3
02 SECOND FLOOR 115'-4" 03 THIRD FLOOR 130'-0" ROOF LEVEL 144'-8" 1 2 3 4 5 6 1 A503 2 A503 ISG-1 IG-1 IG-1 3 A503 A503 4 10'-0 1/2" 46'-10 1/2" D A602 1 A502 A301 6 1 2 3 5 5 5 5 1 2 7 9 6 4 6 4 3 13 13 3 11 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 ISG-1 ISG-1 ISG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 IG-1 IG-1 14 15 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 7 11 12 10 10 10 10 10 10 10 10 ISG-1 ISG-1 9 9 9 9 9 10 10 9 12 6 6 6 6 6 7 11 7 11 7 11 ISG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 ISG-1 ISG-1 6 6 6 6 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 ISG-1 ISG-1 6 6 6 6 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 ISG-1 ISG-1 6 6 6 6 13 13 13 13 13 13 13 3 8 3 13 TYP. STOREFRONT SYSTEM - TYPE (B) BAY 24'-0" STOREFRONT SYSTEM - TYPE (B) BAY 24'-0" STOREFRONT SYSTEM - TYPE (B) BAY 24'-0" STOREFRONT SYSTEM - TYPE (B) BAY 24'-0" EQ. EQ. EQ. EQ. EQ. EQ. 16 16 16 16 16 EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. 01 FIRST FLOOR 100'-0" 02 SECOND FLOOR 115'-4" 03 THIRD FLOOR 130'-0" ROOF LEVEL 144'-8" 8 9 10 7 11 3 A501 2 A501 46'-10 1/2" 54'-8 1/2" 40'-8" 15'-4" 14'-8" 14'-8" 1 A501 1 A603 A501 4 SPANDREL GLASS 1 2 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 6 6 6 6 13 13 3 3 13 13 IG-1 IG-1 IG-1 IG-1 6 6 ISG-1 ISG-1 7 9 4 3 13 11 8 5 ISG-1 ISG-1 ISG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 4 11 10 10 10 10 12 9 TYP. 12 9 TYP. 12 9 TYP. 3 5 ISG-1 IG-1 IG-1 ISG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 6 6 6 6 13 13 3 3 13 13 6 6 ISG-1 ISG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 3 3 6 6 6 6 13 13 3 3 13 13 IG-1 IG-1 IG-1 IG-1 6 6 ISG-1 ISG-1 ISG-1 ISG-1 ISG-1 ISG-1 14 15 IG-1 IG-1 IG-1 5 STOREFRONT SYSTEM - TYPE (A) BAY 24'-0" STOREFRONT SYSTEM - TYPE (A-1) BAY 24'-0" STOREFRONT SYSTEM - TYPE (A) BAY 24'-0" 01 FIRST FLOOR 100'-0" 02 SECOND FLOOR 115'-4" 3 3 3 5 5 5 5 14 14 14 15 01 FIRST FLOOR 100'-0" 02 SECOND FLOOR 115'-4" 03 THIRD FLOOR 130'-0" ROOF LEVEL 144'-8" H 54'-8 1/2" 10'-8" 4'-8" 3 A506 3 5 14 15 3 7 5 ISG-1 ISG-1 ISG-1 ISG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 01 FIRST FLOOR 100'-0" 02 SECOND FLOOR 115'-4" 03 THIRD FLOOR 130'-0" ROOF LEVEL 144'-8" 15'-4" 32'-2 1/2" C.9 3 5 7 9 12 14 15 EXTERIOR ELEVATIONS LEGEND GLAZING IG-1: TYPICAL INSULATED VISION GLASS ISG-1: TYPICAL INSULATED SPANDREL GLASS METAL PANEL AIP-1: ALUMINUM COMPOSITE INFILL PANEL ACP-1: ALUM. COMPOSITE PANEL FACE BRICK BR-1: FACE BRICK ALUM. STOREFRONT SYSTEM AS-1: CENTER GLAZED 2" x 4-1/2" STOREFRONT SYSTEM CURTAIN WALL SYSTEM CW-1: CENTER GLAZED 7-1/2" CURTAIN WALL SYSTEM METAL COPING MC-1: METAL COPING, MATCH FACE BRICK MC-2: METAL COPING TO MATCH CURTAIN WALL SYSTEM CANOPY FASCIA: COMPOSITE METAL PANEL SAFETY GLAZING ALL GLAZING, INCLUDING PLASTIC GLAZING SHALL MEET ALL APPLICABLE CODES AND REGULATIONS AS A MINIMUM ALL GLAZING AT THE FOLLOWING LOCATION SHALL BE SAFETY GLAZING: DOORS- GLAZING IN DOORS (SWINGING, SLIDING, STORM, OR OTHER, EXCEPT CURVED GLAZING AT REVOLVING DOORS) SIDELIGHTS- GLAZING IN SIDELIGHT ADJACENT TO A DOOR ADJACENT TO DOORS- ALL GLAZING WITHIN 24" OF A CLOSED DOOR IF THE GLAZING IS WITHIN 60" OF THE FLOOR MEASURED VERTICALLY WALKING SURFACE- GLAZING GREATER THAN 9 SQUARE FEET IN AREA IF THE BOTTOM OF THE GLAZING IS LESS THAN 18" AFF, AND THE TOP OF THE GLAZING IS MORE THAN 36" AFF, AND THERE IS A WALKING SURFACE WITHIN 36" OF THE GLAZING MEASURED HORIZONTALLY. STAIRS AND RAMPS- GLAZING WITHIN 36" HORIZONTALLY OF A STAIR TREAD, LANDING, OR RAMP IF THE GLAZING IS WITHIN 60" VERTICALLY OF THE STANDING SURFACE DIRECTLY BELOW. BOTTOM OF STAIRS- GLAZING WITHIN 60" HORIZONTALLY OF THE BOTTOM STAIR TREAD IF THE GLAZING IS LESS THAN 60" VERTICALLY FROM THE NOSING UNLESS THERE IS A GUARD BETWEEN THE TREAD AND THE GLAZING, AND THE GLAZING IS MORE THAN 18" HORIZONTALLY FROM THE RAILING. MIRRORS- GLAZING AT MIRRORS WITHOUT CONTINUOUS BACKING EXTERIOR ELEVATIONS CODED NOTES: 1. MECHANICAL EQUIPMENT 2. MECHANICAL UNIT SCREEN WALL 3. ALUMINUM COMPOSITE PANEL (ACP-1) 4. ALUMINUM COMPOSITE INFILL PANEL (AIP-1) 5. CURTAIN WALL SYSTEM (CW-1) 6. ALUMINUM STOREFRONT WINDOW SYSTEM (AS-1) 7. METAL COPING (MC-1) 8. METAL COPING (MC-2) 9. FACE BRICK, (BR-1), TYPICAL 10. CONTROL JOINT 11. BRICK SOLDIER (2 COURSES) 12. RECESS BRICK (TYPICAL) 13. METAL PANEL REVEAL 14. METAL PANEL CANOPY COLUMN ENCLOSURE 15. METAL PANEL CANOPY FASCIA 16. ALIGN 17. HM DOOR & FRAME PAINT TO MATCH BRICK EXTERIOR ELEVATIONS GENERAL NOTES: A. ALL METAL (MECHANICAL SCREEN WALL, CURTAINWALL SYSTEM, STOREFRONT SYSTEM & ALUMINUM COMPOSITE PANELS) TO MATCH ANDBE A CUSTOM COLOR. B. PROVIDE SAFETY GLASS AT ALL REQUIRED LOCATIONS PER 2011 OBC SECTION 2404 (REFER TO FAFETY GLAXING NOTES THIS SHEET) 01 FIRST FLOOR 100'-0" 02 SECOND FLOOR 115'-4" 24'-0" ALIGN T.O. REVEAL W/ T.O. MULLION CENTER T.O. MULLION W/ REVEAL CENTER T.O. MULLION W/ REVEAL CENTER T.O. MULLION W/ REVEAL CENTER T.O. MULLION W/ REVEAL CENTER T.O. MULLION W/ REVEAL EQ. EQ. 1'-0" EQ. EQ. CENTER REVEAL W/ MULLION 2012 Moody/Nolan Inc. C Key Plan for Dwg. Coord.: Tech. Coord.: PRINT DATE: FILE INFO: Phone: (614) 461-4664 Fax: (614) 280-8881 www.moodynolan.com 300 Spruce Street Suite 300 Columbus, Ohio 43215 PROGRESS DRAWING NOT FOR CONSTRUCTION AREA A AREA B 12/30/2013 9:26:08 AM C:\Local Revit Projects\2014 Projects\13464 Daimler - OU Dublin_CRutkowski.rvt A301 Proj. # 13464 The Daimler Group Author Checker Post Road, Dublin Ohio 43016 Exterior Elevations Ohio University Dublin Campus Phase I Core & Shell Package 12-23-2013 Progress Set ELEVATION 1/8" = 1'-0" 1 Elevation @ Front Entry 1 ELEVATION 1/8" = 1'-0" 2 Elevation @ Front Entry- Area B 2 ELEVATION 1/4" = 1'-0" 3 Entry Vestibule ELEVATION 1/8" = 1'-0" 4 Elevation 2 - d ELEVATION 1/8" = 1'-0" 5 Elevation 7 - d 3 4 5 ELEVATION 1/4" = 1'-0" 6 STOREFRONT SYSTEM TYPICAL TYPE (B) BAY IG-1 IG-1 IG-1 IG-1 IG-1 IG-1 # Date Change Description

