Transcript of F-MAN Project - 3 nd Annual Review
![Page 1: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/1.jpg)
Caminhos de FerroPortugueses E.P.
EuropeanDatacomm NV
IVU TrafficTechnologies AG
National TechnicalUniversity of Athens
Prometni InstitutLjubljana D.O.O.
SCIRO S.r.l. TECNOSISTEMI S.p.A.TLC Engineering & Services
SIGMAConseil S.a.r.l.
Università degli Studidi Genova
F-MAN Project - 3nd Annual Review
SYSTEM Architecture
Genova, December 2 & 3, 2004
![Page 2: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/2.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 2
The fleet management conceptFleeMandata input
Tracking System Externaldata input
GNSS/GSMSensors
Geo data,timetable
Data Processing
Event Messages
- F-Man Pool formulation - ETA- Technical availability of wagons
Train Control info
Wagon related info
Asset Management
Data Base
- Decision Support Financial targetsCommercial,controlling datas
- Position- Status- Events
![Page 3: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/3.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 3
System Architecture: Module overview•Tracking System Module (TSM)
OBT communicationTracking & TracingMap module
•Data Processing Module (DPM)Management of Users, ItinerariesMaintenance dataETA
•Asset Management Module (AMM)ReservationDecision Support SystemETA/Maintenance affecting the processUser-Interface concepts
![Page 4: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/4.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 4
Tracking System Module: Overview
NON F - MAN OBT
F - MAN OBT 1
F - MAN OBT n
Modem
INTERNET
HUB
+32 123 456 789 F-MAN
DPM
Other
Message
![Page 5: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/5.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 5
Tracking System Module: OBT devices
On-Board Terminals (OBTs) mounted on wagons
Loading Sensor apparatus
Micro controller & Mobile
Communication
XML standards for data exchange from Ground Station
> GPS receiver
> mobile communication system
> a loading sensor
(allows the F-man tool to be compliant with OBT devices produced by other companies)
![Page 6: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/6.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 6
Tracking System Module: Ground Station
Cent
Country A
Country B
Country C
OBT
International provider
OBT
National provider
International provider
Roaming
OBT
Users’ premises Users’
premises Users’ premises
Internet connection
Internet connection
Internet connection
Roaming
A central ground station concentrates and elaborates all information entering the system (SMS messages from OBTs, user queries, etc.) and distributes the required information to the users’ premises.
![Page 7: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/7.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 7
Fleet Managersasking for wagons
Fleet Managersoffering wagons to the pool
Wagon LeasingCompaniesOrder Manager
WagonsMaintenance Managers
OperationalManagers,Infrastructure managers & other authorisedactors
Authorised station staff
Data Processing Module: Actors Involved
![Page 8: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/8.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 8
Data Processing Module: Information Flow
Empty wagons path and timetable data
Wagons Running
OPM FM F-Man toolOM
time
Wagons request in coded form (O/D, loading, departure and delivery dates,
wagons quantity and type)
Wagons request (O/D, loading, departure and delivery dates,
wagons quantity and type)
F-Man options: alternative sets of empty wagons (criteria: cost,
wagons location, time availability…)
A request for verification of the OPM availability to move wagons to the transportation
origin
The OPM confirmation of availability
Order confirmation
Wagons are empty and again available
F-Man action perimeter
1 2
4
Order for the sending of empty wagons
Information to release the other alternative
6
5
Transport request
Transport confirmation
3
Wagon
Delay*: a delay compared to a given time but also a damage
9
11
12
CSTransport request including :•O/D,•loading, departure and delivery dates, •freights type and quantityor•wagon types and quantity
Real time events
16
14
87
13
14Delay * detection
10
15
Wagons movement confirmation
Wagons identification numbers
Loaded wagons path and timetable data
Event messages ( departure and arrival dates, delivery, restitution…)
![Page 9: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/9.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 9
Data Processing Module: User Management
Select language
Allocate privileges
![Page 10: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/10.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 10
Data Processing Module: other aspects
Agreements
Itineraries
Information
![Page 11: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/11.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 11
Data Processing Module: ETA Management
A B C D
Re
al w
ag
on
p
osi
tio
n
Wa
go
n
po
siti
on
a
cco
rd. t
o
sch
ed
ule
Time
Railw.
nodes
![Page 12: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/12.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 12
Asset Management: State Machine
![Page 13: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/13.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 13
Technical Approach
HTML client
JSP
HTML / DHTML
HTTP / SSL
firewall
RMI-IIOP RMI-IIOP
EJB session bean
EJB entity bean
RMI-IIOP
application server
web servers
database
JDBC JDBC
database-layer
business-layer
presentation-layer
CommunicationServer servlet
![Page 14: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/14.jpg)
Final Review
Genoa, December 2nd - 3rd, 2004 14
OBT functionality and limitations: SCIRO, EDC, TechnosistemiOBT to Ground Station communication: EDC, SCIRO
User (national FMs) dependences and hostilities F-Man system role in the FMs Decision support PI, CP, SigmaRealistic level of procedure automation SCIRO Business rules NTUA IVU
ETA algorithm: NTUAState of the art software solutions: IVU NTUA SCIRO (map viewer)
Simulation analysis of management aspects: UGDIE, NTUA
Acknowledgement of Partners Contribution The high-level architecture of the system has already been defined in the Technical annex of the project.
System architecture at a more detailed level required the synthesis of the complimentary knowledge and qualification of all partners as well as the work performed in previous work-packages (user requirements, AFNOR analysis) for the analysis of the following aspects
![Page 15: F-MAN Project - 3 nd Annual Review](https://reader031.fdocuments.us/reader031/viewer/2022013122/568137e8550346895d9f9a25/html5/thumbnails/15.jpg)
Caminhos de FerroPortugueses E.P.
EuropeanDatacomm NV
IVU TrafficTechnologies AG
National TechnicalUniversity of Athens
Prometni InstitutLjubljana D.O.O.
SCIRO S.r.l. TECNOSISTEMI S.p.A.TLC Engineering & Services
SIGMAConseil S.a.r.l.
Università degli Studidi Genova
Thank you for your attention