Transcript of F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
![Page 1: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/1.jpg)
f
Status and Plans for SRF FacilityStatus and Plans for SRF Facility
Sergei Nagaitsev
May 18, 2007
![Page 2: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/2.jpg)
S. Nagaitsev 2
f Setting the ScaleSetting the Scale
For ILC: produce 4 to 6 cryomodules in the next 4 years ~ 50 cavities used; additional needed for development and testing
International (ILC/GDE) coordination: S0 ‘tight loop’ task force:
• Process and re-process the inside surface of a limited number of cavities, repeatedly, testing each time… (~100 procedures/year for several years)
• Answers due 08, 09 guidance for a final gradient recommendation
S1 ‘cryomodule’ task force :• 31.5 MV/m OPERATING cryomodule
S2 ‘string test’ task force :• Put it all together• Run ILC-like beam• Various critical tasks
![Page 3: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/3.jpg)
S. Nagaitsev 3
f SCRF Cavity Gradient RDSCRF Cavity Gradient RD
“S0 / S1” GDE charge: Provide the information needed
to make a gradient decision for TDR. Challenge: Cavity surface processing
variability (yield) Secondary: the rest of the fabrication effort
• From the mine to the cryomodule (‘production-like RD’)
Focused charge, well defined deliverable, broad base, expensive task with excellent cost / benefit
US labs are heavily involved but expertise is scattered; Fermilab is playing a “catch-up” game.
![Page 4: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/4.jpg)
S. Nagaitsev 4
f String test (S2)String test (S2)
Charge: Recommend a string test strategy;
Expensive Referendum on the SRF readiness for the ILC Many duplication / competition /
standardization issues between DESY, KEK, FNAL
Cross threaded with mass-production issues, ‘regional interest’ and lab ambitions
R or D? What is the balance?
![Page 5: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/5.jpg)
S. Nagaitsev 5
f
Surface Processing
Cavity Fabrication
Vertical Testing
He Vessel, couplers,
tuner
HPR or reprocess
Horizontal Testing
Cold String Assembly
Pass!
Pass!
Fail!
Fail!
Cavity/CM process and TestingCavity/CM process and Testing
Plan… Develop in labs then transfer technology to industry
![Page 6: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/6.jpg)
S. Nagaitsev 6
f SCRF InfrastructureSCRF Infrastructure
This process requires extensive infrastructure Bare cavities
Fabrication facilities (Electron beam welder, QC, etc) Surface treatment facilities BCP & Electro-polish facilities (EP) Ultra clean H20 & High Pressure Rinse systems Vertical Test facilities ( Cryogenics + low power RF)
Cavity Dressing Facilities ( cryostat, tuner, coupler) Class 10/100 clean room Horizontal Test System (cryogenics and pulsed RF power)
String Assembly Facilities Large class 10/100 clean rooms, Large fixtures
Cryo-module test facilities Cryogenics, pulsed RF power, LLRF, controls, shielding, etc. Beam tests electron source (RF unit test facility at NML)
![Page 7: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/7.jpg)
S. Nagaitsev 7
f Materials & SRF R&D infrastructureMaterials & SRF R&D infrastructure
Quality assurance: Characterization of Nb sheet from vendors Surface properties: oxide layer, inclusions, and scratches (eddy
scanner) Measure material composition (RRR, chemical composition, etc) Measure Nb mechanical properties ( ie crystal structure)
Surface processing studies Electropolish and BCP process studies (single cell programs) Surface contamination studies
Infrastructure: (ANL, TJNL, FNAL, Cornell, MSU, etc…) Labs for handling HF and processing and test of single cells Materials equipment ( RRR measurement, INSTRON, EM microscope,
SIMS.