Transcript of EXTERIOR ELEVATIONS LEGEND NOTES - Dublin,...

Page 1: EXTERIOR ELEVATIONS LEGEND NOTES - Dublin, Ohiodublinohiousa.gov/dev/dev/wp-content/uploads/2014/... · exterior elevations general notes: a. all metal (mechanical screen wall, curtainwall

02 SECOND FLOOR115'-4"

03 THIRD FLOOR130'-0"

ROOF LEVEL144'-8"

1 2 3 4 5 61

A503

2A503

ISG-1

IG-1

IG-1

3A503

A5034

10'-0

1/2

"

46'-1

0 1/

2"

DA602

1A502

A3016

1

2

3

5

55

5

1

2

7

9

6

4

6

4

3

13

13

3

11

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

ISG-1ISG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

33

IG-1IG-1

14

15

IG-1

IG-1

IG-1IG-1IG-1

IG-1

IG-1IG-1

IG-1 IG-1

IG-1IG-1

IG-1 IG-1

33

7

11

12

101010101010 1010

ISG-1ISG-1

9

9999

10

10

9

12

6

6

6

6

6

7117 117 11

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1IG-1

IG-1 IG-1

IG-1IG-1

IG-1 IG-1

33

ISG-1ISG-1

6

6

6

6

IG-1IG-1

IG-1 IG-1

IG-1IG-1

IG-1 IG-1

33

ISG-1ISG-1

6

6

6

6

IG-1IG-1

IG-1 IG-1

IG-1IG-1

IG-1 IG-1

33

ISG-1ISG-1

6

6

6

6

13131313131313

3

8

3

13

TYP.

STOREFRONT SYSTEM - TYPE (B) BAY24'-0"

STOREFRONT SYSTEM - TYPE (B) BAY24'-0"

STOREFRONT SYSTEM - TYPE (B) BAY24'-0"

STOREFRONT SYSTEM - TYPE (B) BAY24'-0"

EQ. EQ. EQ. EQ. EQ. EQ.

16 16 1616

16

EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ

EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ.

01 FIRST FLOOR100'-0"

02 SECOND FLOOR115'-4"

03 THIRD FLOOR130'-0"

ROOF LEVEL144'-8"

8 9 107 11

3A501

2A501

46'-1

0 1/

2"

54'-8

1/2

"

40'-8

"

15'-4

"14

'-8"

14'-8

"

1A501

1A603

A5014

SPANDREL GLASS

1

2

IG-1IG-1

IG-1 IG-1

IG-1IG-1

IG-1 IG-1

33

6

6

6

6

1313

33

1313

IG-1IG-1

IG-1 IG-166

ISG-1ISG-1

7

9

4

3

13

11

8

5

ISG-1

ISG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

4 11

10

10

10

10

12

9

TYP.12

9

TYP.12

9

TYP.

