F-35 Lightning II EOTS
Transcript of F-35 Lightning II EOTS
-
8/16/2019 F-35 Lightning II EOTS
1/17
LOCKHEED MARTIN PROPRIETARY INFORMATION
F-35 Lightning II EOTS
TM1409-0107-1CLEARED FOR PUBLIC RELEASE
Lockheed Martin Missiles and Fire Control
2015 Supplier Summit
-
8/16/2019 F-35 Lightning II EOTS
2/17
CLEARED FOR PUBLIC RELEASE TM1409-0107-2
F-35 Lightning II Electro-Optical
Targeting System (EOTS)
-
8/16/2019 F-35 Lightning II EOTS
3/17
CLEARED FOR PUBLIC RELEASE TM1409-0107-3
EOTS Functional Capability
Air-to-Air Targeting
Forward-Looking Infrared
(FLIR)
• Infrared video imaging
• Automatic image track
• Laser range measurement
Air-to-Surface Targeting FLIR
• Infrared video imaging
• Angle cue and geolocation
• Automatic target search and cue
• Automatic image track
• Offset track
Long-Range Infrared Search and
Track (IRST)
• Automatic track-while-scan• Single target track
Laser Spot Tracker
• Automatic target search and cue
Laser Designation and Ranging
CLEARED FOR PUBLIC RELEASE
-
8/16/2019 F-35 Lightning II EOTS
4/17
CLEARED FOR PUBLIC RELEASE TM1409-0107-4
EOTS Supports All Three Variants
F-35B STOVL (U.S. Marine Corps)
First Flight at Eglin Air Force Base
F-35A CTOL (U.S. Air Force)
Test Flights at Edwards Air Force Base
F-35C CV (U.S. Navy)
First Steam Ingestion Catapult Launch
-
8/16/2019 F-35 Lightning II EOTS
5/17
CLEARED FOR PUBLIC RELEASE TM1409-0107-5
Advanced Capabilityfor Lethality and Survivability
• Faceted window for low-observableperformance
• Compact, single-aperture design
• Lightweight (less than 200 lbs)
• Large, high-resolution
focal plane array
• Multiple fields-of-view with digital zoom
• IRST and FLIR capabilities in a single package
• Automatic boresight and aircraft alignment
• Tactical and eye-safe laser• Highly accurate geo-coordinate
generation to meet strike requirements
World’s First and Only Targeting FLIR-IRST Sensor
-
8/16/2019 F-35 Lightning II EOTS
6/17
CLEARED FOR PUBLIC RELEASE TM1409-0107-6
LORR Assembly
Shroud Assembly
Gimbal Assembly
Aircraft Interface Structure
IDCA
Fast Steering Mirror
Laser Transmitter Processor/Mechanism ECA
Power/Servo ECA
Optical Bed Assembly
FLIR Optics Assembly
LBEST Assembly
EMI Environmental
Closeout
Fiber Optic Cable
EMI Filter Assembly
Sensor Assembly
Window Assembly
EOTS Exploded View
-
8/16/2019 F-35 Lightning II EOTS
7/17CLEARED FOR PUBLIC RELEASE TM1409-0107-7
EOTS Window Overview
Faceted Window over Aperture Window in Aircraft Cover Assembly
-
8/16/2019 F-35 Lightning II EOTS
8/17CLEARED FOR PUBLIC RELEASE TM1409-0107-8
√ Successfully employed Laser-Guided Bomb
Unit-12 Weapons Drop Oct 2013
√ 100th System Delivery July 2013
√ Completed low-rate initial production Oct 2014
(LRIP) 6 deliveries
√ Completed JDAM weapon drop Nov 2014
√ LRIP 7 (37 qty) and LRIP 8 (43 qty) Current
√ LRIP 9 (70 qty) and LRIP 10 (81 qty) Awarded
F-35 EOTS Program Meeting Milestones and In Production
Meeting Commitments on Customer Major Milestones
-
8/16/2019 F-35 Lightning II EOTS
9/17CLEARED FOR PUBLIC RELEASE TM1409-0107-9
F-35 EOTS Flight Test Imagery
-
8/16/2019 F-35 Lightning II EOTS
10/17CLEARED FOR PUBLIC RELEASE TM1409-0107-10
• Information needed for evaluation
–Investment• Cost to develop the idea
• When are funds needed?
