F02 Filler Mecafill VKP e

1
Course-No. F02 Mecafill VKP filler Target group: operators, operators with maintenance tasks, mechanics, electricians, electronic and mechanical engineers, team leaders, shift supervisors Duration: 4 days Suitable for machine types: Mecafill VKP, VKP-PET, VKP-PET-DL, VKPV, VKPV-CF Requirements: none Stand: 13.08.09/Vers. 1.0/Cerek F02_Filler_Mecafill_VKP 1/1 KRONES Academy seminar programme Topics: Safety Control components Structure and function Filling valve Process technology Filling phases Principle of operation Troubleshooting for over/under fill and foam Control and Visualisation Control of filling valves FVC, KFS-3 Diagnostics Pipe system plan Process and cleaning channel Understanding the valve manifold Function of the individual valves and sensors Introduction to the pressure and level regulation Explanation of operating and cleaning programme Touch-screen Operator interventions Functions Malfunction messages and remedy Change-over Convert for type change-over Change-over for CIP Cleaning Pneumatic Terminal diagram Required pressure, min and max Maintenance and Lubrication Position and interval Lubricator Central lubrication system Method of operation, taking apart and putting together individual assemblies using training components (only at KRONES) Use of spare parts list Mechanical adjustment Drive, gearing layout drawing, star wheel column Container guide adjustment Capper Principle of operation Adjustment Cleaning Maintenance and lubrication

Transcript of F02 Filler Mecafill VKP e

Page 1: F02 Filler Mecafill VKP e

Course-No. F02 Mecafill VKP filler Target group: operators, operators with maintenance tasks, mechanics, electricians, electronic and mechanical engineers, team leaders, shift supervisors

Duration: 4 days Suitable for machine types: Mecafill VKP, VKP-PET, VKP-PET-DL, VKPV, VKPV-CF Requirements: none

Stand: 13.08.09/Vers. 1.0/Cerek F02_Filler_Mecafill_VKP 1/1

KRONES Academy seminar programme

Topics: Safety Control components Structure and function Filling valve � Process technology � Filling phases � Principle of operation � Troubleshooting for over/under fill and foam

Control and Visualisation � Control of filling valves FVC, KFS-3 � Diagnostics Pipe system plan � Process and cleaning channel � Understanding the valve manifold

� Function of the individual valves and sensors � Introduction to the pressure and level regulation � Explanation of operating and cleaning

programme

Touch-screen � Operator interventions � Functions � Malfunction messages and remedy

Change-over � Convert for type change-over � Change-over for CIP

Cleaning

Pneumatic � Terminal diagram

� Required pressure, min and max

Maintenance and Lubrication � Position and interval � Lubricator � Central lubrication system

Method of operation, taking apart and putting together individual assemblies using training components (only at KRONES) Use of spare parts list Mechanical adjustment � Drive, gearing layout drawing, star wheel column

� Container guide adjustment

Capper � Principle of operation � Adjustment

� Cleaning � Maintenance and lubrication