Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC...

32
DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater Mountable DP Thrusters: New Unique Advantages of Gearless Azipod DZ Kimmo Kokkila ABB Marine

Transcript of Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC...

Page 1: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

DYNAMIC POSITIONING CONFERENCE October 11-12, 2016

THRUSTERS

Extending the Limits of Underwater MountableDP Thrusters:

New Unique Advantages of Gearless Azipod DZ

Kimmo Kokkila

ABB Marine

Page 2: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 1 3AFV6088515 A

© ABBSlide 1 3AFV6088515 A

Extending the limits of UW mountable thrusters: New unique advantages of gearless Azipod DZ

Kimmo Kokkila, Product Manager, 2016

Photo: AP/Gerald Herbert

Page 3: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 2 3AFV6088515 A

© ABBSlide 2 3AFV6088515 A

Azipod® – gearless thruster familyPower range 2…22 MW

Page 4: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 3 3AFV6088515 A

© ABBSlide 3 3AFV6088515 A

Azipod® – gearless thrusterReferences from all vessel segments

Page 5: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 4 3AFV6088515 A

© ABBSlide 4 3AFV6088515 A

Azipod® – gearless thrusterExperience

25 years5,000 megawatts

12 million operation hours

Page 6: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 5 3AFV6088515 A

© ABBSlide 5 3AFV6088515 A

Azipod® – gearless thrusterAzipod® Global Service

Azipod factory or service workshop

ABB Marine Service Center

Azipod Global Service headcount: >100 persons

>50 % of Azipod installed base covered by maintenance agreements

Global 24/7 Technical Support

Remote Diagnostic Services (RDS) available

Page 7: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 6 3AFV6088515 A

© ABBSlide 6 3AFV6088515 A

Azipod® – gearless thrusterAzipod® D product series

Open (DO) and

ducted (DZ) propellersPower range 1.5…7.5

MW

Page 8: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 7 3AFV6088515 A

© ABBSlide 7 3AFV6088515 A

Azipod® – gearless thrusterAzipod® family

Azipod® C Azipod® D Azipod® X Azipod® V

Power (MW) 1.5 – 4.7 1.5 – 7.5 7 – 22 6 – 17

Max ice class 1A 1AS / PC5 1AS PC1

Max thrust 93 t 130 t - -

Page 9: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 8 3AFV6088515 A

© ABBSlide 8 3AFV6088515 A

Azipod® – gearless thrusterAzipod® DZ series

Page 10: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 9 3AFV6088515 A

© ABBSlide 9 3AFV6088515 A

Azipod® – gearless thrusterAzipod® DZ series

Azipod DZ

Frame size Max power

980 2.4 MW1100 3.1 MW1250 4.2 MW1400 5.5 MW1600 7.5 MW

Page 11: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 10 3AFV6088515 A

© ABBSlide 10 3AFV6088515 A

More power, thrust and efficiency:better performance for vessel

Page 12: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 11 3AFV6088515 A

© ABBSlide 11 3AFV6088515 A

Azipod® – gearless thrusterAzipod® DZ series

Page 13: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 12 3AFV6088515 A

© ABBSlide 12 3AFV6088515 A

Azipod® – gearless thrusterAzipod® DZ series

Page 14: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 13 3AFV6088515 A

© ABBSlide 13 3AFV6088515 A

Domeless under-water mounting solution:saves space and time

Page 15: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 14 3AFV6088515 A

© ABBSlide 14 3AFV6088515 A

Under-water mountingDomeless UW mounting solution

Page 16: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 15 3AFV6088515 A

© ABBSlide 15 3AFV6088515 A

Under-water mounting

Whole thruster (Propulsor + Steering Module) assembled

as a single unit in factory

Traditional solution uses large domes

Page 17: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 16 3AFV6088515 A

© ABBSlide 16 3AFV6088515 A

Under-water mounting

Six small flanges instead of

large domesSteering Module pre-installed

and permanently connected to vessel systemsFast connections between