3

5

ISG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

IG-1IG-1

IG-1 IG-1

IG-1IG-1

IG-1 IG-1

33

6

6

6

6

1313

33

1313

66

ISG-1ISG-1

IG-1IG-1

IG-1 IG-1

IG-1IG-1

IG-1 IG-1

33

6

6

6

6

1313

33

1313

IG-1IG-1

IG-1 IG-166

ISG-1ISG-1

ISG-1

ISG-1ISG-1

ISG-114

15

IG-1

IG-1IG-1

5

STOREFRONT SYSTEM - TYPE (A) BAY24'-0"

STOREFRONT SYSTEM - TYPE (A-1) BAY24'-0"

STOREFRONT SYSTEM - TYPE (A) BAY24'-0"

01 FIRST FLOOR100'-0"

02 SECOND FLOOR115'-4"

3

33

5

55 5

14

1414

15

01 FIRST FLOOR100'-0"

02 SECOND FLOOR115'-4"

03 THIRD FLOOR130'-0"

ROOF LEVEL144'-8"

H

54'-8

1/2

"

10'-8

"4'

-8"

3A506

3

5

14

15

3

7

5

ISG-1

ISG-1

ISG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-101 FIRST FLOOR

100'-0"

02 SECOND FLOOR115'-4"

03 THIRD FLOOR130'-0"

ROOF LEVEL144'-8"

15'-4

"

32'-2

1/2

"

6.106.116.126.136.15C.9

3

5

7

9

12

14

15

EXTERIOR ELEVATIONS LEGEND

GLAZING

IG-1: TYPICAL INSULATED VISION GLASSISG-1: TYPICAL INSULATED SPANDREL GLASS

METAL PANEL

AIP-1: ALUMINUM COMPOSITE INFILL PANELACP-1: ALUM. COMPOSITE PANEL

FACE BRICK

BR-1: FACE BRICK

ALUM. STOREFRONT SYSTEM

AS-1: CENTER GLAZED 2" x 4-1/2" STOREFRONT SYSTEM

CURTAIN WALL SYSTEM

CW-1: CENTER GLAZED 7-1/2" CURTAIN WALL SYSTEM

METAL COPING

MC-1: METAL COPING, MATCH FACE BRICKMC-2: METAL COPING TO MATCH CURTAIN WALL SYSTEM

CANOPY FASCIA: COMPOSITE METAL PANEL

SAFETY GLAZING

ALL GLAZING, INCLUDING PLASTIC GLAZING SHALL MEET ALL APPLICABLECODES AND REGULATIONS

AS A MINIMUM ALL GLAZING AT THE FOLLOWING LOCATION SHALL BE SAFETYGLAZING:

DOORS- GLAZING IN DOORS (SWINGING, SLIDING, STORM, OR OTHER, EXCEPTCURVED GLAZING AT REVOLVING DOORS)

SIDELIGHTS- GLAZING IN SIDELIGHT ADJACENT TO A DOOR

ADJACENT TO DOORS- ALL GLAZING WITHIN 24" OF A CLOSED DOOR IF THEGLAZING IS WITHIN 60" OF THE FLOOR MEASURED VERTICALLY

WALKING SURFACE- GLAZING GREATER THAN 9 SQUARE FEET IN AREA IF THEBOTTOM OF THE GLAZING IS LESS THAN 18" AFF, AND THE TOP OF THE GLAZINGIS MORE THAN 36" AFF, AND THERE IS A WALKING SURFACE WITHIN 36" OF THEGLAZING MEASURED HORIZONTALLY.

STAIRS AND RAMPS- GLAZING WITHIN 36" HORIZONTALLY OF A STAIR TREAD,LANDING, OR RAMP IF THE GLAZING IS WITHIN 60" VERTICALLY OF THESTANDING SURFACE DIRECTLY BELOW.

BOTTOM OF STAIRS- GLAZING WITHIN 60" HORIZONTALLY OF THE BOTTOM STAIRTREAD IF THE GLAZING IS LESS THAN 60" VERTICALLY FROM THE NOSINGUNLESS THERE IS A GUARD BETWEEN THE TREAD AND THE GLAZING, AND THEGLAZING IS MORE THAN 18" HORIZONTALLY FROM THE RAILING.

