SITE MANAGEMENT FORM Site Daily Log Form No:NP0001\ SM\F013 Procedure No:NP0001\SM Revision:Draft Page 1 of 6 Site Name: Project No: Prepared By: Day: Date: Weather: Wind None Light Moderate Strong Gale Sun Sunny Sunny Intervals Overcast Mist Fog Rain Showers Intermittent Heavy Sleet Snow Temperature (c) 0 & below 1 to 9 10 to 19 20 to 29 30+ Lightening Risk Status 1 2 3 4 Special Meetings/Discussions/Warnings given (oral/written): Visitors to Site: Uncontrolled when printed Author Creation Date Reviewer Review Date Authoriser Issue Date W Lawton

description

Daily Log

Transcript of F13_SiteDailyLog

Page 1: F13_SiteDailyLog

SITE MANAGEMENT FORM

S i t e D a i l y L o g

Form No:NP0001\

SM\F013

Procedure

No:NP0001\SM

Revision:Draft Page 1 of 5

Site Name: Project No:

Prepared By: Day:

Date:

Weather:

Wind None Light Moderate Strong Gale

Sun Sunny Sunny Intervals Overcast Mist Fog

Rain Showers Intermittent Heavy Sleet Snow

Temperature (c) 0 & below 1 to 9 10 to 19 20 to 29 30+

Lightening Risk Status 1 2 3 4

Special Meetings/Discussions/Warnings given (oral/written): Visitors to Site:

Day’s Activities: (On Site)

Uncontrolled when printed

Author Creation

Date

Reviewer Review

Date

Authoriser Issue Date

W Lawton

Page 2: F13_SiteDailyLog

SITE MANAGEMENT FORM

S i t e D a i l y L o g

Form No:Procedure

No:

Revision: Page 2 of 5

Accidents/Near Misses

Action List Resources

Hired Plant/Equipment Excavations, Overhead Apparatus, Underground Services Controls Checked

Uncontrolled when printed

Author Creation

Date

Reviewer Review

Date

Authoriser Issue Date

W Lawton

Page 3: F13_SiteDailyLog

SITE MANAGEMENT FORM

S i t e D a i l y L o g

Form No:Procedure

No:

Revision: Page 3 of 5

Delays/Problems: (including hours lost)

Training/Standowns/Toolbox Talks Carried Out:

Inductions:

Uncontrolled when printed

Author Creation

Date

Reviewer Review

Date

Authoriser Issue Date

W Lawton

Page 4: F13_SiteDailyLog

SITE MANAGEMENT FORM

S i t e D a i l y L o g

Form No:Procedure

No:

Revision: Page 4 of 5

Communications With Subcontractors:

Communications With Client:

Communications Within Atkins:

Uncontrolled when printed

Author Creation

Date

Reviewer Review

Date

Authoriser Issue Date

W Lawton

Page 5: F13_SiteDailyLog

SITE MANAGEMENT FORM

S i t e D a i l y L o g

Form No:Procedure

No:

Revision: Page 5 of 5

Operative Name Contractor Name Position Observations / Comments. Note in this

section any comments or observations

with regards to the workman ship,

behaviour, actions, performance of the

individuals on site. Note any actions

taken by the site manager in response to

the items highlighted.