architecture  302_2  bicycle  shelter

Page 2: Explorations of OSB

design  brief 01

Site:  Students  were  free  to  choose  a  site  around  the  North  Carolina  State  University  campus  or  Raleigh.  If  the  site  was  not  on  campus,  transportation  for  the  shelter  would  have  to  be  considered.

Objective:  Create  a  bike  rack  and/or  shelter  that  improves  the  quantity  and  quality  of  available  bike  parking  in  Raleigh  or  on  campus.  For  the  shelter  students  were  asked  to  consider  weather  and  theft  protection  for  bikes,  but  also  the  bike  shelter’s  contribution  to  the  built  environment  which  included  overall  aesthetics,  ease  of  use  and  space  consumption.  It  was  desired  that  the  bike  shelter  provide  added  amenities  to  the  community  such  as  seating  and  shade.

Schedule  and  Budget:  The  project  needed  to  be  complete  by  Monday,  April  25th  and  needed  to  be  on  a  budget  of  around  $50  per  person  for  the  group  of  8  ($400).

Organization:  Students  were  allowed  to  develop  multiple  designs  individually  or  in  small  teams.  At  a  mid-­project  meeting  students  voted  on  a  few  alternatives  to  mock  up  at  full  scale.

Page 3: Explorations of OSB

project  teams

ownerDavid  Benson

designMia  MulicMatt  KellyTyler  Shannon

construction  1David  BensonSara  MarleyEthan  Sitver

construction  2Michael  HobgoodScott  Nelsen

02

Page 4: Explorations of OSB

project  schedule

04/01/11 04/04/11 04/06/11 04/08/11 04/11/11 04/13/11 04/15/11 04/18/11 04/20/11 04/22/11 04/25/11

DESIGN DESIGN

RESEARCH BID  PREPARATION FABRICATION  AND  ASSEMBLY

ADDENDUM PREPARATION  OF  FINAL  DRAWINGS drafts  due

structure  complete

list  of  changes

punch  listCONSTRUCTION

03

Page 5: Explorations of OSB

design  team

Page 6: Explorations of OSB

project  options

01

02

Michael  Hobgood  &  Tyler  Shannon

03Mia  Mulic  &  Ethan  Sitver

Emily  Faber  &  Heidi  Northcutt

05

Page 7: Explorations of OSB

working  drawingsside  elevation

7’-­10”  ABOVE  GRADE

6’-­6”  ABOVE  GRADE

1’-­6”  ABOVE  GRADE

REFER  TO  DETAIL  ON  SHEET  A2  FOR  CONTSTRUCTION  OF  THIS  12’-­0”  MEMBER

06

Page 8: Explorations of OSB

working  drawingsbench  elevation

07

Page 9: Explorations of OSB

working  drawingsplan

08

Page 10: Explorations of OSB

working  drawingsassembly  detail

09

6”x.5”x8’  OSB

6”x.5”x8’  OSB

BOLTED  CONNECTION

TRHEADED  ROD

Page 11: Explorations of OSB

renderings 10

Page 12: Explorations of OSB

renderings 11

Page 13: Explorations of OSB

constructionteam

Page 14: Explorations of OSB

initial  bids 13

Bike  Shelter  Cost  EstimateUnit Item Quantity Quantity TotalPrice Size per  Unit Required Price

STR.  MEMBERS

Material:

OSB  Sheet 6.87 7/16”  x  4'  x  8' 4 75 128.81Subtotal 128.81

Hardware:

#44610  Threaded  Rod 9.06 1/2”  x  6' 1 16 144.96Loctite® 8.00 -­ 1 1 8.00#63449  Washers  (Galv) 0.28 1/2” 1 270 75.60#67342  Hex  Nuts  (Galv) 0.30 1/2” 1 270 81.00#135536  Washers  (Stainless) 1.09 1/2” 3 270 98.10#135639  Hex  Nuts  (Stainless) 1.09 1/2” 2 270 147.15Subtotal 309.56

ROOF  +  ATCHMTS.