MIRRORS- GLAZING AT MIRRORS WITHOUT CONTINUOUS BACKING

EXTERIOR ELEVATIONS CODEDNOTES:1. MECHANICAL EQUIPMENT2. MECHANICAL UNIT SCREEN WALL3. ALUMINUM COMPOSITE PANEL (ACP-1)4. ALUMINUM COMPOSITE INFILL PANEL (AIP-1)5. CURTAIN WALL SYSTEM (CW-1)6. ALUMINUM STOREFRONT WINDOW SYSTEM (AS-1)7. METAL COPING (MC-1)8. METAL COPING (MC-2)9. FACE BRICK, (BR-1), TYPICAL10. CONTROL JOINT11. BRICK SOLDIER (2 COURSES)12. RECESS BRICK (TYPICAL)13. METAL PANEL REVEAL14. METAL PANEL CANOPY COLUMN ENCLOSURE15. METAL PANEL CANOPY FASCIA16. ALIGN17. HM DOOR & FRAME PAINT TO MATCH BRICK

EXTERIOR ELEVATIONS GENERALNOTES:A. ALL METAL (MECHANICAL SCREEN WALL, CURTAINWALL SYSTEM,STOREFRONT SYSTEM & ALUMINUM COMPOSITE PANELS) TO MATCHANDBE A CUSTOM COLOR.

B. PROVIDE SAFETY GLASS AT ALL REQUIRED LOCATIONS PER 2011 OBCSECTION 2404 (REFER TO FAFETY GLAXING NOTES THIS SHEET)

01 FIRST FLOOR100'-0"

02 SECOND FLOOR115'-4"

24'-0"

ALIGN T.O. REVEALW/ T.O. MULLION

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

EQ. EQ. 1'-0" EQ. EQ.

CENTER REVEALW/ MULLION

2012

Moo

dy/N

olan

Inc.

C

Key Plan

for

Dwg. Coord.: Tech. Coord.:

PRIN

T DA

T E:

FILE

INFO

:

Phone: (614) 461-4664Fax: (614) 280-8881www.moodynolan.com

300 Spruce StreetSuite 300Columbus, Ohio 43215

PROGRESSDRAWINGNOT FOR

CONSTRUCTION

AREA A

AREA B

12/3

0/20

13 9

:26:

08 A

MC

:\Loc

al R

evit

Proj

ects

\201

4 Pr

ojec

ts\1

3464

Dai

mle

r - O

U D

ublin

_CR

utko

wsk

i.rvt

A301Proj. # 13464

The Daimler Group

Author Checker

Post Road, Dublin Ohio 43016

Exterior Elevations

Ohio UniversityDublin Campus Phase ICore & Shell Package

12-23-2013Progress Set

ELEVATION 1/8" = 1'-0"1 Elevation @ Front Entry

1

ELEVATION 1/8" = 1'-0"2 Elevation @ Front Entry- Area B

2

ELEVATION 1/4" = 1'-0"3 Entry Vestibule ELEVATION

1/8" = 1'-0"4 Elevation 2 - dELEVATION 1/8" = 1'-0"5 Elevation 7 - d

3

45

ELEVATION 1/4" = 1'-0"6 STOREFRONT SYSTEM TYPICAL TYPE (B) BAY

IG-1

IG-1 IG-1

IG-1

IG-1IG-1

# Date Change Description

Page 2: EXTERIOR ELEVATIONS LEGEND NOTES - Dublin, Ohiodublinohiousa.gov/dev/dev/wp-content/uploads/2014/... · exterior elevations general notes: a. all metal (mechanical screen wall, curtainwall

FACE BRICK(MATCHBUILDING)

LIMESTONECAP

GRADE

CONCRETEFOOTING

3"X3" STEELGATEWELDED FRAME

METAL DECKING(PAINTED)

3" DIAMCASTERS

FACEBRICK

CONCRETEFOOTING

LIMESTONECAP

6" STEEL GATEPOST

GATE PULL as MANUFBY LAWRENCE BROS (NO.209)

3'-6" LONG 3/4" SOLID STEELBAR w/ SLEEVE FOR CANE BOLT

SLEEVE SET INTOCONCRETE

0 1 2 8SCALE 1/4" = 1'-0" 4

0 1 2 8SCALE 1/4" = 1'-0" 4

ELEVATION FRONT ELEVATIONTRASH ENCLOSURE

ELEVATION REAR (SIDE SIMILAR)TRASH ENCLOSURE

A

B

8'-0

"8'-0

"

15'-4"

H G F E

46'-1

0 1/

2"42

'-2"

15'-4

"

54'-8

1/2

"

3A506

G4

1717

1

2

78

3

9

3

5

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

5

ISG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

10

10

12 TYP.

5

IG-1

IG-1

IG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

STOREFRONT SYSTEM TYPICAL TYPE (A) BAY24'-0"

ISG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

ISG-1

ISG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

ISG-1

7

9118

3

5

53

15

14

912TYP.

