EXXON MOBILE HEAD OFFICE BUILDING tm

1
As part of the EXXON MOBIL Head Office Building Complex three 11kV substations were installed along with four 1MVA generators and associated step up transformers. Including state of the art protection and EMS systems. The protection system is equipped with IEC61850 GOOSE messaging as part of a protection blocking scheme to assist with protection discrimination. KBR provided the HV specification and design. The protection study was provided by FLOTH. Schneider 11kV switchgear and power factor correction units were installed with four Cummins 1MVA generators. Schneider SEPAM protection relays were utilised for the project, these include: B40—11kV Bus bar protection; S40— Radial feeder protection; and G40—Generator protection. ROBSAL (Aust) Pty Ltd provided drawing reviews of the high voltage switchgear. Provided the protection logic design and settings for the protection relays, and performed site wide protection testing. ROBSAL also provided the High Voltage Isolation and Access (HVIA) procedures and switching sheets for the site wide HV system. ROBSAL provided reviews and instructions for the HV Earthing system, Energy Management System (EMS) and Building Management System (BMS). ROBSAL provided Design, FAT SAT and O&M documentation. Location EXXON MOBIL Head Office Building Port Moresby, Papua New Guinea Client EXXON MOBIL Principal Contractor Leighton PNG Contract Type Subcontract Sub Contract Value $400,000 Start/Finish Date May 2014— June 2015 Brief Description The Head office complex in port Moresby is part of the EXXON MOBIL LPNG development in the New Guinea Highlands. This Office complex houses the management and operations facilities for the PNG operations Key Personnel Robert Smith -Manager Design Jamie Garton -Manager Construction Referees Stephen Jenkins –Site Project Manager Leighton PNG +61 404 812 415 Gerry Wyman - Site Services Manager Leighton PNG +61 458 296 504 tm EXXON MOBILE HEAD OFFICE BUILDING

Transcript of EXXON MOBILE HEAD OFFICE BUILDING tm

As part of the EXXON MOBIL Head Office Building Complex three 11kV substations were installed along with four 1MVA generators and associated step up transformers. Including state of the art protection and EMS systems. The protection system is equipped with IEC61850 GOOSE messaging as part of a protection blocking scheme to assist with protection discrimination.

KBR provided the HV specification and design. The protection study was provided by FLOTH.

Schneider 11kV switchgear and power factor correction units were installed with four Cummins 1MVA generators.

Schneider SEPAM protection relays were utilised for the project, these include:B40—11kV Bus bar protection;S40— Radial feeder protection; andG40—Generator protection.

ROBSAL (Aust) Pty Ltd provided drawing reviews of the high voltage switchgear. Provided the protection logic design and settings for the protection relays, and performed site wide protection testing. ROBSAL also provided the High Voltage Isolation and Access (HVIA) procedures and switching sheets for the site wide HV system.

ROBSAL provided reviews and instructions for the HV Earthing system, Energy Management System (EMS) and Building Management System (BMS).

ROBSAL provided Design, FAT SAT and O&M documentation.

Location

EXXON MOBIL Head Office Building Port Moresby, Papua New Guinea

Client

EXXON MOBIL Principal Contractor

Leighton PNG

Contract Type

SubcontractSub Contract Value

$400,000

Start/Finish Date

May 2014— June 2015

Brief Description

The Head office complex in port Moresby is part of the EXXON MOBIL LPNG development in the New Guinea Highlands. This Office complex houses the management and operations facilities for the PNG operations

Key Personnel

Robert Smith -Manager Design Jamie Garton -Manager Construction

Referees

Stephen Jenkins –Site Project ManagerLeighton PNG +61 404 812 415

Gerry Wyman - Site Services ManagerLeighton PNG +61 458 296 504