Current Status sPHYNIX taking data Rotating table available! (and other small stages) MCenter Control Room: –Heat On! –Shielding blocks in place (to shield muon plume) –Moving Furniture (racks) in MCenter beamline: –MC2 Quad replacement (6 days to go) –Interlocks: Chipmunks & Key tree being placed Other LAriaT work: –Wire Chambers waiting on TDC’s, being assembled.

Transcript of F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Page 1: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

FERMILAB TEST BEAM FACILITY

Aria SohaAll Experimenter’s Meeting

January 27, 2014

Page 2: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Latest Experiments

http://www-ppd.fnal.gov/FTBF/ 2

•Jan 22 – Feb 4–T-1042 (Muon g-2)–T-992 Rad-Hard Sensors for SLHC

•Feb 5 – 26 super PHENIX–T-1044 – 5 ton Hadron calorimeter–T-1048 – Time-of-flight system–T-1037 – (FLYSUB) GEM detectors –T-1054 – pre-shower calorimeter

http://www-ppd.fnal.gov/FTBF/schedule

Page 3: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Current Status• sPHYNIX taking data • Rotating table available! (and other small stages)• MCenter Control Room:

– Heat On! – Shielding blocks in place (to shield muon plume)– Moving Furniture (racks) in

• MCenter beamline:– MC2 Quad replacement (6 days to go)– Interlocks: Chipmunks & Key tree being placed

• Other LAriaT work:– Wire Chambers waiting on TDC’s, being assembled.

http://www-ppd.fnal.gov/FTBF/ 3

Page 4: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Up Coming Experiments

http://www-ppd.fnal.gov/FTBF/ 4

•Feb 26 – Mar 19–T-1018 – Spacordian Tungsten Fiber Calorimeter (UCLA) (STAR)–T-1036 – CMS High Rate Pixel tracker (Make-up slot)

•Mar 19 - –T-1041 – CMS Forward Calorimeter

http://www-ppd.fnal.gov/FTBF/schedule

Page 5: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

TSW’s In Progress

http://www-ppd.fnal.gov/FTBF/ 5

• T-1048, approved (taking data)• T-1049, waiting on experimenter feedback• T-1054, approved (taking data Weds)

– extreme processing!• T-1055, processing

http://www-ppd.fnal.gov/FTBF/TSW

Technical Scope of Work

Page 6: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

ADDITIONAL SLIDES

http://www-ppd.fnal.gov/FTBF/ 6

Page 7: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Facility Usage

Page 8: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Facility Weekly Usage

http://www-ppd.fnal.gov/FTBF/ 8

Page 9: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Experiments & TSWs

http://www-ppd.fnal.gov/FTBF/ 9

Page 10: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Beam Delivery