9

12TYP.

912TYP.

3

8910 711

42'-2

"

8A506

STOREFRONT SYSTEM - TYPE (A) BAY24'-0"

STOREFRONT SYSTEM - TYPE (A) BAY24'-0"

STOREFRONT SYSTEM - TYPE (A-2) BAY24'-0"

7

8

3

5

IG-1

IG-1

ISG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

9

12 TYP.

10

11

7

10

11

7

10

11

7

6

6

6

6

6

6

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

ISG-1

3

3

4

4

4

13

13

7

8

3

3

5

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

8

11

EQ EQ EQ

A B C D54

'-8 1

/2"

1A504

2A504

A5044

3A504

C.4

2

89

3

10

15

14

5

8

12

10

17

EQEQEQEQEQEQ

EQEQEQEQ

3

EQEQEQEQEQEQ

8

3

7

9

5

ISG-1

ISG-1

ISG-1

ISG-1

ISG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

6IG-1

IG-1

6IG-1

IG-19

12

10

3

12

9

TYP.

01 FIRST FLOOR100'-0"

02 SECOND FLOOR115'-4"

03 THIRD FLOOR130'-0"

ROOF LEVEL144'-8"

12345

46'-1

0 1/

2"

5A506

2A504

SIM

2A501

TYP3

A501

SIMA3026

10

10

9

12

3

8

3

5

TYP.6

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

ISG-1

ISG-1

16 16 16 16

EQEQEQEQEQ

113

7

10

117

10

8

7

13

STOREFRONT SYSTEM TYPICAL TYPE (A) BAY24'-0"

STOREFRONT SYSTEM TYPICAL TYPE (A) BAY24'-0"

STOREFRONT SYSTEM TYPICAL TYPE (A) BAY24'-0"

EQEQEQEQEQ

9

5

IG-1

IG-1

ISG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

12

01 FIRST FLOOR100'-0"

02 SECOND FLOOR115'-4"

03 THIRD FLOOR130'-0"

ROOF LEVEL144'-8"

4

ALIGN T.O. REVEALW/ T.O. MULLION

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER REVEALW/ MULLION

24'-0"

EQ.EQ.1'-0"EQ.EQ.

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

CENTER T.O. MULLIONW/ REVEAL

6 6

6

66

6

OF MULLION OF MULLION

EXTERIOR ELEVATIONS LEGEND

GLAZING

IG-1: TYPICAL INSULATED VISION GLASSISG-1: TYPICAL INSULATED SPANDREL GLASS

METAL PANEL

AIP-1: ALUMINUM COMPOSITE INFILL PANELACP-1: ALUM. COMPOSITE PANEL

FACE BRICK

BR-1: FACE BRICK

ALUM. STOREFRONT SYSTEM

AS-1: CENTER GLAZED 2" x 4-1/2" STOREFRONT SYSTEM

CURTAIN WALL SYSTEM

CW-1: CENTER GLAZED 7-1/2" CURTAIN WALL SYSTEM

METAL COPING

MC-1: METAL COPING, MATCH FACE BRICKMC-2: METAL COPING TO MATCH CURTAIN WALL SYSTEM

CANOPY FASCIA: COMPOSITE METAL PANEL

SAFETY GLAZING

ALL GLAZING, INCLUDING PLASTIC GLAZING SHALL MEET ALL APPLICABLECODES AND REGULATIONS

AS A MINIMUM ALL GLAZING AT THE FOLLOWING LOCATION SHALL BE SAFETYGLAZING:

DOORS- GLAZING IN DOORS (SWINGING, SLIDING, STORM, OR OTHER, EXCEPTCURVED GLAZING AT REVOLVING DOORS)

SIDELIGHTS- GLAZING IN SIDELIGHT ADJACENT TO A DOOR

ADJACENT TO DOORS- ALL GLAZING WITHIN 24" OF A CLOSED DOOR IF THEGLAZING IS WITHIN 60" OF THE FLOOR MEASURED VERTICALLY

WALKING SURFACE- GLAZING GREATER THAN 9 SQUARE FEET IN AREA IF THEBOTTOM OF THE GLAZING IS LESS THAN 18" AFF, AND THE TOP OF THE GLAZINGIS MORE THAN 36" AFF, AND THERE IS A WALKING SURFACE WITHIN 36" OF THEGLAZING MEASURED HORIZONTALLY.