Weld studies ( e.g. crystal structure, contamination, TIG welding) ILC is helping to upgrade existing national capabilities but much of
this is funded by other sources
![Page 8: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/8.jpg)
S. Nagaitsev 8
fCavity Fabrication
By Industry
Cavity Dressing &Horizontal Testing
@ Fermilab
SurfaceProcessing @ Cornell
SurfaceProcessing
@ Jlab
SurfaceProcessing @ ANL/FNAL
Vertical Testing @ Cornell
Vertical Testing @ Jlab
Vertical Testing @ FNAL
Exists
Developing
U.S. Cavity Processing & TestU.S. Cavity Processing & Test
![Page 9: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/9.jpg)
S. Nagaitsev 9
f FNAL/ANL collaboration Goal: A new joint surface processing facility Clean rooms, BCP, and state of the art EP New Chemistry and Clean rooms operational
New Clean Rooms Controls and HF scrubber
Surface Processing @ ANLSurface Processing @ ANL
![Page 10: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/10.jpg)
S. Nagaitsev 10
f
•World knowledge to design new EP system
•Design Review 2/12/07, Under construction
•Plan: Commission late FY07
•Capacity ~ 45 EP cycles per year
•Plan for new HPR system by late 07
New Electropolish facility @ANL New Electropolish facility @ANL
![Page 11: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/11.jpg)
S. Nagaitsev 11
f Fermilab SCRF MAPFermilab SCRF MAP
New Muon Lab:RF unit test facility
MDB:CCII HTSHINS
IB1: VTS
WH
CAF:MP9ICB
IARC
![Page 12: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/12.jpg)
S. Nagaitsev 12
f A new Vertical Test Stand is under Construction at
Fermilab (IB1) Existing 1.8 K Cryogenic plant 125 W at 2 K (250 W intermittent test) RF system based on TJNL VTS RF/DAQ system Current test Stand will be capable of testing ~50 Cavities/yr Commissioning started (cryo), reached 2K, next step: single cavity test Evolutionary upgrades: Thermometry for 9-cells, 2 cavities at a time, 2
top plates, Cryo upgrades: increased pumping capability & purifiers, up to two additional VTS cryostats
Ultimate capacity ~ 264 cavity tests/yr
VTS Cryostat:IB1 New RF &
Control Room
Movable shielding for up to 3 pits
Vertical Test@FNALVertical Test@FNAL
![Page 13: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/13.jpg)
S. Nagaitsev 13
f HTS @ MDB HTS @ MDB
Cryostat complete: ~DESY design but 2 Doors improve access
Extensive MDB cryo modifications [email protected] K 300 KW klystron & modulator is in place and tested Cooled down w/o cavity, 1st cavity test in May
1.3 GHz Cavity in
HTS Cryostat
HTS CryostatInstalled at MDB
DESY C22 VTS @ 17 MV/M
![Page 14: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/14.jpg)
S. Nagaitsev 14
f MDB InfrastructureMDB Infrastructure
RF Power for HTS
Cryogenics transfer lines in MDB
Large Vacuum Pump for 2K
RF Power for HTS
Capture Cavity-II
![Page 15: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/15.jpg)
S. Nagaitsev 15
f CAF: MP9CAF: MP9
Infrastructure: String Assembly Fixtures Clean Vacuum & Leak Check Ultra Pure Gas and Water Ultrasonic Cleaner Cold Mass Assembly Fixture
String Assembly Fixture
1st Cavity being prepared for HTS
MP9 Clean Roomand tooling built in FY06
UltrasonicCleaner
![Page 16: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/16.jpg)
S. Nagaitsev 16
f CAF: ICB Final AssemblyCAF: ICB Final Assembly
Industrial Center Building (ICB) 18,000 ft2
Alignment, Instrumentation, coupler installation, etc Large Vacuum Vessel Assembly Fixture
CAF Goal: Produce R&D quantity Cryomodules (~1/month) Goal: Use infrastructure for tech transfer to industry Will Assemble 1st cryomodule (DESY kit) early fall 07 Also 3.9 GHz!
Cryomodule has1200 parts !
Parts for copy of DESY Assembly fixtureICB cleaned!
![Page 17: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/17.jpg)
S. Nagaitsev 17
f ILCTA_NML@FNALILCTA_NML@FNAL
NML Building
CCM removal: Sep 06
NML: Apr 071st of 2 refrigerators each 60 [email protected]
![Page 18: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/18.jpg)
S. Nagaitsev 18
f Two CMs with beamTwo CMs with beam
The existing building is perfect for testing two cryomodules with ILC-like beam. The building can be extended to fit 3 cryomodules.
![Page 19: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/19.jpg)
S. Nagaitsev 19
f ILC RF unit with BeamILC RF unit with Beam
Construct a new building ~50m away from NML Connect by ILC-like tunnel (2nd RF unit) Upgrade RF system to 10 MW klystron Add larger 300W @ 1.8 K refrigerator New Bldg houses diagnostics, dump, refrigerator
![Page 20: F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.](https://reader031.fdocuments.us/reader031/viewer/2022032607/56649ebb5503460f94bc2db7/html5/thumbnails/20.jpg)
S. Nagaitsev 20
f SummarySummary
Cavities & Cryomodules are cost drivers for ILC SRF R&D requires extensive infrastructure The U.S. is making good use of existing SRF
assets as well as new ANL/FNAL infrastructure to rapidly expand U.S. SRF R&D capabilities
Infrastructure is needed to support: GDE S0, S1, S2, S4 goals U.S. Industrialization of SRF technology
We have made a lot of progress in FY06-07 We have ambitious plans for FY08 and beyond Effort is resource limited