Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014,...

download Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.

If you can't read please download the document

description

KI: ALICE status  Running ALICE activities as disk-only Tier-1 since December 2013  Providing 720 CPU cores and 150 TB of disks (can add more, once current usage will reach 70%, now we're at 25%)  Running with average efficiency of 83%  Tape instance will be rolled out once we will settle down with ATLAS in the tape realm

Transcript of Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014,...

Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting KI: ATLAS status Production activity since 2012 Preparing ourselves for analysis since March: evaluating data access protocols Acting as Tier-2, since ATLAS needs MoU and pledges to start Tier-1 activities Receiving 500 TB of job logs for tape storage since mid-April, 78 TB were successfully stored to tape KI: ALICE status Running ALICE activities as disk-only Tier-1 since December 2013 Providing 720 CPU cores and 150 TB of disks (can add more, once current usage will reach 70%, now we're at 25%) Running with average efficiency of 83% Tape instance will be rolled out once we will settle down with ATLAS in the tape realm KI: LHCb status Running in MC-only mode since November 2013 Disk-based dCache instance is ready and being validated Mean job efficiency is 90% 61.5 million of HS06-hours since the beginning of operations (42% of all CPU capacity, provided by RRC-KI-T1) KI: networking status Using 2 Gbit/sec channel to GEANT and LHCONE (transit from NORDUnet) Peering with ESnet on LHCONE space, Internet2 should come soon Establishing peering with SARA/NIKHEF (physical transport is ready, waiting for 100G link between SARA and NIKHEF, ETA is next week) KI: networking status Connected to LHCOPN since April 22th 2014 via CERN: 10 Gbit/sec link from Moscow to Amsterdam Second LHCOPN circuit (Moscow Budapest Amsterdam) is ready, but waiting for Wigner DC last mile fiber Exchanging traffic on LHCOPN with all other Tier-1 sites, but FNAL (should be fixed next week) KI: networking status Peering with all big Tier-2 sites in Russia: JINR, IHEP (Protvino), ITEP, PNPI Have direct peering with R&N networks: RBnet, RunNET and Radio-MSU Establishing HEP traffic exchange point at M9 facility Creating Russian VRF for LHCONE: RRC-KI-T1 and RRC-KI are pilot sites KI: assorted pictures KI: plans Reach resource capacity promised in 2013: HS06, 4.8 PB disks, 5.7 PB tapes Create 24x7 admin/monitoring team that will do most Tier-1 operations autonomously Sign MoU and start working as Tier-1 Grow networking capacity and links JINR: current state Our Tier-1 currently supports CMS as the tape-less Tier-1 since October 2013; Our resources were fully validated; Our Tier-1 participate in CMS Multicore job scheduling project: o Able to run multicore glideins (12-cores) through ce{01,02} mcore queues by April 29th o Large scale tests at Tier1s: Start asap Our Tier-1 was tested for high memory (6GB) jobs JINR: installed services Computing field: 1200 cores (17K HS06), Torque/Maui, 2xCREAM CE Storage: Disk-only dCache (running v2.6), 450 TB; has xrootd-federation working plugin dCache for MSS (v2.2), 130 TB pools + 72 TB tapes FTS PhEDEx for disk-only dCache and MSS Argus server 2x Frontier Squids site BDII and top-level BDII UI, MyProxy, WMS, LB, LFC for internal testing All services run EMI-3 JINR: running jobs JINR: reliability and availability JINR: CMS link validation JINR: status at CMS SUM portal CMS T1 Site Activity JINR: future work Engineering infrastructure (New UPS and climate control system July-Aug) High-speed reliable network infrastructure with provisioned path to LHCOPN Computing and storage system basing on servers, disk arrays and tape libraries of high capacity (Sep) 100% of reliability and availability Grid'2014 conference in JINR June 30th July 5th 2014, Dubna, Russia Everyone is invited to join and do some talks