader036/viewer/2022071022/5fd63edad1002b59a3501bdb/html5/thumbnails/5.jpg)
![Page 6: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not](https://reader036.fdocuments.us/reader036/viewer/2022071022/5fd63edad1002b59a3501bdb/html5/thumbnails/6.jpg)
![Page 7: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not](https://reader036.fdocuments.us/reader036/viewer/2022071022/5fd63edad1002b59a3501bdb/html5/thumbnails/7.jpg)