STAIRS AND RAMPS- GLAZING WITHIN 36" HORIZONTALLY OF A STAIR TREAD,LANDING, OR RAMP IF THE GLAZING IS WITHIN 60" VERTICALLY OF THESTANDING SURFACE DIRECTLY BELOW.

BOTTOM OF STAIRS- GLAZING WITHIN 60" HORIZONTALLY OF THE BOTTOM STAIRTREAD IF THE GLAZING IS LESS THAN 60" VERTICALLY FROM THE NOSINGUNLESS THERE IS A GUARD BETWEEN THE TREAD AND THE GLAZING, AND THEGLAZING IS MORE THAN 18" HORIZONTALLY FROM THE RAILING.

MIRRORS- GLAZING AT MIRRORS WITHOUT CONTINUOUS BACKING

EXTERIOR ELEVATIONS CODEDNOTES:1. MECHANICAL EQUIPMENT2. MECHANICAL UNIT SCREEN WALL3. ALUMINUM COMPOSITE PANEL (ACP-1)4. ALUMINUM COMPOSITE INFILL PANEL (AIP-1)5. CURTAIN WALL SYSTEM (CW-1)6. ALUMINUM STOREFRONT WINDOW SYSTEM (AS-1)7. METAL COPING (MC-1)8. METAL COPING (MC-2)9. FACE BRICK, (BR-1), TYPICAL10. CONTROL JOINT11. BRICK SOLDIER (2 COURSES)12. RECESS BRICK (TYPICAL)13. METAL PANEL REVEAL14. METAL PANEL CANOPY COLUMN ENCLOSURE15. METAL PANEL CANOPY FASCIA16. ALIGN17. HM DOOR & FRAME PAINT TO MATCH BRICK

EXTERIOR ELEVATIONS GENERALNOTES:A. ALL METAL (MECHANICAL SCREEN WALL, CURTAINWALL SYSTEM,STOREFRONT SYSTEM & ALUMINUM COMPOSITE PANELS) TO MATCHANDBE A CUSTOM COLOR.

B. PROVIDE SAFETY GLASS AT ALL REQUIRED LOCATIONS PER 2011 OBCSECTION 2404 (REFER TO FAFETY GLAXING NOTES THIS SHEET)

2012

Moo

dy/N

olan

Inc.

C

Key Plan

for

Dwg. Coord.: Tech. Coord.:

PRIN

T DA

T E:

FILE

INFO

:

Phone: (614) 461-4664Fax: (614) 280-8881www.moodynolan.com

300 Spruce StreetSuite 300Columbus, Ohio 43215

PROGRESSDRAWINGNOT FOR

CONSTRUCTION

AREA A

AREA B

12/3

0/20

13 9

:26:

19 A

MC

:\Loc

al R

evit

Proj

ects

\201

4 Pr

ojec

ts\1

3464

Dai

mle

r - O

U D

ublin

_CR

utko

wsk

i.rvt

A302Proj. # 13464

Exterior Elevations

The Daimler Group

Author Checker

Post Road, Dublin Ohio 43016

Ohio UniversityDublin Campus Phase ICore & Shell Package

12-23-2013Progress Set

ELEVATION 1/8" = 1'-0"3 EASTELEVATION

1/8" = 1'-0"1 NORTH (EAST END)

ELEVATION 1/8" = 1'-0"4 WEST

3

1

2

ELEVATION 1/8" = 1'-0"2 NORTH (WEST END)

ELEVATION 1/4" = 1'-0"5 DUMPSTER ELEVATION

1/4" = 1'-0"6 STOREFRONT SYSTEM TYPICAL TYPE (A) BAY

11

7

33

33

13

13

IG-1

IG-1

4

IG-1

IG-1

IG-1

IG-1

ISG-1

IG-1

IG-1

IG-1

IG-1

IG-1

IG-1

ISG-1

10

# Date Change Description

1616

5

Page 3: EXTERIOR ELEVATIONS LEGEND NOTES - Dublin, Ohiodublinohiousa.gov/dev/dev/wp-content/uploads/2014/... · exterior elevations general notes: a. all metal (mechanical screen wall, curtainwall