Propulsor and Steering ModuleOnly Propulsor changed UW –

less lifting capacity needed!Faster change-out and less

space needed onboard

Domeless UW mounting solution

Page 18: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 17 3AFV6088515 A

© ABBSlide 17 3AFV6088515 A

Under-water mountingDomeless UW mounting solution

Page 19: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 18 3AFV6088515 A

© ABBSlide 18 3AFV6088515 A

Under-water mounting

Save space onboard

(no storing of large domes)Light flanges are faster

& safer to handleLow weight for

outboard propulsor part – less lifting/crane capacity needed

Domeless UW mounting solution

Page 20: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 19 3AFV6088515 A

© ABBSlide 19 3AFV6088515 A

New patented bearing condition algorithm:Increase uptime

Page 21: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 20 3AFV6088515 A

© ABBSlide 20 3AFV6088515 A

Azipod® – gearless thrusterESPD bearing condition monitoring

ABB have extensive knowledge of

large thruster bearingsPatented bearing health monitoring

algorithm: Early Shock Pulse Detection (ESPD)Indicates start of raceway surface

crack earlier than any other system currently available in the market for large bearingsOriginally developed for 14…22 MW

Azipod units, but benefits also Azipod D power range (up to 7.5 MW)Reduces risk of unplanned

maintenance!

Page 22: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 21 3AFV6088515 A

© ABBSlide 21 3AFV6088515 A

Azipod® – gearless thrusterESPD bearing condition monitoring

Page 23: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 22 3AFV6088515 A

© ABBSlide 22 3AFV6088515 A

Azipod® – gearless thrusterESPD bearing condition monitoring

More time to react and plan for the

best mitigating action for defectsBalancing operation power for the

defected thruster reduces the further development of a bearing defectImproves likelihood to continue

the operation till scheduled maintenance to the thruster can be performedBetter knowledge to make

decision of bearing maintenance interval

Page 24: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 23 3AFV6088515 A

© ABBSlide 23 3AFV6088515 A

Azipod D reference projects

Page 25: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 24 3AFV6088515 A

© ABBSlide 24 3AFV6088515 A

Azipod® – gearless thrusterAzipod® D series

Frame size Azipod DZ Azipod DO

980 2.4 MW 2.5 MW

1100 3.1 MW 3.3 MW

1250 4.2 MW 4.8 MW

1400 5.5 MW 5.5 MW

1600 7.5 MW 7.5 MW

Page 26: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 25 3AFV6088515 A

© ABBSlide 25 3AFV6088515 A

Azipod® D referencesOffshore vessels, deliveries 2017-2018

x 2 vessels

2 x 4.2MWAzipod DZ1250P

Page 27: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 26 3AFV6088515 A

© ABBSlide 26 3AFV6088515 A

Azipod® D referencesMultipurpose vessels, deliveries 2018

x 3 vessels

2 x 4.2MWAzipod DZ1250P

Page 28: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 27 3AFV6088515 A

© ABBSlide 27 3AFV6088515 A

Azipod® D referencesLuxury discovery yacht, delivery 2018

2 x 3 MWAzipod DO1250A-PC6

Page 29: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 28 3AFV6088515 A

© ABBSlide 28 3AFV6088515 A

Summary

Page 30: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 29 3AFV6088515 A

© ABBSlide 29 3AFV6088515 A

Faster, safer, lighter domeless UW mounting

25 years and 5 GW of experience with Azipod

Tailorable dimensions

Extending the limits of UW mountable DP thrustersNew unique advantages of Azipod DZ

7.5 MW and 130 tonnes

Early warning bearing condition monitoring

Page 31: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater

© ABBSlide 30 3AFV6088515 A

© ABBSlide 30 3AFV6088515 A

Questions..?

Azipod® DZ

Thank you!

Page 32: Extending the Limits of Underwater Mountable DP Thrusters: New … · 2016-11-18 · DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 THRUSTERS Extending the Limits of Underwater