– Other Benefits
• Weight savings?
• Improved reliability?• Reduced sustainment costs?
• Idea Generation
– Targeted Lockheed Martin/supplier events in high cost areas
– Manufacturing process improvements
– Alternate/second sourcing
– Tooling/testing enhancements
– Design changes
Affordability Idea Generation
–Savings• Amount of savings?
• When will the savings begin?
• How long will the savings continue?
Discuss Your Cost Saving Ideas with Lockheed Martin
-
8/16/2019 F-35 Lightning II EOTS
11/17CLEARED FOR PUBLIC RELEASE TM1409-0107-11
What Can Be Funded
• Opportunities
– Design changes – Tool improvements
– Technology changes
– Re-architecting the supply chain
– Lean processes
– Changes in material flow
– Changes in factory layout
– Automation
– Supplier long term agreements
– Bring on lower-cost supplier
• Cannot Fund
– Capital equipment – ManTech
– Research and development/
follow-on development
Lockheed Martin Can Help with Idea Generation/Evaluation
-
8/16/2019 F-35 Lightning II EOTS
12/17CLEARED FOR PUBLIC RELEASE TM1409-0107-12
Reliability, Maintainability and Availability
Improvement Program
• There are three tasks associated with this program
1. R&M program administration
2. Idea generation and triage
3. Business case analysis
• “Start-Up” funding is via LRIP 7 annualized sustainment
– CLIN 901 para 24.2.1.2 The Contractor shall utilize existing decision
support tools to facilitate the evaluation and implementation of
alternative actions including the initiation of new/revised air system
product designs that incorporate R&M/PHM improvements,
manufacturing changes, training updates, sustainment process and
performance-based logistics improvements
-
8/16/2019 F-35 Lightning II EOTS
13/17CLEARED FOR PUBLIC RELEASE TM1409-0107-13
F-35 EOTS
Affordability Initiatives
-
8/16/2019 F-35 Lightning II EOTS
14/17CLEARED FOR PUBLIC RELEASE TM1409-0107-14
F-35 EOTS Customer-Funded InitiativesFocal Plane Array (FPA)/Integrated Detector Cooler (IDC) ProducibilityAFRL/Office of Naval Research (ONR) ManTech
• Improve InSb FPA processes and automate IDC manufacturing techniques to reducevariability, rework and scrap
Beryllium Aluminum Castings Affordability Initiative
• Develop and qualify two EOTS BeAl castings to reduce cost and lead time
Second Source Slip Ring Affordability Initiative• Develop and qualify a second source for the gimbal assembly slip ring to reduce cost
and lead time
Automated Inspection of Optical Panels ONR ManTech
• Automate and standardize inspection process, lowering costs and producingrepeatable results
Reduced Height Laser Affordability Initiative (new)
• Develop and qualify reduced height laser to enhance capability, improve reliability andreduce weight
$220 Million Projected Savings to F-35 Program
-
8/16/2019 F-35 Lightning II EOTS
15/17
CLEARED FOR PUBLIC RELEASE TM1409-0107-15
F-35 EOTS Supply Chain Focus Areas
• F-35 EOTS supply chain is expected to meet affordability
targets without exception
• F-35 EOTS supply chain is expected to meet hardware delivery
commitments
• F-35 EOTS supply chain is expected to deliver hardware that
meets the quality requirements of the program and to be
reliable in the field
-
8/16/2019 F-35 Lightning II EOTS
16/17
CLEARED FOR PUBLIC RELEASE TM1409-0107-16
Summary
• Affordability
– Affordability funding is available to reduce supplier cost
– Lockheed Martin will enable idea generation/evaluation
– Discuss your cost savings ideas with your IPT or Affordability
representatives
• Reliability and Maintainability Improvement Program – Per direction, the F-35 Program now has a funded Reliability,
Maintainability and Availability Improvement program
– We are seeking a full spectrum of improvement opportunities
– The “Suggestion Box” is open
– F-35 EOTS supply chain investments are required to facilitize, modernize
and optimize future high rate production
-
8/16/2019 F-35 Lightning II EOTS
17/17
CLEARED FOR PUBLIC RELEASE