Material:

#12473  Galv.  Steel 12.10 24”  x  8' 1 7 84.70#12540  Alum.  Flashing 16.98 20”  x  10' 1 5 84.90#HD82967  Lattice  (Plastic) 25.97 1/2”  x  4'  x  8' 1 4 103.88#HD54137  Lattice  (Wood) 11.97 1/2”  x  4'  x  8' 1 4 47.88#12779  Ondura 20.91 48”  x  79” 1 4 83.64#77000  Polycarb. 31.90 26”  x  12' 1 5 159.50#HD5189903  Vinyl  Tiles 32.85 12”  x  12”  x  1/8” 45 135 98.55Subtotal 84.70

Hardware:

#102893  Steel  Angle  (Galv.) 2.77 2-­1/2”  x  5/8” 2 24 33.24Bolts  (Stainless) 1.09 1/4” 2 48 26.16Hex  Nuts  (Stainless) 0.97 1/4” 5 96 18.62Washers  (Stainless) 0.97 1/4” 5 72 13.97Washers  (Rubber) 0.92 1/4”  x  1/2”  x  1/16” 1 48 44.16Subtotal 136.15

MISCELLANEOUS

Material:

Bench  Boards  (?) 4.00 2  x  4  x  10” 1 4 16.00Cross  Bracing  (?) 15.00 -­ 1 1 15.00Subtotal 31

Net  Total 690.2245Tax 48.315715

Total 738.54

Page 15: Explorations of OSB

construction  photos 14

Page 16: Explorations of OSB

construction  photos 15

Page 17: Explorations of OSB

construction  photos 16

Page 18: Explorations of OSB

construction  photos 17

Page 19: Explorations of OSB

construction  photos 18

Page 20: Explorations of OSB

construction  cost  &  final  product

Page 21: Explorations of OSB

20

STRUCTURAL  MEMBERS

Material:

00.000.003200.0teehS  BSO 0.00 -­075114013444  10FT  ROD  <A> 6.57 1 0 6.57 0.51 7.08 MIKE611942039494  DWV  PIPE<A> 6.17 3 0 18.51 1.43 19.94 MATT032053101052  WATERSEAL  <A> 44.96 1 0 44.96 3.48 48.44 MATT075114013444  10FT  ROD  <A> 6.57 9 1 52.56 4.07 56.63 DAVIDSubtotal 132.10

Hardware:

655554  CUTWSHR  1/4”  <A> 0.11 12 0 1.32 0.10 1.42 MIKE655414  HEXNUTUSS  <A> 0.06 7 0 0.42 0.03 0.45 MIKE030699080748  COMBO  PACK  <A> 4.50 1 0 4.50 0.35 4.85 MIA030699080700  WASHER  <A> 20.77 1 0 20.77 1.61 22.38 MIA030699084609  HEX  NUTS  <A> 7.97 3 0 23.91 1.85 25.76 MIA030699080700  WASHER  <A> 20.77 1 0 20.77 1.61 22.38 MATT030699084609  HEX  NUTS  <A> 7.97 3 0 23.91 1.85 25.76 MATT030699084609  HEX  NUTS  <A> 7.97 0 1 -­7.97 -­0.62 -­8.59 DAVID

38.1-­76.32-­6398.7>A<  1S4NTP  246825666467 -­25.50 DAVID38.176.320398.7>A<  1S4NTP  246825666467 25.50 TYLER

Subtotal 92.55

ROOF  +  ATTACHMENTS

Material:

099137600771  UT  2.5  COR  10  <A> 14.00 2 0 28.00 2.17 30.17 SCOTT12474  ROOF  2  1/2”  CORR  10'  GALV 15.17 4 4 0.00 0.00 0.00 MIKE12473  ROOF  2  1/2”  CORR  8'  GALV 12.10 4 4 0.00 0.00 0.00 MIKE12475  ROOF  2  1/2”  CORR  12'  GALV 18.14 2.67 0 48.40 3.75 52.15 MIKE12475  ROOF  2  1/2”  CORR  12'  GALV 18.14 0.33 0 6.02 0.47 6.49 TYLERSubtotal 58.64

Hardware:

315683  STAN  1-­1/2”  ZN  CNR  BRC  4P 2.38 8 8 0.00 0.00 0.00 DAVID43428  1/4”  HEX  NUT  ZINC  COARSE 1.57 1 1 0.00 0.00 0.00 DAVID63408  HELICAL  LOCK  WASHERS 0.13 130 30 13.00 1.01 14.01 DAVID

00.000.050150150.0STUN  XEH  10336 0.00 DAVID215897  1/4”-­20-­2'  ALL  THREAD  PLAT 1.55 1 1 0.00 0.00 0.00 DAVID44584  1/4”-­20-­6'  ALL  THREAD  PLA 3.10 1 1 0.00 0.00 0.00 DAVID44584  1/4”-­20-­6'  ALL  THREAD  PLA 3.10 1 0 3.10 0.24 3.34 SARA44540  1/4”-­20-­1'  ALL  THREAD  PLA 1.01 1 0 1.01 0.08 1.09 SARA315686  STAN  2-­1/2”  ZN  CNR  BRC  4P 2.97 9 9 0.00 0.00 0.00 SARA

Price

Quantity

Returned

Subtotal

Tax

Total

Buyer

67340  GALV   58.000.1104104211.0TUN  XEH   11.85 SARA67343  GALV    FLAT  WASHER 0.12 40 40 0.00 0.00 0.00 SARA67343  GALV    FLAT  WASHER 0.10 0 100 -­10.00 -­0.78 -­10.78 DAVID10643  USS  FLAT  WASHER  1” 0.18 2 0 0.36 0.03 0.39 SARASubtotal 19.90

MISCELLANEOUS

Material:

077089150032  2”  WHTBRSBRSH  <A> 1.15 2 0 2.30 0.18 2.48 SCOTT033287139934  1/4”  TIN  BIT  <A> 3.97 1 0 3.97 0.31 4.28 SCOTT022367568252  GL  EXT  FLT  <A> 19.97 2 0 39.94 3.10 43.04 SCOTT022367568252  GL  EXT  FLT  <A> 19.97 0 1 -­19.97 -­1.55 -­21.52 DAVID071514002293  TURNBUCKLE  <A> 4.94 2 2 0.00 0.00 0.00 DAVID071514005331  3/16”  SWG  SLV  <A> 1.69 4 4 0.00 0.00 0.00 DAVID

00.000.04497.2>A<  TLOB-­U  613200415170 0.00 DAVID61.100.5100305.0>A<  EPOR  ERIW  098964 16.16 DAVID

7001  2X4X96”  TOP  CHOICE  STUD 2.89 7 0 20.23 1.57 21.80 MIKE7001  2X4X96”  TOP  CHOICE  STUD 2.89 5 0 14.45 1.12 15.57 TYLERSubtotal 53.53

Net  Total 387.04Tax 30

Total 417.04

COST  DISTRIBUTION

Team  Member Dues Paid BalanceBenson,  David 52.13 20.42 31.71

52.13 82.91 -­30.78Kelly,  Matt 52.13 116.53 -­64.40Marley,  Sara 52.13 16.67 35.46

52.13 52.99 -­0.86Nelsen,  Scott 52.13 79.96 -­27.83Shannon,  Tyler 52.13 47.56 4.57

52.13 0.00 52.13Total 417.04 417.04 0.00

Hobgood,  Michael

Mulic,  Mia

Sitver,  Ethan

Price

Quantity

Returned

Subtotal

Tax

Total

Buyer

Bike  Shelter  Cost  Summary