FERMILAB TEST BEAM FACILITY
Aria SohaAll Experimenter’s Meeting
January 27, 2014
Latest Experiments
http://www-ppd.fnal.gov/FTBF/ 2
•Jan 22 – Feb 4–T-1042 (Muon g-2)–T-992 Rad-Hard Sensors for SLHC
•Feb 5 – 26 super PHENIX–T-1044 – 5 ton Hadron calorimeter–T-1048 – Time-of-flight system–T-1037 – (FLYSUB) GEM detectors –T-1054 – pre-shower calorimeter
http://www-ppd.fnal.gov/FTBF/schedule
Current Status• sPHYNIX taking data • Rotating table available! (and other small stages)• MCenter Control Room:
– Heat On! – Shielding blocks in place (to shield muon plume)– Moving Furniture (racks) in
• MCenter beamline:– MC2 Quad replacement (6 days to go)– Interlocks: Chipmunks & Key tree being placed
• Other LAriaT work:– Wire Chambers waiting on TDC’s, being assembled.
http://www-ppd.fnal.gov/FTBF/ 3
Up Coming Experiments
http://www-ppd.fnal.gov/FTBF/ 4
•Feb 26 – Mar 19–T-1018 – Spacordian Tungsten Fiber Calorimeter (UCLA) (STAR)–T-1036 – CMS High Rate Pixel tracker (Make-up slot)
•Mar 19 - –T-1041 – CMS Forward Calorimeter
http://www-ppd.fnal.gov/FTBF/schedule
TSW’s In Progress
http://www-ppd.fnal.gov/FTBF/ 5
• T-1048, approved (taking data)• T-1049, waiting on experimenter feedback• T-1054, approved (taking data Weds)
– extreme processing!• T-1055, processing
http://www-ppd.fnal.gov/FTBF/TSW
Technical Scope of Work
ADDITIONAL SLIDES
http://www-ppd.fnal.gov/FTBF/ 6
Facility Usage
Facility Weekly Usage
http://www-ppd.fnal.gov/FTBF/ 8
Experiments & TSWs
http://www-ppd.fnal.gov/FTBF/ 9
Beam Delivery
http://www-ppd.fnal.gov/FTBF/ 10