F.005 FINAL DESIGN REVIEW REQUESTdqpgtzxn0wn4l.cloudfront.net/docs/LPD/F005 - Final Design...
Transcript of F.005 FINAL DESIGN REVIEW REQUESTdqpgtzxn0wn4l.cloudfront.net/docs/LPD/F005 - Final Design...
![Page 1: F.005 FINAL DESIGN REVIEW REQUESTdqpgtzxn0wn4l.cloudfront.net/docs/LPD/F005 - Final Design Review... · FINAL DESIGN REVIEW REQUEST ... NOC from DEWA for Utilities (Water and Electricity)](https://reader034.fdocuments.us/reader034/viewer/2022051718/5a7161867f8b9a9d538cd117/html5/thumbnails/1.jpg)
F.005
FINAL DESIGN REVIEW REQUEST
Please complete this application and submit it with required attachments to DUBAI SOUTH Regulatory Affairs / Land Planning & Development Control Dept.
A: General Information
Project Name:
Project Owner: Plot No:
Consultant: B: Required Information and Submittals
◊ Copy of Consultant’s Registration (Copy of Consultants Professional License to be enclosed)◊ Copy of Preliminary Design Approval◊ Copy of Consultant’s Appointment Letter◊ Project Details Sheet (Updated)◊ NOC from Department of Civil Aviation (If not in compliance)◊ NOC from DEWA for Utilities (Water and Electricity)/ sub-station room location approval◊ NOC from Etisalat for Telecommunications◊ Design NOC from DS-UIM for Sewerage and Drainage ◊ Design NOC from DS-UIM for District Cooling ( if Applicable)◊ Design approval from Civil Defense◊ Structural Calculations with Soil Investigation Report◊ Final Design Drawings (2 Hardcopy sets signed by the owner + 1 DWG. format set) ◊ AWQAF Approval for Religious use (If Applicable)◊ Services Details (Refer to the attachment)◊ Approved Final Design Review Request Form (If this is a Resubmission)
C: Fees Submission Fee*: Received By: Receipt #: Signature:
*Warehouses: (AED 3 per M2 of BUA for Initial Submission or AED 1 per M2 of BUA for Resubmission. *Residential: (AED 4 per M2 of BUA for Initial Submission or AED 1 per M2 of BUA for Resubmission. *A Knowledge fee of AED 10 applies to each transaction.
D: Submission Details
Submission Details : Initial Submission Resubmission
Consultant:
STAMP Contact Person: Signature:
Email: Date:
Tel: Fax: Mobile:
E: For Official Use Only Document Receiving: TRN- File: DLC RC AC
Received By Signature Date Remarks:
Approved Conditional Approval Resubmit Refer Enclosed Name, Signature & Date
Reviewed By Architect
Reviewed By Structural Engineer
Approved By VP – Land Planning & Development
Date :
PDC-F-005, Rev. 3, Aug 2015 Page 1 of 1